24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer...

25
24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES Presented By: James Bryan, P.E. Trag Bailey

Transcript of 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer...

Page 1: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

24” FORCE MAIN BYHDD FOR DALLASWATER UTILITIES

Presented By:James Bryan, P.E.Trag Bailey

Page 2: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Agenda

•Project Overview•Why HDD?•Traffic Control•Construction Footprint•HDD Layout•Construction Photos•Summary

Page 3: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Project Overview

•Location•Scope

• 9 MGD Lift Station• 15,000 LF 24” HDPE

Force Main• 5,000 LF by HDD

•Total Project Cost• $5.5 Million

Page 4: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Project Overview

Page 5: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Why HDD?

•Belt Line Road Corridor•Adjacent Development•Railroad•Traffic•School•Existing Utilities•Visibility

Page 6: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Traffic Control

•Belt Line Road Section• 4-lane Divided• 6-lane Divided

•Maintain minimum two lanes each direction•Rolling lane closures•Phased traffic control plans•Strung pipe out in sections to keep mediansopen

•CTB protection for drill rig overnight; cones forremaining traffic control

Page 7: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Construction Footprint

•Water Tanker Truck•Mud Recycling Trailer•Job/Tool Trailer•Drilling Rig•Excavator•Flatbed Truck•Work Trucks

Page 8: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Project Overview

BELT LINE ROADDART RAILROAD FA

IRW

AYD

R.

TRA CONNECTION

HDD #1

HDD #2

HDD #3

HDD #4

NORTH

BARBARA BUSHMIDDLE SCHOOL

Page 9: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Project Overview

BELT LINE ROAD

DART RAILROAD

HDD #1

HDD #2

ENTRYEXIT

1140 FEET

NORTH

Page 10: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Project Overview

NORTH

BELT LINE ROAD

DART RAILROAD

HDD #2

HDD #3

ENTRY EXIT

890 FEET

HDD #1

Page 11: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Project Overview

NORTH

BELT LINE ROAD

DART RAILROAD

HDD #3ENTRY EXIT

1150 FEET

HDD #2 HDD #4

Page 12: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Project Overview

NORTH

BELT LINE ROAD

DART RAILROAD

HDD #4

ENTRY

EXIT

1060 FEET

FAIR

WAY

DRI

VE

HDD #3

Page 13: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Project Overview

Page 14: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Construction Footprint

•Water Tanker Truck•Mud Recycling Trailer•Job/Tool Trailer•Drilling Rig•Excavator•Flatbed Truck

Page 15: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 16: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 17: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 18: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 19: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 20: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 21: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 22: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 23: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Photos

Page 24: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Summary

•Schedule• 1 month per drill• 4 months total in Belt Line Road corridor

•Coordination success•Minimal disruption and no complaints!•Lessons Learned

• Depth variation/ideal radius• Utility clearance• Drill rig anchoring

Page 25: 24” FORCE MAIN BY HDD FOR DALLAS WATER UTILITIES•Mud Recycling Trailer •Job/Tool Trailer •Drilling Rig •Excavator •Flatbed Truck •Work Trucks Project Overview BELT LINE

Thank You! Any Questions?