2100 Settings

download 2100 Settings

of 16

Transcript of 2100 Settings

  • 8/9/2019 2100 Settings

    1/16

      Settings

    EPLAN Training 1

    Settings

  • 8/9/2019 2100 Settings

    2/16

      Settings

    EPLAN Training 2

    1  Viewing and Changing the Settings ............................................................3 

    Exchanging the Settings ..............................................................................6 

    2.1  Save the project as a template..................................................................6 

    2.2  Create projects from templates.................................................................9 

    3  Restoring the Settings to Standard Values ..............................................11 

    4  Changing the Settings for Individual Objects ..........................................14 

    This functionality is only available for certain module packages. Info

  • 8/9/2019 2100 Settings

    3/16

      Settings

    EPLAN Training 3

    1 Viewing and Changing the Settings

    In the Settings dialog, you can view and edit all settings for the Project, User,

    Workstation, or Company categories.

    Precondition:

    You have opened a project.

    Options > Settings

    1. Double-click the Settings dialog on one of the possible categories Project,User, Workstation, or Company.

    Multiple folders / subfolders are opened in the tree view.

  • 8/9/2019 2100 Settings

    4/16

      Settings

    EPLAN Training 4

    2. Double-click the desired folder / subfolder.

    The settings areas in the folders / subfolders are shown in a subordinatebranch of the tree view.

    3. To display the settings, select the desired settings area in the tree.

    4. Change the desired settings in the right-hand side of the settings dialog.

  • 8/9/2019 2100 Settings

    5/16

      Settings

    EPLAN Training 5

    This functionality is only available for certain module packages. Info

  • 8/9/2019 2100 Settings

    6/16

      Settings

    EPLAN Training 6

    2 Exchanging the Settings

    You can pass project-specific settings  to other projects. To do this, you must save the

    source project settings, together with the project, as a template and then create thenew project from the template.

    2.1 Save the project as a template

    Project > Management

    Precondition:

    In the tree structure of project management there is an imported directory with at

    least one project.

    1. Select your source project in the Project management dialog.

  • 8/9/2019 2100 Settings

    7/16

      Settings

    EPLAN Training 7

    2. Select [Extras] > Create project template.

    3. Select the storage location and the name of the project template.

  • 8/9/2019 2100 Settings

    8/16

      Settings

    EPLAN Training 8

    4. Click [Save].

    A project template is created.

  • 8/9/2019 2100 Settings

    9/16

      Settings

    EPLAN Training 9

    2.2 Create projects from templates

    1. Select the menu item Project > New (Wizard).

    You reach the Create project dialog, the so-called Project Wizard .

    2. Give the new project a name.

    3. Click [...] next to the Template field.

  • 8/9/2019 2100 Settings

    10/16

      Settings

    EPLAN Training 10

    4. Select the desired template in the Open dialog and click [Open].

    5. Select a storage location for the project.

    6. Click [Finish].

    A project is created on the basis of the project template.

    This functionality is only available for certain module packages. Info

  • 8/9/2019 2100 Settings

    11/16

      Settings

    EPLAN Training 11

    3 Restoring the Settings to Standard Values

    In the settings dialog, you can use a command in the popup menu to return the

    individual settings to standard starting values defined by EPLAN. Any settings thatyou have made are lost and they return to their default values.

    Precondition:

    You have opened a project.

    Options > Settings

    1. Double-click the Settings dialog on one of the possible categories Project,User, Workstation, or Company.

    Multiple folders / subfolders are opened in the tree view.

  • 8/9/2019 2100 Settings

    12/16

      Settings

    EPLAN Training 12

    2. Double-click the desired folder / subfolder.

    The settings areas in the folders / subfolders are shown in a subordinatebranch of the tree view.

    3. To display the settings, select the desired settings area in the tree.

    4. Click the desired field or check box in the right-hand side of the settings dialog.

  • 8/9/2019 2100 Settings

    13/16

      Settings

    EPLAN Training 13

    5. Select Popup menu > Go to default.

    The setting is returned to the default value.

    This functionality is only available for certain module packages. Info

  • 8/9/2019 2100 Settings

    14/16

      Settings

    EPLAN Training 14

    4 Changing the Settings for Individual Objects

    The settings made for an object are adopted at all levels in your project, i.e. if you

    make a setting at a particular level then the setting applies to all levels below. Youcan also change the settings for individual objects.

    Precondition:

    You have selected an object in the page navigator or the graphical editor.

    Popup menu > Properties

    1. In the Settings dialog, in the Category drop-down list, select the Settings entry.

    The settings are displayed in a table.

    2. Click the setting whose value you wish to change.

  • 8/9/2019 2100 Settings

    15/16

      Settings

    EPLAN Training 15

    3. Enter the desired value.

    4. Click [OK].

    The setting for the object is saved.

    Example:

    You wish to use a plot frame in all pages of a project. You also wish to use a differentplot frame on one specific page. To do this, you define the plot frame for all pages in your project and then only change the plot frame setting forthe single page that you wish to be different.