ADEQ A R K A N S A S Department of Environmental Quality
Via Email Only to: [email protected]
Kevin Glauber Facility Manager Bunge N01th America, Inc. - DeSoto Landing P. 0. Box 327 Arkansas City, AR 71630
RE: Application for Registration Modification AFIN: 21-00037 Registration No.: 0335-A-REG315
Dear Mr. Glauber:
The Depmtment has reviewed your facility's application for registration modification for the facility located at Highway 4 N01th - 2724 Blmge Road, Arkansas City in Desha County, Arkansas.
The Depmtment has detennined that the infonnation ce1tified in the application fulfills the required criteria for registration modification as specified in Arkansas Air Pollution Control Code (Regulation 18), Section 18.315 and other applicable regulations. Your registration number will continue to be 0335-A-REG315.
This registration modification is your authority to construct, operate, and maintain the equipment and/or conti·ol appm·atus as set f01th in your registi·ation request received on November 9, 2018. Bunge N01th America, Inc. - DeSoto Landing is required to update this registi·ation should the facility operations or emissions change so that the cmTent registration no longer reflects actual operations.
Please maintain a copy of this letter and the application at the facility.
Sincerely,
Thomas Rheaume, P .E. Senior Operations Manager Office of Air Quality
c: Compliance Monitoring
Attachment: Registi·ation Application
ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY 5301 NORTHSHORE DRIVE I NORTH UTILE ROCK I ARKANSAS 72118-5317 I TELEPHONE 501-682-0744 I FAX 501-682-0880
www.odeq.stote.or.us
BLJNGE
November 6, 2018
Arkansas Department of Environmental Quality Air Permitting Section 5301 Northshore Drive North Little Rock, AR 72118-5317
RE: Bunge North America - DeSoto Landing AFIN: 21-00037 Registration No.: 0335-A-REG315
To Whom it May Concern:
Bunge North America is in possession of Registration No. 0335-A-REG315. Proposed changes at the facility necessitate the attached update to this registration. An existing 1 ,000,000 bushel storage tanks will be replaced with a 250,000 bushel storage tank. Two new truck receiving pits will be installed, and the existing truck receiving pits will be closed. A baghouse used to aspirate the receiving pits will be removed. The receiving pits have been redesigned with baffles that slow the rate that grain enters the pit. With the removal of the baghouse and these new baffles, the PM1 0 emissions stay basically the same.
The threshold levels of 25/10 tons per year of PM/PM1 0 will not be exceeded. The associated emissions calculations for PM and PM1o can be found in the attached document.
If you have any questions or need additional information, please feel free to contact me at (314) 292-2707 or via e-mail at [email protected].
Sincerely,
Christa Andrew Environmental Specialist
cc: Kevin Glauber
Attachments
Bunge North America, IDe. 1391 Timberlake Manor Parkway Chesterfield, MO 63017 Phone: (314) 292-2707
ADEQ Arkansas Department of Environmental Quality
AIR DIVISION
AIR PERMIT APPLICATION FORMS
November 2018
GENERAL INFORMATION APPLICATION FORMS (Complete this General Information section for all Registrations and Applications)
1. FACILITY PHYSICAL INFORMATION Facility Name: Bunge North America, Inc. Facility Address or Location: Hwy 4 North - 2724 Bunge Rd. City: Arkansas City County: Desha Zip: 71630-0327 Physical Contact First Name: Kevin I LastName: I Glauber, Physical Contact Position/Title: Facility Manager Physical Contact Phone: 870-877-2312/2313 I FAX: I Physical Contact Email: [email protected]
I 2. FACILITY MAILING INFORMATION I Organization N arne: Bunge North America Facility Mailing Address: POBox327 City: Arkansas City State: Arkansas Zip: 71630-0327 Mailing Contact First Name: Kevin I LastName: I Glauber Mailing Contact Position/Title: Facility Manager Mailing Contact Phone: 870-877-2312/2313 I FAX: I Mailing Contact Email: [email protected]
3. INVOICE MAILING INFORMATION Organization Name: Same as above Invoice Mailil!g Address: City: State: Zip: Invoice Contact First N arne: I LastName: I Invoice Contact Position/Title: Invoice Contact Phone: I FAX: I Invoice Contact Email:
4. PERMIT APPLICATION CONTACT INFORMATION Organization N arne: Bunge North America Applicant Mailing Address: 1391 Timberlake Manor Parkway City: Chesterfield State: MO Zip: 63017 Applicant Contact First Name: Christa I LastName: I Andrew Applicant Contact Position/Title: Environmental Specialist Applicant Phone Number: 314-292-2707 I FAX: I Applicant Email Address: [email protected]
AFIN Facility Permit# Date Page
GENERAL INFORMATION APPLICATION FORMS 5. UTM COORDINATES OF CENTER OF PLANT (Not Required for Permit Transfers or Name
Changes)
UTM Zone (15 or 16) 15
UTM North (to the nearest meter) 3729563
UTM West (to the nearest meter) 664098 E
Datum System (indicate only one) NAD27 I I NAD83 I I WGS84I
j6. NAICS INFORMATION I
NAICS Number: 424510
NAICS Title:
7. TYPE OF PERMIT (CHECK ONE):
X lAir Permit Registration I !Minor Source Permit I .lTitle V/Major Source Permit
8. TYPE OF PERMIT APPLICATION (CHECK ONE):
Initial (New) Permit (Includes changes between Minor, Title V, Registrations and General Permit types)
Renewal Of Existing Permit (Title V Permits Only)
Minor Modification (Title V Permits Only)
De Minimis (Minor Source Permits Only)
Significant Modification
X Administrative Amendment
Name Change
Transfer Of Ownership
j9. CURRENT ACTIVE PERMIT NUMBER (IF APPLICABLE):
Air Permit No. I 0335-A-REG315
10. DATE OF COMMENCEMENT OF CONSTRUCTION OR RECONSTRUCTION: (Not Required for Permit Transfers or Name Changes)
Expected Date of Commencement of Construction or Reconstruction: December 2018
Expected Date of Completion of Construction or Reconstruction: March 2019
Anticipated Date of Operation: March 2019
AFIN Facility Permit# Date Page
GENERAL INFORMATION APPLICATION FORMS GENERAL APPLICATION QUESTIONS
11. Disclosure Statement Yes No Is this an Initial Permit, Registration, Renewal, or Change of Ownership? X
If yes, attach a disclosure statement.
12. Federal Regulations (Not Required for Permit Transfers or Name Changes)
Is any source, existing or new, subject to a NSPS (40 CPR Part 60) or NESHAP (40 CPR X Part 61 or 63) requirement?
If yes, is a list of the sources with the specific applicable subpart paragraphs attached?. See instructions for more details on this requirement
13. ·Would you like to subscribe to the Air Permit Branch Email list? (A periodic email from the X ADEQ Air Permit Branch of notable events and issues relating to air permits and permitting.)
If yes, list the email address( es) you wish to use: (or you can email us at [email protected] with "subscribe" (no quotation marks) in the subject box.
1114. ORGANIZATIONAL STATUS OF APPLICANT
AFIN
a. Please check the box which appropriately describes the legal organization of the applicant.
Solely Owned Proprietorship X Corporation General Partnership Joint Venture Limited Partnership Government Entity LLC Other (Specify)
b. Is the applicant currently registered to do business with the Arkansas Secretary of State?
XYES (indicate SOS filing I EXISTING FACILITY I NO D Number) . .
c. If the applicant is registered with the Arkansas Secretary of State, indicate if it is domestic (Arkansas) or a foreign (chartered outside of Arkansas).
Domestic I X I Foreign 1.------
d. Attach a Certificate of Good Standing for Arkansas from the State of Origin, if other than Arkansas.
(Please note no permit will be issued to a corporation until the proper documents have been filed with the Secretary of State. Also, note that the name of the applicant must be identical to the name of the registered corporation.)
e. If the applicant is organized as a partnership, then list the names and addresses of all partners
Facility Permit# Date Page
GENERAL INFORMATION APPLICATION FORMS involved. Attach additional sheets if necessary.
f. If the applicant is organized as a joint venture, list the names and addresses of all of the principals involved. Attach additional sheets if necessary.
END OF GENERAL INFORMATION APPLICATION FORMS
GO TO REGISTRATION, MAJOR SOURCE APPLICATION FORMS OR EMISSION RATE TABLE AND OTHER FORMS
AFIN Facility Permit# Date Page
REGISTRATIONS (Complete this section for Registration applications only. Otherwise, skip to the next section.)
15. Provide a description of the facility, processes and sources of air pollution emissions. Also include a Process Flow Diagram. Attach additional pages if necessary.
The facility is a grain elevator. Sources of air pollution emissions are listed on the
attached emission calculations. An existing 1,000,000 bushel storage tank will be replaced with a
250,000 bushel tank. Two new grain receiving pits will be installed. Two existing pits will be closed.
A baghouse used to aspirate the receiving pits will be removed from service, but with the new pit design,
emissions will not increase. The throughput of the facility will not change.
16. What are the total actual emissions from this facility?
Pollutant Tons per year Eligible TPY limits
PM 13.9 ::::15 and<25
PMw 4.3 ::::10 and< 15
so2 N/A ::::25 and<40
voc N/A ::::25 and< 40
co N/A ::::40 and< 75
NOx N/A
::::25 and<40
Single HAP N/A
::::1and<2
Combination HAP N/A
::::3and<5
Air Contaminants N/A
<25
Lead N/A
<0.5
17. Provide a detailed explanation ofhow the emissions estimate was determined e.g. AP-42, test information, etc. Attach additional pages if necessary.
Emission factors from Section 9.9.1 of AP-42 were used. Calculations are attached.
AFIN
END OF REGISTRATION SPECIFIC QUESTIONS
GO TO MAILING AND CERTIFICATION FORMS
Facility Permit# Date Page
MAJOR SOURCE APPLICATIONS
(Complete this section for Title V/Major Source Air Permit Applications only. Otherwise, skip to the Emission Rate Table and Other Forms section.)
18. NEIGHBORING STATES WITHIN 50 MILES OF THE PERMITTED FACILITY (CHECK ALL THAT APPLY):
Texas Tennessee Kentucky
Oklahoma Mississippi Kansas
Missouri Louisiana
TITLE V!MAJOR SOURCE QUESTIONS Yes
19. Prevention Of Significant Deterioration (PSD)
a. Is the facility a major source as defined in PSD rules? If yes, include an explanation why this application is not subject to PSD.
b. Will the facility engage in construction, reconstruction, or modification that will require a PSD application? If yes, complete Request for Applicability of Class I Area Modeling form.
20. Is the facility subject to:
a. Cross-State Air Pollution Rule (CSAPR)/Transport Rule (TR)?
If yes and the Description of TR Monitoring Provisions Table has not been submitted or this request is to update the table, attach the completed Description ofTR Monitoring Provisions Table.
b. Acid Deposition Control contained in 40 CPR Part 72?
If yes and the Acid Rain Application has not been provided or this request is to update the application, attach the completed forms, available on-line from USEPA.
21. Will the facility engage in construction or reconstruction that will require a 112(g) application?
22. Title VI applicability
a. Does the facility have any air conditioners or refrigeration equipment that uses CFCs, HCFs or other ozone depleting substances?
b. Does the air conditioner or refrigeration equipment contain a refrigeration charge greater than 50 pounds per unit?
c. Do facility personnel maintain, service, repair or dispose of any motor vehicle air conditioners or appliances (as defined in 40 CPR 82.152)?
23. Is the facility subject to the Accidental Release Prevention requirements of §112(r)?
If yes, is the facility in compliance (If not in compliance, submit a compliance plan.)
END OF MAJOR SOURCE APPLICATION SPECIFIC QUESTIONS
GO TO EMISSION RATE TABLE AND OTHER FORMS SECTION
AFIN Facility Permit# Date Page
No
CERTIFICATION AND MAILING
Checklist - The following may be required information for an application:
C'-· Initial Significant, De .s § Permit
'"0 ·..:::: Item Registration (New or Renewal2 Minimis or Administrative
<lJ ro '"d -~ Minor Amendment ;:j...-< existing ...... 0.. Modifications u 0.. .El~ Facility)
~ General Information
Yes Yes Yes Yes Yes Forms
D Emission Rate Table No Yes Yes Yes No
Forms ~ Calculations Yes Yes Yes Yes Maybe
Control Equipment D Operating Parameters No Yes Yes Yes Not Applicable
Forms ~ Process Flow Diagram Yes Yes Yes Yes No
D Process Description Yes Yes Yes Yes No
D USGS (Area) Map No Yes Yes Maybe1 No
D Plot Plan No Yes Yes Maybe1 No
D Property Description No Yes Yes No No
D Operating Scenarios No Yes Yes Yes No
D Equipment Specifications Yes Yes Yes Maybe1 No
D Compliance Plan No Title V
Yes Title V Only No Only
D Applicable Requirements No Title V
Yes Title V Only No Only
D Compliance Schedule No Title V
Yes Title V Only No Only
D USEP A Acid Rain Forms No Maybe Maybe Maybe No
D CSAPRForms No Maybe Maybe Maybe No
Detailed NSPS and D NESHAP/MACT Yes Yes Yes Yes No
Requirements
~ Additional Information No Yes Yes Yes No
D List of Insignificant
No Yes Yes Yes Maybe Activities Forms
D Disclosure Statement Form Yes Yes Yes No No Certificate of Good
D Standing, Domestic and Yes Yes Yes Yes No Foreign
~ Certification of
Yes Yes Yes Yes Yes A}JlJlication Form
D Certification of No
Title V Yes Title V Only Title V Only
Compliance Form Only
D Certification of Minor No No No
Minor Mod No
Modification Form Only
Request for Applicability PSDOnly PSDOnly
D of Class I Area Modeling No Email to: No Email to: No AirPermits@ad [email protected] Analysis Form eq.state.ar.us tate.ar.us
1 - Modifications involving new construction or modification of the manner in which the current process operates will require this attachment. Modifications involving production increases, hour of operation increases, etc. (i.e. do not involve the addition of any new equipment units or modification of the manner in which the current process operates) will not require this attachment. 2 - A renewal must include all information as if it were the initial application. This includes items that are not changing.
CERTIFICATION OF APPLICATION COMPLETE FOR ALL REGISTRATIONS AND APPLICATIONS
"Responsible Official" means one of the following:
1) For a corporation: a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation, or a duly authorized representative of such person if the representative is responsible for the overall operation of one or more manufacturing, production, or operating facilities applying for or subject to a permit and either:
(i) the facilities employ more than 250 persons or have gross annual sales or expenditures exceeding $25 million (in second quarter 1980 dollars); or
(ii) the .delegation of authority to such representative is approved in advance by the permitting authority (a copy of this delegation of authority must be attached);
(2) For a partnership or sole proprietorship: a general partner or the proprietor, respectively;
(3) For a municipality, State, Federal, or other public agency: either a principal executive officer or ranking elected official. For the purposes of this part, a principal executive officer of a Federal agency includes the chief executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., a Regional Administrator of EPA).
I certify under penalty of law that this application and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Mike Tate District Manager
typed/printed name of responsible official title
wt~~/ (r~jg signature of responsible offidal date
(A copy of any delegation of authority must be attached)
Christa Andrew Bunge North America typed/printed name of person preparing application firm or company
1391 Timberlake Manor Parkway 314-292-2707
Address of preparer' s firm telephone number (including area code)
AFIN Facility Permit# Date Page
BCJNGE Enhancing the Value of America's Harvest
Dust Control on Truck Receiving Pits
Bunge realizes the importance of controlling the emissions in and around our truck receiving operations. We have developed many baffle designs over time in an effort to offset the need and expense of installing 'Dust Collection - Filter Systems'.
To this end, we have investigated designs that would accomplish our goal but not require supplemental dust collection equipment. The newest, improved system design will be installed in our truck receiving pits at DeSoto Landing. This new system is a baffle system of basically small inlet hoppers with small swing gates at each discharge. These hoppers are intended to slow the rate that grain enters into the pit, and shorten the distance that grain falls, causing grain to back up above the grating and to the hopper bottom trailer, creating a "choke" condition. By better controlling the speed of the discharge out of the truck, we in turn, control the entrained air associated with it. Also, the new baffle system is always closed until the grain opens the individual swing gates at the bottom of the hoppers. Therefore, dust cannot travel up and out of the pit. The baffled outlets from these hoppers are 12" x 10" with a single hanging baffle plate. Over each of the 14' by 30' receiving pits are 21 of these hopper/baffle devices.
Bunge always wants to be innovative and efficient in all things we do. This process is no different. We feel that this new design paves the way for the future as we strive to also be good stewards of the environment.
November 5, 2018
(;Ji ...... <J~ .,. __
~---.... .... ....
-:>
"' --
' ! • I
t
flOW DIAGRAM --
.... 11000 ....
e 1
BLJNGE Bunge North America, Inc
Hwy4 Arkansas City, AR (Desoto Landing)
AFIN: 21-00037 Permit#: 0335-A-REG315
TABLE 1.
OPERATION
Truck Receiving Pit #1 - (SN-1)
Internal Operations- (SN-2)
Grain Storage - (SN-3)
Barge Loadout- (SN-4)
Truck Receiving Pit #2- (SN-5)
Roadway Fugitives***
**Sum Total
Maximum Controlled Emission Limits Summary
Emissions (lbs/hour) Emission (tons/year)
PM PM10 PM2.5 PM PM10 PM2.5
13.13 2.93 0.49 1.97 0.44 0.07
9.15 5.10 0.87 2.75 1.53 0.26
37.50 9.45 1.65 5.63 1.42 0.25
24.00 6.00 0.83 3.60 0.90 0.12
13.13 2.93 0.49 1.97 0.44 0.07
8.45 2.28 0.70 8.79 2.37 0.73
83.8 23.5 3.8 13.9 4.3 0.7
*** Roadway fugitives are not included in the total emission limits
Desoto Landing - Emissions Spreadsheet- 2018 potential changes .xis
BLJNGE Bunge North America, Inc
Hwy4 Arkansas City, AR (Desoto Landing)
AFIN: 21-00037 Permit #: 0335-AR-1
Emissions Estimate
Total Bu Total Tons Receipts 15,000,000 450,000 Handlin~ 30,000,000 900,000
Barge shipments 15,000,000 450,000
bushels I tons
commodity receipts
com beans
Total 15,000,000 450,000
Through "half-pit" - removing this one. I -
Page 1
I
F F
bushels T
Max: 60 #/bu
or these calculations, the annual throughput was increased to 15 mm bu/yr. or some sources, the hourly throughput was changed to 40,000 bu/hr.
barge shi tons
pments
15,000,000 450,000
Desoto Landing- Emissions Spreadsheet- 2018 potential changes .xis
Page 1
BLJNGE Bunge North America, Inc
Hwy4 Arkansas City, AR (Desoto Landing)
AFIN: 21-00037 Permit #: 0335-AR-1
Truck Receiving Pit #1- ISN-1)
PM Emission Factor PM10 Emission Factor
PM2.5 Emission Factor Unloading rate/hour Unloading rate/year
%Reduction
Potential PM emissions due to grain unloading
a. Max Hourly
b. Max Yearly
Potential PM10 emissions due to grain unloading
a. Max Hourly
b. Max Yearly
PotentiaiPM2.5 emissions due to grain unloading
a. Max Hourly
b. Max Yearly
Truck Receiving Pit #2 - ISN-51
PM Emission Factor PM10 Emission Factor
PM2.5 Emission Factor Unloading rate/hour Unloading rate/year
%Reduction
Potential PM emissions due to grain unloading
a. Max Hourly
b. Max Yearly
Potential PM10 emissions due to grain unloading
a. Max Hourly
b. Max Yearly
Potential Emissions Estimate
0.035 lb/ton 0.008 lb/ton 0.001 lb/ton
(Table 9.9.1-1, Hopper Bottom Truck Receiving AP-42, March 2003). Conservative assumption that gravity-actuated pit baffles reduce particulate matter generation by 50%. sec 3-02-005-52
750 tons 25,000 BPH 225,000 tons annual throughput
50 % - Inherent to the process- enclosure and baffles
Emission Factor • Process Rate • %Reduction
(lb/ton)*(unload rate ton/hour)*(%reduction) 13.13 lbs/hour
(lb/ton)*(unload rate ton/year)/(2000 lb/ton) 1.97 tons/year
Emission Factor • Process Rate
(lb/ton)*(unload rate ton/hour) 2.93 lbs/hour
(lb/ton)*(unload rate ton/year)/(2000 lb/ton) 0.44 tons/year
Emission Factor • Process Rate
(lb/ton)"(unload rate ton/hour) 0.49 lbs/hour
(lb/ton)"(unload rate ton/year)/(2000 lb/ton) 0.07 tons/year
0.035 lb/ton 0.008 lb/ton 0.001 lb/ton
(Table 9.9.1-1, Hopper Bottom Truck Receiving AP-42, March 2003). Conservative assumption that gravity-actuated pit baffles reduce particulate matter generation by 50%. sec 3-02-005-52
750 tons 25,000 BPH 225,000 tons annual throughput
50 % - Inherent to the process -enclosure and baffles
Emission Factor • Process Rate
(lb/ton)*(unload rate ton/hour) 13.13 lbs/hour
(lb/ton)*(unload rate ton/year)/(2000 lb/ton) 1.97 tons/year
Emission Factor • Process Rate
(lb/ton)*(unload rate ton/hour) 2.93 lbs/hour
(lb/ton)*(unload rate ton/year)/(2000 lb/ton) 0.44 tons/year
Desoto Landing - Emissions Spreadsheet - 2018 potential changes .xis
Page 2
Potential PM2.5 emissions due to grain unloading
a. Max Hourly
b. Max Yearly
Internal Operations - (SN-2)
Emission Factor* Process Rate
(lb/ton)*(unload rate ton/hour) 0.49 lbs/hour
(lb/ton)*(unload rate ton/year)/(2000 lb/ton) 0.07 tons/year
Note: All handling equipment is totally enclosed or in the facility interior. PM Emission Factor 0.061 lb/ton (Table 9.9.1-1, Headhouse and Internal Handling, March 2003)
sec 3-02-005-3D PM10 Emission Factor 0.034 lb/ton PM2.5 Emission Factor 0.0058 lb/ton
Conveying rate/hour 1,500 tons 50,000 BPH Conveying rate/year 900,000 tons
Capture Efficiency 90 % - main conveying: Enclosed or in the interior. Control Dev Eff 0 %
PM emissions due to grain handling
a. Max Hourly
b. Max Yearly
PM1 0 emissions due to grain handling
a. Max Hourly
b. Max Yearly
PM2.5 emissions due to grain handling
a. Max Hourly
b. Max Yearly
Grain Storage - fSN-3)
PM Emission Factor PM1 0 Emission Factor
PM2.5 Emission Factor Conveying rate/hour Conveying rate/year
Capture Efficiency Control Dev Eff
Potential PM emissions due to grain storage
a. Max Hourly
b. Max Yearly
Potential PM1 0 emissions due to grain storage
a. Max Hourly
b. Max Yearly
Potential PM2.5 emissions due to grain storage
a. Max Hourly
b. Max Yearly
Emission Factor* Process Rate * (1 -capture eff)
(lb/ton)*(rate ton/hour)*((1 DO-capture efficiency)/1 00) 9.15 lbs/hour
(lb/ton)*(rate ton/year)*((1 00-eff'y)/1 00)/(2000 lb/ton) 2. 75 tons/year
Emission Factor* Process Rate * (1 -capture eff)
(lb/ton)*(rate ton/hour)*((1 DO-capture efficiency)/1 00) 5.10 lbs/hour
(lb/ton)*(rate ton/year)*((1 00-eff'y)/1 00)/(2000 lb/ton) 1.53 tons/year
Emission Factor* Process Rate* (1 -capture eff)
(lb/ton)*(rate ton/hour)*((1 DO-capture efficiency)/1 DO) 0.87 lbs/hour
(lb/ton)*(rate ton/year)*((1 00-eff'y)/1 00)/(2000 lb/ton) 0.26 tons/year
0.025 lb/ton 0.0063 lb/ton 0.0011 lb/ton
1500 tons 450,000 tons
0% 0%
(Table 9.9.1-1, Storage Bin Vents, 3/03) sec 3-02-005-4D
50,000 BPH
Emission Factor* Process Rate
(lb/ton)*(load rate ton/hour) 37.50 lbs/hour
(lb/ton)*(ton/year)/(2000 lb/ton) 5.63 tons/year
Emission Factor* Process Rate
(lb/ton)*(load rate ton/hour) 9.45 lbs/hour
(lb/ton)*(ton/year)/(2000 lb/ton) 1.42 tons/year
Emission Factor* Process Rate
(lb/ton)*(load rate ton/hour) 1.65 lbs/hour
(lb/ton)*(ton/year)/(2000 lb/ton) 0.25 tons/year
Desoto Landing - Emissions Spreadsheet- 2018 potential changes .xis
Page 3
GRAIN lOADOUT Barge loadout - (SN-4) The grain barge shipping system includes an enclosed conveyor to the barge.
PM Emission Factor 0.016 lb/lon (AP-42, Section 9.11.1, Table 9.1.1-1; 3/03) PM10 Emission Factor 0.004 lb/lon SCC 3-02-005-64
PM2.5 Emission Factor 0.00055 lb/ton Load out rate/hour Loadout rate/year Capture efficiency
Control Dev Eff
Potential PM emissions due to grain
a. Max Hourly
b. Max Yearly
Potential PM10 emissions due to grain load out
a. Max Hourly
b. Max Yearly
Potential PM2.5 emissions due to grain loadout
a. Max Hourly
b. Max Yearly
1,500 tons 450,000 tons
0 % - telescopin(l spout 0%
Emission Factor • Process Rate
(lb/lon)*(load rate ton/hour) 24.00 lbs/hour
(lb/ton)"(load rate ton/year)/(2000 lb/ton) 3.60 tons/year
Emission Factor • Process Rate
(lbilon)*(load rate ton/hour) 6.00 lbs/hour
(lb/lon)*(load rate ton/year)/(2000 lb/ton) 0.90 tons/year
Emission Factor • Process Rate
(lbilon)"(load rate ton/hour) 0.83 lbs/hour
(lb/lon)*(load rate ton/year)/(2000 lb/lon) 0.12 tons/year
50,000 BPH
Desoto Landing -Emissions Spreadsheet- 2018 potential changes .xis
8 0
g 0 g 0 ..9 0
~ ~ fBiZ fi ~ ;.£ ... ~
IJI ~~ -= !b.~
~~g~ -= ~ ~::I:
~§ ...,, w m
;:tl 0 (") ~
> ;:tl
~ ..... N
:>:' .... i
.... co
~
d CJI >> w c-0 m;:o ..... z D"'tt m 0 ;:tl
~ s:: ~ ::I:
CIJ z ::I: 0 Ci)
;:tl CIJ m m c (")
;:tl :::! 0 z
g ,..,
~ AS_:a- ·
After printing this label:
g.; ..... N
~ g ...... N --00
~~ ~
~~ J1S2tf008 1501w
1. Use the 'Print' button on this page to print your label to your laser or inkjet printer. 2. Fold the printed page along the horizontal fine.
c: $
552J3JC392!>C.A5
Page 1 of 1
~~ ~!P ,.... ~
~ ~~· ~ a> <..) - 0::::~ • ~ :;on ~ ..
'W .; .... ~ !
2! 0'7><n .- ;; r-(/)
I i! i~
3. Place label in shipping pouch and affix it to your shipment so that the barcode portion of the label can be read and scanned.
Warning: IMPORTANT: TRANSMIT YOUR SHIPPING DATA AND PRINT A MANIFEST: At the end of each shipping day, you should perform the FedEx Ground End of Day Close procedure to transmit your shipping data to FedEx. To do so, click on the Ground End of Day Close Button. If required, print the pickup manifest that appears. A printed manifest is required to be tendered along with your packages if they are being picked up by Fed Ex Ground. If you are dropping your packages off at a Fed Ex drop off location, the manifest Is not required. Use of this system constitutes your agreement to the service conditions in the current Fed Ex Service Guide and applicable tariff, available upon request. FedEx will not be responsible for any claim in excess of $100 per package, whether the result of loss, damage, delay, non-delivery, misdelivery, or misinformation, unless you declare a higher value, pay an additional charge, document your actual loss and file a timely claim. Limitations, Including limitations on our liability, can be found in the current FedEx Service Guide and applicable tariff apply. In no event shall FedEx Ground be liable for any special, incidental, or consequential damages, including, without limitation, loss of profit, loss to the intrinsic value of the package, loss of sale, interest income or attorney's fees. Recovery cannot exceed actual documented loss. Items of extraordinary value are subject to separate limitations of liability set forth In the Service Guide and tariff. Written claims must be filed within strict time limits, see current FedEx Service Guide.
https://www.fedex.com/shipping/html/en/PrintlFrarne.html 1116/2018