ISO Public ISO Public 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder Call March 16, 2020

Transcript of 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results...

Page 1: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO PublicISO Public

2021 & 2025 Draft LCR Study Results

San Diego Non-Bulk Sub-Areas

Frank Chen

Regional Transmission Engineer Lead

Stakeholder Call

March 16, 2020

Page 2: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

San Diego Non-Bulk LCR Area

Slide 2

HUNTINGTON

BEACH [SCE]

CHINO [SCE]

AR

IZO

NA

IMPERIA

L

VALLEY[SDG&E /

IID]

HIGHLINE[IID]

MIDWAY[IID]

COACHELL

A[IID]

NORT

H

GILA[APS]

Tijuan

a

MIGUEL

DEVE

RS[SCE]

VALLEY[SCE]

SAN

ONOFRE[SCE &

SDG&E]ENCIN

A P.P.[SDG&E]

ESCONDIDO[SDG&E]

SAN

LUIS

REY

TALEGA

[SDG&E]

EL

CENTRO[IID]

MEXICO[CFE]

IMPERIAL

CO.

RIVERSIDE

CO.SAN DIEGO

CO.

SERRANO[SCE]

MIRA LOMA [SCE]

ORANGE

CO.

SOUTH

BAY P.P.

OLD

TOWN

MISSION

PENASQUITOS

SYCAMORE CANYON

KNOB[WALC]

PALO

VERDE[APS]

MIRAG

E[SCE]

SANTIAGO

[SCE]

JOHANN

A

[SCE]

Cerro Prieto

Rosarito

La Rosita

Mexicali

To Ensenada

Rumorosa

N

* Not to Scale

Generation Plants

Nuclear Generating

Station

500 kV Transmission

Substation

230 kV Transmission

Substation

500 kV Transmission

Lines/Path

230 kV Transmission

Lines/Path

County Lines

State Lines

Proposed Lines

OTAY MESA

P.P.

SUNCREST

ECO

Page 3: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Major Network Upgrades Modeled by 2021

1. Ocean Ranch 69 kV substation

3. TL6906 Mesa Rim loop-in

4. Mesa Height TL600 Loop-in

4. TL633 Upgrade Bernardo - Rancho Carmel 69 kV line

5. Suncrest SVC project

6. 2nd Poway–Pomerado 69 kV line

7. Otay Landfill Gas Resources Retirement

8. Miramar Energy Storage Project (30 MW)

9. Storage projects at Melrose (40 MW)

Slide 3

Page 4: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Additional Network Upgrades by 2025

1. 2nd San Marcos–Escondido 69 kV line

2. Reconductor of Stuart Tap–Las Pulgas 69 kV line

(TL690E)

3. Artesian 230 kV expansion with 69 kV upgrade

4. IID’s S-Line Upgrade

5. South Orange County Reliability Enhancement

6. Avocado Energy Storage project (40 MW)

Slide 4

Page 5: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Sub-areas studied:

• Border sub-area

• El Cajon sub-area

• Esco sub-area

• Pala sub-area

• Mission sub-area

• Miramar sub-area

Slide 5

Page 6: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Sub-areas without LCR requirement in 2021 and 2025

due to the LCR criteria change or network upgrade

• Esco sub-area

• Pala sub-area

• Mission sub-area

• Miramar sub-area

Slide 6

Page 7: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Border Sub-area: Load and Resources

Slide 7

2021 2025

Load (MW)

Gross Load 162 166

AAEE -8 -8

Behand-The-Meter PV 0 0

Net Load 154 158

Transmission Loss 2 2

Net Load + Loss 156 160

Resources (MW)

Gas-Fired 175.5 175.5

Solar PV 0.0 0.0

Wind 0.0 0.0

QF/Other 0.0 0.0

Demand Response 0.0 0.0

Energy Storage 0.0 0.0

Page 8: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Border Sub-area: One-line diagram

Slide 8

Bay Blvd

San Ysidro

Otay Lake

69 kV

Border

Swee

t Wat

er A

rea

Border Sub-area

Transmission Import

Cutplane

69 kV

Imperial Beach

Otay

Miguel

Salt Creek

Otay Lake

(Gas Fired)

~

~

Border

(Gas Fired)

~

~

~Otay Gen

(Gas Fired)

JM/PD/SW/LL220 kV

220 kV69 kV

XOtay Lake Tap

X

Page 9: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Border Sub-area: LCR Requirement

Slide 9

Year Category Contingency Limiting FacilityLCR

(MW)

2021 P3Border unit out of service followed by the outage of Miguel-Salt Creek

69 kV #1 (TL6910)

Otay-Otay Lake Tap 69 kV (TL649)

60

2025 P3Border unit out of service followed by the outage of Miguel-Salt Creek

69 kV #1 (TL6910)

Otay-Otay Lake Tap 69 kV (TL649)

62

Page 10: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Border Sub-area Load Profiles - 2021

Slide 10

Page 11: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Border Sub-area Daily Load Profiles and L-1 Load Serving Capability - 2021

Slide 11

Page 12: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Border Sub-area Annual Load Profiles - 2025

Slide 12

Page 13: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

Border Sub-area Daily Load Profiles and L-1 Load Serving Capability - 2025

Slide 13

Page 14: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

El Cajon Sub-area: Load and Resources

Slide 14

2021 2025

Load (MW)

Gross Load 167 172

AAEE -2 -3

Behand-The-Meter PV 0 0

Net Load 165 169

Transmission Loss 2 3

Net Load + Loss 167 172

Resources (MW)

Gas-Fired 93.5 93.5

Solar PV 0.0 0.0

Wind 0.0 0.0

QF/Other 0.0 0.0

Demand Response 0 0

Energy Storage 7.5 7.5

Page 15: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

El Cajon Sub-area: One-line diagram

Slide 15

Jamacha

Granite Tap

138 kV

El Cajon

Garfield

Los Coche

Loveland

69 kV

69 kV

(Energy

Storage)

EC Gen 1 & 2

(Gas Fired)

Murray

Mig

uel

Spring Valley

Alpine

Elliott

Creelman

El Cajon Sub-area

Transmission Import

Cutplane~ ~

~

MiguelX

X

Page 16: 2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub ......2021 & 2025 Draft LCR Study Results San Diego Non-Bulk Sub-Areas Frank Chen Regional Transmission Engineer Lead Stakeholder

ISO Public

El Cajon Sub-area: LCR Requirement

Slide 16

Year Category Contingency Limiting FacilityLCR

(MW)

2021 P3El Cajon unit out of service followedby the outage of TL632 Granite–Los

Coches–Miguel 69 kV 3-terminal line

El Cajon-Los Coches 69 kV (TL631)

92

2025 P3El Cajon unit out of service followedby the outage of TL632 Granite–Los

Coches–Miguel 69 kV 3-terminal line

El Cajon-Los Coches 69 kV (TL631)

99

The LCR needs for the El Cajon sub-area will be eliminated

with the completions of the TL632 Granite loop-in and TL6914

reconfiguration project, currently scheduled for 7/2029.