2021 CONSTRUCTION PROJECTS
Transcript of 2021 CONSTRUCTION PROJECTS
2021 CONSTRUCTION PROJECTS
0.0 0.5 1.0 1.5 2.0 2.5
Water Main Replacement
Hydrant Painting and Flow Testing
LEGEND
Water
PETERBOROUGH UTILITIES
Water Construction
Produced by the Peterborough Utilities GIS. 2021 Construction datum derived from GeoMedia GIS warehouse.ERRORS and OMISSIONS: Bring any verified errors and omissions to Engineering GIS for revisions. June 1st, 2021 - R4
1 Site NumberSee Water Construction Table 1 for details
D4527
0.0 0.5 1.0 1.5
km
mi
km
mi
Water Main Structural Lining
HYDRANT PAINTING
AND FLOW TESTING
NORTH EAST QUADRANT
Contact John Ellison @ 1239
1
3
4
5
6
2
10
9
8
7
Water Main New Construction
Water Tower Coating Replacement
1 High St. Coating Replacement Higher St Tower Rehabitation Kevin Conlin 1296
2 Nassau Mills Rd. Armour Rd. Pioneer Rd. New Construction Clean Tech Commons Brad Nurse 1318
3 Townsend St. George St. Bethune St. COP Contract - Eliminate Dead End - Casing pipe Steve Billings 1242
4 Bethune St. Townsend St. Dublin St. COP Contract - Replacement with Services Steve Billings 1242
5 Willowcreek Subdivision John Boddy Developments Ltd. - Subdivision Steve Billings 1242
6 Lily Lake West Subdivision Durham Building Corp. - Subdivision Steve Billings 1242
7 AppleGrove Ave. Highland Rd. Chemong Rd. COP Contract - Replacement with Services John Ellison 1239
8 Parkhill Rd West Wallis Dr. Pinehill Dr. Structural Lining (CIPP) John Ellison 1239
9 Stannor Dr. Sherbrooke St. Albertu Ave. Structural Lining (CIPP) John Ellison 1239
10 Burnham Meadows Subdivision Safe Harbour Developments Inc. Steve Billings 1242
TABLE 1: 2021 Water Construction
Site # Street From To ProjectContact