240V reefer outlet repair Tuck San

47
Tuck San’s Reefer Workshop Featuring

Transcript of 240V reefer outlet repair Tuck San

Page 1: 240V reefer outlet repair Tuck San

Tuck San’s Reefer Workshop

Featuring

Page 2: 240V reefer outlet repair Tuck San
Page 3: 240V reefer outlet repair Tuck San
Page 4: 240V reefer outlet repair Tuck San

I cannot recall the particulars of this case as it

occurred over 1 year ago already. Definitely salt water

entering gang box either through bad or missing gasket

or a warped frame.

Break it down

The circuit breaker lugs were all frozen

Page 5: 240V reefer outlet repair Tuck San

So the wires had to be cut

Page 6: 240V reefer outlet repair Tuck San

Remove retaining ring from its groove with a flat

screwdriver

Page 7: 240V reefer outlet repair Tuck San

Spring compression retaining ring for interlock release

Page 8: 240V reefer outlet repair Tuck San

Pull down on on/off plunger to remove spring,

interlock mechanism and plunger

Page 9: 240V reefer outlet repair Tuck San
Page 10: 240V reefer outlet repair Tuck San

Remove the 4 screws securing breaker handle

actuator unit, top plate and breaker to frame. Lift off

breaker with actuator unit and ground pin.

Page 11: 240V reefer outlet repair Tuck San

Observe alignment with circuit breaker handle as it is

removed. Be careful not to disturb cam positioning

inside actuator. The plastic housing can separate.

Page 12: 240V reefer outlet repair Tuck San
Page 13: 240V reefer outlet repair Tuck San
Page 14: 240V reefer outlet repair Tuck San
Page 15: 240V reefer outlet repair Tuck San

Remove brass receptacle housing

Page 16: 240V reefer outlet repair Tuck San
Page 17: 240V reefer outlet repair Tuck San

And remove receptacle from brass housing

Page 18: 240V reefer outlet repair Tuck San

Stainless steel and brass clean up nicely. The brass is a

little more work but is necessary for the new receptacle

to slide into the bore. Wire brush and medium grain

crocus cloth work well. Some brass housings have a

groove at base end for a retaining ring which needs to

be scraped and brushed clean.

Once brass housings are polished clean a thick coating

of LPS 3 left to dry overnight will keep the creeping

corrosion at bay.

Page 19: 240V reefer outlet repair Tuck San
Page 20: 240V reefer outlet repair Tuck San

Reassemble The top 1/3 at flange end of the brass housing internal

bore needs to be super clean for an easy fitting of new

receptacle so only apply a light coat of LPS 3 if any here.

Below the receptacle resting ledge a thick layer will be

good.

Dow Corning 111 valve lubricant and sealant works

well on internal bore as well as Molykote 55 o-ring

grease around receptacle o-ring. This will extend the life

of your module and reduce your maintenance load.

Page 21: 240V reefer outlet repair Tuck San
Page 22: 240V reefer outlet repair Tuck San
Page 23: 240V reefer outlet repair Tuck San

To prepare the receptacle wires for a quick and

smooth installation into the circuit breaker lugs they

must be shaped for a compressible helical spiral. The

wires are thick stranded gauge so a 3/8 closed end

wrench can be slipped over for bending leverage.

Page 24: 240V reefer outlet repair Tuck San

Do not try to cut the wires to length because

the circuit breaker lugs are not in direct

alignment with receptacle.

Page 25: 240V reefer outlet repair Tuck San

Install receptacle into brass housing aligning tab at

base of receptacle with notch in brass housing flange.

This prevents rotation of receptacle within housing.

After shaping the wires, the ends will need to be

trimmed flat or the contact surface between wire and

lug will be reduced. Poor contact area will result in

overheating and reduced life of circuit breaker and

receptacle.

Page 26: 240V reefer outlet repair Tuck San
Page 27: 240V reefer outlet repair Tuck San
Page 28: 240V reefer outlet repair Tuck San
Page 29: 240V reefer outlet repair Tuck San
Page 30: 240V reefer outlet repair Tuck San

Reassemble circuit breaker actuator to circuit

breaker.

Page 31: 240V reefer outlet repair Tuck San

With circuit breaker switch in off position align circuit

breaker switch handle with actuator mechanism.

Install circuit breaker and secure to frame with the 4

screws.

Lightly lubricate receptacle mating gasket with 111

and place over housing flange.

While guiding actuator ground plunger into bore of

receptacle ground pin insert wires into circuit breaker

lugs being careful not to bend any wire strands.

Tighten lugs. Bend the B phase wire to the side to

allow free movement of ground pin plunger.

Tighten the 4 receptacle housing screws evenly until

gasket touches frame plus ¼ turn or so being careful not

to squeeze out the gasket.

Page 32: 240V reefer outlet repair Tuck San
Page 33: 240V reefer outlet repair Tuck San
Page 34: 240V reefer outlet repair Tuck San
Page 35: 240V reefer outlet repair Tuck San
Page 36: 240V reefer outlet repair Tuck San
Page 37: 240V reefer outlet repair Tuck San
Page 38: 240V reefer outlet repair Tuck San

With circuit breaker and receptacle secured, bench test

for smooth operation.

Page 39: 240V reefer outlet repair Tuck San
Page 40: 240V reefer outlet repair Tuck San
Page 41: 240V reefer outlet repair Tuck San

To reassemble on/off plunger first place interlock

release mechanism in position on its actuator.

Page 42: 240V reefer outlet repair Tuck San

The sliding cam actuated block mounted on circuit

breaker is aligned with plunger in interlock release

mechanism.

With o-ring and shaft greased, insert on/off plunger

through faceplate and interlock release.

The cam actuated release plunger will interact with

deep groove in on/off plunger shaft.

Page 43: 240V reefer outlet repair Tuck San
Page 44: 240V reefer outlet repair Tuck San

Place spring into position into guides above interlock

release

Page 45: 240V reefer outlet repair Tuck San

Push on/off plunger up through interlock release, spring

and guides until groove for retaining ring is visible

above interlock release mechanism.

Page 46: 240V reefer outlet repair Tuck San

And insert ring between release mechanism and spring

Page 47: 240V reefer outlet repair Tuck San

The module is now complete and is ready for testing

in same manner as shown in 480V version with ohm

and meggar meter test equipment before installation

for use.