2
250 APOLLO DRIVE Chelmsford, Massachusetts 9,366 SF SPACE AVAILABLE FOR LEASE SPACE AVAILABLE Black Oak Property Advisors is pleased to offer 9,366 SF of fully built-out office space for lease in a premiere building campus setting. First floor with lobby identity. 250 Apollo Drive is conveniently located just off of Route 3 and I-495, and is 30 minutes from Logan Airport and Downtown Boston. Nearby hotels include Marriott, Best Western, and Radison. Plentiful retail include Stop & Shop, Kohl’s, Staples, and PetSmart. One International Place, Suite 1400 Boston, MA 02110 3 129 APOLLO DR PROGRESS AVE

Transcript of 250 APOLLO DRIVE€¦ · REFRESH 65 SF BUILDING SPECIFICATIONS Building Area 143,215 RSF Available...

Page 1: 250 APOLLO DRIVE€¦ · REFRESH 65 SF BUILDING SPECIFICATIONS Building Area 143,215 RSF Available Area 9,366 RSF Land Area 10.99 acres Year Built 1986 - As a build to suit for Apollo

250 APOLLO DRIVE Chelmsford, Massachusetts

9,366 SF SPACE AVAILABLE FOR LEASE

SPACE AVAILABLEBlack Oak Property Advisors is pleased to offer 9,366 SF of fully built-out office space for lease in a premiere building campus setting. First floor with lobby identity.

250 Apollo Drive is conveniently located just off of Route 3 and I-495, and is 30 minutes from Logan Airport and Downtown Boston. Nearby hotels include Marriott, Best Western, and Radison. Plentiful retail include Stop & Shop, Kohl’s, Staples, and PetSmart.

One International Place, Suite 1400 Boston, MA 02110

3

129

APOL

LO D

R

PROGRESS AVE

Page 2: 250 APOLLO DRIVE€¦ · REFRESH 65 SF BUILDING SPECIFICATIONS Building Area 143,215 RSF Available Area 9,366 RSF Land Area 10.99 acres Year Built 1986 - As a build to suit for Apollo

TRAINING1,128 SF

STORAGE216 SFOFFICE

105 SF

OFFICE108 SF

OFFICE103 SF

OFFICE99 SF

OFFICE116 SF

OFFICE105 SF

OFFICE105 SF

RECEPTION142 SF

OFFICE107 SF

OFFICE110 SF

CONFERENCE354 SF

OFFICE109 SF

OFFICE109 SF

OFFICE108 SF

PANTRY121 SF

STORAGE73 SF

REFRESH65 SF

BUILDING SPECIFICATIONSBuilding Area 143,215 RSF

Available Area 9,366 RSF

Land Area 10.99 acres

Year Built 1986 - As a build to suit for Apollo Computer, Inc.

Architect CBT/Childs Bertman Tseckares & Casendino, Inc.

Developer Tambone Corporation

Floors 2

Column Spacing 25’ x 25’

Structure Steel frame, brick exterior with concrete foundation and floor slabs

Roof Firestone EDPM fully adhered rubber membrane insulated roof installed 2010

Windows Ribbon windows consisting of insulated glass in bronze anodized aluminum frames

Window Height 52"

Lobbies One (1) two-story atrium lobby located at the center of the building and two (2) two-story atrium lobbies at either end of the building

Cafeteria Attractively designed, full-service cafeteria with seating capacity for approximately 450

Elevator One 2,500-pound capacity hydraulic passenger elevator (Dover); one 8,000-pound capacity hydraulic freight elevator (Dover); cab interior finishes upgraded in 2011

Sprinklers Wet system split into three zones with an alarm check valve

Restrooms Three (3) men/three (3) women per floor

Loading Loading dock area with one dock at rear of building

Power One (1) pad mounted transformer; 3,000 ampere, 480/277 volt, 3 phase, 4 wire

Life Safety Full building wet sprinkler system

Fitness Center Yes, with men’s and women’s showers

Recreation Area Basketball court

250 APOLLO DRIVE | CHELMSFORD, MA

No warranty or representation, express or implied, is made as the accuracy of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, prior sale or lease, or withdrawal without notice.

ECLUSIVE AGENT: Gregory H. Cahill, SIOR | [email protected] | 617.535.7773

One International Place, Suite 1400 Boston, MA 02110

Utilities Water and Sewer: Town of Chelmsford Electric: National Grid Telcom: Verizon Communications

HVAC 100 KW diesel generator for life safety/critical systems. Four (4) roof-mounted air handling units, total capacity 170,000 CFM, replaced in 2012; two (2) central chillers, 250-ton capacity each, replaced in 2011-2012; two cell cooling towers, 350-ton capacity each, replaced in 2007; above-ceiling fan-powered box heating system with hot water generated by three gas-fired high-efficiency condensing boilers, replaced in 2010

Security Win-Pak card access system

Parking Approximately 5.2/1000