    Fully automated bagging plants in

    Saudi Arabiaand new technologies

    Claus Ohlmeyer

    Area Sales ManagerHAVER & BOECKER - GERMANY

  • 7/27/2019 23Haver

    2/36

    Status and Plant Examples

    Installed Technology

    AGENDA

    New Technology Roto Classic

  • 7/27/2019 23Haver

    3/36

    Status And Plant Examples

  • 7/27/2019 23Haver

    4/36

    Status of Saudi Arabias packing plants

    App. 100 cement packing lines installed

    Mainly 8 spout packers for 2400 bags/hour 50 kg each

    Thus 240.000 bags/hour installed capacity = 12.000 t/hr

    Traditionally high degree of automation with automatic empty bag placing

    with automatic direct truck loading

  • 7/27/2019 23Haver

    5/36

    SAUDI CEMENT HOFUF

    4 x Roto Packer 8 RSE _ 8 x autopac

  • 7/27/2019 23Haver

    6/36

    SAUDI CEMENT HOFUF

    Typical installation on 1st floor

    5 m

  • 7/27/2019 23Haver

    7/36

    YAMAMA PLANT

    5 x Roto Packer 8 RSE on 2nd floor

    Level + 9 m

  • 7/27/2019 23Haver

    8/36

    YAMAMA PLANT

    5 x autopac on 1st floor

    Level + 5 m

  • 7/27/2019 23Haver

    9/36

    YAMAMA PLANT

    9 m

    5 m

    Compact installation

  • 7/27/2019 23Haver

    10/36

    Installed Technology

  • 7/27/2019 23Haver

    11/36

    Actual ROTO-PACKER

    Version Type RSE

    machine basic

    structure

    all machine components are mounted onthe machine basic structure

  • 7/27/2019 23Haver

    12/36

    via the first

    valve bag packingmachine in 1925

    From the bag

    fastener made

    from wire

    to the mostadvanced rotary

    packer in 2010

  • 7/27/2019 23Haver

    13/36

    NEW TECHNOLOGYTHE HAVER ROTO CLASSIC

    ADVANCED RELIABILITY

  • 7/27/2019 23Haver

    14/36

    THE HAVER ROTO CLASSIC Type RCC

    MAIN TOPICS OF

    DEVELOPMENT

    Higher capacity Modular

    Compact

    Maintenance friendly

    Economical approach

  • 7/27/2019 23Haver

    15/36

    rotating

    packer bin

    filling module

    main control panel

    (electrical)

    sub panel

    (pneumatic)

    rotation drive

    THE HAVERROTO CLASSIC

    hoppermodule part

  • 7/27/2019 23Haver

    16/36

    Filling ModuleType: Cement

    aeration

    impeller box cover

    impeller box

    control panel

    impeller drive

    filling spout

    tilting bag chair

  • 7/27/2019 23Haver

    17/36

    Impeller Drive by means of Bevel Gear

    1. Gear box

    2. Quick dischargedevice (Option)

    3. Wedge shaped rib belt

    4. Drive

    3

    2

    1

    4

    Integrated impeller bearings

    Maintenance free

    Enhanced accessability

    Optimised drive arrangement> vertical arrangement

  • 7/27/2019 23Haver

    18/36

    Filling Module Advantages

    Longterm flexibility

    Easy maintenance

    Enhanced system availability

    Compact

    SEAL module

    with ultrasonic valve sealing (Option)

  • 7/27/2019 23Haver

    19/36

    Compact Drive Arrangement

    Inside view of 12 RCC

  • 7/27/2019 23Haver

    20/36

    THE ROTO CLASSIC

    Diameter*

    remarkable reduction of the diameter

    OLD

    NEW

    6 8 10 12 14 16

    1430 1600 2000 2200 2700 3000

    6 8 10 12 14 16

    1430 1600 1800 2000 2200 2400

    4

    4

    1430

    1430

    Rotating Packer bin outer diameter

  • 7/27/2019 23Haver

    21/36

    ROTO CLASSICNominal Filling Capacities

    45504970525014 RCC

    52005680600016 RCC

    39004260450012 RCC

    32503550375010 RCC

    2600284030008 RCC

    1950213022506 RCC

    1300142015004 RCC

    (bags/h)*(bags/h)*(bags/h)*Size

    50 kg35 kg25 kgbag weight

    *Depending on the product

  • 7/27/2019 23Haver

    22/36

    Modularity

  • 7/27/2019 23Haver

    23/36

    ROTO CLASSIC THE MULTITALENT

  • 7/27/2019 23Haver

    24/36

    Maintenance Advantages

  • 7/27/2019 23Haver

    25/36

    Easy Maintenance

    by

    Improved accessability

    Defined maintenance areas

    Improved and standarized components

    Quick dismantable modules

  • 7/27/2019 23Haver

    26/36

    at the filling box cover side at the front

    side

    Improved Accessibility

  • 7/27/2019 23Haver

    27/36

    Example For Quick Access

    Aeration cartridges

  • 7/27/2019 23Haver

    28/36

    Opening of the

    impeller box

    Disassembling

    of the impeller

    Disassembling

    of the cartridge

    Drive shaft =

    impeller shaft

    Overhauling Of The Impeller Seal Package

  • 7/27/2019 23Haver

    29/36

    Change of seal package or impellervery easy access

    Roto Classic

    Vertical Impeller Box

    12 spout Roto Classic

  • 7/27/2019 23Haver

    30/36

    Average Inspection & Maintenance Times in Minutes

    (one filling module)Compared To The Previous Standard

    Component H&B RSE H&B RCC Delta in %

    Aeration nozzle 25 7,5 -70

    Vertical turbine 20 10 -50

    Connecting hose 30 15 -50

    V-belt 40 10 -75

    LOOK FOR PRODUCTIONDECREASE MAINTENANCE TIME

  • 7/27/2019 23Haver

    31/36

    Filling Module Disassembly And Assembly

    OUT and IN again within less 20 Minutes!

  • 7/27/2019 23Haver

    32/36

    ROTO CLASSIC THE MULTITALENT

  • 7/27/2019 23Haver

    33/36

    The first HAVER ROTO CLASSIC 12 RCC

    Comissioned December 2008

  • 7/27/2019 23Haver

    34/36

    Take not just a machineTake advantages for your profitWITH THE HAVER ROTO CLASSIC

  • 7/27/2019 23Haver

    35/36

    Thank you very much

    for your attention!

    Business unit cement

    Haver & Boecker

    Carl-Haver-Platz 3

    59302 Oelde + 49 (02522) 30-487 / 272

    [email protected]

  • 7/27/2019 23Haver

    36/36

    Fully automated bagging plants in Saudi

    Arabia

    and new technologies

    Claus Ohlmeyer

    HAVER & BOECKER