Integrating iPad Technology Into the Project
Controls for Large Construction Projects
Session # 205470
Chris P O’Grady, Manager Technology Services
Don Draper, Sr. Information Management Specialist
Melissa Wilkinson, Project Assistant
![Page 2: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/2.jpg)
• Quick Organization Overview
• Demonstrate use of offline data collection using mobile
Application(s)
• Discuss various tools and techniques used to overcome
potential barriers.
• Show how both Contract Manager and P6v7 can be updated
with this information.
• Display project controls cost information visually using
OneTouchPM®
• Discuss various tools and techniques used to integrate data
into GIS/OneTouchPM® systems.
Objectives
![Page 3: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/3.jpg)
• Founded in 1898
• 100% Employee-Owned
• Results Based Culture
• 80% Repeat Business
• Depth of Expertise
• 1100+ PCM Users
• PCM Hosted by LoadSpring
Company Overview
![Page 4: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/4.jpg)
• Aviation Facilities
• Power Generation
• Industrial Plants
• Offices and Commercial
Buildings
• Petroleum & Refining
• Water and Wastewater
Facilities
• Environmental Remediation
• Power Delivery and more …
Areas of Expertise
![Page 5: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/5.jpg)
• Information Management support for Program
Management
• Primavera Contract Management Support
• Primavera Scheduling Support
• Database Application development
• Mobile Application development
• Geographic Information Systems (GIS) and Support
Business & Technology Services
![Page 6: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/6.jpg)
• Develop a suite “Off Line” Daily Reports Mobile
Applications which can utilize multiple platforms (IOS,
Android etc..) integrates and provides 2-way
communication with Contract Manager for large scale
construction projects.
The Challenge!
![Page 7: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/7.jpg)
• Platforms to be used iPad, Android etc..
• “Out of the Box” application availability
• Outsourcing Development
• Return on Investment (ROI)
• Field Personnel are not always connected to the internet
• Up to date dictionary information must be available
• Mobile Application must follow established business
processes
Considerations
![Page 8: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/8.jpg)
• Daily Reports Application
• RFI Application
• Custom Field Handling
• Schedule information
• Geo Spatial Referencing
Demonstration
![Page 9: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/9.jpg)
• OneTouchPM®
• Project Routing
• Construction Points
• Construction Status
• Cost Layer
Demonstration
![Page 10: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/10.jpg)
![Page 11: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/11.jpg)
![Page 12: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/12.jpg)
![Page 13: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/13.jpg)
![Page 14: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/14.jpg)
NoTouchPM®
![Page 15: 205470 integrating i pad technology into the project controls for large construction projects](https://reader031.fdocuments.in/reader031/viewer/2022030312/58eddba01a28ab7b2d8b45af/html5/thumbnails/15.jpg)
OneTouchPM®