2018 Weather Conditions

Received 55.89 inches total rainfall • 3.27 inches below average

No major rain events in 2018

Currently in a moderate drought • Lake Okeechobee level at

12.58’

1

2

1/9/2019

2

Capital Improvements

Capital ImprovementsSCADA and Electrical Upgrades

Construction completed in February 2018

System operational!

Ongoing maintenance and support of servers/software

3

4

1/9/2019

3

Capital ImprovementsControl Structure 9 Relocation

Project design ongoing and scheduled for completion in early 2019 Projected completion

schedule:• Permitting, construction bid &

award – July 2019• Construction – December 2020

2018 2019 2020 2021

FY18 Oct 2018 FY19 Oct 2019 FY20 Oct 2020 FY21

3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr

DESIGN (9 Months)

BID & AWARD (6 Months)

CONSTRUCTION (18 Months)

PERMITTING (12 Months)

Capital ImprovementsControl Structure 19

Completed installation of 3-phase power with FPL for SCADA implementation

SCADA instrumentation will improve operations to effectively manage discharge of C-51 Reservoir water to the Hillsboro Canal and points south

5

6

1/9/2019

4

Capital ImprovementsControl Structure 20

Completed structural evaluation of Control Structure 20 Completed installation of 3-phase

power with FPL for SCADA implementation Structure improvements underway

including replacement of gates

Capital ImprovementsCulvert at E-1W South & Hillsboro Canal

Completed structural evaluation of drainage culvert on the E-1W South & Hillsboro Canal

Design underway for replacement of culvert

7

8

1/9/2019

5

Control Structure Improvements

Control Structure ImprovementsPump House: Before

9

10

1/9/2019

6

Control Structure ImprovementsPump House: After

Control Structure ImprovementsYard Stabilization: Before

11

12

1/9/2019

7

Control Structure ImprovementsYard Stabilization: After

Control Structure ImprovementsFencing

13

14

1/9/2019

8

Control Structure ImprovementsSafety Markers

Control Structure ImprovementsBoat Barriers and Signage

15

16

1/9/2019

9

Control Structure Improvements

Before After

Canal Rehabilitation Program

17

18

1/9/2019

10

Canal Rehabilitation Program

Continued execution of canal rehabilitation program In 2018, 28.35 miles of

vegetation cleared• LWDD staff – 16.75 miles• Contracted services – 9.35 miles

($1.3 million)• Third party – 2.25 miles

Since October 2015, cleared approximately 69.05 miles of vegetation from encumbered rights-of-way• Nearly 40% of encumbered rights-

of-way cleared of vegetation

TOTAL ROW Clearing (OCT 2015‐ Dec 2018)

Completed Remaining

E-1; North of Spanish Isles (0.11 mi)

19

20

1/9/2019

11

E-2; L-4 to Belvedere (0.62 mi)

E-2; South of Okeechobee (0.23 mi)

21

22

1/9/2019

12

E-2W; Hillsboro to SW 18th (0.20 mi)

E-3; North/South of L-19 (0.65 mi)

23

24

1/9/2019

13

E-3; L-45 to L- 44 (0.63 mi)

E-3 ½-8; L-2 to Westgate (0.41 mi)

25

26

1/9/2019

14

E-4; Mission Hill (WEST bank) (0.22 mi)

E-4; Mission Hill to I-95 (EAST bank) (0.22 mi)

27

28

1/9/2019

15

E-4; Thompson Rd to L-18 (0.32 mi)

E-4; Thompson Rd to L-18 (0.32 mi)

29

30

1/9/2019

16

E-4; L-38 to Old Germantown Rd (0.40 mi)

L-2; Wabasso to Congress (0.91 mi)

31

32

1/9/2019

17

L-2; East of E-3 to West of Military (0.39 mi)

L - 2 ½ ;L-14 to L-13, L-14 east to Jog (1.10 mi)

33

34

1/9/2019

18

L-3; Turnpike to Jog & Caroline to E-3 (0.99 mi)

L-4; West of Military Trail (1.37 mi)

35

36

1/9/2019

19

L-6; Kirk to FL Mango (1.50 mi)

L-7; FL Mango to Forest Hill (0.30 mi)

37

38

1/9/2019

20

L-8; Tucker to Congress (0.40 mi)

L-21; Lawrence to E-4 (0.85 mi)

39

40

1/9/2019

21

L-23; East of Hagan Ranch Rd (0.13 mi)

L-23; E-2E to Hagen Ranch Rd (0.50 mi)

41

42

1/9/2019

22

L-23; West of Lawrence (0.13 mi)

L-23W; West of SR7 (0.78 mi)

43

44

1/9/2019

23

L-24; Boynton Bch to Knuth (1.35 mi)

L-24; ~800ft East of Military (0.26 mi)

45

46

1/9/2019

24

L-25; ~1700ft west of Jog (0.32 mi)

L-26; ~1200ft west of Military (0.23 mi)

47

48

1/9/2019

25

L-26; Military to E-4 (2.73 mi)

L-31 Canal; West of E-3 (0.51 mi)

49

50

1/9/2019

26

L-34; East of E-3 (0.13 mi)

L-34W; ~3400ft to ~1200ft west of SR7 (0.44 mi)

51

52

1/9/2019

27

L-36; west of Lyons (0.13 mi)

L-39; SR7 to Lyons (1.05 mi)

53

54

1/9/2019

28

L-39W; S-7 to SR-7 (0.97 mi)

L-41; West of E-1 (0.31 mi)

55

56

1/9/2019

29

L-41; Broken Sound to E-4 (0.78 mi)

L-44; Jog Rd to E-3 (1.21 mi)

57

58

1/9/2019

30

L-45; Jog Rd to E-3 (1.00 mi)

L-46; Glades to E-4 (0.45 mi)

59

60

1/9/2019

31

L-46; Glades to E-4 (0.45 mi) IN PROGRESS

L-48; ~1000ft e/o SR7 to Vineyard (0.21 mi)

61

62

1/9/2019

32

L-48; East of Vineyard to Lyons (0.60 mi)

L-48; I-95 to Royal Palm Rd. (0.74 mi)

63

64

1/9/2019

33

L-48; Lyons to Boca Rio Rd. (0.85 mi)

L-49; I-95 to 12th (0.41 mi)

65

66

1/9/2019

34

Canal Rehabilitation Program

Coordination of canal rehabilitation projects is a District-wide effort requiring participation by all staff• Researched and mapped right-of-way

ownership for ~42 miles of canal • Field staked ~27 miles of canal right-of-

way• Prepared and distributed more than 2,700

notification letters via hand and mail delivery for 25 projects

• Captured 46 videos for advance inspection of canals

• Fielded ~2,500 public inquiries• Hosted 12 project-specific public outreach

meetings with residents and neighborhood associations

• Updated information and project status on District website, social media and newsletters

Horticultural Waste Disposal Site (HWDS)Debris Mulching

67

68

1/9/2019

35

E-4 Canal:Seawall Rehabilitation at Leisureville

E-4; North of Ocean Dr. (Leisureville)

BEFORE

69

70

1/9/2019

36

E-4; North of Ocean Dr. (Leisureville)

AFTER

Canal Maintenance

71

72

1/9/2019

37

Canal MaintenanceMowing

Mowed ~3,915 miles of canal rights-of-way• Flat mowing - 510 miles / 4x per year

• Slope mowing - 625 miles / 3x per year

Extended annual contract for mowing services on the E-1, E-2W, E-2E & C. Stanley Weaver Canals • Flat mowing – 76 miles / 4x per year

• Slope mowing - 107 miles / 4x per year

Canal MaintenanceVegetation Management

Continued mechanical removal of aquatic vegetation to supplement chemical treatment

Treated ~5,300 acres of aquatic vegetation and 742 acres of upland vegetation

Increased upland treatment and management of canal banks following completion of tree removal projects (approx. 30 miles in 2018)

Purchased an additional John Deere Gator to assist with upland treatment

73

74

1/9/2019

38

Post-Rehabilitation MaintenanceExample: L-44; E-1 to West of Lyons Rd

Post-Rehabilitation MaintenanceExample: L-35; West of Sims

75

76

1/9/2019

39

Post-Rehabilitation MaintenanceExample: L-33; Smith Sundy to E2-W

Post-Rehabilitation MaintenanceExample: E-3; North of L-2

77

78

1/9/2019

40

Post-Rehabilitation MaintenanceExample: E-2; L-1 to L-2

Post-Rehabilitation MaintenanceExample: E-1WS; Hillsboro to SCRP

79

80

1/9/2019

41

Canal MaintenanceVegetation Management

Installed 13 additional weed booms to manage aquatic weeds and trash; maintaining a total of 110 boom sites throughout District canals

Added corrugated piping for easier boat travel and less wear on booms

Full tracking of chemical inventory with Chemical Safety software for paperless process; deployed tablets for staff for real-time reporting

Improved tracking and reporting of treatment operations with GIS tools and apps

Canal MaintenanceVegetation Management

81

82

1/9/2019

42

Canal MaintenanceVegetation Debris Management

District staff also identify and remove illegally dumped debris on canal rights-of-way

Canal MaintenanceDebris Management

83

84

1/9/2019

43

Canal MaintenanceDebris Management

Canal MaintenanceDebris Management

85

86

1/9/2019

44

Canal MaintenanceOther Activities

Expanded access gate installations at arterial or collector roads and local roads where warranted; reducing interior gate installations; 38 new gates installed Closing select unauthorized

“roads” on canal rights-of-way Ongoing dredging of canals

to maintain conveyance and remedy shoaling

Right-of-Way Management

Right-of-Way Management policy review and changes to eliminate redundancy• Updated permitting criteria for construction projects

adjacent to District canals; fee schedule changes

Issued ~285 right-of-way permits Researched and responded to ~2,150 Chancery

Case 407 review requests Completed ~365 plat and development reviews

for county and municipality projects Resolved ~59 compliance matters Documented ~663 encroachments Mapped 9,050 of 15,500 closed permit

boundaries; 60% complete Scanned additional 278 boxes of permit files for

electronic access and research• 773 boxes of records scanned to date; expected

completion of project in 2019

87

88

1/9/2019

45

Right-of-Way ManagementUAV (Drone) Program

Expanded use of drone to inspect canals and rights-of way, document projects (before and after), provide visual record of sites enhancing staffs ability to analyze site

Began new 360 degree video program to capture and review rights-of-way

L-37 east of Military Trail (360 Video)

Fleet Maintenance

89

90

1/9/2019

46

Fleet Maintenance

District staff maintains a fleet of:• 63 vehicles

• 18 machines / heavy equipment

• 11 tractor mowers

• 7 boats

Ongoing tracking and quarterly reporting of equipment usage

Equipment Utilization

5%

16%

21%55%

3%

2018Mower Utilization

Sum of Maint

Sum of 3rd Prty

Sum of UN Hrs

Sum of Crnt Hrs

Sum of OPT

10%

5%

21%

60%

4%

2018Heavy Equipment 

Sum of Maint

Sum of 3rd Prty

Sum of UN Hrs

Sum of Crnt Hrs

Sum of OPT

91

92

1/9/2019

47

Campus Improvements

Campus ImprovementsNew Generators

Before After

New generators delivered and installed at Shop and Cell Tower (SCADA base) to ensure continuity of operations

93

94

1/9/2019

48

Campus ImprovementsBuilding E Refurbishment

Before After

BEFORE AFTER

Campus ImprovementsBuilding F Refurbishment

Before After

BEFORE AFTER

95

96

1/9/2019

49

Campus ImprovementsBuilding G Refurbishment

Campus ImprovementsBuilding G Refurbishment

97

98

1/9/2019

50

Campus ImprovementsEnhanced Access and Security

Campus ImprovementsShop Facilities

99

100

1/9/2019

51

Campus ImprovementsShop Lighting

Campus ImprovementsShop Offices

101

102

1/9/2019

52

Campus ImprovementsAuditorium

Campus ImprovementsLandscaping

103

104

1/9/2019

53

Campus ImprovementsLandscaping

Campus ImprovementsLandscaping

105

106

1/9/2019

54

Campus ImprovementsOffice Building Roof Repairs

Campus ImprovementsParking

107

108

1/9/2019

55

Technology Enhancements

Ongoing utilization and implementation of technology to increase business efficiencies • SCADA, GIS, Accela, Microix

Doubled network infrastructure with SCADA implementation Solicited and finalized contract

for IT managed services • Service agreement for 24/7

technical support and disaster recovery and back up

Rolled-out 45 new computers to employees and deployed Office 365 software

Employee Safety

Continued focus on employee safety in the workplace Quarterly safety committee

meetings for review of accidents and incidents, and discussion of preventative measures Ongoing safety training for

employees:• Level 2 Hazmat Spill Team Certification• Level 5 Hazmat Spill Team Certification • Fire Safety & Extinguisher Training• FPL Safety 6 Program• Forklift Operator Certification • Drug Free Workplace Training

District workers compensation experience modification rate continues to fall below average

109

110

1/9/2019

56

Financial Highlights

Revenues received:• Permit fees - $803,860• Sale of surplus lands - $1,132,348• Quit claim deeds - $1,980• ROW agreements (tower leases) - $83,275

Opened new accounts with Florida Community Bank to take advantage of higher interest rates

Cost code accounting for tracking programmatic expenses

Admin17%

Regulatory14%

O&M69%

FY2019 Budget

Auditors issued unqualified opinion for FY2017; financial records and statements are fairly and appropriately stated in accordance with generally accepted accounting principals

Adopted FY19 budget of $18.3 million; $2.9 million dedicated for capital projects including canal rehabilitation, secondary structure refurbishments and Control Structure 9 relocation • $49.50 non-ad valorem annual assessment rate; $1.50 non-ad valorem

assessment increase for accelerated canal rehabilitation

Maintained Salaries

4,000,000

4,200,000

4,400,000

4,600,000

4,800,000

5,000,000

5,200,000

5,400,000

5,600,000

5,800,000

6,000,000

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

111

112

1/9/2019

57

Maintained Healthcare Costs

 ‐

 500,000

 1,000,000

 1,500,000

 2,000,000

 2,500,000

 3,000,000

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

 ‐

 50,000

 100,000

 150,000

 200,000

 250,000

 300,000

 350,000

 400,000

 450,000

 500,000

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Maintained Property/Casualty Insurance Costs

113

114

1/9/2019

58

Expenditures

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

2013 2014 2015 2016 2017 2018

Salaries Benefits Operations & Maintenance Administrative Capital Outlay Debt Service ‐ Principal

Outreach and Communication

Responded to 1,500+ constituent inquiries related to field activities; 1,000+ public records request

Hosted workshop on storm readiness and FL Friendly Landscaping: 80+ property managers attending earning CEU credits

Hurricane Michael messaging including five (5) TV-news interviews

Presented and attended multiple residential, civic & legislative groups

Increased subscriptions to monthly newsletter, e-notices and social media 2,700+ newsletter & e-notices 50,000+ website visits 500+ Facebook & Twitter followers

115

116

1/9/2019

59

Outreach and CommunicationSocial Media and Website Focused social media and website

messages on: • Flood Control • Canal Rehabilitation• Emergency Alerts • Weather Updates• Upcoming Events• Job Postings

Current platforms include:• Facebook• Twitter• Linked In• Nextdoor (new)

Expanded communication regarding canal rehabilitation project status

Revised website to meet new ADA Compliance Law

Increased production of videos to provide consistent messaging and increases public engagement

Looking Ahead

117

118

1/9/2019

60

Looking Ahead

Continued execution and acceleration of Canal Rehabilitation Program• $1.3 million budgeted for contracted services in FY2019 (~13 miles)

Ongoing capital projects for refurbishment of water control infrastructure • Control Structure 9 relocation• Control Structures 19 & 20

Evaluation and procurement of Asset Management software to track preventative maintenance schedules, work orders and associated costs

Renewal of LWDD’s water use permit• 20-year permit issued 2003 and expires on June 12, 2023

Transfer of Development Rights (TDRs)

De-annexation of canals within the City of Boca Raton

Encroachment Management

Management of existing structural encroachments on rights-of-way remaining after canal rehabilitation

119

120

1/9/2019

61

Canal Maintenance Options

Future maintenance options for rights-of-way with restricted access (cleared low maintenance side) inaccessible by large equipment

Restricted Right-of-Way AccessExample: L-16W – West of State Road 7

121

122

1/9/2019

62

Restricted Right-of-Way AccessExample: E-3; Purdy Lane to L-8

Staffing

Total number of staff has not increased in more than 10 years

All vacancies reviewed for business need Ongoing evaluation/consolidation of

job functions through attrition as operational efficiencies are realized• 13 employees currently enrolled in

DROP and will be retiring within next 5 years

Continued use of contracted maintenance work and consideration of cost savings – mowing, tree removal and demolition

123

124

1/9/2019

63

Hazard Mitigation Funds

$18,158,383 

$19,417,804 

$16,523,629 

$15,636,508  $15,846,534 

$14,948,000 $16,020,000 

$13,604,630 

$0

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2018*

FY18 Current SCADA Costs FY18 Year End* 

EI Balance $16,020,000 ($2,500,000) $13,604,630

Recommendation

The 2018 Report to Landowners provides an overview of the District’s annual activities, including District activities undertaken in furtherance of the adopted water control plan