BUILDING NO. SC# PROJECT NAME SECTION 232113 – HYDRONIC PIPING PART 1 - GENERAL SCHEDULE 0 - SUMMARY PRODUCT DATA SHEET 0 - Related Documents: 0.1 Drawings and gener al pr ovisions of the Subcontract appl y t o t hi s Secti on. 0.2 Rev iew these d ocu men ts for coordination with addition al r equirements and inf ormati on t hat apply to work under this Section. PRODUCT DATA SHEET 1 - Section Includes: 1.1 Hot water piping system. 1.2 Chilled water piping system. 1.3 Tower water piping system. 1.4 Low conductivity water piping system. 1.5 Treated water piping system. 1.6 Boiler feed water. 1.7 Boiler blow off and drain. 1.8 Condensate drain. PRODUCT DATA SHEET 2 - Related Sections: 2.1 Division 01 Section "General Requiremen ts." 2. 2 Division 01 Section "Special Procedure s." 2.3 Division 31 Section "Excavation". 2.4 Division 31 Section "Backfilling". 2.5 Division 31 Section "Trenching." 2. 6 Division 26 Section "Ca th odic Protection". 2. 7 Division 40 Section "Corr os ion Prote ction". 2.8 Division 09 Section "Painting". 2. 9 Divi si on 23 Section "Expansi on Fi tt ings and L oops for HVAC Piping". 2.10 Di vi si on 23 Section "Hangers and Support s for HVAC Piping and Equipment". 2.11 Di vi si on 23 Section "Identification for HVAC Piping and Equipment" . 2.12 Div ision 23 Section " Vib ration and Sei smi c Control s f or HVAC Piping and Equipment". 2.13 Di vi si on 23 Section "HVAC Piping Insulati on". 2.14 Di vi si on 23 Section "HVAC Equipment Insulation". 2.15 Di vi si on 23 Section "Hyd roni c Specialties". SCHEDULE 1 - REFERENCES PRODUCT DATA SHEET 0 - General: 0.1 The fol lowing d ocumen ts for m pa rt of the Sp eci fic ati ons to the exte nt stated. Where differences exi st between codes and standards, the one affording the greatest protection shall apply. 0.2 Unless otherwise noted, the reference d st andard edition is the cur rent one at t he t ime of commencement of t he Work. 0.3 Ref er t o Di vi sion 01 Sec tion "General Req uirements " fo r the list of applicable regul ato ry r equiremen ts. 0.4 Ref er t o Di vi sion 23 Section "Common Results for HVA C" for cod es and st andards, and oth er g eneral requirements. PRODUCT DATA SHEET 1 - American National Standards Institute (ANSI): 1.1 ANSI/ASME B31.9 Piping and Piping Systems 1.2 ANSI/AWS A5.8 Brazing Filler Metal 1.3 ANSI B2.1 Pipe Threads (Except Dryseal) 1. 4 ANS I B16 .3 Mal le ab le -I ro n Thr ea de d Fit ti ngs 1. 5 ANS I B16 .5 Pip e Fla ng es and Fla nge d Fi ttin gs 1. 6 ANSI B16. 9 Fact or y- Made Wrought St eel Butt we lding Fittings 1.7 ANSI B16.11 Steel Socket Welding Fittings 1.8 ANSI B16.18 Cast Bra ss Solder Fittings LBNL Facilities Master Specifications 232113-1 Revised Hydronic Piping 12/02/09

Transcript of 232113

Page 1: 232113

7/27/2019 232113

http://slidepdf.com/reader/full/232113 1/8

BUILDING NO. SC#PROJECT NAME

SECTION 232113 – HYDRONIC PIPING

PART 1 - GENERAL

SCHEDULE 0 - SUMMARY

PRODUCT DATA SHEET 0 - Related Documents:0.1 Drawings and general provisions of the Subcontract apply to this Section.0.2 Review these documents for coordination with additional requirements and information that apply to work

under this Section.

PRODUCT DATA SHEET 1 - Section Includes:1.1 Hot water piping system.1.2 Chilled water piping system.1.3 Tower water piping system.1.4 Low conductivity water piping system.1.5 Treated water piping system.1.6 Boiler feed water.1.7 Boiler blow off and drain.

1.8 Condensate drain.

PRODUCT DATA SHEET 2 - Related Sections:2.1 Division 01 Section "General Requirements."2.2 Division 01 Section "Special Procedures."2.3 Division 31 Section "Excavation".2.4 Division 31 Section "Backfilling".2.5 Division 31 Section "Trenching."2.6 Division 26 Section "Cathodic Protection".2.7 Division 40 Section "Corrosion Protection".2.8 Division 09 Section "Painting".2.9 Division 23 Section "Expansion Fittings and Loops for HVAC Piping".2.10 Division 23 Section "Hangers and Supports for HVAC Piping and Equipment".2.11 Division 23 Section "Identification for HVAC Piping and Equipment".

2.12 Division 23 Section "Vibration and Seismic Controls for HVAC Piping and Equipment".2.13 Division 23 Section "HVAC Piping Insulation".2.14 Division 23 Section "HVAC Equipment Insulation".2.15 Division 23 Section "Hydronic Specialties".

SCHEDULE 1 - REFERENCES

PRODUCT DATA SHEET 0 - General:0.1 The following documents form part of the Specifications to the extent stated. Where differences exist between

codes and standards, the one affording the greatest protection shall apply.0.2 Unless otherwise noted, the referenced standard edition is the current one at the time of commencement of the

Work.0.3 Refer to Division 01 Section "General Requirements" for the list of applicable regulatory requirements.0.4 Refer to Division 23 Section "Common Results for HVAC" for codes and standards, and other general

requirements.

PRODUCT DATA SHEET 1 - American National Standards Institute (ANSI):1.1 ANSI/ASME B31.9 Piping and Piping Systems1.2 ANSI/AWS A5.8 Brazing Filler Metal1.3 ANSI B2.1 Pipe Threads (Except Dryseal)1.4 ANSI B16.3 Malleable-Iron Threaded Fitt ings1.5 ANSI B16.5 Pipe Flanges and Flanged Fittings1.6 ANSI B16.9 Factory-Made Wrought Steel Buttwelding Fittings1.7 ANSI B16.11 Steel Socket Welding Fittings1.8 ANSI B16.18 Cast Brass Solder Fittings

LBNL Facilities Master Specifications 232113-1 RevisedHydronic Piping 12/02/09

Page 2: 232113

7/27/2019 232113

http://slidepdf.com/reader/full/232113 2/8

BUILDING NO. SC#PROJECT NAME

1.9 ANSI B16.22 Wrought Copper and Wrought Bronze Solder Joint Fittings1.10 ANSI B16.24 Bronze Flanges and Flanged Fittings1.11 ANSI B16.28 Wrought Steel Buttwelding Short Radius Elbows and Returns1.12 ANSI B31.2 Fuel Gas Piping1.13 ANSI B36.10 Wrought Steel and Wrought Iron Pipe

PRODUCT DATA SHEET 2 - ASTM International:2.1 ASTM A 47 Malleable Iron Castings2.2 ASTM A 53 Pipe, Steel, Black and Hot Dipped Zinc-Coated, Welded and

Seamless2.3 ASTM A 106 Seamless Carbon Steel Pipe for High-Temperature Service2.4 ASTM A 120 Pipe, Steel, Black and Hot Dipped Zinc-Coated, Welded and

Seamless, for Ordinary Uses2.5 ASTM A 181 Forgings, Carbon Steel for General Purpose Piping2.6 ASTM A 197 Cupola Malleable Iron2.7 ASTM A 234 Piping and Fittings of Wrought Carbon Steel and Alloy Steel

For Moderate and Elevated Temperatures2.8 ASTM B 32 Solder Metal2.9 ASTM B 62 Composition Bronze or Ounce Metal Castings2.10 ASTM B 88 Seamless Copper Water Tube

PRODUCT DATA SHEET 3 - National Fire Protection Association (NFPA)3.1 NFPA 31 Oil Burning Equipment3.2 NFPA 51 Oxygen-Fuel Gas Systems for Welding and Cutting3.3 NFPA 58 Liquefied Petroleum Gases, Storage and Handling

PRODUCT DATA SHEET 4 - Sheet Metal and Air Conditioning Contractors National Association SMACNA Guidelines for Seismic Restraints of Mechanical Systems.

SCHEDULE 2 - SUBMITTALS

SCHEDULE 3 - Submit under provisions of Division 23 Section "Common Results for HVAC, Review of Materials" andDivision 01 Section "General Requirements."

SCHEDULE 4 - LEED Submittals:0.1 Product Data for Credit EQ 4.1: For solvent cements and adhesive primers, including printed statement of 

VOC content.

SCHEDULE 5 - QUALITY ASSURANCE

PRODUCT DATA SHEET 0 - Welding: The Subcontractor is responsible for the quality of welding done by itsorganization, and shall conduct the required qualification tests to qualify the welding procedures and welders inaccordance with ASME/ANSI B31.3, ASME/ANSI B31.9. Provide welding procedures for LBNL review.

PRODUCT DATA SHEET 1 - Valves: Manufacturer's name and pressure rating shall be marked on the valve body.

PRODUCT DATA SHEET 2 - Welders Certification: In accordance with ANSI/AWS D1.1 and AWS/API- 1104. The

subcontractor shall provide welder’s certificate indicating the welder’s qualification for conducting welds on the specificmaterials provided for the project.

SCHEDULE 6 - DELIVERY, STORAGE, AND HANDLING

PRODUCT DATA SHEET 0 - Deliver, store and protect products under provisions of Division 01 Section "SpecialProcedures."

PRODUCT DATA SHEET 1 - Deliver and store valves in shipping containers with labeling in place

LBNL Facilities Master Specifications 232113-2 RevisedHydronic Piping 12/02/09

Page 3: 232113

7/27/2019 232113

http://slidepdf.com/reader/full/232113 3/8

BUILDING NO. SC#PROJECT NAME

PART 2 - PRODUCTS

SCHEDULE 0 - MATERIAL SCHEDULE

PRODUCT DATA SHEET 0 - Refer to following subparts for complete material specifications for each pipe class specified

below.

Piping System Material Specification

Chilled Water Supply & Return3 inches (75 mm) or less

Pipe Class C1, Type L with soft solder per Paragraph 2.04.E

Chilled Water Supply & Return4 inches (100 mm) or larger 

Pipe Class BS2, (black steel)

Indoor Tower Water Supply & Return3 inches (75 mm) or less

Pipe Class C1, Type L with soft solder per Paragraph 2.04.E

Indoor Tower Water Supply & Return4 inches (100 mm) or larger 

Pipe Class BS2, (black steel)

 Above Grade Tower Water Supply & Return Pipe Class BS2, (black steel)

Below Grade Tower Water Supply and Return Pipe Class BS2, (black steel) with cathodic protection per Division 26 Section "Cathodic Protection" and wrapping per Division 40 Section "Corrosion Protection."

Below Grade Tower Water Makeup Pipe Class BS2, (black steel) with cathodic protection per Division 26 Section "Cathodic Protection" and wrapping per Division 40 Section "Corrosion Protection."

Treated Water Supply & Return Pipe Class C1, Type L with soft solder per Paragraph 2.04.E

Low Conductivity Water Supply & Return Pipe Class C1, Type L with soft solder per Paragraph 2.04.E

Heating Hot Water Supply & Return3 inches (75 mm) or less

Pipe Class C1, Type L with soft solder per Paragraph 2.04.E

Heating Hot Water Supply & Return4 inches (100 mm) or larger 

Pipe Class BS2 (black steel)

Boiler Feedwater Pipe Class C1, Type L with soft solder per Paragraph 2.04.E

Boiler Blowoff & Drain Pipe Class C1, Type L with soft solder per Paragraph 2.04.E

Condensate Drain Pipe Class C1, Type L with soft solder per Paragraph 2.04.E

SCHEDULE 1 - PIPE CLASS BS2: BLACK STEEL PIPE AND FITTINGS

PRODUCT DATA SHEET 0 - Pipe: Black Steel, welded or seamless wall pipe, schedule 40 ASTM A 120 or A 53, ANSI B36.10. Welded joints.

PRODUCT DATA SHEET 1 - Fittings:1.1 Pipe Sizes 2 Inch or Smaller: Socket-welding fittings, 2000 lb, ASTM A 181, ANSI B16.11.

LBNL Facilities Master Specifications 232113-3 RevisedHydronic Piping 12/02/09

Page 4: 232113

7/27/2019 232113

http://slidepdf.com/reader/full/232113 4/8

BUILDING NO. SC#PROJECT NAME

1.2 Pipe Sizes 2-1/2 Inch or Larger: Butt-welding fittings, schedule 40, ASTM A 234, ANSI B16.9. Short radiuselbows (ANSI B16.28) will be allowed on gas piping systems, but long radius elbows are preferred and shall beused on other piping systems.

PRODUCT DATA SHEET 2 - Flanges: Slip-on or weld-neck type, 150 lb (68 Kg), rais ed face, carbon steel, ASTM A 181,Grade 1, dimensions in accordance with ANSI B16.5.

PRODUCT DATA SHEET 3 - Unions:3.1 Pipe Sizes 2 Inch or Smaller: 150 lb, screwed, black, malleable iron, ground joint, brass to iron seat.3.2 Pipe Sizes 2-1/2 Inch or Larger: Use flanges.

PRODUCT DATA SHEET 4 - Local Connections (2 inches or smaller): Threaded joints using 150 lb (68 Kg), black,banded, threaded, malleable iron fittings may be used for exposed local connections. Fittings shall conform to

 ANSI B16.3, dimensions, ASTM A 197, materials, ANSI B2.1, threads.

SCHEDULE 2 - PIPE CLASS C1: COPPER TUBE AND FITTINGS (TYPE K OR L)

PRODUCT DATA SHEET 0 - Tubing: Copper tubing, hard drawn temper, type K or type L, as specified, ASTM B 88.Soldered joints.

PRODUCT DATA SHEET 1 - Fittings: Wrought copper, socket solder-type joint, ASTM B 88 and ANSI B16.22.Couplings shall be of the staked stop type.

PRODUCT DATA SHEET 2 - Flanges: Socket solder-type joint. 150 lb (68 Kg), plain (flat) face, cast bronze, ASTM B 62.Dimensions shall be in accordance with ANSI B16.24.

PRODUCT DATA SHEET 3 - Unions: Socket solder-joint ends, cast bronze, ASTM B 62. Dimensions shall be inaccordance with ANSI B16.18.

PRODUCT DATA SHEET 4 - Solder: 95 percent tin, 4 percent copper, 0.5 percent silver, with non-acid flux. 95-5 tinantimony solder is not allowed. Solder with lead content is not allowed. Use silver brazing alloy, as scheduled. or silver brazing alloy, as specified. All solder joints of piping that convey flammable materials shall be made with brazing alloyshaving melting points above 1000 deg F (538 deg C), (ANSI B31.2; NFPA 51, 31, 58). Silver brazing alloy shall be

 ANSI/AWS A5.8, classification BCUP-5 containing 15 percent silver, 80 percent copper, 5 percent phosphorous.

SCHEDULE 3 - GROOVED JOINT PIPING SYSTEMS

PRODUCT DATA SHEET 0 - Grooved joint piping systems may be used as option to welding. If a grooved joint pipingsystem is selected, it must be used exclusively, except in special cases where welding is essential.

PRODUCT DATA SHEET 1 - Grooved Joint Couplings: Victaulic 07 rigid grooved end joint couplings for steel pipe, and606 rigid grooved end joint coupling for copper pipe, , Grinnell or equal. Units shall be clamp-on and secured with twobolts rated up to 750 PSI. Gaskets shall be EPDM rated up 230 deg F (110 deg C) service.1.1 Use only for above-grade chilled water, tower water, treated water, and heating hot water.

PRODUCT DATA SHEET 2 - Grooved End Pipe Fittings: Victaulic, Grinnell, Gustin-Bacon, or equal. Allowable items arelimited to pipe, radius turns, tees, valves, and strainers. Strap-on tees, etc. are not allowed. Grooved piping systemmanufacturers must be ISO 9001 certified. Gaskets must be manufactured under ISO 9001 certification

PRODUCT DATA SHEET 3 - Grooved system components must be from the same manufacturer.

PRODUCT DATA SHEET 4 - Galvanized outdoors.

SCHEDULE 4 - VALVE SCHEDULE

LBNL Facilities Master Specifications 232113-4 RevisedHydronic Piping 12/02/09

Page 5: 232113

7/27/2019 232113

http://slidepdf.com/reader/full/232113 5/8

BUILDING NO. SC#PROJECT NAME

Service Size Type

3 inches (75 mm) or smaller VB-1.01 Ball Valve

4 inches (200 mm) and larger VB-2.01 Butterfly Valve

HHW, CHW, TRW, TW, LCW,COND, 200 psig non-shock

2 inches (50 mm) or smaller VB-5.01 Balance/Shutoff VB-6.01 Swing CheckVB-7.01 Circuit Balancing Valve

2-1/2 inches (63 mm) or larger VB-5.02 Balance/Shutoff VB-6.02 Spring Loaded Check

SCHEDULE 5 - BALL VALVES

PRODUCT DATA SHEET 0 - Type VB-1.01 (through 3 inches): 3-piece construction, threaded bronze body with stainlesssteel or chrome plated brass ball, Teflon seats and packing, blowout-proof stem, 600 PSI WOG. Full port sizes through 2-1/2 inch and conventional port size for 3 inches. Install increasing and reducing fittings as required. Provide extended

stem where required to clear insulation. All valves for the natural gas systems shall be AGA certified and UL listed. Red-White, NIBCO T-595-Y-66 through 2-1/2 inches and NIBCO T-590-V for 3 inches, or equal.

SCHEDULE 6 - BUTTERFLY VALVES

PRODUCT DATA SHEET 0 - Type VB-2.01: Iron body, aluminum bronze ASTM B-148 alloy 9-C disc, Type 410 stainlesssteel stem and steel operating handle. All valves shall have full lug style bodies and extended stem so that handle clearsthe insulation. Valves shall have seven (7) positions to positively lock the valve disc against turning including a positivestop at “OPEN” and “CLOSED” positions. Butterfly valves for throttling and balancing service shall be complete withthrottling handle capable of locking in position from “FULL OPEN” to “FULL CLOSED”, position indicator, marked dialplate, and built-in concealed set screw type memory stop. All valves shall have EPDM seats suitable for 250-degree F(121 deg C) water service. Valve shall close bubble tight against 150 psig, 200 deg F (93 deg C) water. Valves shall befitted between specified flanges and bolted with specified threaded studs, hex nuts and lock washers. All valves shall

have a means of mechanically locking in final fixed position. NIBCO CD-2000, DEMCO Series NE, or equal.0.1 Where required, provide electric actuators for air suitable for tight shut-off against 150 PSIG water. Include

actuator, linkage, mounting assembly and controls. See Drawings.

SCHEDULE 7 - CHECK VALVES

PRODUCT DATA SHEET 0 - Type VB-6.01 (1/4 inches to 3 inches): 125-psig SP/200-psig WOG, swing type, bronzebody, renewable bronze disc, screwed ends. Lunkenheimer No. 2144, Jenkins 92A, Stockham No. B-319, or equal.

PRODUCT DATA SHEET 1 - Type VB-6.02 (2 inches to 8 inches): 150-psig, spring-loaded clapper, nonslam operation,wafer-type body of ductile iron, with type 316 stainless steel seat or viton seat seals. Use plastic lined, nickel or chromiumplated bodies for LCW service. K & F Machine & Mfg. Co. series CV-3 (DEMCO), Mission DUO-CHEK, or equal.

SCHEDULE 8 - CIRCUIT BALANCING VALVES

PRODUCT DATA SHEET 0 - VB-7.01: Mult-turn, globe style circuit balancing valve. Valve body shall be threadedbronze for sizes up to 2 inches, and flanged cast iron for larger sizes. Valve shall provide tight shut-off against a workingpressure of 200 PSI at 250 degrees F. Flow measuring taps shall provide positive shut-off against system pressure andbe suitable for quick connection to a portable differential pressure meter. Valve shall have a vernier type ring scale with atleast four 360-degree turns between full open and full closed, and a memory stop locking device. Insulate valve withremovable formed block insulation. Armstrong, CBV, Tour and Anderson, Nibco, or equal.0.1 Furnish one portable electronic meter kit, Armstrong Compuflo or equal, with dual pressure gauges, hose

connections and same pressure/temperature rating as circuit balancing valve. Furnish two bound copies of full

LBNL Facilities Master Specifications 232113-5 RevisedHydronic Piping 12/02/09

Page 6: 232113

7/27/2019 232113

http://slidepdf.com/reader/full/232113 6/8

BUILDING NO. SC#PROJECT NAME

size flow charts. Meter kit shall be made available to balancing contractor hired by University, and after testingand balancing, shall become property of the University.

SCHEDULE 9 - AIR VENT VALVES

PRODUCT DATA SHEET 0 - Provide and install manual air vents, Crane 88, Lunkenheimer 906-BS, or equal, in hot-water heating and chilled-water cooling systems at locations shown on drawings, at high points, and other pointsnecessary to free the piping system of air. The air vent assemblies shall consist of 1/4-inch copper tubing connected tothe top of the high point, or other location, and extended down to easily accessible 1/4-inch globe valves mounted,grouped and tagged, approximately 5 feet above the floor. The valves shall individually discharge through 1/4-inchcopper tubing to nearest floor drain, hopper drain, or to the outside, if drain line routing is not shown on the drawings.

PRODUCT DATA SHEET 1 - Use 1/2-inch (13 mm), automatic-type air vent valves only where specifically shown on thedrawings; Bailey 241, Armstrong 1-AV, or equal. The automatic valves shall be installed on a short, 3/4-inch minimum,riser with globe valve in riser. A full-sized copper tubing drain line shall be provided from the automatic valve to thenearest floor drain, hooper drain, or to the outside if drain line routing is not shown on the drawings.

SCHEDULE 10 - LUBRICATED GAS COCKS

PRODUCT DATA SHEET 0 - Over 2-inch size: Homestead 602, Nordstrom 115, or equal lubricated semi-steel, 150 PSI,flanged (for 2 inches and under, use specified ball valves); AGA certified and UL listed.

SCHEDULE 11 - GAUGE COCKS

PRODUCT DATA SHEET 0 - Use specified ball valves.

PART 3 - EXECUTION

SCHEDULE 0 - PREPARATION

PRODUCT DATA SHEET 0 - Six-inch pipes, fittings, and valves may be used in lieu of 5-inch, when 5-inch sizes are notavailable and only with the approval of the University.

PRODUCT DATA SHEET 1 - Ream pipe and tube ends. Remove burrs. Bevel plain end ferrous pipe.

PRODUCT DATA SHEET 2 - Remove scale and dirt on inside and outside before assembly.

PRODUCT DATA SHEET 3 - Prepare piping connections to equipment with flanges or unions.

PRODUCT DATA SHEET 4 - After completion, fill, clean, and treat systems. Refer to Division 23 Section "HVAC Water Treatment".

SCHEDULE 1 - INSTALLATION

PRODUCT DATA SHEET 0 - Route piping plumb and parallel to building structure and maintain gradient.

PRODUCT DATA SHEET 1 - Install piping to conserve building space, and not interfere with use of space and other work.

PRODUCT DATA SHEET 2 - Group piping whenever practical at common elevations.

LBNL Facilities Master Specifications 232113-6 RevisedHydronic Piping 12/02/09

Page 7: 232113

7/27/2019 232113

http://slidepdf.com/reader/full/232113 7/8

BUILDING NO. SC#PROJECT NAME

PRODUCT DATA SHEET 3 - Install piping to allow for expansion and contraction without stressing pipe, joints, or connected equipment. Refer to Division 23 Section "Expansion Fittings and Loops for HVAC Piping".

PRODUCT DATA SHEET 4 - Provide clearance for installation of insulation, and access to valves and fittings.

PRODUCT DATA SHEET 5 - Provide access where valves and fittings are not exposed.

PRODUCT DATA SHEET 6 - Slope piping and arrange systems to drain at low points. Use eccentric reducers tomaintain top of pipe level.

PRODUCT DATA SHEET 7 - Where pipe support members are welded to structural building framing, scrape, brush clean,and apply one coat of zinc rich primer to welding.

PRODUCT DATA SHEET 8 - Prepare pipe, fittings, supports, and accessories for finish painting. Refer to Division 09Section "Painting".

PRODUCT DATA SHEET 9 - Install valves with stems upright or horizontal, not inverted.

PRODUCT DATA SHEET 10 - Perform excavation, trenching, and backfilling for buried pipes per Division 31 Sections"Excavation", "Tenching", and "Backfilling".

PRODUCT DATA SHEET 11 - Provide buried pipes with cathodic protection per Division 26 Section "CathodicProtection."

PRODUCT DATA SHEET 12 - Wrap buried pipes with protective materials per Division 40 "Corrosion Protection."

PRODUCT DATA SHEET 13 - Perform buried pipe installation per Division 33 Section "Schedules for Water Utilities1.

SCHEDULE 2 - PIPE JOINT CONNECTIONS

PRODUCT DATA SHEET 0 - Threaded Pipe: Use Crane No. JC-40, Rector Seal No. 5, or equal, for general serviceapplications, temperatures from –50 to +400 deg F (-45 deg C to 204 deg C), metal or plastic threads, nontoxic,nonhardening, gas pressures to 2600 psi (18 MPa), liquid pressures to 10,000 psi (69 MPa).

PRODUCT DATA SHEET 1 - Copper Tubing with Solder Joint Fittings: Use silver brazed joints for piping located in or under concrete slab on ground, condensate piping located in underground conduits and manholes, and for attaching"Brazolet" fittings for service.1.1 Silver brazing alloy shall comply with ANSI/AWS A5.8, class BCUP-5. Use care in silver brazing to prevent

overheating of pipe and fittings. Disassemble solder type valves before silver brazing and keep bodies cool.1.2 Make other joints with soft solder per Paragraph 2.04.E.

PRODUCT DATA SHEET 2 - Grooved Joint Coupling Systems:2.1 Install only on piping systems allowed.2.2 Install in accordance with manufacturer's recommendations.2.3 Cut grooves are acceptable, all sizes.2.4 Rolled grooves are acceptable for pipe sizes 3 inches (75 mm) and larger.2.5 Only standard full flow, long radius fittings and specified couplings are acceptable. Clamp-on, drilled-in tee

connections are specifically prohibited.2.6 Use specified valves.2.7 Indicate extent of welding, if sti ll required.2.8 Coordinate insulation and jacketing requirements.

SCHEDULE 3 - DIELECTRIC INSULATING FITTINGS

PRODUCT DATA SHEET 0 - Insulating unions or flanges shall be provided at locations described herein unless notedotherwise.

1 This section is not in the LBNL Masters.

LBNL Facilities Master Specifications 232113-7 RevisedHydronic Piping 12/02/09

Page 8: 232113

7/27/2019 232113

http://slidepdf.com/reader/full/232113 8/8

BUILDING NO. SC#PROJECT NAME

PRODUCT DATA SHEET 1 - A shutoff valve shall be provided locally, upstream of dielectric insulating fittings, so thatrepairs can be made easily on these fittings.

PRODUCT DATA SHEET 2 - Locations requiring insulating couplings or flanges are as follows:2.1 At connection points where copper water lines connect to steel domestic water heater tanks.2.2 At points in water lines where ferrous and other dissimilar metallic pipes are connected together.2.3 In metallic water and gas service connections into each building within 5 feet of the building wall. Install

adjacent to the shutoff valve or cock, and aboveground where possible.2.4 Where steel or cast iron pipe in the ground connects to copper or brass piping above the ground, the transition

from steel or cast iron pipe to the copper or brass pipe shall be made aboveground in an accessible location.2.5 Where copper or brass piping is connected to steel or cast iron piping and the connection is buried in the

ground, the connection shall be covered with a protective coal tar tape wrap extending outward at least 5 feeton pipes, from the point of connection. The tape shall be Protecto Wrap No. 200, or equal. A primer,specifically designed for use with the tape, shall be used. The piping shall be thoroughly cleaned before tapeor primer is applied.

SCHEDULE 4 - VALVE INSTALLATION

PRODUCT DATA SHEET 0 - Piping systems shall be supplied with valves at points shown on the drawings or hereinspecified, arranged so as to give shut-off and regulating control of piping systems throughout the building.

PRODUCT DATA SHEET 1 - Valves shall be the full size of the line in which they are installed.

PRODUCT DATA SHEET 2 - Valves shall be installed in neat arrangements with accessibility for maintenance. No valveshall be installed with its stem pointing down. Globe valves may be installed with stems horizontal, but the preferredposition is vertical. All globe and angle valves shall be installed to close against pressure.

SCHEDULE 5 - PIPE SLEEVES

PRODUCT DATA SHEET 0 - On existing concrete construction, holes for new piping shall be made with power-drivencircular cutters. No pipe sleeves are required.

PRODUCT DATA SHEET 1 - On new concrete construction, provide pipe sleeves where piping passes through concrete

floors, walls, or ceilings. Extend sleeve for the full thickness of the concrete with 1/2-inch clearance around pipe for insulation.

PRODUCT DATA SHEET 2 - On pipe penetrations below grade, caulk space between pipes and pipe sleeves with oakumand mastic, and make watertight.

PRODUCT DATA SHEET 3 - On other floor and wall locations, secure sleeves to forms so they will not become displacedduring pouring of concrete. Fill metal or fiber sleeves on decks with sand. Remove sleeves from openings after removalof forms. Cut-in proper sized holes in concrete to replace sleeves crushed or knocked out of position during pouring of concrete. Caulk space around pipe with mastic and oakum.

SCHEDULE 6 - SEISMIC RESTRAINTS

PRODUCT DATA SHEET 0 - Ductwork, piping, and mechanical equipment, with or without vibration isolation, shall beprovided with seismic restraints in accordance with Division 01 Section "Lateral Force Procedures."

END OF SECTION 232113

LBNL Facilities Master Specifications 232113-8 RevisedHydronic Piping 12/02/09