2018 State Transportation Improvement Program Highway Needs Page 1 of 30 September 15, 2017 District County Route Beg PM End PM Location Project Description CTC Project Category Planning Level Cost Est ($1000) PID Completion Date PA & ED Date 1 DN 101 12.500 16.300 Last Chance Grade Last Chance Grade Highway Restoration System Preservation $ 650,000.00 6/1/2016 2026 1 DN 101 23.500 28.400 Crescent City Crescent City Gateway project System Management $ 1,153.00 1/8/2013 1 DN 101 23.500 28.400 Crescent City Crescent City Gateway project System Management $ 1,153.00 1/8/2013 1 DN 199 20.500 25.700 Sections of US 199/197 US 199 allow Industry standard trucks through bridge replacement, shoulder widening on narrow section of highway System Management $ 26,686.00 4/11/2013 1 DN 199 20.500 25.700 Sections of US 199/197 US 199 allow Industry standard trucks through bridge replacement, shoulder widening on narrow section of highway System Management $ 26,686.00 4/11/2013 1 HUM 101 77.240 78.021 Eureka US 101 Couplet for Safety, Livability, and Sustainability System Expansion $ 32,150.00 Need PID 1 LAK 29 23.800 26.900 In Lake County on Route 29 near Lower Lake. Lake 29 Expressway 2A provides needed congestion relief, reduce collisions by 60%, and diverts traffic from main street communities on SR 20 System Management $ 94,000.00 2001 11/30/2016 1 LAK 29 26.100 29.100 In Lake County on Route 29 near Lower Lake. Lake 29 Expressway 2B provides needed congestion relief, reduce collisions by 60%, and diverts traffic from main street communities on SR 20 System Management $ 94,000.00 2001 11/30/2016 1 LAK 29 28.500 31.600 In Lake County on Route 29 near Lower Lake. Lake 29 Expressway 2C provides needed congestion relief, reduce collisions by 60%, and diverts traffic from main street communities on SR 20 System Management $ 110,000.00 2001 11/30/2016 2 SHA 5 3.830 7.000 From Rte 5/273 Separation to the Sacramento River Bridge "Big Easy" (Redding to Anderson 6-Lane) Add median lanes Deschutes to Riverside Ave Interchange (Phase 2 of 2) Expansion $ 81,739.00 2014 2016 2 SHA 5 6.200 11.700 From 0.6 mile south of Riverside Avenue Overcrossing to 0.4 mile south of Churn Creek Road Overcrossing "Little Easy" (Redding to Anderson 6-Lane) Add median lanes Riverside Ave to S. Bonnyview Rd. interchange (Phase 1 of 2) Expansion $ 27,400.00 2014 2016 2 SHA 5 14.800 20.000 from 0.3 mile north of Cypress Ave overcrossing to 0.6 mile north of Oasis Road overcrossing "North Redding 6 Lane " Expand freeway to six lanes from south of Route 5/44 separation to north of Oasis Rd interchange Expansion $ 67,000.00 2017 2018 2 SHA 44 3.600 7.000 Airport Road Interchange to Deschutes Road Interchange "Stillwater Freeway" Upgrade SR 44 from a 2 lane expressway to a 4 lane freeway from the Airport Road Interchange to the Deschutes Road Interchange Expansion $ 35,000.00 2016 2023 3 ED 50 17.111 17.778 US 50 WB Auxiliary lane In Placerville, from west of Coloma Road off-ramp to the Placerville Drive off-ramp, Construct WB Auxiliary Lane. Project is only constrained up to PA/ED in the MTP/SCS. System Management $ 20,000.00 3 NEV 49 11.100 13.300 North of La Barr Meadows Rd. to McKnight Way I/C Construction: SR 49 widening and frontage road system (St. Hwy). Widen shoulders, construct TWLTL, SB right-turn lane System Expansion $ 54,000.00 1/14/2008 3 NEV 80 23.400 27.300 In Nevada County from Floriston to Hinton Add WB truck climbing lane $ 30,000.00 2022 PID Cycle Candidate 3 NEV 80 59.400 59.500 In Nevada County near Emigrant Gap at the Yuba Pass Separation OH Bridges (Br#17-0023L/R) Replace bridges, widen WB direction for truck climbing lane, install TMS elements & communications. System Management $ 80,000.00 3 PLA 49 8.105 10.551 Dry Creek in Placer County to La Barr Meadow in Nevada County Construct Continuous passing lanes and 2-way channelization System Expansion $ 100,000.00 1999 3 PLA 65 6.000 12.870 SR 65, from Galleria Blvd. to Blue Oaks Blvd. SR 65 Capacity & Operational Improvements Phase 1. From Galleria Blvd. to Blue Oaks Blvd., construct HOV and auxiliary lanes. Operational Improvements $ 60,000.00 1/10/2013

Transcript of 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In...

Page 1: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 1 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

1 DN 101 12.500 16.300 Last Chance Grade Last Chance Grade Highway Restoration System Preservation $ 650,000.00 6/1/2016 2026

1 DN 101 23.500 28.400 Crescent City Crescent City Gateway project System Management $ 1,153.00 1/8/2013

1 DN 101 23.500 28.400 Crescent City Crescent City Gateway project System Management $ 1,153.00 1/8/2013

1 DN 199 20.500 25.700 Sections of US 199/197US 199 allow Industry standard trucks through bridge replacement,

shoulder widening on narrow section of highwaySystem Management $ 26,686.00 4/11/2013

1 DN 199 20.500 25.700 Sections of US 199/197US 199 allow Industry standard trucks through bridge replacement,

shoulder widening on narrow section of highwaySystem Management $ 26,686.00 4/11/2013

1 HUM 101 77.240 78.021 Eureka US 101 Couplet for Safety, Livability, and Sustainability System Expansion $ 32,150.00 Need PID

1 LAK 29 23.800 26.900 In Lake County on Route 29 near Lower Lake.Lake 29 Expressway 2A provides needed congestion relief, reduce

collisions by 60%, and diverts traffic from main street communities on SR 20

System Management $ 94,000.00 2001 11/30/2016

1 LAK 29 26.100 29.100 In Lake County on Route 29 near Lower Lake.Lake 29 Expressway 2B provides needed congestion relief, reduce

collisions by 60%, and diverts traffic from main street communities on SR 20

System Management $ 94,000.00 2001 11/30/2016

1 LAK 29 28.500 31.600 In Lake County on Route 29 near Lower Lake.Lake 29 Expressway 2C provides needed congestion relief, reduce

collisions by 60%, and diverts traffic from main street communities on SR 20

System Management $ 110,000.00 2001 11/30/2016

2 SHA 5 3.830 7.000From Rte 5/273 Separation to the Sacramento River

Bridge "Big Easy" (Redding to Anderson 6-Lane) Add median lanes Deschutes to

Riverside Ave Interchange (Phase 2 of 2)Expansion $ 81,739.00 2014 2016

2 SHA 5 6.200 11.700From 0.6 mile south of Riverside Avenue Overcrossing

to 0.4 mile south of Churn Creek Road Overcrossing"Little Easy" (Redding to Anderson 6-Lane) Add median lanes Riverside

Ave to S. Bonnyview Rd. interchange (Phase 1 of 2)Expansion $ 27,400.00 2014 2016

2 SHA 5 14.800 20.000from 0.3 mile north of Cypress Ave overcrossing to 0.6

mile north of Oasis Road overcrossing"North Redding 6 Lane " Expand freeway to six lanes from south of Route

5/44 separation to north of Oasis Rd interchangeExpansion $ 67,000.00 2017 2018

2 SHA 44 3.600 7.000Airport Road Interchange to Deschutes Road

Interchange

"Stillwater Freeway" Upgrade SR 44 from a 2 lane expressway to a 4 lane freeway from the Airport Road Interchange to the Deschutes Road

InterchangeExpansion $ 35,000.00 2016 2023

3 ED 50 17.111 17.778 US 50 WB Auxiliary laneIn Placerville, from west of Coloma Road off-ramp to the Placerville Drive off-ramp, Construct WB Auxiliary Lane. Project is only constrained up to

PA/ED in the MTP/SCS.System Management $ 20,000.00

3 NEV 49 11.100 13.300 North of La Barr Meadows Rd. to McKnight Way I/CConstruction: SR 49 widening and frontage road system (St. Hwy). Widen

shoulders, construct TWLTL, SB right-turn laneSystem Expansion $ 54,000.00 1/14/2008

3 NEV 80 23.400 27.300 In Nevada County from Floriston to Hinton Add WB truck climbing lane $ 30,000.00 2022 PID Cycle

Candidate

3 NEV 80 59.400 59.500In Nevada County near Emigrant Gap at the Yuba Pass

Separation OH Bridges (Br#17-0023L/R)Replace bridges, widen WB direction for truck climbing lane, install TMS

elements & communications.System Management $ 80,000.00

3 PLA 49 8.105 10.551Dry Creek in Placer County to La Barr Meadow in

Nevada CountyConstruct Continuous passing lanes and 2-way channelization System Expansion $ 100,000.00 1999

3 PLA 65 6.000 12.870 SR 65, from Galleria Blvd. to Blue Oaks Blvd.SR 65 Capacity & Operational Improvements Phase 1. From Galleria Blvd.

to Blue Oaks Blvd., construct HOV and auxiliary lanes.Operational

Improvements $ 60,000.00 1/10/2013

Page 2: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 2 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

3 PLA 65 6.000 12.870 SR 65, from Blue Oaks Blvd. to Lincoln Blvd.SR 65 Capacity & Operational Improvements Phase 2. From Blue Oaks

Blvd. to Lincoln Blvd.Operational

Improvements $ 57,000.00

3 PLA 80 1.968 6.061In Placer County: Between I-80 Douglas Blvd. and

Rocklin Rd.I-80/SR 65 I/C Improvements Phase 3 and 4

Operational Improvements

$ 250,000.00

3 PLA 80 1.968 6.061In Placer County: Between I-80 Douglas Blvd. and

Rocklin Road

I-80/SR 65 Interchange Improvements Phase 2 Reconfigure I-80/SR 65 interchange to widen southbound to eastbound ramp from 1 to 2 lanes, and replace existing eastbound to northbound

loop ramp with a new 3 lane direct flyover ramp.

Operational Improvements

$ 250,000.00

3 PLA 80 1.968 6.061In Placer County: Between I-80 Douglas Blvd. and

Rocklin RoadI-80/SR 65 Interchange Improvements Phase 3 and 4

Operational Improvements

$ 250,000.00

3 PLA 80 27.200 28.800In Placer County from Heather Glen/ Applegate to

Weimar OHAdd EB truck climbing lane $ 25,000.00

2020 PID Cycle Candidate for FY 18/19 Delivery

3 PLA 80 31.900 33.700 In Placer County from E. Illinoistown OC to E of SR 174 Add EB truck climbing lane $ 15,000.00 2022 PID Cycle

Candidate

3 PLA 80 32.500 35.100In Placer County near Colfax from 0.5 miles west of the

80/174 separation to Long Ravine UCReplace 80/174 separation and widen or replace Long Ravine UC #19-

0090 (Carpenter Road) $ 44,000.00

Project is on 2020 PID Work Plan - PID will be completed

by 8/23/17

3 PLA 80 33.200 35.100On I-80 in Placer County in and near Colfax from 0.1

mile east of the I-80/SR 174 Separation to Long Ravine Bridge (Br#19-89)

Widen shoulders, construct truck climbing lanes (EB and WB), widen Long Ravine UC, install fiber optics, rehab AC pavement, replace concrete

barrier & MBGR, extend drainage, and replace signs as necessary.System Expansion $ 100,000.00 7/28/2017

3 PLA 80 35.100 37.800In Placer County near Colfax from Long Ravine UC to

Magro OCAdd shoulders in WB direction and investigate WB truck descend lane $ 46,000.00

2022 PID Cycle Candidate

3 PLA 80 39.500 40.900 In Placer County from Magra OH to Gold Run Add EB truck climbing lane $ 25,000.00 2020 PID Cycle

Candidate for FY 18/19 Delivery

3 PLA 80 42.700 44.900 In Placer County from Sawmill OC to Alta Rd UC Add EB truck climbing lane $ 25,000.00 Project is on 2020

PID Work Plan - PID will be delivered by

3 PLA 80 44.900 47.000 In Placer County from Alta to Baxter Add EB truck climbing lane from Alta Rd UC to Baxter OC $ 32,000.00 Project is on 2020

PID Work Plan - PID will be delivered by

3 PLA 80 47.000 49.300 In Placer County from Baxter to Drum Forebay Extend existing EB truck climbing lane $ 38,000.00 Project is on 2020

PID Work Plan - PID will be completed

3 PLA 80 52.100 54.500 In Placer County from Blue Canyon to Putts Lake Extend existing EB truck climbing lane $ 25,000.00 2020 PID Cycle

Candidate for FY 18/19 Delivery

3 PLA 80 58.200 60.400In Placer County from east of SR 20 to Yuba Pass

SummitAdd WB truck climbing lane (Eagle Lake Grade) $ 20,000.00

2022 PID Cycle Candidate

3 PLA 80 64.200 66.300 In Placer County from Cisco Grove to Hampshire Rocks Add EB truck climbing lane (EB Big Bend/ Kingvale Grade) $ 20,000.00 2022 PID Cycle

Candidate

3 PLA 80 67.700 69.200 In Placer County from SY to Kingvale Add EB truck climbing lane (EB Troy Grade/ Kingvale Grade) $ 15,000.00 2022 PID Cycle

Candidate

3 SAC 5 9.700 22.500 I-5 HOV Lanes from Elk Grove Blvd. to US 50In Sacramento County on I-5, from 1.1 miles south of Elk Grove Blvd. to

US 50 – Add HOV LanesSystem Expansion $ 60,000.00 6/27/2013 6/27/2013

Page 3: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 3 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

3 SAC 5 22.100 26.700Strengthen/replace structures for permit load rating

(Br#24-0267, 24-0068L, 24-0068R)

In the City of Sacramento, in Sacramento County, from 0.5 miles south of I-5/US 50 separation to I-5/I-80 separation. Project has funds allocated to it for a PID. It is not currently listed in the 2016 SACOG MTP/SCS, but can

be added in at a future time. Locations: BR#24-0267 - SAC 5, South Connector UC (PM 022.42); BR# 24-0068L - SAC 5 - American River

Viaduct (PM 024.82); BR#24-0068R - SAC 5 - American River Viaduct (PM 024.82)

System Management $ 382,615.00

Project is on 2020 PID Work Plan - PID will be completed

by 8/23/17

3 SAC 5 22.584 22.584 I-5/US 50 Riverfront Interchange Reconstruction Reconstruct I-5/US50 Riverfront Interchange, including bus/carpool lane

connectorsSystem Management $ 100,000.00

3 SAC 5 22.589 26.654 In SAC county on I-5 - US 50 to I-80 in both directions, Bus/Carpool Lanes: US 50 to I-80 in both directions, including a new Class

I bike path over the American RiverSystem Mang $ 116,000.00

3 SAC 5 23.400 24.600In Sacramento County, in the City of Sacramento at the

West End Viaduct (Br#24-0069 R/L)

Replace existing structure to allow permit loads. Project has funds allocated to it for a PID. It is not currently listed in the 2016 SACOG

MTP/SCS, but can be amended in at a future time. System Management $ 345,657.00 6/30/2017

3 SAC 5 26.654 0.000 I-5 Bus/Carpool Lane: I-80 to Sac/Yolo County Line Bus/Carpool Lanes: I-80 to Sac/Yolo County Line in both directions System Management $ 100,000.00

3 SAC 5 26.700 27.000 I-5 and I-80 HOV Connectors and Lanes to Downtown

Reconstruct I-5/I-80 Interchange, including high occupancy vehicle (HOV, bus/carpool) lane connectors, and construction of HOV lanes from the I-

5/I-80 Interchange to downtown Sacramento (PM 26.7/27.0) [EFIS ID 0300000313] (Emission Benefits in kg/day 1.0 ROG)

Operational Improvements

$ 300,000.00

3 SAC 50 0.001 0.001U.S. 50 / SR 99 / SR 51 Oak Park Interchange

ReconstructionU.S. 50 / SR 99 / SR 51 Oak Park Interchange Reconstruction: includes:

bus/carpool lane freeway to freeway connectors.Operational

Improvements $ 10,000.00

3 SAC 50 0.200 6.100 US 50 HOV Lanes (I-5 to Watt Ave.) US 50 HOV Lanes - Construct HOV Lanes on US 50 System Expansion $ 109,000.00 PID Completed in

PAED5/31/2017

3 SAC 50 17.500 6.800US 50 from Folsom Blvd in Folsom to Cameron Park

Drive in El Dorado County (Phase 2: Segment 3)

This project will build an Integrated Corridor Management (ICM) System that will actively manage all modes along the US 50 corridor with the

primary objective to reduce non-recurrent congestion. System Management $ 8,000.00

3 SAC 51 1.100 4.400Capital City Freeway (SR 51) widening over the

American River

Widen the existing roadway, extend the existing bus/carpool lanes from J St. to east of Arden Way, construct auxiliary lanes in both directions

between E St. and Exposition Blvd., improve ITS elements, and widen or replace existing structures within the project limits. Construct a transition

lane on SR 51 SB from Exposition Blvd. slip off-ramp to Exposition Blvd. New Class 4 bike path next to the freeway.

System Expansion $ 400,000.00 6/29/2017

3 SAC 51 5.500 7.970 SR 51 from Marconi Ave. to Watt Ave. Construct transition lane NB & SB System Management $ 84,700.00

3 SAC 99 10.043 12.742 SR 99 Bus/Carpool LanesBus/Carpool Lanes and auxiliary lanes in both directions from Elk Grove

Blvd. to Kammerer Rd/Grant Line Rd.System Expansion $ 36,000.00 PSR Expected 2017 projected 2019

3 SAC 99 19.700 22.000SR 99 Auxi Lanes NB from WB Florin Rd. to Fruitridge

Rd.Auxiliary Lanes, slip on-ramps, soundwall relocations, right-of-way

acquisitionsSystem Expansion $ 15,000.00

Page 4: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 4 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

3 SOL 80 41.200 44.700Both directions on I-80 in SOL county from Kidwell Rd in

Dixon to the Solano/Yolo County LineBus/Carpool Lanes in both directions. System Expansion $ 172,000.00

Completion anticipated by

06/30/2018

3 SUT 99 15.590 15.590 Yuba City SR 99/20 new I/C System Expansion $ 25,000.00 PSR-PDS completion

anticipated 01/16/2018

7/1/2022

3 YOL 5 0.000 10.795 I-5 Bus/Carpool Lanes: Sac/Yolo County line to I-5/SR 16 I-5 Bus/Carpool Lanes: Sac/Yol County line to I-5/SR16 System Management $ 120,000.00

3 YOL 5 4.490 28.920In Yolo County near Woodland from Wye Line Rd. OC (Br#22-158) to County Line Rd. OC (Br#22-139) and in

Colusa County at County Line Rd. OC.

Raise structure or lower roadway profile. Project has funds allocated to it for a PID. It is not currently listed in the 2016 SACOG MTP/SCS, but can be

amended in at a future time. BR#22-0158 - YOL 5, WYE Line OC (PM 004.49); BR#22-0139 - YOL 5, County Line Road OC (PM R028.92)

System Management $ 17,352.00 5/15/2017

3 YOL 5 7.800 7.800 I-5 / SR 113 InterchangeConstruct New Interchange freeway to freeway connection Phase 2 and

3.Operational

Improvements $ 66,000.00

3 YOL 5 14.270 22.740In Colusa and Yolo Counties at various locations (see

project description)

Increase vertical clearance on 5 structures: BR#22-0155 - YOL 5, County Road 96 OC (PM R014.27); BR#22-0156 - YOL 5, County Road 95 OC (PM R015.85); BR#22-0157 - YOL 5, Zamora OC (PMR017.62); BR#15-0067 - COL 5, E Street OC (PM R017.98); BR#15-0075 - COL 5 , Lurline Ave OC

(PM R022.74). Project has funds allocated to it for a PID. It is not currently listed in the 2016 SACOG MTP/SCS, but can be amended in at a future

time.

System Management $ 53,692.00

Project is on 2020 PID Work Plan - PID will be completed

by 8/23/17

3 YOL 50 0.000 17.050 Yolo County line to Folsom Blvd. Bus/Carpool Lanes in both directions. System Expansion $ 172,000.00 Completion

anticipated by 06/30/2018

3 YOL 50 0.000 17.500US 50 from Enterprise Blvd. in West Sacramento to Folsom Blvd in Folsom (Phase 1: Segments 1 and 2)

This proejct will build an ICM system that will actively manage all modes along the US 50 corridor with the primary objective to reduce non-

recurrent congestion. System Management $ 37,000.00 6/30/2017

3 YOL 80 0.000 1.360 Yolo County Line to West El CaminoBus/Carpool Lanes in both directions. Including new bike bridge across

the Yolo Causeway. Total distance of this segment in 17.4 milesSystem Expansion $ 172,000.00

Completion anticipated by

06/30/2018

3 YOL 80 0.010 6.000 I-80 in Roseville Riverside Blvd. to Rocklin Rd. I/CCorridor improvements including auxiliary lane (PLA25542), from WB Riverside Blvd to Douglas Blvd and SR 65 to Rocklin, ramp meters at

Atlanic, concrete barrier/retaining walls, and shoulder improvements.System Management $ 30,000.00

6/30/2015 & 4/30/2012

3 YOL 80 11.300 11.300In West Sacramento, I-80, at the Sacramento River

Bridge and Overhead #22-0026L/RI-80 Sacramento River BOH (Bryte Bend) to accommodate HOV System Management $ 600,000.00 6/30/2015

3 YOL 80 9.193 9.552 From Enterprise Blvd. to I-80/US 50 Junction Bus/Carpool Lanes in both directions. System Expansion $ 172,000.00 Completion

anticipated by 06/30/2018

3 YUB 70 16.500 11.800 SR 70 Widening/Passing Lanes Widening/Passing Lanes: Marysville to Ophir Road System Management $ 60,000.00 11/27/2017 &

3/30/2015

Page 5: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 5 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

4 ALA 80 5.835 7.313 I-80 Gilman Street Interchange Improvements

The proposed project is located in northwest Berkeley and will reconfigure the I-80/Gilman interchange. The limits for the freeway and ramp traffic operations would include I-80 from east of Buchanan Street

to west of University Avenue.

Efficiency $ 42,000.00 TBD TBD

4 ALA 262 0.392 1.07SR-262 Mission Boulevard Cross Connector

Improvements

This project will increase mobility between I-680 and I-880 by widening Mission to 3 lanes in each direction throughout the I-680 interchange,

rebuild the NB and SB 680 on and off ramps, and potentially grade separate Mission Blvd. from Mohave Dr. and Warm Springs Blvd.

Efficiency $ 112,000.00 TBD TBD

4 ALA 680 4 9.93I-680 Express Lanes: Northbound from SR 237 to SR 84

Auto Mall Parkway

Express lanes on I-680 in the northbound direction from SR 237 to SR 84 Auto Mall Parkway which involves constructing a new lane. (Post Miles

ALA 0.0 - 4.00, Post Miles SCL M7.25 - M9.93)Expansion $ 130,000.00 TBD TBD

4 ALA 680 11.86 11.078I-680 Southbound Express Lanes (SR-237 to SR-84)

Upgrades

To upgrade the existing toll system for the I-680 southbound express lane project. Additionally, it would also result in upgrades to the existing

pavement for a near continuous access express lanes facility.Efficiency $ 39,000.00 TBD TBD

4 ALA 880 13.679 13.679 I-880 Whipple Road Interchange ImprovementsFull interchange improvements at Whipple Road/I-880, including

northbound off-ramp, surface street improvements and realignmentEfficiency $ 80,000.00 TBD TBD

4 ALA 880 14.524 14.524 I-880 Industrial Parkway Interchange ReconstructionReconstruct the I-880/Industrial Parkway interchange to provide a northbound off-ramp and a southbound HOV bypass lane on the

southbound loop off-ramp. Reconstruct the bridge over I-880.Efficiency $ 57,000.00 TBD TBD

4 ALA 880 17.599 17.599 I-880 Winton Avenue Interchange Improvements

This project proposes to modify the existing Winton Avenue/I-880 cloverleaf interchange to a partial cloverleaf interchange, implement

Complete Street per Caltrans HDM and provide direct access to Southland Mall.

Efficiency $ 41,000.00 TBD TBD

4 ALA 880 18.359 18.359 I-880 A Street Interchange Reconstruction

Reconstruct interchange to widen A Street from 5 lanes to 6 lanes and add bike lanes, and provide additional lane capacity for potential future

freeway widening. Project also involves modifying signals and reconfiguring intersections to improve truck-turning maneuvers.

Expansion $ 54,000.00 TBD TBD

4 ALA 880 31.23 31.587 I-880 Broadway/Jackson Interchange ImprovementsThe project proposes to improve connectivity between I-880/I-980 and

Alameda and Oakland. Improvements include reconfiguration of existing ramps, demolition of existing ones, and construction of new ramps.

Efficiency $ 244,000.00 TBD TBD

4 ALA58084

14.199 N28.15

14.199 N28.15

I-580 SR-84/Isabel Interchange Improvements Phase 2Complete ultimate improvements at I-580/Isabel/State Route 84

Interchange to provide 6-lanes over I-580 at the Isabel/State Route 84 Interchange and 4-lanes over I-580 at the Portola Avenue flyover.

Efficiency $ 43,000.00 TBD TBD

4 ALA84

680R9.71 R9.70

R21.16 R11.86

SR-84/I-680 Interchange Improvements and SR-84 Widening

Construct interchange improvements for the Route 84/I-680 Interchange, widen Route 84 from Pigeon Pass to I-680 and construct aux lanes on I-

680 between Andrade and Route 84.Expansion $ 278,000.00 TBD TBD

4 CC 4 0 3.4 201.121 In Concord, from Route 680 to Route 4. Pavement rehabilitation. Preservation $ 15,529.00 TBD TBD

4 CC 4 0 30.485 SR4 Integrated Corridor MobilitySR4 Integrated Corridor Mobility from I-80 to SR160, including adaptive

ramp metering, advanced traveler information, arterial management system, freeway management system, connected vehicle applications

Efficiency $ 15,000.00 TBD TBD

Page 6: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 6 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

4 CC 4 0 31.5 201.235Near Concord, on Route 4 from Route 80 to Route 160; also on Route 24

east of Caldecott Tunnel to Route 680. Place vegetation control, Maintenance Vehicle Pullout (MVP) and pave beyond gore.

Preservation $ 7,530.00 TBD TBD

4 CC 4 0.707 0.707I-80/SR-4 Interchange Improvements - New Eastbound

Willow Avenue RampsNew SR4 eastbound offramp and onramp at Willow north of Palm Avenue

and removal of Willow Hook RampsEfficiency $ 25,000.00 TBD TBD

4 CC 4 1 2.5 201.010In Orinda and Lafayette, from east of the Caldecott Tunnel to east of

Camino Pablo and at Acalanes Road (PM R4.2/R4.99); also in Oakland on Route 13, at Redwood Road (PM 5.2/5.5). Install safety lighting.

Efficiency $ 4,968.00 TBD TBD

4 CC 4 1.6 1.6 201.110 In Concord, at Buchanan Field Viaduct No. 28-0186. Rehabilitate bridge. Preservation $ 4,210.00 TBD TBD

4 CC 4 11 12 201.131Near Alamo, from south of Rudgear Road to 0.2 mile south of Livorna

Road. Repair slide.Preservation $ 9,663.00 TBD TBD

4 CC 4 12.666 12.666 I-680/SR4 Interchange Improvements - Phases 1-3

Improve I-680/SR4 interchange by implementing: direct connectors for NB I-680 to WB SR4 (Ph1) & WB SR4 to SB I-680 (Ph2), & widening SR4 btw SR242 & Morello from 2 to 3 lanes per direction (Ph3). The 2-lane direct connectors will replace a single lane loop ramp & a single lane

diagonal ramp, respectively.

Expansion $ 292,000.00 TBD TBD

4 CC 4 14.683 20.116 SR-4 Operational Improvements - Initial PhasesVarious operational improvements on SR-4 between SR-242 and Bailey Road, including adding auxiliary lanes in strategic locations along this

corridorEfficiency $ 144,000.00 TBD TBD

4 CC 4 19.938 29.001 East County Rail Extension (eBART), Phase 1Construction of rail extension eastward from Pittsburg-Bay Point BART

station with Phase 1 terminus at Hillcrest Avenue in Antioch.Expansion $ 525,000.00 TBD TBD

4 CC 4 34.542 36.057State Route 4 Widening and Balfour Road IC

ConstructionConstruct SR4 Bypass interchange at Balfour Rd and Widen SR4 from 2 to

4 lanes.Expansion $ 69,000.00 TBD TBD

4 CC 4 48.1 48.3 201.131Near Discovery Bay, at 0.1 mile west of Old River Bridge. Construct

retaining walls to repair storm damage slip-outs.Preservation $ 4,420.00 TBD TBD

4 CC 4 1.2 1.2 201.110 In Richmond, at Stege Drain Bridge No. 28-0091. Bridge rehabilitation. Preservation $ 8,402.00 TBD TBD

4 CC 4 5.8 5.8 201.113In Richmond, at Scofield Avenue Undercrossing No. 28-140L/R. Seismic

retrofit.Preservation $ 8,507.00 TBD TBD

4 CC 4 VAR VAR 201.010In and near Concord, from Route 680 to east of Bailey Road at three

locations. Install safety lighting, high reflective striping and markings.Efficiency $ 6,682.00 TBD TBD

4 CC 24 0 10.1 201.121In Richmond, El Cerrito, San Pablo, Pinole and Hercules, from Alameda

County line to Route 4. Pavement rehabilitation.Preservation $ 44,642.00 TBD TBD

4 CC 24 0 14.1 201.235In various cities from the Alameda County line to the Solano County line;

also on Route 242, 580, and 680 at various locations. Construct maintenance worker safety improvements

Preservation $ 4,424.00 TBD TBD

4 CC 24 1.193 2.318Eastbound SR-24: Construct Auxiliary Lane, Wilder Road

to Camino Pablo

Construct auxiliary lane along eastbound Highway 24 from on-ramp at Wilder Road to downtown Orinda off-ramp at Moraga Way/Camino

Pablo/Brookwood RoadExpansion $ 7,000.00 TBD TBD

4 CC 24 13.9 22.7 201.010In and near Walnut Creek, Pleasant Hill, and Concord, from Olympic

Boulevard to Arthur Road. Install safety lighting.Efficiency $ 23,968.00 TBD TBD

4 CC 24 VAR VAR 201.315In Contra Costa County, on Routes 4, 24, 80, 242, 580, and 680 at various

locations. Repair and replace existing Transportation Management System elements.

Efficiency $ 4,750.00 TBD TBD

4 CC 80 0 10.1 Capital preventive maintenance Pavement preservation (CAPM) Preservation $ 44,752.00 42286 TBD

Page 7: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 7 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

4 CC 80 0 20.4 Collision Severity Reduction Install/upgrade Metal Beam Guardrail Preservation $ 13,263.00 42916 TBD

4 CC 80 0.01 0.01 Bridge preservation Structure Rehab Preservation $ 289,000.00 43281 TBD

4 CC 80 0.234 0.234I-80/Central Avenue Interchange Modification - Phases

1 & 2

Construct new signals and changeable message signs to redirect I-80 westbound on-ramp traffic during weekend peak periods to I-580,

connect Pierce Street to San Mateo Street to relocate the traffic signal at Pierce Street/Central Avenue to the San Mateo Street/Central Avenue

intersection, and construct other necessary improvements.

Efficiency $ 26,000.00 TBD TBD

4 CC 80 8.519 8.519I-80 Eastbound and Westbound Pinole Valley Road On-

ramp Improvement

Improve conditions for merging onto the I-80 mainline from the eastbound and westbound Pinole Valley Road on-ramps to address

vehicles accelerating uphill after stopping at ramp meter.Efficiency $ 10,000.00 TBD TBD

4 CC 80 13.9 22.7 Enhance night-time visibility and minimize glare Install lighting along the median and upgrade median barrier Preservation $ 38,943.00 42771 TBD

4 CC 80 14.3 24.3 Capital preventive maintenance Roadway rehabilitation (CAPM) Preservation $ 13,760.00 42916 TBD

4 CC 80 1.98 (ALA) 13.48 (CC) I-80 ICM Project Operations and Maintenance

I-80 Integrated Corridor Mobility (ICM) Project Operations and Management - Local Portion - Maintenance in Contra Costa; This project

will implement Adaptive Ramp Metering (ARM) and Active Traffic Management (ATM) strategies will be employed to reduction congestion

and provide incident management capabilities.

Efficiency $ 3,000.00 TBD TBD

4 CC 160 10.1 13.5 Roadway rehabilitation Roadway rehabilitation (2R) Preservation $ 76,759.00 42422 TBD

4 CC 580 VAR VAR Repair detection devices Restoration of Non-Operational Vehicle Detection Devices Preservation $ 4,750.00 42709 TBD

4 CC 580 VAR VAR Operational improvements Add mixed-flow lanes and operational improvements Expansion $ 185,000.00 42885 TBD

4 CC 680 4.5 6.99 Improve safety and reduce accidentsIn Contra Costa County, at various locations - Install shoulder rumble

stripsEfficiency $ 1,405.00 Proposed TBD

4 CC 680 7.6 12.75 Bridge rail upgrade and replacementAppian Way OC BR#28-0146R, Cummings Skyway OC Br28-0149; bridge

railsPreservation $ 1,500.00 Proposed TBD

4 CC 680 11.301 15.61I-680 Southbound HOV Lane between N. Main and

Rudgear Rd/Livorna Ave

Through the I-680/SR 24 Interchange, this project adds an HOV lane on I-680 SB, through minor widening and restriping to narrower lanes. Existing

number of mixed flow lanes will be kept the same.Expansion $ 83,000.00 TBD TBD

4 CC 680 15.619 18.509I-680 Northbound HOV lane extension between N. Main

and SR-242

Provides an HOV lane in the northbound direction between N. Main and SR242, which will shorten a gap in the HOV network which currently

exists between Livorna and SR242.Expansion $ 54,000.00 TBD TBD

4 CC 680 22.697 22.697 ADA curb ramp upgrade and pedestrian infrastructureAt CC 680 Arthur Road Undercrossing - missing curb ramps and sidewalk

(4 curb ramps, 250 Lf sidewalk)Efficiency $ 33.00 Proposed TBD

Page 8: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 8 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

4 CC 68011.3012.883

8.1920.005

Construct Additional Auxiliary Lanes on I-680 - South of I-680/SR-24 Interchange

Additional I-680 NB and SB auxiliary lanes south of I-680/SR 24 Interchange, including the following locations: Alcosta Road to Bollinger Canyon Road; El Cerro Blvd to El Pintado Road; El Pintado Road to Stone

Valley Road; Stone Valley Road to Livorna Road; and Livorna Road to Rudgear Road.

Expansion $ 20,000.00 TBD TBD

4 CC 680 VAR VAR Operation improvementsIntersection operation improvements in Alameda & Contra Costa

Counties in various locations on various routes Efficiency $ 2,600.00 Proposed TBD

4 CC 680 VAR VAR Improve safety and reduce accidents In Contra Costa, at various locations- upgrade metal beam guardrail Preservation $ 1,800.00 Proposed TBD

4 CC VAR 0 0.1 Bridge preservationBridge rehabilitation and upgrade/replace bridge rails at Victory HWY Sep

No. 28-0041L/R; Rehabilitation and railsPreservation $ 2,620.00 Proposed TBD

4 CC VAR 0 14.6 Capital preventive maintenance Pavement CAPM from San Pablo Ave to Route 4/242 Separation Preservation $ 18,150.00 Proposed TBD

4 CC VAR 14.56 17.7 Bridge preservationOakvale Rd OC No. 28-0116 and Monument Blvd UC No.28-0104- Brige

health; Rehabilitation and railsPreservation $ 2,620.00 Proposed TBD

4 MRN 101 0 22.02Implement Marin Sonoma Narrows HOV Lane and

corridor improvements Phase 2 (Marin and Sonoma Counties)

Marin County: Extend US 101 HOV lane from Atherton Avenue to Marin/Sonoma County line in the northbound direction and from Rowland Boulevard to Marin/Sonoma County line in southbound

direction. This project will complete the HOV lane system in Marin County from Richardson Bay Bridge to Marin/Sonoma County line (Post Miles

MRN 0.00 - 22.02, RTP ID 17-03-0006) . Sonoma: Adds 1 HOV lane in each direction to US 101 from Old Redwood Highway in Petaluma to the

Marin/Sonoma County line making the freeway 6 lanes wide. It includes widening and replacing the Hwy 116 separation bridges (Post Miles SON

0.00 - 7.65, RTP ID 17-09-0006)

Expansion $ 212,810.00 TBD TBD

4 MRN 101 5.69 5.69 Tiburon East Blithedale InterchangePlanning, environmental assessment of alternatives and construction to

improve the US 101/Tiburon Boulevard interchangeEfficiency $ 200,000.00 TBD TBD

4 MRN 101 9.96 9.96 US 101/580 Interchange Direct Connector

Study, design and connection for a two lane direct connector northbound US 101 to eastbound HWY 580. The project would entail PSR, PAED and construction of a direct freeway to freeway interchange instead of local

arterials. Study includes 580 westbound to south US 101.

Expansion $ 230,000.00 TBD TBD

4 MULTI 3711.226 (MRN)

12.012 (SOL)

Highway 37 Improvements and Sea Level Rise Mitigation PSR

Prepare multi-county study, to PID standard, on improvements to SR 37 to accommodate future sea level rise and existing congestion

Preservation $ 24,000.00 TBD TBD

4 MULTI 80 3.799 1.669 I-80 Express Lanes: Westbound Bay Bridge Approaches

Express Lanes on the four westbound SFOBB bridge approaches: (1) I-80 direct connector from Powell Street to SFOBB metering lights (1.8 miles);

(2) I-580 from I-80 junction to metering lights (1 mile); (3) I-880/880S direct connector from 14th Street to metering lights (1.5 miles); (4) West Grand Ave/I-880 direct connector to metering lights (0.7 miles) - convert

existing HOV lanes to express lanes

Expansion $ 18,000.00 TBD TBD

4 MULTI 80 11.4 19.181I-80 Express Lanes in both directions: Airbase Parkway

to Red Top RoadExpress Lanes on I-80 in Solano County from Red Top Road to Air Base

Parkway - convert existing HOV lanes to express lanesEfficiency $ 42,000.00 TBD TBD

4 MULTI 80 19.189 28.256I-80 Express Lanes in both directions: Airbase Parkway

to I-505I-80 Solano Express Lanes from Air Base to I-505-widen to add an express

lane in each directionExpansion $ 125,000.00 TBD TBD

Page 9: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 9 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

4 MULTI 680 12.62 24.45I-680 Express Lanes: Southbound from Marina Vista to

Rudgear

Express Lanes on I-680 southbound from Marina Vista to Rudgear Rd. Convert existing and future SB HOV lane to express lane. Future SB HOV

lane from North Main to Livorna/Rudgear is in RTPID 17-02-0022 Efficiency $ 36,000.00 TBD TBD

4 MULTI 68012.637 (ALA)

18.59 (CC)I-680 Express Lanes: Northbound from Rudgear to SR

242 and operational improvements

Widen I-680 for a new northbound express lane between N. Main Street and Route 242 and implement operational improvements on I-680 from

Rudgear to N. Main. This project complements the NB HOV lane extension through the 680/24 interchange and from N. Main to SR 242 as well as operational improvements included in RTPIDs 17-02-0012 and 17-

02-0013.

Expansion $ 57,000.00 TBD TBD

4 MULTI 880 20.34 25.477I-880 Express Lanes: Northbound from Hegenberger to

Lewelling and bridge improvements

I-880 Northbound express lane from Lewelling Blvd to Hegenberger Rd. and reconstruct bridges at Davis Street and Marina Boulevard - widen to

add an express lane and reconstruct bridgesExpansion $ 221,000.00 TBD TBD

4 MULTI 88025.467 (ALA)

8.58 (SCL)I-880 Express Lanes in both directions:

Hegenberger/Lewelling to SR-237

Express lane on I-880 in Alameda County from Lewelling Blvd to SR 237 Direct Connector in northbound direction, Hegenberger Rd to SR 237

Direct Connector in the southbound direction- convert existing HOV lanes to express lanes.

Efficiency $ 78,000.00 TBD TBD

4 NAP 29 0.7 1.51 SR29 Gateway/Improvements

Construct SR29 to a 6-lane Parkway with improved conditions for all travel modes from American Canyon to Napa Junction Road to South Kelly Road and increase capacity in SR-29 from 4 lanes to 6 lanes in unincorporated Napa County, between South Kelly Road and SR 12

Jameson Canyon Road, as well as other operational and intersection improvements along the SR 29 corridor countywide.

Expansion $ 67,000.00 TBD TBD

4 NAP 121 6.02 6.55 Soscol Junction & Roadway OperationsIntersection improvements and modifications, roadway capacity

enhancements, including SR 221 and Soscol Avenue, and other City of Napa intersection improvements including SR-29 and Soscvol Ferry Road.

Efficiency $ 91,000.00 TBD TBD

4 NAP 29/12 4.2/0.0 5.4/0.2SR-29/Airport Way- SR 12 intersection Operation

Improvements

New interchange at SR 29 / SR 12 Airport. Project includes a north/south free flowing underpass with a tight diamond or “double helix” operational improvements for SR 12 through traffic and left hand turn lanes to SR 29.

The environmental document has been completed on the former and further analysis will need to be evaluated on the latter.

Efficiency $ 45,000M TBD TBD

4 SCL 85 5.18 18.44SR 85 Express Lanes: US 101 (South San Jose) to

Mountain View

SR 85 typically has 1 HOV lane and 2 general purpose lanes in both directions with auxiliary lane in some segments. Project will convert

existing HOV lane to express lane and add a second express lane between SR 87 and I-280 in both directions.

Efficiency $ 198,000.00 TBD TBD

4 SCL 101 3.17 3.17 US 101/SR 25 Interchange

The project consists of reconfiguring the interchange at US 101 and SR 25 just south of the City of Gilroy in Santa Clara County, connecting SR 25

and Santa Teresa Boulevard, and widening the existing freeway from 4 to 6 lanes from the Monterey Street interchange to the US 101/SR 25

interchange.

Expansion $ 185,000.00 TBD TBD

4 SCL 101 39.96 39.96Double Lane Southbound US 101 off-ramp to

Southbound SR 87Widen Southbound US 101 freeway connector to Southbound SR 87 to

add a second lane and install TOS.Expansion $ 3,000.00 TBD TBD

4 SCL 101 49.6 50.32US 101 Interchanges Improvements: San Antonio Rd. to

Charleston Rd./Rengstorff Ave.Improve U.S. 101 interchanges at San Antonio Road to Charleston

Road/Rengstorff Avenue including new auxiliary lane.Preservation $ 40,000.00 TBD TBD

4 SCL 101 SM 6.60 SCL 17.81US 101 Express Lanes: Whipple Ave. in San Mateo

County to Cochrane Road in Morgan HillConvert HOV Lanes to express lane and add a second express lane in

some segments.Expansion $ 507,000.00 TBD TBD

Page 10: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 10 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

4 SCL 237 6.91 9.11 237 WB Additional Lane from McCarthy to North First

Corridor Improvements in the cities of San Jose, Santa Clara and Milpitas to address mainline congestion and regional connectivity by the addition

of SR 237 westbound auxiliary lane between McCarthy Boulevard and North First Street

Preservation $ 52,000.00 TBD TBD

4 SCL 237 42.73 42.73SR 237/Great America Parkway WB Off- Ramps

ImprovementsModify WB off-ramps at the SR 237/Great America Parkway interchange

to improve traffic operations and relieve congestion.Efficiency $ 15,000.00 TBD TBD

4 SCL 280 7.13 7.13 Lawrence/Stevens Creek/I-280 InterchangeLawrence/Stevens Creek/I�280 Interchange: Provide direct connections

between Lawrence Expressway and I�280Efficiency $ 140,000.00 TBD TBD

4 SCL 280 10.73 11.45I-280 Northbound Braided Ramps between Foothill

Expressway and SR 85Improve braided ramps on northbound I-280 between Foothill

Expressway and Route 85.Preservation $ 54,000.00 TBD TBD

4 SCL 280 14.1 20.62I-280 New HOV Lane from San Mateo County line to

Magdalena AvenueNew HOV lane added to I-280 from existing HOV lane at Magdalena

Avenue to the San Mateo County Line. Requires constructing a new lane.Expansion $ 60,000.00 TBD TBD

4 SCL 880 4.08 8.48 I-880 Express Lanes: SR-237 to US-101Convert existing HOV lane to an express lane in both directions between

SR 237 and US 101Efficiency $ 28,000.00 TBD TBD

4 SM 1 41.7 43.08Construct Route 1 (Calera Parkway) northbound and southbound lanes from Fassler Avenue to Westport

Drive in Pacifica

The Calera Parkway project will widen Highway 1 from four lanes to six lanes, from approximately 1,500 feet south of Fassler Avenue to

approximately 2,300 feet north of Reina Del Mar Avenue, a distance of 1.3 miles, and will add a 16€™ wide landscaped median between

concrete barriers from San Marlo Way to Reina Del Mar Avenue

Expansion $ 58,000.00 TBD TBD

4 SM 101 5.39 5.39 Improve U.S. 101/Woodside Road interchange Modifies the Woodside Road Interchange at US 101. Efficiency $ 171,000.00 TBD TBD

4 SM 101 20.63 26.11Add northbound and southbound modified auxiliary

lanes and/ or implementation of managed lanes on U.S. 101 from I-380 to San Francisco County line

Add northbound and southbound modified auxiliary lanes and/or implementation of managed lanes on U.S. 101 from I-380 to San

Francisco County line.Expansion $ 222,000.00 TBD TBD

4 SM 101 26.11 45.7 SM / SCL Managed Lanes Project

Modify existing lanes to accommodate an HOV lane from Whipple to San Francisco County Line and/ or an Express Lane from approximately 2

miles south of the Santa Clara County Line to San Francisco County Line. Work may include shoulder modification, ramp modifications, and

interchange modifications to accommodate an extra lane. Work will be phased. (Post Miles SM 0.0 - 26.11, Post Miles SCL 45.7 - 52.55)

Efficiency $ 485,000.00 TBD TBD

4 SOL 80 11.4 19.181I-80/I-680/SR12 Interchange (Packages 2-7) and I-80 Express Lanes in both directions: Airbase Parkway to

Red Top Road

Packages 2-7 provide direct connectivity from I-680 NB to SR12 WB, widens I-680 and I-80 near the interchange, and improves connections to

Red Top road off-ramp. Express lane direct connectors are included in RTPID 17-10-0061 (RTP ID 17-08-0009). Express Lanes on I-80 in Solano County from Red Top Road to Air Base Parkway - convert existing HOV

lanes to express lanes (RTP ID 17-10-0044)

Expansion $ 415,270.00 TBD TBD

4 SOL 80 14.18 16.15 I-80 WB Truck Scales

Project upgrades existing truck scales on WB I-80 in Solano County. Existing westbound truck scales are located on the most congested freeway segment of I-80 in Solano County. Scales are outdated and

cannot process the current and future truck volumes on WB I-80. Trucks are slow to enter and leave the scales because of short ramps, adding to

existing traffic congestion and safety issues on I-80.

Preservation $ 170,000.00 TBD TBD

4 SON 101 0 7.65Implement Marin Sonoma Narrows Phase 2 (Sonoma

County)

Adds 1 HOV lane in each direction to US 101 from Old Redwood Highway in Petaluma to the Marin/Sonoma County line making the freeway 6 lanes wide. It includes widening and replacing the Hwy 116 separation bridges.

Expansion $ 243,000.00 TBD TBD

Page 11: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 11 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

4 SON 101 18.49 18.49 Hearn Avenue Interchange

The project would replace the existing Hearn Avenue overcrossing bridge with a new bridge to accommodate four traffic lanes with bike lanes and sidewalks on both sides of the roadway. The project would also increase

the bridge height clearance and improve ramp connections to US 101 and provide continuous bike lanes and sidewalks between Corby Avenue and

Santa Rosa Avenue

Efficiency $ 36,000.00 TBD TBD

4 SON 101 27.3 27.8 Shiloh Road Interchange Reconstruction

Reconstruct the Shiloh Road/US 101 interchange to provide two lanes in each direction. It is anticipated that the existing over crossing will be

replaced and ramps reconfigured. It is expected that 60% of project costs will come from federal, state or regional funds.

Preservation $ 27,000.00 TBD TBD

4 SON 101 VAR VAR Roadway Operations

This category includes projects that improve roadway, intersection, or interchange operations, ITS, as well as other transportation system

management. This project also includes landscaping along US 101 HOV lanes, intersection improvements at Route 116/Route 121, local

circulation in Penn Grove, Sonoma Boulevard Improvements, among other operational improvements throughout Sonoma County.

Efficiency $ 272,000.00 TBD TBD

5 MON 68 3.950 20.000 SR 68 from Monterey to Salinas Construct roundabouts and wildlife crossings System Management $ 88,000.00 12/20/2017 N/A

5 MON 101 77.150 85.624 US 101 from Main St in Chualar to Airport Blvd South Salinas Corridor Phase I - Construct frontage road System Management $ 150,000.00 9/22/2003 N/A

5 MON 101 83.170 83.170 US 101 at Harris Rd South Salinas Corridor Phase II - Construct new Interchange System Management $ 80,000.00 9/23/2003 N/A

5 MON 156 1.820 5.171 SR 156 from Castroville Blvd to US 101SR 156 West Corridor Project - Widen to 4 lane divided expressway and

build interchanges at Castroville Blvd and US 101System Expansion $ 365,000.00 4/15/2006 1/31/2013

5 SB 101 1.400 12.300US 101 from Bailard Rd in Carpinteria to Sycamore

Creek in City of Santa Barbara

US 101 South Coast HOV (component of Santa Barbara US 101 Multimodal Corridor) - Add HOV lanes, modify interchange at Hot Springs

Rd/Cabrillo Blvd and Sheffield DrSystem Expansion $ 462,200.00 2/26/2007 8/26/2014

5 SBT 156 3.022 8.024 SR 156 from The Alameda to 4th St Widen to 4 lane expressway System Expansion $ 48,520.00 5/11/2015 10/10/2008

5 SCR 1 7.672 15.822 SR 1 from Larkin Valley Rd to Morrissey BlvdSR 1 Corridor Investment Program (CIP) - Full HOV System

ImplementationSystem Expansion $ 600,000.00 4/7/2006 12/1/2018

5 SCR 1 10.535 12.088 SR 1 from State Park Dr to Park Ave CIP: Construct auxiliary lanes System Management $ 42,350.00 4/7/2006 12/1/2018

5 SCR 1 10.932 10.932 SR 1 at Mar Vista Dr Construct bike/ped overcrossing System Expansion $ 7,800.00 4/7/2006 12/1/2018

5 SCR 1 12.088 13.192 SR 1 from Park Ave to Bay Ave/Porter St CIP: Construct auxiliary lanes and reconstruct Capitola Ave overcrossing System Management $ 33,060.00 4/7/2006 12/1/2018

5 SCR 1 13.620 14.864 SR 1 from 41st Ave to Soquel AveCIP: Construct auxiliary lanes and bike/ped overcrossing at Chanticleer

AveSystem Management $ 30,000.00 4/7/2006 12/1/2018

5 SLO 46 54.100 57.800 SR 46 at SR 41/SR 46 Wye Widen to 4 Lanes, expressway conversion, construct interchange System Expansion $ 75,400.00 4/16/1999 5/19/2006

5 SLO 46 55.106 60.849 SR 46 from SR 41/SR 46 Wye to Kern County Line Antelope Segment - Convert 2-lane highway to 4-lane expressway System Expansion $ 70,000.00 6/6/2000 3/15/2015

Page 12: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 12 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

5 SLO 46 56.320 57.800 SR 46 at Antelope Grade Construct new climbing lane System Management $ 7,025.00 6/6/2000 1/9/2007

5 SLO 101 16.000 21.500 US 101 from Avila Beach Dr to N 4th StSouthbound Pismo Congestion Relief - construct inside left shoulder for

part-time travelSystem Management $ 17,000.00 12/15/2015 1/5/2021

5 SLO 101 16.000 21.500 US 101 from 4th St to Avila Beach DrNorthbound Pismo Congestion Relief - construct inside left shoulder for

part-time travelSystem Management $ 17,000.00 12/15/2015 N/A

6 FRE 0 NA NAVeterans Blvd, from Herndon Ave to the Grantland

Grade SepNew interchange System Expansion $ 55,823.00 N/A 7/31/2013

6 FRE 41 0.000 7.100 North of Excelsior Ave to north of Elkhorn Ave 2E to 4E System Expansion $ 42,742.00 N/A N/A

6 KER 5 15.800 15.800In Kern County near Wheeler Ridge at Rte 99/5

SeparationI-5 Fast Freight Corridor I-5/99 Separation Bridge(Br. No. 50-0240R) -

Improve bridge vertical clearance (06-0W430)System Management $ 4,500.00 4/28/2017 4/2/2018

6 KER 5 VAR 12.500In Kern County near Grapevine at the California

AqueductI-5 Fast Freight Corridor at the California Aqueduct (Br. No 50-0321 L/R) -

Improve load rating (06-0W460)System Management $ 4,100.00 4/28/2017 4/2/2018

6 KER 46 27.500 30.800In and near Lost Hills, from Browns Material Road to 0.3

miles east of Lost Hills Road.Widen 2-lane conventional highway to 4-lane conventional expressway System Expansion $ 22,430.00 N/A N/A

6 KER5899

SR-58: T31.7SR-99: 21.1

SR-58: R55.6SR-99: 26.2

Bakersfield

This project will construct a new alignment for SR 58 from Cottonwood Road on existing SR 58 to I-5. It will include improvements to SR 99 from Gilmore Ave to Wilson Road. It will provide route continuity and traffic congestion relief along SR 58 within metropolitan Bakersfield and Kern

County from the existing SR 58 (East) to I-5.

$ 525,457.00 1/4/2012 TBD

6 KEROff

SystemBakersfield TBD Grade Sep $ 22,000.00

6 KEROff

SystemBakersfield TBD Grade Sep $ 22,000.00

6 KEROff

SystemBakersfield TBD Grade Sep $ 51,000.00

6 MAD 99 1.700 7.500 Near Madera, from Ave 7 to Ave 12 4F to 6F System Expansion $ 104,920.00 3/11/2008 N/A

6 MAD 99 7.500 15.100In and near Madera, from the Ave 12 OC to south of the

Ave 18 1/2 OC4F to 6F System Expansion $ 48,150.00 11/28/2011 8/14/2015

6 MAD 99 7.500 15.100 Madera Mad 6-Lane Widening (EA 06-47090 - PPNO 5335) $ 37,000.00 N/A 8/14/20156 MAD 99 13.500 14.700 Madera Avenue 12 - Avenue 17, Widen to 6-Lanes N/A N/A 1/2/20246 MAD 99 TBD TBD FASTLANE/Highway $ 67,136.00 6 TUL 99 25.400 30.500 In the City of Tulare, from Ave 200 to Prosperity Ave 4F to 6F System Expansion $ 200,500.00 3/18/2009 1/1/2022

6 TUL 99 27.600 28.000 In the City of Tulare, at Paige Ave Modify interchange System Management $ 18,802.00 9/20/1993 PID

6 TUL 99 30.600 35.200Near Tulare, from Prosperity Ave to south of the Ave

280 OC in Southbound direction only4F to 6F System Expansion $ 53,463.00 N/A 2/25/2009

6 TUL 99 30.600 35.200Near Tulare, from Prosperity Ave to south of the Ave

280 OC in Northbound direction only4F to 6F System Expansion $ 64,250.00 N/A 2/25/2009

6 TUL 99 30.600 35.200 Tagus Tagus 6-Lane Widening (EA 06-36024 - PPNO 6400D) $ 56,400.00 N/A 2/25/20096 TUL 99 TBD TBD FASTLANE/Highway $ 91,411.00

Page 13: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 13 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

6 TUL 198 10.500 12.000 On SR 198 and SR 216 Operation improvement near Lovers Lane System Management $ 10,000.00 N/A PID

7 LA 5 0.000 26.651 ICM and CV $ 53,302.00

7 LA 5 8.860 13.890Widen I-5 to add mix flow lanes and HOV lanes; modify interchanges and

local arterials from Paramount to I-710.System Expansion $ 1,057,000.00 7/31/2007

7 LA 5 14.760 15.170 Los Angeles Construct SB auxiliary lane on I-5 from Ditman Av to Calzona St System Management N/A N/A N/A

7 LA 5 27.000 66.500 From SR-134 to Kern County Line

Eliminating load capacity restrictions and vertical clearance limitations on ten bridges in D7. 1) Lower the roadway or replace the bridge for locations with vertical clearance issue. 2) Replace the bridge or

strengthening the bridge girders to eliminate load capacity restriction.

System Management $ 390,000.00 6/4/2017 10/1/2018

7 LA 5 45.400 59.000 Los AngelesIn Los Angeles County in Santa Clarita from SR-14 to Parker Road.

Construct HOV and Truck LanesSystem Expansion $ 440,000.00 3/28/2003 9/29/2009

7 LA 5 45.580 50.320PHASE 2,From SR-14 to Pico Cyn, construct HOV/HOT, Truck & Aux Lanes

(EA 2332E PPNO 3189B), SAFTETEA-LU#465.System Expansion $ 46,877.00 N/A

7 LA 5 59.000 88.600I-5 North Capacity Enhancements (Parker Lane to Kern Co. Line) Phase III -

Adding one HOV & Truck LanesSystem Expansion $ 1,300,000.00 N/A

7 LA 10 2.155 18.394 ICM and CV $ 32,478.00 7 LA 10 18.330 48.270 ICM, CV, Communications System Upgrades $ 83,832.00

7 LA 47 0.751 0.751

SR 47-V. Thomas Bridge/Front St Interchange: NEW WESTBOUND SR 47 ON- AND OFF-RAMPS

AT FRONT STREET JUST WEST OF THE VINCENTTHOMAS BRIDGE AND ELIMINATE THE EXISTING

NON-STANDARD RAMP CONNECTION TO THE HARBORBOULEVARD OFF-RAMP; Front Street is an NHS Connector Route;

V.Thomas Bridge is a State-owned bridge; on the USDOT PFN.

System Management $ 25,000.00 N/A

7 LA 57Diamond Bar

SR-57SR-60

This component of the Los Angeles County Freight Triangle involves the construction of critical bypass improvements to unlock a bottleneck on SR-

60 where SR-57 shares the same alignment.FASTLANE/Highway $ 230,211.00

7 LA 60 0.000 30.456 ICM and CV $ 60,912.00

7 LA 60 15.930 19.460

The purpose of this project is to improve freight mobility and remove identified load and vertical clearance constraints. (Hacienda Boulevard

Undercrossing -Br. No. 53-1784) (Stimson Avenue Undercrossing- Br. No. 53-1785) (Azusa Avenue Overcrossing -Br. No. 53-1789) (Fullerton Road

Undercrossing - Br. No. 53-1786)

System Management $ 54,870.00 10/30/2017 7/28/2017

7 LA 71 0.500 4.500 Los AngelesExpressway to Freeway Regional w/ Transit - (Phase I - Mission Boulevard to Rio Rancho Road/State Route 60) Covert from Expressway to Freeway

and add HOV lanesSystem Expansion $ 307,000.00 N/A

7 LA 71 Diamond Bar

This component of the Freight Triangle will upgrade the existing 4-lane expressway to an 8-lane freeway by providing full access control and

adding 6.4 lane miles of mixed flow and 6.4 lane miles of concurrent flow HOV lanes on SR-71 between Mission Blvd. and SR-60 at the Los Angeles County and San Bernardino County line. This segment is 3.2 miles and is

one of the last remaining segments on SR-71 to convert to a freeway. The new HOV lanes will connect with existing HOV lanes through San

Bernardino County to SR-91 in Riverside County.

FASTLANE/Highway $ 181,500.00

7 LA 91 6.344 11.640 ATM, ICM, CV $ 23,832.00 7 LA 91 11.640 20.741 ICM, CV $ 18,202.00

7 LA 91Westbound SR-91 to I-605/SR-91 interchange. to reduce congestion and

improve freeway operations to main lines and connected ramps.,System Management $ 174,000.00 4/19/2018 4/30/2018

7 LA 101 0.000 17.400 N/A Regional: Upgrade TMS: I-5 to I-405 System Management N/A N/A N/A

Page 14: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 14 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

7 LA 101 0.330 17.165 ATM, ICM, CV $ 75,757.50

7 LA 101 1.300 2.480 Los AngelesWiden Edgeware bridge on SB US-101 between Glendale Bl on-ramp and

US-101/I-110 interchange to provide auxiliary lanesSystem Management $ 26,000.00 N/A N/A

7 LA 101 1.800 2.400 N/AAdd new auxiliary lane on northbound US-101 from the I-110 to the Echo

Park Avenue/Glendale Blvd. off-rampSystem Management $ 15,000.00 N/A To be determined

7 LA 101 3.900 4.300WB Silverlake/Vermont - Add transition Lane (mobility/operational

improvement)System Management $ 19,500.00

7 LA 101 7.580 10.230 N/ASegment 3 & 4 - Add auxiliary lanes in both directions between SB Off-Ramp to Cahunga Blvd and NB Off-Ramp to Lankershim Blvd (mobility

improvements)System Management $ 23,000.00 N/A To be determined

7 LA 101 7.800 9.200

Improve safety and freeway operations with a new transition/on-ramp from Highland to Barham. Replaces deficient bridges with wider

structure that allow for safter vehicular movements and allow options for peds and cyclist.

System Management $ 90,000.00

7 LA 101 8.200 9.200 N/ASegment 4 - Add auxiliary lane in both directions; Barham Blvd OC to 1200

feet south of Highland Avenue - Segment 4System Management $ 25,600.00 N/A To be determined

7 LA 101 9.200 10.400 N/ASegment 3 - Add auxiliary lane in both directions; Campo de Cahuenga OC

to Barham Blvd OC - Segment 3System Management $ 16,000.00 N/A To be determined

7 LA 101 10.400 10.900 N/ASegment 2 - Add auxiliary lane in both directions; Moorpark Street UC to

Campo de Cahuenga OC (mobility improvements)System Management $ 20,600.00 N/A To be determined

7 LA 101 12.810 14.660

Improve connector traffic operations thru US-101/SR-134/SR-170 IC. Western project limit is on US-101 PM 12.81, eastern project limit is on SR-134 PM 0.90 and the northern project limit is on Sr-170 PM R14.66.

Total length of project is approx. 2 miles.

System Management $ 157,000.00

7 LA 105 0.530 7.380

MM-ST I-105 (LAMP)-23 Freeway Intelligent Transportation System (ITS) Improvements: implementation of Active Traffic Management (ATM)

Strategies along the I-105 freeway corridor between I-110 and Sepulveda Boulevard. ATM is a proactive set of strategies to dynamically manage

and regulate traffic based on prevailing conditions of recurrent and non-recurrent congestion.

System Management

7 LA 105 2.100 17.800 Add HOT Lane on 105 from 405 to 605 (Managed Lane) System Expansion $ 900,000.00 9/8/2015

7 LA 105 2.106 13.471 ATM, ICM, CV $ 51,142.50 7 LA 105 13.471 18.145 ICM and CV $ 9,348.00

7 LA 110 0.000 25.750Upgrade Traffic Management Communication System (From SR-47 to I-5 --

25.75 miles)System Management $ 38,547.00 6/30/2015

7 LA 110 0.120 21.880 Los Angeles

In Los Angeles from 8th street on ramp to I-110/I-10 connector, construct nb & sb auxiliary lanes and modify ramps (ea 2411u, ppno 3343) convert existing sb auxiliary lane to optional lane & modify ramps; nb harbor fly, from north end of 12th St uc to north end of the 7th St uc, add storage

lane on the mainline & reconstruct ramp

System Management N/A N/A N/A

7 LA 110 4.000 5.500 N/AConstruct Auxiliary Lane on SB Route 110 between Sepulveda Blvd. to

Route 1System Management $ 38,000.00 N/A To be determined

7 LA 110 4.063 23.727 ATM, ICM, CV $ 88,488.00

7 LA 110 20.500 20.900 Los Angeles

Extend north from current terminus into Downtown Los Angeles via Central City west area. The Adams/Figueroa flyover study, PSR, will

investigate how the construction of a new structure connecting the I-110 northbound HOV lane off-ramp directly to Figueroa Street.

System Expansion $ 43,000.00 N/A N/A

Page 15: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 15 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

7 LA 110 22.500 24.500

Operational improvements on SR-110 by correcting on and off ramp alignments, eliminate existing sight distance issues, realignment of

connectors to US-101 NB and SB, and relieve existing chokepoints by adding aux lanes on both SR-110 NB and SB

System Management $ 150,000.00

7 LA 170 14.500 20.551 ICM and CV, Communications System Upgrades System Management $ 16,942.80 7 LA 405 0.000 12.946 ICM and CV System Management $ 25,892.00 7 LA 405 12.946 21.180 ATM, ICM, CV System Management $ 37,053.00

7 LA 405 14.400 15.600 Los Angeles405/Crenshaw Blvd interchange and to add auxiliary lanes between

Western Ave. and Crenshaw Blvd (1.2 miles)System Management $ 91,000.00 N/A

7 LA 405 16.430 16.500 N/A Widen to add lanes and modify signal System Management $ 2,500.00 N/A To be determined

7 LA 405 16.900 17.580 Los AngelesProject Route- I-405: Add NB auxiliary lane from Redondo Beach Bl to

HawthorneSystem Management $ 15,000.00 N/A N/A

7 LA 405 16.900 17.580 Los Angeles Add Aux lane on SB I-405 from Hawthorne to Redondo Beach System Management $ 15,000.00 N/A N/A

7 LA 405 20.216 21.228

MM-ST (LAMP)-19 l-405 Northbound Auxiliary Lane: auxiliary lane along northbound I-405 between El Segundo Boulevard on-ramp and the Imperial Highway off-ramp. This improvement would require LAWA

widening the I-405 northbound roadway between the limits noted above including potentially widening the bridge over 120th Street

System Management

7 LA 405 21.180 43.756 ATM, ICM, CV System Management $ 101,592.00

7 LA 405 21.228 21.228

MM-ST (LAMP)-20 Imperial Highway Off-ramp: widen off-ramp to two lanes at the exit from the I-405 northbound lanes and carrying the

widening to the ramp junction at Imperial Highway to provide two left-turn lanes and a separate right-turn lane.

System Management

7 LA 405 21.228 23.355

MM-ST l-405 (LAMP)-22 Corridor and Network Connectivity Enhancements: implementation of the I-405 corridor LAWA mobility and access improvements such as the I-405 southbound collector-distributor

roadway improvements between Florence Avenue and Century Boulevard associated I-405 SB interchange access improvements at La Cienega

Boulevard, Manchester Boulevard and Century Boulevard; I-405 northbound access improvements at Imperial Highway, Century

Boulevard and La Cienega Boulevard; and the I-105 westbound to 1-405 northbound freeway connector enhancement to potentially improve

access to the Century Boulevard interchange. These improvements would be planned to operate in conjunction with the ITS improvements along

the I-405 and I-105 freeway corridors such that traffic flow experiencing recurrent and non-recurrent congestion can be improved and managed,

and safety is enhanced on an overall basis.

System Management

7 LA 405 43.756 48.643 ICM and CV $ 9,774.00

7 LA 405

MM-ST I-405 (LAMP)-24 Freeway Intelligent Transportation System (ITS) Improvements: implementation of Active Traffic Management (ATM) Strategies along the I-405 freeway corridor between SR 90 (Marina

Freeway) and Rosecrans Avenue.

System Management $ 30,339.00

7 LA 605 0.000 26.000 ICM and CV $ 52,000.00

7 LA 710 3.400 26.500Upgrade Traffic Management Communication System (From SR-47 to I-5 --

25.75 miles)System Management $ 40,000.00

Page 16: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 16 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

7 LA 710 4.960 32.720 Los Angeles

For the first phase of ZE and NZE truck deployment program between 2018 and 2025, it is envisioned that the startup fleet of approximately 500 vehicles would lean more heavily towards low NOx/NZE trucks as

these low NZE technologies are expected to be more readily available in commercial application in the near term. In future years, as additional zero emission technologies achieve greater market penetration and as

the costs of zero emission technologies are reduced, it is anticipated that the Phase 2 deployment of 500 trucks between 2026 and 2035 would

consist mainly of ZE trucks.

$ 8,500.00 N/A TBD

7 LA 710 4.960 32.720 Los Angeles

An important element of the program is to develop sufficient fueling infrastructure for zero emissions trucks. In the first phase, ten (10)

electric charging stations and five (5) hydrogen refueling stations will be provided within the I-710 Corridor. In the second phase, ten (10)

additional electric charging stations and five (5) hydrogen refueling stations will be provided. Specific locations of these electric charging and

hydrogen refueling stations are still to be determined, but would be targeted towards locations served by heavy duty vehicles such as

intermodal terminals (ports/rail yards) and warehouse / distribution centers within the I-710 corridor and/or along routes that lead to I-710.

$ 8,500.00 N/A TBD

7 LA 710 5.057 27.475 ICM and CV, Communications System Upgrades System Management $ 51,000.00

7 LA 710 6.384 6.881I-710 South Early Action Project: Anaheim Street and Pacific Coast

Highway Interchange ImprovementsSystem Management $ 300,000.00 2026

7 LA 710 10.820 10.820 I-710 South Early Action Project: Del Amo Interchange Improvements System Management $ 124,000.00 2023

7 LA 710 11.670 11.670 Los AngelesBuild Ramps to connect I-710 Freight Corridor to SR-91 (may be part of

RTP project #LA0B952System Management $ 40,500.00 N/A

7 LA 710 18.440 18.440 I-710 South Early Action Project: Firestone Blvd Interchange Improvement System Management $ 41,000.00 2023

7 LA 710 Los Angeles

For the first phase of ZE and NZE truck deployment program between 2018 and 2025, it is envisioned that the startup fleet of approximately 500 vehicles would lean more heavily towards low NOx/NZE trucks as

these low NZE technologies are expected to be more readily available in commercial application in the near term. In future years, as additional zero emission technologies achieve greater market penetration and as

the costs of zero emission technologies are reduced, it is anticipated that the Phase 2 deployment of 500 trucks between 2026 and 2035 would

consist mainly of ZE trucks.

CSFAP $ 100,000.00

7 LA 710 Los Angeles

An important element of the program is to develop sufficient fueling infrastructure for zero emissions trucks. In the first phase, ten (10)

electric charging stations and five (5) hydrogen refueling stations will be provided within the I-710 Corridor. In the second phase, ten (10)

additional electric charging stations and five (5) hydrogen refueling stations will be provided. Specific locations of these electric charging and

hydrogen refueling stations are still to be determined, but would be targeted towards locations served by heavy duty vehicles such as

intermodal terminals (ports/rail yards) and warehouse / distribution centers within the I-710 corridor and/or along routes that lead to I-710.

CSFAP $ 8,500.00

Page 17: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 17 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

7 LA 710 LA

The project proposes a connected corridor approach along a portion of I-710 from SR 47 (Postmile 3.4) in Long Beach to I-10 (Postmile 26.5) for Transportation Management System (TMS) installations and upgrades and for Life Cycle replacements. The project proposes to install closed-

circuit television cameras, upgrade ramp meter controllers and detection, replace loop detectors, install and upgrade electronic changeable

message signs, upgrade the existing communication system to all fiber optics communications, install ramp meters and vehicle detection

stations, and provide life cycle replacement for TMS field elements where needed. The project would be integrated with the FRATIS project.

CSFAP $ 40,000.00

7 LA5760

4.3 23.5

4.8 25.5 Diamond Bar SR-57/SR-60 Confluence Freight Bottleneck -- East bound by pass lane $ 215,211.00 N/A 6/30/2017

7 LA 57/ 60 4.370 4.370 Los AngelesHighway - Interchange Improvements; SR-57 / SR-60 Interchange (Future

improvements include direct freeway connectors, HOV to HOV connectors, and/or a westbound SR-60 bypass to Grand Avenue.)

System Management $ 197,000.00 N/A

7 LA 57/60

Reconstruct SR 60/Grand ave. interchagne - Widen Grand ave: SB add 1 thru ln (2 existing); NB add 1 thru ln (3 existing), replace Grand ave OC,

add EB loop on-ramp, construct addional EB thru ln from Grand Ave TRAP ln to SR-57 addln, add two bypass ramp connectors.

System Management $ 256,000.00 N/A

7 LA605, 5 7.628

6.37911.567 8.964

I-605 from Slauson Ave to I-105. I-5 from Florence Ave. to Paramont Blvd. mainline. ramp and freeway to

freeway connector improvement. (I-605 Hot Spots)System Expansion $ 815,000.00 4/7/2016 5/21/2021

7 LAOff

SystemPico Rivera

The Durfee Avenue Grade Separation Project will separate the roadway and the railroad tracks on Durfee Avenue in the City of Pico Rivera. Plans

call for constructing a roadway underpass on Durfee Avenue between Beverly Road and Whittier Boulevard under the Union Pacific railroad

tracks with retaining walls and a new railroad bridge.

Grade Sep $ 92,000.00

7 LAOff

SystemLos Angeles

This porject will provide a grade separation at the intersection of Rosecrans and Marquardt Avenues from the BNSF maniline tracks. It will adress safety and operational constraits faced by passenger and freight

rail.

Grade Sep $ 155,300.00

7 VEN 34 6.270 6.270 N/A Provide grade separation over R/R Crossing $ 71,200.00 12/9/2015 10/27/2017

8 RIV 10 21.200 31.200 Banning

Dynamic Truck Parking on I-10, near Banning from 4.8 miles west of to 5.2 miIes east of Whitewater Rest Area; Near Coachella from 5.2 miles west

of to 4.8 miles east of Cactus City Rest Area; and near Blythe from 5.2 miles west of to 9.9 miles east of Wiley Well Rest Area.

System Management $ 1,210.00 TBD TBD

8 RIV 10 Banning

On I-10, near Banning from 4.8 miles west of to 5.2 miIes east of Whitewater Rest Area; Near Coachella from 5.2 miles west of to 4.8 miles

east of Cactus City Rest Area; and near Blythe from 5.2 miles west of to 9.9 miles east of Wiley Well Rest Area.

CSFAP $ 1,200.00

8 RIV 15 49.100 11.000 I-15 Express Lanes

Construct 2 new express lanes in each direction from Cantu Galleano Ranch Rd to SR-210, Construct 1 express lane each direction from SR-210

to Duncan Canyon Rd. Additional Improvements to aux lane widening, undercrossings, overcrossings, and reconstruction of ramps and lane

transitions where needed

System Management & Expansion

$ 476,590.00 9/23/2014 5/14/2018

Page 18: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 18 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

8 RIV 15 N/A

Utilizing a publicly driven Public Private Partnership (P3) approach, the I-15 Express Lanes Project, includes adding capacity through the

construction of two tolled express lanes for 14.8 miles in each direction within the median of I-15’s most congested segment from SR-60 to

Cajalco Road.

FASTLANE/Highway $ 489,139.00

8 RIV 60 30.240 30.490 SR-60/I-10 On SR-60 near Beaumont: Construct New Interchange System Expansion $ 300,000.00 TBD TBD

8 RIV 71 0.000 2.940 From the SBD/RIV County Line to SR-91 Widen to 3 mixed flow lanes in each direction System Expansion $ 177,132.00 TBD TBD

8 RIV 79 6.000 15.900 From Hunter Rd to Domenigoni Pkwy Widen from 4 to 6 lanes System Expansion $ 124,803.00 N/A 12/28/2010

8 RIV 79 15.900 33.790 From Domenigoni Parkway to Gilman Springs RoadOn SR-79, in southwestern Riverside County, between 2.0 km south of

Domenigoni Pkwy to Gilman Springs Rd: Realign and widen SR-79 from 2 to 4 through lanes

System Expansion $ 1,125,438.00 12/19/2002 1/17/2017

8 RIV 91 0.600 2.600ON RTE 91 FR 0.4 MI W/O GREEN RIVER RD TO 1.6 MI

E/O GREEN RIVER RD & ON RTE 71 FR RTE 91 TO 1.4 MI N/O RTE 91

CONSTRUCT A NEW FLY OVER CONNECTOR System Management $ 118,124.00 12/21/2006 6/29/2011

8 RIV 91 0.600 2.600 AT SR-91/71 JCT

Replace EB 91 to NB 71 connector with direct fly-over connector, and reconstruct the green river road EB on-ramp. Toll Credits will be used in PS&E to match demo-safetealu/demo-tea21/stp, respectively. $159 toll

credits will be used in r/w to match demo-safetealu.

System Management $ 124,663.00 12/21/2006 N/A

8 RIV 91 21.300 21.800 From SR-91 NB to SR-60 WB Flyover connector on SR-91 NB to SR-60 WB System Management $50,000-$80,000

TBD TBD

8 RIV 215 27.900 38.900 From Nuevo Rd to Box Springs Rd Construct 2 HOV lanes (1 lane in each direction)System Management and

Expansion $ 212,500.00 N/A N/A

8 RIV 215 27.900 38.900 On I-215 from Nuevo Road to Box Springs Road Construct 2 HOV lanes (1 lane in each direction) - PA&ED OnlySystem Management and

Expansion $ 8,000.00 N/A N/A

8 SBD 10 0.000 9.930LA/SBD County Line to I-10/I-15 Interchange (Contract

1)

Also referred to as Contract 1 of the I-10 Express Lane/Auxiliary Lane Project, this component includes implementation of two tolled express lanes for 10 miles and strategic auxiliary lanes in each direction on I-10

from the Los Angeles County line to I-15. The complete I-10 Corridor Project (Contracts 1 and 2) extends 33 miles and entails construction of

two tolled express lanes in each direction, plus auxiliary lanes where warranted, between the Los Angeles County line and SR-210, including a transition to a single tolled express lane in each direction from SR-210 to

Ford Street in the city of Redlands. The project is a part of a broader improvement program termed the “I-10 Logistics Corridor” in San

Bernardino County, consisting of freeway mainline improvements, freight-related freeway/arterial interchanges, rail/highway grade separations,

and truck climbing lane projects.

System Management and Expansion

$ 625,532.00 12/8/2006 5/15/2017

8 SBD 10 0.000 33.130 LA/SBD County Line to Ford Street in Redlands Interstate 10 Logistics Corridor ( Express Lane/Auxiliary Lane)System Management and

Expansion $ 616,400.00 12/8/2006 N/A

8 SBD 10 9.310 R102.0007_LA_60_15.93/19.49, 08_SBD_60_R1.37,

08_SBD/RIV_10_R9.31/R102.00

SR-60 and I-10 Accel Freight Bridge Work (Paul Chung is facilitating) - At various bridges, vertical clearance will be increased for freight trucks. (Elevated bridge or pavement grinding to achieve increased vertical

clearance.)

System Management & System Preservation

$ 57,740.00 7/28/2017 6/13/2018

Page 19: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 19 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

8 SBD 10 9.700 10.200 I-10 and I-15 JunctionExpress lane direct connectors from SB I-15 to WB I-10 and reverse; NB I-

15 to WB I-10 and reverse and WB I-10 to SB I-15 and reverseSystem Management and

Expansion $ 764,117.00 TBD TBD

8 SBD 10 10.000 37.000I-10 from I-15 to California Street, California Street to

Ford Street (Contract 2)

Implement 2 express lanes in each direction from I-10/I-15 interchange to California St; implement 1 express lane in each direction from California

St to Ford St in Redlands for a total of 10-12 lanes, and aux lanes, undercrossing, overcrossings, ramp reconstruction, and lane transitions

where needed

System Management and Expansion

$ 1,142,243.00 N/A N/A

8 SBD 10 19.400 20.400 Rialto Riverside Ave. Interchange, Rialto N/A N/A TBD

8 SBD 10 37.000 1.930On I-10 from Live Oak Canyon Road to Singleton Road, project begins in San Bernardino County and ends in

Riverside County

Construct new eastbound truck climbing lane from Live Oak Canyon Road to Singleton Rd including transition between County line and Calimesa

BlvdSystem Management $ 50,024.00 6/13/2017 6/7/2019

8 SBD 10 N/A

Also referred to as Contract 1 of the I-10 Express Lane/Auxiliary Lane Project, this component includes implementation of two tolled express lanes for 10 miles and strategic auxiliary lanes in each direction on I-10

from the Los Angeles County line to I-15. The complete I-10 Corridor Project (Contracts 1 and 2) extends 33 miles and entails construction of

two tolled express lanes in each direction, plus auxiliary lanes where warranted, between the Los Angeles County line and SR-210, including a transition to a single tolled express lane in each direction from SR-210 to

Ford Street in the city of Redlands. The project is a part of a broader improvement program termed the “I-10 Logistics Corridor” in San

Bernardino County, consisting of freeway mainline improvements, freight-related freeway/arterial interchanges, rail/highway grade separations,

and truck climbing lane projects.

FASTLANE/Highway $ 625,400.00

8 SBD 10 BarstowOn I-15, near Barstow from Field Rd. overcrossing to 0.8 miles north of

Afton Rd overcrossing; and 0.5 miles north of Halloran Summit overcrossing to Cima Rd. overcrossing.

CSFAP $ 800.00

8 SBD 15 0.000 11.040From Cantu-Galleano Ranch Road & SR-60 to SR-210 &

Duncan Canyon Road

I-15 Express Lanes: Construct 2 new express lanes in each direction b/w SR-60 & SR-210, Construct 1 Express Lane in each direction b/w Cantu-

Galleano Ranch Rd & SR-60, and Construct 1 Express Lane in each direction b/w SR-210 & Duncan Canyon Rd. Additional improvements to

aux lane widening, undercrossings, and reconstruction of ramps and lane transitions where needed.

System Management and Expansion

$ 476,590.00 9/23/2014 5/14/2018

8 SBD 15 68.770 186.238 From I-40 in Barstow to CA/NV State LineOn I-15 from Barstow to State line, to address bottlenecks, alternatives

to be studied may include widening to increase capacity, and other alternatives that may effectively reduce bottlenecks/congestion.

System Management and Expansion

$ 500,000.00 6/30/2019 TBD

8 SBD 15 103.600 112.400 East of BarstowDynamic Truck Parking on I-15, near Barstow from Field Rd overcrossing

to 0.8 miles north of Afton Rd overcrossing; and 0.5 miles north of Halloran Summit overcrossing to Cima Rd. overcrossing.

System Management $ 810.00 TBD TBD

8 SBD 40 BarstowOn I-40, Near Barstow from Fort Cady Rd. overcrossing to 0.8 miles east

of Hector Rd. undercrossing; and near Needles from 0.8 miles east of Essex Rd. overcrossing to 0.7 miles east of Goffs Rd. undercrossing.

CSFAP $ 800.00

8 SBD 58 0.000 12.9000.4 Miles west of Kern County Line to 7.5 miles east of

US 395 JCTConstruct 4 lane expressway on new alignment, new interchange at US

395System Expansion $ 194,838.00 N/A 7/1/2014

Page 20: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 20 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

8 SBD 60 0.000 0.491 from 2 miles east of SR-57 to I-15

Freight Corridor from 2-miles east of the SR-57 to I-15. This is a collaborative effort with SCAG, D7, and HQ Freight to study a continuous freight corridor, atlernatives to be studied may include truck only lanes

and toll truck lanes. This PID is connected to the East-West Freight Corridor project, but may result in a different alternative than the East-

West Freight Corridor. (PID Phase Only)

System Management and Expansion

TBD N/A

8 SBD 60 0.000 0.690

On SR-60, Segment 3 is proposed from the junction of SR-57 to the junction of I-15. Segment 3 falls under both

District 7 and District 8, however, postmiles reflect District 8 only for the purpose of this list.

East-West Freight Corridor - Segment 3 of the project - On SR-60 or parallel to SR-60, develop a freight corridor to improve freight mobility

(such as truck only lanes). Currently proposed alternative being discussed is a toll corridor for trucks only.

System Expansion $ 3,777,816.00 6/30/2018 N/A

8 SBD 138 14.200 15.200 FROM LONE PINE INTERSECTION TO JCT RTE 15WIDEN TWO BNSF BRIDGE STRUCTURES TO 4-LNS & CONSTRUCT

RETAINING WALLS (PHASE 1B)System Management and

Expansion $ 16,734.00 7/31/1997 3/18/2014

8 SBD 210 0.000 11.500 From LA/SBD County Line to I-15 On SR-210 convert existing HOV lane to Express/HOT Lane System Management TBD TBD TBD

8 SBD 395 4.000 11.200 FROM 0.16 MI N/O I-15 JCT TO SR 18 WIDEN HWY TO 4-LANES & ADD LEFT-TURN CHANNELIZATION AT

INTERSECTIONS (PHASE 3)System Expansion $ 48,215.00 12/31/2009 12/31/2009

8 SBD 395 4.000 11.200US-395 Hesperia, Victorville and Adelanto from 0.16 mi

n/o I-15 JCT to SR-18Interim widening, widen from 2-4 lanes and add left turn channelization

at intersections (PA&ED Only)System Expansion $ 7,223.00 N/A TBD

8 SBD 395 4.100 48.500 On US-395 from I-15 to 0.5 miles SO Farmington Road

Realign and widen US-395 to a 6 lane freeway from I-15 to SR-18 (Phase 1); widen to a 4 lane freeway from SR-18 to Purple Sage (Phase 2); and

widen to a 4 lane expressway from Purple Sage to 0.5 miles SO Farmington Rd (Phase 3) (PA&ED Only)

System Expansion $ 2,629.00 TBD TBD

8 SBD 395 11.200 16.600US-395 Hesperia, Victorville and Adelanto from SR-18 to

Chamberlaine WayInterim widening, widen from 2-4 lanes and add left turn channelization

at intersectionsSystem Expansion $ 55,191.00 TBD 12/31/2009

8 SBD 395 16.600 19.300FROM CHAMBERLAINE WAY TO 1.8 MI S/O DESERT

FLOWER ROADWIDEN HWY TO 4-LANES & ADD LEFT-TURN CHANNELIZATION AT

INTERSECTIONS (PHASE 2)System Expansion $ 28,838.00 12/31/2009 12/31/2009

8 SBD 395 16.600 19.300US-395 Hesperia, Victorville, and Adelanto from

Chamberlaine Way to 1.8 mi s/o Desert Flower Rd Interim widening, widen from 2-4 lanes and add left turn channelization

at intersectionsSystem Expansion $ 28,838.00 TBD TBD

8 SBD 395 19.300 48.500On US-395 from 1.8 miles SO Desert Flower Road to 0.5

miles SO Farmington RoadNew alignment, construct 4 lane expressway (northerly alignment) System Expansion $ 459,978.00 7/27/2001 3/2/2018

9 Iny 395 30.800 41.800

In Inyo County from Olancha to Cartago on new alignment between 0.3 mile north of North Haiwee

Road and 0.2 mile south of Bridges 48-0068R and 48-0068L over Ash Creek

construct 4-lane expressway System Expansion $ 149,000.00 initial document,

1998; revision, 2015?

9 Ker 14 45.900 53.000In Kern County at and near Red Rock Canyon State Park from 5.3 miles north of Abbott Drive to 3.4 miles south

of Bridge 50-0014 over Freeman Gulchwiden from 2-lane expressway to 4-lane expressway System Expansion $ 63,025.00 9/14/2001

9 Ker 14 53.000 58.300In Kern County near Inyokern from 4.8 miles south of

the west leg of Route 178 to 0.5 mile north of the west leg of Route 178

widen from 2-lane expressway and 2-lane conventional to 4-lane expressway

System Expansion $ 47,685.00 9/14/2001

9 Ker 58 82.200 85.000In Kern County at Keene from 0.14 mile east of Keene

Road to 0.149 mile west of Broome Roadconstruct eastbound truck climbing lane System Expansion $ 15,000.00

9 Ker 58 82.200 85.000In Kern County at Keene from 0.14 mile east of Keene

Road to 0.149 mile west of Broome Roadconstruct eastbound truck climbing lane System Expansion $ 15,000.00 N/A

Page 21: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 21 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

9 Ker 58 117.900 129.700In Kern County near Mojave between 1.3 miles east of

the Business Route 58 East Overcrossing, Bridge 50-0492, and the Edwards Overcrossing, Bridge 50-0396

upgrade roadway from four-lane expressway to four-lane freeway System Expansion $ 44,400.00

9 Mno 395 57.800 60.200In Mono County at and near Mono City from 0.44 mile

south of Route 167 to 0.24 mile north of Conway Ranch Road

construct passing lanes System Expansion $ 10,000.00 N/A

9 Mno 395 66.000 68.000In Mono County about 9 miles south of Bridgeport from

2.48 miles north of Virginia Lakes Road to 1.85 miles south of Route 270

construct passing lanes System Management $ 20,000.00 N/A

10 ALP 89 14.900 14.900 In Alpine County on SR 89 at Weber Street Bikeway Signage and identify segments for shoulder widening System Management $ 670.00 N/A

10 ALP 89 19.718 19.718 Sierra Pines Trailer Park - Manzanita Drive Class II bicycle facility System Management N/A N/A

10 ALP 89 20.380 20.380 Health Center - Diamond Valley Road Hung-A-Lel-Ti Class I bicycle facility and multi-use path System Management N/A N/A

10 ALP 89 21.366 23.647 In Alpine County Line on SR 89 at Luther Pass Road Luther Pass Road Class III bicycle facility System Management N/A N/A

10 ALP 890.000 0.000

In Alpine County on SR 89 - Luther Pass Road SR 88 Class II bicycle lanes and shoulder widening System Management N/A N/A

10 ALP 890.000 0.000

In Alpine County on SR 88 at Nevada state line Class III bicycle facility System Management N/A N/A

10 AMA 88 21.600 24.600In Amador County on SR 88 from Ridge Road to Berry

Street, Ridge Road intersection, Berry to Hilltop, Hilltop to Tabeaud Road. (Pine Grove)

Pine Grove Corridor Improvement Project (add sidewalks, intersection improvements, add east bound dual left and west bound right turn lanes, signalize intersections, pedestrian crossing, revise school access, signalize

intersection, extend west bound passing lane)

System Expansion $ 41,036.00 6/29/2007 2/26/2016

10 AMA 88 21.600 24.600In Amador County on SR 88 from Climax Road to Ridge Road, SR 88/Ridge Road intersection, Berry to Hilltop,

Hilltop to Tabeaud Road. (Pine Grove)

Stage II of Pine Grove Corridor Improvement Project (Realign intersection , add receiving pocket, intersection improvements, add east bound dual left and west bound right turn lanes, signalize intersections, pedestrian crossing, revise school access, signalize intersection, extend west bound

passing lane) $8M if IIP matched

System Management $ 8,000.00 N/A

10 CAL 4 10.300 16.400In Calaveras County on SR 4 from east of Copperopolis

to Angels CampWagon Trail Expressway on new alignment (Wagon Trail Realignment) System Expansion $ 71,458.00 6/29/2001 1/10/2017

10 CAL 12 9.000 11.530 In Calaveras County SR 12/26 Bypass Valley Springs Bypass System Expansion $ 2,736.00 N/A

10 CAL 12 9.780 11.530In Calaveras County on SR 12 from Pine Street to Lime

Creek Road (Valley Springs)Class II bike lane (0.6 miles) System Expansion $ 15.00 N/A

10 CAL26

10433.564 35.400

In Calaveras County on SR 26 from Sneed Road to Railroad Flat Road (West Point)

Class II bike lane (1.9 miles) System Expansion $ 17.00 N/A

10 MER 59 14.700 19.000In Merced County from Green Sands to SR

59/BellevueAtwater-Merced Expressway - 4 lane expressway on new alignment System Expansion $ 180.00 N/A

10 MER 99 12.800 19.300In Merced County in Merced on SR 99

from north of Mission Avenue to 1.26 miles south of Buhach Road

Merced SR 99 Widening System Management N/A N/A

10 MER 99 20.900 23.800In Merced County, 0.3 mile south of East Atwater

Overhead to 0.5 miles north of West Atwater Overhead. Applegate IC/Route 99

Convert four lane expressway to six lane freeway System Expansion 6/1/2018

10 MER 99 28.200 37.300In Merced County on SR 99 in

Livingston from 0.8 mile south of Hammatt Avenue to Merced/Stanislaus County Line

North Bound Livingston Widening from two to three lanes System Expansion $ 20,429.00 N/A 6/2/2014

10 MER 99 28.200 37.300In Merced County on SR 99 in

Livingston from 0.8 mile south of Hammatt Avenue to Merced/Stanislaus County Line

South Bound Livingston Widening from two to three lanes System Expansion $ 31,439.00 N/A 6/2/2014

10 MER 140 5.600 5.600In Merced County, in Gustine on SR 140 at intersection

of SR 33Gustine Roundabout Roundabout $ 3,513.00 12/31/2016 5/30/2017

Page 22: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 22 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

10 MER 140 38.100 38.360In Merced County in Merced on SR 140 from 65 miles east of Santa Fe Avenue to 0.15 miles west of Kibby

RoadConstruct Interchange and Overhead System Expansion $ 43,756.00 N/A 1/27/2009

10 MER 152 0.000 13.848In Merced County on SR 152 between I-5 and Santa Clara County Line

Install Truck Climbing Lane System Management N/A N/A

10 MER 152 0.000 40.800In Merced County along SR 152 from Merced to San

JoseHigh Speed Rail Merced to San Jose System Expansion $ 250,000.00 6/1/2011 5/1/2018

10 MER 152 16.200 26.200In Merced County in Los Banos from Ramos Road to SR

165Construct four lane freeway bypass on six lane right of way (Los Banos

Bypass Segment II)System Expansion $ 128,554.00 N/A

10 MER 152 16.200 26.900 In Los Banos from Ramos Road to Santa Fe Road Construct four lane freeway (Los Banos Bypass Segment III) System Expansion N/A N/A

10 MER 152 22.300 25.800In Merced County in Los Banos from SR 165 to SR 152

near Santa Fe Road

Construct four-lane freeway bypass on six-lane right of way with signalized at-grade intersections (Los Banos Bypass Segment I) System Expansion $ 59,140.00 N/A 9/21/2009

10 MPA 140 0.000 0.000In Mariposa County on SR 140 from

Bear Creek to Briceberg Realign the highway System Expansion $ 1,300.00 N/A

10 SJ 4 14.700 14.600In San Joaquin County on SR 4 new alignment

from Navy Drive to Charter WayNew alignment System Expansion $ 200,000.00 N/A

10 SJ 5 7.300 17.800In San Joaquin County on I-5 at

Lathrop Road Reconstruct interchange System Expansion $ 33,000.00 N/A

10 SJ 5 10.650 21.440 In San Joaquin County, on I-5 Improve freight mobility, upgrade deficient and aging structure infrastructure and remove corridor vertical clearance and load

constraintsSystem Management 4/27/2017 12/30/2017

10 SJ 5 11.060 16.470In San Joaquin County on I-5 Mossdale HOV Widening

(SR 120 to I-205 Connections)I-5 Mossdale HOV Widening (SR 120 to I-205 Connections) Expanding 10

to 12 lanesSystem Expansion $ 207,970.00 3/1/2018 12/1/2020

10 SJ 5 14.300 22.400In San Joaquin County on

I-5 from SR 120 to French Camp Widen to eight lanes for HOV System Management $ 193,880.00 N/A

10 SJ 5 15.800 15.900In Stanislaus County near Patterson on I-5 at Sperry

Road interchangeI-5 Sperry Road Interchange System Expansion $ 8,337.00 9/5/2002 12/20/2018

10 SJ 5 16.400 16.600In San Joaquin County on

I-5 at Louise Avenue Reconstruct Interchange System Expansion $ 33,000.00 N/A

10 SJ 5 19.200 19.820In San Joaquin County on I-5

at Roth Road

Relocation of intersection at Roth/Harlan Road inclusive of signalization; relocation of intersection at Roth/Manthey Road inclusive of

signalization. Widen from 2-5 lanes from Roth/Harlan Road intersection to Roth/Manthey Road Intersection

System Management $ 16,800.00 N/A

10 SJ 5 22.400 25.400In San Joaquin County on I-5 from

French Camp Road to Charter WayWiden to eight lanes for HOV System Management $ 97,880.00 N/A

10 SJ 5 26.100 26.500In San Joaquin County on I-5 in Stockton at Channel

ViaductBridge Rehab System Management $ 815,000.00 6/22/2015 10/30/2020

10 SJ 5 26.300 26.500In San Joaquin County on I-5 at

Stockton RiverWiden Channel Viaduct System Management N/A N/A

10 SJ 5 26.500 12.700On Route I-5 and State Route I-580 in San Joaquin

County High Speed Rail - Altamont Pass (Altamont Corridor High

Speed Rail)System Expansion $ 50.00 N/A

10 SJ 5 32.600 32.600In San Joaquin County on I-5 at

Hammer Lane Interchange modification and auxiliary lanes System Management $ 37,200.00 N/A

10 SJ 5 32.600 35.300In San Joaquin County on I-5

HOV from Hammer Lane to Eight Mile RoadWiden to eight lanes for HOV System Management $ 124,620.00 N/A

10 SJ 5 35.100 35.600In San Joaquin County on SR-

99 at Eight Mile Road Reconstruct Interchange System Management $ 65,900.00 N/A

10 SJ 12 10.167 15.120In San Joaquin County on SR 12 from I-5

and Lower Sacramento RoadWiden to four lanes System Expansion $ 75,000.00 N/A

Page 23: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 23 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

10 SJ 12 15.115 18.070In San Joaquin County on SR

12 from Lower Sacramento Road to SR-99Widen to six lanes System Expansion $ 58,100.00 N/A

10 SJ 99 0.000 0.000In San Joaquin County on

SR 99 at March Lane and Wilson WayNew interchange System Expansion $ 198,100.00 N/A

10 SJ 99 2.500 4.100In San Joaquin County on SR 99 at Olive Expressway

New interchange System Expansion $ 100,000.00 N/A

10 SJ 99 4.100 5.100In San Joaquin County on

SR 99 at Austin RoadModify existing Interchange System Expansion $ 3,000.00 N/A

10 SJ 99 4.600 6.300In San Joaquin County in Manteca at the SR 99/120

interchangeSR 99 and SR 120 Interchange Improvements (west) System Management $ 35,744.00 12/21/2015 8/8/2018

10 SJ 99 23.500 24.500In San Joaquin County on

SR 99 at Morada Reconstruct Interchange System Expansion $ 698,000.00 N/A

10 SJ 99 28.300 28.620In San Joaquin County on

SR 99 at Harney LaneReconstruct Interchange to provide 6 through lanes on

SR 99, 4 lanes on Harney and modify on-ramps and off-rampsSystem Expansion $ 39,183.00 N/A

10 SJ 99 28.300 31.400In San Joaquin County in Lodi on SR 99 from Harney

Lane Interchange to Turner Road Lodi 99 Widening from 4 to 6 lanes System Expansion $ 50.00 4/12/2017

10 SJ 99 29.400 29.600In San Joaquin County on

SR 99 at SR 12 West (Kettleman Lane)Reconstruct Interchange and widen to free flowing interchange System Expansion $ 16,164.00 N/A

10 SJ 99 34.700 35.900In San Joaquin County on

I-5 at Eight Mile Road Modification of interchange System Expansion $ 51,400.00 N/A

10 SJ 99 36.000 36.900In San Joaquin County on

SR 99 at Gateway Blvd.New interchange System Expansion $ 80,300.00 N/A

10 SJ 120 0.490 7.140In San Joaquin County on SR 120 from I-5 to SR-99

SR 120 Widen to six lanes (SR 99 to I 5) System Expansion $ 115,191.00 N/A 12/1/2020

10 SJ 120 1.328 1.328In San Joaquin County on

SR 120 at Yosemite/ Guthmiller Roads

Reconstruct interchange $ 20,050.00 N/A

10 SJ 120 2.000 3.000In San Joaquin County on

SR 120 at McKinley AvenueConstruct Interchange System Expansion $ 33,890.00 N/A 11/26/2014

10 SJ 120 3.400 5.200In San Joaquin County on

SR 120 at Union Road Reconstruct Interchange System Expansion $ 22,000.00 N/A 6/17/2010

10 SJ 120 TBD TBD Manteca TBD $ 29,360.00 N/A TBD

10 SJ 132 5.850 7.110In San Joaquin County on

SR 132 between SR 33 and Stanislaus County LineExpand facility to expressway System Expansion N/A N/A

10 SJ 205 1.100 1.600In San Joaquin County in the City of Tracy along

Mountain House Parkway (MHP) at I-205 Interchange

I-205/MHP interchange System Expansion $ 6,820.00 N/A 3/30/2018

10 SJ 205 2.600 5.100

In San Joaquin County in and near Tracy from Hansen Road Overcrossing to Grant Line Road, I-205/Lammers

Road/ Eleventh Street

Construct Interchange at Eleventh Street. Realign and widen Eleventh Street to 6 lanes north of Grant Line to Byron Road. Construct Auxiliary lane Hansen to Eleventh in WB I-205 Eleventh Street to Grant Line Road

System Expansion $ 49,800.00 N/A 11/7/2012

10 SJ 205 2.920 8.120In San Joaquin County on I-205 from

Eleventh Street to MacArthur DriveWiden to eight lanes (inside and outside) for HOV System Expansion $ 143,450.00 N/A

10 SJ 205 5.011 5.573In San Joaquin County on I-205 at Grant Line Road

Modify existing Interchange System Expansion $ 32,574.00 N/A

10 SJ 205 7.970 8.127In San Joaquin County on

I-205 at MacArthurModify interchange System Expansion $ 9,670.00 N/A

10 SJ 205 8.120 13.390In San Joaquin County on I-205 from MacArthur Drive to

I-5 Widen to eight lanes (inside outside) for HOV System Expansion $ 143,184.00 N/A

Page 24: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 24 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

10 SJ 205 9.000 9.600In San Joaquin County on

I-205 at Paradise Road/ChrismanChrisman Road Interchange System Expansion $ 36,056.00 N/A 1/31/2018

10 SJ 580 6.500 8.000In San Joaquin County on I-580 at Lammers Road

New interchange System Expansion $ 55,000.00 N/A

10 SJ 580 8.149 8.149In San Joaquin County on

I-580 at Corral Hollow RoadModify interchange System Expansion $ 20,000.00 N/A

10 SJ 580 13.300 13.800In San Joaquin County in the City of Tracy along

Mountain House Parkway (MHP) at I-580 interchangeI-580/MHP interchange modifications System Expansion $ 5,760.00 N/A 3/30/2018

10 SJ N/A N/A N/A Stockton

The overall project has two components, the Stockton Passenger Track Extension and a new connection in the northwest quadrant of the

Stockton Wye. The two components are located adjacent to each other along the Union Pacific Railroad Fresno Subdivision in central Stockton

and together they allow for more direct routing of passenger and freight trains to their destinations and help to better separate commuter and freight operations, thus reducing delays and improving overall system

capacity in the region.

$ 32,080.00 N/A TBD

10 SJ N/A TBD TBD Stockton TBD N/A N/A TBD

10 SJ N/A Stockton

The overall project has two components, the Stockton Passenger Track Extension and a new connection in the northwest quadrant of the

Stockton Wye. The two components are located adjacent to each other along the Union Pacific Railroad Fresno Subdivision in central Stockton

and together they allow for more direct routing of passenger and freight trains to their destinations and help to better separate commuter and freight operations, thus reducing delays and improving overall system

capacity in the region.

FASTLANE/Highway $ 32,080.00

10 STA 5 15.800 0.300In Stanislaus and San Joaquin Counties on SR 5 at Sperry

Road and I-580Widen to six lanes System Expansion N/A N/A

10 STA 99 1.630 1.630 In Stanislaus County on SR 99 at Lander Avenue Construct new interchange System Expansion $ 35,785.00 N/A10 STA 99 3.450 3.450 In Stanislaus County on SR 99 at W. Main Street Construct new interchange System Expansion $ 19,091.00 N/A

10 STA 99 3.640 4.740In Stanislaus County on R 99 from Fulkerth Road to

W. Main AvenueConstruct Auxiliary lane System Management $ 6,402.00 N/A

10 STA 99 4.740 5.480In Stanislaus County on SR 99 from Monte Vista Avenue

to Fulkerth Road Construct Auxiliary lane System Management $ 6,461.00 N/A

10 STA 99 5.480 6.590In Stanislaus County on SR 99 from Taylor Road to

Monte Vista AvenueConstruct Auxiliary lane System Management $ 6,520.00 N/A

10 STA 99 6.540 8.100In Stanislaus County on SR 99 from Keyes Road to

Taylor RoadConstruct Auxiliary lane System Management $ 6,226.00 N/A

10 STA 99 6.750 6.750 In Stanislaus County on SR 99 at Taylor Road Reconstruct interchange System Expansion $ 7,693.00 N/A10 STA 99 9.500 11.400 In Stanislaus County in and near Ceres Interchange Project System Management $ 91,707.00 N/A 3/30/2018

10 STA 99 10.360 10.580In Stanislaus County on SR 99 at Mitchell and Service

Roads Install new interchange System Expansion $ 122,987.00 N/A

10 STA 99 10.360 24.750In Stanislaus County on SR 99 from San Joaquin County

to Mitchell RoadInstall Ramp Metering System Management $ 15,758.00 N/A

10 STA 99 10.360 37.300In Stanislaus County on SR 99 from Mitchell Road to

Merced CountyInstall Ramp Metering System Management $ 3,097.00 N/A

10 STA 99 15.100 15.380 In Stanislaus County on SR 99 at Tuolumne Boulevard Construct new overpass System Expansion $ 9,693.00 N/A

10 STA 99 16.100 22.800 In Stanislaus County on SR 99 from Kiernan Road to SR-

132Widen to eight lanes System Expansion $ 50,670.00 N/A

10 STA 99 16.200 16.700In Stanislaus County, in Modesto on new alignment

from west of north Emerald to SR 99Modesto Soil Stockpile (SR 132 West mitigation) System Management $ 2,200.00 N/A 12/20/2017

Page 25: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 25 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

10 STA 99 18.520 18.520In Stanislaus County on SR 99 at Briggsmore Road to

eight lanesReconstruct interchange System Expansion $ 98,679.00 N/A

10 STA 99 20.876 21.674 In Stanislaus County on SR 99 at Fulkerth Road Reconstruct interchange System Expansion $ 12,667.00 N/A10 STA 99 24.270 24.270 In Stanislaus County on SR 99 at Hammatt Road Replace interchange System Expansion $ 95,524.00 N/A

10 STA 132 6.300 11.400In Stanislaus County on SR 132 West Extension from

Dakota to GatesSR 132 West Extension improvement System Expansion $ 10,000.00 N/A 9/1/2021

10 STA 132 11.300 14.700In Stanislaus County on SR 132 in Modesto on

new alignment from Dakota to SR 99 Construct 4 lane expressway on new alignment and

soundwall (SR 132 West Expressway) System Expansion $ 467,464.00 12/17/1997 12/20/2017

10 STA 132 14.700 14.983In Stanislaus County on SR 132 from SR-99 to Ninth

Street Various Improvements System Preservation $ 6,333.00 N/A

10 STA108120

R27.510.5

R45.5R12.5

In Stanislaus County North of the City of Modesto from SR 99 to SR 120 east of the city of Oakdale

Construct Expressway on new alignment System Expansion N/A

10STASJ

9922.560.00

24.756.67

In San Joaquin County and Stanislaus County, construct HOV lanes on SR 99 from junction SR 219 to north

junction SR 120 (Yosemite Ave) in Stanislaus and San Joaquin County

Construction HOV lanes System Expansion 6/1/2018

10 TUO 120 5.852 8.910In Tuolumne County on SR 108 /120 Widen to four lane

expressway between SR 120 and existing four lane section (Keystone)

Widen to four lane expressway System Expansion $ 17,000.00 N/A

11 IMP 7 0.000 N/A Calexico East Port of Entry

Expansion of the Calexico East Port of Entry- widen bridge over the All-American Canal (canal serves at U.S./Mexico border) and increase the

number of commerical vehicle lanes from existing 3 to 6 lanes; add 6 new northbound privately owned vehicle (POV) lane; pedestrian pathway

improvements including shadded sidewalks and transit lot (pick-up and drop-off area)

System Expansion $ 90,000.00

11 IMP 8 34.000 41.000 From Forrester Road to SR-111 Add/Widen and Improve to Six-Lane Freeway. System Expansion $ 188,700.00

11 IMP 86 34.000 27.500 Forrester Road Corridor (Proposed SR-86) Widen and improve to 4 lane arterial from I-8 to SR-78. System Expansion $ 307,168.00

11 IMP 98 31.900 32.000 SR-98/Cesar Chavez Blvd. (Calexico) Construct roadway/rail grade separations System Management $ 30,000.00

11 IMP 98 Calexico

Project is in the Project Report/Environmental Document phase, but due to funding and resource constraits, work on the project has been

suspended. The schedule for design and cnstruction will be contingent on the availability of funding. State Route 98 (SR-98) is an east/west two-lane conventional highway which parallels the international border in Imperial County. The plan calls for widening and/or realigning SR-98 etween State Route 111 (SR-111) and State Route 7 (SR-7) from two to four lanes -- six in some locations. The project will require acquisition of additional right

of way and relocation of irrigation systems. This project is included in the state’s Transportation Congestion Relief Program (TCRP).

Border $ 374,500.00

11 SD 5 37.300 51.200 From Lomas Santa Fe Drive to SR-78 I-5 NCC - Phase 1 operational improvements System Management $ 51,000.00 ED Complete

11 SD 5 39.800 47.000 From Birmingham Drive to Palomar Airport Road Add 1 lane in each direction (I-5 NCC - Phase 1 Express Lanes) System Expansion $ 335,000.00 ED Complete

11 SD 5 40.600 41.500 From Encinitas Boulevard to Santa Fe Drive I-5 NCC - Phase 1 multimodal connectivity Bike/Ped $ 4,000.00

Page 26: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 26 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

11 SD 5 47.000 51.200 From Palomar Airport Road to SR-78 Add 1 lane in each direction (I-5 NCC - Phase 1 Express Lanes) System Expansion $ 126,000.00 ED Complete

11 SD 5 51.200 53.900 From SR-78 to SR-76 Add 1 lane in each direction (I-5 NCC - Phase 1 Express Lanes) System Expansion $ 110,000.00

11 SD 5Harbor Drive, south of downtown San Diego from Port

of San Diego to I-5

Harbor Drive Multimodal Corridor Improvements, including but not limited to: improvements at 32nd Street and Vesta Street; pedestrian

crossings and bridges; various truck improvements; bikeway accommodations; streetscape, safety, and parking improvements.

$ 273,000.00

11 SD 7

San DiegoSR-7

SR-11SR-125SR-905

In Phase I, the following ITS elements will be installed along the southbound routes in San Diego and Imperial County at the Otay Mesa and Calexico East LPOEs (where possible): Wi-Fi and GPS readers (PVTD

devices), changeable message signs (CMSs), radio-frequency identification (RFID) cards, and fiber optic (FO) cable.

CSFAP $ 13,000.00

11 SD 7

San DiegoSR-7

SR-11SR-125SR-905

Caltrans is collaborating with U.S. Customs and Border Protection (CBP) and SAT [Tax Administration Service] Customs to explore the potential of

northbound ITS investments. Currently, Caltrans and its partners are working with FHWA to install radio-frequency identification (RFID) and Wi-

Fi readers on Mexico’s northbound lanes at the existing Otay Mesa and San Ysidro land point of entries (LPOEs) in order to capture commercial vehicle wait time data, expanding Texas Department of Transportation’s (TxDOT) current border wait time program. The RFID project is expected

to last for one year, and an agreement for future maintenance and operations will need to be established between partner agencies.

CSFAP $ 2,200.00

11 SD 7

San DiegoSR-7

SR-11SR-125SR-905

Caltrans will integrate border wait times into existing information-sharing systems, such as the free 511 San Diego mobile application and Caltrans

QuickMap. In addition, Caltrans will work to share real-time data with the private sector, allowing them to develop an Advanced Traveler Information system (ATI) accessible to the general public. This information will ideally be available through a website, mobile

application, and electronic highway signage through Changeable Message Signs (CMSs). When data becomes available, additional platforms for

disseminating information will be explored.

CSFAP $ 400.00

11 SD 7

San DiegoSR-7

SR-11SR-125SR-905

Caltrans, SANDAG, Tijuana, and Mexico’s Secretary of Communications and Transportation (SCT) are developing a Regional Border Management System (RBMS). The partner agencies are in the process of developing an integrated traffic management system that will link traffic operations in

Tijuana with those managed by SANDAG and Caltrans.

CSFAP $ 200.00

11 SD 11 1.000 2.800 From existing SR-11 to future Otay Mesa East POESR-11 Segment 2 (construct highway, interchange, CVEF, 4 toll lanes, ITS

elements)System Expansion $ 304,000.00

11 SD 11 1.000 2.800 From existing SR-11 to future Otay Mesa East POE SR-11 Segment 3 (Land Port of Entry) System Expansion $ 326,000.00

Page 27: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 27 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

11 SD 11 San Diego

The State Route 11 Segment 2 and Southbound Connectors project (Project) will construct the final segment of a new freeway system to the

future Otay Mesa East Port of Entry (POE) at the California-Mexico border, as well as two freeway to freeway connectors providing critical

linkages between San Diego’s primary freight corridors in the border region. In particular, the Project will extend the current freeway (State

Route [SR] 11) by more than a mile to provide the final piece of connectivity to the future Otay Mesa East POE. In addition, it will

complete a critical system of freeway connectors, linking international trade access points from Southbound SR 125 to Southbound SR 905 and

Southbound SR 125 to Eastbound SR 11.

Border $ 177,200.00

11 SD 11 San Diego

SR 11/Otay Mesa East POE Project is a flagship border infrastructure project that will enhance binational prosperity. Mexico is California’s number one export market. In 2014, the Golden State exported $25.4 billion in goods to Mexico, accounting for 14 percent of all California

exports. At the national level, Mexico is the United States’ third largest trading partner, after Canada and China, accounting for more than $534 billion in bilateral trade in 2014. More than 7 percent of the total U.S.-

Mexico trade value crosses at the Otay Mesa and Tecate ports of entry in the San Diego-Baja California region. And more than 90 percent of total

trade between California and Mexico is transported by trucks, which seek greater reliability and predictability that the new POE will provide.

Border $ 21,500.00

11 SD 15 6.100 10.600 From SR-52 to I-8 Construct 2 HOV lanes System Expansion $ 60,000.00

11 SD 52 7.400 14.900 From I-15 to SR-125Add 1 GP lane EB & WB (total of 6) from Mast to SR-125. Climbing WB

Mast. EB aux lane from Spring Canyon to Mast. EB aux between 1-15 and Santo Road.

System Expansion/Management

$ 65,000.00

11 SD 56 0.000 N/A SR-56 at I-5 Construct operational improvement at I-5/SR-56 System Management $ 32,000.00

11 SD 78 6.900 14.300 From Vista to San Marcos Construct operational improvements- 6 auxiliary lanes System Management $ 155,000.00

11 SD 78 16.500 N/A SR-78 at I-15 Construct express lanes connector System Management $ 310,000.00

11 SD 94 10.500 N/A SR-94 at SR-125 SR-94/SR-125 connectors System Management $ 80,000.00

11 SD 805 5.500 13.900From Naples Street in Chula Vista to Home Avenue in

San DiegoConstruct operational improvements- auxiliary lanes from Naples to

Telegraph, 47th to Imperial, Market to HomeSystem Management $ 50,000.00

11 SD 805 7.200 N/A H Street at I-805 in Chula Vista Construct H Street transit station Transit $ 175,000.00

11 SD 805 10.300 N/A Plaza Boulevard at I-805 in National City Construct Plaza Boulevard transit station Transit $ 275,000.00

11 SD 805 13.500 14.700 From I-15 to SR-94 Construct 2 HOV lanes and I-15/I-805 connectorsSystem

Expansion/Management $ 267,000.00 ED Complete

11 SD 805 23.700 24.500 From SR-52 to Governor Drive Construct operational improvements- auxiliary lanes from NB and SB System Management $ 41,000.00

11 SD 905 La Media Road Otay Mesa Southbound Truck Route Improvements $ 35,000.00

Page 28: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 28 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

11 SD11

90510.400 10.400 SB SR-125 to WB SR-905 Freeway connector System Management $ 40,000.00 ED Complete

11 SD11,

125,905, 7, 98

N/A TBD San Diego, ImperialPilot Project, Advanced Technology Corridors at

Border Ports of Entry Phase I: Southbound ITS Infrastructure Improvements

$ 13,000.00 N/A TBD

11 SD11,

125,905, 7, 98

N/A TBD San Diego, ImperialPilot Project, Advanced Technology Corridors at

Border Ports of Entry Phase II: Information Dissemination $ 400.00 N/A TBD

11 SD11,

125,905, 7, 98

N/A TBD South or U.S./Mexico border near land POEsPilot Project, Advanced Technology Corridors at

Border Ports of Entry Phase III: Potential NorthboundInvestments

$ 2,200.00 N/A TBD

11 SD11,

125,905, 7, 98

N/A TBD San Diego, ImperialPilot Project, Advanced Technology Corridors at

Border Ports of Entry Phase IV: Potential RegionalBorder Management System

$ 22,800.00 N/A TBD

11 SD11,Off

SystemN/A TBD San Diego

Siempre Viva Interchange and Commercial Vehicle Enforcement Facility - Segment 2B

N/A N/A TBD

11 SDOff

SystemSan Diego TBD Border TBD

12 ORA 1 0.148 33.710 Entire corridor in Orange County Gridsmart camera deployment $ 7,000.00

12 ORA 1 24.271 Huntington Street in Huntington Beach Pedestrian Overcrossing $ 10,000.00

12 ORA 1 29.877 33.710 Warner to Los Angeles County line Pedestrian upgrades $ 5,000.00

12 ORA 1 31.059 32.727 Seal Beach: Anderson to Seal Beach Blvd OC Bike Loop (Segment L) bikeway $ 12,000.00

12 ORA 5 0.000 3.397 Avenida Pico to SD County line HOV extension $ 120,000.00 4/1/2018

12 ORA 5 23.930 23.772 SB I-5 offramp to Sand Canyon Modify SR-133 exit gore point north of Sand Canyon by 1500 feet $ 6,000.00

12 ORA 5 24.870 24.870 Irvine (Jeffrey)Jeffrey Open Space Trail (JOST) Pedestrian/Bike Trail elevated

overcrossing. Interstate 5 @ Jeffrey off-ramp $ 10,500.00 12/1/2015

12 ORA 5 27.600 27.600 Irvine (Jamboree)I-5 @ Jamboree - construct aux lane on I-5 SB; widen SB off-ramp from 1

to 2 lanes; and widening Jamboree Road EB undercrossing to create a turn lane to NB on-ramp PPNO 2806B

$ 8,485.00 N/A

12 ORA 5 29.104 29.612 Newport Blvd to Red Hill Extend aux lane and merge on-ramp into dedicated lanes $ 3,000.00

12 ORA 5 30.264 42.140 SR 55 to SR 91Conversion of existing HOV lanes to HOT lanes between SR 55 to SR 91,

with the option to construct additional HOT lanes (12 miles per direction) $ 225,000.00 6/1/2019

12 ORA 5 30.270 44.382 Between SR-55 and Los Angeles County LineHard shoulder projects on corridor overhead gantries (dynamic lane

management) $ 20,000.00

12 ORA 5 34.146 34.146 I-5NB at WB SR-22/La Veta Offramp Modify offramp at La Veta; Extend merge taper to SR-22 $ 3,000.00 12 ORA 5 44.382 SB I-5 at LA County Line Origin Destination WIM Station $ 12,000.00

12 ORA 22 10.364 I-5; Horseshoe SR-22 horseshoe operational improvements to I-5 $ 64,000.00 9/10/2009

12 ORA 22 6.825 EB SR-22 Euclid offramp Modify termini to add lane $ 2,000.00 12 ORA 39 0.021 22.660 Entire corridor in Orange County Gridsmart camera deployment $ 15,000.00 12 ORA 55 3.589 SB SR-55 at Fair Drive Braid Fair Drive w/SR-73 $ 40,000.00

Page 29: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 29 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

12 ORA 55 5.970 10.470 Costa Mesa, Santa Ana, Tustin (I-405 - I-5) SR 55 widening between I-405 and I-5. Add one lane in both direction. $ 297,000.00 11/6/2008

12 ORA 55 6.213 6.886 I-405 to MacArthur Blvd Braid I-405N to SB SR-55 with MacArthur off ramp $ 30,000.00

12 ORA 55 6.886 MacArthur Braid with I-405 NB connector $ 40,000.00

12 ORA 55 8.724 17.806 Between I-405 and SR-91 Conversion of existing and future HOV lanes to HOT lanes(approximatly

12 miles per direction) $ 48,000.00 N/A

12 ORA 55 13.578 Chapman Ave Braid SB SR-55 onramp with SR-22 Connector $ 35,000.00

12 ORA 57 20.880 22.490 Brea (Lambert - LA County Line)SR 57 truck climbing auxiliary lane from Lambert to Los Angeles County

Line. PPNO 3847A EA 0C120 $ 124,600.00 9/7/2011

12 ORA 57 22.551 SB SR-57 at LA County Line Origin Destination WIM Station $ 12,000.00

12 ORA 73 21.617 Newport Coast Drive Bikeway Undercrossing $ 10,000.00

12 ORA 74 2.280 2.570San Juan Capistrano (San Juan Capistrano - La Pata/SR

74)

Widen Ortega Highway from county/city of San Juan Capistrano to approximately 1,900 feet east of the intersection of the La Pata/Ortega

Highway intersection (approximately 1.2 miles). Widen from 2 to 4. Including widening of the bridge over San Juan Creek.

$ 42,694.00 12/4/1997

12 ORA 74 2.603 5.249 San Antonio to Gibby Road Add Truck lane12 ORA 74 5.249 16.599 Gibby Road to County Line Add Truck lane12 ORA 91 0.000 EB SR-91 at LA County Line Origin Destination WIM Station $ 12,000.00

12 ORA 91 3.743 11.552 Between SR 91 Express Lanes and I-5 Conversion of existing HOV lanes to HOT lanes between SR 91 Express

Lanes and I-5 (approximatly 9.3 miles per direction) $ 37,200.00 N/A

12 ORA 91 5.088 State College 91 braid at State College to address weaving $ 30,000.00

12 ORA 91 8.904 SR-91 at SR-55 Modify WB SR-91 to SB SR-55 connector to the right $ 84,000.00

12 ORA 133 0.609 Old Laguna Canyon Road Pedestrian Overcrossing $ 10,000.00

12 ORA 133 0.962 3.416 South of Canyon Acres to El Toro Add bike lane, underground utilities, widen shoulders $ 15,000.00

12 ORA 133 1.523 Laguna Canyon School of Arts Pedestrian Overcrossing $ 10,000.00

12 ORA 133 3.100 4.300 Laguna Beach (El Toro Road - SR 73)Widen shoulders for bike lanes (OC), utilities relocation, and reconstruct

SB channel to eliminate flooding (CT) $ 22,000.00 3/17/2017

12 ORA 133 10.900 Great Park/Trabuco Construct new interchange

12 ORA 142 0.753 6.350 Entire Orange County stretch Add bike lane and retaining wall $ 20,000.00

12 ORA 405 3.941 Jeffrey Bikeway Undercrossing $ 10,000.00

12 ORA 405 5.463 5.463 Culver Drive Bikeway Undercrossing $ 10,000.00

12 ORA 405 7.403 Von Karman HOV drop ramp $ 50,000.00

12 ORA 405 8.724 10.314 SR 55/SR 73Conversion of existing HOV lanes and construction of additional HOT

lanes between SR 55 and SR 73 (approximatly 1.5 miles) $ 6,000.00 N/A

12 ORA 405 9.890 Bear HOV drop ramp $ 60,000.00

Page 30: 2018 State Transportation Improvement Program … · Sections of US 199/197 ... 28.500 31.600: In Lake County on Route 29 near Lower Lake. ... Reconfigure I-80/SR 65 interchange to

2018 State Transportation Improvement Program Highway Needs

Page 30 of 30 September 15, 2017

Dist

rict

Coun

ty

Rout

e

Beg

PM

End

PM

Location Project DescriptionCTC Project

Category

Planning Level Cost Est ($1000)

PID Completion Date

PA & ED Date

12 ORA 405 10.508 SR-73 NB HOV Direct Connector $ 45,000.00

12 ORA 405 24.178 SB I-405 at LA County Line Origin Destination WIM Station $ 12,000.00 12 ORA 5 3.393 4.077 Avenida Pico to Vista Hermosa Truck Climbing Lanes $ 40,000.00 12 ORA 57 20.871 Lambert Road Reconstruct interchange $ 30,000.00 11/15/2007

12 SD 56 0.000 9.800 SR-56 Corridor Corridor improvements and possibly add 1 lane System Management $ 160,000.00