Government of Maharashtra SEAC-III-2014/C.R.140/TC-3 Environment department Room No. 217, 2nd floor, Mantralaya Annexe, Mumbai- 400 032. Dated: ll,h March, 2015. To, Superintending Engineer Nagpur Improvement Trust Address: Station Road, Sadar, Nagpur. 440001. Subject: Environment clearance for Proposed affordable Housing Scheme for LIG and MIG category on NIT land bearing Kh.No.54, City Survey Nol73 Mouza- Wathoda, Middle Ring Road, Sheshnagar, Dist.Nagpur by M/s. Nagpur Improvement Trust. This has reference to your communication on the above mentioned subject. The proposal was considered as per the EIA Notification - 2006, by the State Level Expert Appraisal Committee-Ill, Maharashtra in its 23ld meeting and recommend the project for prior environmental clearance to SEIAA. Information submitted by you has been considered by State Level Environment Impact Assessment Authority in its 81s1 meeting. 2. It is noted that the proposal is considered by SEAC-III under screening category 8(a) B2 as per EIA Notification 2006. Brief Information of the project submitted by you is as- Name of Project Proposed Affordable Housing scheme for LIG and MIG income group on NIT Land bearing Kh. No. 54, City Survey No. 173 Mouza - Wathoda, Sheshnagar Middle Ring Road, Nagpur. Project Proponent Superintending Engineer Nagpur Improvement Trust Consultant Pollution & Ecology Control Services Type of project: Housing project / Industrial Estate / SRA scheme / MHADA / Township or others Building and Construction Project 8(a) Housing Project LIG& MIG Location of the Project KH. No. 54 ,City Survey No. 173 Middle Ring Road Near Sheshnagar, Nagpur Maharashtra Whether in Corporation / Municipal / other area Nagpur Municipal Corporation area _1_

Transcript of 23ld - nitnagpur.org

Page 1: 23ld - nitnagpur.org

Government of Maharashtra

SEAC-III-2014/C.R.140/TC-3Environment departmentRoom No. 217, 2nd floor,Mantralaya Annexe,Mumbai- 400 032.Dated: ll,hMarch, 2015.

To,

Superintending EngineerNagpur Improvement TrustAddress: Station Road, Sadar, Nagpur. 440001.

Subject: Environment clearance for Proposed affordable Housing Scheme for LIG andMIG category on NIT land bearing Kh.No.54, City Survey Nol73 Mouza-Wathoda, Middle Ring Road, Sheshnagar, Dist.Nagpur by M/s. NagpurImprovement Trust.

This has reference to your communication on the above mentioned subject. The proposalwas considered as per the EIA Notification - 2006, by the State Level Expert AppraisalCommittee-Ill, Maharashtra in its 23ld meeting and recommend the project for priorenvironmental clearance to SEIAA. Information submitted by you has been considered by StateLevel Environment Impact Assessment Authority in its 81s1 meeting.

2. It is noted that the proposal is considered by SEAC-III under screening category 8(a) B2 asper EIA Notification 2006.

Brief Informationof the project submitted by you is as-

Name of Project

Proposed Affordable Housing scheme for LIG andMIG income group on NIT Land bearing Kh. No.54, City Survey No. 173 Mouza - Wathoda,Sheshnagar MiddleRingRoad,Nagpur.

Project ProponentSuperintending EngineerNagpur Improvement Trust

Consultant Pollution& Ecology Control Services

Type of project: Housing project /Industrial Estate / SRA scheme /MHADA / Township or others

Building and Construction Project 8(a)Housing Project LIG& MIG

Location of the ProjectKH.No. 54 ,City Survey No. 173Middle RingRoadNear Sheshnagar,Nagpur Maharashtra

Whether in Corporation / Municipal /other area Nagpur Municipal Corporation area

_1_

Page 2: 23ld - nitnagpur.org

Applicability of the DCRYes - Development Control Regulation ( DCR)For Nagpur City

IOD/IOA/Concession document orany other form of document asapplicable(Clarifying its conformitywith local planning rules &provision)

Approved layout plan and building plan vide letterno. B. E. (East) / 1550 dated 18/06/2014 (Copyattached)

Note on the Initiated work (Ifapplicable)

Plain land, construction not started

LOI / NOC from MHADA / Otherapprovals (If applicable)

Not applicable

Total Plot Area (sq. m.)DeductionsNet Plot area

Land area as per Khasrano. 54, city survey no. 173

19221.870

Land area as per site ofKh.No. 54

13365.206

Less tangent area 65.410Less road widening area 141.467Net land area 13158.32915% open area 1973.749

Net plot area fordevelopment

9868.747

Permissible FSI (includingTDR etc.) 2.5

Proposed Built-up Area (FSI )NON FSITotal ( FSI+ NON FSI)

24667.227 Sqm.19632.556 Sqm.44299.783 Sqm.

Ground-coverage Percentage (%)(Note: Percentage of plot not open tosky)

28%

Estimated Cost of the Project Rs. 85 Crores (approx.)

No. of building & its configuration(s)

ResidentialBuildings

Nos. of floors No. of flats

Building typeA,B,C,

(WING-1)

Basement +Stilt +Tenth

floor140

Building typeD,E,F, (Wing-

2)

Basement +Stilt +Tenth

floor140

Building typeG,H,I,

(Wing 3)

Basement +stilt + Seventh

floor84

Building typeJ,K,H

Basement +stilt + Seventh

] floor84

Number of tenaments and shops Housing tenements - 448 Nos. for LIG and M1G

-2-

Page 3: 23ld - nitnagpur.org

Income group.Convenience shopping center4 Nos. of area 247 .00 sqm.

Number of expected residents /usersResidential Users: 2464 .00 Nos.

Commercial Users: 50.00 Nos.

Tenement density per hector 335 per hectorHeight of the building(s) 37.50 m (Maximum)

Right of way (Width of the roadfrom the nearest fire station to theproposed building (s))

12 m. wide.

Turning radius for easy access of firetender movement from all around thebuilding excluding the width for theplantation

9 m.wide.

Total Water Requirement

Residential : 322 KLDDry season :Source : Fresh Water will be supplied by NMC

• Freshwater : 205KLD

• Recycled water (Flushing) : 103 KLD

• Recycled water (Gardening) : 14 KLD

• HVAC Makeup :Not applicable• Total Fresh water Requirement :205 KLD

• Excess treated water : 67 KLD

• Swimming Pool :Not applicable

• Fire fighting (Cum) : 125 KL

Wet Season :

• Residential :3 13 KLD

• Freshwater :205 KLD

• Recycled water(Flushing) : 105 KLD

• Recycled water(Gardening) :5 KLD

• HVAC Makeup :Not applicable

• Total Fresh water Requirement :205 KLD

• Firefighting(Cum) :125 ICL

Rain Water Harvesting(RWH)

® Level of the Ground water table:Depth of groundwater table: About 5 m belowground level

• Size and no of RWH tank (s) and Quantity : 12Nos. 3.46m X 1.50m

• Capacity ofRWH tanks :500 m3• Location of the RWH tank (s): As shown in

drawings

• No of recharge pits: 12.00 Nos.

• Budgetary allocation (Capital cost and O&Mcost) :

Capital cost :Rs.50.00 LacsO&M Cost :Rs. 3.00 Lacs

;

:

Page 4: 23ld - nitnagpur.org

The rain water harvesting details are attached as

UGT tanks

Residential:Domestic UG tank Capacity: 300 cum.Flushing UG tank : 175cumCapacity : Fire UG tank- 125 cumCommercial :Domestic UGtank Capacity :Not applicableFlushingUG tankCapacity : Fire UG tank :Capacity : Liters_

Stonn water drainage

» Natural water drainage pattern: Strom waterdrains will be provided along with the internalroads over the site to meet the expected increasein the runoff during the rainy season due to theimpervious nature of the roof.

e Quantity of stonn water :

• Size of SWD :

Stonn water generated on site will be harvestedfor ground water recharge._

Sewage and Wastewater

e Residential :® Sewage generation(CMD) : 247 m3/day• Capacity of STP (CMD) : 275 m3/day« STP technology :Phytorid technology® DG sets (during emergency) Residential,

commercial & Club House: DG set back upis provided during emergency and allpollution control devices.

® Budgetary allocation (Capital cost and O&Mcost) :

® Capital Cost: Rs. 50 Lacs

• O&M Cost :Rs. 0.7 Lacs/year_

Solid waste Management

Waste generation in the pre Construction andConstruction phase:ÿQuantity of the top soil to be preserved:ÿDisposal of the construction way debris:Unusable, excess construction debris will bedisposed at designated places in tune with thelocal norms.

Waste generation in the operation phaseTotal solidwaste (Kg)

60% dry solid

waste (Kg)

40% wet solidwaste (Kg)

1120 672 448

Residential &commercial :

• Biodegradable waste :® Non-Biodegradable waste

-4-

Page 5: 23ld - nitnagpur.org

E-waste :Not applicableHazardous waste :Biomedical waste (Kg/month) (Ifapplicable) :Not applicableSTP sludge (Dry Sludge) :mix with wet waste and compost

Mode of Disposal of waste:

• Dry waste:

• Wet waste:

• E-waste:

• Hazardous waste:

• Biomedical waste

(Kg/month) (Ifapplicable):• STP sludge:

-\

J

Area requirement:1. Location(s) :

2. Total area provided for the storage &Treatment of the solid waste: 100 Sqm.

The solid wastes generated will be segregatedinto organic and inorganic components andcollected in separate bins. The organicbiodegradable wastes (waste vegetables, foodsetc.) will be treated by composting method andin organic transferred into a designated solidwaste collection point for disposal by municipalauthority.

3. Budgetary allocation (capital Cost & O&Mcost) :Capital Cost :Rs. 50 LacsO&M cost :Rs. 1 Lacs/year_

Green Belt Development

TotalRGarea:15% of total plot area (1973.749 Sq.m)

• Number & list of trees species to be planted in the ground RG : As shown in drawingof Amenities provided in RG area

List of Proposed Plantation for the scheme : As shown on drawing of Landscaping

No. BotanicalName

Common Name Qty. Characteristics&EcologicalImportance

Azardirachta inclica Neem 17 Dense ,EvergreenFicns Benghalensis Bargad,(Wad) Large, Dense,

-5-

Page 6: 23ld - nitnagpur.org

Evergreen3. Terminalia Arjuna Arjuna 3 semi-deciduous,

Medium

4. Polyalthia Pendula Ashoka 12 Evergreen, small5. Mangifera Inclica Amba 10 Large, Dense ,

Evergreen6. Syzygiam Cuminii Jambhul 10 semi-deciduous,

Medium7. Saraca Asoca Ashoka 36 Evergreen, small8. Dalbergia Latifolia Shisam 43 Large,Dense ,

Evergreen9. Michelia Chcimpaka Soan Chafa 5 Large, Dense ,

Evergreen10 Anthcephalus

CadambaKadamb 4 semi-deciduous,

Medium, tall11. Furcrata Gigantia Furcurea 10 succulent garden

ornamental.12. Delonix Regia Gulmohar 14 Deciduous, Large13. Ficus Benjamina Fig 6 Deciduous, Large14. Rosassea Rose 20 Flowers garden

ornamental.15. Tecoma Gaiidichaudi Gaudichavdi 26 Yellow flowers garden

ornamental.16. Murrya Paniculat Orange

Jessamine113 evergreen plant

bearing small, white,scented flowers gardenornamental.

17. Dracaena Fragrans Com Plant 10 slow growing shrub,evergreen with whitecolor flowers, gardenornamental.

18. Thespesia Populnea Indian Tulip 45 semi-deciduous,small.

19. Terminalia Elliptica Indian Laurel(Ain)

4 Deciduous trees

20. Acalypha Hillcesiana Copper Lea 45 evergreen shrub gardenornamental.

21. Papaver Rhoeas Red Poppy 70 flowering plant gardenornamental.

22. Erythrina Suberose Pangara 5 flowering tree

23. Ixora Chinesis Rosea Rugmini 12 flowering plant gardenornamental.

24. Golden Duranta Golden Duranta 47 evergreen gardenornamental.

25. Catharanthns Rosens Sdabhar 30 Evergreen herbsThe flowers are whiteto dark pink with adarker red centre

26. Asparagus Shatavari 55 spring vegetable, a

-6-

Page 7: 23ld - nitnagpur.org

*flowering perennial ,garden ornamental.

27.ChrysanthemumMaximum, Eucalyptus,Tagetes

Flower Bed 100 floweringplant gardenornamental.

Flower Bed 100 flowering plant gardenornamental.

Flower Bed 100 flowering plant gardenornamental.

Total trees 786

• NOC for the tree cutting / transplantation / Compensatory plantation, if any : NR

Budgetaiy allocation (capital Cost & O &M Cost) :Capital Cost : Rs.100 lacsO & M :Rs. 5 LacsEnergy Power Supply:

Source :Maharashtra State Electricity DistributionCompany Limited (MSEDCL)ÿTotal DG power consumption for

residential buildings =5826 KWH/DAY

ÿTotal DG power consumption for club house andcommercial buildings =Nil

ÿ Energy saving measures: Solar system

Lighting SchemeFor parking area

For staircase and lobby

For street lightsSolar Energy Utilization

Source of ElectricitySupply_Total Connected LoadTotal Maximum DemandTotal estimated energyrequirement of commonareas + residentialtenementsNet energy saving byenergy conservationmethodNet energy requirementsfor common areasOther energy conservationmeasures

CFL/T-5 lampswith timer /sensorcontrolSolar PV GeneratorMNRE solar streetlight fittings_For water heating& staircase & lobbylighting_MSEDCL

1986 KW1390 KW7962 KWH/Day

1153KWH/Day

6809

Maximum useof daylight

-7-

Page 8: 23ld - nitnagpur.org

® Use of energyefficient devices

® Optimumbuildingorientation

9 ECBC Yes10 DG Sets 40ICVA x 6

30 KVA x 611 Fuel requirement 72 liters/hour12 Transformer 630 KVA x 3 nos.

Energy Efficient Features:

Total Solar PV System 12KW18 Nos. MNRE streetlights

1.8 KW

CFL 12.70 KWEnergy efficientfluorescent light

13.30

Trough solar waterheating for 448 tenements

720

Total Energy saving 1153 KWH/Day(percentage saving 16.93)

ÿ Maximum utilization ofnatural lightB CFL & T-5 lighting fixtures in the common areas

and True lite fluorescent lamps inbasementsÿ Energy efficient HVAC systems to maintain indoor

air quality.ÿ Appropriate thermal insulation in walls and roofs to

reduce heat gain and lossÿ Glazing Glass: to keep the Uvalue as per ECBCÿ External glazing will be below 40% of the total

vertical surface as per ECBC.

® The following Energy Conservation ;

Methods are proposed in the project :ÿ Solar water system for Hot water andÿ Solar lighting for common areas ofbuildings and

street light

® Detail calculations &%of saving :17

Compliance of the CB C guidelines : (Yes/No) (Ifyes then submit compliance in tabular fonn) :

® Budgetary allocation (Capital cost and 0 & M cost) :Capital Cost :Rs. 2.5 Crores0 & M Cost :Rs. 20 Lacs.

-8-

Page 9: 23ld - nitnagpur.org

Environmental Management plan Budgetary Allocation:During Construction Phase:

During Operation Phase:

Description

EMPDuringOperation

Phase

Approximate Capital

Cost(Rs inLacs) InPhases

Approximate Recurring

Cost/Annum/Rs inLacs)/

Phase

Sewage Treatment Plant/Effluent Treatment Plant

50.00 0.70

Air Pollution ControlManagement

10.00 2.00

Solid and hazardous wastemanagement

50.00 1.00

RainWater Harvesting 50.00 3.00

Tree plantation 100.00 5.00

Total 260.0011.70

Traffic ManagementTraffic Management Plan at the Entry & Exit to the Project Site :The Project area is well connected to the Middle Ring Road. The increase in traffic due tothe project is marginal compared to the existing high volume of traffic in the area, andtherefore the impact will be marginal. Internal roads will be provided within the building.The traffic management plan for the project is given below:Parking Statement___

Sr.No

ParkingLevel

ParkingAreaprovided(Sqm.)

CarScooter

Cycle

Parkingspaces as perMOEFconstructionManualSqm./car

Actual carparkingspacesSqm./car

1Basement parking

4535.195 Nil 537 219 35 Nil

2Stiltparking

4527.30 113 193 81 30 33.935

oJ

Openparking 3550.563 69 Nil 430 25 42.191

Total 12613.058 182 730 730

ParkingArea Calculation Statement

S.No. Type Of Parking Nos.PerUnitArea

TotalArea

Actual CarParkingAreaSqm./Car

-9-

Page 10: 23ld - nitnagpur.org

Stilt Parking Area

Cycle Park InStilt 81 1.44 116.64

Scooter Park In Stilt 192 3.00 576

Cars Park InStilt Area 113

D Stilt ParkingArea 4527.30

6 M& 3m Wide Pavement Area 1469.4

Total Stilt Area For Car Parking 3834.66 33.935

Open Space Parking Statement

Cars Park InOpen Area 69

Cycle Park InOpen 444 1.44 639.36

E Total Open Space Of Site13365.206

Less Area

BuildingCoverage 3749.465

Open Space 1973.749

6.5 MWide Approach Road Area 2249.315

6 M & 3m Wide Approach RoadArea

1469.42

Ramp Area 372.694

Open Cycle ParkingArea 639.36

Open Scooter ParkingArea 0

Total Deductions10454.003

Total Net Open Space For CarsParking

2911.203 42.191

3. The proposal has been considered by SEIAA in its 81st meeting & decided to accordenvironmental clearance to the said project under the provisions of Environment ImpactAssessment Notification, 2006 subject to implementation of the following terms andconditions :

General Conditions for Pre- construction phase:-

(i) This environmental clearance is issued subject to utilization of excess treated water.(ii) This environmental clearance is issued subject to condition that rain water harvesting

calculations shall be based on geotechnical report which shall be followed in letterand spirit.

(iii) This environmental clearance is issued subject to land use verification. Localauthority / planning authority should ensure this with respect to Rules, Regulations,Notifications, Government Resolutions, Circulars, etc. issued if any.Judgments/orders issued by Hon'ble High Court, Hon'ble NGT, Hon'ble Supreme

-10-

Page 11: 23ld - nitnagpur.org

Court regarding DCR provisions, environmental issues applicable in this mattershould be verified. PP should submit exactly the same plans appraised by concernSEAC and SEIAA. If any discrepancy found in the plans submitted or detailsprovided in the above para may be reported to environment department. Thisenvironmental clearance issued with respect to the environmental consideration and itdoes not mean that State Level Impact Assessment Authority (SEIAA) approved theproposed land use.

(iv) Occupation certificate shall be issued to the project only after ensuring availability ofdrinking water and connectivity of the sewer line to the project site.

(v) STP capacity shall be increased appropriately considering waste water generation.(vi) This environmental clearance is issued subject to obtaining NOC from Forestry &

Wild life angle including clearance from the standing committee of the NationalBoard for Wild life as if applicable & this environment clearance does not necessarilyimplies that Forestry & Wild life clearance granted to the project which will beconsidered separately on merit.

(vii) PP has to abide by the conditions stipulated by SEAC & SEIAA.(viii) The height, Construction built up area of proposed construction shall be in accordance

with the existing FSI/FAR norms of the urban local body & it should ensure the samealong with survey number before approving layout plan & before accordingcommencement certificate to proposed work. Plan approving authority should alsoensure the zoning pennissibility for the proposed project as per the approveddevelopment plan of the area.

(ix) "Consent for Establishment" shall be obtained from Maharashtra Pollution ControlBoard under Air and Water Act and a copy shall be submitted to the Environmentdepartment before start of any construction work at the site.

(x) All required sanitary and hygienic measures should be in place before startingconstruction activities and to be maintained throughout the construction phase.

General Conditions for Construction Phase-

(i) Provision shall be made for the housing of construction labour within the site withall necessary infrastructure and facilities such as fuel for cooking, mobile toilets,mobile STP, safe drinking water, medical health care, creche and First Aid Roometc.

(ii) Adequate drinking water and sanitary facilities should be provided for constructionworkers at the site. Provision should be made for mobile toilets. The safe disposalof wastewater and solid wastes generated during the construction phase should be •

ensured.(iii) The solid waste generated should be properly collected and segregated, dry/inert

solid waste should be disposed off to the approved sites for land filling afterrecovering recyclable material.

(iv) Disposal of muck during construction phase should not create any adverse effect onthe neighboring communities and be disposed taking the necessary precautions forgeneral safety and health aspects of people, only in approved sites with the approvalof competent authority.

(v) Arrangement shall be made that waste water and storm water do not get mixed.(vi) All the topsoil excavated during construction activities should be stored for use in

horticulture / landscape development within the project site.(vii) Additional soil for leveling of the proposed site shall be generated within the sites

(to the extent possible) so that natural drainage system of the area is protected andimproved.

-11-

Page 12: 23ld - nitnagpur.org

(viii) Green Belt Development shall be earned out considering CPCB guidelinesincluding selection of plant species and in consultation with the local DFO/Agriculture Dept.

(ix) Soil and ground water samples will be tested to ascertain that there is no threat toground water quality by leachingof heavy metals and other toxic contaminants.

(x) Construction spoils, including bituminous material and other hazardous materialsmust not be allowed to contaminate watercourses and the dumpsites for suchmaterial must be secured so that they should not leach into the ground water.

(xi) Any hazardous waste generated during construction phase should be disposed off asper applicable rules and nonns with necessary approvals of the MaharashtraPollution Control Board.

(xii) The diesel generator sets to be used during construction phase should be lowsulphur diesel type and should conform to Environments (Protection) Rulesprescribed for air and noise emission standards.

(xiii) The diesel required for operating DG sets shall be stored in underground tanks andif required, clearance from concern authority shall be taken.

(xiv) Vehicles hired for bringing construction material to the site should be in goodcondition and should have a pollution check certificate and should conform toapplicable air and noise emission standards and should be operated only duringnon-peak hours.

(xv) Ambient noise levels should conform to residential standards both during day andnight. Incremental pollution loads on the ambient air and noise quality should beclosely monitored during construction phase. Adequate measures should be made toreduce ambient air and noise level during construction phase, so as to conform tothe stipulated standards by CPCB/MPCB.

(xvi) Fly ash should be used as building material in the construction as per the provisionsof Fly Ash Notification of September 1999 and amended as on 27th August, 2003.(The above condition is applicable only if the project site is located within thelOOKm ofThermal Power Stations).

(xvii) Ready mixed concrete must be used inbuilding construction.(xviii) The approval of competent authority shall be obtained for stiuctural safety of the

buildings due to any possible earthquake, adequacy of fire fighting equipments etc.as per National Building Code including measures from lighting.

(xix) Storm water control and its re-use as per CGWB and BIS standards for variousapplications.

(xx) Water demand during construction should be reduced by use of pre-mixed concrete,curing agents and other best practices referred.

(xxi) The ground water level and its quality should be monitored regularly in consultationwith Ground Water Authority.

(xxii) The installation of the Sewage Treatment Plant (STP) should be certified by anindependent expert and a report in this regard should be submitted to the MPCB andEnvironmenent department before the project is commissioned for operation.Discharge of this unused treated affluent, if any should be discharge in the sewerline. Treated effluent emanating from STP shall be recycled/refused to themaximum extent possible. Discharge of this unused treated affluent, if any shouldbe discharge in the sewer line. Treatment of 100% gray water by decentralizedtreatment should be done. Necessary measures should be made to mitigate theodour problem from STP.

(xxiii) Permission to draw ground water and construction of basement if any shall beobtained from the competent Authority prior to construction/operation of theproject.

-12-

Page 13: 23ld - nitnagpur.org

(xxiv) Separation of gray and black water should be done by the use of dual plumbing linefor separation of gray and black water.

(xxv) Fixtures for showers, toilet flushing and drinking should be of low flow either byuse of aerators or pressure reducing devices or sensor based control.

(xxvi) Use of glass may be reduced up to 40% to reduce the electricity consumption andload on air conditioning. If necessary, use high quality double glass with specialreflective coating in windows.

(xxvii) Roof should meet prescriptive requirement as per Energy Conservation BuildingCode by using appropriate thermal insulation material to fulfill requirement.

(xxviii)Energy conservation measures like installation of CFLs /TFLs for the lighting theareas outside the building should be integral part of the project design and should bein place before project commissioning. Use CFLs and TFLs should be properlycollected and disposed off/sent for recycling as per the prevailing guidelines/rulesof the regulatory authority to avoid mercury contamination. Use of solar panels maybe done to the extent possible like installing solar street lights, common solar water

heaters system. Project proponent should install, after checking feasibility, solarplus hybrid non conventional energy source as source of energy.

(xxix) Diesel power generating sets proposed as source of back up power for elevators andcommon area illumination during operation phase should be of enclosed type andconform to rules made under the Environment (Protection) Act, 1986. The height ofstack of DG sets should be equal to the height needed for the combined capacity ofall proposed DG sets. Use low sulphur diesel. The location of the DG sets may bedecided with in consultation with Maharashtra Pollution Control Board.

(xxx) Noise should be controlled to ensure that it does not exceed the prescribedstandards. During nighttime the noise levels measured at the boundary of thebuilding shall be restricted to the pennissible levels to comply with the prevalentregulations.

(xxxi) Traffic congestion near the entry and exit points from the roads adjoining theproposed project site must be avoided. Parking should be fully internalized and nopublic space should be utilized.

(xxxii) Opaque wall should meet prescriptive requirement as per Energy ConservationBuilding Code, which is proposed to be mandatory for all air-conditioned spaceswhile it is aspirational for non-air-conditioned spaces by use of appropriate thennalinsulation material to fulfill requirement.

(xxxiii) The building should have adequate distance between them to allow movement offresh air and passage of natural light, air and ventilation.

(xxxiv)Regular supervision of the above and other measures for monitoring should be inplace all through the construction phase, so as to avoid disturbance to thesurroundings.

(xxxv) Under the provisions of Environment (Protection) Act, 1986, legal action shall beinitiated against the project proponent if it was found that construction of theproject has been started without obtaining environmental clearance.

(xxxvi)Six monthly monitoring reports should be submitted to the Regional office MoEF,Bhopal with copy to this department and MPCB.

General Conditions for Post- construction/operation phase-

-13-

Page 14: 23ld - nitnagpur.org

(i) Project proponent shall ensure completion of STP, MSW disposal facility, green beltdevelopment prior to occupation of the buildings.As agrred during the SEIAAmeeting, PP to explore possibility ofutilizingexcess treated water in the adjacent areafor gardening before discharging it into sewer line No physical occupation orallotment will be given unless all above said environmental infrastructure is installedand made functional including water requirement in Para 2. Prior certification fromappropriate authority shall be obtained.

(ii) Wet garbage should be treated by Organic Waste Converter and treated waste(manure) should be utilized in the existing premises for gardening. And, no wetgarbage will be disposed outside the premises. Local authority should ensure this.

(iii) Local body should ensure that no occupation certification is issued prior to operationof STP/MSW site etc. with due permission ofMPCB.

(iv) A complete set of all the documents submitted to Department should be forwarded tothe Local authority and MPCB.

(v) In the case of any change(s) in the scope of the project, the project would require afresh appraisal by this Department.

(vi) A separate environment management cell with qualified staff shall be set up forimplementation of the stipulated environmental safeguards.

(vii) Separate funds shall be allocated for implementation of environmental protectionmeasures/EMP along with item-wise breaks-up. These cost shall be included as partof the project cost. The funds earmarked for the environment protection measuresshall not be diverted for other purposes and year-wise expenditure should reported tothe MPCB & this department.

(viii) The project management shall advertise at least in two local newspapers widelycirculated in the region around the project, one of which shall be in the Marathilanguage of the local concerned within seven days of issue of this letter, informingthat the project has been accorded environmental clearance and copies of clearanceletter are available with the Maharashtra Pollution Control Board and may also beseen at Website at http://ec.maharashtra.gov. in.

(ix) Project management should submit half yearly compliance reports in respect of thestipulated prior environment clearance terms and conditions in hard & soft copies tothe MPCB & this department, on 1st June & 1st December of each calendar year.

(x) A copy of the clearance letter shall be sent by proponent to the concerned MunicipalCorporation and the local NGO, if any, from whom suggestions/representations, ifany, were received while processing the proposal. The clearance letter shall also beput on the website of the Company by the proponent.

(xi) The proponent shall upload the status of compliance of the stipulated EC conditions,including results of monitored data on their website and shall update the sameperiodically. It shall simultaneously be sent to the Regional Office of MoEF, therespective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely;SPM, RSPM. SO2, NOx (ambient levels as well as stack emissions) or critical sectorparameters, indicated for the project shall be monitored and displayed at a convenientlocation near the main gate of the company in the public domain.

(xii) The project proponent shall also submit six monthly reports on the status ofcompliance of the stipulated EC conditions including results of monitored data (bothin hard copies as well as by e-mail) to the respective Regional Office of MoEF, therespective Zonal Office of CPCB and the SPCB.

(xiii) The environmental statement for each financial year ending 31st March in Form-V asis mandated to be submitted by the project proponent to the concerned State PollutionControl Board as prescribed under the Environment (Protection) Rules, 1986, asamended subsequently, shall also be put on the website of the company along with the

-14-

Page 15: 23ld - nitnagpur.org

5.

6.

7.

8.

9.

status of compliance of EC conditions and shall also be sent to the respectiveRegional Offices of MoEF by e-mail.

The environmental clearance is being issued without prejudice to the action initiated underEP Act or any court case pending in the court of law and it does not mean that projectproponent has not violated any environmental laws in the past and whatever decisionunder EP Act or of the Hon'ble court will be binding on the project proponent. Hence thisclearance does not give immunity to the project proponent in the case filed against him, ifany or action initiated under EP Act.

In case of submission of false document and non compliance of stipulated conditions,Authority/ Environment Department will revoke or suspend the Environmental Clearancewithout any intimation and initiate appropriate legal action under EnvironmentalProtection Act, 1986.

The Environment department reserves the right to add any stringent condition or to revokethe clearance if conditions stipulated are not implemented to the satisfaction of thedepartment or for that matter, for any other administrative reason.

Validity of Environment Clearance: The environmental clearance accorded shall bevalid for a period of 5 years.

In case of any deviation or alteration in the project proposed from those submitted to thisdepartment for clearance, a fresh reference should be made to the department to assess theadequacy of the condition(s) imposed and to incorporate additional environmentalprotection measures required, if any.

The above stipulations would be enforced among others under the Water (Prevention andControl of Pollution) Act, 1974, the Air (Prevention and Control of Pollution ) Act, 1981,the Environment (Protection) Act, 1986 and rules there under, Hazardous Wastes(Management and Handling ) Rules, 1989 and its amendments, the public LiabilityInsuranceAct, 1991 and its amendments.

Any appeal against this environmental clearance shall lie with the National GreenTribunal (Western Zone Bench, Pune), New Administrative Building, 1st Floor, D-, Wing,Opposite Council Hall, Pune, if preferred, within 30 days as prescribed under Section 16of the National Green Tribunal Act, 2010.

to:1. Shri. R. C. Joshi, IAS (Retd.), Chairman, SEIAA, Flat No. 26, Belvedere, Bhulabhai

desai road, Breach candy, Mumbai- 400026.

2. Shri. Ravi Bhushan Budhiraja, Chairman, SEAC-II, 5-South, Dilwara Apartment,Cooperage, M.IC.Road, Mumbai 400021.

Principal secretary,Environment department &MS, SEIAA

(AjqJÿClehta)

-15-

Page 16: 23ld - nitnagpur.org

3. Additional Secretary, MOEF, 'MoEF & CC, Indira Paryavaran Bhavan, Jorb.aghRoad, Aliganj, New Delhi-110003.

4. Member Secretary, Maharashtra Pollution Control Board, with request to display acopy of the clearance.

5. The CCF, Regional Office, Ministry of Environment and Forest (Regional Office,Western Region, Kendriya Paryavaran Bhavan, Link Road No- 3, E-5, Ravi-ShankarNagar, Bhopal- 462 016). (MP).

6. Regional Office, MPCB, Nagpur.

7. Collector, Nagpur.

8. Commissioner, Municipal Corporation, Nagpur

9. IA- Division, Monitoring Cell, MoEF & CC, Indira Paryavaran Bhavan, JorbaghRoad, Aliganj, New Delhi-110003.

10. Select file (TC-3)

(EC uploaded on 1ÿ,|0(3] 2ÿ)1ST )

-16-