7/21/2019 208 http://slidepdf.com/reader/full/2085695d0081a28ab9b0290a432 1/3 HOWO HOWO‐290 ON HIGHWAY REAR DUMP TRUCK ‐‐ RIGID BODY BDT‐R‐208 Start Date ‐‐‐ End Date ‐‐‐ Total Calendar 9 Hours achieve F re qu en t D ow n 0 times Wheel/Roller Drum UB1 MECHANIC UB2 MATERIAL / PARTS UB3 FACILITIES / TOOLS UB4 3rd PARTY 18 0 0 ltr/hr 14 0 0 BDWN 0 7 0 0 STBY ### 3,5 0 0 OPRT 8 POPULATION HOWO-290 2 units ## ## by DURATION hours by FREQUENCIES times WEEK PERIOD 1 2 3 4 5 0 ltr 10 Day Service 10 Day Service FLEET - TOP PROBLEM TREND 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service Wheel/Roller Drum Transmission Transmission 1 216,00 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service BDT‐R‐208 WEEK Consumption Not Valid Data or it just a lemon :) AVAILABILITY - PA (%) 49,9% 48,0 168,4 5 4 3 2 1 0,0 0,0% 100,0% 0,0% 1‐Dec 10‐Dec TOP 5 PROBLEM dur TOTAL DOWN (hours) 7,5 AVAILABILITY - PA (%) MTBF (hours) MTTR (hours) 0,37 0,0% hours % 0,0% 0,0% 0,37 DELAY MAINTENANCE (compare to down) UNSCHEDULE 99,8% 0,00 7,50 4236 4235 4234 FLEET WEEK HOURS DOWN SCHEDULE TOP 5 PROBLEM frq UTILIZATION - UA (%) 3,1% HIGH MIDDLE LOW LOW times UB1 UB2 UB3 UB4 FLEET DELAY HOURS 50% 86% 100% 100% 100% 25‐Dec 7‐Dec 13‐Dec 19‐Dec 25‐Dec 31‐Dec 36 144 0 0 1‐Dec 7‐Dec 13‐Dec 19‐Dec 10 Day Service 10 Day Service 10 Day Service 0,37 Unit Code BDT‐R‐302 BDT‐R‐209 BDT‐R‐208 BAT304 49,9% 85,7% 100,0% 100,0% 100,0% 0% 20% 40% 60% 80% 100% 1 2 3 4 5 FLEET PA WEEK (%) WEEK 36,0 144,0 UB1 UB2 UB3 UB4 PT. MUARA BUKIT BILLITON PLANT Department Key Performance Indicator ‐ UNIT PA graph FUEL CONSUMPTION BDWN 0% STBY 96% OPRT 4% HOURS DISTRIBUTION 99,78% 100,00% 100,00% 100,00% 100,00% 1 2 3 4 5 Weekly PA (%) Key Performance Indicator ‐ FLEET PA graph on target / achieve out of target / bad

description

208

Transcript of 208

Page 1: 208

7/21/2019 208

http://slidepdf.com/reader/full/2085695d0081a28ab9b0290a432 1/3

HOWO HOWO‐290 ON HIGHWAY REAR DUMP TRUCK ‐‐ RIGID BODY

BDT‐R‐208

Start Date ‐‐‐ End Date ‐‐‐ Total Calendar 9 Hours achieve

Frequent Down 0 t imes

Wheel/Roller Drum UB1 MECHANICUB2 MATERIAL / PARTSUB3 FACILITIES / TOOLSUB4 3rd PARTY

180 0 ltr/hr

14 0 0 BDWN 0

7 0 0 STBY ###

3,5 0 0 OPRT 8

POPULATION HOWO-290 2 units

## ## by DURATION hours by FREQUENCIES times

WEEK PERIOD 1

2

3

4

5

0 ltr

10 Day Service ‐

10 Day Service ‐

FLEET - TOP PROBLEM TREND

10 Day Service ‐

10 Day Service ‐

10 Day Service ‐

10 Day Service ‐

10 Day Service ‐

10 Day Service ‐

Wheel/Roller Drum

Transmission Transmission 1 216,00

10 Day Service ‐

10 Day Service

10 Day Service

10 Day Service

10 Day Service

10 Day Service

BDT‐R‐208

WEEK

Consumption Not Valid Data orit just a lemon :)

AVAILABILITY - PA(%)

49,9%49,9%

‐ ‐ ‐ 48,0 168,4

54321

99,8%

0,0

0,0% 100,0% 0,0%

1‐Dec 10‐Dec

TOP 5 PROBLEM durTOTAL DOWN (hours)

7,5

AVAILABILITY - PA(%)

MTBF (hours)MTTR (hours)

0,370,0%

hours %

0,0%0,0%

0,37

DELAY MAINTENANCE(compare to down)

UNSCHEDULE 99,8% 0,00 7,50

423642354234FLEET WEEK HOURS DOWN

SCHEDULE

TOP 5 PROBLEM frqUTILIZATION - UA(%)

3,1%

HIGH

MIDDLELOWLOW

times

UB1 UB2 UB3 UB4

FLEET DELAY HOURS

50% 86% 100% 100% 100%

25‐Dec

7‐Dec

13‐Dec

19‐Dec

25‐Dec

31‐Dec

36 144 0 0

1‐Dec

7‐Dec

13‐Dec

19‐Dec

‐ 10 Day Service

10 Day Service

10 Day Service

0,37

Unit Code

BDT‐R‐302

BDT‐R‐209

BDT‐R‐208

BAT304

49,9%

85,7%100,0% 100,0% 100,0%

0%

20%

40%

60%

80%

100%

1 2 3 4 5

FLEET PA WEEK (%)

WEEK

36,0

144,0

‐ ‐

UB1 UB2 UB3 UB4

PT. MUARA BUKIT BILLITONPLANT Department

Key Performance Indicator ‐ UNIT

PA graph

FUEL CONSUMPTION

BDWN0%STBY

96%

OPRT4%

HOURS DISTRIBUTION99,78% 100,00% 100,00% 100,00% 100,00%

1 2 3 4 5

Weekly PA (%)

Key Performance Indicator ‐ FLEET

PA graph

on target / achieve

out of target / bad

Page 2: 208

7/21/2019 208

http://slidepdf.com/reader/full/2085695d0081a28ab9b0290a432 2/3

Page 3: 208

7/21/2019 208

http://slidepdf.com/reader/full/2085695d0081a28ab9b0290a432 3/3

Code Number BDT‐R‐208

Sum of Period Down (hrs)Time BD Start BD Type 1 BD Type 2 BD Description Corrective Action Component MTBF count Total

07/12/2015 16.46 BUS TBO Tyre pos #08 leaks Inspect & Replace tyre Wheel/Roller Drum 0 0,37

<