    220/132/11KV Shutdown Normalization Procedure :

    At times of Shutdown, Both Earth

    Switches -S2 and -S4 of main bus bar ,interlink earth switches -S6 and -S8 must

    be at on position with breakers -S1,-S3,-S5

    and -S7 are at off position. all off position

    breakers must be verified before

    commencing

    operation/repair/maintenance work.

    Ground Rods are best choice for checking

    it.

  • 8/19/2019 220,132,11KV Shutdown Normalization Procedure

    2/2

    Carpediem Tech

    Engr. Qazi Arsalan Hamid

    Shutdown normalization process :

    Engineer must well aware of Team clearance for shutdown normalization. Safety personnel clearance is mandatory.

    both breakers at 132/11KV Transformer must be remain in off position during normalization.

    In good practice the earth switch (Isolators) are couple mechanically with Breakers , in the normalization case S2 and S4 will be off and

    Breaker S1 or S3 will be at on position

    after that make -S6 at off position

    then put on -S5

    after that make -S8 at off position

    then put on -S7 (Transformer Primary Breaker )

    now you can normalized transformer breakers, 1st primary then secondary , all feeders breaker must remain at off position during

    normalization process