2018 Emergency Management Performance Grant (EMPG) Application Workshop October 2018

Transcript of 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method...

Page 1: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

2018 Emergency Management Performance Grant (EMPG)Application Workshop

October 2018

Page 2: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Today’s Topics1) EMPG Objective-Overview

• Key Changes• Allowable Activities• Unallowable Costs• Functional Timesheets

2) Application Components

3) EMPG Requirements• Training and Exercise Requirements• Match/Cost Sharing• Performance Reports

4) Public Alert and Warning 2

Page 3: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

EMPG ObjectiveTo assist state, local, and tribal governments in preparing for all-hazards

To support a comprehensive, all-hazards emergency preparedness system by building and sustaining the core capabilities contained in the National Preparedness Goal (NPG) is located on Cal OES’s EMPG webpage:http://www.caloes.ca.gov/GrantsManagementSite/Documents/National_Preparedness_Goal_2nd_Edition.pdf

3

Page 4: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

EMPG ObjectiveThe EMPG Program supports investments that improve the ability of jurisdictions to:• Prevent a threatened or an actual act of terrorism;

• Protect our citizens, residents, visitors, and assets against the

greatest threats and hazards;

• Mitigate the loss of life and property by lessening the impact

of future disasters;

• Respond quickly to save lives, protect property and the

environment, and meet basic human needs in the aftermath

of a catastrophic incident 4

Page 5: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Overview

• FY 2018 EMPG Key Changes

• EMPG Allowable Activities

• EMPG Unallowable Costs

• Functional Timesheets

5

Page 6: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Key Changes

• NOFO identified no minimum exercise requirements for the state. Subrecipients and the state are required to complete three exercises by the end of the subaward performance period

• NOFO identified that EMPG recipients will report through the new THIRA/SPR methodology implemented in 2018. This applies to only the state and UASI’s for 2018 however, subrecipients should prioritize funding that address capability gaps identified in the THIRA/SPR.

6

Page 7: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Allowable Activities

POETE• Planning• Organization• Equipment• Training• Exercises

• Maintenance & Sustainment

• Construction & Renovation

• Management & Administration

• Indirect Costs

Resource: FY 2018 Notice of Funding Opportunity, Appendix B, Page 40-507

Page 8: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

POETE Examples

Planning – Emergency Operations PlansOrganization – Staffing Costs: salary, overtime, time off, and benefitsEquipment – Interoperable Communications Training – Travel and Tuition ExpensesExercise – Conducting exercises

8

Page 9: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Allowable ActivitiesMaintenance & Sustainment• Maintenance Contracts • Warranties• Repair/Replacement Costs• Upgrades• User Fees• Licenses

9

Page 10: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FMFW—Project Description Tab Maintenance And Sustainment

• The AEL Number and Title of the Equipment

• The duration of the coverage

• Is the service/warranty being purchased at the same time as the equipment or is it a purchase for pre-existing equipment

10

Page 11: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Allowable ActivitiesCONSTRUCTION & RENOVATIONPrimary/main Emergency Operations Center

• Construction (up to $1 million) New building or expanding footprint of an existing facility

• Renovation (up to $250,000) Internal improvements to an existing EOC • Both require written FEMA approval, an EOC Investment Justification

and are required to submit a SF-424C Form and Budget detail citing the project costs

11

Page 12: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Allowable ActivitiesManagement & Administration (M&A)M&A costs are necessary costs incurred in direct support of the grant or as a consequence of the grant.

• Activities directly relating to the management and administration of EMPG

• Financial management and reporting

• May use up to five percent (5%) of their subaward

• Reimbursed at 5% of the expended federal share12

Page 13: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Allowable ActivitiesIndirect Cost Rate

Method One• The applicant has an

approved indirect cost rate with the cognizant Federal agency

• At the time of application, a copy of the approved rate (a fully executed, agreement negotiated with the applicant's cognizant federal agency) is required

Method Two• OAs may claim the 10% De

Minimis Rate if they:• Have never received a

negotiated indirect cost rate

• Receive less than $35M in direct federal funding per year

13

Page 14: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Allowable Indirect Costs–Grant Subaward Face Sheet

• Indirect Cost Rates applied to Cal OES grants must be identified on the Face Sheet and can only be requested at the time of initial application. 14

Page 15: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Allowable Indirect Costs–ICR Summary

ICR Summary Tab

Project Ledger

Indirect Costs Tab

15

Page 16: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Unallowable Costs

• Unallowable Equipment: Grant funds must comply with IB 426

• Costs to support hiring sworn public safety officers for the purposes of fulfilling traditional public safety roles.

• Positions or items purchased to supplant existing funds

• Activities and projects unrelated to the EMPG Program

16

Page 17: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Functional Timesheets• Functional Timesheets are utilized to document specific

activities and costs for employees who work on more than one Federal award.

17

Page 18: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FY 2018 Emergency Management Performance Grant Program

APPLICATION COMPONENTS

Page 19: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Financial Management

Forms Workbook (FMFW)

EMPG Application Components

CompleteFY18 EMPG

Application

Governing Body

Resolution (GBR)

Grant Assurances

Subrecipient Grants

Management Assessment

FFATA Financial

Disclosure

Indirect Cost Rate

Negotiation Agreement

(if applicable)

19

Page 20: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Financial Management Forms Workbook (FMFW)—General Information

• Contains all EMPG project information and financial data• Each tab of the FMFW must be included with the initial

application package

• If a tab will not be used, indicate “N/A” on the tab in Row 22

20

Page 21: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FMFW—General Information• Verify DUNS Number(s) are active

• SAM Update: All non-Federal entities must still mail the original, signed copy of the notarized letter to the Federal Service Desk. However, All non-Federal entities who create or update their registration in SAM.gov will no longer need to have an approved Entity Administrator notarized letter on file before their registration is activated.

• The registration process may take up to four weeks• The provided letter templates in the instructions must be

used

New login process for SAM.GOV can be found at: https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update-updated-july-11-2018

Page 22: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FMFW—General Information Cont.

• Authorized Agent named at the bottom of the Face Sheet will receive all correspondence pertaining to the subaward

• Use the same titles that are on the Governing Body Resolution for the Face Sheet, Authorized Agent Contact Information and Authorized Agent tabs (and on all the application components)

22

Page 23: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FMFW—Training TabFeedback Number

• A Training Feedback Number should be obtained 30 days prior to the training event.

• A Training Request Form is required to obtain a feedback number follow the direct link listed below to the “Training Request Form:” http://w3.calema.ca.gov/WebPage/trainreq.nsf/TrainRequest?OpenForm

• A tutorial on “Obtaining a Training Feedback Number” is located on Cal OES’s EMPG webpage at: http://www.caloes.ca.gov/cal-oes-divisions/grants-management/criminal-justice-emergency-management-victim-services-grant-programs/emergency-management-performance-grant

23

Page 24: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Governing Body Resolution (GBR)• Identifies the authorized agent by NAME—if that person

leaves, a new GBR and a modified FMFW Authorized Agent and Contact Information tab will be needed to identify a new authorized agent

• Identifies the authorized agent by TITLE—if that person leaves, a modified FMFW Authorized Agent and Contact Information tab will be needed

24

Page 25: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Grant Assurances• A newly signed Grant Assurances form must be

submitted for FY18

• Name and title of the person signing must match what is identified on the Governing Body Resolution (GBR)

• Every page requires initials, including the last page containing a signature

25

Page 26: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Subrecipient Grants Management Self-assessment

• Evaluates risk of noncompliance with federal statutes, regulations, and grant terms and conditions

• Amount of experience each Subrecipient has in the management of federal grant awards

• Level of technical assistance, training, and oversight necessary during the Performance Period

26

Page 27: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Application Submission

The completed/reviewed original signed hard copy of the completed application applications shouldbe received by November 16, 2018

27

Page 28: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FY 2018 Emergency Management Performance Grant Program

TRAINING AND EXERCISE REQUIREMENTS

Page 29: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Multi-year Training & Exercise Plan• Link to the NPG Core Capabilities

• Be updated annually

• At a minimum, cover this two-year period: January 1, 2019 – December 31, 2020

• Email by October 1, 2018 to:

• EMPG Program Representative

• MY-TEP Point of Contact (POC) – at [email protected]

29

Page 30: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

TRAININGFOR EMPG-FUNDED PERSONNEL

Training Requirement

• Complete training by June 30, 2019

– Option 1: NIMS TrainingFEMA Professional Development Series (PDS)

• IS 120.c An Introduction to Exercises updated 2/12/18

– Option 2:National Emergency Management Basic AcademyEMI Basic Academy Online Prerequisites 30

Page 31: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Training Requirement Option 1National Incident Management System (NIMS) Training:• IS 100.b Intro to ICS• IS 200.b ICS for Single Resources and Initial Action Incident • IS 700.a Intro to NIMS• IS 800.b Intro to NRF

FEMA Professional Development Series (PDS):• IS 120.c Intro to Exercises dated 2/12/18• IS 230.d Fundamentals of Emergency Management dated 12/16/2013• IS 235.c Emergency Planning dated 12/15/2015• IS 240.b Leadership and Influence dated 06/16/2014• IS 241.b Decision Making and Problem Solving dated 03/31/2014• IS 242.b Effective Communication dated 03/31/2014• IS 244.b Developing and Managing Volunteers dated 03/29/2013

31

Page 32: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Training Requirement Option 2National Emergency Management Basic Academy: • E/L0101, Foundations of Emergency Management – 10 days (80

hours)• E/L0102, Science of Disaster – 3 days (approximately 24 hours)• E/L0103, Planning Emergency Operations – 2 days (16 hours)• E/L0104, Exercise Design – 2 days (16 hours)• E/L0105, Public Information and Warning – 2 days (16 hours)EMI Basic Academy Online Prerequisites:• IS-100 (any version), Introduction to ICS• IS-700 (any version), Intro to NIMS (3 hours)• IS-800.b Intro to NRF (3 hours)• IS-230.d Fundamentals of Emergency Management (10 hours)

32

Page 33: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Exercises ForEMPG-Funded Personnel

Exercise Requirement:All EMPG Program-funded personnel shall: • Participate in no less than three exercises in a 12-month

period of July 1, 2018 – June 30, 2019. Any level of participation is acceptable.

• EMPG Program-funded personnel are any personnel paid at any percentage with EMPG funding, including M&A staff.

33

Page 34: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

After Action Report/Improvement Plan (AAR/IP)

• Completed by the host of any EMPG-funded exercise• Submitted, no later than 90 days after completion of the

exercise, to:1) Your EMPG Program Representative 2) The HSEEP email address at [email protected]

• All AARs must be submitted by no later than June 30, 2019

34

Page 35: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FY 2018 EMERGENCY MANAGEMENT PERFORMANCE GRANT PROGRAM

MATCH REQUIREMENT

Page 36: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Match/Cost ShareA dollar-for-dollar cost match is required under the EMPG Program.

Types of Match• Cash Match - Non-federal cash spent for EMPG-eligible

activities/projects.

• In-Kind Match - The value of something received or provided by a third-party that does not have a cost associated with it. Contributions of the value of property or services in lieu of cash which benefit the EMPG Program. This type of match must be supported with source documentation.

36

Page 37: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FMFW—Project Descriptions Tab Match

50% EMPG/50% Match for the same project

Use the verbiage in the box below as template language to explain what will be used as the matching component using 50% EMPG funds/50% Match with local funds.

Match for Project B is 50% cash match from County general funds to match the 50% EMPG funds.

37

Page 38: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

50% EMPG/50% MatchProject Ledger And Match Tabs

Using 50% EMPG funds/50% Match with local funds, the Project Ledger and Match tabs will mirror each other

38

Page 39: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FMFW—Project Descriptions Tab Match

100%EMPG/100% Other Match

Use the verbiage in the box below as template language to explain what will be used as the matching component using 100% EMPG funds/100% Match with local funds for another EMPG-eligible project.

Match for Project B is 100% cash match from County general funds for OES personnel costs to match the 100% EMPG funds.

39

Page 40: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

100% EMPG/100% Other MatchProject Ledger And Match Tabs

Using 100% EMPG funds/100% Match with local funds for another EMPG-eligible project, the Project Name and the Matching Source will need to be identified and the matching component’s Solution Area and Solution Area Sub-Category will need to be identified

40

Page 41: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

100% EMPG/100% Other MatchProject Ledger And Match Tabs

41

Page 42: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FY 2018 EMERGENCY MANAGEMENT PERFORMANCE GRANT PROGRAM

PERFORMANCE REPORTS

Page 43: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Performance ReportsSubrecipients must submit quarterly Performance Reports on EMPG project status, training and exercise data, and other metrics that are required by FEMA

43

Page 44: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Grant Activities Table• List project letters and names from the FMFW’s Project Ledger• Tasks to be completed • Status: Not started, On-Time, Complete, Delayed or Cancelled• Summary of activities to complete the tasks

44

Page 45: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Personnel Data Table• EMPG Personnel Costs--the total amount of Federal

and match– Calculated by totaling EMPG dollars allocated to

staffing throughout the FMFW including the Match tab

• The number of emergency management personnel on the FMFW’s Personnel tab

45

Page 46: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Training Data TableProjects in Part IV link to the FMFW Training tab

• List the EMPG-funded training courses completed during the quarter

• The total number of attendees, both EMPG-funded and otherwise

46

Page 47: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

EMPG Program-funded Personnel Training Record

• List first and last names of staff on the FMFW’s Personnel tab

• Enter the training completion dates for staff up to the quarter being reported

NOTE: Staff completing Training Option 2 will report their progress in attached document.

47

Page 48: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

EMPG Program-funded Personnel Exercise Record

• List first and last names of staff on the FMFW’s Personnel tab

• Enter the name and date of exercises completed in the quarter being reported

NOTE: Staff completing Training Option 2 must still report on their exercise completion progress on this table

48

Page 49: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FY18 EMPG Performance Report Submission Instructions

Submit an electronic copy via email to your EMPG Program Representative for review. They will provide feedback and direct the Subrecipient to re-submit the final electronic copy

49

Page 50: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

FY 2018 EMERGENCY MANAGEMENT PERFORMANCE GRANT PROGRAM

ALERT AND WARNING SYSTEMS

Page 51: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Public Alert And WarningSenate Bill (SB) No. 833• On or before, July 1, 2019, Cal OES, in conjunction with

certain agencies and associations, shall develop guidelines for alerting and warning the public of an emergency

• Cal OES may impose conditions upon city and/or county applications for any voluntary grant funds that have a connection to emergency management performance requiring operation of alert and warning activities consistent with the guidelines.

• Within 6 months of the guidelines being available, Cal OES shall develop an alert and warning training 51

Page 52: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Public Alert And Warning GuidelinesPer Senate Bill (SB) No. 833The guidelines shall include at minimum, the following:1) Timelines for sending alerts during an emergency2) Practices for sending advance warnings of an impeding

threat3) Practices for testing, training on, and exercising a city

and or county’s alert and warning system4) Consideration for coordinating alerts with neighboring

jurisdictions5) Guidelines and protocols for redundancy and utilizing

multiple forms of alerts52

Page 53: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Public Alert And Warning Guidelines Cont.

6) Guidelines and protocols for chain of command communications and accounting for staffing patterns to ensure a trained operator is always on call

7) Practices for effective notifications to the access and functional needs population as defined in subdivision (b) of Section 8593.3

8) Message Templates

9) Common terminology53

Page 54: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Public Alert And Warning Cont.Assembly Bill (AB) No.1877• Cal OES must create a library of translated emergency

notifications and a translated style guide, to be used when issuing emergency notifications to the public.

• Six months after the library is launched, Cal OES may impose conditions upon city and/or county applications for any voluntary grant funds that have a connection to emergency management performance requiring the designated alerting authority to translate emergency notifications.

54

Page 55: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Public Alert And Warning Cont.

• Allowable under both HSGP and EMPG Programs

• Cal OES encourages Subrecipients to consider how use of this funding may ensure that their jurisdiction’s alert and warning activities are consistent with the guidelines developed Pursuant to SB 833 of the 2018 Legislative Session

55

Page 56: 2018 Emergency Management Performance Grant (EMPG ... · 11/16/2018  · Indirect Cost Rate. Method One • The applicant has an approved indirect cost rate with the cognizant Federal

Questions?