Transcript of 242 Material Estimate & Procedure
2
3. Material List & Cost Analysis
4. Equipment Requirements
5. Project Detail (Filter Design)
6-14. Procedural Storyboard
3
Foundation
Item Quantity Price Per
Unit Total Price
8x8x16 CMU Block 4 $1.59 $6.36
<20 lbs Quikrete 1 $4.98 $4.98
5’ Sill Sealer 1 $4.69 $4.69
6” Anchor Bolts 4 $3.09 $12.37
Flooring
Item Quantity Price Per
Unit Total Price
>1’6” Wide Carpet 1 $6.24 $6.24
3/4"x4'x8' OSB 2 $22.97 $45.94
Base Board 7’ 1 $12.52 $12.52
Rebond Carpet Padding (Sq. Ft.) 6 $2.88 $17.28
Wall Components
Item Quantity Price Per
Unit Total Price
2x6x8’ Wood (Frieze, Treated, Sill)
15 $4.21 $63.15
½x4x8’ Plywood 2 $16.17 $32.34
Vinyl Siding 14 $8.47 $118.58
60 sq. ft. Tyvek/Vapor Barrier 1 $43.96 $43.96
35 sq. ft. Gypsum Board 2 $13.30 $13.30
2x10x8’ Wood Header 2 $7.39 $14.78
Roof Components
Item Quantity Price Per
Unit Total Price
2x8x8’ Rafters 2 $5.72 $11.44
25 sq. ft. Shingles 1 $27.50 $27.50
Soffit Vent 1 $1.49 $1.49
Roof Components (Continued)
Item Quantity Price Per Unit
Total Price
2x4x8’ Wood 2 $2.84 $5.68
1”x6” Tongue & Groove Soffit Boards
5 $3.57 $17.85
25 sq. ft. Black Felt/Tar Paper 1 $14.20 $14.20
12’ Drip Edge 1 $4.69 $4.69
Water Runoff
Item Quantity Price Per Unit
Total Price
Gutter Spikes 3 $3.66 $10.97
Downspout 1 $8.34 $8.34
Elbow 3 $2.35 $7.05
Gutter Straps 2 $1.52 $3.04
8’ Gutter Length 1 $5.23 $5.23
4” Vinyl Gutter End Cap 1 $2.97 $2.97
Fasteners
Item Quantity Price Per Unit
Total Price
Box of Nails 1 $2.48 $2.48
Box of Roofing Nails 1 $7.97 $7.97
Box of Drywall Screws 1 $4.37 $4.37
Box of Finishing Nails 1 $1.48 $1.48
Filter
Item Quantity Price Per Unit
Total Price
1x4x8’ Wood 3 $2.04 $6.12
18” Slide Track & Roller 4 $7.49 $29.96
24x36 Glass 2 $13.00 $26.00
Totals
Subtotal $595.32
Tax X 8.25%
Total $644.43
Hand Tools
Framing Hammer
Screwdrivers - Basic Set
Adjustable Wrench
Combination Square
Tin Snips
Utility Knife
Hand Saw
Speed Square
Tape Measure
Level
Pliers
Power Tools
Drill + Bit Set
Miter Saw
Circular Saw
Nail Gun
Compressor
Equipment
Safety Glasses
Calculator
Saw Horse
50’ Extension Cord
Step Ladder
4
5
1: Construct the frame of the filter according to the dimensions of the wall opening.
2: Construct the wooden panels by cutting out slant pieces of a width of 1/2". Then attach
them to a 3" wide frame.
3: Construct a mirror image of the wooden panel to create the second filter piece.
4: Attach the railing rollers to the filter frame in the wall opening.
5: Insert the wooden panels and glass panels in the railing systems to complete the filter.
1 2 3
(1) 4 CMU blocks are arranged in an “L” shaped
pattern to form a base.
(3) Before the Quikrete hardens, 5 anchor
bolts will be placed into the cores of the CMU.
(2) Quikrete is poured into the CMU cores in
preparation of the anchor bolts.
5
(5) 2x10 Headers are placed on top of the sill
plate and toenailed down. The headers should be
flush with the side of the sill plate.
(4) A termite shield and sill sealer is rolled onto the
CMU. The 2x6 sill plate is bolted down to the CMU.
The sill plate should be offset 1/2” from the side of
the CMU so that the sheathing will be flush.
(6) 2x6 joists are attached using 2 joist
hangers. A rear header is attached to stabi-
lize the joists.
4 6
7
8
7 8 9
(7) Attach ¾” OSB Sheathing to Joist System.
(8) Construct the stud wall system. Attach the 2x6
studs to the sole plate according to the location of
the wall opening. Construct the corner system as il-
lustrated in the graphic. Construct the window frame
and attach to the stud wall system.
(9) Attach the sole plate of the stud wall sys-
tem to the floor sheathing.
9
10 11
(10) Attach ½” exterior OSB wall sheathing to the studs.
(11) Attach Tyvek weather barrier to the
exterior OSB wall sheathing.
10
12 13
(12) Attach 2x8 rafter to the double header by cutting a birds
mouth cut into the rafters where needed. Attach the 2x8 frieze
board to the end of rafters. Attach 2x8 lookouts to the rafters
where needed.
(13) Attach the 1x6 tongue and groove soffit boards and
the soffit vent to the underside of the rafters. Attach
3/4” OSB roof sheathing to the top of the rafters.
11
15 14 16
(14) Attach vinyl panel siding to the exterior
walls, and cover corner with edge trim piece.
(15) Attach 1x10 fascia board to frieze board.
Attach gutter system using gutter spikes and
brackets to the fascia board.
(16) Layer OSB roof sheathing with roofing
felt. Attach composite asphalt shingles to the
OSB roof sheathing through the roofing felt.
12
17 18 19
(17) Attach 2x4 ceiling joists to the double
header and rafters.
(18) Attach the gypsum board to the in-
terior wall studs and ceiling joists.
Stretch the carpet pad and carpet to the
floor OSB sheathing.
(19) Attach the base board/trim to the
bottom of the interior walls.
13
20 21 22 23
(20) Construct wooden frame to
the dimensions of the wall opening
insert into wall opening.
(21) Attach interior filter rail
system to the edge of the wall
opening. Insert glass panels
into railing system.
(22) Attach exterior filter rail
system to the edge of the wall
opening. Insert wooden filter
pieces into the railing system.
(23) Attach 2x4 support post to
the rear corner of the construction.