STATE HIGHWAY OPERATION AND PROTECTION PROGRAM
Fiscal Years 2018-19 through 2021-22
Prepared by the CALIFORNIA DEPARTMENT OF
TRANSPORTATION In accordance with Government Code section 14526.5
December 6, 2017
2018 DRAFT SHOPP
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
STATE OF CALIFORNIA------- CALIFORNIA STATE TRANSPORTATION AGENCY EDMUND G. BROWN Jr., Governor
DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PROGRAMMING P.O. BOX 942873, MS-82 SACRAMENTO, CA 94273-0001 PHONE (916) 654-4013 TTY 711 www.dot.ca.gov
Making Conservation a California Way of Life.
December 6, 2017
Executive Directors Regional Transportation Agencies
Dear Executive Directors:
I am pleased to provide the attached Draft 2018 State Highway Operations and Protection Program (SHOPP) Project List for review and comment, consistent with Senate Bill 486 (DeSaulnier, 2014). Senate Bill 486 requires that the draft SHOPP Project List be made available to Regional Transportation Planning Agencies for review and comment prior to the document’s submittal to the California Transportation Commission (Commission) for their adoption and submittal to the Legislature and the Governor not later than April 1 of even-number years. The California Department of Transportation’s (Department) 2018 SHOPP will be submitted, including comments received through this review process, to the Commission no later than January 31, 2018.
The SHOPP is based on Government Code Section 14526.5 and Streets and Highways Code Section 164.6. The 2018 SHOPP continues the Department’s transition to a full Asset Management approach to protecting, preserving and rehabilitating the State Highway System (SHS). Asset Management will be fully implemented in the 2020 SHOPP as required by Senate Bill 486 and further amplified by requirements of Senate Bill 1 (Beall, 2017). The SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project List includes approximately $4.0 billion in projects for fiscal years 2018-19 through 2021-22.
In its simplest terms, the SHOPP, consistent with Asset Management, is the State’s fix-it-first program that prioritizes and funds capital projects that protect, preserve and rehabilitate State Highway System (SHS) infrastructure. The SHS includes State owned roadways and bridges, and their supporting infrastructure such as culverts, intelligent transportation systems, maintenance stations and other tangible physical assets. Very importantly, the SHOPP also provides capital funding to respond to emergency and safety issues. Projects funded by the SHOPP are limited to capital improvements to the SHS that do not add capacity, such as new highway lanes. There are several "reservations" within the SHOPP Program for specific, not-yet-identified investments for emergency, safety, mandates, and Advance Environmental Mitigation projects. This broad list of project categories constitute the Draft 2018 SHOPP
Executive Directors December 6, 2017 Page 2
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
Project List that is the set of projects which the Department is proposing for the next four years to meet safety, emergency, mandates, and fix-it-first needs. As individual SHOPP projects are developed and implemented, there are also often opportunities to accomplish additional non-capacity increasing goals such as improving pedestrian access, accommodating bicyclists, reducing air pollutants and greenhouse gas emissions, and responding to SHS impacts to wildlife. Such additional benefits from SHOPP projects will be captured and reported in the respective project development documents for each project. All comments regarding the Draft 2018 SHOPP Project List must be submitted to Caltrans in writing no later than January 2, 2018 to: http://www.dot.ca.gov/hq/transprog/SHOPP/draft_2018_shopp.html
Should you need clarification regarding the listed projects or SHOPP process, please contact Donna Berry, Office Chief for the SHOPP, Division of Transportation Programming at (916) 654-4327. Sincerely,
BRUCE DE TERRA, Chief Division of Transportation Programming Enclosure
Project List
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Berkeley and Albany, from Route 13 to east ofEl Cerrito Separation. Install median safety lighting and replace median concrete barrier. 1488S
3J700$14,587
$25
Subtotal: $14,612
2019-20$2,750$2,750
$100$2,625
$8,225Total Project Cost: $22,837
04150001834/1/20204/1/20202/1/2019PA&ED:
RTL:R/W Cert:
11/30/2020Begin Con:
04-Alameda-80 Prior18-1918-1919-20
201.010185 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.5/R7.6
Con Sup:
Safety Improvements
Const:R/W:
In Fremont, from north end of Dumbarton Bridgeto south of the Toll Plaza. Install outer separationbarrier between route and frontage road.1493F
4J750$15,560$3,280
Subtotal: $18,840
2019-20$2,000$2,500
$240$2,500
$7,240Total Project Cost: $26,080
04160000054/1/20203/1/2020
9/30/2018PA&ED:
RTL:R/W Cert:
12/7/2020Begin Con:
04-Alameda-84 Prior18-1918-1919-20
201.01023 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.7/R3.1
Con Sup:
Safety Improvements
Const:R/W:
In Fremont, from Route 238 (Mission Boulevard)to Route 680. Widen shoulders, install trafficsignals and upgrade barriers. 0076B
2A332$19,500$2,000
Subtotal: $21,500
2018-19$11,000$2,800
$500$4,000
$18,300Total Project Cost: $39,800
04140000394/16/20192/1/2019
10/30/2017PA&ED:
RTL:R/W Cert:
12/8/2019Begin Con:
04-Alameda-84 PriorPriorPrior18-19
201.01090 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.8/18.0
Con Sup:
Safety Improvements
Const:R/W:
Near Livermore, from Flynn Road to Grant LineRoad. Install safety lighting and establishelectrical service connection. 1495F
0K680$4,211
$493
Subtotal: $4,704
2019-20$962$806$104$962
$2,834Total Project Cost: $7,538
04160001256/1/20205/1/20206/1/2019PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
04-Alameda-580 Prior19-2019-2019-20
201.01065 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R1.3/R6.0
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 1 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Leandro, at the southbound Route 880/238 Connector offramp to Washington Avenue.Reconstruct and signalize offramp.1491G
4J730$3,445
$150
Subtotal: $3,595
2019-20$1,200$1,250
$125$1,250
$3,825Total Project Cost: $7,420
04160000015/4/20202/4/20207/2/2018PA&ED:
RTL:R/W Cert:
11/2/2020Begin Con:
04-Alameda-880 Prior18-1918-1919-20
201.01074 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.9
Con Sup:
Safety Improvements
Const:R/W:
In Alameda County on Routes 80, 84, and 880 atvarious locations; also, in Contra Costa Countyon Routes 24 and 680 at various locations. InstallHigh Friction Surface Treatment (HFST) at spot locations to enhance wet pavement conditions.
1481B
1J780$6,311
$10
Subtotal: $6,321
2020-21$1,118$1,274
$104$1,534
$4,030Total Project Cost: $10,351
04140003576/1/20213/1/2021
10/1/2019PA&ED:
RTL:R/W Cert:
2/1/2022Begin Con:
04-Alameda-Var 18-1919-2019-2021-22
201.01566 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In Alameda County, on Routes 13, 24, 580, 680,and 880 at various locations; also in Contra CostaCounty on Routes 4, 24, 80, 160, and 680 atvarious locations. Install Rectangular RapidFlashing Beacons (RRFBs) to enhance pedestriansafety at ramp termini and uncontrolledpedestrian crossings.
1492F
0K120$8,237
$290
Subtotal: $8,527
2021-22$1,261$1,145
$229$1,345
$3,980Total Project Cost: $12,507
04160000545/5/20223/1/20226/1/2020PA&ED:
RTL:R/W Cert:
11/2/2022Begin Con:
04-Alameda-13 18-1919-2020-2121-22
201.01580 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In various cities, on Routes 13, 61, and 123 atvarious locations; also in Contra Costa County,on Route 123, at Eureka Avenue. Crosswalksafety enhancements.
0488Q
0J470$3,320
$260
Subtotal: $3,580
2018-19$788
$1,393$200$680
$3,061Total Project Cost: $6,641
041400000311/1/2018
10/18/201812/1/2017PA&ED:
RTL:R/W Cert:
4/23/2019Begin Con:
04-Alameda-13 PriorPriorPrior18-19
201.01533 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 2 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In various cities, on various routes, at variouslocations. Crosswalk safety enhancements.
1487Q
3J110$4,040
$50
Subtotal: $4,090
2018-19$786
$1,000$214$572
$2,572Total Project Cost: $6,662
04150000885/1/20194/1/20191/3/2018PA&ED:
RTL:R/W Cert:
12/30/2019Begin Con:
04-Alameda-13 PriorPriorPrior18-19
201.015939 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
In Oakland, San Leandro, Hayward and Fremonton Routes 84, 92, 112, 185 and 238 at variouslocations. Crosswalk safety enhancements.0448R
1J600$2,803
$150
Subtotal: $2,953
2018-19$453$657$23
$453
$1,586Total Project Cost: $4,539
04140002874/5/2019
1/15/20199/26/2017PA&ED:
RTL:R/W Cert:
12/2/2019Begin Con:
04-Alameda-84 PriorPriorPrior18-19
201.01527 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
In Oakland, San Leandro, Hayward, Union Cityand Fremont on Routes 185, 238, and 262 atvarious locations. Crosswalk safetyenhancements.
1487P
3J190$1,711
$10
Subtotal: $1,721
2018-19$550$550$66
$550
$1,716Total Project Cost: $3,437
04150000995/1/20194/1/2019
2/15/2018PA&ED:
RTL:R/W Cert:
12/13/2019Begin Con:
04-Alameda-185 PriorPriorPrior18-19
201.015231 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
In various cities, on Routes 580, 680, 880, and980 at various locations. Enhance pedestriansafety by installing Accessible Pedestrian Signal(APS) systems and countdown timers andupgrading crosswalk markings.
1487M
3J130$6,068
$20
Subtotal: $6,088
2021-22$940$940$130
$1,030
$3,040Total Project Cost: $9,128
04150000907/15/20217/1/20214/1/2020PA&ED:
RTL:R/W Cert:
1/19/2022Begin Con:
04-Alameda-580 18-1919-2019-2021-22
201.015264 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 3 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Alameda County, on Routes 580 and 680 atvarious locations; also in Contra Costa County onRoutes 160 and 680 at various locations. Installconcrete barrier to shield structure column fromerrant vehicles, and upgrade existing guardrails tocurrent standards.
1495E
0K650$3,156
$70
Subtotal: $3,226
2020-21$500$800$166$800
$2,266Total Project Cost: $5,492
04160001236/1/20213/1/20212/2/2020PA&ED:
RTL:R/W Cert:
12/8/2021Begin Con:
04-Alameda-580 18-1919-2019-2020-21
201.01515 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In Alameda and Contra Costa Counties, onvarious routes, at various locations. Upgradeadvance warning signs to make standard.1496A
0K770$2,638
$108
Subtotal: $2,746
2021-22$700$700$10
$700
$2,110Total Project Cost: $4,856
04160001376/30/20216/1/20216/1/2020PA&ED:
RTL:R/W Cert:
2/1/2022Begin Con:
04-Alameda-580 18-1919-2019-2021-22
201.01531 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Livermore, from San Joaquin countyline to 0.7 mile west of Greenville Road.Highway worker safety improvements.1494D
4J940$1,997
$183
Subtotal: $2,180
2021-22$625$400$75
$525
$1,625Total Project Cost: $3,805
04160000251/15/202211/1/20214/1/2020PA&ED:
RTL:R/W Cert:
5/1/2022Begin Con:
04-Alameda-580 18-1919-2019-2021-22
201.23514 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.1/R9.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Fremont, from north of Auto Mall Parkway tosouth of Fremont Boulevard at various locations.Highway worker safety improvements.1483N
2J810$4,918
$10
Subtotal: $4,928
2018-19$660$880$44
$880
$2,464Total Project Cost: $7,392
04150000086/3/2019
5/23/20196/7/2018PA&ED:
RTL:R/W Cert:
12/20/2019Begin Con:
04-Alameda-880 Prior18-1918-1918-19
201.23583 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.8/11.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 4 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Oakland, from south of 5th Avenue to north of7th Street. Pave narrow strips and miscellaneousareas, construct MVPs, and upgrade crashcushions to reduce maintenance work andenhance highway worker safety.
1452N
2K820$2,170
$5
Subtotal: $2,175
2020-21$500$350$100$450
$1,400Total Project Cost: $3,575
04170000352/1/20211/1/20219/1/2019PA&ED:
RTL:R/W Cert:
8/1/2021Begin Con:
04-Alameda-880 18-1919-2019-2020-21
201.23520 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
30.2/R33.6
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Oakland, Union City, and Fremont, and onRoute 80 in Berkeley (PM 4.7) at various locations; also in Santa Clara County in Milpitasat PM 8.9. Construct permanent Best Management Practices (BMPs) to achieveStatewide NPDES permit compliance units (CUs)for trash capture.
1453D
4J980$5,801
$25
Subtotal: $5,826
2020-21$1,060
$800$26
$1,000
$2,886Total Project Cost: $8,712
04160000366/1/20215/1/20213/1/2020PA&ED:
RTL:R/W Cert:
2/1/2022Begin Con:
04-Alameda-880 18-1919-2020-2121-22
201.33560 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.9/24.8
Con Sup:
Storm Water Mitigation
Const:R/W:
In Hayward, from A Street to Rose Street (PM0.39 to 0.90); also, in Oakland, from 55th Avenueto 50th Avenue (PM 9.75 to 10.09). Upgradecurb ramps, driveways, and sidewalks to makecompliant with ADA standards.
0434J
2G740$5,017
$195
Subtotal: $5,212
2021-22$700$950$95
$950
$2,695Total Project Cost: $7,907
04000212156/1/20222/1/20226/1/2020PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
04-Alameda-185 18-1919-2019-2021-22
201.36131 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.4/10.1
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Oakland and Berkeley, from Hiller Drive to Claremont Avenue at various locations. UpgradeADA facilities. 0144A
2G660$2,673
$200
Subtotal: $2,873
2018-19$870$740$140$580
$2,330Total Project Cost: $5,203
04000211036/3/2019
5/20/20192/14/2018PA&ED:
RTL:R/W Cert:
12/2/2019Begin Con:
04-Alameda-13 PriorPriorPrior18-19
201.37836.7 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
T9.8/10.8
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 5 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Berkeley, from Claremont Avenue to west ofShattuck Avenue. Upgrade curb ramps and repairsidewalks to meet ADA standards.0124M
2G460$1,389
$120
Subtotal: $1,509
2019-20$619$543$75
$423
$1,660Total Project Cost: $3,169
040002085911/1/2019
10/25/20197/11/2018PA&ED:
RTL:R/W Cert:
4/24/2020Begin Con:
04-Alameda-13 Prior18-1918-1919-20
201.37847.9 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.8/12.1
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
In Berkeley, from Shattuck Avenue to 7th Street.Upgrade curb ramps and sidewalks.
0124L
2G482$3,500
$125
Subtotal: $3,625
2018-19$455
$1,000$200$793
$2,448Total Project Cost: $6,073
04150003627/31/20187/2/20182/1/2016PA&ED:
RTL:R/W Cert:
3/29/2019Begin Con:
04-Alameda-13 PriorPriorPrior18-19
201.37834 Structure(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
12.1/13.4
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
In Oakland and San Leandro, from Plaza Drive to55th Avenue; also in Contra Costa County, in ElCerrito on Route 123 (PM 0.18/0.29) and inPleasant Hill on Route 680 (PM 16.85), at variouslocations. Reinstall and/or upgrade existing curbramps and sidewalks to ADA standards.
0091P
1G910$2,252
$50
Subtotal: $2,302
2019-20$446$655$102$450
$1,653Total Project Cost: $3,955
04000205828/1/20197/1/20193/1/2018PA&ED:
RTL:R/W Cert:
2/28/2020Begin Con:
04-Alameda-185 PriorPriorPrior19-20
201.37866.16 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.3/9.8
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
BRIDGE PRESERVATIONIn Fremont, at Alameda Creek Bridge No. 33-36.Replace bridge.
0084B
16030$24,000
$275
Subtotal: $24,275
2018-19$6,500$6,500
$299$5,000
$18,299Total Project Cost: $42,574
04000004294/1/20193/1/2019
9/25/2017PA&ED:
RTL:R/W Cert:
12/8/2019Begin Con:
04-Alameda-84 PriorPriorPrior18-19
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.0/13.6
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 6 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Livermore, near Greenville Road atGreenville Overhead No. 33-0121R. Rehabilitatewestbound structure.0480J
0J520$5,979
$140
Subtotal: $6,119
2019-20$600$900$120
$1,000
$2,620Total Project Cost: $8,739
041400000910/1/20199/2/2019
1/15/2018PA&ED:
RTL:R/W Cert:
2/3/2020Begin Con:
04-Alameda-580 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R8.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Oakland, at Foothill Boulevard UndercrossingNo. 33-0334K. Bridge deck rehabilitation.
1494K
0K470$360
Subtotal: $360
2019-20 $398$21
$212
$631Total Project Cost: $991
04160000911/31/2020
12/31/20195/27/2017PA&ED:
RTL:R/W Cert:
8/31/2020Begin Con:
04-Alameda-580PriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R35.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Fremont, from 0.5 mile south to 0.5 mile north of Patterson Slough Bridge No. 33-0250 (PM11.8). Bridge rehabilitation. 0480A
0J530$11,784
$427
Subtotal: $12,211
2019-20$2,200$1,980
$704$2,420
$7,304Total Project Cost: $19,515
04140000105/27/20205/13/20205/22/2019PA&ED:
RTL:R/W Cert:
2/10/2021Begin Con:
04-Alameda-880 Prior19-2019-2019-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.3/12.3
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Sunol, at Arroyo De La Laguna Bridge No.33-0043. Bridge scour mitigation and bridge railupgrade.0481M
0J550$6,970
$5
Subtotal: $6,975
2019-20$1,863$2,392
$23$2,461
$6,739Total Project Cost: $13,714
04140000126/1/20206/1/2020
9/15/2018PA&ED:
RTL:R/W Cert:
1/18/2021Begin Con:
04-Alameda-84 Prior18-1918-1919-20
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
17.2
Con Sup:
Bridge Scour Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 7 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Hayward, San Leandro, and Oakland, atTennyson Road Overcrossing (OC) No. 33-0236(PM 15.65), Washington Avenue OC No. 33 -0166 (PM 20.82), and Damon Slough Southboudonramp No. 33-0142K (PM 26.53); also, onRoute 77 in Oakland at San Leandro OC No. 33-0284 (PM 0.29). Upgrade bridge rails, replacejoint seals.
1450C
2K170$10,300
$25
Subtotal: $10,325
2021-22$800
$1,500$250
$2,200
$4,750Total Project Cost: $15,075
04160003781/21/2022
12/17/20213/16/2020PA&ED:
RTL:R/W Cert:
9/26/2022Begin Con:
04-Alameda-880 18-1919-2019-2021-22
201.1122123 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
15.6/26.5
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In Oakland, at East Creek Slough Bridge No. 33-0143. Mitigate eroded channel side-slope tidalscour and replace bridge approach slabs.1483D
2J760$2,307
$100
Subtotal: $2,407
2021-22$1,000
$850$160
$1,170
$3,180Total Project Cost: $5,587
04150000051/15/2022
12/15/20216/15/2020PA&ED:
RTL:R/W Cert:
8/15/2022Begin Con:
04-Alameda-880 Prior20-2120-2121-22
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
27.2
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In Oakland, at the Routes 80/580/680 MacArthurMaze Bridge No. 33-0061R, 33-0061L, 33-0061Land 33-0611. Establish standard verticalclearance.
ACCELERATED BRIDGE (PA&ED Only)
1460R
4K810$105,489
$500
Subtotal: $105,989
2019-20$6,600$7,800
$260$7,800
$22,460Total Project Cost: $128,449
04170003636/1/20205/2/20201/1/2019PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
04-Alameda-80 19-2019-2019-2019-20
201.3224 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
In Berkeley, at University Avenue OvercrossingNo. 33-0023. Establish standard verticalclearance.
ACCELERATED BRIDGE (PA&ED Only)
1452H
2K830$27,678
$35
Subtotal: $27,713
2019-20$3,380$3,000
$300$5,400
$12,080Total Project Cost: $39,793
04170000306/1/20205/1/20201/1/2019PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
04-Alameda-80 19-2019-2019-2019-20
201.3221 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
5.8
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 8 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn the city of Alameda, from Broadway/EncinalAvenue to Sherman Street. Pavementrehabilitation, upgrade ADA curb ramps, andimprove crosswalks.
1452J
2K710$4,874
$5
Subtotal: $4,879
2020-21$1,220$1,200
$22$1,500
$3,942Total Project Cost: $8,821
04170000135/1/20213/1/20212/1/2020PA&ED:
RTL:R/W Cert:
11/1/2021Begin Con:
04-Alameda-61 Prior19-2019-2020-21
201.1215.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
19.8/21.2
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Fremont, from Route 880 (PM 6.922) to Route238. Rehabilitate pavement and upgrade curbramps to make ADA compliant.1454C
2K690$12,874
$173
Subtotal: $13,047
2021-22$2,080$2,340
$780$2,080
$7,280Total Project Cost: $20,327
04170000092/1/2022
12/1/20214/1/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
04-Alameda-84 18-1919-2019-2021-22
201.12111.96 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
6.9/10.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Hayward and San Leandro, from AStreet to Davis Street. Rehabilitate pavement andupgrade curb ramps to ADA standards. 1494C
0K490$14,928
$40
Subtotal: $14,968
2021-22$1,417$2,093
$375$2,405
$6,290Total Project Cost: $21,258
04160000948/2/20217/1/2021
12/1/2019PA&ED:
RTL:R/W Cert:
2/23/2022Begin Con:
04-Alameda-185 18-1919-2020-2121-22
201.12124.1 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.4/5.7
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Fremont, from Santa Clara County line to northof Fremont Boulevard Overcrossing. Cold planepavement, overlay with Rubberized Hot MixAsphalt (RHMA-G) and Open Graded FrictionCourse (OGFC), upgrade ADA curb ramps,upgrade metal beam guardrail, and replace loopdetectors.
1454G
2K700$57,166
$50
Subtotal: $57,216
2021-22$3,000$5,000
$620$5,400
$14,020Total Project Cost: $71,236
041700001011/1/20219/1/20213/2/2020PA&ED:
RTL:R/W Cert:
6/4/2022Begin Con:
04-Alameda-880 18-1919-2019-2021-22
201.12190.19 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.0/11.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 9 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Livermore, from San Joaquin county line toeast of Greenville Overcrossing; also on Route205 (PM 0.0/1.0) from San Joaquin county line toMidway Road Undercrossing. Environmentalmitigation for EA 04-3G590.
8315X
3G59C $2,100
Subtotal: $2,100
2018-19$150
$150Total Project Cost: $2,250
04160001579/30/20187/18/20189/15/2014PA&ED:
RTL:R/W Cert:
2/28/2019Begin Con:
04-Alameda-580
Prior
201.12253 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/7.8
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In and near Pleasanton and Dublin, from north ofRoute 84 to Alcosta Boulevard. Roadwayrehabilitation.0481P
0J620$109,853
$75
Subtotal: $109,928
2019-20$7,150$7,150$1,500
$16,400
$32,200Total Project Cost: $142,128
04140000196/1/20206/1/20203/1/2019PA&ED:
RTL:R/W Cert:
3/30/2021Begin Con:
04-Alameda-680 Prior18-1918-1919-20
201.12263 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R12.4/R21.9
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
MOBILITYIn various counties, on various routes at variouslocations. Restore non-operational TransportationManagement System (TMS) field elements by useof on-call Task Order service contracts.
1464M
0P380$15,990
$10
Subtotal: $16,000
2019-20$450
$1,340$10
$3,000
$4,800Total Project Cost: $20,800
041700043112/30/20198/15/20194/15/2019PA&ED:
RTL:R/W Cert:
8/1/2020Begin Con:
04-Alameda-Var Prior18-1918-1919-20
201.315800 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
In Emeryville and Oakland, from San Francisco-Oakland Bay Bridge Toll Plaza to north of PowellStreet; also in Oakland on Routes 580 and 880, atvarious locations. Upgrade/replaceTransportation Management System elements.
1483H
2J830$5,135
$12
Subtotal: $5,147
2019-20$760$760$260
$1,044
$2,824Total Project Cost: $7,971
04150000065/1/20204/1/20203/1/2019PA&ED:
RTL:R/W Cert:
12/24/2020Begin Con:
04-Alameda-80 Prior18-1918-1919-20
201.31529 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.9/4.0
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 10 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Oakland and San Leandro, fromRoute 238 to Route 80. Install and upgradeTransportation Management System elements.1487A
3J050$17,970
$10
Subtotal: $17,980
2019-20$2,700$2,700
$50$3,600
$9,050Total Project Cost: $27,030
04150000756/15/20204/16/202010/1/2018PA&ED:
RTL:R/W Cert:
11/16/2020Begin Con:
04-Alameda-580 Prior18-1918-1919-20
201.31589 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R30.8/46.5
Con Sup:
Transportation Management Systems
Const:R/W:
In and near Fremont, Pleasanton, and Dublin,from 0.3 mile south of Scott Creek Road to 0.3mile north of Alcosta Boulevard. Install rampmeters, ramp HOV bypass lanes, and TrafficOperations Systems (TOS).
1463D
4G113$28,300
$800
Subtotal: $29,100
2018-19 $5,600$100
$5,600
$11,300Total Project Cost: $40,400
04140003056/15/20186/15/2018
11/16/2016PA&ED:
RTL:R/W Cert:
1/28/2019Begin Con:
04-Alameda-680PriorPrior18-19
201.31546 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
M0.0/R21.9
Con Sup:
Transportation Management Systems
Const:R/W:
In Oakland, at the District 4 TransportationManagement Center (TMC). Upgrade or replacelegacy TMC hardware components and relatedsoftware by service contract to improve reliabilityand functionality.
1464L
0P370$2,570
$10
Subtotal: $2,580
2019-20$110$392$10
$262
$774Total Project Cost: $3,354
041700043012/1/20199/1/2019
10/1/2018PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
04-Alameda-980 Prior18-1918-1919-20
201.3151 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.2
Con Sup:
Transportation Management Systems
Const:R/W:
In Hayward, at 500 feet north of IndustrialParkway West. Install weigh-in-motion system inboth directions.1482G
2J320$3,540
$5
Subtotal: $3,545
2018-19 $1,121$63
$1,121
$2,305Total Project Cost: $5,850
04140004884/26/2019
12/28/20186/29/2015PA&ED:
RTL:R/W Cert:
11/29/2019Begin Con:
04-Alameda-880PriorPrior18-19
201.3212 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
14.7
Con Sup:
Weigh Stations
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 11 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alameda($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADSIDE PRESERVATIONIn Oakland, from north of Redwood Road tonorth of La Salle Avenue; also, on Route 238 inSan Leandro, from Hesperian Boulevard to Route880 (PM 16.3/16.7); and in Solano County onRoute 80 in Vallejo, at Redwood Parkway (PM4.0 to PM 4.5). Highway planting and irrigationsystem rehabilitation.
1453H
2K790$2,530
$5
Subtotal: $2,535
2020-21$600$420$50
$510
$1,580Total Project Cost: $4,115
04170000231/15/2021
11/15/202010/15/2019PA&ED:
RTL:R/W Cert:
8/15/2021Begin Con:
04-Alameda-13 18-1919-2019-2020-21
201.2104.5 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
6.0/7.8
Con Sup:
Highway Planting Restoration
Const:R/W:
FACILITIESIn Oakland, at the California Department ofTransportation District 4 headquarters officebuilding, 111 Grand Avenue. Rehabilitate theexisting 13 building elevators with new systemsto extend service life, increase efficiency, andcorrect performance failures.
1462A
4K980$4,728
$0
Subtotal: $4,728
2019-20$260$325
$0$710
$1,295Total Project Cost: $6,023
04170003832/27/20202/28/20203/30/2019PA&ED:
RTL:R/W Cert:
6/3/2020Begin Con:
04-Alameda- 18-1919-20
19-20
201.3531 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Office Facilities
Const:R/W:
MISCELLANEOUSIn Oakland, at the District 4 TransportationManagement Center (TMC). Upgrade or replacelegacy TMC software applications and interfacecomponents, and related system devices byservice contract.
1499J
1K670$3,687
Subtotal: $3,687
2019-20$111$553$12
$431
$1,107Total Project Cost: $4,794
041600028412/1/20199/1/2019
10/1/2018PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
04-Alameda-980 Prior18-1918-1919-20
201.9991 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.2
Con Sup:
Miscellaneous
Const:R/W:
CountyAlameda
PA&ED:PS&E:
R/W Sup:Con Sup:
$12,631$604,316
R/W:
Subtotal: $616,947
Const:$73,744$81,197$9,207
$96,778
$260,926
Total (Capital + Support): $877,873
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 12 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Alpine($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Markleeville, on Routes 88, 89 and 4 atvarious locations. Bridge rail upgrade on fourbridges.3134
0X750$5,451
$313
Subtotal: $5,764
2019-20$496
$1,460$110
$1,484
$3,550Total Project Cost: $9,314
10130000094/17/20202/10/20207/2/2018PA&ED:
RTL:R/W Cert:
9/8/2020Begin Con:
10-Alpine-88 19-2019-2019-2019-20
201.112550 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
ROADWAY PRESERVATIONIn Alpine County, on Routes 4, 88, and 89 atvarious locations. Rehabilitate culverts.
3142
0S680$3,319
$71
Subtotal: $3,390
2019-20$870
$1,176$359$851
$3,256Total Project Cost: $6,646
10140001001/2/2020
10/13/20197/2/2018PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
10-Alpine-4 Prior18-1918-1919-20
201.15132 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Drainage System Restoration
Const:R/W:
In Alpine County, on Routes 4, 88 and 207; inAmador County on Routes 16 and 49; and in Tuolumne County on Route 108; at variouslocations. Rehabilitate culverts.
3138
0S750$4,290
$269
Subtotal: $4,559
2019-20$698
$1,043$317$762
$2,820Total Project Cost: $7,379
10140000991/15/202012/1/20197/2/2018PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
10-Alpine-88 Prior18-1918-1919-20
201.15150 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Drainage System Restoration
Const:R/W:
CountyAlpine
PA&ED:PS&E:
R/W Sup:Con Sup:
$653$13,060
R/W:
Subtotal: $13,713
Const:$2,064$3,679
$786$3,097
$9,626
Total (Capital + Support): $23,339
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 13 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Amador($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Jackson, from 0.5 mile east of Route 104 to5.5 miles west of Kirkwood Meadows Road atvarious locations. Upgrade guardrail to makestandard.
3199
1C360$2,613
$10
Subtotal: $2,623
2020-21$536$851
$0$711
$2,098Total Project Cost: $4,721
10160001364/15/20214/1/20217/1/2020PA&ED:
RTL:R/W Cert:
11/1/2021Begin Con:
10-Amador-88 18-1920-21
20-21
201.01569 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
7.9/R65.8
Con Sup:
Collision Severity Reduction
Const:R/W:
BRIDGE PRESERVATIONNear Jackson, at Mokelumne River Bridge No. 26-0012. Upgrade bridge rails and widen shoulders.
3219
0X752$3,914
$185
Subtotal: $4,099
2021-22$1,590$2,010
$135$2,055
$5,790Total Project Cost: $9,889
10170000045/2/2022
4/28/20226/30/2020PA&ED:
RTL:R/W Cert:
12/27/2022Begin Con:
10-Amador-49 18-1920-2120-2121-22
201.112810 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
ROADWAY PRESERVATIONIn Amador County, on Route 88 and in TuolumneCounty of Routes 120,108 and 49, at variouslocations. Rehabilitate culverts.3119
1C690$2,328
$26
Subtotal: $2,354
2018-19$250$448$65
$616
$1,379Total Project Cost: $3,733
10150000041/2/2019
12/1/20183/1/2018PA&ED:
RTL:R/W Cert:
8/15/2019Begin Con:
10-Amador-88 PriorPriorPrior18-19
201.15135 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Drainage System Restoration
Const:R/W:
CountyAmador
PA&ED:PS&E:
R/W Sup:Con Sup:
$221$8,855
R/W:
Subtotal: $9,076
Const:$2,376$3,309
$200$3,382
$9,267
Total (Capital + Support): $18,343
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 14 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Butte($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Chico, from West Sacramento Avenue (East)to West Sacramento Avenue (West). Constructtwo roundabouts.2114
2H240$2,332$1,789
Subtotal: $4,121
2019-20$650$663$756$565
$2,634Total Project Cost: $6,755
03170000843/1/20202/1/20209/3/2018PA&ED:
RTL:R/W Cert:
7/30/2020Begin Con:
03-Butte-32 Prior18-1918-1919-20
201.01058 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.6/7.9
Con Sup:
Safety Improvements
Const:R/W:
Near Oroville, from Yuba County Line to southof East Gridley Road/Stimpson Road; also, inYuba County on Route 70 from PM 25.7 to PM25.8. Widen for two-way left-turn lane andstandard shoulders.
2296
3H930$20,610$3,218
Subtotal: $23,828
2020-21$3,400$3,000$2,500$3,200
$12,100Total Project Cost: $35,928
031800010210/15/20209/15/20202/20/2019PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
03-Butte-70 Prior18-1918-1920-21
201.01035 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/3.8
Con Sup:
Safety Improvements
Const:R/W:
Near Oroville, from 0.3 mile north of Cox Lane tosouth of Palermo Road. Widen for two-way left-turn lane and standard shoulders, and provide aroadside clear recovery zone.
2295
3H720$25,350$3,220
Subtotal: $28,570
2019-20$980
$2,180$1,590$3,540
$8,290Total Project Cost: $36,860
03180000546/1/2019
5/15/20197/18/2018PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
03-Butte-70 Prior18-1918-1919-20
201.01035 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.6/8.8
Con Sup:
Safety Improvements
Const:R/W:
Near Oroville, from south of Palermo Road tonorth of Ophir Road. Widen for two-way left-turn lane and standard shoulders, and provide aroadside clear recovery zone.
2294
3H710$23,130
$480
Subtotal: $23,610
2019-20$850
$2,240$2,320$3,700
$9,110Total Project Cost: $32,720
03180000531/2/2019
12/1/20187/18/2018PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
03-Butte-70 Prior18-1918-1919-20
201.01058 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.8/11.8
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 15 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Butte($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Oroville, from Foothill Boulevard tothe Gold Country Casino entrance. Constructtwo-way left-turn lane and widen shoulders.2635
2H630$14,075$1,645
Subtotal: $15,720
2019-20$927
$1,769$2,023$1,913
$6,632Total Project Cost: $22,352
03170001663/20/20203/5/2020
12/1/2018PA&ED:
RTL:R/W Cert:
9/15/2020Begin Con:
03-Butte-162 Prior18-1918-1919-20
201.01050 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.4/19.9
Con Sup:
Safety Improvements
Const:R/W:
MANDATESIn Chico, from Walnut Street to Poplar Street.Upgrade ADA facilities.
2112
4F800$2,900
Subtotal: $2,900
2018-19$405$650$375$935
$2,365Total Project Cost: $5,265
03140002888/25/20188/1/2018
10/2/2017PA&ED:
RTL:R/W Cert:
4/1/2019Begin Con:
03-Butte-32 PriorPriorPrior18-19
201.36134 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R8.8/9.5
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONNear Oroville, at West Branch Feather RiverBridge No. 12-0134. Rehabilitate bridge byplacing a polyester overlay, and replacing jointseals and catwalk surface.
2288
1H120$11,150
$120
Subtotal: $11,270
2021-22$620
$1,190$40
$1,850
$3,700Total Project Cost: $14,970
031600005810/15/202110/1/20218/1/2019PA&ED:
RTL:R/W Cert:
4/15/2022Begin Con:
03-Butte-70 18-1919-2019-2021-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
28.2
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Richvale, at Cottonwood Creek Bridge No.12-0120. Replace scour-critical bridge.
2425
0F290$6,200
$590
Subtotal: $6,790
2019-20$700
$1,390$270
$2,200
$4,560Total Project Cost: $11,350
031400010110/15/201910/1/20195/1/2018PA&ED:
RTL:R/W Cert:
5/15/2020Begin Con:
03-Butte-99 PriorPriorPrior19-20
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
15.4
Con Sup:
Bridge Scour Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 16 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Butte($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Chico, from north of Route 162 tonorth of Broyles Road. Bridge rail upgrade at sixlocations.2433
0H330$5,235
$363
Subtotal: $5,598
2019-20$610
$1,230$160
$1,425
$3,425Total Project Cost: $9,023
03150001458/15/20198/15/20192/1/2018PA&ED:
RTL:R/W Cert:
4/1/2020Begin Con:
03-Butte-99 PriorPriorPrior19-20
201.112999 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.2/45.9
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
ROADWAY PRESERVATIONNear Pulga, from 3.0 miles west of Coal CanyonRoad to Plumas County line at various locations.Drainage system restoration.3588
0H560$2,525
$290
Subtotal: $2,815
2019-20$780$760
$1,060$850
$3,450Total Project Cost: $6,265
021500005110/11/2019
9/4/20199/1/2018PA&ED:
RTL:R/W Cert:
2/13/2020Begin Con:
02-Butte-70 Prior18-1918-1919-20
201.15125 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
22.0/48.0
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYIn and near Chico, from Estates Drive to GarnerLane. Install Intelligent Transportation System(ITS) elements.2437
1H860$8,470
$35
Subtotal: $8,505
2020-21$561
$1,177$41
$1,352
$3,131Total Project Cost: $11,636
03170000108/1/20207/2/20207/2/2019PA&ED:
RTL:R/W Cert:
1/2/2021Begin Con:
03-Butte-99 Prior19-2019-2020-21
201.3159.4 Mile(s) of cablePerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.3/T37.8
Con Sup:
Transportation Management Systems
Const:R/W:
ROADSIDE PRESERVATIONIn Butte County, on Route 70 at approximately7.0 miles south of Oroville; also, in ColusaCounty on Route 20 at approximately 4.0 mileseast of Colusa. Advance mitigation creditpurchases for future SHOPP construction projectsexpected to impact sensitive habitats.
2438
2H140 $1,764
Subtotal: $1,764
2019-20$53$16$61
$130Total Project Cost: $1,894
0317000067
10/1/20218/1/2019PA&ED:
RTL:R/W Cert:
10/15/2021Begin Con:
03-Butte-70 Prior19-2019-20
201.2402 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Roadside Enhancement
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 17 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Butte($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyButte
PA&ED:PS&E:
R/W Sup:Con Sup:
$13,514$121,977
R/W:
Subtotal: $135,491
Const:$10,536$16,265$11,196$21,530
$59,527
Total (Capital + Support): $195,018
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 18 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Calaveras($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Mokelumne Hill and West Point, at variouslocations from 5.4 miles west of Ridge Road tothe Amador County line. Stabilize failing anderoded slopes.
3132
0V480$10,548$1,817
Subtotal: $12,365
2021-22$1,323$1,978
$31$3,242
$6,574Total Project Cost: $18,939
10130002646/1/20226/1/20228/1/2020PA&ED:
RTL:R/W Cert:
1/2/2023Begin Con:
10-Calaveras-26 18-1920-2120-2121-22
201.13126 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
21.4/38.3
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONIn Calaveras and Amador Counties, on Routes 4and 26 at various locations. Install centerline andedge-line rumble strips.3220
1F740$2,300
$5
Subtotal: $2,305
2018-19$60
$840$5
$640
$1,545Total Project Cost: $3,850
10170000428/31/20187/16/2018
11/28/2017PA&ED:
RTL:R/W Cert:
3/5/2019Begin Con:
10-Calaveras-4 PriorPriorPrior18-19
201.01024 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Safety Improvements
Const:R/W:
BRIDGE PRESERVATIONNear Angels Camp, at West Branch CherokeeCreek Bridge No. 30-0036. Replace bridge.
3255
1H500$2,000
$278
Subtotal: $2,278
2021-22$605
$1,392$103
$1,241
$3,341Total Project Cost: $5,619
10170001548/11/20212/4/20218/6/2019PA&ED:
RTL:R/W Cert:
2/28/2022Begin Con:
10-Calaveras-4 Prior19-2019-2021-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near West Point, at South Fork Mokelumne RiverBridge No. 30-0022 (PM 30.0), and at North ForkMokelumne River Bridge No. 30-0049 (PM38.3); also, on Route 4 in Angels Camp, atAngels Creek Bridge No. 30-0008 (PM R21.4).Upgrade bridge railing at three structures, alsoseismic retrofit at one location.
3247
0X751$4,536
$8
Subtotal: $4,544
2021-22$757
$1,604$60
$1,540
$3,961Total Project Cost: $8,505
10150001288/2/20215/3/20218/3/2020PA&ED:
RTL:R/W Cert:
1/3/2022Begin Con:
10-Calaveras-26 18-1920-2120-2121-22
201.112808 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 19 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Calaveras($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MOBILITYNear Murphys, from Pennsylvania Gulch Road toMain Street/Lawrence Street. Traffic operationalimprovements.3245
0W870$2,161
$10
Subtotal: $2,171
2020-21$524
$1,306$30
$772
$2,632Total Project Cost: $4,803
10170000061/20/20219/21/20209/25/2019PA&ED:
RTL:R/W Cert:
7/19/2021Begin Con:
10-Calaveras-4 18-1919-2019-2020-21
201.31041.44 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
29.2/29.4
Con Sup:
Operational Improvements
Const:R/W:
CountyCalaveras
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,118$21,545
R/W:
Subtotal: $23,663
Const:$3,269$7,120
$229$7,435
$18,053
Total (Capital + Support): $41,716
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 20 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Colusa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Colusa, from Niagara Avenue to 0.3 milewest of Steidlmayer Road. Widen shoulders to 8feet to provide adequate recoverable space forerrant vehicles.
2951
0H650$5,900$4,700
Subtotal: $10,600
2021-22$860
$1,120$580
$1,460
$4,020Total Project Cost: $14,620
03160000034/1/20224/1/20227/2/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
03-Colusa-20 18-1920-2120-2121-22
201.01579 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
34.8/36.5
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Maxwell, at the Maxwell Safety RoadsideRest Area. Upgrade water and wastewatersystems to current standards. 2793
4F430$3,880
$16
Subtotal: $3,896
2018-19$420$460$30
$810
$1,720Total Project Cost: $5,616
03140001621/2/2019
12/1/20182/1/2018PA&ED:
RTL:R/W Cert:
6/1/2019Begin Con:
03-Colusa-5 PriorPriorPrior18-19
201.2351 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R24.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
CountyColusa
PA&ED:PS&E:
R/W Sup:Con Sup:
$4,716$9,780
R/W:
Subtotal: $14,496
Const:$1,280$1,580
$610$2,270
$5,740
Total (Capital + Support): $20,236
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 21 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Contra Costa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTION In Orinda and Lafayette, from east of theCaldecott Tunnel to east of Camino Pablo and atAcalanes Road (PM R4.2/R4.99); also in Oaklandon Route 13, at Redwood Road (PM 5.2/5.5). Install safety lighting.
1418C
1J990$2,955
$313
Subtotal: $3,268
2018-19$736$420$64
$480
$1,700Total Project Cost: $4,968
04140004116/17/20193/30/20185/1/2018PA&ED:
RTL:R/W Cert:
11/12/2018Begin Con:
04-Contra Costa-24 Prior18-1918-1918-19
201.01065 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.0/R2.5
Con Sup:
Safety Improvements
Const:R/W:
In various cities, from Alameda County line to0.6 mile west of Solano County line; also, inAlameda County in Albany, from 0.4 mile west tothe Contra Costa County line (PM R7.6/8.0). Install lighting and upgrade concrete barrier.
1497F
0K160$52,621
$254
Subtotal: $52,875
2021-22$6,869$6,869$1,374$7,327
$22,439Total Project Cost: $75,314
04160000444/1/20221/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
10/1/2022Begin Con:
04-Contra Costa-80 Prior20-2120-2121-22
201.010460 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/13.5
Con Sup:
Safety Improvements
Const:R/W:
In Contra Costa County, on Routes 4, 24, 80, 123,242, 580, and 680 at various locations. InstallAccessible Pedestrian Signal (APS) systems andpedestrian countdown timers, and refreshcrosswalk markings with high-visibility stripingto enhance pedestrian safety.
1487N
3J140$7,487
$20
Subtotal: $7,507
2021-22$1,108$1,108
$80$1,400
$3,696Total Project Cost: $11,203
04150000918/1/20216/1/20211/1/2020PA&ED:
RTL:R/W Cert:
3/1/2022Begin Con:
04-Contra Costa-4 18-1919-2019-2021-22
201.015333 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Hercules, Martinez, and Concord, atvarious locations from Route 80 to 0.3 mile eastof Bailey Road. Upgrade guardrail to make standard.
0481U
0J480$12,400
$10
Subtotal: $12,410
2021-22$1,000$1,400
$52$1,500
$3,952Total Project Cost: $16,362
041400000410/1/20216/1/20212/3/2020PA&ED:
RTL:R/W Cert:
4/1/2022Begin Con:
04-Contra Costa-4 19-2019-2020-2121-22
201.015225 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/R20.4
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 22 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Contra Costa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Antioch and Brentwood, from 0.6mile east of Route 160 to Old River Bridge.Construct and modify MVPs to improve highwayworker safety.
1492H
4J950$1,234
$72
Subtotal: $1,306
2021-22$928$663$40
$530
$2,161Total Project Cost: $3,467
04160000263/1/20222/1/2022
11/1/2020PA&ED:
RTL:R/W Cert:
10/1/2022Begin Con:
04-Contra Costa-4 18-1920-2121-2221-22
201.23515 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R31.0/48.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In various cities, from the Alameda County line tothe Solano County line; also on Route 242, 580,and 680 at various locations. Constructmaintenance worker safety improvements
1483P
2J820$2,630
$5
Subtotal: $2,635
2019-20$455$637
$5$692
$1,789Total Project Cost: $4,424
04150000098/30/20198/9/20191/2/2018PA&ED:
RTL:R/W Cert:
3/24/2020Begin Con:
04-Contra Costa-80 PriorPriorPrior19-20
201.23527 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/14.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
BRIDGE PRESERVATIONIn Richmond, at Stege Drain Bridge No. 28-0091.Bridge rehabilitation.
1482Q
2J720$5,828
$5
Subtotal: $5,833
2019-20$700$876$117$876
$2,569Total Project Cost: $8,402
04150000164/20/20208/1/2019
11/30/2018PA&ED:
RTL:R/W Cert:
10/12/2020Begin Con:
04-Contra Costa-580 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.2
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Orinda, at St. Stephens Drive Overcrossing No.28-0111. Seismic retrofit.
1493A
4J840$2,067
$38
Subtotal: $2,105
2021-22$925
$1,175$175$375
$2,650Total Project Cost: $4,755
04160000271/1/20221/1/20222/1/2020PA&ED:
RTL:R/W Cert:
6/1/2022Begin Con:
04-Contra Costa-24 18-1919-2019-2021-22
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R3.5
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 23 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Contra Costa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn and near Concord and Pittsburg, from Route242 to Loveridge Road. Rehabilitate pavement,upgrade curb ramps to make ADA compliant, andupgrade guardrail to make standard.
1462R
2K720$55,281
$93
Subtotal: $55,374
2021-22$2,720$6,400
$780$8,320
$18,220Total Project Cost: $73,594
04170000146/1/20223/1/20226/1/2020PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
04-Contra Costa-4 18-1920-2120-2121-22
201.12195 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R14.3/24.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Concord, from Route 680 to Route 4.Pavement rehabilitation.
0269H
26980$11,774
$15
Subtotal: $11,789
2019-20$990
$1,210$110
$1,430
$3,740Total Project Cost: $15,529
041200015911/1/20198/1/2019
12/1/2017PA&ED:
RTL:R/W Cert:
3/30/2020Begin Con:
04-Contra Costa-242 PriorPriorPrior19-20
201.12120.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R3.4
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Hercules, Rodeo, and Crocket, fromRoute 4 to the Carquinez Bridge. RoadwayRehabilitation.1487E
3J070$61,317
$28
Subtotal: $61,345
2021-22$3,083$4,624
$206$7,501
$15,414Total Project Cost: $76,759
04150000772/1/2022
12/1/20214/1/2020PA&ED:
RTL:R/W Cert:
11/15/2022Begin Con:
04-Contra Costa-80 Prior19-2019-2021-22
201.12221.9 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.1/13.5
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
CountyContra Costa
PA&ED:PS&E:
R/W Sup:Con Sup:
$853$215,594
R/W:
Subtotal: $216,447
Const:$19,514$25,382$3,003
$30,431
$78,330
Total (Capital + Support): $294,777
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 24 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Del Norte($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Crescent City, at 0.2 mile north of CushingCreek Viaduct. Restore roadway to pre-slidecondition.1122
0G210$10,148
$18
Subtotal: $10,166
2019-20$1,488$2,276
$116$3,974
$7,854Total Project Cost: $18,020
01160001373/1/2020
2/15/202012/1/2018PA&ED:
RTL:R/W Cert:
11/15/2020Begin Con:
01-Del Norte-101 Prior18-1918-1919-20
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.2
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONNear Gasquet, from 0.7 to 0.3 mile south ofHardscrabble Creek Bridge. Install high frictionsurface treatment (HFST), signs, guardrail, andcenterline rumble strip.
1121
0G130$1,570
$25
Subtotal: $1,595
2019-20$402$507$93
$393
$1,395Total Project Cost: $2,990
01160001281/13/2020
12/16/201912/1/2018PA&ED:
RTL:R/W Cert:
6/6/2020Begin Con:
01-Del Norte-199 Prior18-1918-1919-20
201.01020 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.2/10.7
Con Sup:
Safety Improvements
Const:R/W:
MANDATESIn and near Crescent City, from south of ElkValley Road to north of WilsonAvenue/Burtschell Street. Upgrade ADAfacilities and construct traffic calming measuresto improve operations and safety for non-motorized users.
1095
0C660$3,527
$432
Subtotal: $3,959
2018-19$669$467
$1,234$180
$2,550Total Project Cost: $6,509
01130000235/1/20194/1/2019
3/15/2018PA&ED:
RTL:R/W Cert:
9/1/2019Begin Con:
01-Del Norte-101 PriorPriorPrior18-19
201.36187 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
25.8/27.3
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONNear Crescent City, from 0.2 mile north of theSmith River Overflow Bridge. Replace bridge.
0100V
43640$50,448$3,900
Subtotal: $54,348
2018-19$10,942$3,700
$650$12,250
$27,542Total Project Cost: $81,890
01000001933/1/20192/1/20192/1/2018PA&ED:
RTL:R/W Cert:
9/1/2019Begin Con:
01-Del Norte-101 PriorPriorPrior18-19
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
36.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 25 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Del Norte($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near the Smith River community, at DominieCreek. Replace box culvert with new bridge andremediate fish passage barrier. 1113
0F310$5,852
$151
Subtotal: $6,003
2019-20$1,068$1,141
$154$1,643
$4,006Total Project Cost: $10,009
01150001081/17/20201/3/2020
1/15/2019PA&ED:
RTL:R/W Cert:
7/22/2020Begin Con:
01-Del Norte-101 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
39.8
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Klamath, at Panther Creek Bridge No. 01-0025 and at Hunter Creek Bridge No. 01-0003.Seismic retrofit.1072
0B090$13,756$5,589
Subtotal: $19,345
2018-19$2,159$3,720
$373$3,282
$9,534Total Project Cost: $28,879
01000204448/1/20197/1/20197/1/2018PA&ED:
RTL:R/W Cert:
6/15/2020Begin Con:
01-Del Norte-101 Prior18-1918-1918-19
201.1132 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.2/8.7
Con Sup:
Bridge Seismic Restoration
Const:R/W:
ROADWAY PRESERVATIONIn Del Norte County, at various locations fromnorth of Elk Valley Cross Road to south of theOregon State Line. Culvert rehabilitation and fishpassage.
1055
48800$4,998
$166
Subtotal: $5,164
2019-20$1,100$1,135
$82$1,221
$3,538Total Project Cost: $8,702
01140000743/1/20202/1/20201/1/2019PA&ED:
RTL:R/W Cert:
8/1/2020Begin Con:
01-Del Norte-199 Prior18-1918-1919-20
201.15118 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.1/36.3
Con Sup:
Drainage System Restoration
Const:R/W:
Near the Oregon State Line, from 0.1 mile to 0.5mile north of Collier Safety Roadside Rest Area(SRRA). Upgrade lighting and power controlsystem at the Randolph Collier Tunnel No. 01-0049.
1115
0F430$2,082
$0
Subtotal: $2,082
2020-21$355
$1,213$86
$949
$2,603Total Project Cost: $4,685
01160000058/1/20207/1/20204/1/2019PA&ED:
RTL:R/W Cert:
1/1/2021Begin Con:
01-Del Norte-199 18-1918-1918-1920-21
201.170158 Lighting fixture(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
33.5/33.9
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 26 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Del Norte($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MOBILITYIn Klamath, from 0.2 mile south to 0.3 mile northof Ehlers Way. Extend the left turn pocket, installacceleration lane for left turns, and extendacceleration lane for right turns at the intersectionof Ehlers Way and Route 101.
1110
0F240$1,581
$446
Subtotal: $2,027
2021-22$697$847$15
$649
$2,208Total Project Cost: $4,235
011500009411/1/202110/1/202110/1/2020PA&ED:
RTL:R/W Cert:
6/1/2022Begin Con:
01-Del Norte-101 18-1920-2120-2121-22
201.310.2 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R5.1/R5.6
Con Sup:
Operational Improvements
Const:R/W:
FACILITIESNear Gasquet, at the Idlewild MaintenanceStation. Construct new office space building, andrehabilitate water system and septic system.1117
0F760$3,960
$20
Subtotal: $3,980
2021-22$561
$1,565$43
$2,038
$4,207Total Project Cost: $8,187
01160000608/1/20217/1/20214/1/2020PA&ED:
RTL:R/W Cert:
2/1/2022Begin Con:
01-Del Norte-199 18-1919-2019-2021-22
201.3521 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
28.1
Con Sup:
Maintenance Facilities
Const:R/W:
CountyDel Norte
PA&ED:PS&E:
R/W Sup:Con Sup:
$10,747$97,922
R/W:
Subtotal: $108,669
Const:$19,441$16,571$2,846
$26,579
$65,437
Total (Capital + Support): $174,106
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 27 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
El Dorado($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Placerville, at 1.1 miles north of the SouthFork American River Bridge (PM 22.8/22.9); alsoat 2.5 miles north of the South Fork AmericanRiver Bridge (PM 24.2/24.3). Restoreembankment slope slip-outs.
3631
1H600$6,042
$13
Subtotal: $6,055
2018-19$1,039$1,201
$106$1,144
$3,490Total Project Cost: $9,545
03160001882/28/20192/1/20197/1/2018PA&ED:
RTL:R/W Cert:
9/15/2019Begin Con:
03-El Dorado-193 Prior18-1918-1918-19
201.1312 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
22.8/24.3
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONIn Cameron Park, at Cameron Park Drive.Improve sight distance and upgrade curb ramps.
3316
1H440$1,200
$83
Subtotal: $1,283
2018-19$150$530
$9$450
$1,139Total Project Cost: $2,422
031600015310/1/201810/1/201812/1/2017PA&ED:
RTL:R/W Cert:
5/1/2019Begin Con:
03-El Dorado-50 PriorPriorPrior18-19
201.01016 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.5
Con Sup:
Safety Improvements
Const:R/W:
Near Placerville and Camino, from 0.1 mile westof Still Meadows Road to 0.1 mile east of UpperCarson Road. Install median barrier, widenshoulders and construct acceleration/decelerationlane.
3290
4E620$32,000$2,000
Subtotal: $34,000
2018-19$2,500$3,500$1,200$5,800
$13,000Total Project Cost: $47,000
03140000395/1/20195/1/20192/2/2018PA&ED:
RTL:R/W Cert:
9/1/2019Begin Con:
03-El Dorado-50 PriorPriorPrior18-19
201.010108 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R22.0/24.3
Con Sup:
Safety Improvements
Const:R/W:
In Yolo, Sacramento and El Dorado Counties, inand near the cities of West Sacramento,Sacramento, Rancho Cordova, Folsom, andPlacerville, from Route 80 to Route 89 at variouslocations. Upgrade guardrail to make standard.
3318
1H870$2,000
$5
Subtotal: $2,005
2020-21$271$461$129$570
$1,431Total Project Cost: $3,436
031700001110/1/20209/1/20208/1/2019PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
03-El Dorado-50 18-1919-2019-2021-22
201.01520 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/70.6
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 28 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
El Dorado($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In El Dorado County, from the SacramentoCounty line to east of Stateline Avenue. Upgradeguard rail to current standards. 3311
0H500$3,450
$16
Subtotal: $3,466
2018-19$150$360$55
$475
$1,040Total Project Cost: $4,506
031500020010/1/201810/1/20184/11/2017PA&ED:
RTL:R/W Cert:
4/1/2019Begin Con:
03-El Dorado-50 PriorPriorPrior18-19
201.0155 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/80.4
Con Sup:
Collision Severity Reduction
Const:R/W:
In El Dorado, Butte, Placer, Sacramento, Sutter,and Yolo Counties, on Routes 50, 65, 70, 80, 89,and 99 at various locations. Upgrade crashcushions and sand barrel arrays to make moredurable.
3313
0H680$2,600
$10
Subtotal: $2,610
2020-21$90
$170$30
$460
$750Total Project Cost: $3,360
031600001010/1/202010/1/20207/1/2019PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
03-El Dorado-50 18-1919-2019-2020-21
201.01520 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R11.0/R31.6
Con Sup:
Collision Severity Reduction
Const:R/W:
BRIDGE PRESERVATIONNear Pollock Pines, at Sawmill UndercrossingNo. 25-0041; also at Sly Park Road (PMR30.17/R31.3). Replace bridge, restore culverts,and add highway lighting.
6923
0H341$8,850
$53
Subtotal: $8,903
2019-20$230$690$11
$1,660
$2,591Total Project Cost: $11,494
03170001529/1/2019
8/15/201911/15/2017PA&ED:
RTL:R/W Cert:
12/15/2019Begin Con:
03-El Dorado-50 PriorPriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R27.9/R29.8
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
ROADWAY PRESERVATIONNear Cameron Park and Shingle Springs, fromeast of Silva Valley Parkway to west of ElDorado Road. Rehabilitate culverts.3315
1H040$3,900
$180
Subtotal: $4,080
2021-22$630$570$540$940
$2,680Total Project Cost: $6,760
03160000502/1/20222/1/20222/1/2020PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
03-El Dorado-50 18-1919-2019-2021-22
201.15128 Culvert(s) (ea)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R2.7/R13.8
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 29 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
El Dorado($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Placerville, from west of El DoradoRoad to 0.1 mile east of Braeburn Lane.Rehabilitate deteriorated culverts and provideaccess for wildlife crossing the route.
3317
1H800$3,700
$930
Subtotal: $4,630
2021-22$290$890$180
$1,440
$2,800Total Project Cost: $7,430
03170000038/15/20218/1/20215/1/2020PA&ED:
RTL:R/W Cert:
12/15/2021Begin Con:
03-El Dorado-50 18-1919-2019-2021-22
201.15141 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R13.7/22.5
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYIn El Dorado County, from the SacramentoCounty line to east of Stateline Avenue. Upgradenew Transportation Management Systemelements.
3312
0H520$9,150
$150
Subtotal: $9,300
2019-20$500
$1,000$580
$1,620
$3,700Total Project Cost: $13,000
03150002022/1/2020
1/15/20209/1/2017PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
03-El Dorado-50 PriorPriorPrior19-20
201.31551 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/80.4
Con Sup:
Transportation Management Systems
Const:R/W:
CountyEl Dorado
PA&ED:PS&E:
R/W Sup:Con Sup:
$3,440$72,892
R/W:
Subtotal: $76,332
Const:$5,850$9,372$2,840
$14,559
$32,621
Total (Capital + Support): $108,953
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 30 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Fresno($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Selma, from Kings County Line to EastMountain View Avenue. Construct rumble stripsand update pavement delineation.6886
0V980$1,026
Subtotal: $1,026
2018-19 $750$22
$202
$974Total Project Cost: $2,000
06170000829/17/20188/1/2018
6/26/2017PA&ED:
RTL:R/W Cert:
3/15/2019Begin Con:
06-Fresno-43PriorPrior18-19
201.01016 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/7.3
Con Sup:
Safety Improvements
Const:R/W:
In Fresno County, between Shepherd Avenue andLockwood Lane and Lodge Road Park and Rideand Tollhouse/Auberry Roads. Constructcenterline rumble strip.
6866
0V320$742
$1
Subtotal: $743
2018-19$220$635
$1$404
$1,260Total Project Cost: $2,003
06160001369/10/20189/3/2018
2/15/2018PA&ED:
RTL:R/W Cert:
1/10/2019Begin Con:
06-Fresno-168 PriorPriorPrior18-19
201.01026 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.7/R36.2
Con Sup:
Safety Improvements
Const:R/W:
Near Coalinga and Kettleman City, at theCoalinga-Avenal Safety Roadside Rest Area fromKings County line to Quist Undercrossing; also inKings County, from 0.2 mile south of AvenalCutoff Road to Fresno County line (PM26.4/26.7). Repair aging water and wastewatersystems.
6736
0T230$4,350
$102
Subtotal: $4,452
2018-19$122$783
$4$1,000
$1,909Total Project Cost: $6,361
06150000401/11/201911/5/201810/2/2017PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
06-Fresno-5 PriorPriorPrior18-19
201.2352 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/1.7
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Firebaugh, from south of Morris Kyle Drive toClyde Fannon Drive. Construct continuousaccessible pedestrian path to comply with ADAstandards.
6747
0T250$2,085
$273
Subtotal: $2,358
2018-19$221$780$240$475
$1,716Total Project Cost: $4,074
06150000434/1/2019
3/29/20196/9/2017PA&ED:
RTL:R/W Cert:
10/15/2019Begin Con:
06-Fresno-33 PriorPriorPrior18-19
201.36129 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
69.3/70.9
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 31 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Fresno($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Mendota, at Tumey Gulch Bridge No. 42-0246L/R. Replace bridge.
6725
0S830$10,898
$79
Subtotal: $10,977
2019-20$850
$1,900$4
$2,800
$5,554Total Project Cost: $16,531
06150000462/3/20201/3/2020
7/31/2018PA&ED:
RTL:R/W Cert:
7/3/2020Begin Con:
06-Fresno-5 Prior18-1918-1919-20
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
44.4/45.4
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Squaw Valley, at Mill Creek Bridge No. 42-0080; also near Cedar Grove at South ForkKings River Bridge No. 42-0024 (PM 130.1).Bridge rail upgrade.
6766
0Q900$3,153
$4
Subtotal: $3,157
2018-19$480$923$10
$814
$2,227Total Project Cost: $5,384
06140000472/25/20191/21/20191/15/2018PA&ED:
RTL:R/W Cert:
9/2/2019Begin Con:
06-Fresno-180 PriorPriorPrior18-19
201.112535 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
92.2
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In Fresno County, at Colony Main Canal BridgeNo. 42-0031, Helm Canal Bridge No. 42-0033 and Poso Canal Bridge No. 42-0034; also in KernCounty on Route 58 at Main Drain Canal BridgeNo. 50-0013. Repair erosion, clean and encasepiers in concrete.
6773
0U000$1,782
$375
Subtotal: $2,157
2020-21$538$893$334$805
$2,570Total Project Cost: $4,727
06150002962/1/20211/1/2021
10/1/2019PA&ED:
RTL:R/W Cert:
7/15/2021Begin Con:
06-Fresno-33 Prior19-2019-2020-21
201.1194 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In Fresno, at the South Fresno Viaduct No. 42-0226L/R. Replace failed joint seals andrehabilitate worn bridge decks with polyesterconcrete overlay
6771
0U160$7,050
$291
Subtotal: $7,341
2018-19$237$750$20
$1,574
$2,581Total Project Cost: $9,922
06150003109/1/20187/1/2018
9/29/2017PA&ED:
RTL:R/W Cert:
2/15/2019Begin Con:
06-Fresno-41 PriorPriorPrior18-19
201.1192 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R22.0/R22.6
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 32 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Fresno($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn and near Selma and Fowler, from 0.1 south ofRose Avenue Undercrossing to Merced Street Undercrossing. Replace pavement withContinuous Reinforced Concrete Pavement (CRCP). Update curb ramps to meet current ADA standards.
6800
0U420$86,000
$56
Subtotal: $86,056
2019-20$845
$2,000$24
$11,000
$13,869Total Project Cost: $99,925
06160000041/24/2020
12/13/201912/3/2018PA&ED:
RTL:R/W Cert:
9/2/2020Begin Con:
06-Fresno-99 Prior18-1918-1919-20
201.12032.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R5.7/11.1
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
Near Prather, from Sample Road to Oak CreekRoad. Upgrade barrier railing, cold planepavement, place Hot Mix Asphalt (HMA) andRubberized Hot Mix Asphalt concrete (RHMA).
6809
0U450$5,000
$5
Subtotal: $5,005
2019-20$750
$1,230$1
$1,140
$3,121Total Project Cost: $8,126
06150002983/26/20203/13/20202/15/2019PA&ED:
RTL:R/W Cert:
9/18/2020Begin Con:
06-Fresno-168 Prior18-1918-1919-20
201.12114.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.6/T25.5
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Kingburg, from Route 201 to south ofSecond Street. Roadway rehabilitation.
6727
0S460$24,086
$25
Subtotal: $24,111
2018-19$577
$1,496$43
$2,705
$4,821Total Project Cost: $28,932
061500003811/6/201810/4/20188/3/2017PA&ED:
RTL:R/W Cert:
6/4/2019Begin Con:
06-Fresno-99 PriorPriorPrior18-19
201.1228.1 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.9/R5.0
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In Fresno County, at various locations; also inKern County on Route 119 at various locations.Replace damaged drainage systems.6802
0R110$1,206
$165
Subtotal: $1,371
2018-19 $1,184$463$454
$2,101Total Project Cost: $3,472
06140000304/1/20193/1/2019
5/22/2017PA&ED:
RTL:R/W Cert:
10/14/2019Begin Con:
06-Fresno-198PriorPrior18-19
201.1517 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R14.5/R18.2
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 33 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Fresno($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MOBILITYNear Fresno, from the northbound Ashlan Avenueonramp to the northbound Shaw Avenue offramp.Construct northbound auxiliary lane and add anadditional lane to the Shaw Avenue offramp.
6879
0W170$14,700
$7
Subtotal: $14,707
2021-22$1,300$2,400
$150$4,400
$8,250Total Project Cost: $22,957
06170001038/23/20217/23/2021
11/15/2019PA&ED:
RTL:R/W Cert:
2/18/2022Begin Con:
06-Fresno-41 18-1919-2019-2021-22
201.31059.4 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R27.6/R28.3
Con Sup:
Operational Improvements
Const:R/W:
In and near the city of Fresno, from 0.1 milesouth of North Avenue to the Madera Countyline; also on Route 99 (PM 19.36 to PM 21.9),Route 168 (PM R0.2L/R to PM R9.7), and Route180 (PM R58.55 to PM R59.85). Replace and upgrade existing communication elements for theTraffic Management System (TMS).
6881
0V780$16,010
$30
Subtotal: $16,040
2020-21$619
$1,809$165
$1,791
$4,384Total Project Cost: $20,424
06160002343/1/20211/4/2021
12/1/2018PA&ED:
RTL:R/W Cert:
8/16/2021Begin Con:
06-Fresno-41 Prior18-1918-1920-21
201.31589 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R20.0/33.4
Con Sup:
Transportation Management Systems
Const:R/W:
In Fresno County, on Routes 99, 41, 168, and 180at various locations; also in Madera County onRoute 99 at various locations. Repair vehicledetection systems.
6883
0V930$3,036
$119
Subtotal: $3,155
2019-20$800
$1,017$450
$1,056
$3,323Total Project Cost: $6,478
061700006712/16/201912/2/20199/3/2018PA&ED:
RTL:R/W Cert:
6/1/2020Begin Con:
06-Fresno-99 Prior18-1918-1919-20
201.31520 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
ROADSIDE PRESERVATIONIn the city of Fresno, from 0.1 mile south ofJensen Avenue Overcrossing to Alluvial AvenueUndercrossing. Replace irrigation system with awater efficient system.
6888
0V750$1,576
$1
Subtotal: $1,577
2019-20$0
$552$1
$460
$1,013Total Project Cost: $2,590
06160002098/7/20197/1/20192/7/2017PA&ED:
RTL:R/W Cert:
2/28/2020Begin Con:
06-Fresno-4118-1918-1919-20
201.210214 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R21.0/R31.0
Con Sup:
Highway Planting Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 34 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Fresno($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Fresno and Clovis, at various locationsbetween Route 180/168 Separation and ShepherdAvenue. Replace black potable water irrigationvalves with purple scrubber valves for recycledirrigation water.
6851
0U760$1,449
$2
Subtotal: $1,451
2020-21$2
$524$2
$370
$898Total Project Cost: $2,349
06160000347/10/20206/1/2020
9/30/2018PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
06-Fresno-168 18-1919-2019-2020-21
201.21030 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.0/R11.7
Con Sup:
Highway Planting Restoration
Const:R/W:
CountyFresno
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,535$184,149
R/W:
Subtotal: $185,684
Const:$7,561
$19,626$1,934
$31,450
$60,571
Total (Capital + Support): $246,255
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 35 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Glenn($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn and near Willows and Orland, from north ofCounty Road 68 to north of County Road 7. Pavebeyond the gore areas, install vegetation controlunder guardrail, construct MVPs, and trim treesand shrubs to improve highway worker safety.
3709
3F500$2,000
$10
Subtotal: $2,010
2020-21$280$420$80
$540
$1,320Total Project Cost: $3,330
03130000198/1/20207/2/20207/1/2019PA&ED:
RTL:R/W Cert:
2/15/2021Begin Con:
03-Glenn-5 18-1919-2019-2020-21
201.23550 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R3.2/R27.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Near Willows, at the Willows Safety RoadsideRest Area (SRRA). Upgrade potable water andwastewater systems.3710
4F420$4,100
$20
Subtotal: $4,120
2019-20$540$550$60
$1,180
$2,330Total Project Cost: $6,450
03140001617/2/20197/2/2019
10/1/2018PA&ED:
RTL:R/W Cert:
2/15/2020Begin Con:
03-Glenn-5 Prior18-1918-1919-20
201.2351 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R14.6
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Orland, from Route 5 to Woodward Avenue.Upgrade pedestrian infrastructure to meet ADArequirements.3788
4F810$700$88
Subtotal: $788
2019-20$240$405$465$260
$1,370Total Project Cost: $2,158
031400029110/1/20199/1/20194/1/2018PA&ED:
RTL:R/W Cert:
4/1/2020Begin Con:
03-Glenn-32 PriorPriorPrior19-20
201.361113 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
L0.0/0.8
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONAt Butte City, from Route 45 to 0.1 mile east ofMcDougall Street. Replace Sacramento River Bridge No. 11-0017.2633
3F060$65,000$1,000
Subtotal: $66,000
2020-21$5,500$5,500$1,200
$10,000
$22,200Total Project Cost: $88,200
031200005210/15/202010/1/20208/1/2018PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
03-Glenn-162 Prior18-1918-1920-21
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
76.3/78.6
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 36 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Glenn($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyGlenn
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,118$71,800
R/W:
Subtotal: $72,918
Const:$6,560$6,875$1,805
$11,980
$27,220
Total (Capital + Support): $100,138
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 37 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Carlotta, from 0.1 mile east of RiversidePark Road to 0.4 mile east of Riverside ParkRoad. Curve correction.2415
0F160$2,240
$309
Subtotal: $2,549
2019-20$910$904$174$537
$2,525Total Project Cost: $5,074
01150000761/15/20201/1/2020
1/15/2019PA&ED:
RTL:R/W Cert:
7/1/2020Begin Con:
01-Humboldt-36 Prior18-1918-1919-20
201.01020 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.5/10.8
Con Sup:
Safety Improvements
Const:R/W:
In Eureka, on 4th Street from Broadway to YStreet. Restripe to add traffic and bicycle lanes,construct pedestrian bulb-outs and ADA ramps,and install or modify signals.
2393
0E680$6,254
$360
Subtotal: $6,614
2018-19$1,114
$690$362
$1,236
$3,402Total Project Cost: $10,016
01140001236/15/20196/1/20197/1/2018PA&ED:
RTL:R/W Cert:
1/23/2020Begin Con:
01-Humboldt-101 Prior18-1918-1918-19
201.010503 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
78.1/79.6
Con Sup:
Safety Improvements
Const:R/W:
In and near Arcata, between West End Road andSchool Road at four locations. Construct shoulder rumble strip, upgrade guardrail, construct guardrail slope retaining wall, and placeHigh Friction Surface Treatment (HFST).
7024
0G510$1,301
Subtotal: $1,301
2019-20$394$582$90
$616
$1,682Total Project Cost: $2,983
011700001311/1/201911/1/20194/1/2019PA&ED:
RTL:R/W Cert:
4/1/2020Begin Con:
01-Humboldt-101 Prior18-1918-1919-20
201.01030 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
87.8/R91.5
Con Sup:
Safety Improvements
Const:R/W:
Near Blue Lake, from 2.2 miles east of SimpsonRoad to 3.2 miles east of Simpson Road. Widenshoulders, and install rumble strips andguardrailing.
2435
0F690$1,386
Subtotal: $1,386
2019-20$498$697
$9$642
$1,846Total Project Cost: $3,232
01160000457/1/20197/1/20199/1/2018PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
01-Humboldt-299 Prior18-1918-1919-20
201.01013 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R14.7/R15.7
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 38 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Willow Creek, from 1.5 mile east of EastBair Road to 0.4 mile west of Cedar Creek Road,at various locations. Widen shoulders.2427
0F460$6,886
$127
Subtotal: $7,013
2019-20$986$864$21
$921
$2,792Total Project Cost: $9,805
01160000108/1/20198/1/20198/1/2018PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
01-Humboldt-299 Prior18-1918-1919-20
201.01040 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.5/30.2
Con Sup:
Safety Improvements
Const:R/W:
Near Willow Creek, from 0.1 mile east of CedarCreek Road to 1.1 miles west of Route 96. Widen shoulders, place high-friction surfacetreatment (HFST), install rumble strips, guardrail,and cable net drapery.
2426
0F470$11,388
$19
Subtotal: $11,407
2019-20$1,640$1,668
$45$2,518
$5,871Total Project Cost: $17,278
01160000118/1/20197/1/20197/1/2018PA&ED:
RTL:R/W Cert:
1/1/2020Begin Con:
01-Humboldt-299 Prior18-1918-1919-20
201.010118 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
30.7/37.7
Con Sup:
Safety Improvements
Const:R/W:
Near Willow Creek, from 0.1 mile west ofWillow Way to Panther Road. Widen shoulders,upgrade ADA curb ramps, and install a bus turn-out.
2434
0F680$2,594
$211
Subtotal: $2,805
2019-20$1,108$1,306
$238$1,103
$3,755Total Project Cost: $6,560
01160000446/1/20206/1/20209/1/2019PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
01-Humboldt-299 Prior19-2019-2019-20
201.01018 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
38.9/39.5
Con Sup:
Safety Improvements
Const:R/W:
Near Fortuna, from Route 101 to River Bar Road.Shoulder widening.
2379
0E010$7,187$2,727
Subtotal: $9,914
2019-20$910$886$592$955
$3,343Total Project Cost: $13,257
01130000903/1/20202/1/20209/1/2018PA&ED:
RTL:R/W Cert:
9/15/2020Begin Con:
01-Humboldt-36 Prior18-1918-1919-20
201.01523 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.1/1.6
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 39 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Eureka, from PMs 80.0 to 87.8. Upgrademetal beam guardrail.
2375
0C970$1,763
$118
Subtotal: $1,881
2018-19$510$300$48
$267
$1,125Total Project Cost: $3,006
011300009410/15/201810/1/20181/10/2017PA&ED:
RTL:R/W Cert:
6/20/2019Begin Con:
01-Humboldt-101 18-19PriorPrior18-19
201.01539 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
80.8/87.8
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Arcata, from Saint Louis RoadOvercrossing to 0.7 mile north of Giuntoli LaneOvercrossing. Install guardrail and upgrade endtreatments, place longitudinal drainage system,pave the median, reconstruct thrie-beam barrier,and construct a Class I bike path.
2460
0G580$5,561
$346
Subtotal: $5,907
2021-22$896
$1,066$104
$1,649
$3,715Total Project Cost: $9,622
01170000238/1/2021
7/15/20213/1/2020PA&ED:
RTL:R/W Cert:
3/13/2022Begin Con:
01-Humboldt-101 18-1919-2019-2021-22
201.01548 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
87.5/89.5
Con Sup:
Collision Severity Reduction
Const:R/W:
In Arcata, at Route 299. Realign ramp curve.
2397
0E650$3,220
$600
Subtotal: $3,820
2019-20$901$662$164$613
$2,340Total Project Cost: $6,160
01140001171/1/2020
12/1/20199/1/2018PA&ED:
RTL:R/W Cert:
5/1/2020Begin Con:
01-Humboldt-101 Prior18-1918-1919-20
201.01524 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
88.2/88.3
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Fortuna, from 0.5 mile south of Route36 to 0.4 mile south of Hookton Road. Removevegetated strips in median area to improve highway worker safety.
2461
0G610$7,297
$912
Subtotal: $8,209
2021-22$799$879$175
$1,256
$3,109Total Project Cost: $11,318
01170000272/1/2022
1/15/20223/1/2020PA&ED:
RTL:R/W Cert:
8/22/2022Begin Con:
01-Humboldt-101 18-1919-2019-2021-22
201.235172 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
57.1/67.8
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 40 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MANDATESNear Bridgeville, at 0.2 mile east of Golden GateDrive. Construct erosion control BMP measuresto achieve Statewide NPDES permit complianceunit (CU) credits that will stabilize the adjacentroadway slope erosion and reduce storm watersediment discharge to the impaired Van DuzenRiver.
2366
0C150$2,174
$152
Subtotal: $2,326
2021-22$726$873$334
$1,452
$3,385Total Project Cost: $5,711
011300001610/1/20219/1/20219/1/2020PA&ED:
RTL:R/W Cert:
4/1/2022Begin Con:
01-Humboldt-36 18-1920-2120-2121-22
201.3355.5 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
21.5
Con Sup:
Storm Water Mitigation
Const:R/W:
Near Phillipsville, at 0.7 mile south of MapleHills Road. Replace existing Fish Creek concretebox culvert with a bridge to eliminate fishpassage barrier and decrease sediment loads toachieve compliance unit (CU) credits towardsStatewide NPDES permit mandate goals. $5million in funds from AB 95 are designated forthis project.
2403
0E790$10,578
$34
Subtotal: $10,612
2021-22$1,742$1,863
$173$2,909
$6,687Total Project Cost: $17,299
01150000213/14/20222/14/20223/1/2021PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
01-Humboldt-254 18-1920-2120-2121-22
201.33579 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
4.2
Con Sup:
Storm Water Mitigation
Const:R/W:
Near Blue Lake, from north of Simpson Road tonorth of Chezem Road at various locations.Install erosion control Storm Water Mitigationmeasures at 3 locations.
2378
0E030$3,008
$19
Subtotal: $3,027
2019-20$425$880$89
$648
$2,042Total Project Cost: $5,069
01130000998/1/20197/1/20192/1/2018PA&ED:
RTL:R/W Cert:
1/1/2020Begin Con:
01-Humboldt-299 PriorPriorPrior19-20
201.33514.33 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R16.1/R16.4
Con Sup:
Storm Water Mitigation
Const:R/W:
In Eureka, from Wabash Avenue to CommercialStreet. Upgrade curb ramps, driveways, andsidewalk, and add Accessible Pedestrian Signal(APS) upgrades to make compliant with ADAstandards; also, install fiber optic communicationsconnection from traffic signals to the Caltransdistrict office.
2456
0G420$4,505
$180
Subtotal: $4,685
2021-22$1,089
$965$979
$1,079
$4,112Total Project Cost: $8,797
01160001869/1/2021
8/15/202112/1/2019PA&ED:
RTL:R/W Cert:
4/26/2022Begin Con:
01-Humboldt-101 18-1919-2019-2021-22
201.36127 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
77.3/78.1
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 41 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Eureka, from north of Herrick AvenueOvercrossing to south of the Eureka SloughBridge. Upgrade curb ramps, sidewalks, andsignal push-buttons to ADA standards.
2346
0B620$5,589
$695
Subtotal: $6,284
2019-20$462$921$644$660
$2,687Total Project Cost: $8,971
01120001563/1/2020
2/15/202011/1/2018PA&ED:
RTL:R/W Cert:
6/20/2020Begin Con:
01-Humboldt-101 Prior18-1918-1919-20
201.37850 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
75.3/77.6
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
BRIDGE PRESERVATIONNear Orick, at 0.2 mile south of Lost Man CreekBridge. Remove fish passage barrier.
2447
0F960$4,919$1,523
Subtotal: $6,442
2018-19$966$644$193
$1,933
$3,736Total Project Cost: $10,178
01160001093/15/20193/1/20193/1/2018PA&ED:
RTL:R/W Cert:
10/15/2019Begin Con:
01-Humboldt-101 PriorPriorPrior18-19
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
124.5
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Bridgeville, at Hely Creek Bridge No. 04-0092, Little Larabee Creek Bridge No. 04-0102(PM 25.3), and Butte Creek Bridge No. 04-0116.Upgrade bridge rails and widen at three bridges.
2363
0C500$14,689
$502
Subtotal: $15,191
2018-19$2,947$3,646
$268$4,325
$11,186Total Project Cost: $26,377
01120002925/1/2019
4/15/20199/1/2018PA&ED:
RTL:R/W Cert:
9/1/2019Begin Con:
01-Humboldt-36 Prior18-1918-1918-19
201.112905.5 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.4/34.5
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Weitchpec and Orleans, at Aikens CreekBridge No. 04-0059 (PM 28.07), Bluff CreekBridge No. 04-0063 (PM 28.27), Bluff CreekBridge No. 04-0225 (PM R28.91), and SlateCreek Bridge No. 04-0061 (PM 29.92); also, onRoute 169 at Rube Creek Bridge No. 04-0215(PM 27.57). Upgrade bridge rails at fivelocations and also strengthen for truck permit loadcapacity at two locations.
2449
0G140$10,486
$278
Subtotal: $10,764
2021-22$1,050$2,127
$110$2,242
$5,529Total Project Cost: $16,293
011600012912/15/202110/5/20214/1/2020PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
01-Humboldt-96 18-1919-2019-2021-22
201.1122508 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 42 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Eureka, at various locations from 0.2 milessouth of Eureka Slough Bridge to 0.2 miles northof Gannon Slough Bridge. Upgrade bridge rails and replace bridge.
2376
0E000$4,249
$196
Subtotal: $4,445
2018-19$1,480$1,514
$63$892
$3,949Total Project Cost: $8,394
01130000914/1/2019
3/15/20191/10/2017PA&ED:
RTL:R/W Cert:
11/21/2019Begin Con:
01-Humboldt-101 18-19PriorPrior18-19
201.112300 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
79.8/84.7
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In Humboldt County, on Routes 96 and 101 atvarious locations. Seismic retrofit 3 bridges.
2302
0A120$6,171$1,089
Subtotal: $7,260
2019-20$1,419$1,856
$171$1,948
$5,394Total Project Cost: $12,654
01130001092/15/20202/1/20202/1/2019PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
01-Humboldt-96 PriorPrior18-1919-20
201.1133 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Near Myers Flat, at South Fork Eel River BridgeNo. 04-0123. Seismic retrofit.
2301
0A110$6,078
$44
Subtotal: $6,122
2019-20$4,641$2,072
$215$1,855
$8,783Total Project Cost: $14,905
01120002111/1/20201/1/20209/1/2018PA&ED:
RTL:R/W Cert:
7/1/2020Begin Con:
01-Humboldt-101 Prior18-1918-1919-20
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
27.7
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In Eureka, at the Eureka Slough Bridge No. 04-0022L. Seismic retrofit.
2417
0F200$3,695$3,837
Subtotal: $7,532
2019-20$709
$1,574$75
$1,206
$3,564Total Project Cost: $11,096
01150000883/1/20202/1/20202/1/2019PA&ED:
RTL:R/W Cert:
10/3/2020Begin Con:
01-Humboldt-101 Prior18-1918-1919-20
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
79.5/80.2
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 43 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Bridgeville, at Van Duzen River Bridge No.04-0284 (PM 17.94) and Van Duzen River BridgeNo. 04-0293 (PM R23.91); also, on Route 211near Ferndale at Salt River Bridge No. 04-131(PM R75.15), in Lake County on Route 29 nearLakeport at Hill Road East Overcrossing No. 14-0039 (PM R43.75), and in Mendocino County onRoute 101 near Longvale at Long Valley CreekRest Area Bridge No. 10-0240Y (PM 61.82).Apply polyester concrete overlay or methacrylatetreatment to bridge decks.
2429
0F500$1,480
$3
Subtotal: $1,483
2021-22$268$757$42
$772
$1,839Total Project Cost: $3,322
01160000149/8/2021
7/20/20215/15/2020PA&ED:
RTL:R/W Cert:
4/11/2022Begin Con:
01-Humboldt-36 18-1919-2019-2021-22
201.1195 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
17.9/R23.9
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In Humboldt County, at South Fork Eel RiverBridge and Separation No. 04-0065, South ForkEel River Bridge No. 04-0076 (PM 35.5), andArcata Overhead No. 04-0079R. Strengthen threebridge structures.
2400
0E770$10,109$1,359
Subtotal: $11,468
2018-19$1,010$1,355
$65$2,102
$4,532Total Project Cost: $16,000
01150000091/1/20201/1/20201/1/2019PA&ED:
RTL:R/W Cert:
12/25/2020Begin Con:
01-Humboldt-101 Prior18-1918-1918-19
201.3223 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R17.9/87.8
Con Sup:
Trans Permit Requirements for Bridges
Const:R/W:
Near Arcata, from 1.5 miles east to 2.0 miles eastof Route 101 at the Route 200/299 Separation No.04-0184. Establish standard vertical clearance.2430
0F530$4,028
$31
Subtotal: $4,059
2019-20$564$857$26
$1,124
$2,571Total Project Cost: $6,630
01160000183/3/20202/4/20208/1/2019PA&ED:
RTL:R/W Cert:
8/4/2020Begin Con:
01-Humboldt-299 18-1919-2019-2019-20
201.3221 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R1.5/R2.0
Con Sup:
Trans Permit Requirements for Bridges
Const:R/W:
ROADWAY PRESERVATIONNear Redcrest, from Englewood ParkUndercrossing to Eel River Bridge and Overhead.Pavement rehabilitation.2422
0F360$14,515
$6
Subtotal: $14,521
2018-19$579$680$85
$1,518
$2,862Total Project Cost: $17,383
01150001152/1/20192/1/20194/1/2018PA&ED:
RTL:R/W Cert:
8/1/2019Begin Con:
01-Humboldt-101 PriorPriorPrior18-19
201.12136.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R39.2/R48.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 44 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Eureka, on 4th Street from Broadway toEureka Slough Bridge; also on 5th street from OStreet to Eureka Slough Bridge. Pavementrehabilitation.
2380
0E040$3,135
$21
Subtotal: $3,156
2018-19$107$167$104$725
$1,103Total Project Cost: $4,259
01130001003/15/20193/1/20195/1/2018PA&ED:
RTL:R/W Cert:
10/3/2019Begin Con:
01-Humboldt-101 Prior18-1918-1918-19
201.1217 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
78.0/79.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Trinidad, from 1.3 miles south of SchoolRoad to 0.4 mile north of Big Lagoon Bridge.Pavement rehabilitation.2439
0F820$45,355
$12
Subtotal: $45,367
2020-21$332$561$84
$4,287
$5,264Total Project Cost: $50,631
011600006711/15/202011/1/20208/1/2019PA&ED:
RTL:R/W Cert:
6/1/2021Begin Con:
01-Humboldt-101 Prior19-2019-2020-21
201.12177.7 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R90.1/109.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Eureka, from south of Fields LandingOverhead to north of Herrick Avenue Overcrossing. Roadway rehabilitation.2382
0C570$31,243
$366
Subtotal: $31,609
2019-20$646
$1,258$52
$6,696
$8,652Total Project Cost: $40,261
01130000092/1/2020
1/15/202010/15/2018PA&ED:
RTL:R/W Cert:
7/6/2020Begin Con:
01-Humboldt-101 Prior18-1918-1919-20
201.12221.1 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
69.9/75.2
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Near Garberville, from north of Redwood Driveto 1.3 miles south of Myers Flat; also, inMendocino County on Route 271 near Piercy,from 0.5 mile north of Confusion Hill to 0.5 milenorth of Route 101 Separation (PM 16.1 to 20.0).Rehabilitate or replace drainage culverts.
7002
48770$2,806
$403
Subtotal: $3,209
2020-21$878$866$309$909
$2,962Total Project Cost: $6,171
01140000713/1/20213/1/20213/1/2020PA&ED:
RTL:R/W Cert:
8/1/2021Begin Con:
01-Humboldt-101 Prior19-2019-2020-21
201.15119 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R11.8/26.7
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 45 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Miranda, from 2.3 miles south of MirandaPost Office to 0.9 mile south of Bear CreekBridge. Upgrade drainage systems.2270
40950$1,453
$305
Subtotal: $1,758
2018-19$513$838$151$403
$1,905Total Project Cost: $3,663
010000015812/1/201812/1/20189/29/2017PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
01-Humboldt-254 PriorPriorPrior18-19
201.1517 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.8/42.1
Con Sup:
Drainage System Restoration
Const:R/W:
Near Blue Lake and Willow Creek, from 0.1 mileeast of Route 200 to 0.5 mile east of Boise CreekCampground. Rehabilitate drainage culverts.2433
0F620$4,268
$920
Subtotal: $5,188
2021-22$904$958$77
$1,615
$3,554Total Project Cost: $8,742
01160000358/1/20218/1/20215/1/2020PA&ED:
RTL:R/W Cert:
2/1/2022Begin Con:
01-Humboldt-299 Prior20-2120-2121-22
201.15124 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R1.9/37.8
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYIn and near Eureka and Arcata, from south ofCole Avenue to north of Route 255. Operationalimprovements.2418
0F220$6,807
$240
Subtotal: $7,047
2018-19$414$667$114$830
$2,025Total Project Cost: $9,072
01150000922/15/20192/1/2019
1/10/2017PA&ED:
RTL:R/W Cert:
10/3/2019Begin Con:
01-Humboldt-101 PriorPriorPrior18-19
201.31023 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
79.9/86.1
Con Sup:
Operational Improvements
Const:R/W:
In Arcata, from north of Route 299/Route 101Connector to 0.2 mile south of Guintoli LaneOvercrossing. Construct auxiliary lane toimprove merging movements.
2424
0E890$4,098
$15
Subtotal: $4,113
2021-22$1,008$1,329
$90$1,546
$3,973Total Project Cost: $8,086
011500004311/1/202111/1/202110/1/2020PA&ED:
RTL:R/W Cert:
5/1/2022Begin Con:
01-Humboldt-101 18-1918-1920-2121-22
201.31036 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
88.3/88.6
Con Sup:
Operational Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 46 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
FACILITIESIn Eureka, at the District 1 Materials Laboratorylocated at the District Office complex (1726Albee Street). Replace District 1 Materials Lab(L5731) at alternative site to address health,safety, accessibility, and operational deficiencies.
2355
0C110$4,284$1,388
Subtotal: $5,672
2020-21$1,134$1,380
$567$1,702
$4,783Total Project Cost: $10,455
01120002299/4/20207/1/20204/1/2019PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
01-Humboldt-101 18-1918-1918-1920-21
201.3541 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Material Labs
Const:R/W:
CountyHumboldt
PA&ED:PS&E:
R/W Sup:Con Sup:
$19,347$266,799
R/W:
Subtotal: $286,146
Const:$36,679$41,112$7,102
$57,691
$142,584
Total (Capital + Support): $428,730
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 47 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Imperial($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn San Diego and Imperial Counties, at variouslocations, on Routes 7, 8, 78, 79, 86, 94, 98, 111,115, 186, and 188. Upgrade and install curvewarning signs.
1201
42500$1,712
$0
Subtotal: $1,712
2021-22$317$493
$0$462
$1,272Total Project Cost: $2,984
11160000951/13/202212/6/2021
11/16/2020PA&ED:
RTL:R/W Cert:
10/14/2022Begin Con:
11-Imperial-Var 19-2020-21
21-22
201.01535 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near El Centro, at various locations onRoutes 8 and 111. Pave slopes under structures.
1252
41200$2,070
$0
Subtotal: $2,070
2021-22$385$585
$0$571
$1,541Total Project Cost: $3,611
11120001587/30/20216/11/20218/7/2020PA&ED:
RTL:R/W Cert:
12/30/2021Begin Con:
11-Imperial-8 19-2020-21
21-22
201.23518 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R32.4/R46.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Calexico, from Ollie Avenue to RockwoodAvenue. Construct and upgrade pedestrian curbramps.1240
42780$2,141
$0
Subtotal: $2,141
2021-22$169$650
$0$661
$1,480Total Project Cost: $3,621
11170000219/3/2021
8/13/20219/23/2019PA&ED:
RTL:R/W Cert:
1/10/2022Begin Con:
11-Imperial-98 18-1919-20
21-22
201.36122 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
32.1/32.5
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
ROADWAY PRESERVATIONIn Imperial County, from west of Midway WellRoad to east of Mitchell Camp Road at variouslocations. Culvert replacement.1283
42050$687
Subtotal: $687
2019-20$177$409
$201
$787Total Project Cost: $1,474
11150000528/26/20197/18/20198/23/2018PA&ED:
RTL:R/W Cert:
4/27/2020Begin Con:
11-Imperial-78 Prior18-19
19-20
201.1516 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
62.3/73.8
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 48 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Imperial($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Imperial County, from north of Alamo RiverBridge to north of Gonder Road. Culvertreplacement.0602
42060$417
Subtotal: $417
2019-20$165$371
$190
$726Total Project Cost: $1,143
11150000537/8/20196/4/20197/5/2018PA&ED:
RTL:R/W Cert:
3/6/2020Begin Con:
11-Imperial-115 Prior18-19
19-20
201.1514 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
L10.4/19.8
Con Sup:
Drainage System Restoration
Const:R/W:
CountyImperial
PA&ED:PS&E:
R/W Sup:Con Sup:
$0$7,027
R/W:
Subtotal: $7,027
Const:$1,213$2,508
$0$2,085
$5,806
Total (Capital + Support): $12,833
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 49 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Inyo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn and near Bishop, from west of Meadow Laneto east of Pioneer Lane. Construct a two-way leftturn lane.2617
36370$1,238
$0
Subtotal: $1,238
2019-20$236$545
$8$677
$1,466Total Project Cost: $2,704
091400003011/14/20198/19/2019
10/31/2018PA&ED:
RTL:R/W Cert:
5/20/2020Begin Con:
09-Inyo-168 18-1919-2018-1919-20
201.01510 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
16.0/17.7
Con Sup:
Collision Severity Reduction
Const:R/W:
ROADWAY PRESERVATIONNear Shoshone, from east of Route 127 toChicago Valley Road. Replace and installculverts.0653
36340$2,210
$800
Subtotal: $3,010
2019-20$405$620$150$405
$1,580Total Project Cost: $4,590
09150000023/20/20203/1/20207/1/2018PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
09-Inyo-178 PriorPriorPrior19-20
201.1513 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
43.4/44.2
Con Sup:
Drainage System Restoration
Const:R/W:
ROADSIDE PRESERVATIONNear Cartago, 3.0 miles north of Route 190Junction. Protect, enhance, preserve, and restorewetland and riparian habitat at Cartago WildlifeArea. This work will also serve as advancemitigation credit purchases for future SHOPPconstruction projects.
0661
36490$1,840
$31
Subtotal: $1,871
2021-22$890$380$100$460
$1,830Total Project Cost: $3,701
091500001811/1/202111/1/20215/1/2020PA&ED:
RTL:R/W Cert:
7/1/2022Begin Con:
09-Inyo-395 18-1919-2019-2021-22
201.24016 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
37.6
Con Sup:
Roadside Enhancement
Const:R/W:
CountyInyo
PA&ED:PS&E:
R/W Sup:Con Sup:
$831$5,288
R/W:
Subtotal: $6,119
Const:$1,531$1,545
$258$1,542
$4,876
Total (Capital + Support): $10,995
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 50 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kern($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn and near Wasco, from 0.7 mile west of BrownMaterial Road to Scofield Avenue. Install centerline and shoulder rumble strips.6865
0W410$1,309
$5
Subtotal: $1,314
2018-19$375$525
$5$390
$1,295Total Project Cost: $2,609
06170002143/22/20192/2/20197/2/2018PA&ED:
RTL:R/W Cert:
9/26/2019Begin Con:
06-Kern-46 Prior18-1918-1918-19
201.01017 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
26.8/47.0
Con Sup:
Safety Improvements
Const:R/W:
Near Lamont, from 0.1 mile south to 0.1 milenorth of Sunset Boulevard. Construct roundaboutat intersection of Route 184/Sunset Boulevard.6791
0V280$3,600
$950
Subtotal: $4,550
2019-20$1,100$1,300
$530$970
$3,900Total Project Cost: $8,450
06160001243/16/20203/2/20208/1/2018PA&ED:
RTL:R/W Cert:
8/1/2020Begin Con:
06-Kern-184 Prior18-1918-1919-20
201.01016 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
L0.9/L1.1
Con Sup:
Safety Improvements
Const:R/W:
In and near Arvin, at Derby Street. Install trafficsignals.
6709
0S510$1,396
$74
Subtotal: $1,470
2018-19$348$775$345$530
$1,998Total Project Cost: $3,468
06140001629/1/2018
8/15/20188/10/2015PA&ED:
RTL:R/W Cert:
3/1/2019Begin Con:
06-Kern-223 PriorPriorPrior18-19
201.0106 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.0/21.3
Con Sup:
Safety Improvements
Const:R/W:
In Kern, Mono, Inyo, and San BernardinoCounties on Routes 14, 89, 108, 120, 127, 168,178, 182, 190, 202, and 395 at various locations.Upgrade guardrails, end treatments, and bridgetransition railings to current standards.
2631
36770$2,831
$1
Subtotal: $2,832
2020-21$240$570$10
$910
$1,730Total Project Cost: $4,562
091700000110/16/2020
5/1/202011/1/2019PA&ED:
RTL:R/W Cert:
5/15/2021Begin Con:
09-Kern-178 18-1919-2019-2020-21
201.01527 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 51 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kern($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Tehachapi, from 0.2 mile west to 0.2 mileeast of Cummings Valley Road East. Construct aleft turn lane from southbound Route 202 toCummings Valley Road East.
2620
36720$1,260
$933
Subtotal: $2,193
2021-22$311$970$620$950
$2,851Total Project Cost: $5,044
09160000168/15/20217/15/20214/1/2019PA&ED:
RTL:R/W Cert:
2/23/2022Begin Con:
09-Kern-202 18-1918-1918-1921-22
201.01539 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R4.7/R5.1
Con Sup:
Collision Severity Reduction
Const:R/W:
In Bakersfield, from M Street to east of FairfaxRoad at various locations. Roadside safetyimprovements.3729
0E320$2,644
Subtotal: $2,644
2018-19$220$587$10
$808
$1,625Total Project Cost: $4,269
06130000379/3/20188/1/20182/7/2017PA&ED:
RTL:R/W Cert:
2/4/2019Begin Con:
06-Kern-178 PriorPriorPrior18-19
201.23561 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.7/6.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Bakersfield, from 0.2 mile west of H StreetOvercrossing to 0.2 mile east of Cottonwood Road Undercrossing. Upgrade curb ramps tomeet current ADA standards.
6757
0T000$3,226
$100
Subtotal: $3,326
2020-21$407
$1,064$865$775
$3,111Total Project Cost: $6,437
06150000031/4/2021
12/2/20201/2/2019PA&ED:
RTL:R/W Cert:
7/1/2021Begin Con:
06-Kern-58 18-1918-1918-1920-21
201.36125 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R53.2/R55.6
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Bakersfield, from Route 204/58 Separation toL street; also, on Route 58 (PM R54.2/R54.6).Upgrade curb ramps and Accessible PedestrianSignals (APS) to meet current ADA standards.
6871
0W150$2,845
$337
Subtotal: $3,182
2021-22$1,105$1,600$1,486$1,292
$5,483Total Project Cost: $8,665
06170000968/2/2021
7/15/20218/1/2019PA&ED:
RTL:R/W Cert:
1/20/2022Begin Con:
06-Kern-204 18-1919-2019-2021-22
201.36191 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.0/4.6
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 52 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kern($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Mettler, at California Aqueduct Bridge No.50-0323. Bridge rehabilitation.
6726
0S050$7,300
$130
Subtotal: $7,430
2018-19$1,045$1,650
$100$2,100
$4,895Total Project Cost: $12,325
06150000474/1/2020
3/15/20207/15/2018PA&ED:
RTL:R/W Cert:
12/15/2020Begin Con:
06-Kern-166 Prior18-1918-1918-19
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
17.3/17.7
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near the Grapevine, at the California AqueductNo. 50-0321L/R. Improve to standard loadcapacity.
ACCELERATED BRIDGE (PA&ED Only)
6877
0W460$4,100
$10
Subtotal: $4,110
2018-19$1,910
$430$10
$1,000
$3,350Total Project Cost: $7,460
06170002258/1/20187/2/20184/2/2018PA&ED:
RTL:R/W Cert:
12/14/2018Begin Con:
06-Kern-5 18-1918-1918-1918-19
201.3222 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
12.5
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
Near the Grapevine, at the Route 5/99 SeparationNo. 50-0240R. Lower roadway profile to obtainstandard vertical clearance.
ACCELERATED BRIDGE (PA&ED Only)
6876
0W430$4,500
$10
Subtotal: $4,510
2018-19$1,600
$470$10
$1,200
$3,280Total Project Cost: $7,790
06170002228/1/20187/2/20184/2/2018PA&ED:
RTL:R/W Cert:
12/14/2018Begin Con:
06-Kern-5 18-1918-1918-1918-19
201.3221 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
R15.8
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
In Bakersfield, at Panama Lane Overcrossing andWhite Lane Overcrossing. Lower highwayprofile below overcrossings to accommodateclearance requirement for permit vehicles.
6681
0Q920$8,173
$30
Subtotal: $8,203
2019-20$700
$1,200$20
$1,100
$3,020Total Project Cost: $11,223
06140000103/2/20201/1/20203/1/2018PA&ED:
RTL:R/W Cert:
8/1/2020Begin Con:
06-Kern-99 PriorPriorPrior19-20
201.3222 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
19.5/21.1
Con Sup:
Trans Permit Requirements for Bridges
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 53 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kern($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONNear Bakersfield, from south of Hickory Lane to north of Brundage Lane. Upgrade ADA curbramps, install bike lanes, cold plane pavement,place Hot Mix Asphalt (HMA) and RubberizedHot Mix Asphalt concrete (RHMA).
6803
0U290$17,700$2,230
Subtotal: $19,930
2021-22$2,425$3,175$2,630$3,750
$11,980Total Project Cost: $31,910
06160000018/16/20218/1/2021
10/1/2019PA&ED:
RTL:R/W Cert:
2/1/2022Begin Con:
06-Kern-184 Prior19-2019-2021-22
201.12018.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.8/8.2
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In and near Bakersfield, from 0.2 mile south ofEdison Highway to Route 178. Upgrade ADAcurbs and barrier railing, widen shoulders, coldplane pavement, place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt concrete(RHMA) to rehabilitate roadway.
6798
0U430$7,600
$350
Subtotal: $7,950
2020-21$1,020$1,520
$50$1,600
$4,190Total Project Cost: $12,140
061600003310/2/20209/9/20201/2/2019PA&ED:
RTL:R/W Cert:
4/11/2021Begin Con:
06-Kern-184 Prior18-1918-1920-21
201.12011 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.1/12.1
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
Near Bakersfield, from Route 119 to south ofNoriega Road; also on Route 119 from Enos Laneto Route 5 (PM 18.1/19.8). Pavementrehabilitation.
6755
0U100$12,700
$23
Subtotal: $12,723
2019-20$450$435$81
$650
$1,616Total Project Cost: $14,339
06150002114/1/20203/2/20208/1/2018PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
06-Kern-43 Prior18-1918-1919-20
201.12122.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.1/9.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Wasco, from Magnolia Avenue toRoute 43 South. Upgrade ADA curb ramps, coldplane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete(RHMA).
6810
0U480$4,600
$90
Subtotal: $4,690
2019-20$710$950$360$900
$2,920Total Project Cost: $7,610
06150002995/1/20204/3/2020
7/19/2018PA&ED:
RTL:R/W Cert:
10/29/2020Begin Con:
06-Kern-46 Prior18-1918-1919-20
201.1216.3 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
49.0/50.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 54 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kern($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Bakersfield, from Route 43 to 0.1mile west of Allen Road. Pavementrehabilitation.6756
0U110$8,500
$350
Subtotal: $8,850
2021-22$1,400$1,200
$250$1,900
$4,750Total Project Cost: $13,600
06150002123/1/20221/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
06-Kern-58 18-1920-2121-2221-22
201.12112.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
39.9/46.0
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Bakersfield, from F Street to Route 99. Coldplane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete(RHMA).
6889
0U490$3,290
$10
Subtotal: $3,300
2019-20$450$740$65
$550
$1,805Total Project Cost: $5,105
061600000212/10/201911/15/20198/13/2018PA&ED:
RTL:R/W Cert:
6/15/2020Begin Con:
06-Kern-204 Prior18-1918-1919-20
201.1214.7 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.1/6.7
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Kettleman City, from 0.34 mile south ofTwisselman Road Overcrossing to Kings Countyline. Cold plane pavement, repair concretepavement panels, place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt concrete(RHMA) to rehabilitate roadway.
6820
0U470$21,500
$65
Subtotal: $21,565
2019-20$440
$1,200$25
$1,900
$3,565Total Project Cost: $25,130
061500030110/4/20199/6/20198/3/2018PA&ED:
RTL:R/W Cert:
4/12/2020Begin Con:
06-Kern-5 Prior18-1918-1919-20
201.12221 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
82.0/87.0
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In Rosamond and Mojave, from 0.5 mile south ofDawn Road Overcrossing (OC) to 0.5 mile northof Silver Queen Road OC. Rehabilitate lanes andramps by replacing slabs and grinding lane 1,construct Continuously Reinforced Concrete Pavement (CRCP) lane 2, cold plane and overlayramps with Rubberized Hot Mix Asphalt(RHMA-G). Replace guardrail, construct rumblestrip, replace signs using retroreflective sheeting,and refresh pavement delineation.
2633
36740$40,515
$22
Subtotal: $40,537
2019-20$370
$1,460$190
$3,010
$5,030Total Project Cost: $45,567
09160000251/23/20201/3/20207/2/2018PA&ED:
RTL:R/W Cert:
10/15/2020Begin Con:
09-Kern-14 Prior18-1918-1919-20
201.12227.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R5.7/R12.6
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 55 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kern($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Bakersfield, from Route 5 to PanamaLane. Roadway rehabilitation.
6731
0T200$31,500
$120
Subtotal: $31,620
2018-19$1,160$1,600
$100$3,600
$6,460Total Project Cost: $38,080
06150000355/1/2018
1/15/20189/22/2017PA&ED:
RTL:R/W Cert:
1/15/2019Begin Con:
06-Kern-99 PriorPriorPrior18-19
201.12258.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/19.5
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In Kern and Kings Counties, on Route 99, 198and 204 at various locations. Upgrade existingpumps and control systems at 11 pumping plants.6796
0U240$5,080
$122
Subtotal: $5,202
2019-20$650
$2,190$610
$2,150
$5,600Total Project Cost: $10,802
061500029411/20/201911/8/20197/13/2018PA&ED:
RTL:R/W Cert:
5/11/2020Begin Con:
06-Kern-Var Prior18-1918-1919-20
201.15111 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Drainage System Restoration
Const:R/W:
Near Lebec, from north Lebec Road to south ofGrapevine Road. Rehabilitate drainage systems.
6749
0Q820$5,100
$150
Subtotal: $5,250
2018-19$375$670$100$690
$1,835Total Project Cost: $7,085
06130002433/30/20192/1/20194/1/2018PA&ED:
RTL:R/W Cert:
11/1/2019Begin Con:
06-Kern-5 PriorPriorPrior18-19
201.1515 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.6/8.8
Con Sup:
Drainage System Restoration
Const:R/W:
In Kern County, from 2.4 miles north of FortTejon Overcrossing to 1.2 miles south of Grapevine Undercrossing at four locations.Repair reinforced concrete box culverts.
6884
0W160$8,162
$132
Subtotal: $8,294
2019-20$955
$2,173$29
$2,763
$5,920Total Project Cost: $14,214
06170000973/1/20202/1/20203/1/2019PA&ED:
RTL:R/W Cert:
9/16/2020Begin Con:
06-Kern-5 Prior18-1918-1919-20
201.1514 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R7.5/R9.0
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 56 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kern($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MOBILITYIn Bakersfield from 0.3 mile south of BelleTerrace Overcrossing to 0.1 mile north of Route58; also on Route 58 from Route 99 to 0.2 mileeast of Route 99 (PM R52.3 to R52.5). Constructan auxilary lane, reconstruct an Overcrossing, andrealign connector ramp.
6891
48464$30,960
Subtotal: $30,960
2018-19 $300
$4,500
$4,800Total Project Cost: $35,760
06180000197/1/20188/1/2017
12/5/2015PA&ED:
RTL:R/W Cert:
8/1/2018Begin Con:
06-Kern-9918-19
18-19
201.310648 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
22.8/23.6
Con Sup:
Operational Improvements
Const:R/W:
ROADSIDE PRESERVATIONIn Bakersfield, from Planz Road to north ofCalifornia Avenue. Upgrade irrigation system toimprove water efficiency.6735
0T280$1,156
$1
Subtotal: $1,157
2018-19$41
$200$3
$180
$424Total Project Cost: $1,581
06150000522/7/2019
12/1/20186/22/2017PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
06-Kern-99 PriorPriorPrior18-19
201.21012.36 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.6/24.7
Con Sup:
Highway Planting Restoration
Const:R/W:
FACILITIESIn Tehachapi, at the Tehachapi MaintenanceStation near Routes 58 and 202 at 320 WestTehachapi Boulevard. Construct a new Tehachapi Maintenance Station at existing oralternative site to replace the old, undersizedfacility that is in constant need of repairs.
2634
36750$8,867$1,001
Subtotal: $9,868
2021-22$930
$2,630$432
$2,778
$6,770Total Project Cost: $16,638
09160000326/24/20226/23/20226/4/2020PA&ED:
RTL:R/W Cert:
1/4/2023Begin Con:
09-Kern- 18-1921-2220-2121-22
201.3521 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Maintenance Facilities
Const:R/W:
CountyKern
PA&ED:PS&E:
R/W Sup:Con Sup:
$7,246$250,414
R/W:
Subtotal: $257,660
Const:$20,737$31,584$8,936
$42,946
$104,203
Total (Capital + Support): $361,863
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 57 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kings($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONIn Kings and Tulare Counties, on Routes 63,99,137, 198 and 216. Repair and replace stolenand damaged electrical systems and protectelectrical and irrigation facilities. The work isrequired to restore incident management,emergency readiness, mobility, functionality, andoperation efficiency.
6797
0U300$15,000
$60
Subtotal: $15,060
2019-20$640
$1,880$1,000$1,850
$5,370Total Project Cost: $20,430
061600002710/1/20199/5/2019
11/1/2017PA&ED:
RTL:R/W Cert:
4/8/2020Begin Con:
06-Kings-Var PriorPriorPrior19-20
201.131296 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONIn and near Lemoore and Hanford, from Route 41to 10th Avenue Undercrossing. Pave areas beyond gore and bridge slopes.6737
0T290$4,700
$13
Subtotal: $4,713
2018-19$350$950$40
$600
$1,940Total Project Cost: $6,653
06150000537/3/20187/2/2018
1/24/2017PA&ED:
RTL:R/W Cert:
2/4/2019Begin Con:
06-Kings-198 PriorPriorPrior18-19
201.23547 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.3/R19.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Near Hanford, from 0.4 mile east of 10th AvenueOvercrossing to 1.5 miles east of Route 43/198Separation. Upgrade gore areas, construct MVPsand slope paving at bridges.
6799
0U790$3,790
$3
Subtotal: $3,793
2020-21$510$770$35
$540
$1,855Total Project Cost: $5,648
06160000378/24/20207/1/2020
10/1/2019PA&ED:
RTL:R/W Cert:
2/15/2021Begin Con:
06-Kings-198 18-1919-2019-2020-21
201.23515 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R19.4/22.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
BRIDGE PRESERVATIONIn and near Stratford, from 22nd Street to LaurelAvenue at the Kings River Bridge No. 45-0007.Replace 73 year old bridge due to extensivesuperstructure and substructure distress andsusceptibility to liquefaction.
6873
0V110$21,400
$94
Subtotal: $21,494
2021-22$2,300$2,700
$400$6,400
$11,800Total Project Cost: $33,294
061600020810/1/20219/1/20214/2/2020PA&ED:
RTL:R/W Cert:
5/11/2022Begin Con:
06-Kings-41 Prior19-2019-2021-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
30.6/33.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 58 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Kings($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADSIDE PRESERVATIONIn and near Hanford, from 0.3 mile west of 12thAvenue to 0.5 mile east of Route 43/198Separation. Electrical upgrade of booster pumps,replace irrigation mainline, valves and valvewiring.
6815
0V820$1,550
$7
Subtotal: $1,557
2020-21$270$590$22
$520
$1,402Total Project Cost: $2,959
06170000108/7/20207/3/20207/5/2019PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
06-Kings-198 18-1919-2019-2020-21
201.21017.9 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R16.6/R21.5
Con Sup:
Highway Planting Restoration
Const:R/W:
CountyKings
PA&ED:PS&E:
R/W Sup:Con Sup:
$177$46,440
R/W:
Subtotal: $46,617
Const:$4,070$6,890$1,497$9,910
$22,367
Total (Capital + Support): $68,984
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 59 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Lake($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Upper Lake, from 0.4 mile west to 0.2 mileeast of Witter Springs Road. Curve improvement,shoulder widening, and add left-turn pocket andrumble strips.
4647
0G330$7,441
$234
Subtotal: $7,675
2019-20$1,463$1,877
$144$1,870
$5,354Total Project Cost: $13,029
01160001704/15/20204/1/20204/8/2019PA&ED:
RTL:R/W Cert:
12/3/2020Begin Con:
01-Lake-20 Prior18-1918-1919-20
201.01014 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.1/5.7
Con Sup:
Safety Improvements
Const:R/W:
Near Lower Lake, at various locations. Widenfor truck climbing lanes and shoulders.
3203
0E730$5,646
$459
Subtotal: $6,105
2019-20$1,355$1,216
$62$2,039
$4,672Total Project Cost: $10,777
011500000410/15/20199/26/201910/1/2018PA&ED:
RTL:R/W Cert:
2/5/2020Begin Con:
01-Lake-29 Prior18-1918-1919-20
201.01045 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Safety Improvements
Const:R/W:
Near Lower Lake, from north of Spruce GroveRoad to south of Hofacker Lane. Widenshoulders.3102
0E720$8,813
$502
Subtotal: $9,315
2019-20$1,280$1,119
$88$2,464
$4,951Total Project Cost: $14,266
011500000310/15/201910/1/201910/1/2018PA&ED:
RTL:R/W Cert:
4/15/2020Begin Con:
01-Lake-29 Prior18-1918-1919-20
201.01018 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
12.8/14.4
Con Sup:
Safety Improvements
Const:R/W:
Near Kelseyville, from north of Route 29/281Junction to north of Route 29/175 Junction.Improve road condition.3099
29811$38,578$9,777
Subtotal: $48,355
2018-19$4,000$4,638$1,920$7,137
$17,695Total Project Cost: $66,050
01140000431/15/2019
12/15/201811/30/2016PA&ED:
RTL:R/W Cert:
8/3/2019Begin Con:
01-Lake-29 PriorPriorPrior18-19
201.01083 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.5/31.6
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 60 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Lake($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Lake and Mendocino Counties, on variousroutes at various locations. Upgrade guardrail,end treatments, and transition railings to currentstandards and install vegetation control measures.
7018
0E850$3,800
$12
Subtotal: $3,812
2018-19$742$812$81
$1,266
$2,901Total Project Cost: $6,713
01150000373/1/2019
2/15/20197/13/2018PA&ED:
RTL:R/W Cert:
9/2/2019Begin Con:
01-Lake-1 Prior18-1918-1918-19
201.015246 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
BRIDGE PRESERVATIONNear Upper Lake, at Bachelor Creek Bridge No.14-0001. Replace multi-plate steel culvert bridgewith precast concrete box culverts and wingwalls.3107
0F490$3,330
$21
Subtotal: $3,351
2020-21$577$708$14
$595
$1,894Total Project Cost: $5,245
01160000137/15/20206/24/2019
12/26/2018PA&ED:
RTL:R/W Cert:
12/17/2020Begin Con:
01-Lake-20 Prior18-1918-1920-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.8
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Lake County, on Routes 20, 29 and 175 atvarious locations. Replace and upgrade bridgerails on 5 bridges. 3098
0E080$5,621
$263
Subtotal: $5,884
2019-20$943
$1,136$324
$1,601
$4,004Total Project Cost: $9,888
01130001228/15/20197/1/20191/1/2019PA&ED:
RTL:R/W Cert:
1/1/2020Begin Con:
01-Lake-20 Prior18-1918-1919-20
201.112853 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
MOBILITYIn Lake and Mendocino Counties, on Routes 20,29, 101, 175, and 281 at various locations.Upgrade the existing Transportation ManagementSystem (TMS) elements to improve trafficmonitoring and data transmission.
7017
0E830$2,087
$30
Subtotal: $2,117
2020-21$587$852$50
$1,021
$2,510Total Project Cost: $4,627
01150000348/1/2020
6/25/20207/1/2019PA&ED:
RTL:R/W Cert:
12/17/2020Begin Con:
01-Lake-29 Prior19-2019-2020-21
201.31521 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 61 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Lake($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Lake County, on Routes 20, 29, 53, and 175 atvarious locations. Upgrade the existingTransportation Management System (TMS)elements to improve traffic monitoring and datatransmission.
3104
0E820$2,123
$39
Subtotal: $2,162
2020-21$618$844$186
$1,073
$2,721Total Project Cost: $4,883
01150000338/1/2020
6/25/20207/1/2019PA&ED:
RTL:R/W Cert:
12/17/2020Begin Con:
01-Lake-53 Prior19-2019-2020-21
201.31530 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
MISCELLANEOUSNear Clearlake Oaks, at the Clearlake OaksMaintenance Station. Transportationinfrastructure improvement for zero-emissionvehicle charging.
3112
0G700$361
$6
Subtotal: $367
2018-19$230$150$32
$133
$545Total Project Cost: $912
01170000511/15/2019
12/24/20186/17/2018PA&ED:
RTL:R/W Cert:
5/15/2019Begin Con:
01-Lake-20 Prior18-1918-1918-19
201.9991 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.4
Con Sup:
Miscellaneous
Const:R/W:
CountyLake
PA&ED:PS&E:
R/W Sup:Con Sup:
$11,343$77,800
R/W:
Subtotal: $89,143
Const:$11,795$13,352$2,901
$19,199
$47,247
Total (Capital + Support): $136,390
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 62 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Lassen($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Susanville, from 0.3 mile west to 0.4 mileeast of Big Springs Road. Curve improvement.
3609
1H440$2,896
$104
Subtotal: $3,000
2018-19$484$645$187$859
$2,175Total Project Cost: $5,175
02160000057/5/2018
6/15/20188/1/2017PA&ED:
RTL:R/W Cert:
10/23/2018Begin Con:
02-Lassen-44 PriorPriorPrior18-19
201.01016 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
31.9/32.6
Con Sup:
Safety Improvements
Const:R/W:
BRIDGE PRESERVATIONNear Westwood, at Goodrich Creek Bridge No.07-0048. Replace bridge.
3512
4F560$3,611
$45
Subtotal: $3,656
2019-20$1,500$1,280
$60$1,419
$4,259Total Project Cost: $7,915
02130000068/14/20198/1/20195/1/2018PA&ED:
RTL:R/W Cert:
1/24/2020Begin Con:
02-Lassen-36 PriorPriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.2/7.4
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
ROADWAY PRESERVATIONNear Westwood, from 1.2 miles west of GoodrichCreek Bridge to 1.3 miles west of Willard CreekRoad. Rehabilitate roadway. 3468
4E460$22,789$1,302
Subtotal: $24,091
2019-20$1,650$1,600
$340$2,173
$5,763Total Project Cost: $29,854
02000202878/14/20198/1/20195/1/2018PA&ED:
RTL:R/W Cert:
1/24/2020Begin Con:
02-Lassen-36 PriorPriorPrior19-20
201.12020.9 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.1/14.3
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
Near Adin, from west of Boyd Hill Lookout Roadto Butte Creek Bridge; also in Modoc Countyfrom Ash Creek Bridge to east of County Road 87(PM 0.0/0.5 and PM 1.0/1.8). Roadway rehabilitation.
3467
4E450$14,317
$281
Subtotal: $14,598
2019-20$1,540$1,330
$280$2,150
$5,300Total Project Cost: $19,898
02000202862/21/20201/17/20201/17/2019PA&ED:
RTL:R/W Cert:
8/25/2020Begin Con:
02-Lassen-299 Prior18-1918-1919-20
201.12016.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.5/25.6
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 63 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Lassen($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
FACILITIESNear Adin, at the Adin Maintenance Station(L5701). Construct new facility.
3600
1H110$12,850
$20
Subtotal: $12,870
2018-19$260
$2,650$40
$3,200
$6,150Total Project Cost: $19,020
02150001063/15/20197/13/20189/29/2017PA&ED:
RTL:R/W Cert:
10/15/2019Begin Con:
02-Lassen-299 PriorPriorPrior18-19
201.3521 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
25.6
Con Sup:
Maintenance Facilities
Const:R/W:
CountyLassen
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,752$56,463
R/W:
Subtotal: $58,215
Const:$5,434$7,505
$907$9,801
$23,647
Total (Capital + Support): $81,862
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 64 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONIn Malibu, south of Big Rock Drive. Shorelineembankment restoration by installing Rock SlopeProtection (RSP) armament.5059
4X970$3,300$4,900
Subtotal: $8,200
2021-22$1,600$2,400
$950$2,750
$7,700Total Project Cost: $15,900
071600033512/13/202111/5/20219/5/2019PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
07-Los Angeles-1 Prior19-2019-2021-22
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
42.5
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONIn the city of Los Angeles, at the westboundRoute 10 Connector to southbound Route 5.Apply High Friction Surface Treatment (HFST)and upgrade lighting.
5153
33270$2,600
$10
Subtotal: $2,610
2018-19$215
$1,152$15
$1,095
$2,477Total Project Cost: $5,087
07160002903/29/20192/19/20192/27/2018PA&ED:
RTL:R/W Cert:
3/2/2020Begin Con:
07-Los Angeles-5 PriorPriorPrior18-19
201.01062 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.3
Con Sup:
Safety Improvements
Const:R/W:
Near Culver City, from Arlington Avenue toBroadway Street. Replace raised islands onmainline and collector-distributor roads withconcrete barrier (Type 60) and install new lightsfrom Arlington Avenue to Hoover Street (PMR12.3/14.2). Also install high mast LED lightingat Route 10/110 Interchange.
5152
33260$18,394
$63
Subtotal: $18,457
2019-20$1,391$3,888
$276$3,544
$9,099Total Project Cost: $27,556
07160002873/18/20202/4/20209/4/2018PA&ED:
RTL:R/W Cert:
5/19/2021Begin Con:
07-Los Angeles-10 18-1918-1918-1919-20
201.010404 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R12.3/R15.5
Con Sup:
Safety Improvements
Const:R/W:
In the city of Los Angeles, at the northboundRoute 110 Connector to eastbound Route 91.Apply High Friction Bauxite Surface Treatment(HFBST), install high visibility thermoplasticlane and edge lines and upgrade guardrail tocurrent standards.
5084
33160$1,585
$10
Subtotal: $1,595
2018-19$304$558$13
$756
$1,631Total Project Cost: $3,226
07160002339/20/20187/13/2018
12/20/2017PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
07-Los Angeles-110 PriorPriorPrior18-19
201.01030 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.7
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 65 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of Los Angeles and South Pasadena,between Figueroa Street and Orange Grove Avenue. Convert outside lane to a dynamiclane/shoulder that can switch between the twodepending on prevailing traffic conditions. Thiswill require Dynamic Message Signs (DMS)monitored by the TMC.
5083
33150$25,284$4,982
Subtotal: $30,266
2019-20$2,835$3,735$1,318$5,390
$13,278Total Project Cost: $43,544
07160002316/1/2020
5/15/202012/18/2018PA&ED:
RTL:R/W Cert:
2/26/2021Begin Con:
07-Los Angeles-110 Prior18-1918-1919-20
201.010504 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
25.8/30.6
Con Sup:
Safety Improvements
Const:R/W:
In Highland Park and South Pasadena, from southof Avenue 60 to north of Avenue of 64. PlaceHigh Friction Surface Treatment (HFST). 5037
32660$2,059
$11
Subtotal: $2,070
2018-19$600
$1,265$15
$885
$2,765Total Project Cost: $4,835
071600011710/1/20188/17/20181/22/2018PA&ED:
RTL:R/W Cert:
8/1/2019Begin Con:
07-Los Angeles-110 PriorPriorPrior18-19
201.010436 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.7/29.4
Con Sup:
Safety Improvements
Const:R/W:
In Palmdale, at the intersection of Avenue R-8.Upgrade traffic signal system, curb ramps andinstall drainage inlets.5155
33290$888$141
Subtotal: $1,029
2019-20$329$988$140$711
$2,168Total Project Cost: $3,197
07160002978/2/2019
6/19/20198/10/2018PA&ED:
RTL:R/W Cert:
3/11/2020Begin Con:
07-Los Angeles-138 Prior18-1918-1919-20
201.01017 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
49.5
Con Sup:
Safety Improvements
Const:R/W:
In Irwindale, at the Route 605 northbound rampto westbound Live Oak Avenue. Realign andwiden ramp, construct retaining wall, installconcrete barrier and replace guardrail.
4963
31880$3,520$1,077
Subtotal: $4,597
2019-20 $1,232$276
$1,340
$2,848Total Project Cost: $7,445
07160000014/8/2020
2/18/20206/29/2016PA&ED:
RTL:R/W Cert:
7/7/2020Begin Con:
07-Los Angeles-605PriorPrior19-20
201.010203 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
23.4/23.6
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 66 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Los Angeles and Ventura Counties, on variousroutes and locations. Upgrade and install newcurve warning signs.4969
31930$2,090
$10
Subtotal: $2,100
2020-21$594
$1,571$12
$878
$3,055Total Project Cost: $5,155
071600002210/1/20209/1/2020
7/15/2019PA&ED:
RTL:R/W Cert:
7/30/2021Begin Con:
07-Los Angeles-Var 18-1919-2019-2020-21
201.01520 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In Long Beach, at Lakewood Boulevard (Route19) and Los Alamitos Traffic Circle. Installpavement delineation, overhead guide signs andassociated roadway improvements.
4632
29910$2,326
$11
Subtotal: $2,337
2018-19$478
$1,028$20
$607
$2,133Total Project Cost: $4,470
07130003023/29/20192/28/20197/10/2018PA&ED:
RTL:R/W Cert:
12/18/2019Begin Con:
07-Los Angeles-1 Prior18-1918-1918-19
201.01559 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.5
Con Sup:
Collision Severity Reduction
Const:R/W:
In Los Angeles County, in Angeles NationalForest, from 0.3 mile east of Bay Tree Road to0.7 mile west of Big Pines Highway at variouslocations. Upgrade existing guardrail and installnew guardrail, and install stormwater TreatmentBMPs.
5151
33250$16,507
$28
Subtotal: $16,535
2020-21$1,020$2,670
$20$2,600
$6,310Total Project Cost: $22,845
07160002703/20/20211/20/20217/15/2019PA&ED:
RTL:R/W Cert:
9/28/2021Begin Con:
07-Los Angeles-2 18-1919-2019-2020-21
201.015129 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
26.7/79.2
Con Sup:
Collision Severity Reduction
Const:R/W:
In the cities of Monterey Park, Rosemead, and ElMonte, from 0.7 mile west of South FremontAvenue Undercrossing to 0.5 mile east of DurfeeAvenue Undercrossing. Upgrade 27 overheadsign posts, associated pedestals, and concretebarriers to current standards to reduce thepotential snagging for out of control vehicles.
5077
33030$4,046
$200
Subtotal: $4,246
2021-22$635
$1,820$531
$1,945
$4,931Total Project Cost: $9,177
071600021312/31/202110/29/20218/30/2019PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
07-Los Angeles-10 18-1919-2019-2021-22
201.01563 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
21.6/31.0
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 67 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Azusa, from 0.9 mile north of North ForkSan Gabriel Bridge No. 53-2245 to 0.2 mile northof Crystal Lake Road (PM T32.1 to 38.4).Upgrade guardrail and end treatments to currentstandards.
5046
32760$4,190
$20
Subtotal: $4,210
2020-21$486
$1,893$10
$1,284
$3,673Total Project Cost: $7,883
07160001322/5/2021
12/17/20204/12/2019PA&ED:
RTL:R/W Cert:
10/8/2021Begin Con:
07-Los Angeles-39 18-1918-1920-2120-21
201.01540 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
32.2/38.4
Con Sup:
Collision Severity Reduction
Const:R/W:
In the cities of Compton, Paramount andBellflower; also on Route 105 (PMR0.50/R18.14), Route 110 (PM 1.23/R11.89) andRoute 405 (PM 0.27/28.51). Construct shoulderrumble strips ground-in indentations where rightshoulder is less than four feet.
4968
31920$2,300
$10
Subtotal: $2,310
2020-21$156$400$30
$550
$1,136Total Project Cost: $3,446
071600002012/1/202011/1/20202/28/2019PA&ED:
RTL:R/W Cert:
7/30/2021Begin Con:
07-Los Angeles-91 18-1919-2019-2020-21
201.015372 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
6.3/18.1
Con Sup:
Collision Severity Reduction
Const:R/W:
In the city of Los Angeles, from HighlandAvenue to south of Parkway Calabasas. Upgrademedian concrete barrier to meet the currentstandards.
4709
30370$20,100
$20
Subtotal: $20,120
2019-20$550
$2,325$15
$3,050
$5,940Total Project Cost: $26,060
07140000356/14/20195/15/2019
12/29/2017PA&ED:
RTL:R/W Cert:
8/13/2020Begin Con:
07-Los Angeles-101 PriorPriorPrior19-20
201.01560 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.7/27.7
Con Sup:
Collision Severity Reduction
Const:R/W:
In the city of Los Angeles, from Vernon Avenueto Route 101. Upgrade Metal Beam Guardrail toMidwest Guardrail System, end treatments, andcrash attenuators.
4785
30910$4,520
$25
Subtotal: $4,545
2018-19$306
$2,280$45
$1,357
$3,988Total Project Cost: $8,533
07140002643/21/2019
10/15/20187/2/2018PA&ED:
RTL:R/W Cert:
8/30/2019Begin Con:
07-Los Angeles-110 Prior18-1918-1918-19
201.01513 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.8/23.8
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 68 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Fernando and Sylmar, from Pacoima Washto Balboa Boulevard. Construct MVPs, accessroads and gates, relocate irrigation facilities, pavebeyond gore and under guardrail.
4975
31990$2,588
$31
Subtotal: $2,619
2020-21$495
$1,322$16
$1,140
$2,973Total Project Cost: $5,592
07160000281/29/2021
12/31/20208/30/2019PA&ED:
RTL:R/W Cert:
8/31/2021Begin Con:
07-Los Angeles-5 18-1919-2019-2020-21
201.23582 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
39.2/R44.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the cities of Los Angeles and Santa Monica,from Route 1/10 Separation bridge to west ofCrenshaw Boulevard. Roadside safetyimprovements.
4715
30420$5,464
$30
Subtotal: $5,494
2018-19$100
$1,560$48
$1,100
$2,808Total Project Cost: $8,302
07140000553/1/20192/1/2019
12/29/2017PA&ED:
RTL:R/W Cert:
11/1/2019Begin Con:
07-Los Angeles-10 PriorPriorPrior18-19
201.235214 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R2.1/R11.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the city of Los Angeles, from Route 5 to westof Route 710. Roadside safety improvements.
4716
30430$2,553
$30
Subtotal: $2,583
2018-19$139
$1,100$34
$1,060
$2,333Total Project Cost: $4,916
07140000583/1/20192/1/20193/1/2018PA&ED:
RTL:R/W Cert:
9/30/2019Begin Con:
07-Los Angeles-10 PriorPriorPrior18-19
201.235106 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.3/21.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Santa Clarita, from Route 5 toCanyon Park Boulevard. Construct roadsidesafety improvements.4809
31080$2,552
Subtotal: $2,552
2018-19$118$429
$5$548
$1,100Total Project Cost: $3,652
07150000073/1/20192/1/2019
12/1/2017PA&ED:
RTL:R/W Cert:
11/27/2019Begin Con:
07-Los Angeles-14 PriorPriorPrior18-19
201.23595 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R24.8/R31.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 69 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Santa Clarita, from Canyon ParkBoulevard to Spring Canyon RoadUndercrossing. Place vegetation control underguardrail, minor concrete beyond gore, slope pavebeneath abutments, rock blanket at narrow areas,cable mesh drapery systems and install sign postsleeves beyond gore.
4976
32000$3,063
$19
Subtotal: $3,082
2020-21$459
$1,047$55
$954
$2,515Total Project Cost: $5,597
071600002912/15/202011/30/2020
4/1/2019PA&ED:
RTL:R/W Cert:
8/15/2021Begin Con:
07-Los Angeles-14 18-1918-1918-1920-21
201.23572 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R31.4/36.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Lancaster, from Vincent RampUndercrossing to Avenue K 8 Overcrossing.Roadside safety improvements.4811
31110$3,257
$30
Subtotal: $3,287
2019-20$118
$1,200$48
$1,430
$2,796Total Project Cost: $6,083
071500000610/1/20198/30/20192/1/2018PA&ED:
RTL:R/W Cert:
7/1/2020Begin Con:
07-Los Angeles-14 PriorPriorPrior19-20
201.23592 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R54.6/R66.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Near Glenview, from Entrado Drive to WoodlandCrest Drive. Enhance highway worker safety byinstalling weed control under existing guardrail.4652
29960$1,100
Subtotal: $1,100
2018-19$101$700$10
$389
$1,200Total Project Cost: $2,300
07130003145/18/20173/9/2017
6/29/2015PA&ED:
RTL:R/W Cert:
12/7/2018Begin Con:
07-Los Angeles-27 PriorPriorPrior18-19
201.23512 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.9/10.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Diamond Bar, from Orange Countyline to 0.1 mile west of Hospital Overcrossing.Construct MVPs, pave beyond gore areas andconstruct biofiltration swales.
5023
32480$2,885
$15
Subtotal: $2,900
2021-22$183$585$22
$666
$1,456Total Project Cost: $4,356
071600007810/21/20219/22/20214/21/2020PA&ED:
RTL:R/W Cert:
5/2/2022Begin Con:
07-Los Angeles-57 18-1919-2021-2221-22
201.23523 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.0/5.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 70 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Dimas and Glendora, from Route 10 toRoute 210. Roadside safety improvements.
4706
30180$2,768
$30
Subtotal: $2,798
2018-19$100
$1,200$48
$1,150
$2,498Total Project Cost: $5,296
07140000323/1/20192/1/2019
1/19/2018PA&ED:
RTL:R/W Cert:
11/27/2019Begin Con:
07-Los Angeles-57 PriorPriorPrior18-19
201.23555 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R7.7/R11.8
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Long Beach, Bellflower and Cerritos, from 0.2mile west of Downey Avenue Undercrossing to0.2 mile east of San Gabriel River Bridge.Roadside safety improvements.
4714
30410$3,601
$90
Subtotal: $3,691
2018-19$99
$1,720$48
$1,320
$3,187Total Project Cost: $6,878
07140000573/1/20192/1/2019
12/29/2017PA&ED:
RTL:R/W Cert:
11/1/2019Begin Con:
07-Los Angeles-91 PriorPriorPrior18-19
201.23523 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R13.9/R16.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the city of Los Angeles, from Wilton PlaceOvercrossing to Barham Boulevard Overcrossing.Place minor concrete at narrow paving areas andslopes, pave areas beyond gore, replace fencingand gates, install sign post sleeves and constructMVPs.
5072
32960$3,185
$15
Subtotal: $3,200
2021-22$518
$1,520$20
$1,465
$3,523Total Project Cost: $6,723
071600020312/1/202111/1/20218/15/2020PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
07-Los Angeles-101 18-1920-2120-2121-22
201.235142 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R6.2/R9.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Downey, from Garfield Avenue toeast of Woodruff Avenue. Roadside safetyimprovements.4893
31640$1,301
$30
Subtotal: $1,331
2019-20$125$900$30
$705
$1,760Total Project Cost: $3,091
071500020912/6/2019
11/20/20199/7/2018PA&ED:
RTL:R/W Cert:
6/5/2020Begin Con:
07-Los Angeles-105 Prior18-1918-1919-20
201.23581 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R14.1/R17.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 71 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Carson, from West Anaheim Street toE 228th Street. Construct MVPs, rock blankets,access roads fences/gates, stairways to accessslopes, relocate controller cabinets and signs.
5214
33650$2,128
$42
Subtotal: $2,170
2021-22$730
$1,701$46
$1,129
$3,606Total Project Cost: $5,776
07160004017/30/20217/15/2021
11/30/2019PA&ED:
RTL:R/W Cert:
3/30/2022Begin Con:
07-Los Angeles-110 18-1919-2019-2021-22
201.23538 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
3.5/6.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the city of Los Angeles, from ExpositionBoulevard to Temple Street. Pave beyond gore,slope paving under structures, construct MVPs,upgrade end treatment to Smart cushion crashattenuator and place vegetation control underguardrail.
4973
31970$2,427
$9
Subtotal: $2,436
2020-21$512
$1,460$93
$964
$3,029Total Project Cost: $5,465
07160000263/18/20211/26/2021
12/24/2019PA&ED:
RTL:R/W Cert:
12/22/2021Begin Con:
07-Los Angeles-110 18-1919-2019-2020-21
201.23576 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
20.0/23.6
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the cities of Granada Hills and Porter Ranch,from 700 feet west of Tampa Avenue to WoodleyAvenue. Construct MVPs, pave beyond gore,repave side slopes, relocate irrigation controller,and provide access gates.
5216
33680$2,669
$163
Subtotal: $2,832
2021-22$659
$1,677$53
$1,513
$3,902Total Project Cost: $6,734
071700001412/1/202110/1/20219/1/2020PA&ED:
RTL:R/W Cert:
7/1/2022Begin Con:
07-Los Angeles-118 19-2020-2120-2121-22
201.23530 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R4.5/R9.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Mission Hills, from Woodley Avenue to Route405. Pave areas beyond gore, install access gates,construct maintenance vehicle and shoulderpullouts, upgrade and relocate irrigation systems.
4808
31070$2,654
$20
Subtotal: $2,674
2018-19$118
$1,058$20
$1,027
$2,223Total Project Cost: $4,897
071500000411/28/20189/28/20186/27/2017PA&ED:
RTL:R/W Cert:
5/20/2019Begin Con:
07-Los Angeles-118 PriorPriorPrior18-19
201.23530 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R9.0/R10.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 72 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of Los Angeles and NorthHollywood, from 170/134 Junction to OxnardStreet Undercrossing. Construct MVPs, accesstrail, minor concrete beyond gore and alongramps, rock blanket at ramps, install fencing andgates, vandal resistant pedestrian undercrossingenclosures.
5073
32970$3,262
$41
Subtotal: $3,303
2021-22$526
$1,313$34
$1,025
$2,898Total Project Cost: $6,201
071600020412/1/202111/1/20218/15/2020PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
07-Los Angeles-170 18-1920-2120-2121-22
201.23584 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R14.5/R16.6
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Pasadena, at the Route 210/134/710Interchange. Roadside safety improvements.
4810
31100$2,970
$30
Subtotal: $3,000
2019-20$118$950$30
$990
$2,088Total Project Cost: $5,088
071500000510/21/20199/23/20193/16/2018PA&ED:
RTL:R/W Cert:
5/4/2020Begin Con:
07-Los Angeles-210 PriorPriorPrior19-20
201.23553 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R24.6/R25.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Pasadena, Arcadia and Monrovia, from Route710 to Huntington Drive. Roadside safetyimprovements.4708
30360$2,624
$30
Subtotal: $2,654
2018-19$144$854$31
$850
$1,879Total Project Cost: $4,533
07140000313/1/20192/1/2019
12/1/2017PA&ED:
RTL:R/W Cert:
9/30/2019Begin Con:
07-Los Angeles-210 PriorPriorPrior18-19
201.23547 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R25.0/R32.8
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the cities of Monrovia, Duarte, Irwindale,Azusa and Glendora, from Huntington Drive toRoute 57. Roadside safety improvements.4707
30190$5,488
$30
Subtotal: $5,518
2018-19$220
$1,270$26
$1,252
$2,768Total Project Cost: $8,286
071400003012/3/201811/1/20186/20/2017PA&ED:
RTL:R/W Cert:
5/17/2019Begin Con:
07-Los Angeles-210 PriorPriorPrior18-19
201.23544 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R32.8/R44.7
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 73 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Long Beach and Carson, from the Route710/405 interchange to Route 110/405interchange. Construct access roads, pave aroundgore areas, construct MVPs, minor/patternedconcrete paving on slopes, upgrade guardrail andend treatment, vegetation management control.
5000
32180$2,267
$23
Subtotal: $2,290
2021-22$440
$1,500$60
$1,200
$3,200Total Project Cost: $5,490
07160000529/3/2021
7/14/20211/6/2020PA&ED:
RTL:R/W Cert:
1/7/2022Begin Con:
07-Los Angeles-405 18-1920-2120-2121-22
201.23530 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
7.0/12.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In various cities, from 405/110Junction to northof 405/105 Junction. Construct MVPs, accessroad, rock blanket at islands and between rampsand upgrade irrigation systems.
5227
33870$3,806
$29
Subtotal: $3,835
2021-22$522
$1,420$102
$1,311
$3,355Total Project Cost: $7,190
07170000639/1/20218/2/20218/1/2019PA&ED:
RTL:R/W Cert:
3/1/2022Begin Con:
07-Los Angeles-405 18-1920-2120-2121-22
201.23561 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
12.9/R21.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Lakewood, from Los Angeles Countyline to 183rd Street. Construct MVPs, anchorassemblies for sign post sleeves, access roads,cable railing, and gates.
5229
33890$1,794
$20
Subtotal: $1,814
2021-22$498
$1,219$42
$926
$2,685Total Project Cost: $4,499
07170000741/26/2022
11/11/20219/11/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
07-Los Angeles-605 18-1920-2120-2121-22
201.23546 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.0/R4.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Industry, from south of Route 60 toValley Boulevard. Roadside safetyimprovements.4713
30400$2,779
Subtotal: $2,779
2018-19$168$900$60
$1,283
$2,411Total Project Cost: $5,190
07140000568/15/20187/2/20186/5/2017PA&ED:
RTL:R/W Cert:
8/1/2019Begin Con:
07-Los Angeles-605 PriorPriorPrior18-19
201.23560 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R17.0/R19.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 74 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of South Gate, Bell Gardens andCommerce, from 800 feet north of RosecransAvenue to Atlantic Boulevard. Construct MVPs,pave narrow and gore areas, install fences/gates.
5078
33050$2,368
$10
Subtotal: $2,378
2021-22$613
$1,578$12
$1,253
$3,456Total Project Cost: $5,834
071600021410/1/20219/1/2021
7/15/2019PA&ED:
RTL:R/W Cert:
5/1/2022Begin Con:
07-Los Angeles-710 18-1919-2019-2021-22
201.23536 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R15.1/21.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn and near South El Monte, on RosemeadBoulevard (SR-164) from Gallatin Road to RushStreet. Relinquishment Financial ContributionOnly to the county of Los Angeles.
5193
33470$1,500
$0
Subtotal: $1,500
2018-19$0$0$0$0
$0Total Project Cost: $1,500
07160003451/30/20181/30/20186/27/2017PA&ED:
RTL:R/W Cert:
4/30/2018Begin Con:
07-Los Angeles-164
201.1602.6 Centerline mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
1.4/4.0
Con Sup:
Relinquishments
Const:R/W:
In Los Angeles and Ventura Counties, on variousroutes, at various locations. Stabilize soil anderosion control.4913
31770$1,545
$85
Subtotal: $1,630
2019-20$400
$1,310$70
$772
$2,552Total Project Cost: $4,182
07150002619/30/20198/15/20197/16/2018PA&ED:
RTL:R/W Cert:
3/30/2020Begin Con:
07-Los Angeles-1 Prior18-1918-1919-20
201.335.9 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.3/9.9
Con Sup:
Storm Water Mitigation
Const:R/W:
In various cities, from Calle Mayor to VenturaCounty line; also on Routes 23 and 27, at variouslocations. Construct storm water treatment BestManagement Practices.
4722
30490$4,740
$427
Subtotal: $5,167
2018-19$800
$1,961$62
$1,691
$4,514Total Project Cost: $9,681
07140000863/29/20192/20/20193/30/2018PA&ED:
RTL:R/W Cert:
10/31/2019Begin Con:
07-Los Angeles-1 PriorPriorPrior18-19
201.33524 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
17.4/62.8
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 75 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Los Angeles County, in various cities on routes60, 66, 164 and 210 at various locations.Construct and install storm water treatment BestManagement Practices.
4420
28830$6,790
$50
Subtotal: $6,840
2019-20$995
$2,447$95
$2,200
$5,737Total Project Cost: $12,577
070002102412/13/201911/27/20199/28/2018PA&ED:
RTL:R/W Cert:
9/30/2020Begin Con:
07-Los Angeles-2 Prior18-1918-1919-20
201.33548.4 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.1/14.3
Con Sup:
Storm Water Mitigation
Const:R/W:
In the city of Los Angeles, from Bundy DriveUndercrossing to Sepulveda BoulevardUndercrossing; also on Route 405 from OlympicBoulevard to National Boulevard Undercrossing(PM 29.1/30.8). Install irrigation system andplant vegetation to stabilize soil.
5091
33200$1,281
$10
Subtotal: $1,291
2021-22$497
$1,054$16
$1,028
$2,595Total Project Cost: $3,886
071600025411/1/20219/1/20213/1/2020PA&ED:
RTL:R/W Cert:
11/1/2022Begin Con:
07-Los Angeles-10 18-1919-2019-2021-22
201.33538.53 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R4.5/R5.6
Con Sup:
Storm Water Mitigation
Const:R/W:
In the cities of Los Angeles, Alhambra, El Monte,Monterey Park and Rosemead, from CentralAvenue to Cogswell Road; also on Route 405from Cherry Avenue to South Alameda Street(PM 4.8/8.5). Construct storm water treatmentBest Management Practices.
3923
26080$24,000
$480
Subtotal: $24,480
2019-20$3,000$3,305
$578$5,500
$12,383Total Project Cost: $36,863
07120001043/12/20202/12/2020
11/30/2018PA&ED:
RTL:R/W Cert:
8/24/2020Begin Con:
07-Los Angeles-10 Prior18-1918-1919-20
201.33533 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.6/30.1
Con Sup:
Storm Water Mitigation
Const:R/W:
In Claremont and Pomona, from east of N.Orange Grove Avenue Undercrossing to east of S.Indian Hill Boulevard Undercrossing; also on Route 71 from north of 9th Street to south ofRoute 60/71 Interchange (PM 1.9/4.7). Constructpermanent treatment BMPs.
4971
31950$10,200
$94
Subtotal: $10,294
2020-21$2,100$2,100
$200$3,400
$7,800Total Project Cost: $18,094
071600002412/1/202010/1/20207/1/2019PA&ED:
RTL:R/W Cert:
8/1/2021Begin Con:
07-Los Angeles-10 18-1919-2019-2020-21
201.33540.74 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
46.0/48.0
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 76 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near South El Monte, Industry, HaciendaHeights, and Rowland Heights, from Peck Roadto Nogales Street. Construct and installstormwater quality BMPs.
4980
32040$10,168
$102
Subtotal: $10,270
2020-21$1,407$2,999
$28$2,064
$6,498Total Project Cost: $16,768
07160000403/22/20211/14/20217/20/2019PA&ED:
RTL:R/W Cert:
10/10/2021Begin Con:
07-Los Angeles-60 18-1919-2020-2121-22
201.33552.5 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
11.0/20.0
Con Sup:
Storm Water Mitigation
Const:R/W:
In and near Diamond Bar, from Fullerton Road toDiamond Bar Boulevard. Construct and installstormwater treatment BMPs includingbiofiltration swales/strips and GSRDs.
5025
32500$5,215
$28
Subtotal: $5,243
2020-21$1,035$2,094
$27$2,188
$5,344Total Project Cost: $10,587
07160000807/14/20206/15/20207/15/2019PA&ED:
RTL:R/W Cert:
1/14/2021Begin Con:
07-Los Angeles-60 18-1919-2019-2020-21
201.33539.4 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
20.0/R26.0
Con Sup:
Storm Water Mitigation
Const:R/W:
In and near Pomona, from Phillips Ranch Road toReservoir Street. Construct and installstormwater treatment BMPs includingbiofiltration swales/strips, detention basin andmedia filters.
5011
32330$6,078
$15
Subtotal: $6,093
2020-21$1,200$2,865
$90$2,380
$6,535Total Project Cost: $12,628
07160000632/18/2021
12/17/20209/6/2019PA&ED:
RTL:R/W Cert:
8/15/2021Begin Con:
07-Los Angeles-60 18-1919-2019-2020-21
201.33518.5 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R28.0/R30.4
Con Sup:
Storm Water Mitigation
Const:R/W:
In the city of Los Angeles, from Routes5/10/60/101 Interchange to Figueroa Street. Plantvegetation an install supporting irrigation systemto stabilize soil.
4977
32010$2,650
$30
Subtotal: $2,680
2021-22$420
$1,010$50
$1,000
$2,480Total Project Cost: $5,160
07160000309/1/2021
7/15/20211/1/2019PA&ED:
RTL:R/W Cert:
3/1/2022Begin Con:
07-Los Angeles-101 18-1919-2019-2021-22
201.33519.48 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
S0.0/1.5
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 77 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of Los Angeles, from Beaudry Avenueto 0.1 mile south of N. Gower Street. Stabilizesoil and erosion control.4814
31140$4,468
$30
Subtotal: $4,498
2018-19$310
$1,200$48
$1,043
$2,601Total Project Cost: $7,099
07150000103/1/20192/1/2019
12/1/2017PA&ED:
RTL:R/W Cert:
12/31/2019Begin Con:
07-Los Angeles-101 PriorPriorPrior18-19
201.33550 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.7/6.8
Con Sup:
Storm Water Mitigation
Const:R/W:
In Willowbrook and Lynwood, from Main Streetto Mona Boulevard. Storm water mitigationincluding planting of vegetation and theinstallation of irrigation systems.
4908
31740$2,765
$30
Subtotal: $2,795
2018-19$150$890$50
$1,250
$2,340Total Project Cost: $5,135
07150002412/1/2019
1/15/20198/2/2017PA&ED:
RTL:R/W Cert:
8/14/2019Begin Con:
07-Los Angeles-105 PriorPriorPrior18-19
201.33517.5 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R7.8/R10.3
Con Sup:
Storm Water Mitigation
Const:R/W:
In the cities of Los Angeles and Carson, from LStreet to 223rd Street. Construct storm watertreatment Best Management Practices.4174
27610$9,900
$65
Subtotal: $9,965
2018-19$940
$1,568$300
$1,900
$4,708Total Project Cost: $14,673
07000005253/29/20193/1/2019
3/15/2018PA&ED:
RTL:R/W Cert:
6/25/2019Begin Con:
07-Los Angeles-110 PriorPriorPrior18-19
201.33529.55 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.8/6.5
Con Sup:
Storm Water Mitigation
Const:R/W:
In the city of Los Angeles, from 120th Street to3rd Street at various locations. Construct grosssolid removal devices, biofiltration devices, anddetention basin.
3279
23830$11,000
$10
Subtotal: $11,010
2018-19$740
$1,855$30
$2,234
$4,859Total Project Cost: $15,869
07140000812/1/2019
12/31/20183/15/2018PA&ED:
RTL:R/W Cert:
8/30/2019Begin Con:
07-Los Angeles-110 PriorPriorPrior18-19
201.33530.8 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.4/23.1
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 78 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of Granada Hills and Porter Ranch,from Topango Canyon Boulevard to SepulvedaBoulevard. Construct and install stormwatertreatment BMPs including biofiltrationswales/strips, detention basin, media filters and aGSRD.
5027
32530$7,945
$55
Subtotal: $8,000
2020-21$1,600$3,300
$170$3,300
$8,370Total Project Cost: $16,370
07160000832/18/2021
12/17/20207/1/2019PA&ED:
RTL:R/W Cert:
9/1/2021Begin Con:
07-Los Angeles-118 18-1919-2019-2020-21
201.33525.31 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R1.5/R10.2
Con Sup:
Storm Water Mitigation
Const:R/W:
In the city of Los Angeles, from Arleta Avenue toRoute 210. Construct stormwater treatmentBMPs.5001
32200$11,750
$300
Subtotal: $12,050
2021-22$2,000$4,000
$250$3,500
$9,750Total Project Cost: $21,800
071600005312/10/202110/15/2021
7/1/2020PA&ED:
RTL:R/W Cert:
6/24/2022Begin Con:
07-Los Angeles-118 18-1920-2120-2121-22
201.33520 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R11.0/R14.0
Con Sup:
Storm Water Mitigation
Const:R/W:
In and near Burbank, from Bob Hope Drive toVictory Boulevard/Riverside Drive. Stabilize soiland erosion control.4816
31160$2,318
$30
Subtotal: $2,348
2019-20$120
$1,050$48
$1,100
$2,318Total Project Cost: $4,666
071500001111/1/201910/1/20192/1/2018PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
07-Los Angeles-134 PriorPriorPrior19-20
201.33512.5 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.6/4.8
Con Sup:
Storm Water Mitigation
Const:R/W:
Near Sylmar, San Fernando and Sunland, fromRoute 5 to Wheatland Avenue. Construct stormwater treatment Best Management Practices toreduce Trash Total Maximum Daily Load(TMDL).
3884
25940$15,000
$106
Subtotal: $15,106
2018-19$700
$3,600$100
$3,000
$7,400Total Project Cost: $22,506
07140001043/28/20192/15/20193/15/2018PA&ED:
RTL:R/W Cert:
1/6/2020Begin Con:
07-Los Angeles-210 PriorPriorPrior18-19
201.33533 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R9.7
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 79 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of Monrovia, Duarte, Irwindale andAzusa, from Myrtle Avenue to Azusa Avenue.Stabilize soil and erosion control.4705
30170$3,662
$30
Subtotal: $3,692
2019-20$144
$1,175$30
$1,054
$2,403Total Project Cost: $6,095
071400003310/1/20199/16/20193/1/2018PA&ED:
RTL:R/W Cert:
4/6/2020Begin Con:
07-Los Angeles-210 PriorPriorPrior19-20
201.33518.3 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R33.7/R39.8
Con Sup:
Storm Water Mitigation
Const:R/W:
In and near Azusa, from 0.1 mile east of HighlandAvenue Undercrossing to S. Citrus AvenueOvercrossing. Construct and install stormwatertreatment BMPs including biofiltration swalesand Austin Vault Sand Filters.
5009
32310$10,045
$37
Subtotal: $10,082
2021-22$1,890$2,836
$189$3,098
$8,013Total Project Cost: $18,095
07160000619/30/20218/5/2021
12/30/2019PA&ED:
RTL:R/W Cert:
4/15/2022Begin Con:
07-Los Angeles-210 18-1919-2019-2021-22
201.33539.95 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R36.0/R40.6
Con Sup:
Storm Water Mitigation
Const:R/W:
In Glendora, at various locations from 0.2 mileeast of S. Barranca Avenue Overcrossing to 0.1mile west of Amelia Avenue Undercrossing.Construct and install various stormwatertreatment BMPs including biofiltrationswales/strips/trenches, infiltration basins andvault sand filters.
5005
32260$7,149
$61
Subtotal: $7,210
2020-21$1,575$2,729
$242$2,730
$7,276Total Project Cost: $14,486
071600005710/29/2021
9/6/20211/30/2020PA&ED:
RTL:R/W Cert:
5/16/2022Begin Con:
07-Los Angeles-210 18-1919-2019-2020-21
201.33542.16 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R41.3/R44.6
Con Sup:
Storm Water Mitigation
Const:R/W:
In and near La Verne, at various locations from0.4 mile east of S Lone Hill AvenueUndercrossing to 0.2 mile west of Base LineRoad Overcrossing. Construct stormwatertreatment BMPs including GSRDs, biofiltrationswales/strips and infiltration trenches.
5068
32850$7,490
$69
Subtotal: $7,559
2021-22$1,900$2,601
$160$2,800
$7,461Total Project Cost: $15,020
07160001788/30/20217/5/2021
11/29/2019PA&ED:
RTL:R/W Cert:
3/15/2022Begin Con:
07-Los Angeles-210 18-1919-2019-2021-22
201.33543.45 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R44.7/R52.1
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 80 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of Los Angeles, Van Nuys, and SanFernando, from Burbank Boulevard to Route5/405 Separation. Plant vegetation, installirrigation, concrete paving, rock blankets andmats.
4978
32020$3,900
$30
Subtotal: $3,930
2020-21$610
$1,590$30
$1,122
$3,352Total Project Cost: $7,282
07160000311/15/2021
11/30/20207/30/2019PA&ED:
RTL:R/W Cert:
8/15/2021Begin Con:
07-Los Angeles-405 18-1919-2020-2120-21
201.33541 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
40.1/48.6
Con Sup:
Storm Water Mitigation
Const:R/W:
In the cities of Los Alamitos, Cerritos, Lakewood,Bellflower and Norwalk, from Orange Countyline to Route 5. Construct stormwater treatmentBMPs including biofiltration swales/strips,detention basin, MVPs and install infiltrationdevices.
4997
32150$15,050
$20
Subtotal: $15,070
2021-22$1,450$3,255
$25$3,556
$8,286Total Project Cost: $23,356
07160000481/31/2022
12/30/20219/1/2020PA&ED:
RTL:R/W Cert:
8/31/2022Begin Con:
07-Los Angeles-605 18-1920-2120-2121-22
201.33570.57 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.0/R9.6
Con Sup:
Storm Water Mitigation
Const:R/W:
In and near Santa Fe Springs, from Santa AnaFreeway Undercrossing to 0.1 mile north of RoseHills Road Overcrossing. Install stormwatertreatment BMPs.
5212
33610$8,633
$72
Subtotal: $8,705
2021-22$1,593$3,402
$202$2,969
$8,166Total Project Cost: $16,871
071600039311/30/202110/5/20212/27/2020PA&ED:
RTL:R/W Cert:
6/15/2022Begin Con:
07-Los Angeles-605 18-1919-2019-2021-22
201.33539.85 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R9.6/R15.7
Con Sup:
Storm Water Mitigation
Const:R/W:
Near El Monte, at various locations, from 0.1mile south of Peck Road Overcrossing to 0.1 milenorth of Valley Boulevard Undercrossing.Construct and install stormwater treatment BMPs including biofiltration swales/strips, linear radialGSRDs, infiltration basins and an Austin Vault Sand Filter.
5234
33930$12,901
$96
Subtotal: $12,997
2021-22$1,500$4,550
$202$3,320
$9,572Total Project Cost: $22,569
071700014312/30/202111/5/20213/30/2020PA&ED:
RTL:R/W Cert:
8/15/2022Begin Con:
07-Los Angeles-605 18-1919-2019-2021-22
201.33554.82 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R16.5/R19.5
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 81 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near El Monte, from 0.2 mile south of Route 10to 0.2 mile north of Route 210. Construct andinstall stormwater treatment BMPs includingbiofiltration swales/strips, GSRDs and a DesignPollution Prevention Infiltration Area.
5236
33940$15,187
$89
Subtotal: $15,276
2021-22$1,576$3,971
$237$4,308
$10,092Total Project Cost: $25,368
07170001441/31/202212/6/20214/30/2020PA&ED:
RTL:R/W Cert:
8/15/2022Begin Con:
07-Los Angeles-605 18-1919-2019-2021-22
201.33552.15 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R20.0/R26.0
Con Sup:
Storm Water Mitigation
Const:R/W:
In East Los Angeles, from Route 5 to north ofFloral Drive; also on Route 60 (PM R2.9/R3.8),from west of Marina Avenue PedestrianOvercrossing to Mednick Avenue. Stabilize soiland erosion control.
4717
30440$3,425
$30
Subtotal: $3,455
2018-19$54
$910$63
$1,138
$2,165Total Project Cost: $5,620
07140000618/1/20187/9/2018
6/30/2017PA&ED:
RTL:R/W Cert:
2/8/2019Begin Con:
07-Los Angeles-710 PriorPriorPrior18-19
201.33546.4 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
23.3/25.6
Con Sup:
Storm Water Mitigation
Const:R/W:
In the city of Los Angeles, from 3rd Street toRoute 10 interchange. Install irrigation systemsand plant vegetation to stabilize soil.5089
33180$3,420
$16
Subtotal: $3,436
2021-22$600
$1,250$50
$1,250
$3,150Total Project Cost: $6,586
071600025211/23/20219/21/20215/12/2020PA&ED:
RTL:R/W Cert:
5/6/2022Begin Con:
07-Los Angeles-710 18-1920-2120-2121-22
201.33534.23 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
24.4/26.7
Con Sup:
Storm Water Mitigation
Const:R/W:
In La Verne and Pomona, from Baseline Road toTowne Avenue. Construct and upgrade curbramps and sidewalks to comply with ADAstandards.
4744
30650$3,800
Subtotal: $3,800
2018-19$753$800$30
$650
$2,233Total Project Cost: $6,033
07140001774/12/20193/12/20197/2/2018PA&ED:
RTL:R/W Cert:
9/24/2019Begin Con:
07-Los Angeles-66 Prior18-1918-1918-19
201.36167 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/3.2
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 82 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Whittier, from Valley Home Avenue toEsperanza Avenue. Construct and upgrade curbramps, sidewalks, driveways, pedestrian pathways, Class III bikeway lanes, accessiblepedestrian signals and push buttons to meetcurrent ADA standards.
5158
33310$5,781$1,000
Subtotal: $6,781
2021-22$900
$4,000$4,600$2,200
$11,700Total Project Cost: $18,481
07160002993/17/20223/2/2022
2/28/2020PA&ED:
RTL:R/W Cert:
11/7/2022Begin Con:
07-Los Angeles-72 18-1920-2120-2121-22
201.361170 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/6.8
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Torrance, from Route 1 to Redondo BeachBoulevard. Construct curb ramps and reconstructdriveways/sidewalks to meet ADA standards.4749
30700$4,546$1,055
Subtotal: $5,601
2018-19$961
$2,553$1,223$2,508
$7,245Total Project Cost: $12,846
07140001983/19/20192/15/20192/8/2018PA&ED:
RTL:R/W Cert:
10/1/2019Begin Con:
07-Los Angeles-107 PriorPriorPrior18-19
201.361107 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/4.8
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Palmdale, from Route 14 Junction (South) toAvenue T. Upgrade curb ramps, traffic signalsand sidewalks to meet current standards.5185
33370$8,385
$703
Subtotal: $9,088
2021-22$695
$3,795$1,401$3,225
$9,116Total Project Cost: $18,204
07160003162/18/2022
12/20/202112/20/2019PA&ED:
RTL:R/W Cert:
10/4/2022Begin Con:
07-Los Angeles-138 18-1919-2019-2021-22
201.36166 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
43.4/51.4
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In the cities of Wittier, South Monte andRosemead, from Gallatin Road to RudellUnderpass. Upgrade curb ramps, sidewalks andpathways to meet current ADA standards.
4982
32080$5,803
$952
Subtotal: $6,755
2021-22$1,034$3,150
$916$2,714
$7,814Total Project Cost: $14,569
071600004210/28/20219/29/20219/25/2019PA&ED:
RTL:R/W Cert:
4/25/2022Begin Con:
07-Los Angeles-164 18-1919-2020-2121-22
201.36176 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
1.4/6.9
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 83 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In La Crescenta and La Canada Flintridge, fromwest of Sunland Boulevard to Baseline Road,near the San Bernardino County line.Reconstruct curb ramps to meet ADA standards,install accessible pedestrian signals, relocate pullboxes and traffic signal poles.
4985
32680$4,480$4,098
Subtotal: $8,578
2021-22$1,400$7,000$2,450$7,000
$17,850Total Project Cost: $26,428
07160001198/30/20217/30/202112/1/2019PA&ED:
RTL:R/W Cert:
3/1/2022Begin Con:
07-Los Angeles-210 18-1921-2221-2221-22
201.361264 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R9.7/R51.9
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In the cities of Rancho Palos Verdes, Lomita andLos Angeles, from W 25th Street to W CarsonStreet at various locations. Upgrade curb ramps,sidewalks and driveways to meet ADA standards.
4743
30660$4,244
$176
Subtotal: $4,420
2018-19$1,087
$500$50
$500
$2,137Total Project Cost: $6,557
07140001783/8/2019
2/15/20197/2/2018PA&ED:
RTL:R/W Cert:
9/20/2019Begin Con:
07-Los Angeles-213 Prior18-1918-1918-19
201.361188 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/8.0
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONIn Malibu, from Guernsey Avenue to TrancasCanyon Road/Broad Beach Road. Replacebridge.4498
29140$5,488$2,021
Subtotal: $7,509
2018-19$2,342$2,123
$740$1,251
$6,456Total Project Cost: $13,965
07120000946/28/2019
10/15/20186/30/2017PA&ED:
RTL:R/W Cert:
1/15/2020Begin Con:
07-Los Angeles-1 PriorPriorPrior18-19
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
56.5/56.9
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In El Monte, at Rio Hondo Busway Bridge No. 53-2637. Replace bridge deck.
4902
31680$2,553
$15
Subtotal: $2,568
2019-20$550
$1,346$27
$1,627
$3,550Total Project Cost: $6,118
071500022012/30/201911/27/20199/28/2018PA&ED:
RTL:R/W Cert:
7/10/2020Begin Con:
07-Los Angeles-10S Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.3
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 84 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Long Beach, at the eastbound Route 91 tonorthbound Route 710 Connector Bridge No. 53-2241G over Connector from northbound Route710 to eastbound Route 91. Lower profile ofconnector to achieve standard vertical clearance
4967
31910$3,230
$40
Subtotal: $3,270
2020-21$910
$2,468$43
$2,073
$5,494Total Project Cost: $8,764
07160000173/15/20212/15/2021
10/15/2019PA&ED:
RTL:R/W Cert:
4/15/2022Begin Con:
07-Los Angeles-91 18-1919-2019-2020-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R11.8
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Encino, at Encino Pedestrian Overcrossing.Replace pedestrian Overcrossing.
4915
31790$6,685$1,067
Subtotal: $7,752
2018-19$1,033$3,205
$500$1,361
$6,099Total Project Cost: $13,851
07150002773/21/20192/21/20193/26/2018PA&ED:
RTL:R/W Cert:
9/19/2019Begin Con:
07-Los Angeles-101 PriorPriorPrior18-19
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In the city of Los Angeles, at the Union PacificOverhead No. 53-2626. Replace the bridge deckwith composite reinforced concrete.5004
32250$12,478$1,730
Subtotal: $14,208
2021-22$669
$3,482$376
$4,228
$8,755Total Project Cost: $22,963
07160000561/30/2022
12/31/202111/12/2019PA&ED:
RTL:R/W Cert:
8/28/2022Begin Con:
07-Los Angeles-103 18-1919-2018-1921-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Irwindale, on the San Gabriel River Bridge No.53-1867. Reconstruct hinge diaphragms at hinge4 and hinge 6, upgrade bridge railing and reinstallelectroliers.
5026
32520$18,697
$596
Subtotal: $19,293
2020-21$1,061$3,665
$444$4,244
$9,414Total Project Cost: $28,707
07160000821/6/2021
11/6/202010/4/2019PA&ED:
RTL:R/W Cert:
10/28/2021Begin Con:
07-Los Angeles-210 18-1919-2019-2020-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R36.8
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 85 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Azusa, at the North Fork San Gabriel RiverBridge No. 53-2245. Replace bridge.
5298
34340$11,742
$10
Subtotal: $11,752
2018-19 $1,930$20
$4,476
$6,426Total Project Cost: $18,178
071800001811/1/20189/3/2018
9/20/2017PA&ED:
RTL:R/W Cert:
8/1/2019Begin Con:
07-Los Angeles-39PriorPrior18-19
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R31.2
Con Sup:
Bridge Scour Mitigation
Const:R/W:
In Long Beach, at the San Gabriel River BridgeNo. 53-1185 and SB LA-605 to NB I-405connector Bridge No. 53-1737H; also in OrangeCounty on I-405 at the SB 405 to NB 605connector Bridge No. 55-0413F; 12-Ora-405-PM24.1. Retrofit scour critical bridges to preservethe structural integrity of the bridges by enlargingand deepening pile cap, adding Cast in DrilledHole (CIDH) piles and reinforcing the area with Rock Slope Protection (RSP).
4984
32100$15,831
$254
Subtotal: $16,085
2021-22$2,140$6,840
$300$5,840
$15,120Total Project Cost: $31,205
07160000443/20/20222/16/20229/15/2019PA&ED:
RTL:R/W Cert:
11/4/2022Begin Con:
07-Los Angeles-405 Prior19-2019-2021-22
201.1113 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0
Con Sup:
Bridge Scour Mitigation
Const:R/W:
In the city of Los Angeles, at the 5th StreetOvercrossing No. 53-0685 and 6th StreetOvercrossing No. 53-0746. Upgrade bridgerailing.
5002
32230$3,520
$30
Subtotal: $3,550
2020-21$465
$1,673$30
$1,632
$3,800Total Project Cost: $7,350
07160000548/26/20207/15/20202/21/2019PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
07-Los Angeles-110 18-1919-2019-2020-21
201.1121565 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
22.8
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In Pasadena, at the Arroyo Seco Bridge No. 53-0166. Replace/upgrade bridge railing.
5003
32240$5,420$2,530
Subtotal: $7,950
2021-22$1,300$2,500
$200$2,860
$6,860Total Project Cost: $14,810
071600005512/30/20217/15/20219/20/2019PA&ED:
RTL:R/W Cert:
2/26/2022Begin Con:
07-Los Angeles-134 18-1921-2221-2221-22
201.1123434 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R12.6
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 86 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Kern County line, at the Tejon PassOvercrossing No. 53-1779. Seismic retrofit ofbridge, widen bridge abutments, add steel casingto bent columns, retrofit bent foundation andinstall micro piles.
5032
32590$1,800
$50
Subtotal: $1,850
2021-22$700
$1,500$400
$1,500
$4,100Total Project Cost: $5,950
07160000917/15/20216/15/202110/1/2019PA&ED:
RTL:R/W Cert:
1/5/2022Begin Con:
07-Los Angeles-5 18-1920-2120-2121-22
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R87.4
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In Compton, at Compton Creek Bridge OverheadNo. 53-2235 and offramp No. 53-2237S andArtesia-Santa Fe Undercrossing No. 53-2238K;also in Long Beach on Routes 710 and 110, atHarbor Scenic Drive Overhead No. 53-2934 (PM6.0) and Gaffy Street Bridge No. 53-0397Y (PMR0.8). Bridge seismic retrofit and bridge railupgrade.
4704
30160$10,712
$50
Subtotal: $10,762
2019-20$2,260$3,500
$150$3,500
$9,410Total Project Cost: $20,172
07140000243/30/20202/28/20208/30/2018PA&ED:
RTL:R/W Cert:
12/30/2020Begin Con:
07-Los Angeles-91 Prior18-1918-1919-20
201.1135 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R10.2/R10.4
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In Pasadena, at Orange Grove Boulevard-E134/134 Overcrossing No. 53-2269S; also onRoute 710, at Union Street Overcrossing No. 53-2537 (PM R32.5). Bridge seismic retrofit andbridge rail upgrade.
4591
29180$5,360
$20
Subtotal: $5,380
2018-19 $2,400$63
$2,000
$4,463Total Project Cost: $9,843
071200009611/2/20187/31/20187/3/2017PA&ED:
RTL:R/W Cert:
12/27/2019Begin Con:
07-Los Angeles-134PriorPrior18-19
201.1132 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R13.1
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In and near Palmdale, Azusa and Pomona, at theCalifornia Aqueduct Bridge No. 53-2174; also onRoute 39 at the San Gabriel River Bridge No. 53-0113 (PM 17.81) and Route 71 at the RidgewayStreet Undercrossing Bridge No. 53-2052 (PMR0.92). Seismic retrofit, barrier replacement,paint San Gabriel River Bridge
5035
32620$19,329
$101
Subtotal: $19,430
2021-22$1,372$4,549
$488$5,686
$12,095Total Project Cost: $31,525
071600011310/3/20218/7/20218/1/2019PA&ED:
RTL:R/W Cert:
6/10/2022Begin Con:
07-Los Angeles-138 Prior19-2019-2021-22
201.1133 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
70.3
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 87 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In various cities, on Routes 210, 405 and 605 atvarious locations. Bridge seismic retrofit andbridge rail upgrade at five locations.4788
30930$6,395
$130
Subtotal: $6,525
2019-20$225
$1,137$20
$1,600
$2,982Total Project Cost: $9,507
071400028111/19/20198/30/20199/22/2017PA&ED:
RTL:R/W Cert:
4/10/2020Begin Con:
07-Los Angeles-210 PriorPriorPrior19-20
201.1135 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R38.6/R38.9
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In the city of Los Angeles, at WilmingtonOverhead No. 53-0352. Paint and repair bridgedeck.4729
30560$3,883
$245
Subtotal: $4,128
2019-20$305
$1,237$203$826
$2,571Total Project Cost: $6,699
07140001023/24/20202/14/20207/11/2018PA&ED:
RTL:R/W Cert:
5/4/2020Begin Con:
07-Los Angeles-1 Prior18-1918-1919-20
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.9
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In the city of Los Angeles, at Sun ValleyOverhead No. 53-1134. Paint bridge and replacedeck drain systems.4853
31420$7,200
$49
Subtotal: $7,249
2019-20$500
$1,200$200
$1,800
$3,700Total Project Cost: $10,949
07150001168/20/20197/10/2019
10/31/2017PA&ED:
RTL:R/W Cert:
1/17/2020Begin Con:
07-Los Angeles-5 PriorPriorPrior19-20
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
34.6
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In the city of El Monte, from Baldwin AvenueOvercrossing to Route 605 at Rio Hondo BridgeNo. 53-657, East El Monte Overhead No. 53-0867 and San Gabriel River Bridge No. 53-109L/R. Replace overhang joints with reinforced concrete closure pours.
5067
32830$8,140$1,262
Subtotal: $9,402
2021-22$813
$3,927$915
$3,526
$9,181Total Project Cost: $18,583
07160001752/1/20221/3/2022
10/1/2019PA&ED:
RTL:R/W Cert:
9/25/2022Begin Con:
07-Los Angeles-10 18-1919-2019-2021-22
201.1193 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
28.2/31.0
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 88 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In El Monte, at Peck Road Undercrossing No. 53-0661. Paint steel portion of bridge forpreventative maintenance to preserve and extendthe life of bridge.
5070
32870$1,632
$10
Subtotal: $1,642
2021-22$141$550$25
$522
$1,238Total Project Cost: $2,880
07160001822/17/20221/12/20226/1/2019PA&ED:
RTL:R/W Cert:
9/23/2022Begin Con:
07-Los Angeles-10 Prior19-2019-2021-22
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
29.4
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In the city of South Gate, at Paramount BoulevardOvercrossing No. 53-2425; also in the city ofDowney, at Ardis Avenue Overcrossing No. 53-2572. Remove and install new joint assemblies,apply waterproof coating, replace joint seals andapply methacrylate to Ardis Avenue Overcrossingdeck.
5069
32860$1,340
$27
Subtotal: $1,367
2020-21$259$891$26
$1,022
$2,198Total Project Cost: $3,565
071600018012/1/202010/1/20208/1/2019PA&ED:
RTL:R/W Cert:
7/30/2021Begin Con:
07-Los Angeles-105 18-1919-2019-2020-21
201.1192 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R14.6/R16.4
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In Carson, at Dolores Yard Overhead No. 53-1168. Upgrade bridge drainage system.
4721
30480$1,574
$395
Subtotal: $1,969
2019-20$301$525$203$351
$1,380Total Project Cost: $3,349
07140000843/30/20202/14/20207/18/2018PA&ED:
RTL:R/W Cert:
1/6/2020Begin Con:
07-Los Angeles-405 Prior18-1918-1919-20
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.8
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In Los Angeles County, at various locations.Establish standard vertical clearance.
ACCELERATED BRIDGE (PA&ED Only)5281
34210$221,390$152,980
Subtotal: $374,370
2019-20$15,640$41,760$10,980$61,790
$130,170Total Project Cost: $504,540
07170002443/30/20202/28/20204/18/2019PA&ED:
RTL:R/W Cert:
10/30/2020Begin Con:
07-Los Angeles-5 19-2019-2019-2019-20
201.32212 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
27.0/66.5
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 89 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of Los Angeles, at the NormandieAvenue Undercrossing Bridge No. 53-1565.Strengthen girders with epoxy and reinforcementsteel.
4966
31900$2,253
$22
Subtotal: $2,275
2021-22$508
$1,493$5
$1,188
$3,194Total Project Cost: $5,469
071600001610/21/20219/22/20217/15/2020PA&ED:
RTL:R/W Cert:
5/22/2022Begin Con:
07-Los Angeles-10 18-1920-2120-2121-22
201.3221 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R13.3
Con Sup:
Trans Permit Requirements for Bridges
Const:R/W:
In the City of Industry at Hacienda BoulevardUndercrossing (UC) No. 53-1789 (PM 15.93),Stemson Avenue UC No. 53-1784 (PM 16.30),Azusa Avenue Overcrossing No. 53-1785 (PM17.97) and Fullerton Road UC No. 53-1786 (PM19.46). Improve freight corridor movement bymodifying and replacing bridges to meet verticalclearance and load carrying capacity standards.
ACCELERATED BRIDGE (PA&ED Only)
5297
34330$37,600$1,000
Subtotal: $38,600
2020-21$3,320$3,984
$500$8,466
$16,270Total Project Cost: $54,870
07180000096/30/20205/29/2020
10/31/2019PA&ED:
RTL:R/W Cert:
7/30/2021Begin Con:
07-Los Angeles-60 Prior20-2120-2120-21
201.3224 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
15.9/19.5
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
ROADWAY PRESERVATIONIn Baldwin Park and West Covina, from Route605 to Citrus Avenue. Rehabilitate roadway.
4712
30390$60,496
$147
Subtotal: $60,643
2019-20$990
$4,670$23
$8,444
$14,127Total Project Cost: $74,770
071400004411/19/20198/30/20192/14/2018PA&ED:
RTL:R/W Cert:
5/7/2020Begin Con:
07-Los Angeles-10 PriorPriorPrior19-20
201.12050.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
31.2/37.2
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In and near Redondo Beach, from Orange Countyline to south of Topaz Street. Upgrade ADA curbramps, upgrade metal beam guardrail, cold plane pavement, and place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt concrete (RHMA) to rehabilitate pavement.
4998
32160$38,220$1,554
Subtotal: $39,774
2021-22$1,680$4,886
$920$7,684
$15,170Total Project Cost: $54,944
07160000493/30/20222/26/2022
12/15/2018PA&ED:
RTL:R/W Cert:
11/6/2022Begin Con:
07-Los Angeles-1 Prior18-1918-1921-22
201.12199.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/19.0
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 90 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Redondo Beach, from Topaz Street toDewey Street. Upgrade ADA curb ramps andmetal beam guardrail, repair concrete pavement,replace asphalt concrete pavement with portland cement concrete at intersections, cold planepavement, and place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt concrete (RHMA) to rehabilitate pavement.
5034
32580$45,900$1,900
Subtotal: $47,800
2021-22$1,960$6,770
$780$8,770
$18,280Total Project Cost: $66,080
07160000903/30/20222/26/2022
12/15/2018PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
07-Los Angeles-1 Prior18-1918-1921-22
201.121104.9 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
19.0/33.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near the city of Los Angeles, fromCentinela Avenue to Cotner Avenue, North LaBrea Avenue to North Oxford Avenue and NorthHollywood Boulevard to Allesandro Street. Cold plane and overlay pavement, upgrade curb ramps, reconstruct curb and gutter, construct bus pads and replace traffic signals at several locations.
5184
33360$19,810
$38
Subtotal: $19,848
2021-22$1,900$5,000
$160$5,000
$12,060Total Project Cost: $31,908
07160003133/1/20221/5/20227/1/2020PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
07-Los Angeles-2 18-1920-2120-2121-22
201.12117.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.3/14.2
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Castaic and Valencia, from 0.2 mile north ofLake Hughes Road Undercrossing to 0.7 milesouth of Vista Del Lago Road Overcrossing.Cold plane pavement and place Rubberized HotMix Asphalt concrete (RHMA), repair drainagesystems, and perform upgrades to overhead signs,drainage curbs and guardrail.
5013
32340$43,080
$55
Subtotal: $43,135
2020-21$100
$2,549$50
$4,006
$6,705Total Project Cost: $49,840
07160000647/30/20217/9/2021
10/30/2019PA&ED:
RTL:R/W Cert:
10/26/2023Begin Con:
07-Los Angeles-5 Prior19-2019-2020-21
201.121112 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R59.7/R73.7
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Long Beach, from Route 1 to San GabrielUndercrossing. Cold plane pavement and overlaywith Rubberized Hot Mixed Asphalt - Type G(RHMA-G), upgrade curb ramps to current ADA standards, install guardrail and construct buspads.
5022
32440$4,376
$126
Subtotal: $4,502
2020-21$670
$2,523$12
$1,967
$5,172Total Project Cost: $9,674
071600007712/15/202011/5/20209/15/2019PA&ED:
RTL:R/W Cert:
9/5/2021Begin Con:
07-Los Angeles-22 18-1919-2019-2020-21
201.1217.37 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/1.5
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 91 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Canoga Park, from Pacific CoastHighway to Entrada Road; also near WoodlandCrest Drive to near Devonshire Street (PM10.11/18.62). Cold plane and overlay asphaltpavement, repair damaged structural and upgradecurb ramps to meet ADA standards.
5007
32290$30,550
$499
Subtotal: $31,049
2021-22$1,593$4,405
$576$5,540
$12,114Total Project Cost: $43,163
071600005910/21/20219/21/20213/28/2020PA&ED:
RTL:R/W Cert:
7/1/2022Begin Con:
07-Los Angeles-27 18-1920-2120-2121-22
201.12153.47 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/4.7
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Diamond Bar, from the OrangeCounty line to Route 60. Pavement rehabilitation.
4718
30450$18,750
$90
Subtotal: $18,840
2018-19$50
$1,800$10
$2,000
$3,860Total Project Cost: $22,700
071400006710/23/20183/19/20197/26/2017PA&ED:
RTL:R/W Cert:
9/3/2019Begin Con:
07-Los Angeles-57 PriorPriorPrior18-19
201.12144.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R4.5
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In the cities of Los Angeles, Calabasas andAgoura Hills, from Route 170 to Kanan Road.Rehabilitate pavement, construct and upgradeADA curb ramps.
4770
30750$9,995$2,389
Subtotal: $12,384
2019-20$370
$2,224$124
$1,607
$4,325Total Project Cost: $16,709
07140002173/19/2020
12/19/20193/26/2018PA&ED:
RTL:R/W Cert:
8/20/2020Begin Con:
07-Los Angeles-101 PriorPriorPrior19-20
201.121.1 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.8/35.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Torrance, from Route 1 to Redondo BeachBoulevard. Pavement rehabilitation.
4818
31180$10,900
Subtotal: $10,900
2018-19$137
$1,289$100
$1,744
$3,270Total Project Cost: $14,170
07150000143/19/20192/15/2019
10/11/2016PA&ED:
RTL:R/W Cert:
10/1/2019Begin Con:
07-Los Angeles-107 PriorPriorPrior18-19
201.12136.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/4.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 92 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of Los Angeles, Burbank, Glendaleand Pasadena, from Route 170 to Route 210.Rehabilitate pavement, upgrade guardrail andADA curb ramps to current standards.
4817
31170$34,034
$376
Subtotal: $34,410
2018-19$973
$3,800$254
$5,735
$10,762Total Project Cost: $45,172
071500001312/28/201810/3/2018
12/15/2017PA&ED:
RTL:R/W Cert:
5/23/2019Begin Con:
07-Los Angeles-134 PriorPriorPrior18-19
201.121112 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/R13.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Gorman and Lancaster, from Route 5 toRoute 14. Rehabilitate pavement.
4804
31040$21,879
$128
Subtotal: $22,007
2018-19$510
$1,810$22
$2,115
$4,457Total Project Cost: $26,464
071500000112/14/201810/12/20182/10/2017PA&ED:
RTL:R/W Cert:
12/10/2020Begin Con:
07-Los Angeles-138 18-19PriorPrior18-19
201.12177 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/36.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In the cities of Irwindale and Baldwin Park, fromRoute 10 Interchange to the end of the freeway atRoute 210. Grind mainline pavement and replacedamaged stabs with Jointed Plain ConcretePavement (JPCP) rapid strength concrete and/orIndividual Precast Slab Replacement (IPSR), coldplane and overlay median, shoulders, ramps with Hot Mix Asphalt (HMA), construct additionallane on southbound Arrow Highwayofframp/modify signal, install and upgradeguardrail.
5029
32550$16,410$2,721
Subtotal: $19,131
2021-22$1,375$6,856
$138$6,242
$14,611Total Project Cost: $33,742
071600008511/8/20218/9/2021
12/1/2018PA&ED:
RTL:R/W Cert:
9/6/2022Begin Con:
07-Los Angeles-605 Prior19-2019-2021-22
201.12139.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.2/26.0
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In San Fernando, from Route 118 to Route 210.Rehabilitate roadway.
4805
30970$41,600
$120
Subtotal: $41,720
2019-20$1,013$5,710
$150$7,421
$14,294Total Project Cost: $56,014
071400030011/27/20199/27/20198/1/2018PA&ED:
RTL:R/W Cert:
6/10/2020Begin Con:
07-Los Angeles-5 PriorPriorPrior19-20
201.12246.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
39.2/R43.8
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 93 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Palmdale and Lancaster, from Avenue P-8 tothe Kern County line. Replace distressedlanes/shoulders, cold plane and overlay ramps,upgrade guardrail, dikes, sign panels, curb rampsand traffic loop detectors.
4887
31600$142,660
$210
Subtotal: $142,870
2020-21$3,000
$21,200$280
$25,800
$50,280Total Project Cost: $193,150
071500019411/6/20209/2/2020
4/11/2019PA&ED:
RTL:R/W Cert:
2/24/2021Begin Con:
07-Los Angeles-14 18-1918-1918-1920-21
201.12282.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R60.7/R77.0
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In the cities of Los Angeles, Pacoima, SanFernando, and Sylmar from Route 5 to NorthWheatland Avenue. Rehabilitate roadway.4801
30960$104,084
$358
Subtotal: $104,442
2018-19$500
$6,000$500
$14,000
$21,000Total Project Cost: $125,442
07140002993/28/20192/15/20199/29/2017PA&ED:
RTL:R/W Cert:
1/6/2020Begin Con:
07-Los Angeles-210 PriorPriorPrior18-19
201.12251.7 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R9.7
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In various cities, from Orange County line toTelegraph Road. Replace structural section onlanes 3 and 4 and other damaged concrete slabson other lanes. Cold plane and overlay Rubberized Hot Mix Asphalt (RHMA-G) on rightshoulders and apply High Friction SurfaceTreatment (HFST) onramps and connectors.
4979
32030$99,810
$25
Subtotal: $99,835
2021-22$1,960$9,290
$150$24,620
$36,020Total Project Cost: $135,855
07160000332/15/2022
10/15/20212/15/2019PA&ED:
RTL:R/W Cert:
11/15/2022Begin Con:
07-Los Angeles-605 Prior18-1918-1921-22
201.122104 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R10.2
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In Santa Clarita, from 1.1 mile north of PlaceritaCanyon Road to 0.2 mile south of Golden ValleyRoad. Regrade slopes, construct drainage ditchesand install erosion control system.
5237
33960$24,600
$36
Subtotal: $24,636
2021-22$1,090$2,720
$49$3,750
$7,609Total Project Cost: $32,245
07170001571/1/2022
11/1/20213/1/2020PA&ED:
RTL:R/W Cert:
11/1/2022Begin Con:
07-Los Angeles-14 18-1919-2019-2021-22
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R29.2/R29.4
Con Sup:
Roadway Protective Betterments
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 94 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of Los Angeles and Malibu, fromsouth of Tenescal Canyon Road to VenturaCounty line; also in Ventura County, from LosAngeles County line to Tonga Street (PM0.0/0.9). Rehabilitate culverts.
4846
31350$4,384
$182
Subtotal: $4,566
2018-19$1,950$2,000
$70$1,535
$5,555Total Project Cost: $10,121
07150000903/6/20192/4/20197/2/2018PA&ED:
RTL:R/W Cert:
8/22/2019Begin Con:
07-Los Angeles-1 Prior18-1918-1918-19
201.15120 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
37.7/62.8
Con Sup:
Drainage System Restoration
Const:R/W:
In the cities of Los Angeles, Hollywood, LongBeach and Signal Hill from Simons Underpass toEastern Avenue; on Routes 101, 405 and 710 atvarious locations. Replace 9 pump plants.
4910
31750$4,803
$10
Subtotal: $4,813
2018-19$360
$1,038$30
$1,500
$2,928Total Project Cost: $7,741
07150002461/30/2019
12/31/201812/1/2017PA&ED:
RTL:R/W Cert:
8/14/2019Begin Con:
07-Los Angeles-5 PriorPriorPrior18-19
201.1519 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.0/13.9
Con Sup:
Drainage System Restoration
Const:R/W:
In various cities, on Route 5 (PM 19.75/35.99),Route 10 (PM 22.32/23.88), Route 91 (PMR11.80), Route 605 (PM R14.07) and Route 710(PM 18.7/21.01). Replace pumps withsubmersible pumps.
5024
32490$5,946
$14
Subtotal: $5,960
2020-21$254
$1,075$73
$1,110
$2,512Total Project Cost: $8,472
07160000792/28/20211/1/2021
12/1/2019PA&ED:
RTL:R/W Cert:
11/30/2021Begin Con:
07-Los Angeles-5 18-1919-2020-2120-21
201.15115 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
19.8/36.0
Con Sup:
Drainage System Restoration
Const:R/W:
In the city of Los Angeles, on the northboundconnector at the Route 5/110 Separation. Replacecompromised 18 inch Reinforced ConcreteCulvert (RCP).
5223
33800$1,654
$10
Subtotal: $1,664
2019-20$709
$2,548$123
$2,462
$5,842Total Project Cost: $7,506
071700005310/1/20199/1/2019
7/15/2018PA&ED:
RTL:R/W Cert:
5/1/2020Begin Con:
07-Los Angeles-5 Prior18-1918-1919-20
201.1511 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.8
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 95 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Pyramid Lake, 4.4 miles north of TemplinHighway. Remove and replace two sections ofdamaged reinforced concrete pipe.4847
31360$1,384
$20
Subtotal: $1,404
2019-20$180$350$20
$970
$1,520Total Project Cost: $2,924
07150000929/10/20187/31/20186/1/2017PA&ED:
RTL:R/W Cert:
3/25/2019Begin Con:
07-Los Angeles-5 PriorPriorPrior19-20
201.1512 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R70.4
Con Sup:
Drainage System Restoration
Const:R/W:
In the City of Santa Clarita, near southboundofframp to Sierra Highway. Replace damageddrainage system that includes 17 culverts.5219
33760$2,719
$10
Subtotal: $2,729
2019-20$556
$1,881$23
$1,262
$3,722Total Project Cost: $6,451
071700003610/1/20199/3/2019
7/13/2018PA&ED:
RTL:R/W Cert:
5/1/2020Begin Con:
07-Los Angeles-14 Prior18-1918-1919-20
201.1511 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.9
Con Sup:
Drainage System Restoration
Const:R/W:
In Long Beach, at Henry Ford Avenue offramp.Construct larger pump plant facility includingreplacing undersized pumps.5043
32730$22,593$1,646
Subtotal: $24,239
2020-21$1,198$2,586
$420$3,954
$8,158Total Project Cost: $32,397
07160001263/30/20211/15/2021
12/31/2019PA&ED:
RTL:R/W Cert:
10/1/2021Begin Con:
07-Los Angeles-103 18-1919-2019-2020-21
201.1511 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.1/0.1
Con Sup:
Drainage System Restoration
Const:R/W:
Near Gardena, south of Redondo BeachBoulevard. Replace culvert.
4849
31380$2,820
$50
Subtotal: $2,870
2018-19$110
$1,325$20
$1,200
$2,655Total Project Cost: $5,525
07150000953/29/20192/28/20191/17/2018PA&ED:
RTL:R/W Cert:
3/13/2020Begin Con:
07-Los Angeles-110 PriorPriorPrior18-19
201.1511 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.0
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 96 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Glendale, from east of Concord StreetOvercrossing to west of Chevy Chase DriveUndercrossing at three locations. Restore culvertsystems.
4848
31370$1,810
$10
Subtotal: $1,820
2018-19$200
$1,200$50
$1,175
$2,625Total Project Cost: $4,445
07150000939/10/20187/31/2018
10/19/2017PA&ED:
RTL:R/W Cert:
3/25/2019Begin Con:
07-Los Angeles-134 PriorPriorPrior18-19
201.1513 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R6.3/R8.2
Con Sup:
Drainage System Restoration
Const:R/W:
In Rancho Palos Verdes, from Caddington Driveto Peninsula Verde Drive. Replace two damageddrainage systems.3734
25310$1,662
$260
Subtotal: $1,922
2019-20$234$923$310$423
$1,890Total Project Cost: $3,812
07000004573/30/20202/28/20208/17/2018PA&ED:
RTL:R/W Cert:
10/31/2019Begin Con:
07-Los Angeles-213 Prior18-1918-1919-20
201.1513 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.7/3.9
Con Sup:
Drainage System Restoration
Const:R/W:
In the cities of Los Angeles and Monterey Park,from Olympic Boulevard to Ramona Boulevard.Rehabilitate culverts. 4845
31340$1,207
$50
Subtotal: $1,257
2018-19$100$155$47
$205
$507Total Project Cost: $1,764
07150000894/30/20191/11/20196/30/2017PA&ED:
RTL:R/W Cert:
9/30/2019Begin Con:
07-Los Angeles-710 PriorPriorPrior18-19
201.15110 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
23.6/26.3
Con Sup:
Drainage System Restoration
Const:R/W:
In Santa Monica, at McClure Tunnel Bridge No.53-0008. Enhance safety lighting inside tunnel.
4903
31690$5,180
$15
Subtotal: $5,195
2018-19$150$592$50
$1,903
$2,695Total Project Cost: $7,890
071500022711/30/201810/9/20186/30/2017PA&ED:
RTL:R/W Cert:
6/14/2019Begin Con:
07-Los Angeles-1 PriorPriorPrior18-19
201.170150 Lighting fixture(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
35.1/35.4
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 97 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Los Angeles County, from 4th StreetOvercrossing to San Bernardino County line.Replace sign panels with ASTM Type XI retroreflective sheeting and remove overhead signlighting and catwalks.
5201
33530$7,823
$50
Subtotal: $7,873
2020-21$588
$2,700$60
$1,900
$5,248Total Project Cost: $13,121
071600036310/16/202010/1/20208/23/2019PA&ED:
RTL:R/W Cert:
5/14/2021Begin Con:
07-Los Angeles-10 18-1919-2019-2020-21
201.170599 Sign(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.2/48.3
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
In various cities, from Route 5 to San BernardinoCounty line; also on Route 710, from Ocean Boulevard to Valley Boulevard (PM 5.6/T27.4).Replace existing signs with retro-reflectivesheeting.
4906
31730$2,665
$15
Subtotal: $2,680
2019-20$398
$1,081$5
$1,156
$2,640Total Project Cost: $5,320
07150002372/28/20201/10/20208/24/2018PA&ED:
RTL:R/W Cert:
1/27/2021Begin Con:
07-Los Angeles-60 Prior18-1918-1919-20
201.17096 Lighting fixture(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/R30.5
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
In various cities, from 9th Street/Gaffey Street toend of freeway. Replace sign panels withretroreflective sheeting ASTM Type XI, removeoverhead lighting and catwalks.
5074
32980$5,360
$10
Subtotal: $5,370
2020-21$418
$2,342$21
$1,573
$4,354Total Project Cost: $9,724
07160002063/18/20211/15/20211/16/2020PA&ED:
RTL:R/W Cert:
10/26/2021Begin Con:
07-Los Angeles-110 18-1919-2019-2020-21
201.170500 Sign(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/31.9
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
MOBILITYIn Pasadena and South Pasadena, at the Fair OaksAvenue northbound offramp. Widen ramp fromtwo lanes to four lanes. City of South Pasadena will AAA the project.
5196
33520$1$0
Subtotal: $1
2021-22$1,400$2,372
$0$0
$3,772Total Project Cost: $3,773
07160003558/1/2021
6/30/20213/1/2020PA&ED:
RTL:R/W Cert:
4/20/2022Begin Con:
07-Los Angeles-110 18-1920-21
201.31023.4 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
31.0/31.0
Con Sup:
Operational Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 98 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of Sherman Oaks, at southboundonramp from Ventura Boulevard. Widen theonramp to two lanes plus a High OccupancyVehicle (HOV) lane.
2681
20490$3,120
$29
Subtotal: $3,149
2021-22$785
$1,918$141
$1,343
$4,187Total Project Cost: $7,336
071700002210/21/20219/21/20213/23/2020PA&ED:
RTL:R/W Cert:
7/15/2022Begin Con:
07-Los Angeles-405 18-1920-2120-2121-22
201.31012.5 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
39.1
Con Sup:
Operational Improvements
Const:R/W:
In and near Santa Monica, from LincolnBoulevard to McClure Tunnel; also on Route 10(PM 2.1/18.3), Route 2 (PM R18.7), Route 101(PM 11.8), and Route 105 (PM R1.95). Upgradethe existing Transportation Management System(TMS) elements to improve traffic monitoring,data transmission, and network connectivityincluding the Los Angeles RegionalTransportation Management Center (LARTMC)and communication hubs at Route 10, Route 101and Route 105.
5041
32720$17,264
$327
Subtotal: $17,591
2020-21$539
$3,159$43
$3,284
$7,025Total Project Cost: $24,616
071600012110/15/20208/22/2020
12/15/2018PA&ED:
RTL:R/W Cert:
5/13/2021Begin Con:
07-Los Angeles-1 Prior18-1918-1920-21
201.315129 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R34.5/35.2
Con Sup:
Transportation Management Systems
Const:R/W:
In and near the city of Los Angeles, from EBRoute 60/5 Separation to Route 605; also onRoute 2 (PM R18.7), Route 5 (PM 6.8), Route 10(PM 18.3), and Route 605 (PM 20.2). Upgradethe existing Transportation Management System(TMS) elements to improve traffic monitoring,data transmission, and network connectivityincluding the Los Angeles RegionalTransportation Management Center (LARTMC)on Route 2, Route 5, Route 10, and Route 605.
5040
32710$6,674
$153
Subtotal: $6,827
2020-21$30
$1,028$45
$1,450
$2,553Total Project Cost: $9,380
071600012010/21/20208/21/20206/15/2018PA&ED:
RTL:R/W Cert:
5/22/2021Begin Con:
07-Los Angeles-60 Prior19-2019-2020-21
201.31562 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.6/11.8
Con Sup:
Transportation Management Systems
Const:R/W:
In and near Carson, from Route 110 to OrangeCounty line; also on Route 2 (PM R18.7), Route 5(PM 6.8), Route 405 (PM 21.1). Upgrade theexisting Transportation Management System(TMS) elements to improve traffic monitoring,data transmission, and network connectivityincluding the various communication hubs onRoute 2, Route 5, and Route 405.
5226
33860$10,851
$590
Subtotal: $11,441
2021-22$511
$2,630$150
$2,237
$5,528Total Project Cost: $16,969
07170000601/3/20228/3/2021
12/12/2018PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
07-Los Angeles-91 Prior18-1918-1921-22
201.31568 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R6.1/R20.7
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 99 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In various ciites, from Routes 5/10 to Route 405,Route 2 at Route 134 (PM R18.7) and Route 10 atRoute 5/10 (PM 18.3). Upgrade TransportationManagement System (TMS) elements includingClosed Circuit Television (CCTV) cameras,Ramp Metering Systems (RMS), Vehicle Detection Stations (VDS), Highway AdvisoryRadio (HAR), Changeable Message Signs (CMS)and the communication system network.
5221
33780$9,718
$13
Subtotal: $9,731
2021-22$438
$3,008$162
$1,863
$5,471Total Project Cost: $15,202
07170000541/3/20229/3/2021
7/15/2018PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
07-Los Angeles-101 Prior18-1918-1921-22
201.31598 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/R17.1
Con Sup:
Transportation Management Systems
Const:R/W:
In the cities of San Pedro, Carson, Gardena andLos Angeles, from Gaffey Street To Route 5; alsoon Route 2 at the TMC Building (PM 18.7),Route 5 at Route 10 Interchange (PM 16.9) andRoute 405 at Route 105 Interchange (PM 21.3).Upgrade and completion of TMS.
4830
31200$29,000
$702
Subtotal: $29,702
2018-19$20
$3,720$105
$5,000
$8,845Total Project Cost: $38,547
07150000512/20/20197/13/2018
11/30/2017PA&ED:
RTL:R/W Cert:
8/15/2019Begin Con:
07-Los Angeles-110 PriorPriorPrior18-19
201.315219 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.7/25.7
Con Sup:
Transportation Management Systems
Const:R/W:
In the cities of Los Angeles, Wilmington, andCarson, from Gaffey Street to Route 405; also onRoute 210 (PM R0.0/R35.8), Route 605 (PM19.9/26.0), Route 710 (PM 5.0/9.4) and Route 2(PM R18.7). Install wireless Bluetooth™detection system to monitor travel time.
5188
33500$1,373
$10
Subtotal: $1,383
2020-21$40
$200
$300
$540Total Project Cost: $1,923
071600034610/21/20207/21/2020
12/28/2018PA&ED:
RTL:R/W Cert:
4/22/2021Begin Con:
07-Los Angeles-110 Prior18-19
20-21
201.31576 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.7/8.8
Con Sup:
Transportation Management Systems
Const:R/W:
In the city of Los Angeles, from Route 170 toRoutes 210/710; also on Route 2 at Route 134(PM R18.7), on Route 10 at Routes 5/10 (PM18.3), and on Route 101 near Pleasant ValleyRoad (PM 11.8). Upgrade TransportationManagement System (TMS) elements includingClosed Circuit Television (CCTV) cameras,Ramp Metering Systems (RMS), Vehicle Detection Stations (VDS), Highway AdvisoryRadio (HAR), Changeable Message Signs (CMS)and the communication system network.
5222
33790$7,559
$13
Subtotal: $7,572
2021-22$454
$2,840$154
$1,953
$5,401Total Project Cost: $12,973
07170000521/3/20228/3/2021
7/15/2018PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
07-Los Angeles-134 Prior18-1918-1921-22
201.31569 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/R13.3
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 100 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In various cities, from Orange County line toRoute 210; also on Route 2 at the TMC (PMR18.7) and Route 5 (PM 6.8). Upgrade Transportation Management System.
4819
31190$10,562
Subtotal: $10,562
2018-19$20
$2,299$2
$2,490
$4,811Total Project Cost: $15,373
07150000163/5/20192/1/20196/9/2015PA&ED:
RTL:R/W Cert:
2/27/2020Begin Con:
07-Los Angeles-605 18-19PriorPrior18-19
201.315115 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/26.0
Con Sup:
Transportation Management Systems
Const:R/W:
In Santa Clarita, from 0.4 mile north of RyeCanyon Road to 1.4 miles south of Route 5/126interchange. Replace office structure andinspection enclosure and upgrade floor slab lighting with LED lighting.
5071
32880$850$10
Subtotal: $860
2020-21$550
$2,000$20
$1,200
$3,770Total Project Cost: $4,630
07160001838/20/20202/20/20209/15/2019PA&ED:
RTL:R/W Cert:
5/15/2021Begin Con:
07-Los Angeles-5 18-1919-2019-2020-21
201.3211 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R54.4/R54.8
Con Sup:
Weigh Stations
Const:R/W:
In Van Nuys, near Saticoy Street. Replace andinstall Weight In Motion system.
4724
30510$2,195
Subtotal: $2,195
2018-19$528$983$12
$890
$2,413Total Project Cost: $4,608
07140000971/4/2019
12/7/201812/1/2017PA&ED:
RTL:R/W Cert:
8/12/2019Begin Con:
07-Los Angeles-405 PriorPriorPrior18-19
201.3211 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
42.9
Con Sup:
Weigh Stations
Const:R/W:
ROADSIDE PRESERVATIONIn La Crescenta and La Canada Flintridge, fromLowell Avenue to Arroyo Boulevard. Restoreexisting irrigation to functionality, upgraderemaining older irrigation controllers to webconnect "smart controllers.
5080
33070$3,528
$10
Subtotal: $3,538
2020-21$375
$1,077$20
$1,383
$2,855Total Project Cost: $6,393
071600021712/18/202010/14/20209/16/2019PA&ED:
RTL:R/W Cert:
8/20/2021Begin Con:
07-Los Angeles-210 18-1919-2019-2020-21
201.21022 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
15.6/22.6
Con Sup:
Highway Planting Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 101 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Los Angeles($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
FACILITIESIn the city of Los Angeles, at the CaliforniaDepartment of Transportation District 7headquarters office building, 100 S. Main Street.Repair damaged roof.
5287
34240$2,300
$0
Subtotal: $2,300
2018-19$0
$450$10
$450
$910Total Project Cost: $3,210
07170002778/15/20187/15/20186/29/2017PA&ED:
RTL:R/W Cert:
12/15/2018Begin Con:
07-Los Angeles-10118-1918-1918-19
201.3531 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Office Facilities
Const:R/W:
MISCELLANEOUSIn Kern County, at the Tejon Safety RoadsideRest Area (PM 0.8). Install concrete pavementsolar panels along the rest area shoulders.5159
33320$2,739
$61
Subtotal: $2,800
2020-21$500$340$20
$340
$1,200Total Project Cost: $4,000
07160003019/2/20208/3/20206/3/2019PA&ED:
RTL:R/W Cert:
5/1/2021Begin Con:
07-Los Angeles-5 18-1919-2019-2020-21
201.9991 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.8
Con Sup:
Miscellaneous
Const:R/W:
In and near the city of Los Angeles, from DitmanAvenue southbound offramp to Route 134; alsoon Route 2 (PM R18.7) and Route 101 (PM 11.8).Multi-objective Asset Management project thatincludes widening and extending decelerationlength on the Indiana Street/Calzona Streetsouthbound offramp, upgrade guardrail and TMS,construct highway worker safety features.
5157
33300$16,927
$147
Subtotal: $17,074
2021-22$650
$2,800$25
$4,100
$7,575Total Project Cost: $24,649
07160002982/28/20221/31/20228/9/2019PA&ED:
RTL:R/W Cert:
9/30/2022Begin Con:
07-Los Angeles-5 18-1919-2019-2021-22
201.999101 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
14.7/26.9
Con Sup:
Miscellaneous
Const:R/W:
CountyLos Angeles
PA&ED:PS&E:
R/W Sup:Con Sup:
$202,589$1,830,553
R/W:
Subtotal: $2,033,142
Const:$128,388$392,070$42,378
$451,509
?
Total (Capital + Support): $3,047,487
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 102 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Madera($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear the city of Madera, at Cottonwood CreekBridge No. 41-065R, No. 41-0065L, and No. 41-0065S. Replace bridges to mitigate corrosion bychloride latent concrete.
6857
0V120$24,500
$137
Subtotal: $24,637
2021-22$2,400$3,200
$100$6,100
$11,800Total Project Cost: $36,437
06160002077/26/20217/7/20217/1/2020PA&ED:
RTL:R/W Cert:
3/2/2022Begin Con:
06-Madera-99 Prior20-2120-2121-22
201.1103 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R7.0/R7.5
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near the city of Madera, at South Gateway DriveOvercrossing No. 41-0046K. Replace bridgerailing, grind deck, and place reinforced PortlandCement Concrete (PCC) to rehabilitate bridge.
6887
0U170$2,700
$30
Subtotal: $2,730
2019-20$950
$1,600$1
$1,300
$3,851Total Project Cost: $6,581
06160002065/1/20204/2/2020
3/15/2019PA&ED:
RTL:R/W Cert:
10/28/2020Begin Con:
06-Madera-99 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.7
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
ROADWAY PRESERVATIONNear Fresno, from north of Avenue 15 to south ofRoute 145. Roadway rehabilitation. Additional$22,000 from Local/Private contribution.6708
0R210$10,184$3,160
Subtotal: $13,344
2019-20$2,463$2,390$1,296$2,722
$8,871Total Project Cost: $22,215
06140000583/1/20202/1/20209/1/2019PA&ED:
RTL:R/W Cert:
10/1/2020Begin Con:
06-Madera-41 Prior19-2019-2019-20
201.12021.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.3/9.2
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In and near Madera, from 0.3 mile north ofAvenue 16 Overcrossing to 0.9 mile north ofAvenue 20 Overcrossing. Rehabilitate pavementon mainline and ramps.
6789
0U520$11,210
$27
Subtotal: $11,237
2018-19 $1,118$19
$1,379
$2,516Total Project Cost: $13,753
06160000031/23/201912/1/20185/11/2016PA&ED:
RTL:R/W Cert:
7/15/2019Begin Con:
06-Madera-99PriorPrior18-19
201.12126 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.1/19.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 103 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Madera($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Chowchilla, from Route 152 to theMerced County line. Roadway rehabilitation.
6732
0T210$17,000
$30
Subtotal: $17,030
2018-19$499
$1,885$30
$2,507
$4,921Total Project Cost: $21,951
06150000373/23/20182/1/20183/1/2017PA&ED:
RTL:R/W Cert:
3/1/2019Begin Con:
06-Madera-99 PriorPriorPrior18-19
201.12226 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
22.7/29.4
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
ROADSIDE PRESERVATIONIn various counties, on various routes. Establishmitigation bank for future Caltrans projects inDistricts 6 and 10 to protect the California TigerSalamander.
6750
0U020$1,800
Subtotal: $1,800
2018-19$5
$130$5
$60
$200Total Project Cost: $2,000
06150001761/2/2019
12/3/20188/25/2017PA&ED:
RTL:R/W Cert:
9/1/2019Begin Con:
06-Madera-Var PriorPriorPrior18-19
201.2405 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Roadside Enhancement
Const:R/W:
CountyMadera
PA&ED:PS&E:
R/W Sup:Con Sup:
$3,384$67,394
R/W:
Subtotal: $70,778
Const:$6,317
$10,323$1,451
$14,068
$32,159
Total (Capital + Support): $102,937
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 104 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Marin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Sausalito, at 0.1 mile south of AlexanderAvenue. Restore damaged drainage systems.
1492J
4J420$909$13
Subtotal: $922
2019-20$837$850$100$850
$2,637Total Project Cost: $3,559
04150003442/1/20202/1/20201/1/2019PA&ED:
RTL:R/W Cert:
7/8/2020Begin Con:
04-Marin-101 Prior18-1918-1919-20
201.1312 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.2
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONIn San Rafael, at Route 580; and in SonomaCounty in Santa Rosa from PM 19.7 to PM 20.7;in Solano County on Route 37 in Vallejo fromPM R9.4 to PM R10.4 and on Route 80 in andnear Vallejo and Fairfield from PM 6.5 to 17.5;also, in Napa County on Route 29 in and near thecities of Napa and Yountville from PM 11.0 to21.0. Upgrade fencing to reduce maintenanceworker exposure.
1452K
2K810$3,142
$100
Subtotal: $3,242
2021-22$550$550$100$550
$1,750Total Project Cost: $4,992
04170000284/15/20221/15/20226/1/2020PA&ED:
RTL:R/W Cert:
10/15/2022Begin Con:
04-Marin-101 18-1919-2019-2021-22
201.23541 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
9.4/10.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn San Rafael, at Manuel T Freitas Parkway.Upgrade curb ramps, sidewalk, and otherfacilities to make compliant with ADA standards.1495K
0K800$2,239
$125
Subtotal: $2,364
2021-22$300$850$120$850
$2,120Total Project Cost: $4,484
04160001415/2/20221/3/20226/1/2020PA&ED:
RTL:R/W Cert:
11/15/2022Begin Con:
04-Marin-101 18-1919-2019-2021-22
201.3618 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
13.7
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In and near Tiburon, at BlackfieldDrive/Greenwood Cove Drive. Intersectionimprovements to make compliant with the ADAincluding removal of traffic islands, upgradingcurb ramps and sidewalk, installing new trafficsignals, and installing Accessible PedestrianSignal (APS) pushbuttons and countdown timers.
1491A
4J450$1,488
$55
Subtotal: $1,543
2019-20$400$409$220$450
$1,479Total Project Cost: $3,022
04150003506/30/20205/1/2020
11/1/2018PA&ED:
RTL:R/W Cert:
12/9/2020Begin Con:
04-Marin-131 18-1918-1918-1919-20
201.3617 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.9
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 105 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Marin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Almonte, near Route 101 offramp to Route 1;also from Coyote Creek to Flamingo Road.Upgrade pedestrian facilities.0434H
2G690$1,976
$842
Subtotal: $2,818
2018-19$510
$1,000$300$850
$2,660Total Project Cost: $5,478
040002121111/16/201810/31/20186/16/2017PA&ED:
RTL:R/W Cert:
5/1/2019Begin Con:
04-Marin-1 PriorPriorPrior18-19
201.37828 Structure(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/0.8
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
BRIDGE PRESERVATIONNear Point Reyes Station, at Lagunitas CreekBridge No. 27-0023. Replace bridge.
0756K
0G642$11,552$2,691
Subtotal: $14,243
2019-20$4,187$1,400
$685$1,756
$8,028Total Project Cost: $22,271
04130003508/1/2019
7/25/20191/25/2018PA&ED:
RTL:R/W Cert:
2/7/2020Begin Con:
04-Marin-1 PriorPriorPrior19-20
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.5
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Near Point Reyes Station, at Millerton GulchBridge No. 27-0114. Repair damagedembankment and construct retaining wall.0480C
0J570$4,020
$450
Subtotal: $4,470
2018-19$1,620$1,080
$180$830
$3,710Total Project Cost: $8,180
04140000146/21/20196/7/2019
12/1/2017PA&ED:
RTL:R/W Cert:
2/4/2020Begin Con:
04-Marin-1 PriorPriorPrior18-19
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
33.4
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In San Rafael, at Irwin Creek Bridge No. 27-0097. Rehabilitate corrugated metal arch culvertbridge and adjoining deteriorated culvertstructures.
1493K
0K510$1,903
$944
Subtotal: $2,847
2021-22$1,100
$880$215$610
$2,805Total Project Cost: $5,652
04160000966/1/20225/1/20228/1/2020PA&ED:
RTL:R/W Cert:
9/15/2022Begin Con:
04-Marin-101 Prior20-2120-2121-22
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.3
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 106 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Marin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONNear Point Reyes Station and Olema, from OlemaCreek Bridge to north of Cypress Road; also, nearTomales, from south of Tomales-Petaluma Roadto south of Valley Ford Road (PM 45.0/50.5).Pavement rehabilitation.
1480A
1J960$13,783
$517
Subtotal: $14,300
2019-20$1,320$1,254
$66$1,540
$4,180Total Project Cost: $18,480
04140004031/9/2020
12/2/201910/1/2018PA&ED:
RTL:R/W Cert:
7/9/2020Begin Con:
04-Marin-1 Prior18-1918-1919-20
201.12127.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
22.8/31.2
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
MOBILITYIn and near Sausalito, Corte Madera, andLarkspur, from north of Golden Gate Bridge to0.3 mile north of Sir Francis Drake Boulevard.Install ramp metering and Traffic OperationsSystem (TOS) elements.
0334J
15161$9,700
$110
Subtotal: $9,810
2018-19 $1,500$50
$1,600
$3,150Total Project Cost: $12,960
04140004466/1/20185/1/20185/7/2014PA&ED:
RTL:R/W Cert:
1/16/2019Begin Con:
04-Marin-101PriorPrior18-19
201.31511 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.3/9.0
Con Sup:
Transportation Management Systems
Const:R/W:
CountyMarin
PA&ED:PS&E:
R/W Sup:Con Sup:
$5,847$50,712
R/W:
Subtotal: $56,559
Const:$10,824$9,773$2,036$9,886
$32,519
Total (Capital + Support): $89,078
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 107 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mariposa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn the community of Mariposa, from Route 49 to12th Street. Improve pedestrian access facilitiesto reduce collision severity.3131
0Y600$1,550
$159
Subtotal: $1,709
2019-20$296$528$411$390
$1,625Total Project Cost: $3,334
10130002449/19/20198/16/20194/13/2018PA&ED:
RTL:R/W Cert:
3/18/2020Begin Con:
10-Mariposa-140 Prior18-1918-1919-20
201.01524 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.2/21.8
Con Sup:
Collision Severity Reduction
Const:R/W:
MANDATESIn the Mariposa community, from 3rd Street to7th street. Upgrade pedestrian facilities to makecompliant with the ADA standards.3151
0Y590$1,326
$55
Subtotal: $1,381
2021-22$739$626$453$592
$2,410Total Project Cost: $3,791
10130002405/1/2022
4/15/20224/15/2020PA&ED:
RTL:R/W Cert:
11/15/2022Begin Con:
10-Mariposa-140 18-1919-2019-2021-22
201.36120 ADA unit(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
21.2/21.4
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
ROADWAY PRESERVATIONNear the community of Mariposa, from MaderaCounty line to the south junction with Route 140.Pavement rehabilitation.3233
1C040$16,197
$7
Subtotal: $16,204
2019-20$403
$1,032$9
$2,150
$3,594Total Project Cost: $19,798
10170000342/18/202010/1/201910/9/2018PA&ED:
RTL:R/W Cert:
9/27/2020Begin Con:
10-Mariposa-49 Prior18-1918-1919-20
201.12134.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.3/18.5
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near the Mariposa community, from 1.7miles east of Catheys Valley Park to the northRoute 49 Junction. Rehabilitate pavement andupgrade ADA ramps.
3252
0Y770$17,363$1,989
Subtotal: $19,352
2021-22$1,025$1,095
$416$1,689
$4,225Total Project Cost: $23,577
10150000086/1/20225/1/20222/1/2020PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
10-Mariposa-140 18-1919-2019-2021-22
201.12126.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
12.0/22.0
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 108 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mariposa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near the Mariposa community and El Portal,from East Whitlock Road to Yosemite NationalPark entrance. Pavement rehabilitation.3167
0Y780$23,765
$162
Subtotal: $23,927
2021-22$900
$1,900$30
$2,330
$5,160Total Project Cost: $29,087
101600002510/1/20219/1/20215/1/2020PA&ED:
RTL:R/W Cert:
4/15/2022Begin Con:
10-Mariposa-140 18-1919-2019-2021-22
201.12154.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
25.3/51.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Briceburg, at 2.1 miles west of Bull CreekRoad. Repair slope slip-out and erosion damageat large culvert pipe outlet. 3194
0Y340$1,850
$40
Subtotal: $1,890
2020-21$0
$955$155$925
$2,035Total Project Cost: $3,925
10140001829/30/20208/30/20207/29/2016PA&ED:
RTL:R/W Cert:
4/30/2021Begin Con:
10-Mariposa-14018-1918-1920-21
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
32.2
Con Sup:
Roadway Protective Betterments
Const:R/W:
Near Fish Camp, from south of Miami MountainRoad to south of Yosemite National Parkboundary; also, in Madera County (PMD0.639/D1.841). Rehabilitate culverts.
3158
1E770$1,893
$16
Subtotal: $1,909
2018-19$435$929$84
$905
$2,353Total Project Cost: $4,262
101500011312/4/201812/3/2018
10/27/2017PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
10-Mariposa-41 PriorPriorPrior18-19
201.15119 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.1/4.9
Con Sup:
Drainage System Restoration
Const:R/W:
CountyMariposa
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,428$63,944
R/W:
Subtotal: $66,372
Const:$3,798$7,065$1,558$8,981
$21,402
Total (Capital + Support): $87,774
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 109 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mendocino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Dos Rios, from 1.4 to 1.7 miles east ofRodeo Creek Bridge. Construct soldier pile wallsand drainage galleries.4553
0B530$7,630
$355
Subtotal: $7,985
2018-19$2,060$1,650
$170$1,700
$5,580Total Project Cost: $13,565
01140000356/30/20196/15/20197/1/2018PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
01-Mendocino-162 Prior18-1918-1918-19
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.5/11.8
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONNear Gualala, from 0.4 mile north of HavensNeck Drive to 0.5 mile south of Iverson Road.Widen shoulders and install edge-line rumblestrips and guardrail.
4630
0F710$519$433
Subtotal: $952
2019-20$940$978$472$728
$3,118Total Project Cost: $4,070
01160000473/1/2020
2/15/20201/11/2019PA&ED:
RTL:R/W Cert:
9/15/2020Begin Con:
01-Mendocino-1 Prior18-1918-1919-20
201.0106 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.5/9.5
Con Sup:
Safety Improvements
Const:R/W:
Near Albion, from 1.5 miles north of Route 128to 0.1 mile south of Navarro Ridge Road. Widenfor standard shoulders, and install rumble stripsand guardrail.
4578
0C550$1,702
$462
Subtotal: $2,164
2019-20$622$326$223$608
$1,779Total Project Cost: $3,943
01120003003/13/20202/28/2020
12/14/2018PA&ED:
RTL:R/W Cert:
8/14/2020Begin Con:
01-Mendocino-1 Prior18-1918-1919-20
201.01016 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
41.8/42.3
Con Sup:
Safety Improvements
Const:R/W:
Near Fort Bragg, from 0.03 mile south to 0.07mile north of Abalobadiah Creek. Curve improvement and shoulder widening.4639
0G060$1,991
$263
Subtotal: $2,254
2019-20$874
$1,094$190$783
$2,941Total Project Cost: $5,195
01160001203/1/2020
2/15/20203/8/2019PA&ED:
RTL:R/W Cert:
8/1/2020Begin Con:
01-Mendocino-1 Prior18-1918-1919-20
201.01016 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
71.2/71.4
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 110 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mendocino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Fort Bragg, from 0.34 mile west of Road200A to 0.13 mile west of Road 200A. Widenshoulders, install center and edge-line rumblestrips, and install guardrail.
4613
0E860$1,339
$88
Subtotal: $1,427
2018-19$782
$1,117$129
$1,063
$3,091Total Project Cost: $4,518
01150000383/13/20202/28/2020
10/15/2018PA&ED:
RTL:R/W Cert:
9/11/2020Begin Con:
01-Mendocino-20 Prior18-1918-1918-19
201.01014 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.9/17.2
Con Sup:
Safety Improvements
Const:R/W:
Near Willits, from 1.0 mile to 0.8 mile west ofThree Chop Road. Widen eastbound shoulders, construct guard railing, place High Friction Surface Treatment (HFST), and extend anexisting culvert.
4650
0G430$1,303
$17
Subtotal: $1,320
2019-20$603$843$175$718
$2,339Total Project Cost: $3,659
01160001883/15/20203/1/20202/1/2019PA&ED:
RTL:R/W Cert:
8/15/2020Begin Con:
01-Mendocino-20 Prior18-1918-1919-20
201.0108 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
24.7/24.9
Con Sup:
Safety Improvements
Const:R/W:
Near Dos Rios, from 1.0 mile east of the MiddleWay to 1.3 miles east of the Middle Way. Increase safety by improving roadway cross slopeat curve, installing High Friction SurfaceTreatment (HFST), and installing an underdrain system.
4652
0G480$1,042
$6
Subtotal: $1,048
2018-19$553$672$123$723
$2,071Total Project Cost: $3,119
011700000912/15/201812/1/20184/1/2018PA&ED:
RTL:R/W Cert:
5/15/2019Begin Con:
01-Mendocino-162 PriorPriorPrior18-19
201.01014 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
17.4/17.8
Con Sup:
Safety Improvements
Const:R/W:
In Mendocino, Lake, Del Norte, and HumboldtCounties on Routes 1, 20, 29, 96, 101, 128, 162,169, 175, 199, 253, 254, 271, 281, and 299, atvarious locations. Replace curve warning signs tomake standard.
7022
0G050$2,322
$9
Subtotal: $2,331
2019-20$413
$1,067$58
$986
$2,524Total Project Cost: $4,855
01160001189/1/20199/1/20192/1/2019PA&ED:
RTL:R/W Cert:
1/1/2020Begin Con:
01-Mendocino-Var 18-1918-1918-1919-20
201.01530 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 111 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mendocino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Laytonville, at Moss Cove Safety RoadsideRest Area (SRRA); also at Irvine Lodge SRRA(PM 61.8) and Empire Camp SRRA (PM 82.5).Upgrade potable and wastewater systems.
4574
0C450$6,322
$3
Subtotal: $6,325
2019-20$365
$2,260$46
$1,232
$3,903Total Project Cost: $10,228
01120002856/15/20206/1/20204/1/2018PA&ED:
RTL:R/W Cert:
10/1/2020Begin Con:
01-Mendocino-101 PriorPriorPrior19-20
201.2353 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
58.9/82.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Fort Bragg, from Route 20 to Pudding CreekBridge. Construct ADA compliant curb ramps and sidewalk, add high visibility signing andstriping at crosswalks, construct retaining walls,and upgrade drainage.
4546
0B220$4,218
$256
Subtotal: $4,474
2020-21$750
$1,246$511
$1,588
$4,095Total Project Cost: $8,569
011200011012/1/2020
11/15/20209/1/2019PA&ED:
RTL:R/W Cert:
7/1/2021Begin Con:
01-Mendocino-1 18-1919-2019-2020-21
201.37868 Structure(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
59.8/62.1
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
BRIDGE PRESERVATIONNear Albion, from 2.2 miles north of Route 128Junction to 0.2 mile north of Salmon CreekBridge No. 10-0134. Bridge replacement.4491
40140$36,775$6,324
Subtotal: $43,099
2019-20$5,800$5,593
$810$6,290
$18,493Total Project Cost: $61,592
01000001552/14/20201/31/2020
11/15/2018PA&ED:
RTL:R/W Cert:
3/1/2020Begin Con:
01-Mendocino-1 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
42.4/43.3
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Albion, from 3.0 miles north of Route 128Junction to 0.2 mile north of Albion River BridgeNo. 10-0136. Bridge Replacement.4490
40110$53,699$7,748
Subtotal: $61,447
2019-20$5,500$5,220
$828$5,950
$17,498Total Project Cost: $78,945
01000001546/30/20203/13/20205/17/2019PA&ED:
RTL:R/W Cert:
12/15/2020Begin Con:
01-Mendocino-1 Prior19-2019-2019-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
43.3/44.2
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 112 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mendocino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Ukiah, from east of Route 101 to east ofRoad 144 at Russian River Bridge and OverheadNo. 10-0182. Rehabilitate bridge deck.4587
0E090$25,832
$250
Subtotal: $26,082
2019-20$2,087$3,129
$260$7,824
$13,300Total Project Cost: $39,382
01130001233/1/2020
2/15/20202/15/2019PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
01-Mendocino-20 Prior18-1918-1919-20
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
33.3/34.4
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In and near Fort Bragg, at Little River Bridge No.10-0178, at Jack Peters Bridge No. 10-0150 andat Pudding Creek Bridge No. 10-0158. Upgradeand replace barrier rails and bridge replacement.
4507
43480$15,650$1,099
Subtotal: $16,749
2019-20$3,806$2,825
$341$3,650
$10,622Total Project Cost: $27,371
01000006723/6/2020
2/28/202012/14/2018PA&ED:
RTL:R/W Cert:
9/4/2020Begin Con:
01-Mendocino-1 Prior18-1918-1919-20
201.1121463 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Fort Bragg, at Elk Creek Bridge No. 10-0120. Replace and upgrade bridge rails.
4588
0E110$7,325
$333
Subtotal: $7,658
2019-20$1,363$1,445
$191$1,759
$4,758Total Project Cost: $12,416
01130001253/12/20212/26/20219/13/2019PA&ED:
RTL:R/W Cert:
8/27/2021Begin Con:
01-Mendocino-1 Prior19-2019-2019-20
201.112321.5 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
31.4
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near the Mendocino community, at RussianGulch Bridge No. 10-0151 (PM 52.64). Replaceor upgrade bridge to address bridge rail standards,functionality, structural integrity, and provideaccess for pedestrians and bicycles.
4636
43481$34,109$7,128
Subtotal: $41,237
2021-22$2,637$2,808
$396$13,142
$18,983Total Project Cost: $60,220
01160001013/18/20223/4/2022
8/14/2020PA&ED:
RTL:R/W Cert:
10/14/2022Begin Con:
01-Mendocino-1 18-1920-2120-2121-22
201.1121134 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R52.4/R52.9
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 113 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mendocino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Fort Bragg, at Hare Creek Bridge No. 10-0175. Upgrade bridge rails and widen to makestandard.4588B
0E111$12,452
$474
Subtotal: $12,926
2021-22$2,770$2,979
$183$3,498
$9,430Total Project Cost: $22,356
01150001095/1/20224/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
01-Mendocino-1 18-1920-2120-2121-22
201.112868 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
59.7
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Piercy, at South Fork Eel River Bridge No.10-0218 (PM R106.57): also in Humboldt County(PM T0.0 to T0.1). Seismic bridge retrofit,bridge rail upgrade, restripe for wider shouldersand bicycle access, and upgrade deck drainage.
4627
0F510$3,605
$26
Subtotal: $3,631
2021-22$739
$1,028$248
$1,278
$3,293Total Project Cost: $6,924
01160000151/15/20221/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
6/1/2022Begin Con:
01-Mendocino-101 18-1920-2120-2121-22
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R106.4/T106.8
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Near Longvale, from 8.2 miles to 8.3 miles east of Route 101 at Eel River Bridge No. 10-0236.Bridge seismic retrofit.4692
0A131$6,383
$618
Subtotal: $7,001
2021-22$737
$1,295$127
$4,179
$6,338Total Project Cost: $13,339
01170002231/15/2022
12/30/202110/1/2020PA&ED:
RTL:R/W Cert:
6/1/2022Begin Con:
01-Mendocino-162 18-1920-2120-2121-22
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
8.2
Con Sup:
Bridge Seismic Restoration
Const:R/W:
ROADWAY PRESERVATIONIn and near Point Arena, from Sonoma CountyLine to 0.1 mile south of Mill Street. Pavementrehabilitation.4626
0F440$12,585
$15
Subtotal: $12,600
2019-20$623$704$85
$2,590
$4,002Total Project Cost: $16,602
011600000810/1/20199/17/201912/1/2018PA&ED:
RTL:R/W Cert:
3/15/2020Begin Con:
01-Mendocino-1 Prior18-1918-1919-20
201.12131.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/15.0
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 114 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mendocino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Fort Bragg, from Pudding CreekBridge to 0.6 mile north of Wages Creek Bridge.Pavement rehabilitation.0154T
36270$13,582
$1
Subtotal: $13,583
2018-19$336$501$36
$657
$1,530Total Project Cost: $15,113
01160000315/15/20195/1/20199/1/2018PA&ED:
RTL:R/W Cert:
10/1/2019Begin Con:
01-Mendocino-1 Prior18-1918-1918-19
201.12132.9 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
62.1/78.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Hopland, from 0.7 mile south of GeysersRoad to Hopland Overhead. Pavementrehabilitation.4442
46630$13,289
$1
Subtotal: $13,290
2018-19$362$635
$4$1,724
$2,725Total Project Cost: $16,015
01160000245/15/20195/1/20199/1/2018PA&ED:
RTL:R/W Cert:
10/1/2019Begin Con:
01-Mendocino-101 Prior18-1918-1918-19
201.12136.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.1/R9.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Albion, at Navarro Ridge Road. Improvedrainage, repair erosion, widen shoulders, andrepair roadway.4616
0E940$1,102
$168
Subtotal: $1,270
2019-20$415$405$67
$370
$1,257Total Project Cost: $2,527
01150000483/13/20202/28/2020
12/14/2018PA&ED:
RTL:R/W Cert:
8/1/2020Begin Con:
01-Mendocino-1 Prior18-1918-1919-20
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
42.3/42.5
Con Sup:
Roadway Protective Betterments
Const:R/W:
ROADSIDE PRESERVATIONNear Point Arena and Fort Bragg, from 0.6 milenorth of Haven Neck Drive to 0.1 mile north ofSouth Fork Cotteneva Creek Bridge. Advancemitigation credit purchases (14 credits) for futureSHOPP construction projects expected to impactwetlands.
4693
0H440 $8,820
Subtotal: $8,820
2019-20$57
$1,700$7
$1,764Total Project Cost: $10,584
01170002223/15/20193/1/2019
4/15/2018PA&ED:
RTL:R/W Cert:
6/15/2019Begin Con:
01-Mendocino-1 PriorPriorPrior
201.2407 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.8/87.9
Con Sup:
Roadside Enhancement
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 115 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mendocino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Manchester and Fort Bragg, from GarciaRiver Bridge to 0.1 mile north of AbalobadiahCreek. Advance mitigation credit purchases (7credits) for future SHOPP construction projectsexpected to impact sensitive streams.
4699
0H441 $4,410
Subtotal: $4,410
2018-19$29
$850$3
$882Total Project Cost: $5,292
01180000776/15/20198/1/2019
4/15/2018PA&ED:
RTL:R/W Cert:
10/15/2019Begin Con:
01-Mendocino-1 PriorPriorPrior
201.2404 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.5/71.4
Con Sup:
Roadside Enhancement
Const:R/W:
CountyMendocino
PA&ED:PS&E:
R/W Sup:Con Sup:
$39,307$264,776
R/W:
Subtotal: $304,083
Const:$35,223$42,370$5,683
$63,040
$146,316
Total (Capital + Support): $450,399
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 116 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Merced($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear the city of Merced, at various locations,from Route 5 to 6 miles east of the city ofMerced. Upgrade metal beam guardrails3018
0Y110$2,940
$928
Subtotal: $3,868
2019-20$1,442
$873$280$704
$3,299Total Project Cost: $7,167
101300010811/15/201911/1/2019
11/17/2017PA&ED:
RTL:R/W Cert:
5/29/2020Begin Con:
10-Merced-140 PriorPriorPrior19-20
201.01536 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/42.1
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near the cities of Gustine and Merced,from Outside Canal Bridge No. 39-0055 to 1.3miles west of Mariposa County line, at variouslocations. Replace bridge approach guardrail ontwo bridges and removal of obstructions fromclear recovery zone at 11 locations.
3074
0Y130$4,225
$355
Subtotal: $4,580
2021-22$1,279
$769$252
$1,172
$3,472Total Project Cost: $8,052
10130002432/1/2022
11/15/202111/1/2019PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
10-Merced-140 19-2020-2120-2121-22
201.01539 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.3/49.0
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Los Banos, from 0.3 mile east ofRoute 5 to 0.2 mile west of Route 59. Upgradeguardrail to make standard. 3740
1C370$2,598
$13
Subtotal: $2,611
2020-21$650$939$12
$745
$2,346Total Project Cost: $4,957
10170000435/4/2021
8/26/20202/7/2020PA&ED:
RTL:R/W Cert:
11/30/2021Begin Con:
10-Merced-152 18-1919-2019-2020-21
201.01525 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
14.1/R40.7
Con Sup:
Collision Severity Reduction
Const:R/W:
MANDATESIn Los Banos, from 0.3 mile south of Route 152to Dove Street at various locations. UpgradeADA facilities.3149
0X520$968
$1,280
Subtotal: $2,248
2019-20$347$477
$1,280$505
$2,609Total Project Cost: $4,857
10130000024/20/20203/16/20207/5/2017PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
10-Merced-165 PriorPriorPrior19-20
201.361100 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.5/10.6
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 117 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Merced($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONIn Merced County, on Routes 152, 140, and 59 atvarious locations. Seismic retrofit and bridge railupgrade of 7 bridges.3122
0G830$6,530
$416
Subtotal: $6,946
2019-20$982$649$19
$1,984
$3,634Total Project Cost: $10,580
10120003162/21/20202/7/20201/2/2019PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
10-Merced-152 Prior18-1918-1919-20
201.1137 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In Merced, San Joaquin, Mariposa and Stanislauscounties on various routes at various locations.Scour mitigation and preventative structuralmaintenance measures at 13 bridges.
3102
1C810$2,100$1,894
Subtotal: $3,994
2020-21$819$950$542
$1,100
$3,411Total Project Cost: $7,405
101500003812/18/202012/1/20207/2/2018PA&ED:
RTL:R/W Cert:
7/23/2021Begin Con:
10-Merced-5 Prior18-1918-1920-21
201.11913 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONIn and near the city of Merced, from south ofChilds Avenue to south of Franklin Road. Roadway rehabilitation.3089
1C170$46,000
$95
Subtotal: $46,095
2019-20$1,600$3,700
$122$12,400
$17,822Total Project Cost: $63,917
10140001445/15/20204/15/20204/2/2018PA&ED:
RTL:R/W Cert:
11/13/2020Begin Con:
10-Merced-99 PriorPriorPrior19-20
201.12219.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R12.7/17.6
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In and near Atwater, from 0.4 mile south ofBuhach Road to south of Westside Boulevard.Roadway rehabilitation.5431
3A720$60,600$3,369
Subtotal: $63,969
2018-19$1,973$5,200
$677$10,000
$17,850Total Project Cost: $81,819
10130002596/21/20196/14/201911/3/2017PA&ED:
RTL:R/W Cert:
2/14/2020Begin Con:
10-Merced-99 Prior18-1918-1918-19
201.12216.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.1/24.3
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 118 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Merced($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Merced County, on Routes 152, 59, and 99 andin San Joaquin County on Routes 5 and 12, atvarious locations. Rehabilitate culverts.3139
0S120$1,768
$151
Subtotal: $1,919
2019-20$622$743$124$765
$2,254Total Project Cost: $4,173
10150000055/1/20194/1/20196/4/2018PA&ED:
RTL:R/W Cert:
1/3/2020Begin Con:
10-Merced-152 Prior18-1918-1919-20
201.15120 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYNear Los Banos, at Route 33 Interchange; also,on Route 5 (PM 6.3) at Route 165 Interchange.Improve the truck turn radius.3214
0T680$2,216
$274
Subtotal: $2,490
2021-22$495$850$64
$630
$2,039Total Project Cost: $4,529
101700000512/1/2021
11/15/20215/15/2020PA&ED:
RTL:R/W Cert:
6/15/2022Begin Con:
10-Merced-152 18-1919-2019-2021-22
201.31048 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
11.3
Con Sup:
Operational Improvements
Const:R/W:
ROADSIDE PRESERVATIONNear Los Banos and Firebaugh, at the John"Chuck" Erreca Safety Roadside Rest Area(SRRA). Upgrade northbound and southboundSRRA facilities.
3215
1C790$16,700
$5
Subtotal: $16,705
2021-22$925
$2,970$10
$3,150
$7,055Total Project Cost: $23,760
10160000468/2/2021
1/15/20218/12/2019PA&ED:
RTL:R/W Cert:
2/11/2022Begin Con:
10-Merced-5 18-1919-2019-2021-22
201.2502 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.4/0.8
Con Sup:
Safety Roadside Rest Area Restoration
Const:R/W:
CountyMerced
PA&ED:PS&E:
R/W Sup:Con Sup:
$8,780$146,645
R/W:
Subtotal: $155,425
Const:$11,134$18,120$3,382
$33,155
$65,791
Total (Capital + Support): $221,216
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 119 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Modoc($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Cedarville, from 0.6 mile west of CedarPass Ski Tow Road to Cedar Pass Ski Tow Road.Curve improvement.3607
1H330$3,214
$15
Subtotal: $3,229
2018-19$580$680$90
$840
$2,190Total Project Cost: $5,419
02150001506/4/20185/4/2018
9/19/2017PA&ED:
RTL:R/W Cert:
9/18/2018Begin Con:
02-Modoc-299 PriorPriorPrior18-19
201.01018 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
51.9/52.5
Con Sup:
Safety Improvements
Const:R/W:
CountyModoc
PA&ED:PS&E:
R/W Sup:Con Sup:
$15$3,214
R/W:
Subtotal: $3,229
Const:$580$680$90
$840
$2,190
Total (Capital + Support): $5,419
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 120 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mono($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Tom’s place, from 2.4 miles south of LowerRock Creek Road to 0.3 mile north of LowerRock Creek Road. Widen shoulders, flattenslopes, install ground in rumble strips, reconstructand install guardrail.
0662
36070$13,740
$368
Subtotal: $14,108
2020-21$922
$2,037$485
$2,799
$6,243Total Project Cost: $20,351
09140000036/30/20206/30/20208/27/2018PA&ED:
RTL:R/W Cert:
10/7/2020Begin Con:
09-Mono-395 18-1918-1918-1920-21
201.01532.4 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
6.9/9.6
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Lee Vining, from Route 167 Junction to 0.2mile north of Conway Ranch Road. Widenshoulders, install shoulder rumble strip, correctcompound curve, and improve chain control area.
2624
36640$5,490
$506
Subtotal: $5,996
2021-22$520$830$590
$1,440
$3,380Total Project Cost: $9,376
09160000064/1/20224/1/20224/1/2020PA&ED:
RTL:R/W Cert:
10/1/2022Begin Con:
09-Mono-395 18-1919-2019-2021-22
201.01560 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
58.2/60.2
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Bridgeport, from north of Devils GateSummit to Burcham Flat Road. Widen shouldersand add rumble strip.2600
34940$7,352$1,299
Subtotal: $8,651
2018-19$2,170$1,280
$350$1,729
$5,529Total Project Cost: $14,180
091200003310/31/201810/31/2018
5/3/2017PA&ED:
RTL:R/W Cert:
4/29/2019Begin Con:
09-Mono-395 PriorPriorPrior18-19
201.01549.5 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
88.4/91.6
Con Sup:
Collision Severity Reduction
Const:R/W:
In Mono County, on Route 395 at variouslocations; also, in Mono County on Route 6 atapproximately 7.0 miles north of Bishop (PM7.0). Improve the chain control turnouts bywidening and lengthening the pavement area,install lighting, improve signage, construct amedian cross-over, and construct two new chaincontrol turnouts.
2616
36660$5,710
$5
Subtotal: $5,715
2020-21$260$300$10
$740
$1,310Total Project Cost: $7,025
09160000082/1/2021
12/1/202011/1/2019PA&ED:
RTL:R/W Cert:
8/1/2021Begin Con:
09-Mono-395 18-1919-2019-2020-21
201.23513 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R2.2/R69.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 121 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Mono($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADSIDE PRESERVATIONIn Mono County, at various locations. Advancemitigation banking credits.
2621
36670$2,300
$600
Subtotal: $2,900
2019-20$200$200$100$150
$650Total Project Cost: $3,550
09160000096/26/20205/15/20202/15/2019PA&ED:
RTL:R/W Cert:
12/15/2020Begin Con:
09-Mono-395 Prior18-1918-1919-20
201.24011 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Roadside Enhancement
Const:R/W:
CountyMono
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,778$34,592
R/W:
Subtotal: $37,370
Const:$4,072$4,647$1,535$6,858
$17,112
Total (Capital + Support): $54,482
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 122 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Monterey($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Monterey, Santa Cruz and San BenitoCounties, on various routes at various locations.Replace and install advance curve warning signs.2595
1G310$1,852
$48
Subtotal: $1,900
2018-19$754
$1,044$35
$552
$2,385Total Project Cost: $4,285
05140001405/1/2019
4/29/20197/3/2018PA&ED:
RTL:R/W Cert:
10/11/2019Begin Con:
05-Monterey-Var Prior18-1918-1918-19
201.0151107 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near King City, from 0.1 mile south ofBroadway Street to 0.1 mile north of BroadwayStreet and from Jolon Road to 0.2 mile north ofJolon Road. Landscape mitigation.
2312Y
0T991$816
Subtotal: $816
2019-20 $344
$483
$827Total Project Cost: $1,643
05160001254/24/20209/9/2019
1/29/2015PA&ED:
RTL:R/W Cert:
11/30/2020Begin Con:
05-Monterey-101Prior
19-20
201.0152 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R41.5/49.8
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Salinas, from 0.1 mile north of EastMarket Street to 0.1 mile south of Sherwood Drive. Lengthen the onramp to improve mergingconflicts.
2635
1H050$4,750
$5
Subtotal: $4,755
2021-22$700
$1,900$190
$2,000
$4,790Total Project Cost: $9,545
05160000188/6/2021
4/23/20217/1/2019PA&ED:
RTL:R/W Cert:
2/23/2022Begin Con:
05-Monterey-101 18-1919-2019-2021-22
201.0153 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
87.4/87.8
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Bradley, at Camp Roberts Safety RoadsideRest Area (SRRA). Upgrade northbound andsouthbound SRRA facilities.2633
1H020$4,873
$6
Subtotal: $4,879
2019-20 $1,763$29
$1,240
$3,032Total Project Cost: $7,911
05160000134/1/2020
12/2/20196/15/2017PA&ED:
RTL:R/W Cert:
11/12/2020Begin Con:
05-Monterey-10118-1918-1919-20
201.2354 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 123 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Monterey($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Monterey and San Benito Counties, from northof North Gonzalez Overcrossing to the SantaClara County line. Roadside safetyimprovements.
2571
1F900$4,368
$456
Subtotal: $4,824
2019-20$715
$1,216$175
$1,355
$3,461Total Project Cost: $8,285
051400007312/24/201912/10/20194/13/2018PA&ED:
RTL:R/W Cert:
6/15/2020Begin Con:
05-Monterey-101 PriorPriorPrior19-20
201.23552 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
73.0/96.8
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Pacific Grove, from 17 Mile Drive to CongressAvenue. Construct ADA compliant pathwayalong eastbound Route 68, upgrade curb rampsand sidewalk to meet ADA standards. Relocatestreetlight pole and signs, remove and replanttrees.
2647
1H220$755$20
Subtotal: $775
2021-22$313$790$48
$586
$1,737Total Project Cost: $2,512
05160000418/2/20214/1/20217/1/2019PA&ED:
RTL:R/W Cert:
2/22/2022Begin Con:
05-Monterey-68 18-1919-2019-2021-22
201.3618 ADA unit(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.5/0.8
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Seaside, from El Monte Road to FremontBoulevard. Construct new sidewalks/upgradepedestrian pathway and construct/upgrade curbramps to meet current standards.
2648
1H230$1,122
$356
Subtotal: $1,478
2021-22$630
$1,269$1,016
$547
$3,462Total Project Cost: $4,940
051600004210/1/20217/1/20217/1/2019PA&ED:
RTL:R/W Cert:
4/22/2022Begin Con:
05-Monterey-218 18-1919-2019-2021-22
201.36123 ADA unit(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.2/L0.9
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONNear Carmel-By-The Sea, at Garrapata Creek No.44-0018. Rehabilitate bridge to extend the servicelife and mitigate corrosion by applyingElectrochemical Chloride Extraction (ECE)process and waterproofing to the structure.
2654
1H460$7,400
Subtotal: $7,400
2020-21$700
$1,500$90
$2,100
$4,390Total Project Cost: $11,790
05160000771/8/2021
9/15/20204/18/2019PA&ED:
RTL:R/W Cert:
7/12/2021Begin Con:
05-Monterey-1 Prior18-1918-1920-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
63.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 124 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Monterey($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Soledad, from Route 146 to Front Street atthe North Soledad Overhead No. 44-91R.Rehabilitate bridge.9700
0F970$7,358$1,578
Subtotal: $8,936
2019-20$34
$2,006$58
$1,535
$3,633Total Project Cost: $12,569
051300001711/1/20197/1/20199/2/2014PA&ED:
RTL:R/W Cert:
5/27/2020Begin Con:
05-Monterey-101 PriorPriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
62.1/63.2
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Big Sur, at the Castro Canon Bridge No. 44-0035. Upgrade bridge railing and approachrailings to meet current standards.2656
1H490$1,605
$41
Subtotal: $1,646
2020-21$608
$1,345$141$762
$2,856Total Project Cost: $4,502
05160000814/1/2021
12/1/202010/1/2019PA&ED:
RTL:R/W Cert:
12/1/2021Begin Con:
05-Monterey-1 18-1919-2019-2020-21
201.112542 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
43.1/43.1
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Castroville, from Route 183 to CastrovilleBoulevard. Upgrade bridge railing and widenoverhead.0900A
0A090$5,050
$467
Subtotal: $5,517
2019-20$70
$1,800$130
$1,340
$3,340Total Project Cost: $8,857
051300002811/22/2019
7/5/20199/2/2014PA&ED:
RTL:R/W Cert:
5/27/2020Begin Con:
05-Monterey-156 PriorPriorPrior19-20
201.112392 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R1.1/R2.1
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Paso Robles, at San Antonio River BridgeNo 44-0141L/R. Bridge seismic restoration.
2565
1F820$7,734
$841
Subtotal: $8,575
2019-20$1,529$1,800
$15$2,236
$5,580Total Project Cost: $14,155
05140000644/29/20202/11/20209/7/2018PA&ED:
RTL:R/W Cert:
12/30/2020Begin Con:
05-Monterey-101 Prior18-1918-1919-20
201.1132 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R6.7
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 125 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Monterey($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn and near Big Sur and Carmel, from TorreCanyon Bridge to San Luis Avenue. Pavementrehabilitation.2534
1F680$24,335
$31
Subtotal: $24,366
2018-19$858
$1,427$41
$2,828
$5,154Total Project Cost: $29,520
05140000466/11/20195/28/20195/31/2018PA&ED:
RTL:R/W Cert:
1/2/2020Begin Con:
05-Monterey-1 Prior18-1918-1918-19
201.12172.1 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
39.8/74.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Pacific Grove, from Forest Avenue toRoute 1. Upgrade ADA curb ramps, cold planepavement and place Rubberized Hot Mix Asphalt concrete (RHMA).
2631
1H000$7,996
$70
Subtotal: $8,066
2020-21$482
$1,638$312
$1,675
$4,107Total Project Cost: $12,173
051600001112/11/202010/26/20202/26/2019PA&ED:
RTL:R/W Cert:
7/15/2021Begin Con:
05-Monterey-68 Prior18-1918-1920-21
201.1216.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.1/L4.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Salinas, from north of North GonzalesOvercrossing to East Market Street. Pavementrehabilitation.2540
1F700$19,400
$70
Subtotal: $19,470
2018-19 $2,100$90
$2,300
$4,490Total Project Cost: $23,960
051400005510/29/2018
4/4/20186/30/2016PA&ED:
RTL:R/W Cert:
5/8/2019Begin Con:
05-Monterey-101PriorPrior18-19
201.12154 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
73.8/87.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near King City, from south of Paris Valley RoadOvercrossing to Rancho Undercrossing.Roadway rehabilitation.2546
1F740$26,950
Subtotal: $26,950
2018-19$11
$1,820$42
$3,490
$5,363Total Project Cost: $32,313
051400004912/7/20188/1/20187/1/2014PA&ED:
RTL:R/W Cert:
6/22/2020Begin Con:
05-Monterey-101 PriorPriorPrior18-19
201.12210.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R28.0/R30.6
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 126 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Monterey($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Salinas, from 0.4 mile south of EspinosaRoad Undercrossing to San Benito County line.Reconstruct embankment, widen shoulders,improve drainage systems, upgrade barrierrailing, cold plane pavement, place RubberizedHot Mix Asphalt concrete (RHMA) and place HotMix Asphalt (HMA) to rehabilitate roadway.
2679
1H690$104,000
$393
Subtotal: $104,393
2021-22$4,500$6,300$1,300
$12,600
$24,700Total Project Cost: $129,093
05160001408/3/2021
5/12/20219/3/2019PA&ED:
RTL:R/W Cert:
2/25/2022Begin Con:
05-Monterey-101 Prior19-2019-2021-22
201.12249 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R91.5/101.3
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Near Lucia, at 0.6 mile south of Limekiln CreekBridge. Replace culvert.
2230
0Q500$1,527
$23
Subtotal: $1,550
2019-20$936
$1,124$113$575
$2,748Total Project Cost: $4,298
05000202882/3/2020
10/28/201910/1/2018PA&ED:
RTL:R/W Cert:
6/1/2020Begin Con:
05-Monterey-1 Prior18-1918-1919-20
201.1511 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.4
Con Sup:
Drainage System Restoration
Const:R/W:
In Monterey and Santa Cruz Counties, on VariousRoutes and locations. Replace overhead signs.
2634
1H040$1,680
Subtotal: $1,680
2019-20 $1,000$38
$537
$1,575Total Project Cost: $3,255
051600001511/22/2019
7/2/20196/9/2016PA&ED:
RTL:R/W Cert:
6/17/2020Begin Con:
05-Monterey-Var18-1918-1919-20
201.17062 Sign(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
MOBILITYIn various counties, on various routes, and atvarious locations. Replace and upgrade existingdetection field elements for the TrafficManagement System (TMS).
2735
1H990$3,200
$21
Subtotal: $3,221
2019-20$585
$1,160$20
$465
$2,230Total Project Cost: $5,451
05170000474/1/20201/3/20209/5/2018PA&ED:
RTL:R/W Cert:
11/6/2020Begin Con:
05-Monterey-Var Prior18-1918-1919-20
201.31578 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 127 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Monterey($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Salinas, from 0.4 mile north ofAirport Boulevard Overcrossing to 0.3 mile southof San Miguel Canyon Road Overcrossing.Install vehicle detection systems, changeablemessage signs, cameras, and a vehicle pullout.
0064Q
0N200$1,500
$9
Subtotal: $1,509
2018-19$260
$1,000$45
$420
$1,725Total Project Cost: $3,234
05160000164/15/20191/11/20197/16/2018PA&ED:
RTL:R/W Cert:
9/16/2019Begin Con:
05-Monterey-101 Prior18-1918-1918-19
201.31511 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
86.0/95.8
Con Sup:
Transportation Management Systems
Const:R/W:
ROADSIDE PRESERVATIONIn Santa Barbara, San Luis Obispo, Monterey andSan Benito Counties, at various locations.Advance mitigation banking credits.2704
1H970 $2,919
Subtotal: $2,919
2018-19 $140$80
$220Total Project Cost: $3,139
0517000040
6/9/2017PA&ED:
RTL:R/W Cert:
Begin Con:
05-Monterey-VarPriorPrior
201.2403 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Roadside Enhancement
Const:R/W:
MISCELLANEOUSAt Camp Roberts Safety Roadside Rest Areas;also in San Luis Obispo County on Route 46 atShandon Safety Roadside Rest Area (PM 49.5).Transportation infrastructure improvement forzero-emission vehicle charging.
2705
1J040$1,210
$5
Subtotal: $1,215
2018-19 $480$18
$715
$1,213Total Project Cost: $2,428
051700005411/1/2018
10/24/20181/31/2017PA&ED:
RTL:R/W Cert:
3/20/2019Begin Con:
05-Monterey-101PriorPrior18-19
201.9993 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R3.1/R5.2
Con Sup:
Miscellaneous
Const:R/W:
In Castroville from Del Monte Ave toWashington Street, a multi-objective AssetManagement Pilot Project. Predominate mobilityproject.
2678
1H650$13,300$2,300
Subtotal: $15,600
2021-22$2,600$3,000$6,600$3,200
$15,400Total Project Cost: $31,000
05160001184/15/20224/14/20223/5/2020PA&ED:
RTL:R/W Cert:
10/26/2022Begin Con:
05-Monterey-183 18-1919-2019-2021-22
201.9991 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R8.4/R9.8
Con Sup:
Miscellaneous
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 128 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Monterey($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyMonterey
PA&ED:PS&E:
R/W Sup:Con Sup:
$9,659$252,781
R/W:
Subtotal: $262,440
Const:$16,285$37,966$10,626$43,541
$108,418
Total (Capital + Support): $370,858
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 129 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Napa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Napa, at northbound ramps and 1st Street.Construct roundabout.
1488P
2J100$3,780
$280
Subtotal: $4,060
2018-19 $250
$1,144
$1,394Total Project Cost: $5,454
04140004263/30/20182/23/20187/18/2016PA&ED:
RTL:R/W Cert:
2/22/2019Begin Con:
04-Napa-29Prior
18-19
201.01048 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.4
Con Sup:
Safety Improvements
Const:R/W:
Near Napa, at Huichica Creek (PM 0.75).Roadway widening.
0775G
4G210$8,700
$220
Subtotal: $8,920
2018-19$1,750$1,530
$90$900
$4,270Total Project Cost: $13,190
04120003105/31/20195/31/2019
12/29/2017PA&ED:
RTL:R/W Cert:
3/13/2020Begin Con:
04-Napa-121 PriorPriorPrior18-19
201.0100 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.7
Con Sup:
Safety Improvements
Const:R/W:
MANDATESNear Calistoga, at 0.3 mile south of Bothe-NapaValley State Park entrance at Ritchie CreekBridge No. 21-0057. Replace bridge and providefinancial contributions to improve fish passagebarriers at the site and within the adjacent StatePark for compliance unit credits towardsStatewide NPDES permit mandate goals.
1464K
4J990$7,566
$590
Subtotal: $8,156
2021-22$1,820$1,300
$167$1,300
$4,587Total Project Cost: $12,743
04160000376/1/20225/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
11/1/2022Begin Con:
04-Napa-28 18-1920-2120-2121-22
201.33570 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
33.1
Con Sup:
Storm Water Mitigation
Const:R/W:
In and near the cities of American Canyon andNapa, from Kimberly Drive to Salvador Avenue.Upgrade curb ramps and pedestrian push buttons,and install new sidewalk to make facilitiescompliant with ADA requirements.
1496E
0K000$989$80
Subtotal: $1,069
2021-22$275$276$92
$203
$846Total Project Cost: $1,915
04160000401/2/2022
10/1/20213/1/2020PA&ED:
RTL:R/W Cert:
7/1/2022Begin Con:
04-Napa-29 18-1920-2118-1921-22
201.36127 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.2/14.6
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 130 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Napa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Napa, at Capell Creek Bridge No. 21-0064.Bridge rehabilitation.
1489K
4J210$2,440
$225
Subtotal: $2,665
2019-20$490$735$100$735
$2,060Total Project Cost: $4,725
04150002884/15/20203/1/20209/1/2018PA&ED:
RTL:R/W Cert:
10/30/2020Begin Con:
04-Napa-121 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.6
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Rutherford, at Hopper Slough Bridge No. 20-0019. Replace bridge.
1451C
4J830$7,864$1,514
Subtotal: $9,378
2021-22$2,074$1,988
$206$2,014
$6,282Total Project Cost: $15,660
04160000385/2/20224/4/2022
10/1/2020PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
04-Napa-128 18-1920-2119-2021-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
5.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Calistoga, at Napa River Bridge No. 21-0018.Environmental mitigation and plant establishmentfor bridge replacement project.0587M
3G64A$500$85
Subtotal: $585
2018-19 $640$400$150
$1,190Total Project Cost: $1,775
04160003496/28/20196/14/20192/9/2015PA&ED:
RTL:R/W Cert:
12/27/2019Begin Con:
04-Napa-29PriorPrior18-19
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
37.0
Con Sup:
Bridge Scour Mitigation
Const:R/W:
In and near the cities of Napa and Yountville, atCraig Creek Bridge No. 21-0048 (PM 14.11), DryCreek Bridge No. 21-0014 (PM 16.48), PerfumeCreek Bridge No. 21-0051 (PM 17.81), and California Drive Undercrossing No. 21-0047 (PM19.04). Upgrade bridge rails and widen shouldersto make standard.
1494E
0K630$7,111
$295
Subtotal: $7,406
2021-22$1,600$1,200
$350$1,500
$4,650Total Project Cost: $12,056
04160001114/15/20221/31/20226/30/2020PA&ED:
RTL:R/W Cert:
12/15/2022Begin Con:
04-Napa-29 18-1920-2120-2121-22
201.112682 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
14.1/19.0
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 131 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Napa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Saint Helena and Calistoga, at MillCreek Bridge No. 21-0056, Garnett Creek BranchBridge No. 21-0111, and No Name Creek BridgeNo. 21-0100. Bridge preventive maintenance.
1482P
2J770$2,844
$495
Subtotal: $3,339
2019-20$900$710$236$850
$2,696Total Project Cost: $6,035
04150000034/15/20203/1/20209/1/2018PA&ED:
RTL:R/W Cert:
10/30/2020Begin Con:
04-Napa-29 Prior18-1918-1919-20
201.1193 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
32.1/42.8
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Near Calistoga, at Garnett Creek Bridge No. 21-0005. Bridge preventative maintenance.
1483E
2J880$1,100
$317
Subtotal: $1,417
2019-20$1,320$1,100
$330$1,100
$3,850Total Project Cost: $5,267
04150000214/15/20203/1/20209/1/2018PA&ED:
RTL:R/W Cert:
10/30/2020Begin Con:
04-Napa-29 Prior18-1918-1919-20
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
39.1
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONIn and near St. Helena and Calistoga, from YorkCreek Bridge to Route 128. Pavementrehabilitation.1490D
4J300$9,647
$20
Subtotal: $9,667
2020-21$900
$1,100$44
$1,100
$3,144Total Project Cost: $12,811
041500032011/2/202010/1/202010/1/2019PA&ED:
RTL:R/W Cert:
6/30/2021Begin Con:
04-Napa-29 Prior19-2019-2020-21
201.12115.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
29.3/36.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In American Canyon, at Rio Del Mar; also, nearAmerican Canyon at 0.3 mile south of NorthKelly Road (PM 5.1). Rehabilitate culverts.1453K
4J410$3,336
$294
Subtotal: $3,630
2021-22$1,086
$786$350$706
$2,928Total Project Cost: $6,558
04150003436/30/20225/2/2022
11/2/2020PA&ED:
RTL:R/W Cert:
1/11/2023Begin Con:
04-Napa-29 Prior20-2120-2121-22
201.1512 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.7/5.1
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 132 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Napa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyNapa
PA&ED:PS&E:
R/W Sup:Con Sup:
$4,415$55,877
R/W:
Subtotal: $60,292
Const:$12,215$11,615$2,365
$11,702
$37,897
Total (Capital + Support): $98,189
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 133 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Nevada($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Nevada City, from 0.1 mile east of WhiteCloud Campground to 0.9 mile west of Washington Road. Curve improvement, shoulderwidening and improve clear recovery zone.
3994
0H240$8,237
$613
Subtotal: $8,850
2019-20$1,096
$976$291
$1,286
$3,649Total Project Cost: $12,499
03150001165/1/20205/1/20202/1/2019PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
03-Nevada-20 Prior18-1918-1919-20
201.01046 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
29.7/30.9
Con Sup:
Safety Improvements
Const:R/W:
Near Emigrant Gap, from 0.3 mile west ofExcelsior Point Road to 1.3 mile west ofZeibright Road. Curve improvement and widen shoulders.
4000
2H620$27,480$1,380
Subtotal: $28,860
2019-20$3,920$2,810
$410$3,480
$10,620Total Project Cost: $39,480
03170001655/15/20204/15/20202/1/2019PA&ED:
RTL:R/W Cert:
11/15/2020Begin Con:
03-Nevada-20 Prior18-1918-1919-20
201.01052 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
37.1/39.8
Con Sup:
Safety Improvements
Const:R/W:
Near Rollins Lake, from Maple Way to You BetRoad. Realign roadway curves.
4451
4F370$17,000$2,503
Subtotal: $19,503
2018-19$1,700$2,100$2,300$3,200
$9,300Total Project Cost: $28,803
03140001522/1/20192/1/20199/2/2016PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
03-Nevada-174 18-19PriorPrior18-19
201.01072 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.7/4.7
Con Sup:
Safety Improvements
Const:R/W:
In and near Truckee, from east of KingvaleUndercrossing to west of Union Mills Bridge andOverhead. Replace guardrail with concretebarrier.
4288
4F600$6,220
$62
Subtotal: $6,282
2018-19$410$660$30
$770
$1,870Total Project Cost: $8,152
031400022811/1/2018
10/15/20188/23/2017PA&ED:
RTL:R/W Cert:
4/1/2019Begin Con:
03-Nevada-80 PriorPriorPrior18-19
201.01524 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/20.0
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 134 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Nevada($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Truckee, at various locations from 1.0mile east of Donner Lake Undercrossing to theSierra County Line. Replace guardrail withconcrete barrier at 21 locations to reducemaintenance repairs.
4297
1H840$3,200
$30
Subtotal: $3,230
2020-21$120$180$30
$360
$690Total Project Cost: $3,920
031700000810/15/202010/1/20207/15/2019PA&ED:
RTL:R/W Cert:
4/15/2021Begin Con:
03-Nevada-80 18-1919-2019-2020-21
201.01530 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R10.0/31.7
Con Sup:
Collision Severity Reduction
Const:R/W:
MANDATESIn Grass Valley, from Park Street to Route 20.Upgrade pedestrian infrastructure to meet ADArequirements.4450
3F680$1,660
$150
Subtotal: $1,810
2018-19$180$330$86
$360
$956Total Project Cost: $2,766
03130000473/15/20203/5/20204/5/2018PA&ED:
RTL:R/W Cert:
9/2/2020Begin Con:
03-Nevada-174 PriorPriorPrior18-19
201.36185.7 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.7/10.1
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
ROADWAY PRESERVATIONNear Truckee and Floriston, from 0.2 mile east ofTruckee River Bridge to 0.8 mile west of FaradRoad. Construct measures to address cut-slopeerosion and rockfall.
4293
1H010$11,400
$90
Subtotal: $11,490
2020-21$570
$1,150$160
$1,020
$2,900Total Project Cost: $14,390
031600004610/15/20209/15/20208/1/2019PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
03-Nevada-80 18-1919-2019-2020-21
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
28.3/28.7
Con Sup:
Roadway Protective Betterments
Const:R/W:
Near Truckee, from east of Floriston Road to westof Farad Undercrossing. Stabilize cut-slope.
4287
3F250$9,690
$200
Subtotal: $9,890
2018-19$570$840$110
$1,110
$2,630Total Project Cost: $12,520
03120001335/31/20195/15/20194/1/2018PA&ED:
RTL:R/W Cert:
11/30/2019Begin Con:
03-Nevada-80 PriorPriorPrior18-19
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
29.1/29.4
Con Sup:
Roadway Protective Betterments
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 135 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Nevada($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Truckee and Floriston, from Farad Road to2.17 mile west of Sierra County line. Mitigaterockfall and stabilize cut-slope erosion withdraped mesh and a drainage ditch.
4298
2H000$3,400
$90
Subtotal: $3,490
2020-21$440$750$280$610
$2,080Total Project Cost: $5,570
031700004410/15/202010/1/20201/2/2019PA&ED:
RTL:R/W Cert:
4/15/2021Begin Con:
03-Nevada-80 18-1918-1918-1920-21
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
29.5/29.7
Con Sup:
Roadway Protective Betterments
Const:R/W:
Near Truckee and Floriston, from 1.9 miles eastof Farad Road to the Sierra County line.Construct mitigation measures to reduce rockfallonto the roadway.
4299
2H690$6,200
$30
Subtotal: $6,230
2021-22$410$890$120
$1,080
$2,500Total Project Cost: $8,730
031700017210/15/202110/1/20218/1/2019PA&ED:
RTL:R/W Cert:
5/1/2022Begin Con:
03-Nevada-80 18-1919-2019-2021-22
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
31.3/31.8
Con Sup:
Roadway Protective Betterments
Const:R/W:
Near Higgins Corner, from the Placer County lineto 0.3 mile north of Lime Kiln Road; also, inPlacer County at PM R8.42 and PM R10.23.Rehabilitate drainage systems.
4124
0H210$3,257
$325
Subtotal: $3,582
2021-22$513$743$547$607
$2,410Total Project Cost: $5,992
031500011210/15/202110/1/20211/2/2020PA&ED:
RTL:R/W Cert:
4/15/2022Begin Con:
03-Nevada-49 Prior19-2019-2021-22
201.15124 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/7.5
Con Sup:
Drainage System Restoration
Const:R/W:
In and near Grass Valley, from Lime Kiln Roadto Route 20. Rehabilitate culverts.
4123
0H220$2,970
$80
Subtotal: $3,050
2018-19$440$550$350$590
$1,930Total Project Cost: $4,980
03150001134/30/20194/15/20198/31/2017PA&ED:
RTL:R/W Cert:
10/30/2019Begin Con:
03-Nevada-49 PriorPriorPrior18-19
201.15138 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.5/R14.4
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 136 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Nevada($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MOBILITYNear Nevada City and Emigrant Gap, at west ofPine Needle Way (PM 25.15), and at west of LastChance Mine Road (PM 37.05); also, in PlacerCounty on Route 193 near Newcastle, at variouslocations from PM 6.7 to 8.5. Operational improvements to upgrade or construct roadwayturnouts at five locations.
3997
0H690$1,280
$110
Subtotal: $1,390
2020-21$170$280$120$460
$1,030Total Project Cost: $2,420
031600000610/1/20209/1/20207/1/2019PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
03-Nevada-20 18-1919-2019-2020-21
201.31020 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
25.1/25.2
Con Sup:
Operational Improvements
Const:R/W:
Near Nevada City and Junction House, from eastof Conservation Road (Washington Ridge Road)to east of Washington Road. Operationalimprovements to widen for left-turn pockets androadway turnouts.
3996
0H660$1,900
$90
Subtotal: $1,990
2020-21$340$470$60
$530
$1,400Total Project Cost: $3,390
03160000043/1/20212/1/20212/1/2020PA&ED:
RTL:R/W Cert:
8/1/2021Begin Con:
03-Nevada-20 18-1919-2019-2020-21
201.31020 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
28.0/32.4
Con Sup:
Operational Improvements
Const:R/W:
Near Bear Valley and Emigrant Gap, from 2.0miles east of Chalk Bluff Road to 0.2 mile west ofExcelsior Point Road. Operational improvement to make existing roadway turnout standard widthwith shoulders.
3999
1H810$1,900
$20
Subtotal: $1,920
2020-21$340$530$140$410
$1,420Total Project Cost: $3,340
031700000510/15/202010/1/202010/1/2019PA&ED:
RTL:R/W Cert:
4/15/2021Begin Con:
03-Nevada-20 18-1919-2019-2020-21
201.31010 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
36.8/37.0
Con Sup:
Operational Improvements
Const:R/W:
In various counties, on various routes at variouslocations. Repair and install vehicle census countstations.4125
0H420$9,200
$30
Subtotal: $9,230
2019-20$1,000$1,000
$180$1,800
$3,980Total Project Cost: $13,210
031500016610/1/20199/1/20191/1/2018PA&ED:
RTL:R/W Cert:
4/15/2020Begin Con:
03-Nevada-49 PriorPriorPrior19-20
201.315470 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 137 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Nevada($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyNevada
PA&ED:PS&E:
R/W Sup:Con Sup:
$5,803$114,994
R/W:
Subtotal: $120,797
Const:$12,219$14,259$5,214
$17,673
$49,365
Total (Capital + Support): $170,162
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 138 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Huntington Beach, at 6th Street; also in SealBeach at Seal Beach Boulevard (PM 32.7). Modify traffic signals and install additionallighting.
2527
0N850$835$67
Subtotal: $902
2019-20$150$412$221$386
$1,169Total Project Cost: $2,071
12140001166/15/20196/5/2019
1/22/2018PA&ED:
RTL:R/W Cert:
12/11/2019Begin Con:
12-Orange-1 PriorPriorPrior19-20
201.01047 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
24.9
Con Sup:
Safety Improvements
Const:R/W:
In Huntington Beach, from Seapoint Street toWarner Avenue at Boisa Chica State Beach.Construct rumble strips and install outerseparation barrier in southbound direction.
2470A
0Q280$1,148
Subtotal: $1,148
2019-20$515$605
$492
$1,612Total Project Cost: $2,760
12160001201/30/20201/15/2020
12/15/2018PA&ED:
RTL:R/W Cert:
6/1/2020Begin Con:
12-Orange-1 Prior18-19
19-20
201.0102 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
27.0/29.9
Con Sup:
Safety Improvements
Const:R/W:
In Anaheim, on the northbound Harbor Boulevardofframp; also on the southbound HarborBoulevard onramp. Modify traffic signal systemand apply High Friction Surface Treatment(HFST).
2861F
0Q300$1,432
$18
Subtotal: $1,450
2018-19 $1,285
$493
$1,778Total Project Cost: $3,228
12160001236/5/20195/3/2019
6/16/2017PA&ED:
RTL:R/W Cert:
11/15/2019Begin Con:
12-Orange-5Prior
18-19
201.01038 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
37.3/37.4
Con Sup:
Safety Improvements
Const:R/W:
In Garden Grove, at westbound onramp fromEuclid Street. Overlay with open graded frictioncourse.2930
0P980$430
Subtotal: $430
2018-19 $381
$251
$632Total Project Cost: $1,062
12160000708/1/20187/2/2018
6/16/2017PA&ED:
RTL:R/W Cert:
4/3/2019Begin Con:
12-Orange-22Prior
18-19
201.01017 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R6.9
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 139 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of Orange and Santa Ana, fromLewis Street Overcrossing to east of Bristol StreetUndercrossing; also on Route 57, from PM10.9/11.9. Replace concrete median barrier andadd lighting in median.
2981
0P520$3,815
$5
Subtotal: $3,820
2019-20$591
$1,247
$1,257
$3,095Total Project Cost: $6,915
12150001373/2/20202/1/20208/7/2018PA&ED:
RTL:R/W Cert:
11/2/2020Begin Con:
12-Orange-22 Prior18-19
19-20
201.01036 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R9.4/R10.1
Con Sup:
Safety Improvements
Const:R/W:
In Huntington Beach, Westminster and GardenGrove, at the intersections of Heil Avenue (PM5.14), MacDonald Street (PM 5.30) and TraskAvenue (PM 8.14); also on Route 90 in Brea atthe intersection of Castlegate Lane/PlacentiaAvenue (PM 5.93). Modify existing signals andlighting and upgrade ADA facilities to currentstandards.
3167
0P010$1,570
$400
Subtotal: $1,970
2018-19$500$750$420$720
$2,390Total Project Cost: $4,360
12150000226/7/20196/3/2019
12/5/2017PA&ED:
RTL:R/W Cert:
12/2/2019Begin Con:
12-Orange-39 PriorPriorPrior18-19
201.010141 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.1/8.1
Con Sup:
Safety Improvements
Const:R/W:
In the city of La Habra, at Fashion Square Lane.Modify traffic signal and add lighting.
3279
0Q290$709$10
Subtotal: $719
2018-19$185$320
$260
$765Total Project Cost: $1,484
12160001226/1/20195/1/20198/1/2018PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
12-Orange-39 Prior18-19
18-19
201.01025 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
19.4
Con Sup:
Safety Improvements
Const:R/W:
In Tustin, on the 4th Street northbound offramp.Modify traffic signals and install additionallighting.3510
0N630$646$11
Subtotal: $657
2018-19$100$427
$318
$845Total Project Cost: $1,502
12140000731/2/2019
12/11/201812/2/2017PA&ED:
RTL:R/W Cert:
6/11/2019Begin Con:
12-Orange-55 PriorPrior
18-19
201.01011 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.7
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 140 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Laguna Beach, on southbound Route 73, fromRoute 133 to 0.2 mile north of Route 133.Modify superelevation, install drainage inlets,place OGAC and place pavement delineation.
4096P
0N840$980
Subtotal: $980
2018-19 $637
$410
$1,047Total Project Cost: $2,027
121400011512/10/201811/15/20183/21/2017PA&ED:
RTL:R/W Cert:
7/29/2019Begin Con:
12-Orange-73Prior
18-19
201.01057 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.8/17.1
Con Sup:
Safety Improvements
Const:R/W:
In Newport Beach, on the Route 73 southboundofframp to MacArthur Boulevard. Widen ramp,install traffic signal and guardrail.4096R
0N860$4,202
$19
Subtotal: $4,221
2019-20$500
$1,500$30
$1,052
$3,082Total Project Cost: $7,303
12140001232/28/20202/3/20203/1/2018PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
12-Orange-73 PriorPriorPrior19-20
201.01082 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
24.0
Con Sup:
Safety Improvements
Const:R/W:
Near San Juan Capistrano, from east of AntonioParkway/La Pata Avenue to west of Conrockentrance. Landscape and plant establishmentproject.
4124B
0L722$850$20
Subtotal: $870
2018-19 $400
$620
$1,020Total Project Cost: $1,890
121400010412/30/2018
8/1/20184/1/2018PA&ED:
RTL:R/W Cert:
9/1/2019Begin Con:
12-Orange-74Prior
18-19
201.0108 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.9/5.1
Con Sup:
Safety Improvements
Const:R/W:
In the Cleveland National Forest, from 0.9 milewest of San Juan Fire Station to theOrange/Riverside County line. Super elevationcorrections, shoulder widening, Open GradedAsphalt Concrete (OGAC) overlay and applyHigh Friction Surface Treatment (HFST).
4218
0P030$35,611
$719
Subtotal: $36,330
2019-20$2,965$4,826$1,018$7,206
$16,015Total Project Cost: $52,345
12150000246/2/20206/1/2020
10/3/2018PA&ED:
RTL:R/W Cert:
1/4/2021Begin Con:
12-Orange-74 Prior18-1918-1919-20
201.010160 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.5/16.6
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 141 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Buena Park, on the 91 eastbound connectorfrom northbound Route 39 (Beach Boulevard).Overlay Hot Mix Asphalt (HMA) Open GradedFriction Course (OGFC).
4533A
0Q040$540
Subtotal: $540
2018-19 $360
$320
$680Total Project Cost: $1,220
121600007810/1/20187/1/2018
6/16/2017PA&ED:
RTL:R/W Cert:
3/1/2019Begin Con:
12-Orange-91Prior
18-19
201.01017 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R2.8
Con Sup:
Safety Improvements
Const:R/W:
In Laguna Beach, at and north of Canyon AcresDrive. Extend the northbound lane reductiontransition.4769
0N870$1,189
$536
Subtotal: $1,725
2018-19 $1,100$150$789
$2,039Total Project Cost: $3,764
121400012411/1/201810/1/20181/4/2016PA&ED:
RTL:R/W Cert:
6/19/2019Begin Con:
12-Orange-133PriorPrior18-19
201.01034 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.9/1.2
Con Sup:
Safety Improvements
Const:R/W:
In Laguna Beach, from 1700 feet south to 1300feet north of El Toro Road. Extend lanes in bothdirections.4793
0N060$6,032$1,230
Subtotal: $7,262
2019-20$1,215$1,820
$550$2,109
$5,694Total Project Cost: $12,956
12130000975/22/20204/3/20209/1/2017PA&ED:
RTL:R/W Cert:
2/5/2021Begin Con:
12-Orange-133 PriorPriorPrior19-20
201.01065 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.1/3.6
Con Sup:
Safety Improvements
Const:R/W:
In Irvine, from Walnut Road to north ofnorthbound Jamboree Road Overcrossing. Install double thrie-beam barrier to prevent cross-mediancollisions.
4926F
0Q130$510
$0
Subtotal: $510
2018-19$0
$412$0
$320
$732Total Project Cost: $1,242
121600009111/15/201811/1/20186/19/2017PA&ED:
RTL:R/W Cert:
7/15/2019Begin Con:
12-Orange-26118-19
18-19
201.0103 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/0.3
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 142 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Irvine and Costa Mesa, from Jamboree Road toRoute 73. Replace existing temporary railing withpermanent concrete barrier.4995A
0P220$2,710
Subtotal: $2,710
2018-19$200
$1,300
$1,000
$2,500Total Project Cost: $5,210
121500005312/3/2018
11/15/20188/31/2017PA&ED:
RTL:R/W Cert:
6/11/2019Begin Con:
12-Orange-405 PriorPrior
18-19
201.0108 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.9/10.3
Con Sup:
Safety Improvements
Const:R/W:
In the cities of San Juan Capistrano, LagunaNigel, Laguna Hills, Aliso Viejo, Laguna Beach,Irvine, Newport Beach, and Costa Mesa fromRoute 5 to Route 405. Upgrade highway safetyfeatures.
4051A
0N720$16,500
Subtotal: $16,500
2019-20$730
$2,600$58
$3,200
$6,588Total Project Cost: $23,088
12140000932/5/2020
12/20/20198/31/2017PA&ED:
RTL:R/W Cert:
9/18/2020Begin Con:
12-Orange-73 PriorPriorPrior19-20
201.015108 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.0/28.0
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Laguna Beach and Irvine, from ElToro Road to Route 241. Flatten steepembankments, replace and upgrade guardrail andterminal systems, install thrie-beam medianbarrier and replace K-rail with concrete barrier.
4795A
0N660$9,500
Subtotal: $9,500
2018-19$830
$1,943$70
$2,165
$5,008Total Project Cost: $14,508
12140000774/5/2019
3/15/201912/15/2017PA&ED:
RTL:R/W Cert:
9/9/2019Begin Con:
12-Orange-133 PriorPriorPrior18-19
201.01563 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.4/13.6
Con Sup:
Collision Severity Reduction
Const:R/W:
In Santa Ana, from south of 4th Street toBroadway. Roadside safety improvements.
2841
0N510$1,900
Subtotal: $1,900
2018-19$285$390
$325
$1,000Total Project Cost: $2,900
12140000543/1/20192/1/20194/1/2018PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
12-Orange-5 PriorPrior
18-19
201.23536 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
31.0/33.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 143 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Anaheim, from Santa Ana Bridge No.55-0811 to 0.6 mile south of Harbor BoulevardOvercrossing. Enhance highway worker safetyby access trails and access gates, relocatingfacilities away from traffic, and installing featuresto reduce repetitive maintenance activities.
2860N
0P900$2,000
$0
Subtotal: $2,000
2020-21$270$400
$0$330
$1,000Total Project Cost: $3,000
121600004610/1/20209/1/20208/1/2019PA&ED:
RTL:R/W Cert:
9/1/2021Begin Con:
12-Orange-5 18-1918-19
20-21
201.23540 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
34.5/36.8
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Anaheim, from north of Anaheim Boulevard toSanta Ana Street. Enhance highway workersafety by access trails and access gates, relocatingfacilities away from traffic, and installing featuresto reduce repetitive maintenance activities.
2861E
0P910$2,000
$0
Subtotal: $2,000
2020-21$200$400
$0$400
$1,000Total Project Cost: $3,000
12160000472/1/2021
12/1/202012/1/2019PA&ED:
RTL:R/W Cert:
11/1/2021Begin Con:
12-Orange-5 18-1918-19
20-21
201.23540 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
36.8/38.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Anaheim, from Santa Ana Street Overcrossing(OC) to 0.3 mile south of Magnolia Avenue OC.Enhance highway worker safety by pavingmiscellaneous areas, install access gates, andrelocate irrigation facilities away from the edge ofthe road.
2861Z
0P920$2,000
$0
Subtotal: $2,000
2021-22$200$400
$0$400
$1,000Total Project Cost: $3,000
121600004410/1/20219/1/20218/1/2020PA&ED:
RTL:R/W Cert:
7/1/2022Begin Con:
12-Orange-5 19-2020-21
21-22
201.23540 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
38.5/41.6
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Fullerton and Buena Park, from MagnoliaAvenue to Stanton Avenue; also, on Route 91from Stanton Avenue to Brookhurst Street (PMR2.8/1.2). Enhance highway worker safety byaccess trails and access gates, relocating facilitiesaway from traffic, and installing features toreduce repetitive maintenance activities.
2862H
0P930$2,000
$0
Subtotal: $2,000
2021-22$200$400
$0$400
$1,000Total Project Cost: $3,000
12160000454/1/20222/1/20221/1/2021PA&ED:
RTL:R/W Cert:
4/1/2023Begin Con:
12-Orange-5 19-2020-21
21-22
201.23580 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
41.9/43.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 144 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of Orange, from La Veta Avenue toRoute 91. Roadside safety improvements.
3535
0N530$2,000
Subtotal: $2,000
2019-20$300$440
$360
$1,100Total Project Cost: $3,100
12140000563/30/20203/1/20204/1/2019PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
12-Orange-55 Prior18-19
19-20
201.23532 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.2/R17.8
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Irvine, and Costa Mesa, from Von KarmenAvenue to west of Harbor Boulevard. Roadsidesafety improvements.4999D
0N520$1,900
Subtotal: $1,900
2019-20$285$390
$325
$1,000Total Project Cost: $2,900
121400005511/30/201910/1/201910/1/2018PA&ED:
RTL:R/W Cert:
8/1/2020Begin Con:
12-Orange-405 Prior18-19
19-20
201.23520 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.3/11.8
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Newport Beach, from 815 feet south of ReefPoint Drive to 1,850 feet north of Crystal HeightsDrive. Restore bioswales.2322B
0P660$1,827
$0
Subtotal: $1,827
2020-21$271$628
$0$501
$1,400Total Project Cost: $3,227
12150001587/1/20205/1/20207/1/2019PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
12-Orange-1 18-1919-20
20-21
201.3359 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
12.2/13.3
Con Sup:
Storm Water Mitigation
Const:R/W:
In San Juan Capistrano, from El Horno Street tosouth of Junipero Serra Road; also in Irvine, fromRoute 133 to south of Sand Canyon Avenue (PM23.2/R23.7). Reconstruct slopes and applyvegetation to control sediment transport.
2632A
0P090$2,729
Subtotal: $2,729
2019-20$400$600$50
$650
$1,700Total Project Cost: $4,429
12150000342/3/2020
12/2/201910/5/2018PA&ED:
RTL:R/W Cert:
11/2/2020Begin Con:
12-Orange-5 Prior18-1918-1919-20
201.3352.5 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.1/10.6
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 145 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Brea, from south of Lambert Road toLos Angeles County Line (PM R22.551).Construct storm water treatment BestManagement Practices (BMP) in the form of newdetention basin to reduce Trash Total MaximumDaily Load (TMDL) to the San Gabriel-CoyoteCreek watershed.
3846B
0Q270$6,797
$0
Subtotal: $6,797
2021-22$887
$1,200$0
$1,500
$3,587Total Project Cost: $10,384
12160001173/1/20222/1/20225/1/2020PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
12-Orange-57 18-1919-20
21-22
201.33514.9 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
20.8/R22.6
Con Sup:
Storm Water Mitigation
Const:R/W:
In Brea, from east of Chino Hills State Parkentrance to east of Olinda Drive. Storm watermitigation.5380A
0N730$3,100
$200
Subtotal: $3,300
2019-20$456$800$380$785
$2,421Total Project Cost: $5,721
12140000956/2/20205/4/2020
10/1/2018PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
12-Orange-142 Prior18-1918-1919-20
201.3351.74 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.5/4.7
Con Sup:
Storm Water Mitigation
Const:R/W:
In Laguna Beach, from 7th Avenue to north ofMoss Street. Upgrade existing curb ramps,sidewalks, and driveways to ADA standards.2255
0P690$1,909$3,121
Subtotal: $5,030
2020-21$0
$3,399$2,864$3,551
$9,814Total Project Cost: $14,844
121600000310/1/20209/1/2020
11/1/2018PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
12-Orange-118-1918-1920-21
201.36156 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
5.5/7.9
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In San Juan Capistrano, from Route 5 to the SanJuan Capistrano city line. Upgrade pedestrianfacilities to meet current ADA standards.4097C
0M090$1,620
$122
Subtotal: $1,742
2018-19$327$940$600
$1,128
$2,995Total Project Cost: $4,737
12000203026/15/20196/3/20197/3/2017PA&ED:
RTL:R/W Cert:
3/5/2020Begin Con:
12-Orange-74 PriorPriorPrior18-19
201.36148 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.1/1.8
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 146 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Laguna Beach, from south of Ruby Street toLedroit Street. Upgrade pedestrian facilities toADA standards.2300
0M820$3,566
$815
Subtotal: $4,381
2019-20$1,225$1,825$1,450$1,600
$6,100Total Project Cost: $10,481
12140000417/19/20197/5/2019
12/5/2017PA&ED:
RTL:R/W Cert:
2/10/2020Begin Con:
12-Orange-1 PriorPriorPrior19-20
201.378187 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.9/10.5
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
BRIDGE PRESERVATIONIn Laguna Beach, at Route 133 (BroadwayStreet). Replace bridge.
2293
0M990$1,550
$800
Subtotal: $2,350
2019-20$270$650$790$600
$2,310Total Project Cost: $4,660
12130000865/28/20195/28/201912/1/2017PA&ED:
RTL:R/W Cert:
11/19/2019Begin Con:
12-Orange-1 PriorPriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.3
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Costa Mesa, at the Route 55/73 ConnectorOvercrossing Bridge No. 55-538F (PM 4.74),Route 91 Carmenita Road PedestrianOvercrossing Bridge No. 55-0473 (PM 0.02) andRoute 405 Laguna Canyon Road OvercrossingBridge No. 55-0247 (PM 2.20). Seismicrestoration.
3450A
0Q390$15,456
Subtotal: $15,456
2020-21$1,048$2,279
$11$5,381
$8,719Total Project Cost: $24,175
12170000032/2/20211/1/2021
9/25/2019PA&ED:
RTL:R/W Cert:
9/9/2021Begin Con:
12-Orange-Var 18-1919-2019-2020-21
201.1133 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Bridge Seismic Restoration
Const:R/W:
ROADWAY PRESERVATIONIn Laguna Beach and Newport Beach, from southof Vista Del Sol to Newport Coast Drive. Coldplane pavement and place Rubberized Hot MixAsphalt concrete (RHMA).
2246
0H150$12,160
$65
Subtotal: $12,225
2019-20 $3,200
$2,950
$6,150Total Project Cost: $18,375
12160000556/1/2020
12/24/20198/30/2005PA&ED:
RTL:R/W Cert:
1/4/2021Begin Con:
12-Orange-1Prior
19-20
201.12136 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.7/14.1
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 147 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Huntington Beach, from Warner Avenue toLos Angeles County line. Upgrade ADA curbramps, cold plane pavement, and place Rubberized Hot Mix Asphalt concrete (RHMA).
2499A
0P590$8,770
$111
Subtotal: $8,881
2019-20$1,720$2,932$1,245$2,358
$8,255Total Project Cost: $17,136
12150001495/15/20205/1/2020
10/15/2018PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
12-Orange-1 Prior18-1918-1919-20
201.12114.9 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
29.9/33.7
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Brea, from Harbor Boulevard toRandolph Avenue. Cold plane pavement andplace Rubberized Hot Mix Asphalt concrete(RHMA).
4337
0P580$8,208
Subtotal: $8,208
2019-20$478
$1,249$129
$2,269
$4,125Total Project Cost: $12,333
12150001481/30/202012/3/201911/1/2018PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
12-Orange-90 Prior18-1918-1919-20
201.12111.7 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.6/5.1
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In the city of Anaheim, from west of LakeviewAvenue to Orange/Riverside County line.Pavement rehabilitation.4609B
0N320$5,750
Subtotal: $5,750
2018-19 $1,740
$1,740
$3,480Total Project Cost: $9,230
12130001964/1/20193/1/20196/3/2015PA&ED:
RTL:R/W Cert:
9/1/2019Begin Con:
12-Orange-91Prior
18-19
201.12190 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R9.8/R18.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Newport Beach, from north of SuperiorAvenue to 60th Street. Rehabilitate drainagesystem.2403A
0N930$1,095
$10
Subtotal: $1,105
2018-19$250$400
$400
$1,050Total Project Cost: $2,155
12150000094/2/20192/1/2019
10/20/2017PA&ED:
RTL:R/W Cert:
11/6/2019Begin Con:
12-Orange-1 PriorPrior
18-19
201.15114 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.5/20.9
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 148 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Clemente, adjacent to northbound AvenidaPico offramp. Restore hydraulic capacity of channel by repairing concrete panels in channelslope and bottom.
2563
0P700$4,303
$15
Subtotal: $4,318
2019-20$452$963$111
$1,080
$2,606Total Project Cost: $6,924
12160000046/1/20205/1/20203/1/2019PA&ED:
RTL:R/W Cert:
12/11/2020Begin Con:
12-Orange-5 Prior18-1918-1919-20
201.1511 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.3
Con Sup:
Drainage System Restoration
Const:R/W:
In Garden Grove, at Haster Street westboundofframp. Upgrade drainage system.
2948
0N920$1,149
$326
Subtotal: $1,475
2019-20$234$410$30
$468
$1,142Total Project Cost: $2,617
12150000105/1/20194/1/20198/1/2017PA&ED:
RTL:R/W Cert:
1/2/2020Begin Con:
12-Orange-22 PriorPriorPrior19-20
201.1518 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R9.1
Con Sup:
Drainage System Restoration
Const:R/W:
In Buena Park, from Auto Center Drive to CraigAvenue. Rehabilitate drainage systems, installnew inlets, reinforced concrete pipes (RCP) andreplace flood damaged sections of curb andgutters.
3230A
0F970$2,226
$414
Subtotal: $2,640
2019-20 $870$153$906
$1,929Total Project Cost: $4,569
121200003111/15/201911/1/20196/26/2017PA&ED:
RTL:R/W Cert:
7/15/2020Begin Con:
12-Orange-39PriorPrior19-20
201.15124 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
15.2/15.9
Con Sup:
Drainage System Restoration
Const:R/W:
In Orange County, from 0.3 mile south of El ToroRoad to 0.2 mile north of Route 73/133 Interchange. Construct detention basin,reconstruct channel, extend reinforced concretebox and regrade to prevent adverse flow.
4792
0Q360$2,095$1,467
Subtotal: $3,562
2019-20$1,125$1,712
$766$1,188
$4,791Total Project Cost: $8,353
12160001336/15/20204/17/202010/2/2018PA&ED:
RTL:R/W Cert:
1/5/2021Begin Con:
12-Orange-133 Prior18-1918-1919-20
201.1512 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.1/R4.3
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 149 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MOBILITYIn the cities of Santa Ana and Tustin, from DyerRoad onramp to Edinger Avenue offramp. Construct northbound auxiliary lane.3483
0G950$13,100$24,500
Subtotal: $37,600
2019-20$200
$3,500$2,700$2,800
$9,200Total Project Cost: $46,800
12150000456/15/20206/3/2019
9/11/2017PA&ED:
RTL:R/W Cert:
12/23/2020Begin Con:
12-Orange-55 PriorPriorPrior19-20
201.3102216 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R8.0/R9.2
Con Sup:
Operational Improvements
Const:R/W:
In Irvine, from SB 5/SB 133 Connector to SB133/NB 405 Connector. Construct a newauxiliary lane to improve traffic flow.4846
0N890$14,926
$253
Subtotal: $15,179
2021-22$1,503$3,224
$652$4,544
$9,923Total Project Cost: $25,102
121400013010/1/20219/1/2021
11/1/2019PA&ED:
RTL:R/W Cert:
3/1/2022Begin Con:
12-Orange-133 18-1919-2019-2021-22
201.310221 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
8.5/M9.3
Con Sup:
Operational Improvements
Const:R/W:
In Irvine, from Route 133 to Sand CanyonAvenue; also from Sand Canyon Avenue toUniversity Drive/Jeffery Road. Constructsouthbound auxiliary lanes.
4956A
0H045$6,000
Subtotal: $6,000
2018-19
$2,200
$2,200Total Project Cost: $8,200
12120000527/1/20183/1/2018
3/22/2016PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
12-Orange-405
18-19
201.310771 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.4/3.9
Con Sup:
Operational Improvements
Const:R/W:
At various locations, on various routes. Replaceand upgrade existing field elements for the TrafficManagement System (TMS).1203
0Q690$6,530
$24
Subtotal: $6,554
2019-20 $2,060
$1,800
$3,860Total Project Cost: $10,414
12170000885/1/20202/1/2020
6/22/2017PA&ED:
RTL:R/W Cert:
1/1/2021Begin Con:
12-Orange-VarPrior
19-20
201.315754 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 150 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of Orange, Anaheim, Santa Ana,Fullerton and Buena Park, from PM 33.0 to PM43.2, also on Route 57, from PM 10.7 to PM 16.6,also on Route 91, from PM R2.6 to PM R4.1 andPM 0.0 to PM 7.2. Install and modify IntelligentTransportation System (ITS) elements.
2859B
0P42U$8,820
Subtotal: $8,820
2019-20$1,323$2,030
$180$2,030
$5,563Total Project Cost: $14,383
12160000974/10/20201/9/20207/1/2018PA&ED:
RTL:R/W Cert:
1/4/2021Begin Con:
12-Orange-Var Prior18-1918-1919-20
201.31524.8 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/0.0
Con Sup:
Transportation Management Systems
Const:R/W:
In the cities of Newport Beach, Huntington Beachand Seal Beach, from Crystal Heights Drive toFirst Street. Replace traffic signals, upgrade non-standard curb ramps to meet ADA standards andmodify drainage.
2330
0P680$12,925
$191
Subtotal: $13,116
2020-21$1,891$4,299$1,244$3,537
$10,971Total Project Cost: $24,087
12160000025/30/20215/15/20211/5/2019PA&ED:
RTL:R/W Cert:
1/30/2022Begin Con:
12-Orange-1 Prior18-1918-1920-21
201.31520 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.0/33.6
Con Sup:
Transportation Management Systems
Const:R/W:
In and near Anaheim, from south of Route 22 tosouth of Route 39; also on Route 57 (PM10.7/16.6) and Route 91 (PM R2.6/R4.1 and (PM0.0/7.2). Create interoperability of TMS byupgrading Intelligent Transportation System(ITS) elements between Caltrans and localagencies.
2859C
0P670$13,673
Subtotal: $13,673
2019-20$2,380$3,650
$320$3,650
$10,000Total Project Cost: $23,673
12150001606/1/20205/1/2020
11/1/2018PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
12-Orange-5 Prior18-1918-1919-20
201.315311 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
33.0/43.2
Con Sup:
Transportation Management Systems
Const:R/W:
In Anaheim, at the Commercial VehicleEnforcement Facility (CVEF) Peralta WeighStation (Eastbound). Rehabilitate and upgradeCVEF.
4642A
0N490$6,847
Subtotal: $6,847
2018-19$624
$1,391$10
$1,332
$3,357Total Project Cost: $10,204
12140000502/1/20191/2/20198/1/2017PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
12-Orange-91 PriorPriorPrior18-19
201.3211 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R13.6
Con Sup:
Weigh Stations
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 151 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Orange($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyOrange
PA&ED:PS&E:
R/W Sup:Con Sup:
$35,469$270,140
R/W:
Subtotal: $305,609
Const:$27,285$71,096$16,202$76,856
$191,439
Total (Capital + Support): $497,048
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 152 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Placer($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Auburn, from 0.3 mile south of LincolnWay/Borland Avenue to Lincoln Way/BorlandAvenue. Realign curves.4785
1H240$1,697
$764
Subtotal: $2,461
2019-20$732
$1,003$306$819
$2,860Total Project Cost: $5,321
03160000775/1/2020
4/15/202012/15/2018PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
03-Placer-49 Prior18-1918-1919-20
201.01050 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.2/2.4
Con Sup:
Safety Improvements
Const:R/W:
In and near various cities, at various locations,from 0.3 mile west of Douglas Boulevard to 0.2mile east of Hampshire Rocks Undercrossing. Upgrade guardrail to current standards.
5026
0H720$2,600
$0
Subtotal: $2,600
2020-21$40
$440$120$550
$1,150Total Project Cost: $3,750
03160000088/15/20207/15/20201/15/2019PA&ED:
RTL:R/W Cert:
3/1/2021Begin Con:
03-Placer-80 18-1918-1919-2020-21
201.01521 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
1.6/R66.5
Con Sup:
Collision Severity Reduction
Const:R/W:
BRIDGE PRESERVATIONIn Placer and Nevada Counties, at variouslocations. Rehabilitate or replace bridges at sixlocations.5097
2F570$32,200
$200
Subtotal: $32,400
2019-20$2,720$6,350
$485$6,430
$15,985Total Project Cost: $48,385
03000206155/7/2020
4/20/20202/15/2018PA&ED:
RTL:R/W Cert:
12/15/2020Begin Con:
03-Placer-80 PriorPriorPrior19-20
201.1106 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.7/R63.5
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
ROADWAY PRESERVATIONNear Weimar, from west of Applegate Road towest of Weimar Cross Road. Drainage systemrehabilitation.5105
4F250$3,070
$70
Subtotal: $3,140
2018-19$220$430$140$610
$1,400Total Project Cost: $4,540
031400008610/11/201810/1/201810/2/2017PA&ED:
RTL:R/W Cert:
2/15/2019Begin Con:
03-Placer-80 PriorPriorPrior18-19
201.15126 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
25.9/28.5
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 153 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Placer($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Colfax, from west of IllinoistownOvercrossing to east of Cape HornUndercrossing. Drainage system rehabilitation.5079
1E050$3,170
$150
Subtotal: $3,320
2019-20$230$440$140$600
$1,410Total Project Cost: $4,730
030002060012/15/201912/15/2019
9/1/2017PA&ED:
RTL:R/W Cert:
8/5/2020Begin Con:
03-Placer-80 PriorPriorPrior19-20
201.15122 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
31.5/36.9
Con Sup:
Drainage System Restoration
Const:R/W:
Near Magra, from Secret Town Overcrossing tothe Gold Run Safety Roadside Rest Area.Rehabilitate drainage systems.5114
1H030$3,069
$220
Subtotal: $3,289
2020-21$429$667$195$806
$2,097Total Project Cost: $5,386
03160000494/20/20214/10/2021
12/15/2019PA&ED:
RTL:R/W Cert:
12/5/2021Begin Con:
03-Placer-80 Prior19-2019-2020-21
201.15132 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
38.3/41.5
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYIn Roseville, at the Atlantic Street/Eureka Roadwestbound onramp. Install ramp meters andwiden ramp for storage capacity.5113
0H460$5,500
$650
Subtotal: $6,150
2018-19$700$700$130$850
$2,380Total Project Cost: $8,530
03150001743/15/20193/15/20199/15/2017PA&ED:
RTL:R/W Cert:
10/15/2019Begin Con:
03-Placer-80 18-19PriorPrior18-19
201.310563 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.8
Con Sup:
Operational Improvements
Const:R/W:
In various counties, on various routes at variouslocations. Upgrade Extinguishable MessageSigns (EMS) to LED.4291
0H400$1,600
Subtotal: $1,600
2019-20$190$210$30
$500
$930Total Project Cost: $2,530
03150001648/1/20197/1/20191/1/2018PA&ED:
RTL:R/W Cert:
4/1/2020Begin Con:
03-Placer-80 PriorPriorPrior19-20
201.31562 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 154 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Placer($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADSIDE PRESERVATIONNear Lincoln, on McCourtney Road betweenRiosa Road and Kilaga Springs Road at the CoonCreek Conservation (C4) Ranch. Advancemitigation construction (4 acres) for futureSHOPP projects expected to impact wetland,riparian and to other waters.
4899
1H530$1,175
$64
Subtotal: $1,239
2019-20$653$434
$7$306
$1,400Total Project Cost: $2,639
03160001775/15/20205/1/2020
10/15/2019PA&ED:
RTL:R/W Cert:
10/20/2020Begin Con:
03-Placer-65 Prior19-2019-2019-20
201.2401 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R19.5
Con Sup:
Roadside Enhancement
Const:R/W:
CountyPlacer
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,118$54,081
R/W:
Subtotal: $56,199
Const:$5,914
$10,674$1,553
$11,471
$29,612
Total (Capital + Support): $85,811
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 155 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Plumas($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Quincy, at various locations from 0.3 milewest of Butterfly Valley Road to 0.2 mile west ofTwo Rivers Road; also, on Route 89 nearGreenville, from 0.9 mile north to 1.4 miles northof Wolf Creek Road (PM 25.1/25.3). Upgraderock fall fence to reduce maintenance andhighway worker exposure.
3639
1H790$1,760
$40
Subtotal: $1,800
2020-21$350$450$20
$450
$1,270Total Project Cost: $3,070
02160000431/21/2021
12/21/202011/5/2019PA&ED:
RTL:R/W Cert:
6/15/2021Begin Con:
02-Plumas-70 18-1919-2019-2020-21
201.2359 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
36.8/R62.4
Con Sup:
Roadside Safety Improvements/ Freeway Maintenance Access
Const:R/W:
ROADWAY PRESERVATIONIn and near Cromberg and Portola, from 0.2 mileeast of Gill Ranch Road to 0.2 mile west of BigGrizzly Creek Bridge. Rehabilitate roadway,repair or replace culverts, upgrade guardrail,upgrade bridge railing at Humbug Creek BridgeNo. 09-0022, and make pedestrian facilities ADAcompliant.
3619
1H580$88,050
$514
Subtotal: $88,564
2021-22$3,490$2,620$1,120$6,810
$14,040Total Project Cost: $102,604
02160000243/28/20222/25/202211/5/2020PA&ED:
RTL:R/W Cert:
9/27/2022Begin Con:
02-Plumas-70 18-1920-2120-2121-22
201.12045.7 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
58.4/R78.4
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In Plumas and Lassen Counties, near Chilcoot,from west of Summit School Drive Road to Route395 (Lassen PM 0.0/3.9). Roadwayrehabilitation.
3599
0H760$20,547
$0
Subtotal: $20,547
2018-19$1,030
$900$70
$1,440
$3,440Total Project Cost: $23,987
02150000863/28/20192/25/20192/2/2018PA&ED:
RTL:R/W Cert:
8/27/2019Begin Con:
02-Plumas-70 PriorPriorPrior18-19
201.12218 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
90.3/96.0
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In Plumas County, from Butte County line to eastof Moach Road at various locations. Drainagerehabilitation.3587
0H550$2,525
$290
Subtotal: $2,815
2019-20$1,060
$710$1,090
$920
$3,780Total Project Cost: $6,595
02150000507/11/20196/4/20199/1/2018PA&ED:
RTL:R/W Cert:
2/13/2020Begin Con:
02-Plumas-70 Prior18-1918-1919-20
201.15150 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/70.0
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 156 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Plumas($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyPlumas
PA&ED:PS&E:
R/W Sup:Con Sup:
$844$112,882
R/W:
Subtotal: $113,726
Const:$5,930$4,680$2,300$9,620
$22,530
Total (Capital + Support): $136,256
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 157 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Blythe, from north of Palo Verde Dam Roadto the San Bernardino County line. Restore stormeroded embankments with rock slope protectionand replace culverts. A previous EmergencyOpening EA 08-1F800 repaired roadway.
3002U
1G000$8,170
$600
Subtotal: $8,770
2019-20$926$901$63
$2,462
$4,352Total Project Cost: $13,122
08150001075/1/20202/3/2020
11/1/2018PA&ED:
RTL:R/W Cert:
2/16/2021Begin Con:
08-Riverside-95 Prior18-1918-1919-20
201.13120 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
14.0/36.2
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONIn Moreno Valley, at the Sunnymead Boulevardeastbound onramp. Install traffic signal.
3006X
1H140$646$90
Subtotal: $736
2018-19$397$546$99
$566
$1,608Total Project Cost: $2,344
08160001622/4/20191/2/20191/2/2018PA&ED:
RTL:R/W Cert:
9/2/2019Begin Con:
08-Riverside-60 PriorPriorPrior18-19
201.01014 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.6
Con Sup:
Safety Improvements
Const:R/W:
Near Beaumont, from Gilman Springs Road to1.4 miles west of Jack Rabbit Trail. Constructleft and right shoulders for westbound direction.0045G
0Q180$25,000
$250
Subtotal: $25,250
2018-19$2,000$1,500
$200$3,700
$7,400Total Project Cost: $32,650
08000202201/2/2018
12/4/20175/2/2016PA&ED:
RTL:R/W Cert:
8/24/2018Begin Con:
08-Riverside-60 PriorPriorPrior18-19
201.010330 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
22.2/26.6
Con Sup:
Safety Improvements
Const:R/W:
Near Lake Elsinore, from the Orange CountyLine to Monte Vista Street. Widen for standardlane widths and shoulders and construct ground-in rumble strips.
0050P
1C850$53,600
$20
Subtotal: $53,620
2019-20$3,934$2,590
$20$4,985
$11,529Total Project Cost: $65,149
08130000473/26/20202/26/2020
12/20/2018PA&ED:
RTL:R/W Cert:
9/10/2020Begin Con:
08-Riverside-74 Prior18-1918-1919-20
201.010298 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/5.8
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 158 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Temecula, from 3.1 miles north of Route371 to 1.1 miles south of Pauba Road. Construct8 foot shoulders and rumble strip.3006G
1G670$43,272$1,705
Subtotal: $44,977
2021-22$4,900$4,700
$751$7,700
$18,051Total Project Cost: $63,028
081600004911/19/202110/19/202111/19/2019PA&ED:
RTL:R/W Cert:
8/19/2022Begin Con:
08-Riverside-79 Prior19-2019-2021-22
201.010108 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.4/11.4
Con Sup:
Safety Improvements
Const:R/W:
In Murrieta, from 0.2 mile north of Clinton KeithRoad Overcrossing to 0.5 mile south of ScottRoad Overcrossing. Install concrete barrier at edge of shoulder.
3005N
1G870$2,990
$10
Subtotal: $3,000
2018-19$600$732$10
$770
$2,112Total Project Cost: $5,112
08160000943/1/20192/1/20193/2/2018PA&ED:
RTL:R/W Cert:
9/5/2019Begin Con:
08-Riverside-215 PriorPriorPrior18-19
201.01023 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R12.7/R15.0
Con Sup:
Safety Improvements
Const:R/W:
MANDATESIn and near Lake Elsinore, from 1.7 miles east ofEl Cariso Road to Lehr Drive. Stabilize slopes todecrease sediment transport.3001Y
1C590$2,918
$10
Subtotal: $2,928
2018-19$310$452$20
$495
$1,277Total Project Cost: $4,205
08120003346/17/20194/15/20197/13/2018PA&ED:
RTL:R/W Cert:
2/18/2020Begin Con:
08-Riverside-74 Prior18-1918-1918-19
201.33512 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.0/R14.4
Con Sup:
Storm Water Mitigation
Const:R/W:
In Murrieta and Menifee, from Route 215 to northof Scott Road. Stabilize slopes to decreasesediment transport.3002A
1C660$7,080
$10
Subtotal: $7,090
2019-20$1,184$1,795
$20$1,209
$4,208Total Project Cost: $11,298
081200034112/11/201910/24/20197/15/2018PA&ED:
RTL:R/W Cert:
8/12/2020Begin Con:
08-Riverside-215 Prior18-1918-1919-20
201.33536 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R9.0/R16.0
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 159 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Hemet, from Warren Avenue to Soboba Street.Construct and upgrade pedestrian facilities tocurrent ADA standards.3003P
1F590$2,188
$246
Subtotal: $2,434
2019-20$710
$1,815$467
$1,100
$4,092Total Project Cost: $6,526
08140002563/16/2020
12/20/20194/16/2018PA&ED:
RTL:R/W Cert:
11/17/2020Begin Con:
08-Riverside-74 PriorPriorPrior19-20
201.361121 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
36.9/43.6
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Hemet, from East Florida Avenue to EastMenlo Avenue. Construct and upgrade pedestrianfacilities to current ADA standards.3002R
1F600$1,117
$379
Subtotal: $1,496
2019-20$450$900$670$600
$2,620Total Project Cost: $4,116
08140002573/10/20202/18/20204/10/2018PA&ED:
RTL:R/W Cert:
11/10/2020Begin Con:
08-Riverside-79 PriorPriorPrior19-20
201.361102 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
25.6/26.4
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Palm Springs, from Gateway Drive to GolfClub Drive. Reconstruct and construct curbramps.3007U
0R302$5,300$2,125
Subtotal: $7,425
2019-20 $1,547$3,339$2,590
$7,476Total Project Cost: $14,901
08170002306/15/20206/12/20206/29/2016PA&ED:
RTL:R/W Cert:
12/14/2020Begin Con:
08-Riverside-111PriorPrior19-20
201.378130 Structure(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
47.3/55.3
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
BRIDGE PRESERVATIONNear Palm Springs, at Whitewater River BridgeNo. 56-0004L/R. Bridge rehabilitation and scourmitigation.3002F
1E570$10,431
$20
Subtotal: $10,451
2018-19$953
$1,645$8
$2,076
$4,682Total Project Cost: $15,133
08140000516/18/20196/3/20195/2/2018PA&ED:
RTL:R/W Cert:
1/21/2020Begin Con:
08-Riverside-10 Prior18-1918-1918-19
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
27.7
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 160 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Desert Center, from Krume Ditch to WideDitch. Replace existing Rock Slope Protection(RSP) to prevent further scour damage andpreserve the integrity of 24 bridges.
3008N
1H200$10,440
$190
Subtotal: $10,630
2021-22$967
$1,232$259
$3,648
$6,106Total Project Cost: $16,736
08160001773/16/20222/16/20229/23/2020PA&ED:
RTL:R/W Cert:
11/4/2022Begin Con:
08-Riverside-10 18-1920-2120-2121-22
201.11024 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R92.9/R101.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Desert Center, from Coxcomb Ditch toCopa Ditch. Replace existing Rock SlopeProtection (RSP) to prevent further scour damageand preserve the structural integrity of 16 bridges.
3008M
1H190$7,356
$140
Subtotal: $7,496
2021-22$825
$1,282$217
$2,336
$4,660Total Project Cost: $12,156
08160001743/16/20222/16/20229/23/2020PA&ED:
RTL:R/W Cert:
12/12/2022Begin Con:
08-Riverside-10 18-1920-2120-2121-22
201.11016 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R106.6/R113.8
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Blythe, from Rubble Ditch to PalowallaDitch. Replace existing Rock Slope Protection(RSP) to prevent further scour damage andpreserve the structural integrity of 18 bridges.
3008P
1H210$8,832
$131
Subtotal: $8,963
2021-22$938
$1,442$281
$2,732
$5,393Total Project Cost: $14,356
08160001763/16/20222/16/20229/23/2020PA&ED:
RTL:R/W Cert:
11/16/2022Begin Con:
08-Riverside-10 18-1920-2120-2121-22
201.11018 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R120.7/R142.7
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Lake Elsinore, at Morrill Canyon BridgeNo. 56-0169; also, near Hemet at StrawberryCreek Bridge No. 56-0180 (PM 53.4/54.7).Replace structures/upgrade rails.
3005Q
1G470$6,824
$653
Subtotal: $7,477
2021-22$1,690$1,295
$150$2,390
$5,525Total Project Cost: $13,002
08160000013/30/20222/28/20222/22/2021PA&ED:
RTL:R/W Cert:
11/30/2022Begin Con:
08-Riverside-74 18-1920-2120-2121-22
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.9/3.2
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 161 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Desert Center, at Palen Ditch Bridge No. 56-0040L/R. Bridge rail replacement.
3002L
1F410$592$10
Subtotal: $602
2018-19$139$342$10
$119
$610Total Project Cost: $1,212
08140002161/4/2019
12/3/201812/15/2017PA&ED:
RTL:R/W Cert:
11/1/2019Begin Con:
08-Riverside-10 PriorPriorPrior18-19
201.112440 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R110.5
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In and near the cities of Lake Elsinore, Perris,Menifee and Hemet, at Leach Canyon ChannelBridge No. 56-0750 and Blue Ridge Wash BridgeNo. 56-0257; also on Routes 79 and 371, at Arroyo Seco Bridge, Temecula Creek Bridge, andCahuilla Bridge. Bridge rail replacement.
3002C
1C680$2,884
$20
Subtotal: $2,904
2019-20$505$859$11
$532
$1,907Total Project Cost: $4,811
08120003438/1/20196/3/20194/2/2018PA&ED:
RTL:R/W Cert:
3/2/2020Begin Con:
08-Riverside-74 PriorPriorPrior19-20
201.1121391 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.2/34.0
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In Riverside County, on Routes 10 and 91, atvarious locations; also in San Bernardino County,on Routes 10 and 15, at various locations. Repairbridge decks.
3002G
1E720$1,472
$30
Subtotal: $1,502
2018-19$350$660$20
$660
$1,690Total Project Cost: $3,192
08140000878/3/2018
6/20/201810/31/2017PA&ED:
RTL:R/W Cert:
4/30/2019Begin Con:
08-Riverside-10 PriorPriorPrior18-19
201.1197 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R74.1
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONIn and near Terra Cotta, from Nichols Road tonorth of Glen Ivy. Concrete pavement slabreplacement.3003L
1F142$20,762
$10
Subtotal: $20,772
2018-19$1,108
$926$10
$3,347
$5,391Total Project Cost: $26,163
08150002325/1/20192/1/2019
11/1/2017PA&ED:
RTL:R/W Cert:
1/15/2020Begin Con:
08-Riverside-15 PriorPriorPrior18-19
201.12157 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
23.9/33.4
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 162 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Corona, from south of OntarioAvenue to Route 60. Concrete pavement slabreplacement.3003M
1F143$24,040
$10
Subtotal: $24,050
2018-19$1,022
$930$10
$4,771
$6,733Total Project Cost: $30,783
08150002333/15/20191/7/20192/1/2018PA&ED:
RTL:R/W Cert:
1/15/2020Begin Con:
08-Riverside-15 PriorPriorPrior18-19
201.12179.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
38.2/51.5
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Beaumont, from Gilman Springs Road to1.4 miles west of Jack Rabbit Trail. Rehabilitatepavement.0033N
1C090$15,000
Subtotal: $15,000
2018-19
Total Project Cost: $15,000
08120002871/2/2018
12/4/20175/2/2016PA&ED:
RTL:R/W Cert:
8/24/2018Begin Con:
08-Riverside-60
201.12117.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
22.1/26.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Yucca Valley and Twentynine Palms,from north of Indian Avenue to Utah Trail; also,in San Bernardino County (PM 0.0/15.1 and PM29.3/33.6). Pavement rehabilitation.
0023C
1E840$35,355$2,209
Subtotal: $37,564
2019-20$1,450$2,800$1,110$4,520
$9,880Total Project Cost: $47,444
08140001133/16/2020
12/16/20196/28/2016PA&ED:
RTL:R/W Cert:
1/15/2021Begin Con:
08-Riverside-62 19-20PriorPrior19-20
201.12185.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R6.7/9.2
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Temecula, from San Diego County line toTemecula city limits. Pavement rehabilitation.
0066Q
1F690$8,742
$10
Subtotal: $8,752
2018-19$240$560$17
$800
$1,617Total Project Cost: $10,369
08150000165/10/20194/12/20195/15/2018PA&ED:
RTL:R/W Cert:
2/14/2020Begin Con:
08-Riverside-79 Prior18-1918-1918-19
201.12132.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/15.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 163 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Coachella, from 0.5 mile east ofCoachella Canal to Hazy Gulch Bridge. Coldplane pavement and overlay with PortlandCement Concrete (PCC). Construct eastboundtruck climbing lane. A one-lane temporary detourwill be constructed in the median for traffic handling.
3008A
1C081$157,000
$10
Subtotal: $157,010
2021-22$7,000
$15,800$90
$22,000
$44,890Total Project Cost: $201,900
08160000865/27/20224/22/20228/28/2020PA&ED:
RTL:R/W Cert:
1/13/2013Begin Con:
08-Riverside-10 Prior20-2120-2121-22
201.12252.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R60.9/R74.0
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Near Blythe, from Rice Road/SR-177 to TeedDitch Bridge. Cold plane mainline pavement andoverlay with Portland Cement Concrete (PCC).The shoulders and ramps will be milled andoverlaid with Hot Mix Asphalt (HMA-A). A twolane temporary detour will be constructed in themedian for traffic handling.
3008Y
1C082$263,010
$10
Subtotal: $263,020
2019-20$16,900$21,800
$153$37,500
$76,353Total Project Cost: $339,373
08160000875/29/20204/24/20206/28/2019PA&ED:
RTL:R/W Cert:
1/15/2021Begin Con:
08-Riverside-10 Prior19-2019-2019-20
201.122116 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R105.0/R134.0
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In and near Blythe, from Teed Ditch Bridge toArizona State line. Cold plane mainline pavementand overlay with Portland Cement Concrete(PCC). The shoulders and ramps will be milledand overlaid with Hot Mix Asphalt (HMA-A). Atwo lane temporary detour will be constructed inthe median for traffic handling.
3009K
1C083$207,000
$10
Subtotal: $207,010
2021-22$9,000
$21,000$117
$29,000
$59,117Total Project Cost: $266,127
08160000905/27/20224/22/20228/28/2020PA&ED:
RTL:R/W Cert:
1/10/2023Begin Con:
08-Riverside-10 Prior20-2120-2121-22
201.12290 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R134.0/R156.5
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In and near Temecula, from Rainbow ValleyBoulevard to Front Street. Rehabilitate roadway.
3003K
1F141$34,890
$10
Subtotal: $34,900
2019-20$1,014$1,200
$10$5,181
$7,405Total Project Cost: $42,305
08150002312/3/20208/1/20192/1/2018PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
08-Riverside-15 PriorPriorPrior19-20
201.12224 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/3.0
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 164 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Lake Elsinore, at 0.8 mile west of GrandAvenue. Stabilize slope to protect safety oftraveling public.3002J
1E770$1,082
$10
Subtotal: $1,092
2018-19$140$250$20
$400
$810Total Project Cost: $1,902
08140001028/30/20187/30/2018
10/24/2017PA&ED:
RTL:R/W Cert:
5/1/2019Begin Con:
08-Riverside-74 PriorPriorPrior18-19
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.0
Con Sup:
Roadway Protective Betterments
Const:R/W:
In Riverside County, on Routes 10, 15, 71 and215 at various locations. Replace existing guidesigns with Type XI reflectivity.3005C
1F372$3,449
$10
Subtotal: $3,459
2018-19$333$722$45
$508
$1,608Total Project Cost: $5,067
08150001625/1/20192/1/2019
9/13/2017PA&ED:
RTL:R/W Cert:
12/2/2019Begin Con:
08-Riverside-10 PriorPriorPrior18-19
201.170307 Sign(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/R156.4
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
In the cities of Eastvale, Jurupa Valley, Riversideand Moreno Valley, from Hamner Avenue toGilman Spring Road; also on Route 91 from Route 15 to Madison Street. Replace existingguide signs with retro-reflective sheeting.
0022K
1F371$1,592
$10
Subtotal: $1,602
2019-20$125$260$15
$210
$610Total Project Cost: $2,212
08150001633/2/20209/3/20197/2/2018PA&ED:
RTL:R/W Cert:
11/2/2020Begin Con:
08-Riverside-60 Prior18-1918-1919-20
201.170221 Lighting fixture(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/22.3
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
MOBILITYIn the cities from Corona and Riverside, fromRoute 15/91 separator to Adams Street Overcrossing. Convert existing limited accessHOV lanes to continuous access HOV lanes to allow safer ingress and egress movements forHOV.
3005X
1G192$463$10
Subtotal: $473
2018-19$33$96$10
$162
$301Total Project Cost: $774
08160001942/25/2019
12/28/20183/26/2018PA&ED:
RTL:R/W Cert:
7/29/2019Begin Con:
08-Riverside-91 PriorPriorPrior18-19
201.310126 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.4/15.6
Con Sup:
Operational Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 165 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Riverside($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Riverside and San Bernardino Counties, onvarious routes and at various locations. Repairand replace vehicle detection equipmentimpacting the operations of the District TMC.
3006W
1H530$4,260
$10
Subtotal: $4,270
2018-19$346$912$90
$1,274
$2,622Total Project Cost: $6,892
081700007410/15/20189/14/20182/15/2018PA&ED:
RTL:R/W Cert:
6/14/2019Begin Con:
08-Riverside-Var PriorPriorPrior18-19
201.315188 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
ROADSIDE PRESERVATIONIn Riverside County, on Routes 10, 62, 74, 86,86S, 111 and 95 at various locations. AdvanceMitigation. Financial Contribution Only. 3002Q
1F560 $7,600
Subtotal: $7,600
2018-19$150
$15
$165Total Project Cost: $7,765
08140002494/15/2019
9/14/2017PA&ED:
RTL:R/W Cert:
Begin Con:
08-Riverside-10 Prior
Prior
201.24030 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.0/70.0
Con Sup:
Roadside Enhancement
Const:R/W:
MISCELLANEOUSIn and near Hemet, from Winchester Road toFairview Avenue. Multi-objective project torehabilitate pavement, install fiber optic/vehicledetection stations and upgrade curb ramps to meetADA standards.
3008L
1H060$26,536
$408
Subtotal: $26,944
2021-22$3,000$3,300$1,300$3,850
$11,450Total Project Cost: $38,394
08160001305/16/20224/15/20229/15/2020PA&ED:
RTL:R/W Cert:
1/17/2023Begin Con:
08-Riverside-74 18-1920-2120-2121-22
201.99949 Centerline mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
34.3/45.1
Con Sup:
Miscellaneous
Const:R/W:
CountyRiverside
PA&ED:PS&E:
R/W Sup:Con Sup:
$16,976$1,004,293
R/W:
Subtotal: $1,021,269
Const:$63,639$96,791$9,627
$154,193
$324,250
Total (Capital + Support): $1,345,519
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 166 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Rio Vista, at Route 160. Intersectionimprovements.
5961
2H640$2,468
$6
Subtotal: $2,474
2019-20$310$560$100
$1,030
$2,000Total Project Cost: $4,474
031700016712/1/2019
11/15/20198/1/2018PA&ED:
RTL:R/W Cert:
4/5/2020Begin Con:
03-Sacramento-12 Prior18-1918-1919-20
201.01026 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.4/1.0
Con Sup:
Safety Improvements
Const:R/W:
In Sacramento County, on Routes 5, 80, and 99 atvarious locations; also in Yolo County on Route80 (PM 0.0/R11.7). Upgrade guard rail to currentstandards.
5850
4F640$2,280
$15
Subtotal: $2,295
2018-19$335$565$115$295
$1,310Total Project Cost: $3,605
031400023210/1/20189/1/20187/7/2017PA&ED:
RTL:R/W Cert:
5/1/2019Begin Con:
03-Sacramento-5 PriorPriorPrior18-19
201.0158 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.1/34.6
Con Sup:
Collision Severity Reduction
Const:R/W:
Near the city of Sacramento, at the ElkhornSafety Roadside Rest Area (SRRA). Upgradepotable water and wastewater systems. 5848
4F580$3,000
$4
Subtotal: $3,004
2018-19$380$370$50
$810
$1,610Total Project Cost: $4,614
03140001861/18/20191/11/20199/8/2017PA&ED:
RTL:R/W Cert:
7/20/2019Begin Con:
03-Sacramento-5 PriorPriorPrior18-19
201.2351 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
33.7
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Sacramento, from Stockton Boulevard toFolsom Boulevard. Construct textured pavementin narrow areas, pave partial slopes, relocate andreconstruct irrigation system, and install plantingsand mulch to reduce maintenance and improvehighway worker safety.
6246
1H050$4,000
$10
Subtotal: $4,010
2020-21$170$520$40
$480
$1,210Total Project Cost: $5,220
031600005110/1/20209/15/20207/1/2019PA&ED:
RTL:R/W Cert:
5/1/2021Begin Con:
03-Sacramento-50 18-1919-2019-2020-21
201.23576 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.5/R3.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 167 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of Sacramento, from 0.1 mile south ofB Street Underpass to 0.4 mile north of ArdenWay. Pave areas behind the gore and at narrowand miscellaneous locations, place vegetationcontrol, and construct maintenance vehiclepullouts to reduce maintenance and improvehighway worker safety.
6413
2H110$4,000
$10
Subtotal: $4,010
2021-22$280$530$50
$1,120
$1,980Total Project Cost: $5,990
03170000648/1/20217/1/2021
10/1/2020PA&ED:
RTL:R/W Cert:
1/1/2022Begin Con:
03-Sacramento-51 19-2020-2120-2121-22
201.23561 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
1.6/4.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near the city of Sacramento, from Del PasoPark Separation to 0.4 mile north of Route 80/244Separation; also, on Route 51 from PM 8.3 to 8.6and Route 244 from PM 0.0 to 0.9. Pave areasbehind the gore and at narrow and miscellaneouslocations, place vegetation control, and constructmaintenance vehicle pullouts to reducemaintenance and improve highway worker safety.
6716
2H150$3,700
$0
Subtotal: $3,700
2020-21$250$570$10
$1,050
$1,880Total Project Cost: $5,580
03170000684/6/20214/6/2021
6/15/2020PA&ED:
RTL:R/W Cert:
9/30/2021Begin Con:
03-Sacramento-80 19-2019-2020-2120-21
201.23549 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
M9.1/R11.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Citrus Heights, from 0.4 mile north ofthe Route 80/244 Separation to the Placer Countyline. Pave areas behind the gore and at narrowand miscellaneous locations, place vegetationcontrol, and construct maintenance vehiclepullouts to reduce maintenance and improvehighway worker safety.
6715
2H120$2,500
$0
Subtotal: $2,500
2021-22$260$500$10
$1,000
$1,770Total Project Cost: $4,270
03170000655/6/2022
4/16/20226/15/2021PA&ED:
RTL:R/W Cert:
9/30/2022Begin Con:
03-Sacramento-80 20-2120-2121-2221-22
201.23567 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R11.4/18.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
BRIDGE PRESERVATIONIn and near Rio Vista, at the Sacramento RiverBridge No. 23-0024; also, in Solano County fromPM 26.3 to PM 26.4. Rehabilitate movablebridge electrical and mechanical systems andupgrade ADA facilities.
5960
1H130$16,400
$100
Subtotal: $16,500
2021-22$760
$2,460$20
$3,120
$6,360Total Project Cost: $22,860
03160000597/1/20216/1/20217/1/2019PA&ED:
RTL:R/W Cert:
2/1/2022Begin Con:
03-Sacramento-12 18-1919-2019-2021-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/0.4
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 168 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of Sacramento, at the American RiverBridge No. 24-0003. Widen and replace bridgedeck.6402
3F070$105,300
$1,000
Subtotal: $106,300
2019-20$4,340
$10,130$360
$16,120
$30,950Total Project Cost: $137,250
03120000545/1/20205/1/20201/2/2019PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
03-Sacramento-51 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.6/3.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In the city of Sacramento, at 21st AvenueUndercrossing No. 24-0154. Replace bridgedeck.6923B
0H342$2,240
$5
Subtotal: $2,245
2019-20$210$240
$3$580
$1,033Total Project Cost: $3,278
031700015310/1/20189/1/2018
11/1/2017PA&ED:
RTL:R/W Cert:
4/15/2019Begin Con:
03-Sacramento-99 19-20PriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.9/23.6
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
On Route 99, at South Lagoon Creek Bridge No.24-0028L, Lagoon Creek Bridge No. 24-0045L(PM 5.0), and North Lagoon Creek Bridge No. 24-0027L (PM 5.1); also on Route 160 (PM R44.5)at American River Bridge No. 24-0001L. Scourmitigation and bridge replacement.
6916
3F540$20,270
$500
Subtotal: $20,770
2018-19$872
$2,000$50
$3,100
$6,022Total Project Cost: $26,792
03130001364/1/2019
3/15/201910/1/2017PA&ED:
RTL:R/W Cert:
7/17/2019Begin Con:
03-Sacramento-99 PriorPriorPrior18-19
201.1114 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.9
Con Sup:
Bridge Scour Mitigation
Const:R/W:
In and near the city of Sacramento, from west ofRio Linda Boulevard Undercrossing (UC) No. 24-0203 to east of Winters Street UC No. 24-0205;also, on Route 51 from south of Route 51/244, 80Separation No. 24-0291L to north of Route51/244, 80 Connector No. 24-0293R (PM 8.2 to8.6). Upgrade bridge rails at 4 structures andwiden for standard shoulders.
6412
1H910$20,104
$6
Subtotal: $20,110
2021-22$1,300$3,000
$500$4,300
$9,100Total Project Cost: $29,210
03170000321/15/20221/3/2022
10/1/2019PA&ED:
RTL:R/W Cert:
5/15/2022Begin Con:
03-Sacramento-80 18-1919-2019-2021-22
201.1124413 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
M6.5/M8.8
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 169 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Elk Grove, from 0.3 mile south ofDillard Road Overcrossing to south of Grant LineRoad (replace Consumnes River Bridge No. 24-0020L/R, and Consumnes River OverflowBridge No. 24-0021L/R; upgrade bridge rails at Dillard Road Overcrossing No. 24-0163; construct new McConnell Overhead No. 24-0048L. Bridge seismic retrofit, bridge scour retrofit, bridge rail replacement, and bridgereplacement.
6912
0F280$113,000
$6,000
Subtotal: $119,000
2019-20$1,700$3,500
$600$14,200
$20,000Total Project Cost: $139,000
03120000695/1/20204/1/20207/1/2019PA&ED:
RTL:R/W Cert:
10/15/2020Begin Con:
03-Sacramento-99 PriorPriorPrior19-20
201.1123178 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.1/9.4
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In the city of Sacramento, at Southbound Route99/5 Connector Overcrossing No. 24-0241F; also,on Route 80 at Longview Ramp Overcrossing No.24-0281K (PM M9.15). Seismic retrofit twostructures.
6707
4F100$1,900
Subtotal: $1,900
2019-20$321$759$18
$691
$1,789Total Project Cost: $3,689
031400002412/15/201911/1/20194/1/2018PA&ED:
RTL:R/W Cert:
6/1/2020Begin Con:
03-Sacramento-99 PriorPriorPrior19-20
201.1132 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R32.1
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In the city of Sacramento, from the Sacramento River Viaduct (Pioneer Bridge) to 4th Street; also,on Route 5 from 0.2 mile south of Broadway to SStreet (PM 22.15 to 22.91). Clean and paint steelbridge girders within Route 5/50 interchange.
6247
1H100$16,700
$20
Subtotal: $16,720
2020-21$350$940$10
$3,010
$4,310Total Project Cost: $21,030
03160000562/1/20212/1/20217/1/2019PA&ED:
RTL:R/W Cert:
9/1/2021Begin Con:
03-Sacramento-50 18-1919-2019-2020-21
201.11911 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
L0.0/L0.5
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In the city of Sacramento, from 0.5 mile south ofRoute 50 to Route 80 at South ConnectorUndercrossing No. 24-0267 (PM 22.42) and at American River Viaduct No. 24-0068L/R (PM24.82). Improve to standard truck capacity.
ACCELERATED BRIDGE (PA&ED Only)
5868
3H390$176,700
$3,110
Subtotal: $179,810
2021-22$16,780$19,340$2,910
$28,390
$67,420Total Project Cost: $247,230
031700034011/15/202111/1/202112/1/2019PA&ED:
RTL:R/W Cert:
4/15/2022Begin Con:
03-Sacramento-5 Prior21-2221-2221-22
201.3223 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
22.1/26.7
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 170 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn the city of Sacramento, from Route 5 to WattAvenue. Roadway rehabilitation.
6177
0H080$216,000
$3,900
Subtotal: $219,900
2019-20$7,800
$17,000$1,800
$31,800
$58,400Total Project Cost: $278,300
03150000742/14/20202/3/2020
12/1/2018PA&ED:
RTL:R/W Cert:
8/1/2020Begin Con:
03-Sacramento-50 Prior19-20Prior19-20
201.12056 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
L0.6/R5.3
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In and near the city of Sacramento, from west ofWest El Camino Avenue to east of Route 244. Pavement rehabilitation.6711
0H470$10,515
$25
Subtotal: $10,540
2018-19$550
$1,110$105
$2,000
$3,765Total Project Cost: $14,305
03150001971/11/2019
12/11/201810/3/2017PA&ED:
RTL:R/W Cert:
7/15/2019Begin Con:
03-Sacramento-80 PriorPriorPrior18-19
201.121.1 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
M1.2/R11.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near the city of Sacramento, from 0.2 mile east ofLongview Drive to 0.4 mile east of MadisonAvenue. Pavement rehabilitation.6714
1H190$14,000
$100
Subtotal: $14,100
2021-22$50
$1,500$80
$2,500
$4,130Total Project Cost: $18,230
031600006510/15/20219/20/20218/1/2019PA&ED:
RTL:R/W Cert:
4/1/2022Begin Con:
03-Sacramento-80 Prior19-2019-2021-22
201.12135.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
M9.6/12.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Galt, from the San Joaquin County line toSimmerhorn Road; also, in the cities of Elk Groveand Sacramento, from 0.7 mile south of ElkGrove Boulevard to Martin Luther King Jr.Boulevard (PM 11.9/21.5). Pavementrehabilitation.
6924
0H480$38,760
$22
Subtotal: $38,782
2018-19$850
$1,700$80
$3,600
$6,230Total Project Cost: $45,012
031500019811/16/201811/1/20185/15/2017PA&ED:
RTL:R/W Cert:
3/1/2019Begin Con:
03-Sacramento-99 PriorPriorPrior18-19
201.12167.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.2/1.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 171 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MOBILITYIn the city of Sacramento, from 65th Street to eastof Howe Avenue. Construct westbound auxiliarylane.6200
1F190$3,080
$6
Subtotal: $3,086
2018-19$155$265
$4$420
$844Total Project Cost: $3,930
03000011053/1/20192/1/20195/3/2017PA&ED:
RTL:R/W Cert:
10/1/2019Begin Con:
03-Sacramento-50 18-19PriorPrior18-19
201.31032 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R2.6/R3.8
Con Sup:
Operational Improvements
Const:R/W:
In the city of Sacramento, at Hornet Driveeastbound offramp. Widen ramp, add signal andright-turn lane.6242
0H580$1,300
$130
Subtotal: $1,430
2018-19$250$450$130$460
$1,290Total Project Cost: $2,720
031500021110/7/201810/1/2018
12/10/2016PA&ED:
RTL:R/W Cert:
4/9/2019Begin Con:
03-Sacramento-50 18-19PriorPrior18-19
201.3101000 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R3.5
Con Sup:
Operational Improvements
Const:R/W:
In and near Rancho Cordova, from BradshawRoad to Mather Field Road. Operationalimprovements that construct auxiliary lanes inboth westbound and eastbound directions.
6197
1F150$7,250
$150
Subtotal: $7,400
2020-21$396$659$103$940
$2,098Total Project Cost: $9,498
030000110111/15/202011/1/20207/1/2019PA&ED:
RTL:R/W Cert:
5/15/2021Begin Con:
03-Sacramento-50 19-2020-2120-2120-21
201.310450 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R7.7/R9.5
Con Sup:
Operational Improvements
Const:R/W:
In the city of Sacramento, at various locations androutes at the Route 5/99 interchange Connectorramps and the eastbound Route 51/160interchange Connector ramp. Install connectorramp meters.
6411
1H850$3,000
$20
Subtotal: $3,020
2020-21$320$660$20
$1,020
$2,020Total Project Cost: $5,040
03170000098/1/20207/1/20208/1/2019PA&ED:
RTL:R/W Cert:
1/1/2021Begin Con:
03-Sacramento-5 Prior18-1918-1920-21
201.3154 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 172 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Placer, Sacramento, and Yolo Counties, onroutes 5, 80, 99, and 113. Replace obsoleteMicrowave Vehicle Detection System (MVDS)elements.
8920
2H700$1,403
$15
Subtotal: $1,418
2018-19$148$249$22
$507
$926Total Project Cost: $2,344
031700017310/1/20189/15/20184/1/2018PA&ED:
RTL:R/W Cert:
5/5/2019Begin Con:
03-Sacramento-5 PriorPriorPrior18-19
201.31548 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
In Sacramento, from 1.1 miles south of Elk GroveBoulevard to Route 50. Install fiber optic cable.
5846
4F450$6,600
$600
Subtotal: $7,200
2018-19$540$900$440
$1,500
$3,380Total Project Cost: $10,580
03140001646/30/20174/24/20176/23/2016PA&ED:
RTL:R/W Cert:
6/30/2018Begin Con:
03-Sacramento-5 PriorPriorPrior18-19
201.31513 Mile(s) of cablePerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.7/22.7
Con Sup:
Transportation Management Systems
Const:R/W:
In and near the cities of Sacramento, RanchoCordova, and Folsom, from Yolo County line toFolsom Boulevard; also, in Yolo County in WestSacramento, from Route 80 to Sacramento County line (PM 0.0 to 3.156), and on Route 80from Enterprise Boulevard to Route 50 (PM 9.2to R9.552). Install Transportation ManagementSystem (TMS) field elements.
6250
3H330$38,400
$200
Subtotal: $38,600
2020-21$940
$2,700$520
$3,900
$8,060Total Project Cost: $46,660
031700032510/1/20209/15/20203/1/2019PA&ED:
RTL:R/W Cert:
4/1/2021Begin Con:
03-Sacramento-50 18-1918-1918-1920-21
201.315122 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
L0.0/17.5
Con Sup:
Transportation Management Systems
Const:R/W:
In and near Rancho Cordova and Folsom, fromSunrise Boulevard to the county line; also in ElDorado County near El Dorado Hills, from thecounty line to Silva Valley Parkway (PM 0.0/1.7).Install fiber optic cable.
6248
1H820$4,650
$21
Subtotal: $4,671
2020-21$240$950$110
$1,050
$2,350Total Project Cost: $7,021
03170000067/1/2020
6/15/202011/1/2018PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
03-Sacramento-50 Prior18-1918-1920-21
201.31512.3 Mile(s) of cablePerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
12.5/23.1
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 173 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In various counties, on various routes. Repair orreplace damaged inductive loop vehicle detectionelements.6717
2H570$922$15
Subtotal: $937
2018-19$94
$211$22
$365
$692Total Project Cost: $1,629
031700015710/1/20189/15/20184/1/2018PA&ED:
RTL:R/W Cert:
5/5/2019Begin Con:
03-Sacramento-80 PriorPriorPrior18-19
201.315300 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
In and near the cities of Sacramento and CitrusHeights, from east of the Yolo County line to thePlacer County line.; also in Placer County in thecity of Roseville from the Sacramento Countyline to east of the Sacramento County line (PM0.0/0.7). Install fiber optic communication line.
6713
0H540$12,200
$50
Subtotal: $12,250
2019-20$1,200$1,200
$300$1,800
$4,500Total Project Cost: $16,750
031500020411/15/201911/1/20193/1/2018PA&ED:
RTL:R/W Cert:
5/15/2020Begin Con:
03-Sacramento-80 PriorPriorPrior19-20
201.31518.4 Mile(s) of cablePerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
M0.1/18.0
Con Sup:
Transportation Management Systems
Const:R/W:
In and near the cities of Elk Grove andSacramento, from Grant Line Road to Route 50;also, on Route 51 from Route 50 to 0.1 mile southof the Fort Sutter Viaduct (PM 0.0 to 0.1). Installfiber optic cable.
6925
0H670$9,000
$100
Subtotal: $9,100
2021-22$700
$1,000$50
$1,300
$3,050Total Project Cost: $12,150
031600000510/1/20219/1/2021
10/1/2020PA&ED:
RTL:R/W Cert:
5/1/2022Begin Con:
03-Sacramento-99 Prior20-2120-2121-22
201.31514 Mile(s) of cablePerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.0/R24.3
Con Sup:
Transportation Management Systems
Const:R/W:
In Citrus Heights, from east of ElkhornBoulevard/Greenback Lane to west of RiversideAvenue. Upgrade weigh-in-motion (WIM)station and widen the westbound auxiliary lane tothe Antelope Truck Scales.
6712
0H530$3,700
$50
Subtotal: $3,750
2018-19$350$600$100$740
$1,790Total Project Cost: $5,540
03150002033/15/20193/1/20193/1/2018PA&ED:
RTL:R/W Cert:
8/1/2019Begin Con:
03-Sacramento-80 PriorPriorPrior18-19
201.3211 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
15.2/17.0
Con Sup:
Weigh Stations
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 174 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADSIDE PRESERVATIONIn the city of Sacramento, from south ofBroadway to 0.12 mile south of R Street.Highway planting rehabilitation.5865
2H130$2,500
$10
Subtotal: $2,510
2021-22$230$520$80
$430
$1,260Total Project Cost: $3,770
03170000668/1/2021
7/25/20218/1/2020PA&ED:
RTL:R/W Cert:
3/5/2022Begin Con:
03-Sacramento-5 19-2020-2120-2121-22
201.21016 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
22.0/22.9
Con Sup:
Highway Planting Restoration
Const:R/W:
CountySacramento
PA&ED:PS&E:
R/W Sup:Con Sup:
$16,200$867,842
R/W:
Subtotal: $884,042
Const:$43,431$77,658$8,812
$133,628
$263,529
Total (Capital + Support): $1,147,571
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 175 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Benito($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Pinnacles National Park, from 0.7 milesnorth of San Benito Lateral/Old Hernandez Roadto 2.4 miles south of Route 146. Improve curveand flatten slope.
2697
1H810$4,265
$363
Subtotal: $4,628
2019-20$1,181$1,756
$345$1,506
$4,788Total Project Cost: $9,416
05160001644/6/2020
2/19/202011/13/2018PA&ED:
RTL:R/W Cert:
10/28/2020Begin Con:
05-San Benito-25 Prior18-1918-1919-20
201.01014 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.8/19.1
Con Sup:
Safety Improvements
Const:R/W:
CountySan Benito
PA&ED:PS&E:
R/W Sup:Con Sup:
$363$4,265
R/W:
Subtotal: $4,628
Const:$1,181$1,756
$345$1,506
$4,788
Total (Capital + Support): $9,416
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 176 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Hesperia, from Cleghorn RoadUndercrossing to Route 138 at the southboundCajon Truck Facility. Reconstruct southboundtruck scale that was destroyed by the Blue CutFire.
3006U
1H390$2,146
$10
Subtotal: $2,156
2018-19$289$488$20
$550
$1,347Total Project Cost: $3,503
081700003210/1/20189/1/20186/1/2018PA&ED:
RTL:R/W Cert:
6/30/2019Begin Con:
08-San Bernardino-15 PriorPriorPrior18-19
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R20.6/R20.9
Con Sup:
Permanent Restoration
Const:R/W:
In Victorville, near Palmdale Road (Route 18)and Route 15. Restore vegetation and irrigationsystem due to fire damage.3006T
1H271$1,061
$10
Subtotal: $1,071
2018-19$206$493$54
$577
$1,330Total Project Cost: $2,401
081700002412/15/201811/15/20184/16/2018PA&ED:
RTL:R/W Cert:
6/18/2019Begin Con:
08-San Bernardino-15 PriorPriorPrior18-19
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
40.3/40.7
Con Sup:
Permanent Restoration
Const:R/W:
Near Baker, at 1.6 miles south of Afton RoadOvercrossing. Reconstruct eroded earthen dikethat protects the highway from inundation andflooding. The failed section of berm is located750 yards from the southbound 1-15 outsideshoulder.
3005L
1G740$1,691
$128
Subtotal: $1,819
2019-20$1,000
$540$102$540
$2,182Total Project Cost: $4,001
08160000605/18/20204/15/20206/18/2019PA&ED:
RTL:R/W Cert:
1/4/2021Begin Con:
08-San Bernardino-15 Prior19-2019-2019-20
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R110.0
Con Sup:
Permanent Restoration
Const:R/W:
In Barstow, at 0.4 mile east of Route 15/40Separation. Reconstruct a damaged section oftrapezoidal channel.3006V
1H400$6,951
$10
Subtotal: $6,961
2019-20$390$780$20
$975
$2,165Total Project Cost: $9,126
081700003112/27/201911/22/2019
1/4/2019PA&ED:
RTL:R/W Cert:
7/10/2020Begin Con:
08-San Bernardino-40 Prior18-1918-1919-20
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.4
Con Sup:
Permanent Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 177 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Vidal Junction, from west of Route 95 towest of Parker Dam Road. Restore storm erodedembankments with rock slope protection. Aprevious Emergency Opening EA 08-1F660repaired roadway.
3005P
1G010$8,435
$107
Subtotal: $8,542
2019-20$1,279
$902$76
$1,940
$4,197Total Project Cost: $12,739
08150001065/1/20202/3/2020
11/1/2018PA&ED:
RTL:R/W Cert:
2/16/2021Begin Con:
08-San Bernardino-62 Prior18-1918-1919-20
201.13110 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
124.0/142.0
Con Sup:
Permanent Restoration
Const:R/W:
Near Cedar Glen, at 0.1 mile south of HospitalRoad. Widen shoulder and replace guard railwith concrete barrier mounted on soldier pilewall.
3006J
1H290$2,345
$10
Subtotal: $2,355
2019-20$713
$1,080$93
$1,376
$3,262Total Project Cost: $5,617
08170000064/15/20203/13/2020
11/15/2018PA&ED:
RTL:R/W Cert:
12/15/2020Begin Con:
08-San Bernardino-173 Prior18-1918-1919-20
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.7
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONIn Victorville, from Amargosa Road to CobaltRoad. Construct raised curb median.
3006F
1E060$5,087
$884
Subtotal: $5,971
2019-20$920
$1,150$480
$1,050
$3,600Total Project Cost: $9,571
08130001405/1/20204/1/2020
7/30/2018PA&ED:
RTL:R/W Cert:
9/30/2020Begin Con:
08-San Bernardino-18 Prior18-1918-1919-20
201.01025 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
97.0/99.5
Con Sup:
Safety Improvements
Const:R/W:
In Twentynine Palms, from 0.1 mile west of to0.4 mile east of Utah Trail.
3005K
1G450$826$25
Subtotal: $851
2018-19$397$486$42
$590
$1,515Total Project Cost: $2,366
08150002389/14/20188/14/20186/30/2017PA&ED:
RTL:R/W Cert:
4/15/2019Begin Con:
08-San Bernardino-62 PriorPriorPrior18-19
201.01013 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
34.1/34.6
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 178 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Needles, from Route 62 to 0.8 mile south ofRoute 40. Construct ground-in shoulder andcenterline rumble strips.3006H
1F780$1,390
$10
Subtotal: $1,400
2019-20$650$700$30
$450
$1,830Total Project Cost: $3,230
081500004711/30/201810/30/2018
2/8/2018PA&ED:
RTL:R/W Cert:
5/30/2019Begin Con:
08-San Bernardino-95 PriorPriorPrior19-20
201.01057 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.6/56.5
Con Sup:
Safety Improvements
Const:R/W:
In and near Barstow, from 0.1 mile north ofBoone Road to 0.7 mile south of Rimrock Road.Construct ground-in shoulder and centerlinerumble strips.
3006K
1F770$1,953
$10
Subtotal: $1,963
2019-20$600$720$60
$550
$1,930Total Project Cost: $3,893
08150000517/30/20187/10/2018
12/15/2017PA&ED:
RTL:R/W Cert:
10/23/2018Begin Con:
08-San Bernardino-247 PriorPriorPrior19-20
201.01065 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.3/76.8
Con Sup:
Safety Improvements
Const:R/W:
Near Barstow, from Harvard Road to Rasor Road.Regrade and flatten median cross slope.
3002E
1C720$12,248
$10
Subtotal: $12,258
2019-20$890$920$50
$3,160
$5,020Total Project Cost: $17,278
08130000031/30/2020
12/30/201912/20/2017PA&ED:
RTL:R/W Cert:
10/22/2020Begin Con:
08-San Bernardino-15 PriorPriorPrior19-20
201.01587 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R96.1/R124.3
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Barstow, from 1.7 miles east of Fort CadyRoad Overcrossing to Crucero Road Undercrossing. Regrade median cross slopes.3007X
0R170$28,488$2,075
Subtotal: $30,563
2021-22$3,200$1,900
$300$3,300
$8,700Total Project Cost: $39,263
08120000282/28/20221/31/2022
11/30/2020PA&ED:
RTL:R/W Cert:
11/30/2022Begin Con:
08-San Bernardino-40 18-1920-2120-2121-22
201.01575 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R25.0/R50.0
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 179 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Essex, from west of Kelbaker Road to EssexRoad. Regrade and flatten median cross slope.
3001R
0R150$21,178$5,010
Subtotal: $26,188
2018-19$3,000$2,500
$200$3,200
$8,900Total Project Cost: $35,088
08120000255/31/20194/30/20198/31/2018PA&ED:
RTL:R/W Cert:
1/31/2020Begin Con:
08-San Bernardino-40 Prior18-1918-1918-19
201.015150 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R75.0/R100.0
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Needles, from Essex Road Overcrossing to4.5 miles east of Homer Wash Bridge. Regrademedian cross slopes.3002W
0R141$25,500$5,006
Subtotal: $30,506
2020-21$3,300$2,500
$300$3,500
$9,600Total Project Cost: $40,106
08150002004/30/20213/31/20213/31/2020PA&ED:
RTL:R/W Cert:
11/30/2021Begin Con:
08-San Bernardino-40 18-1919-2019-2020-21
201.015164 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R100.0/R125.0
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Needles, from 4.5 miles east ofHomer Wash to Arizona state line. Regrade andflatten median cross slope. 3003J
0R142$19,134$5,006
Subtotal: $24,140
2019-20$2,900$2,300
$200$2,800
$8,200Total Project Cost: $32,340
08150002012/28/20201/31/2020
11/30/2018PA&ED:
RTL:R/W Cert:
11/30/2020Begin Con:
08-San Bernardino-40 Prior18-1918-1919-20
201.01588 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R125.0/R154.6
Con Sup:
Collision Severity Reduction
Const:R/W:
In Loma Linda and Redlands, from RichardsonStreet Overcrossing to 0.1 mile west of WabashAvenue Overcrossing. Roadside safetyimprovements.
3003F
1C29U$7,377
$10
Subtotal: $7,387
2018-19$350$695$30
$860
$1,935Total Project Cost: $9,322
08170002191/25/2019
12/14/20183/1/2018PA&ED:
RTL:R/W Cert:
6/21/2019Begin Con:
08-San Bernardino-10 18-19PriorPrior18-19
201.235487 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
26.8/34.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 180 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Redlands and Yucaipa, from Wabash Avenueto County Line Road. Construct roadside safetyimprovements.3001U
1C300$1,899
$7
Subtotal: $1,906
2019-20$358$417$43
$362
$1,180Total Project Cost: $3,086
08120002709/19/20198/15/20197/11/2018PA&ED:
RTL:R/W Cert:
6/15/2020Begin Con:
08-San Bernardino-10 Prior18-1918-1919-20
201.235120 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
34.2/R39.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESAt various locations, from Eagle Mountain Driveto Route 38/18 Separation. Sediment control andstabilization.3008W
0R432$576$150
Subtotal: $726
2019-20 $86$50
$200
$336Total Project Cost: $1,062
08170002327/5/2019
3/20/201710/24/2016PA&ED:
RTL:R/W Cert:
3/27/2020Begin Con:
08-San Bernardino-38PriorPrior19-20
201.33527 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
50.4/59.4
Con Sup:
Storm Water Mitigation
Const:R/W:
BRIDGE PRESERVATIONIn Colton, from 0.3 mile south to 0.3 north ofWashington Avenue Overcrossing No. 54-0530.Replace overcrossing.3002S
1F730$17,871$3,726
Subtotal: $21,597
2019-20$1,125$2,870
$296$1,790
$6,081Total Project Cost: $27,678
08150000342/21/202011/8/201912/1/2017PA&ED:
RTL:R/W Cert:
6/12/2020Begin Con:
08-San Bernardino-215 PriorPriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.4/3.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Needles, at the Halfway Hills Wash BridgeNo. 54-0799L/R. Retrofit bridge footings,replace and expand RSP limits.3008K
1G830$9,652
$30
Subtotal: $9,682
2021-22$1,393$1,903
$55$2,538
$5,889Total Project Cost: $15,571
08160000793/15/20222/22/20229/14/2020PA&ED:
RTL:R/W Cert:
11/2/2022Begin Con:
08-San Bernardino-40 18-1920-2120-2121-22
201.1112 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
101.3
Con Sup:
Bridge Scour Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 181 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Victorville, at Mojave River Bridge No. 54-0307; also on Route 10 at Colton Overhead No.54-0464R (PM 22.36) and Route 215North/Route 10 East Connector Overhead No. 54-0482G. Various repairs to 3 bridges.
3006C
1G280$2,639
$62
Subtotal: $2,701
2021-22$320$780$100$690
$1,890Total Project Cost: $4,591
081500019210/15/20219/17/20213/6/2020PA&ED:
RTL:R/W Cert:
4/29/2022Begin Con:
08-San Bernardino-18 18-1919-2019-2021-22
201.1193 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
95.4
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In San Bernardino County, at the Etiwanda SanSevain FCC Br. No. 54-0454L, Colton OverheadNo. 54-0464R; also on Route 60 at RamonaAvenue Overcrossing No. 54-0745 (PM R1.37).In Riverside County, on Route 10 at HighlandSprings Avenue Undercrossing No. 56-0432 (PM9.3) and at Eagle Mountain Road Bridge No. 56-0575L/R (PM R102.0). Improve freight corridormovement by modifying and replacing bridges tomeet vertical clearance and load-carrying capacitystandards.
ACCELERATED BRIDGE (PA&ED Only)
3009R
1J210$60,900$1,000
Subtotal: $61,900
2020-21$5,822$6,370
$350$8,000
$20,542Total Project Cost: $82,442
08170002403/10/20212/12/2021
12/11/2019PA&ED:
RTL:R/W Cert:
1/5/2022Begin Con:
08-San Bernardino-10 Prior20-2120-2120-21
201.3226 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
11.6/R22.4
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
ROADWAY PRESERVATIONIn Barstow, from Outlet Center Drive to MojaveRiver Bridge. Rehabilitate pavement.
3003V
0K123$26,798
$10
Subtotal: $26,808
2019-20$600
$1,200$10
$2,100
$3,910Total Project Cost: $30,718
081500024210/2/20198/9/2019
9/14/2017PA&ED:
RTL:R/W Cert:
8/3/2020Begin Con:
08-San Bernardino-15 PriorPriorPrior19-20
201.12164.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
64.6/75.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Adelanto, from Route 395 Junction toLos Angeles County Line. Cold plane pavementand place Hot Mix Asphalt (HMA) andRubberized Hot Mix Asphalt concrete (RHMA).
3007M
1G520$16,442
$65
Subtotal: $16,507
2020-21$564
$1,588$77
$2,366
$4,595Total Project Cost: $21,102
08160000202/16/2021
11/16/20207/15/2019PA&ED:
RTL:R/W Cert:
10/15/2021Begin Con:
08-San Bernardino-18 18-1919-2019-2020-21
201.12137.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
100.9/115.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 182 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Vidal, from west of Route 95 to NevadaState line; also on Route 95 at various locations.Rehabilitate pavement and upgrade guardrail.3004A
1F133$8,666
$65
Subtotal: $8,731
2019-20$400$300$10
$1,400
$2,110Total Project Cost: $10,841
08160000032/21/20201/7/20205/4/2018PA&ED:
RTL:R/W Cert:
10/26/2020Begin Con:
08-San Bernardino-62 Prior18-1918-1919-20
201.12142.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
121.5/142.7
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Needles, from Route 62 to south of HavasuLake Road. Rehabilitate pavement.
3002V
1F131$9,567
$65
Subtotal: $9,632
2019-20$450$320$10
$1,500
$2,280Total Project Cost: $11,912
08150002112/21/20201/7/20205/4/2018PA&ED:
RTL:R/W Cert:
10/26/2020Begin Con:
08-San Bernardino-95 Prior18-1918-1919-20
201.12147.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.7/33.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Needles, from Goffs Road to Nevada Stateline. Rehabilitate pavement.
3003Y
1F132$4,389
$65
Subtotal: $4,454
2019-20$200$150$10
$690
$1,050Total Project Cost: $5,504
08150002122/21/20201/7/20205/4/2018PA&ED:
RTL:R/W Cert:
10/26/2020Begin Con:
08-San Bernardino-95 Prior18-1918-1919-20
201.12132 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
64.5/80.5
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Fontana, from Sierra Avenue to DevoreRoad. Rehabilitate roadway.
3003T
0K121$22,104
$10
Subtotal: $22,114
2019-20$570$900$10
$2,350
$3,830Total Project Cost: $25,944
081500024512/2/20199/9/2019
1/10/2018PA&ED:
RTL:R/W Cert:
8/3/2020Begin Con:
08-San Bernardino-15 PriorPriorPrior19-20
201.12216 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
12.8/14.8
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 183 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Hesperia and Victorville, from Route 395 tonorth of Mojave Drive. Rehabilitate roadway.
3003U
0K122$159,029
$10
Subtotal: $159,039
2019-20$900
$1,500$10
$11,700
$14,110Total Project Cost: $173,149
08150002442/3/2020
11/4/20193/1/2018PA&ED:
RTL:R/W Cert:
10/29/2020Begin Con:
08-San Bernardino-15 PriorPriorPrior19-20
201.12273 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
30.8/42.5
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Near Smiley Park, from 6.9 miles south ofRunning Spring to 3.4 miles east of Fork CityCreek Bridge. Construct rockfall barrier tostabilize hillside slopes.
3002H
1E780$2,011
$20
Subtotal: $2,031
2018-19$370$400$20
$470
$1,260Total Project Cost: $3,291
081400010312/3/201811/1/20181/15/2018PA&ED:
RTL:R/W Cert:
6/17/2019Begin Con:
08-San Bernardino-330 PriorPriorPrior18-19
201.1502 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
37.1/39.8
Con Sup:
Roadway Protective Betterments
Const:R/W:
In and near Arrowhead, from 48th Street to Route138. Repair, reline and replace culverts.
0184C
0G691$7,185
$385
Subtotal: $7,570
2021-22$742
$1,090$1,240$1,059
$4,131Total Project Cost: $11,701
08150001845/2/2022
2/15/20225/1/2020PA&ED:
RTL:R/W Cert:
1/17/2023Begin Con:
08-San Bernardino-18 Prior20-2120-2121-22
201.15163 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
T8.0/R17.8
Con Sup:
Drainage System Restoration
Const:R/W:
Near Big Bear and Lucerne Valley, at variouslocations, from Route 38 at Big Bear Lake Damto Artic Canyon Wash. Reline or replace.0181J
0G690$4,107
$700
Subtotal: $4,807
2021-22$1,192$1,493$2,708$1,417
$6,810Total Project Cost: $11,617
08120001101/18/202212/1/20217/5/2020PA&ED:
RTL:R/W Cert:
7/15/2022Begin Con:
08-San Bernardino-18 18-1920-2120-2121-22
201.15141 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
44.3/68.5
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 184 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Big Bear Lake, from Zaca Road to Route18. Replace culverts.
0205C
0G800$2,397
$697
Subtotal: $3,094
2019-20$600
$1,040$1,900
$800
$4,340Total Project Cost: $7,434
08120001113/16/20203/2/2020
10/17/2018PA&ED:
RTL:R/W Cert:
9/15/2020Begin Con:
08-San Bernardino-38 Prior18-1918-1919-20
201.15143 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
47.5/59.4
Con Sup:
Drainage System Restoration
Const:R/W:
In Pomona, Chino and Ontario, from Los AngelesCounty line to Riverside County line. Replaceexisting signs with retro-reflective sheeting.0178P
1F361$1,271
$10
Subtotal: $1,281
2019-20$125$289$12
$250
$676Total Project Cost: $1,957
08150001603/2/20209/3/20197/2/2018PA&ED:
RTL:R/W Cert:
11/2/2020Begin Con:
08-San Bernardino-60 Prior18-1918-1919-20
201.17068 Sign(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R9.9
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
In San Bernardino County, on Routes 71, 210,215 and 259 at various locations. Replaceexisting guide signs with Type XI reflectivity.3005A
1F362$1,846
$10
Subtotal: $1,856
2018-19$301$614$32
$425
$1,372Total Project Cost: $3,228
08160000115/1/20192/1/2019
9/13/2017PA&ED:
RTL:R/W Cert:
12/2/2019Begin Con:
08-San Bernardino-210 PriorPriorPrior18-19
201.17089 Sign(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R21.7/R33.2
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
MOBILITYIn Ontario, from Haven Avenue to MillikenAvenue/Hamner Avenue. Construct auxiliarylane and widen connector and ramps.3003N
0E33U$20,955
$710
Subtotal: $21,665
2019-20$2,700$4,170
$20$7,107
$13,997Total Project Cost: $35,662
08170000755/15/20205/1/2020
11/1/2018PA&ED:
RTL:R/W Cert:
3/1/2021Begin Con:
08-San Bernardino-60 Prior18-1918-1919-20
201.3101827 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R7.3/R10.0
Con Sup:
Operational Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 185 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Redlands, from Route 210/10Junction to the Riverside County line. Installwireless VDS pole, CMS, CCTV, Data Node Cabinet and Fiber Optic elements.
3009A
38423$7,654
$10
Subtotal: $7,664
2018-19$300
$1,000$10
$1,600
$2,910Total Project Cost: $10,574
08150001686/3/20195/1/20196/1/2018PA&ED:
RTL:R/W Cert:
11/1/2019Begin Con:
08-San Bernardino-10 Prior18-1918-1918-19
201.31526 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
29.4/R39.2
Con Sup:
Transportation Management Systems
Const:R/W:
Near Chino Hills, from the Los Angeles Countyline to the Riverside County line; also in Riverside County, from San Bernardino Countyline to Route 91 (PM R0.0 to PM R3.0). Replaceand upgrade existing communication elements,and install Closed Circuit Television Cameras(CCTV) for the Traffic Management System(TMS).
3009N
0G790$11,167
$99
Subtotal: $11,266
2019-20$561
$1,361$113
$1,657
$3,692Total Project Cost: $14,958
08140001765/1/20201/6/2020
12/3/2018PA&ED:
RTL:R/W Cert:
1/5/2021Begin Con:
08-San Bernardino-71 Prior18-1918-1919-20
201.31531 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R8.5
Con Sup:
Transportation Management Systems
Const:R/W:
In Rancho Cucamonga and Fontana, from EastAvenue to west of Beech Avenue; also on Route15 at Route 210/15 Separation. InstallTransportation Management System elements.
3003X
1G210$2,295
$10
Subtotal: $2,305
2018-19$135$390$10
$450
$985Total Project Cost: $3,290
08150001703/15/20192/26/2019
10/27/2017PA&ED:
RTL:R/W Cert:
10/15/2019Begin Con:
08-San Bernardino-210 PriorPriorPrior18-19
201.3154 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.5/12.7
Con Sup:
Transportation Management Systems
Const:R/W:
In and near the city of San Bernardino, fromRoute 215/10 Connector to Route 215/15Junction; also on Route 259 from Route 259/215Separation to Route 259/210 Junction. Installwireless VDS, CMS, CCTV and Fiber Opticelements.
3007S
47642$9,238
$10
Subtotal: $9,248
2019-20$376$842$37
$1,930
$3,185Total Project Cost: $12,433
08160001866/1/20205/1/20202/1/2019PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
08-San Bernardino-215 Prior18-1918-1919-20
201.31532 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.0/17.8
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 186 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Newberry Springs, at 5.6 miles east of FortCady Road Overcrossing. Replace the existingWeigh-in-Motion (WIM) system to meet currentstandards.
3007N
1G550$2,136
$11
Subtotal: $2,147
2020-21$310$593$32
$664
$1,599Total Project Cost: $3,746
081600003510/1/20209/1/2020
10/1/2019PA&ED:
RTL:R/W Cert:
5/1/2021Begin Con:
08-San Bernardino-40 18-1919-2019-2020-21
201.3211 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R28.9
Con Sup:
Weigh Stations
Const:R/W:
ROADSIDE PRESERVATIONNear Needles, west of Goffs Road at John WilkieSafety Roadside Rest Area. Reconstruct safetyroadside rest areas.0206L
0G860$5,340
$10
Subtotal: $5,350
2019-20$1,400$1,940
$10$2,300
$5,650Total Project Cost: $11,000
08140001325/1/2020
1/15/20208/1/2018PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
08-San Bernardino-40 Prior18-1918-1919-20
201.2502 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R105.3/R105.6
Con Sup:
Safety Roadside Rest Area Restoration
Const:R/W:
FACILITIESIn Fontana, near the southeast quadrant of Route15/210 Interchange. Construct new maintenance facility (L5758) adjacent to the SouthernRegional Laboratory.
3005R
0R420$19,800
$10
Subtotal: $19,810
2021-22$1,500
$0$10
$3,600
$5,110Total Project Cost: $24,920
08120000769/5/2021
8/15/20217/15/2019PA&ED:
RTL:R/W Cert:
5/10/2022Begin Con:
08-San Bernardino-15 18-19
19-2021-22
201.3521 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Maintenance Facilities
Const:R/W:
In the city of San Bernardino, at San BernardinoMaintenance Station (L5726) at 175 ClusterStreet. Reconstruct maintenance station.3001P
0K840$6,670
$10
Subtotal: $6,680
2018-19$897
$1,248$42
$1,755
$3,942Total Project Cost: $10,622
08000205633/28/20192/28/2019
10/17/2017PA&ED:
RTL:R/W Cert:
11/21/2019Begin Con:
08-San Bernardino-215 PriorPriorPrior18-19
201.3521 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Maintenance Facilities
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 187 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MISCELLANEOUSAt Clyde V. Kane Roadside Rest Areas.Transportation infrastructure improvement forzero-emission vehicle charging.3007E
1H660$560$10
Subtotal: $570
2018-19$259$415$33
$265
$972Total Project Cost: $1,542
08170001033/18/20192/15/20196/18/2018PA&ED:
RTL:R/W Cert:
9/17/2019Begin Con:
08-San Bernardino-15 Prior18-1918-1918-19
201.9992 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R107.4
Con Sup:
Miscellaneous
Const:R/W:
CountySan Bernardino
PA&ED:PS&E:
R/W Sup:Con Sup:
$26,298$590,974
R/W:
Subtotal: $617,272
Const:$44,554$53,423$9,317
$86,853
$194,147
Total (Capital + Support): $811,419
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 188 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONAt various locations, on Routes 5, 8, 15, 52, 54,56, 67, 75, 76, 78, 94, 125, 163, 805 and 905.Upgrade and install curve warning signs.1200
42490$2,350
$0
Subtotal: $2,350
2020-21$498$561
$0$497
$1,556Total Project Cost: $3,906
11160000941/15/2021
12/15/202011/18/2019PA&ED:
RTL:R/W Cert:
10/15/2021Begin Con:
11-San Diego-Var 18-1919-20
20-21
201.01530 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In San Diego County, on Routes 8, 67, 79, and 94at various locations. Widen and grade existinghinges at end treatment platforms, and to upgradeguardrails and end treatments to currentstandards.
1189
42460$4,552
$0
Subtotal: $4,552
2020-21$526
$1,046$0
$824
$2,396Total Project Cost: $6,948
111600007511/20/202010/16/20207/12/2019PA&ED:
RTL:R/W Cert:
5/4/2021Begin Con:
11-San Diego-8 18-1919-20
20-21
201.01543 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In the city of San Diego and Santee, from Route 5to Route 125. Construct rumble strips, enhancepavement delineation and install barrier.1135
42030$4,121
Subtotal: $4,121
2019-20$478
$1,015
$1,317
$2,810Total Project Cost: $6,931
11150000267/15/20197/2/2019
3/28/2018PA&ED:
RTL:R/W Cert:
3/16/2020Begin Con:
11-San Diego-52 PriorPrior
19-20
201.01590 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/14.8
Con Sup:
Collision Severity Reduction
Const:R/W:
In San Diego County, on various routes at variouslocations. Construct maintenance vehicle pullouts, pave areas beyond the gore, upgradecrash cushions, reduce maintenance intensivelandscaping and relocate irrigation controls.
1168
41134$3,618
$3
Subtotal: $3,621
2018-19$409
$1,469$2
$522
$2,402Total Project Cost: $6,023
11150001345/10/20193/29/20195/4/2018PA&ED:
RTL:R/W Cert:
9/20/2019Begin Con:
11-San Diego-Var Prior18-1918-1918-19
201.23521 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 189 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of San Diego, from east of Route 163to east of Route 805; also on Route 805 fromnorth of Adams Avenue to south of Route 8 (PM17.3/17.5). Roadside safety improvements.
1165
41131$5,209
$3
Subtotal: $5,212
2018-19$603
$2,167$3
$770
$3,543Total Project Cost: $8,755
11140001186/7/2019
4/19/20195/18/2018PA&ED:
RTL:R/W Cert:
10/18/2019Begin Con:
11-San Diego-8 Prior18-1918-1918-19
201.23548 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.8/5.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the city of San Diego, from east of Route 805to east of Route 15; also on Route 15 from northof Adams Avenue to north of Route 8 (PMM5.8/R6.3). Roadside safety improvements.
1166
41132$3,278
$3
Subtotal: $3,281
2018-19$371
$1,330$2
$474
$2,177Total Project Cost: $5,458
11150001324/12/20192/14/20194/13/2018PA&ED:
RTL:R/W Cert:
10/18/2019Begin Con:
11-San Diego-8 PriorPriorPrior18-19
201.23525 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.0/6.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the city of San Diego and La Mesa, from westof Mission Gorge Road to west of Route 125.Roadside safety improvements.1167
41133$4,959
$3
Subtotal: $4,962
2019-20$565
$2,029$3
$721
$3,318Total Project Cost: $8,280
11150001333/6/2020
1/17/20207/27/2018PA&ED:
RTL:R/W Cert:
7/17/2020Begin Con:
11-San Diego-8 Prior18-1918-1919-20
201.23564 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.0/12.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In El Cajon, at various locations, from 0.5 mileeast of Grossmont Boulevard Overcrossing toSecond Street Undercrossing. Construct MVPs,pave beyond gore areas, relocate irrigation controllers and reduce high maintenancelandscaping.
1146
41160$4,740
$0
Subtotal: $4,740
2020-21$444
$1,202$0
$1,009
$2,655Total Project Cost: $7,395
11120001451/21/202110/1/20203/13/2019PA&ED:
RTL:R/W Cert:
7/13/2021Begin Con:
11-San Diego-8 18-1918-19
20-21
201.23584 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
13.0/17.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 190 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near El Cajon, at various locations, fromGreenfield Drive to 0.4 mile east of Los CochesRoad Undercrossing. Pave beyond gore areas,reduce high maintenance landscaping and relocateirrigation components.
1250
41210$1,896
$0
Subtotal: $1,896
2021-22$346$536
$0$448
$1,330Total Project Cost: $3,226
11120001597/16/20215/28/20217/30/2020PA&ED:
RTL:R/W Cert:
1/7/2022Begin Con:
11-San Diego-8 19-2020-21
21-22
201.2355 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R18.7/R20.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Near Pine Valley, at Buckman Springs SafetyRoadside Rest Area (SRRA). Rehabilitate SRRAsewer and water systems.1085
40910$3,275
$20
Subtotal: $3,295
2018-19$698
$1,251
$1,034
$2,983Total Project Cost: $6,278
11120000436/28/20195/7/2019
3/30/2016PA&ED:
RTL:R/W Cert:
11/26/2019Begin Con:
11-San Diego-8 PriorPrior
18-19
201.2351 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
49.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the city of San Diego, from 0.1 mile east ofRoute 5 to 0.1 mile east of Convoy Street.Construct MVPs, pave slopes under bridgestructures, pave narrow areas and beyond gores.
1219
41180$3,296
$0
Subtotal: $3,296
2020-21$394
$1,118$0
$539
$2,051Total Project Cost: $5,347
11120001559/30/20208/30/20207/31/2019PA&ED:
RTL:R/W Cert:
7/30/2021Begin Con:
11-San Diego-52 18-1919-20
20-21
201.23528 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.4/5.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the city of San Diego, from El Camino RealUndercrossing to Route 56/15 Separation. Pavebeyond gore areas, relocate irrigation controlvalve boxes, construct rumble strip.
1251
41190$2,007
$0
Subtotal: $2,007
2021-22$284$629
$0$429
$1,342Total Project Cost: $3,349
111200015710/8/20218/2/2021
2/11/2020PA&ED:
RTL:R/W Cert:
1/27/2022Begin Con:
11-San Diego-56 19-2020-21
21-22
201.235106 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.3/9.7
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 191 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of San Diego and Lemon Grove, atvarious locations from 0.2 mile west of 47thStreet Overcrossing to 0.6 mile west of CollegeAvenue Undercrossing. Construct MVPs, pave areas beyond gore, upgrade guardrail, installconcrete barrier/crash cushions, relocate irrigation/electrical equipment and upgrade curbramps to current ADA standards.
1253
41220$2,973
$0
Subtotal: $2,973
2020-21$340$901
$0$858
$2,099Total Project Cost: $5,072
11120001601/27/2021
11/22/20208/16/2019PA&ED:
RTL:R/W Cert:
9/17/2021Begin Con:
11-San Diego-94 18-1919-20
20-21
201.23538 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
4.4/7.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the cities of Lemon Grove and San Diego,from 0.1 mile south of Elkelton PlaceUndercrossing to Route 94/125 Separation.Construct MVPs, pave beyond gore areas, replacecrash cushions, guardrail with concrete barrier,install access gates, relocate irrigation equipmentand remove high maintenance landscaping.
1141
41140$5,074
$0
Subtotal: $5,074
2020-21$431$864
$0$1,660
$2,955Total Project Cost: $8,029
11120001438/20/20207/17/20206/6/2019PA&ED:
RTL:R/W Cert:
5/17/2021Begin Con:
11-San Diego-125 18-1919-20
20-21
201.235103 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
9.6/13.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In the city of San Diego, at various locations,from Linda Vista Road Overcrossing to Route805/52 Separation. Construct MVPs, installaccess gates, pave beyond gore areas, reduce highmaintenance landscaping, relocate irrigationcontrols, and upgrade crash cushions.
1142
41150$6,542
$50
Subtotal: $6,592
2020-21$453
$1,033$26
$1,038
$2,550Total Project Cost: $9,142
11120001441/21/20211/8/2021
3/14/2019PA&ED:
RTL:R/W Cert:
7/13/2021Begin Con:
11-San Diego-805 18-1919-2019-2020-21
201.23597 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
20.7/23.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Imperial Beach, from Georgia Street to 0.2mile north of Rainbow Drive. Relinquishroadway to Imperial Beach. FinancialContribution Only.
1204
42040$5,276
$0
Subtotal: $5,276
2018-19$348
$0$0$0
$348Total Project Cost: $5,624
1115000034
9/28/2018PA&ED:
RTL:R/W Cert:
Begin Con:
11-San Diego-75 18-19
201.1601.2 Centerline mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
10.0/11.2
Con Sup:
Relinquishments
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 192 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of San Diego, from Carmel MountainRoad Undercrossing to 0.05 mile west of Route5/56 Separation. Stabilize existing slopes andlandscaping from further erosion and sedimentdeposition into the Los Penasquitos Lagoon.
1203
42200$1,533
$0
Subtotal: $1,533
2020-21$283$632
$0$892
$1,807Total Project Cost: $3,340
11150001738/20/20207/16/20208/21/2019PA&ED:
RTL:R/W Cert:
3/4/2021Begin Con:
11-San Diego-5 18-1919-20
20-21
201.33510.02 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R31.8/R32.2
Con Sup:
Storm Water Mitigation
Const:R/W:
In the city of San Diego, from 0.8 mile to 1.0 milenorth of Del Mar Heights Road. Repair and enhance detention basin and regrade overflowchannel and access road.
1164
41750$1,875
Subtotal: $1,875
2019-20$241$526
$702
$1,469Total Project Cost: $3,344
11140000289/20/20198/2/2019
7/20/2018PA&ED:
RTL:R/W Cert:
2/14/2020Begin Con:
11-San Diego-5 Prior18-19
19-20
201.33573 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R34.6/R35.1
Con Sup:
Storm Water Mitigation
Const:R/W:
In Oceanside, from 0.8 mile to 0.6 mile west ofCollege Boulevard. Stormwater mitigation andslope erosion repair.1125
41740$3,547
$120
Subtotal: $3,667
2018-19$276$651$50
$984
$1,961Total Project Cost: $5,628
11140000271/29/2019
12/20/20181/29/2018PA&ED:
RTL:R/W Cert:
9/25/2019Begin Con:
11-San Diego-78 Prior18-1918-1918-19
201.3354.28 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.5/2.7
Con Sup:
Storm Water Mitigation
Const:R/W:
In San Diego County, on routes 5, 15, 75 and 163at various locations. Construct and upgrade curbramps, driveways and sidewalks to comply withADA standards.
1127
41810$2,766
$110
Subtotal: $2,876
2019-20$881
$2,425$101
$1,658
$5,065Total Project Cost: $7,941
11140000561/15/202012/9/20197/6/2018PA&ED:
RTL:R/W Cert:
6/30/2020Begin Con:
11-San Diego-Var Prior18-1918-1919-20
201.361108 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 193 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of San Diego, from Mission CenterRoad to College Avenue. Construct and upgradepedestrian curb ramps to meet ADA standards.Replaced damaged sidewalk and install accessiblepedestrian signals.
1227
42710$1,107
$25
Subtotal: $1,132
2021-22$326
$1,148$0
$545
$2,019Total Project Cost: $3,151
111600015411/15/20217/21/20217/15/2020PA&ED:
RTL:R/W Cert:
7/15/2022Begin Con:
11-San Diego-8 19-2020-21
21-22
201.36118 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
3.0/8.5
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In and near the cities of San Diego and LemonGrove, from 32nd Street Undercrossing toBancroff Drive Undercrossing. Construct andupgrade pedestrian curb ramps and sidewalks tomeet current standards.
1191
42510$2,660
$465
Subtotal: $3,125
2020-21$776
$1,847$714$833
$4,170Total Project Cost: $7,295
11160000778/28/20204/17/20207/1/2019PA&ED:
RTL:R/W Cert:
12/30/2020Begin Con:
11-San Diego-94 18-1919-2019-2020-21
201.36151 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.6/R11.1
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In various cities, from Main Street/Auto ParkDrive Undercrossing to Market StreetOvercrossing. Construct and upgrade pedestriancurb ramps to meet ADA standards. Replacepedestrian signal heads, push buttons and relocatepull boxes, light poles and controller cabinet.
1248
42900$3,098
$12
Subtotal: $3,110
2021-22$843
$1,960$0
$1,189
$3,992Total Project Cost: $7,102
111700004511/15/20217/21/20217/15/2020PA&ED:
RTL:R/W Cert:
7/15/2022Begin Con:
11-San Diego-805 19-2020-21
21-22
201.36149 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
3.5/13.1
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONIn the city of San Diego, at the east Route 8 tosouth Route 163 Connector Overcrossing No. 57-0355G. Bridge rail replacement.1256
26410$1,441
$426
Subtotal: $1,867
2020-21$374$969
$0$848
$2,191Total Project Cost: $4,058
111600004511/6/2020
10/26/20207/2/2019PA&ED:
RTL:R/W Cert:
3/11/2021Begin Con:
11-San Diego-8 18-1919-20
20-21
201.112318 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.2
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 194 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Diego County, at various locations. Applymethacrylate to bridge decks, replace joint seals,repair unsound concrete and replace approachslabs.
1221
42690$3,542
Subtotal: $3,542
2018-19 $663
$733
$1,396Total Project Cost: $4,938
111600014412/7/201812/5/2018
12/15/2016PA&ED:
RTL:R/W Cert:
4/5/2019Begin Con:
11-San Diego-VarPrior
Prior
201.11935 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONIn and near National City and Chula Vista, fromRoute 54/5 Separation to the Route 54/125Junction. Rehabilitate flexible and rigidpavement on the traveled way, shoulders, rampsand connectors, upgrade guard rail and dike.
1188
42480$21,329
$297
Subtotal: $21,626
2021-22$709
$2,260$24
$2,513
$5,506Total Project Cost: $27,132
111600006810/20/20218/27/20212/3/2020PA&ED:
RTL:R/W Cert:
5/5/2022Begin Con:
11-San Diego-54 18-1919-2019-2021-22
201.12143.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/6.4
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Escondido, from west of NorthBroadway to Teepee Drive. Pavement rehabilitation.1162
41930$17,731$3,136
Subtotal: $20,867
2019-20$1,180$2,790$2,168$2,643
$8,781Total Project Cost: $29,648
11150000421/23/20201/7/2020
7/13/2018PA&ED:
RTL:R/W Cert:
9/2/2020Begin Con:
11-San Diego-78 Prior18-1918-1919-20
201.12113.9 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
N17.6/R21.4
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In the city of San Diego, from Spring Street toRoute 54. Pavement rehabilitation.
1177
42000$11,312
$159
Subtotal: $11,471
2019-20$505
$1,252$10
$1,537
$3,304Total Project Cost: $14,775
111500004111/26/201910/28/20191/19/2018PA&ED:
RTL:R/W Cert:
6/16/2020Begin Con:
11-San Diego-94 PriorPriorPrior19-20
201.12121.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R10.4/14.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 195 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near La Mesa and in Santee, from 0.2 mile southof Route 125/94 Separation to Mission GorgeRoad. Rehabilitate pavement by grinding andreplacing concrete slabs and cold plane andoverlay shoulders with Rubberized Hot MixAsphalt (RHMA-G).
1257
42380$34,185
$252
Subtotal: $34,437
2021-22$1,383$2,541
$53$3,863
$7,840Total Project Cost: $42,277
111600006111/9/20219/30/202112/2/2019PA&ED:
RTL:R/W Cert:
6/8/2022Begin Con:
11-San Diego-125 Prior19-2019-2021-22
201.12149.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.0/22.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Alpine, from Viejas Creek Bridge to PineValley Creek Bridge. Grind, remove and replaceJointed Plain Concrete Pavement (JPCP) lanes,remove and replace asphalt concrete outsideshoulders and cold plane and overlay insideshoulders. Upgrade guardrail, replaceapproach/departure slabs and construct rumblestrips.
1255
42370$43,768
Subtotal: $43,768
2021-22$936
$3,276
$5,479
$9,691Total Project Cost: $53,459
111600005911/3/20219/21/202112/4/2019PA&ED:
RTL:R/W Cert:
3/14/2022Begin Con:
11-San Diego-8 Prior19-20
21-22
201.12222.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R31.8/R41.7
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In San Diego County, on various routes at variouslocations. Culvert rehabilitation.
1134
41820$2,646
$483
Subtotal: $3,129
2018-19$568$988$418$718
$2,692Total Project Cost: $5,821
11140000636/3/2019
5/22/20197/20/2018PA&ED:
RTL:R/W Cert:
10/18/2019Begin Con:
11-San Diego-Var Prior18-1918-1918-19
201.1517 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Drainage System Restoration
Const:R/W:
In San Diego County, at various locations, from0.5 mile west of Midway Drive Undercrossing to0.6 mile west of Flinn Springs Road Undercrossing. Repair, rehabilitate and replaceculvert systems.
1246
42810$8,367
$80
Subtotal: $8,447
2019-20$1,173$1,590
$2,020
$4,783Total Project Cost: $13,230
11170000283/30/20202/4/2020
11/26/2018PA&ED:
RTL:R/W Cert:
10/8/2020Begin Con:
11-San Diego-8 Prior18-19
19-20
201.15165 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
L0.7/R23.0
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 196 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Diego County, from 0.7 mile west of FlinnSprings Road Undercrossing to 0.2 mile east ofCrestwood Road Undercrossing. Rehabilitateculverts and energy dissipaters.
1194
42210$11,773
$75
Subtotal: $11,848
2019-20$1,077$2,346
$519$2,836
$6,778Total Project Cost: $18,626
11150001787/24/20195/23/20192/2/2018PA&ED:
RTL:R/W Cert:
3/20/2020Begin Con:
11-San Diego-8 PriorPriorPrior19-20
201.15127 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R23.0/R61.3
Con Sup:
Drainage System Restoration
Const:R/W:
In San Diego County, at various locations from0.1 mile east of Route 78/5 Separation to Route15/78 Separation. Rehabilitate and replaceculverts including invert paving, joint repairgrouting, Cured-in-Place Pipeliner (CIPP) anddrainage inlet lid repair.
1247
42230$8,519
$204
Subtotal: $8,723
2021-22$811
$1,469$212
$2,047
$4,539Total Project Cost: $13,262
111500018012/10/202112/10/20213/18/2020PA&ED:
RTL:R/W Cert:
6/13/2022Begin Con:
11-San Diego-78 Prior19-2019-2021-22
201.15165 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/R16.5
Con Sup:
Drainage System Restoration
Const:R/W:
In San Diego County, at various locations onvarious routes. Replace aging roadside signpanels with retroreflective sheeting.1237
42550$1,962
$0
Subtotal: $1,962
2019-20$0
$355$0
$325
$680Total Project Cost: $2,642
111600009711/21/20197/16/20196/30/2016PA&ED:
RTL:R/W Cert:
7/14/2020Begin Con:
11-San Diego-518-19
19-20
201.170936 Sign(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.4/72.4
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
MOBILITYIn the city of San Diego, from north of La JollaVillage Drive to south of Genesee Avenue, onsouthbound. Construct a 1/2 mile auxiliary lane.1136
2T215$5,000
Subtotal: $5,000
2018-19 $1,000
$750
$1,750Total Project Cost: $6,750
111400007410/12/2018
7/5/20186/30/2011PA&ED:
RTL:R/W Cert:
1/31/2019Begin Con:
11-San Diego-5Prior
18-19
201.310464 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R28.6/R29.3
Con Sup:
Operational Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 197 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Carlsbad, from Palomar Airport Road toCannon Road. Construct auxiliary lane insouthbound direction for operational efficiency.1279
43017$5,501
$23
Subtotal: $5,524
2021-22$207
$1,052$0
$1,243
$2,502Total Project Cost: $8,026
11170002066/30/20213/30/20212/25/2020PA&ED:
RTL:R/W Cert:
2/18/2022Begin Con:
11-San Diego-5 18-1919-20
21-22
201.31077 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R47.0/R48.0
Con Sup:
Operational Improvements
Const:R/W:
In San Diego County, on various routes at various locations. Replace Changeable Message Sign(CMS) panels with Advanced Variable MessageSign (AVMS) panels.
1171
42070$4,401
Subtotal: $4,401
2019-20 $585
$886
$1,471Total Project Cost: $5,872
111500005712/12/201910/14/20196/19/2015PA&ED:
RTL:R/W Cert:
9/4/2020Begin Con:
11-San Diego-VarPrior
19-20
201.31525 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
In San Diego County, on various routes at variouslocations. Replace Changeable Message Sign(CMS) panels with Advanced Variable MessageSign (AVMS) panels.
1174
42080$4,586
Subtotal: $4,586
2018-19$389$585
$886
$1,860Total Project Cost: $6,446
11150000605/25/20182/22/20183/24/2017PA&ED:
RTL:R/W Cert:
1/23/2019Begin Con:
11-San Diego-Var PriorPrior
18-19
201.31525 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
In San Diego County, at various locations.Repair and install Vehicle Detection Station(VDS) elements including Microwave VehicleDetection Systems (MVDS) and loop detectors.
1262
42970$11,535
Subtotal: $11,535
2019-20$911
$2,160
$2,264
$5,335Total Project Cost: $16,870
111700010212/13/201911/15/20198/22/2018PA&ED:
RTL:R/W Cert:
5/15/2020Begin Con:
11-San Diego-Var Prior18-19
19-20
201.315239 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 198 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Diego County, at various locations; also onRoute 905 (PM 2.5/5.4) and Route 805 (PM0.2/14.0). Install fiber optic communication linesto improve regional traffic operations andmobility near the U.S./Mexico border.
1241
42750$19,827
$375
Subtotal: $20,202
2020-21$818
$1,721$62
$4,404
$7,005Total Project Cost: $27,207
11160001777/3/2020
4/10/20202/8/2019PA&ED:
RTL:R/W Cert:
3/29/2021Begin Con:
11-San Diego-5 Prior18-1918-1920-21
201.31513.8 Mile(s) of cablePerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.3/R15.2
Con Sup:
Transportation Management Systems
Const:R/W:
In San Diego County, from 0.6 mile south ofRoute 5/ 8 Separation to 1.5 miles north of Route5/76 Separation. Install VDS, CMS, CCTV,Ramp Metering, Traffic Signal and Fiber OpticNetwork elements.
1281
42560$19,621
$3
Subtotal: $19,624
2019-20 $1,497$122
$2,995
$4,614Total Project Cost: $24,238
11160001013/17/20208/2/2019
10/23/2013PA&ED:
RTL:R/W Cert:
6/16/2020Begin Con:
11-San Diego-5PriorPrior19-20
201.315103 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R19.5/R55.4
Con Sup:
Transportation Management Systems
Const:R/W:
In San Diego County, at various locations.Update Microwave Vehicle Detection System(MVDS) elements for traffic flow monitoring anddata collections.
1263
42980$3,324
Subtotal: $3,324
2018-19$372$865
$654
$1,891Total Project Cost: $5,215
11170001035/8/20193/8/2019
4/18/2018PA&ED:
RTL:R/W Cert:
12/13/2019Begin Con:
11-San Diego-15 PriorPrior
18-19
201.31562 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.5/31.2
Con Sup:
Transportation Management Systems
Const:R/W:
ROADSIDE PRESERVATIONIn the city of San Diego, from Camino de la PlazaOvercrossing to Otay River Bridge; also on Route805 from Route 805/5 Separation to San YsidroBoulevard Undercrossing. Convert potableirrigation system to recycled water.
1245
42890$10,670
$40
Subtotal: $10,710
2020-21$384
$1,243$3
$1,361
$2,991Total Project Cost: $13,701
11170000391/8/2021
12/2/20201/9/2020PA&ED:
RTL:R/W Cert:
7/20/2021Begin Con:
11-San Diego-5 18-1919-2019-2020-21
201.210132 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.3/R5.0
Con Sup:
Highway Planting Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 199 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of San Diego, from Iris StreetOvercrossing to Otay River Bridge. Replacedeteriorated water supply lines and plantlandscaping for erosion control.
1205
41880$1,320
$0
Subtotal: $1,320
2020-21$304$564
$0$534
$1,402Total Project Cost: $2,722
11140001157/8/20206/3/20207/9/2019PA&ED:
RTL:R/W Cert:
1/19/2021Begin Con:
11-San Diego-5 18-1919-20
20-21
201.2104.6 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
3.4/5.0
Con Sup:
Highway Planting Restoration
Const:R/W:
In the city of San Diego, from San YsidroBoulevard Undercrossing to Otay River Bridge;also on Route 905 from 0.3 mile east of PicadorBoulevard Undercrossing to Caliente AvenueOvercrossing. Convert potable irrigation systemsto recycled water.
1244
42880$8,220
$30
Subtotal: $8,250
2020-21$327
$1,149$3
$1,174
$2,653Total Project Cost: $10,903
111700003810/9/20209/3/2020
10/10/2019PA&ED:
RTL:R/W Cert:
4/23/2021Begin Con:
11-San Diego-805 18-1919-2019-2020-21
201.210139 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.7/3.3
Con Sup:
Highway Planting Restoration
Const:R/W:
In Chula Vista, from 0.3 mile south of MainStreet Undercrossing to Palomar Street Overcrossing. Convert potable irrigation systemsto recycled water.
1243
42870$4,097
$20
Subtotal: $4,117
2020-21$284$721
$3$888
$1,896Total Project Cost: $6,013
11170000377/10/20206/5/2020
7/11/2019PA&ED:
RTL:R/W Cert:
1/21/2021Begin Con:
11-San Diego-805 18-1919-2019-2020-21
201.21040 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
3.4/5.1
Con Sup:
Highway Planting Restoration
Const:R/W:
MISCELLANEOUSIn the city of San Diego, from Sorrento ValleyRoad to Del Mar Heights Road. Constructrumble strips on both shoulders, rehabilitate bikepath, install fiber optic cable/CCTVs andrehabilitate 48 inch culvert. Asset ManagementPilot Project.
1218
42650$3,824
$0
Subtotal: $3,824
2020-21$471
$1,304$40
$678
$2,493Total Project Cost: $6,317
111600012510/30/202010/13/2021
9/1/2019PA&ED:
RTL:R/W Cert:
4/30/2021Begin Con:
11-San Diego-5 18-1919-2019-2020-21
201.9990 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R30.2/R34.2
Con Sup:
Miscellaneous
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 200 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountySan Diego
PA&ED:PS&E:
R/W Sup:Con Sup:
$6,417$348,253
R/W:
Subtotal: $354,670
Const:$23,997$61,285$4,538
$63,222
$153,042
Total (Capital + Support): $507,712
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 201 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Francisco($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn the city and county of San Francisco, from SanMateo County Line to Route 101/80 Junction.Overlay existing pavement with open gradedasphalt, groove concrete pavement, and upgradedrainage system.
1490F
4J390$21,970
$20
Subtotal: $21,990
2019-20$1,500$1,700
$30$3,000
$6,230Total Project Cost: $28,220
04150003406/1/20205/1/2020
10/1/2018PA&ED:
RTL:R/W Cert:
10/1/2020Begin Con:
04-San Francisco-101 Prior18-1918-1919-20
201.010261 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/4.2
Con Sup:
Safety Improvements
Const:R/W:
In the city of San Francisco, on Routes 1, 35, 80,101 and 280 at various locations. Crosswalksafety enhancements.1489B
3J890$7,060
$5
Subtotal: $7,065
2018-19$440$914$91
$914
$2,359Total Project Cost: $9,424
04150002216/28/20196/7/2019
1/15/2018PA&ED:
RTL:R/W Cert:
1/7/2020Begin Con:
04-San Francisco-1 PriorPriorPrior18-19
201.015252 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
In the city and county of San Francisco, fromBayshore Boulevard Overcrossing (OC) to SouthVan Ness Avenue; also, on Route 280 fromMonterey Boulevard onramp OC to King Streetonramp (PM R2.8 to T7.2). Install vandalism-resistant security fence and gates to reducemaintenance repairs and enhance highway workersafety.
1493G
4J970$6,196
$3
Subtotal: $6,199
2020-21$950
$1,000$95
$1,520
$3,565Total Project Cost: $9,764
04160000486/30/20215/31/2021
11/29/2019PA&ED:
RTL:R/W Cert:
11/30/2021Begin Con:
04-San Francisco-101 18-1919-2019-2020-21
201.23580 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.5/R5.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn the city of San Francisco, at Presidio NationalPark. Water quality improvements.
1067C
1A905$785
$1,050
Subtotal: $1,835
2019-20$1,020
$315$50
$336
$1,721Total Project Cost: $3,556
04140003406/29/20206/15/20203/1/2019PA&ED:
RTL:R/W Cert:
2/10/2021Begin Con:
04-San Francisco-1 Prior18-1918-1919-20
201.3359.6 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.0
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 202 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Francisco($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear San Francisco, at Alemany CircleUndercrossing No. 34-0033. Rehabilitate bridge.
0587D
3G620$32,400
$20
Subtotal: $32,420
2018-19$4,000$3,000
$20$3,250
$10,270Total Project Cost: $42,690
04120001415/1/2019
4/15/201911/15/2017PA&ED:
RTL:R/W Cert:
8/26/2019Begin Con:
04-San Francisco-101 PriorPriorPrior18-19
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In the city and county of San Francisco, at theCentral Viaduct No. 34-0077 from south of 17th Street to S. Van Ness Avenue ; also, on Route 80at the Bayshore Viaduct No. 34-0088 from Route101 to 4th Street (PM 3.9/4.8). Paintsuperstructure steel members.
1483S
2J800$100,793
$62
Subtotal: $100,855
2019-20$2,500$9,200
$300$13,000
$25,000Total Project Cost: $125,855
04150000346/1/20205/1/2020
12/1/2018PA&ED:
RTL:R/W Cert:
8/1/2021Begin Con:
04-San Francisco-101 Prior18-1918-1919-20
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.1/R5.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In the city and county of San Francisco, atAlemany Circle Undercrossing (UC) No. 34 -0064K, Alemany Circle UC No. 34-0063S, andBayshore Boulevard UC No. 34-0047S; also, inSan Mateo County in Pacifica, at Paloma AvenueOvercrossing No. 35-0187 (PM R44.21). Upgrade bridge rails.
1450E
2K190$5,461
$10
Subtotal: $5,471
2020-21$657
$1,751$164
$1,805
$4,377Total Project Cost: $9,848
04160003803/1/20211/1/2021
10/1/2019PA&ED:
RTL:R/W Cert:
10/1/2021Begin Con:
04-San Francisco-101 18-1919-2019-2020-21
201.1122249 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.0/2.9
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
ROADWAY PRESERVATIONIn the city and county of San Francisco, fromnorth of Lake Street to south of Route 101 at theMcArthur Tunnel. Replace existing lightingsystem with LED lighting system.
1490A
3J300$3,956
$5
Subtotal: $3,961
2018-19$220$440$25
$790
$1,475Total Project Cost: $5,436
04150001473/1/2019
2/15/20191/17/2018PA&ED:
RTL:R/W Cert:
11/1/2019Begin Con:
04-San Francisco-1 PriorPriorPrior18-19
201.170380 Lighting fixture(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.3/6.6
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 203 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Francisco($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
FACILITIESIn the city and county of San Francisco, at theDistrict 4 Materials Laboratory beneath Route101 (325 San Bruno Avenue). Constructpermanent District 4 Materials Lab at alternativestate-owned site to replace obsolete facility closedin March 2015 due to unsafe conditions.
1453E
2K950$12,087
$255
Subtotal: $12,342
2021-22$2,210$1,820
$130$3,086
$7,246Total Project Cost: $19,588
04170000572/1/2022
12/1/20214/1/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
04-San Francisco-101 18-1919-2019-2021-22
201.3541 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
4.2
Con Sup:
Material Labs
Const:R/W:
CountySan Francisco
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,430$190,708
R/W:
Subtotal: $192,138
Const:$13,497$20,140
$905$27,701
$62,243
Total (Capital + Support): $254,381
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 204 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Holt, from 0.3 mile west to 0.5 mile east ofMiddle River Bridge. Realign curve, widenshoulders, upgrade guard rail, and install flashingbeacons.
3177
1F460$7,335$1,358
Subtotal: $8,693
2019-20$1,081$1,453
$274$2,006
$4,814Total Project Cost: $13,507
10160001396/22/20206/15/202012/3/2018PA&ED:
RTL:R/W Cert:
10/21/2020Begin Con:
10-San Joaquin-4 Prior18-1918-1919-20
201.01050 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.1/4.9
Con Sup:
Safety Improvements
Const:R/W:
Near Clements, at Liberty Road. Improveintersection.
3207
1E531$972$266
Subtotal: $1,238
2019-20$434
$1,068$154$948
$2,604Total Project Cost: $3,842
10160000315/29/20205/15/20207/31/2018PA&ED:
RTL:R/W Cert:
11/30/2020Begin Con:
10-San Joaquin-88 Prior18-1918-1919-20
201.01018 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
22.1
Con Sup:
Safety Improvements
Const:R/W:
In San Joaquin, Stanislaus, and TuolumneCounties, on Routes 4, 5, 99, 120, and 205 atvarious locations. Improve wet roadway surfaceconditions at 12 locations.
3231
1E590$4,150
Subtotal: $4,150
2018-19$288$642$31
$547
$1,508Total Project Cost: $5,658
10170000145/1/2018
2/16/201810/26/2017PA&ED:
RTL:R/W Cert:
9/30/2018Begin Con:
10-San Joaquin-205 PriorPriorPrior18-19
201.010264 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Safety Improvements
Const:R/W:
In San Joaquin and Stanislaus Counties, on Route5 at various locations; also, in Merced County onRoute 152 at various locations. Install new orupgrade existing safety devices to shield objectsfrom errant vehicles.
3190
1C970$1,361
$14
Subtotal: $1,375
2019-20$445
$1,104$0
$872
$2,421Total Project Cost: $3,796
10160000211/15/2020
12/15/20193/1/2019PA&ED:
RTL:R/W Cert:
7/15/2020Begin Con:
10-San Joaquin-5 18-1918-19
19-20
201.01513 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 205 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Stockton, from Garfield Avenue to Route 99 atvarious locations. Highway worker safetyimprovements.3110
0X690$3,520
$60
Subtotal: $3,580
2018-19$650$740$10
$600
$2,000Total Project Cost: $5,580
10130002411/15/2019
12/15/20188/10/2017PA&ED:
RTL:R/W Cert:
7/22/2019Begin Con:
10-San Joaquin-4 PriorPriorPrior18-19
201.235102 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R15.7/R19.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Lathrop and Stockton, from south ofLouise Avenue to Charter Way; also, from southof Hammer Lane to north of Eight Mile Road(PM 32.3/35.7). Highway worker safetyimprovements.
3112
0X720$2,770
$10
Subtotal: $2,780
2018-19$200$470$10
$480
$1,160Total Project Cost: $3,940
10130002426/5/2018
5/16/201810/3/2017PA&ED:
RTL:R/W Cert:
1/23/2019Begin Con:
10-San Joaquin-5 PriorPriorPrior18-19
201.23561 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R16.1/25.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Stockton and Lodi, at variouslocations from French Camp Road to KettlemanLane; also at the Route 4 (PM R15.7 to R16.6)and Route 5 (PM 25.8 to 26.6) interchange. Paveareas behind the gore, slopes, and at narrowlocations, and construct access gates and maintenance vehicle pullouts to reducemaintenance and improve highway worker safety.
3237
1C760$1,922
$23
Subtotal: $1,945
2020-21$495
$1,130$15
$790
$2,430Total Project Cost: $4,375
101700001510/15/20208/21/20207/2/2019PA&ED:
RTL:R/W Cert:
4/21/2021Begin Con:
10-San Joaquin-99 18-1919-2019-2020-21
201.23588 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
11.5/29.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Manteca, from east of McKinleyAvenue to Route 99. Highway worker safetyimprovements.3120
0X710$3,491
$11
Subtotal: $3,502
2018-19$409$723
$9$808
$1,949Total Project Cost: $5,451
10130002471/29/20191/15/20191/3/2018PA&ED:
RTL:R/W Cert:
7/2/2019Begin Con:
10-San Joaquin-120 PriorPriorPrior18-19
201.23538 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R2.6/T7.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 206 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Tracy, from Hansen Road to ParadiseRoad. Highway worker safety improvements.
3111
0X700$3,727
$33
Subtotal: $3,760
2018-19$225$877$10
$861
$1,973Total Project Cost: $5,733
101300024811/1/201810/1/20189/14/2017PA&ED:
RTL:R/W Cert:
5/6/2019Begin Con:
10-San Joaquin-205 PriorPriorPrior18-19
201.23541 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.3/R9.7
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Lodi, from Stockton Street to Route 99.Upgrade pedestrian facilities to make compliantwith the ADA standards.3254
1G510$850$479
Subtotal: $1,329
2021-22$286$770$915$560
$2,531Total Project Cost: $3,860
101700001611/1/20219/30/20215/28/2019PA&ED:
RTL:R/W Cert:
5/12/2022Begin Con:
10-San Joaquin-12 18-1918-1918-1921-22
201.36172 ADA unit(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
17.4/18.1
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Ripon, at Main Street Overcrossing; also inLodi at Turner Road Overcrossing (PM 31.6). Upgrade pedestrian facilities to comply withADA requirements.
3156
1C060$1,553
$8
Subtotal: $1,561
2018-19$97
$530$58
$550
$1,235Total Project Cost: $2,796
10140001025/17/20185/1/2018
6/26/2017PA&ED:
RTL:R/W Cert:
1/2/2019Begin Con:
10-San Joaquin-99 PriorPriorPrior18-19
201.36140 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.9
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONIn Stockton, at the Stockton Channel Viaduct No.29-0176L/R. Bridge deck rehabilitation at spotlocations.3193
1C940$4,766
$5
Subtotal: $4,771
2019-20$335
$1,030$10
$1,950
$3,325Total Project Cost: $8,096
10160000201/3/2020
9/20/20197/13/2018PA&ED:
RTL:R/W Cert:
7/13/2020Begin Con:
10-San Joaquin-5 Prior18-1918-1919-20
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
26.5
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 207 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Stockton, at Route 26/99 Separation No. 29-0142 (PM 1.11). Establish standard verticalclearance.3169
1F170$6,112
$7
Subtotal: $6,119
2020-21$598
$1,827$13
$3,221
$5,659Total Project Cost: $11,778
10160000321/15/2021
12/15/20205/1/2019PA&ED:
RTL:R/W Cert:
7/1/2021Begin Con:
10-San Joaquin-26 18-1918-1918-1920-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
1.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In San Joaquin County, on Routes 5 and 580 andin Stanislaus County on Route 99, at variouslocations. Seismic retrofit of 4 bridges.3118
0P540$8,758
$263
Subtotal: $9,021
2019-20$515
$1,992$73
$1,783
$4,363Total Project Cost: $13,384
101300025111/15/201911/1/2019
10/10/2017PA&ED:
RTL:R/W Cert:
5/6/2020Begin Con:
10-San Joaquin-5 PriorPriorPrior19-20
201.1134 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Near Discovery Bay, at Old River Bridge No. 29-0045. Upgrade mechanical and electricalequipment on movable bridge.3113
1C800$4,079$2,000
Subtotal: $6,079
2019-20$490
$1,358$55
$1,319
$3,222Total Project Cost: $9,301
10150000375/4/20204/3/2020
8/15/2018PA&ED:
RTL:R/W Cert:
10/21/2020Begin Con:
10-San Joaquin-4 Prior18-1918-1919-20
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In Stockton, at Crosstown Freeway Viaduct No.29-0269. Reconstruct hinge 32 (left and right)and three ramp joint seals. 3198
1C860$3,428
$115
Subtotal: $3,543
2018-19$648$848$37
$631
$2,164Total Project Cost: $5,707
10160000233/15/20193/1/2019
11/15/2017PA&ED:
RTL:R/W Cert:
11/29/2019Begin Con:
10-San Joaquin-4 PriorPriorPrior18-19
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R16.6/R17.8
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 208 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Terminous, at Little Potato Slough BridgeNo. 29-0101. Replace joint seals and bearing padsusing temporary pile supports.3273
1F760$3,028
$925
Subtotal: $3,953
2020-21$553$905
$2$1,232
$2,692Total Project Cost: $6,645
10170000245/20/20212/17/20217/20/2020PA&ED:
RTL:R/W Cert:
12/15/2021Begin Con:
10-San Joaquin-12 Prior20-2120-2120-21
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R4.4
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Near Stockton, at Wilson Way Overcrossing No.29-0118C. Remove existing damaged girder andbuild new overhang and barrier, resulting inreduced bridge width and increased verticalclearance.
3206
1C880$1,170
$4
Subtotal: $1,174
2018-19$172$562
$7$420
$1,161Total Project Cost: $2,335
10160000227/5/20186/5/2018
7/13/2017PA&ED:
RTL:R/W Cert:
11/22/2018Begin Con:
10-San Joaquin-99 PriorPriorPrior18-19
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.7
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In and near Lathrop, at Deuel Overhead No. 29-0262L/R. Improve to standard truck capacity.(PA&ED Only)3235B
1H342$7,700
$440
Subtotal: $8,140
2019-20$498$925$70
$1,700
$3,193Total Project Cost: $11,333
10180000782/28/20201/30/2020
12/30/2017PA&ED:
RTL:R/W Cert:
8/26/2020Begin Con:
10-San Joaquin-5 Prior19-2019-2019-20
201.3222 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
10.7
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
In Stockton, at Route 4/99 Separation(Farmington Road) Bridge No. 29-0155. Replacestructure to provide standard vertical clearance.3148
0X310$5,776
$115
Subtotal: $5,891
2019-20$673
$2,092$147
$1,984
$4,896Total Project Cost: $10,787
101300026512/16/201912/2/201911/9/2017PA&ED:
RTL:R/W Cert:
7/1/2020Begin Con:
10-San Joaquin-99 PriorPriorPrior19-20
201.3221 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
17.2
Con Sup:
Trans Permit Requirements for Bridges
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 209 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn Stockton, from 0.1 mile east of Fresno Avenueto west of Center Street. Roadway rehabilitation.
3165
1C500$30,576
$48
Subtotal: $30,624
2019-20$538
$2,324$19
$4,589
$7,470Total Project Cost: $38,094
101600002611/10/201910/10/2019
5/7/2018PA&ED:
RTL:R/W Cert:
7/11/2020Begin Con:
10-San Joaquin-4 Prior18-1918-1919-20
201.1229.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
T15.5/R16.6
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
In San Joaquin County, on Routes 4, 5, and 99 atvarious locations. Rehabilitate culverts.
3140
1C200$3,178
$71
Subtotal: $3,249
2019-20$870$725$199$597
$2,391Total Project Cost: $5,640
10140000986/22/20205/22/20209/4/2018PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
10-San Joaquin-5 Prior18-1918-1919-20
201.15131 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.5/49.0
Con Sup:
Drainage System Restoration
Const:R/W:
Near Lockeford, from 0.1 mile south of East JackTone Road to north of North Tully Road intersection; also, near Kirkwood in AlpineCounty (PM 0.3/2.4). Replace culverts.
3141
0S740$3,160
$335
Subtotal: $3,495
2020-21$795$900$290$875
$2,860Total Project Cost: $6,355
101300026012/20/202012/5/202012/3/2018PA&ED:
RTL:R/W Cert:
7/21/2021Begin Con:
10-San Joaquin-88 Prior18-1918-1920-21
201.15130 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.5/14.1
Con Sup:
Drainage System Restoration
Const:R/W:
In and near Stockton and Lodi, at variouslocations from Eastside Underpass to AcampoRoad; also, on Route 4 at the Route 4/5Separation (PM R16.10), and on Route 120 inLathrop at Mossdale Underpass (PM R0.5). Upgrade drainage pump plants.
3229
1E610$5,169
$260
Subtotal: $5,429
2021-22$439
$1,530$59
$1,289
$3,317Total Project Cost: $8,746
10170000221/13/2022
12/13/20219/9/2019PA&ED:
RTL:R/W Cert:
7/5/2022Begin Con:
10-San Joaquin-99 18-1919-2019-2021-22
201.1515 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
19.7/33.6
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 210 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Joaquin County, on Routes 5 and 99, andin Stanislaus County, on Routes 5, at variouslocations. Upgrade sign panels and replaceoverhead sign structures.
3129
1C530$1,538
$8
Subtotal: $1,546
2018-19$353$889$52
$543
$1,837Total Project Cost: $3,383
101500000212/3/20188/15/20185/16/2017PA&ED:
RTL:R/W Cert:
7/15/2019Begin Con:
10-San Joaquin-5 PriorPriorPrior18-19
201.17023 Lighting fixture(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Signs and Lighting Rehabilitation
Const:R/W:
MOBILITYNear Linden, from 0.3 mile east of Fine Road to0.1 mile west of Podesta Lane. Widen travel lanes and shoulders to improve the existingconditions for Surface Transportation AssistanceAct (STAA) trucks.
3275
0H560$1,250
$540
Subtotal: $1,790
2019-20 $425$230$680
$1,335Total Project Cost: $3,125
10130001488/14/20197/3/2019
6/30/2017PA&ED:
RTL:R/W Cert:
2/28/2020Begin Con:
10-San Joaquin-2618-1918-1919-20
201.31034 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
13.1/R13.8
Con Sup:
Operational Improvements
Const:R/W:
In Lodi, from south of Route 12 (Victor Road) tosouth of Turner Road. Realign northboundonramp, lower mainline ramp vertical profile forincreased vertical clearance, and constructauxiliary lane.
3145
1C280$7,136
$92
Subtotal: $7,228
2018-19$910
$1,296$75
$1,575
$3,856Total Project Cost: $11,084
10140001345/28/20195/17/2019
12/29/2017PA&ED:
RTL:R/W Cert:
1/6/2020Begin Con:
10-San Joaquin-99 PriorPriorPrior18-19
201.31080 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
30.9/31.3
Con Sup:
Operational Improvements
Const:R/W:
In Stockton, from Route 5 to Route 99. Installramp meters, traffic monitoring systems, closed-circuit television (CCTV), and synchronizeintersection signals with ramp metering.
3274
1F180$37,521$1,269
Subtotal: $38,790
2021-22$2,177$5,813
$667$9,058
$17,715Total Project Cost: $56,505
10160000774/15/20223/15/20229/15/2019PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
10-San Joaquin-4 18-1919-2019-2021-22
201.31530 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R16.0/R19.4
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 211 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In various counties, on various routes, at variouslocations. Upgrade Transportation ManagementSystem (TMS) elements.3147
1C620$3,462
$15
Subtotal: $3,477
2018-19$333$881$138$697
$2,049Total Project Cost: $5,526
10150000016/14/20195/7/2019
5/16/2017PA&ED:
RTL:R/W Cert:
12/27/2019Begin Con:
10-San Joaquin-5 PriorPriorPrior18-19
201.31524 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
In and near Stockton, on Routes 5, 4 (PM14.6/21.2), and 99 (PM 15.8/18.5) at variouslocations. Install Intelligent TransportationSystem (ITS) elements.
3250
1F400$8,960
$80
Subtotal: $9,040
2021-22$820
$2,550$380
$1,805
$5,555Total Project Cost: $14,595
101600005312/22/202111/23/20218/28/2018PA&ED:
RTL:R/W Cert:
7/14/2022Begin Con:
10-San Joaquin-5 Prior18-1918-1921-22
201.31522 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R21.4/27.9
Con Sup:
Transportation Management Systems
Const:R/W:
In San Joaquin, Merced, and Stanislaus Counties,on Routes 5, 12, 59, 99, and 152 at variouslocations. Upgrade or replace inefficient anddamaged Traffic Monitoring Station elements.
3227
1G750$6,862
$7
Subtotal: $6,869
2019-20$1,202$1,719
$465$1,310
$4,696Total Project Cost: $11,565
10170000363/16/20202/14/20204/1/2019PA&ED:
RTL:R/W Cert:
9/15/2020Begin Con:
10-San Joaquin-99 Prior18-1918-1919-20
201.315101 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
In San Joaquin, Amador, Calaveras, Merced,Mariposa, Stanislaus, and Tuolumne Counties, onRoutes 4, 5, 26, 33, 49, 59, 88, 99, 104, 108, 120,132, 140, 152 and 205 at various locations.Repair or replace damaged and nonfunctioningTraffic Management System (TMS) elements.
3226
1G990$2,065
$33
Subtotal: $2,098
2020-21$632
$1,191$107
$1,243
$3,173Total Project Cost: $5,271
10170000741/5/2021
11/5/20204/26/2019PA&ED:
RTL:R/W Cert:
7/6/2021Begin Con:
10-San Joaquin-120 Prior18-1918-1920-21
201.31559 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 212 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Manteca and Lathrop, from Route 5to Route 99; also, on Route 5 at PM R13.34, andon Route 99 at PM 4.56. Install IntelligentTransportation System (ITS) field elements.
3230
1C960$3,550
$68
Subtotal: $3,618
2020-21$373
$1,221$5
$1,121
$2,720Total Project Cost: $6,338
10170000211/29/202112/3/20208/17/2018PA&ED:
RTL:R/W Cert:
9/13/2021Begin Con:
10-San Joaquin-120 Prior18-1918-1920-21
201.31559 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.6/R6.1
Con Sup:
Transportation Management Systems
Const:R/W:
In and near Tracy and Lathrop, from Route 580 toRoute 5. Install ramp meters and other IntelligentTransportation System (ITS) elements.3146
1C330$10,857
$10
Subtotal: $10,867
2019-20$1,057$1,772
$6$2,333
$5,168Total Project Cost: $16,035
101400014610/15/2019
3/1/20218/15/2018PA&ED:
RTL:R/W Cert:
5/19/2020Begin Con:
10-San Joaquin-205 Prior18-1918-1919-20
201.3157 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
L0.0/R13.4
Con Sup:
Transportation Management Systems
Const:R/W:
CountySan Joaquin
PA&ED:PS&E:
R/W Sup:Con Sup:
$8,972$201,752
R/W:
Subtotal: $210,724
Const:$19,591$44,282$4,592
$50,977
$119,442
Total (Capital + Support): $330,166
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 213 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Luis Obispo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn the city of San Luis Obispo, from north of Marsh Street Bridge to Broad Street; also inAtascadero on Route 41 from Old Morro Road toAtascadero Creek Bridge (PM 12.5/13.3). Upgrade highway safety features.
2508
1F370$3,800
$7
Subtotal: $3,807
2019-20$834$970$92
$843
$2,739Total Project Cost: $6,546
05130001354/1/2020
3/20/20207/3/2018PA&ED:
RTL:R/W Cert:
12/16/2020Begin Con:
05-San Luis Obispo-101 Prior18-1918-1919-20
201.01533 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Atascadero, from Santa MargaritaCreek to South Paso Robles Overhead. Improveclear recovery and install barrier.2518
1F490$2,687
$50
Subtotal: $2,737
2019-20$395
$1,097$50
$805
$2,347Total Project Cost: $5,084
05140000023/2/2020
11/1/20198/1/2018PA&ED:
RTL:R/W Cert:
7/20/2020Begin Con:
05-San Luis Obispo-101 Prior18-1918-1919-20
201.01529 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
36.6/55.7
Con Sup:
Collision Severity Reduction
Const:R/W:
MANDATESIn Atascadero, from San Gabriel Road to Route101 Southbound ramps. Improve and constructnew ADA accessible pedestrian pathways andinstall Accessible Pedestrian Signal (APS)systems.
2532
1F630$3,550
$679
Subtotal: $4,229
2018-19$827
$1,333$1,082$1,141
$4,383Total Project Cost: $8,612
05140000406/20/20196/20/201910/5/2017PA&ED:
RTL:R/W Cert:
2/20/2020Begin Con:
05-San Luis Obispo-41 PriorPriorPrior18-19
201.361126 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
14.2/15.9
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONIn Morro Bay, at Toro Creek Bridge No. 49-0068R. Replace bridge.
0072
0L721$5,200
$906
Subtotal: $6,106
2019-20$1,424$2,300
$275$2,400
$6,399Total Project Cost: $12,505
05150000976/29/20204/17/20206/18/2018PA&ED:
RTL:R/W Cert:
2/4/2021Begin Con:
05-San Luis Obispo-1 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
32.6
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 214 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Luis Obispo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Morro Bay, at Old Creek Bridge No. 05-49-0070R. Replace bridge.
0072A
0L722$4,200
$450
Subtotal: $4,650
2019-20$1,399$1,900
$200$1,900
$5,399Total Project Cost: $10,049
05150000984/28/20201/2/2020
11/2/2017PA&ED:
RTL:R/W Cert:
11/13/2020Begin Con:
05-San Luis Obispo-1 PriorPriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
34.5
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Santa Margarita, at Trout Creek Bridge No.05-49-0091. Replace bridge.
0072B
0L723$5,987
$308
Subtotal: $6,295
2019-20$1,419$2,500
$210$2,900
$7,029Total Project Cost: $13,324
05150000991/8/2020
12/2/201911/1/2017PA&ED:
RTL:R/W Cert:
8/12/2020Begin Con:
05-San Luis Obispo-58 PriorPriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
ROADWAY PRESERVATIONIn San Luis Obispo County, near Paso Roblesfrom 0.1 mile south to 0.1 mile north of SanMarcos Creek Bridge and from 0.1 mile south to0.1 mile north of South San MiguelUndercrossing. Landscape mitigation.
0040C
0G041$270
Subtotal: $270
2018-19 $223$28
$479
$730Total Project Cost: $1,000
05150000196/3/2019
3/15/20199/4/2013PA&ED:
RTL:R/W Cert:
11/18/2019Begin Con:
05-San Luis Obispo-101PriorPrior18-19
201.1208 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
63.5/R65.2
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In and near Pismo Beach, from Gracia Way toNorth Pismo (Route 101/Route 1) Separation.Upgrade ADA curb ramps, cold plane pavementand place Rubberized Hot Mix Asphalt concrete(RHMA).
2630
1G980$8,618
$303
Subtotal: $8,921
2021-22$1,156$1,751$1,670$1,568
$6,145Total Project Cost: $15,066
05160000094/6/20224/6/20222/1/2019PA&ED:
RTL:R/W Cert:
8/23/2022Begin Con:
05-San Luis Obispo-1 Prior18-1918-1921-22
201.12113.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.0/16.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 215 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Luis Obispo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near San Simeon, from the Arroyo de la CruzBridge to 0.3 mile north of the Arroyo de la CruzBridge. Plant propagation. 4928X
49284$140
Subtotal: $140
2018-19 $110
$229
$339Total Project Cost: $479
05170000453/18/201910/1/20188/11/2010PA&ED:
RTL:R/W Cert:
9/25/2019Begin Con:
05-San Luis Obispo-1Prior
18-19
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R66.9/R67.2
Con Sup:
Roadway Protective Betterments
Const:R/W:
Near San Simeon, from the Arroyo de la CruzBridge to 0.3 mile north of the Arroyo de la CruzBridge. Planting, wetland and California Red-legged Frog mitigation.
4928Y
49285$7,464
$11
Subtotal: $7,475
2019-20 $1,057$56
$2,424
$3,537Total Project Cost: $11,012
05170000467/25/20192/27/20198/11/2010PA&ED:
RTL:R/W Cert:
3/5/2020Begin Con:
05-San Luis Obispo-1PriorPrior19-20
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R66.9/R67.2
Con Sup:
Roadway Protective Betterments
Const:R/W:
MOBILITYIn San Luis Obispo County, from 0.3 mile northof Reservoir Canyon Road to 0.3 mile north ofNorth Paso Robles Overhead at various locations.Install vehicle detection systems, changeablemessage signs, cameras, and loop detectors.
4022
0N220$2,865
$5
Subtotal: $2,870
2020-21$380
$1,095$78
$702
$2,255Total Project Cost: $5,125
051600000712/1/20208/3/20202/1/2019PA&ED:
RTL:R/W Cert:
4/1/2022Begin Con:
05-San Luis Obispo-101 Prior18-1918-1920-21
201.315107 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
31.5/59.1
Con Sup:
Transportation Management Systems
Const:R/W:
CountySan Luis Obispo
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,719$44,781
R/W:
Subtotal: $47,500
Const:$7,834
$14,336$3,741
$15,391
$41,302
Total (Capital + Support): $88,802
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 216 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Mateo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONIn South San Francisco, at 0.1 mile north ofFrancisco Drive. Permanent embankmentrestoration by installing retaining wall anddrainage improvements.
1450J
0K670$1,590
$10
Subtotal: $1,600
2020-21$500$710$60
$800
$2,070Total Project Cost: $3,670
041600012411/30/2019
6/4/20209/7/2018PA&ED:
RTL:R/W Cert:
6/29/2020Begin Con:
04-San Mateo-82 Prior18-1918-1920-21
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
19.8
Con Sup:
Permanent Restoration
Const:R/W:
In San Bruno, from Jenevein Avenue to 0.1 milesouth of San Bruno Avenue. Reconstruct failedconcrete ditch and place Rock Slope Protection(RSP) at slope washouts as storm damagepermanent restoration.
1499H
4J080$1,093
$168
Subtotal: $1,261
2019-20$390$650$78
$390
$1,508Total Project Cost: $2,769
04150002526/1/20204/1/2020
10/1/2018PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
04-San Mateo-280 18-1918-1918-1919-20
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R20.3/R20.6
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONNear Burlingame and Hillsborough city limits, atthe intersection of Route 82 and FloribundaAvenue. Install left turn signal.0686
1G020$2,610$1,765
Subtotal: $4,375
2019-20$2,900$1,300
$450$700
$5,350Total Project Cost: $9,725
04000020116/15/20206/7/2020
5/15/2019PA&ED:
RTL:R/W Cert:
1/15/2021Begin Con:
04-San Mateo-82 Prior19-2019-2019-20
201.010120 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.7
Con Sup:
Safety Improvements
Const:R/W:
In and near various cities, on Routes 1, 35, 82, 84,92, 101, 109, 114, 280, and 380 at variouslocations. Enhance pedestrian safety byupgrading signals with Accessible PedestrianSignal (APS) audible indicators, pushbuttons, andcountdown timers, and upgrading crosswalkmarkings.
1491J
0K070$5,832
$57
Subtotal: $5,889
2021-22$1,250$1,250
$175$1,250
$3,925Total Project Cost: $9,814
04160000332/1/2022
12/1/20214/1/2020PA&ED:
RTL:R/W Cert:
6/1/2022Begin Con:
04-San Mateo-Var 18-1919-2019-2021-22
201.01563 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 217 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Mateo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Woodside, at various locations (alsoSanta Clara County PM 20.4); also in the city andcounty of San Francisco on Route 101 at SanBruno Avenue offramp (PM 1.7). Constructmaintenance worker safety improvements.
0481J
0J670$2,678
$10
Subtotal: $2,688
2018-19$440$800$110$770
$2,120Total Project Cost: $4,808
04140000241/30/2019
12/18/201810/31/2017PA&ED:
RTL:R/W Cert:
7/1/2019Begin Con:
04-San Mateo-280 PriorPriorPrior18-19
201.23561 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.2/R3.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESNear Redwood City, north of Edgewood Road;also on Route 84 from Hildebrand Road to northof La Honda Creek Bridge (PM 9.4/10.0).Stabilize soil and erosion control to mitigate forstorm water quality.
1487G
0J720$2,008
$204
Subtotal: $2,212
2019-20$874$763$77
$564
$2,278Total Project Cost: $4,490
041400003010/1/20199/1/2019
7/30/2018PA&ED:
RTL:R/W Cert:
4/1/2020Begin Con:
04-San Mateo-280 Prior18-1918-1919-20
201.3357.8 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.0/7.7
Con Sup:
Storm Water Mitigation
Const:R/W:
BRIDGE PRESERVATIONNear Pescadero, at Pescadero Creek Bridge No.35-0028. Upgrade bridge rails and repairapproach slabs.1494G
4J870$4,434
$260
Subtotal: $4,694
2021-22$1,200$1,000
$8$1,200
$3,408Total Project Cost: $8,102
04160000295/1/20224/1/2022
11/1/2020PA&ED:
RTL:R/W Cert:
12/15/2022Begin Con:
04-San Mateo-1 18-1920-2120-2121-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
14.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Redwood City, at Cordilleras Creek Bridge No.35-0019. Replace bridge to restore structuralintegrity.1483C
2J730$26,570$4,285
Subtotal: $30,855
2021-22$4,500$4,500$1,125$7,500
$17,625Total Project Cost: $48,480
04150000046/30/20226/30/202210/2/2020PA&ED:
RTL:R/W Cert:
1/11/2023Begin Con:
04-San Mateo-101 18-1920-2120-2121-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
7.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 218 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Mateo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In East Palo Alto, Redwood City, Belmont,Burlingame, Millbrae, South San Francisco, andBrisbane, from University Avenue Overcrossingto Sierra Point offramp Separation. Upgradebridge rails at 8 structures.
1485K
2J740$7,748
$64
Subtotal: $7,812
2021-22$1,326$1,586
$130$1,456
$4,498Total Project Cost: $12,310
04150000103/1/20222/1/20213/1/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
04-San Mateo-101 18-1919-2019-2021-22
201.1123706 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.1/23.4
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In and near Menlo Park and San Bruno, fromAlpine Road to Route 380 at Alpine RoadUndercrossing No. 35-0009L/R (PM R0.05),Sand Hill Road Overcrossing (OC) (South) No.35-0007 (PM R1.56), Sand Hill Road OC (North)No. 35-0008 (PM R1.62), and Route 280/380 Separation No. 35-0217L/R (PM R20.97).Structure seismic retrofit.
1498G
4J850$7,470
$262
Subtotal: $7,732
2021-22$600
$1,000$100
$1,000
$2,700Total Project Cost: $10,432
04160000284/1/20225/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
10/1/2022Begin Con:
04-San Mateo-280 Prior20-2120-2121-22
201.1136 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R21.0
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In Half Moon Bay, at the Pilarcitos Creek BridgeNo. 35-0139L/R; also, on Route 84 at SanGregorio Creek Bridge No. 35-0166 (PM 7.55).Retrofit scour critical bridges to preserve thestructural integrity of the bridges by reinforcingwith Rock Slope Protection (RSP).
1483M
2J790$1,936
$343
Subtotal: $2,279
2021-22$1,250$1,040
$260$1,300
$3,850Total Project Cost: $6,129
04150000144/1/20222/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
11/1/2022Begin Con:
04-San Mateo-1 18-1920-2120-2121-22
201.1193 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
28.9
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONNear Pescadero, from Santa Cruz County Line tosouth of Bean Hollow Road. Pavementrehabilitation.0622B
0C930$11,671
$10
Subtotal: $11,681
2019-20$1,403$1,081
$46$1,081
$3,611Total Project Cost: $15,292
04140000949/1/20196/1/20197/2/2018PA&ED:
RTL:R/W Cert:
1/15/2020Begin Con:
04-San Mateo-1 Prior18-1918-1919-20
201.12121.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/10.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 219 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Mateo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Woodside and Redwood City, fromRoute 280 to Route 101. Rehabilitate pavement,make curb ramps and sidewalks ADA compliant,and upgrade guardrails to make standard.
1497A
0K780$18,225
$566
Subtotal: $18,791
2021-22$2,340$2,860
$39$3,120
$8,359Total Project Cost: $27,150
04160001384/1/20223/1/20226/1/2020PA&ED:
RTL:R/W Cert:
11/1/2022Begin Con:
04-San Mateo-84 18-1919-2019-2021-22
201.12116.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
21.5/25.7
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In the cities of Burlingame, Millbrae, San Brunoand South San Francisco, from Broadway toOyster Point Boulevard. Pavement rehabilitation.1487J
3J060$16,500
$100
Subtotal: $16,600
2019-20$1,056$1,342
$132$1,628
$4,158Total Project Cost: $20,758
041500008011/1/2019
10/15/20194/2/2018PA&ED:
RTL:R/W Cert:
4/29/2020Begin Con:
04-San Mateo-101 PriorPriorPrior19-20
201.12158.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.5/23.0
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Redwood City, San Carlos and Belmont,from Edgewood Road to Route 92 and nearHillsborough at PM R12.7; also, in Santa ClaraCounty in and near Mountain View and PaloAlto, at various spot locations (PM 11.6, 12.8,12.9, 18.8). Replace failing culverts and restoredamaged slopes, pavement, and bridgeapproaches at 6 locations.
0732J
2A970$16,404
$13
Subtotal: $16,417
2021-22$1,800$2,000
$260$3,000
$7,060Total Project Cost: $23,477
041200016111/1/202110/1/20212/1/2020PA&ED:
RTL:R/W Cert:
5/1/2022Begin Con:
04-San Mateo-280 18-1919-2019-2021-22
201.15128 Culvert(s) (ea)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
6.7/10.5
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYIn and near the cities of Half Moon Bay, Pacificaand Daly City, from south of Miramontes PointRoad to Clarinada Avenue Undercrossing, atvarious locations. Install Bluetooth DetectionSystems and Variable Message Signs (VMS), enable two existing Changeable Message Signs(CMS), modify Advanced TransportationManagement System (ATMS), and constructMaintenance Vehicle Pullouts (MVP) to improvethe system performance.
1452A
2K880$2,408
$36
Subtotal: $2,444
2021-22$430$444$30
$444
$1,348Total Project Cost: $3,792
04170000409/1/20218/1/20214/1/2020PA&ED:
RTL:R/W Cert:
1/15/2022Begin Con:
04-San Mateo-1 18-1919-2020-2121-22
201.31513 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
26.4/R47.3
Con Sup:
Transportation Management Systems
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 220 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
San Mateo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MISCELLANEOUSNear Redwood City, at Edgewood Road atEdgewood Park-and-Ride lot. Transportationinfrastructure improvement for zero-emissionvehicle charging.
1453N
3K270$523$10
Subtotal: $533
2018-19$130$260$25
$260
$675Total Project Cost: $1,208
0417000122
PA&ED:
RTL:R/W Cert:
Begin Con:
04-San Mateo-280 Prior18-1918-1918-19
201.9991 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
6.7
Con Sup:
Miscellaneous
Const:R/W:
CountySan Mateo
PA&ED:PS&E:
R/W Sup:Con Sup:
$8,163$129,700
R/W:
Subtotal: $137,863
Const:$22,389$22,586$3,105
$26,463
$74,543
Total (Capital + Support): $212,406
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 221 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Barbara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Santa Barbara, San Luis Obispo, Monterey,and Santa Cruz Counties on Routes 1, 101, 129,135, 156, and 246 at various locations. InstallAccessible Pedestrian Signal (APS) push buttons,Countdown Pedestrian Signal (CPS) heads,pedestrian barricades, and crosswalk signage toimprove pedestrian and bicycle safety.
2628
1G960$2,232
$16
Subtotal: $2,248
2020-21$879$940$71
$746
$2,636Total Project Cost: $4,884
05160000062/1/20212/1/20214/2/2019PA&ED:
RTL:R/W Cert:
9/15/2021Begin Con:
05-Santa Barbara-Var 18-1918-1918-1920-21
201.01532 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In Santa Barbara and San Luis Obispo Counties,on various routes at various locations. Replaceand install advance curve warning signs.2594
1G300$2,084
$48
Subtotal: $2,132
2018-19$780
$1,125$41
$629
$2,575Total Project Cost: $4,707
05140001386/10/20192/28/20197/9/2018PA&ED:
RTL:R/W Cert:
11/27/2019Begin Con:
05-Santa Barbara-Var Prior18-1918-1918-19
201.0151277 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Buellton, from Gaviota State ParkEntrance to north of Alisos Canyon Road.Roadside safety improvements. 2460
1E000$2,578
$3
Subtotal: $2,581
2019-20$520$840$34
$698
$2,092Total Project Cost: $4,673
05130000232/3/2020
10/7/201910/5/2017PA&ED:
RTL:R/W Cert:
7/1/2020Begin Con:
05-Santa Barbara-101 PriorPriorPrior19-20
201.23556 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
46.5/68.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Near Gaviota, at the Gaviota Safety RoadsideRest Area. Upgrade wastewater system.
2462
1E010$2,800
$5
Subtotal: $2,805
2018-19$240
$1,060$10
$1,180
$2,490Total Project Cost: $5,295
05130000242/1/2019
10/1/20182/22/2016PA&ED:
RTL:R/W Cert:
9/3/2019Begin Con:
05-Santa Barbara-101 PriorPriorPrior18-19
201.2352 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
46.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 222 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Barbara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Santa Barbara and San Luis Obispo (PM0.0/8.4) Counties, from Alisos Canyon Road toLos Berros Road at various locations. Roadsidesafety improvements.
2699
1H850$2,142
$25
Subtotal: $2,167
2020-21$714
$1,123$35
$1,003
$2,875Total Project Cost: $5,042
05170000012/19/2021
10/15/202010/24/2019PA&ED:
RTL:R/W Cert:
9/30/2021Begin Con:
05-Santa Barbara-101 18-1919-2019-2020-21
201.23566 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
68.7/91.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn the city of Santa Barbara, at Butterfly LanePedestrian Undercrossing. Construct pedestrianramps and sidewalks to comply with ADAstandards.
2468
1E040$2,904
$970
Subtotal: $3,874
2019-20$70
$1,875$303
$1,136
$3,384Total Project Cost: $7,258
05130000274/22/2020
12/26/201911/1/2016PA&ED:
RTL:R/W Cert:
11/24/2020Begin Con:
05-Santa Barbara-101 PriorPriorPrior19-20
201.3612 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.0
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONIn Goleta, at San Jose Creek Bridge No. 51-0163L/R. Replace bridges to maintain standardsof safety and reliability. 2649
1H430$9,240
$40
Subtotal: $9,280
2021-22$1,400$2,730
$70$3,480
$7,680Total Project Cost: $16,960
051600007310/1/20217/1/2021
4/20/2020PA&ED:
RTL:R/W Cert:
6/15/2022Begin Con:
05-Santa Barbara-101 Prior19-2019-2021-22
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.6
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Los Alamos, at Route 101/135 Separation No.51-0073L/R. Replace bridge decks.
2522
1F500$7,000
$100
Subtotal: $7,100
2019-20$650
$1,800$250
$2,100
$4,800Total Project Cost: $11,900
05140000038/15/20197/15/201912/1/2017PA&ED:
RTL:R/W Cert:
3/16/2020Begin Con:
05-Santa Barbara-101 PriorPriorPrior19-20
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
70.9
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 223 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Barbara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Lake Cachuma at Cold Spring CanyonBridge No. 51-0037. Install inspection accesssystem below bridge and paint structure.2392
1C420$19,000
$50
Subtotal: $19,050
2020-21$1,100$1,500
$75$1,500
$4,175Total Project Cost: $23,225
05120001414/15/2021
12/15/20207/15/2019PA&ED:
RTL:R/W Cert:
11/1/2021Begin Con:
05-Santa Barbara-154 Prior19-2019-2020-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
22.9/23.2
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In the city of Santa Barabara, at La Colina RoadUndercrossing (UC) No. 51-0256 (PM R31.82)and at Primavera Road UC No. 51-0257 (PMR32.07). Upgrade bridge railing and reconstructabutment for bridge rehabilitation.
2651
1H450$6,416
$3
Subtotal: $6,419
2021-22$928
$2,135$52
$2,186
$5,301Total Project Cost: $11,720
05160000757/30/20214/15/2021
12/20/2019PA&ED:
RTL:R/W Cert:
1/5/2022Begin Con:
05-Santa Barbara-154 Prior19-2019-2021-22
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R31.8/R32.1
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Goleta, from 0.2 mile south to 0.4 milenorth of San Jose Creek Bridge No. 51-0217. Replace bridge.2386
1C360$18,600
$158
Subtotal: $18,758
2021-22$3,887$3,459
$156$4,550
$12,052Total Project Cost: $30,810
051200013410/19/20218/18/20216/20/2019PA&ED:
RTL:R/W Cert:
4/1/2022Begin Con:
05-Santa Barbara-217 Prior19-20Prior21-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.8/1.4
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Lompoc, at San Antonio Creek Bridge No.51-0237L/R. Bridge scour mitigation.
2563
1F810$1,241
$83
Subtotal: $1,324
2021-22$688
$1,692$99
$1,029
$3,508Total Project Cost: $4,832
05140000637/7/20212/4/20217/5/2019PA&ED:
RTL:R/W Cert:
1/4/2022Begin Con:
05-Santa Barbara-1 Prior19-2019-2021-22
201.1112 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
M33.1
Con Sup:
Bridge Scour Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 224 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Barbara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Carpinteria, at Arroyo Parida Creek BridgeNo. 51-113. Replace bridge (scour).
0335
39610$6,845
$905
Subtotal: $7,750
2019-20$960
$4,266$692
$1,310
$7,228Total Project Cost: $14,978
05000005141/21/20209/3/2019
6/29/2009PA&ED:
RTL:R/W Cert:
8/7/2020Begin Con:
05-Santa Barbara-192 PriorPriorPrior19-20
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
15.4/15.6
Con Sup:
Bridge Scour Mitigation
Const:R/W:
Near Buellton, at Nojoqui Creek Bridge No. 51-0018L/R. Bridge rail replacement and widening.
2561
1F790$4,890
$412
Subtotal: $5,302
2019-20$910
$1,490$130
$1,000
$3,530Total Project Cost: $8,832
05140000611/29/202011/1/20198/29/2018PA&ED:
RTL:R/W Cert:
7/15/2020Begin Con:
05-Santa Barbara-101 Prior18-1918-1919-20
201.112768 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
56.0
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Los Alamos, at San Antonio Creek BridgeNo. 51-0006. Bridge seismic restoration.
2567
1F830$1,978
$132
Subtotal: $2,110
2019-20$676
$1,228$23
$640
$2,567Total Project Cost: $4,677
05140000653/9/20209/1/20197/2/2018PA&ED:
RTL:R/W Cert:
9/17/2020Begin Con:
05-Santa Barbara-135 PriorPriorPrior19-20
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R7.2
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Near Los Olivos, at Alamo Pintado PedestrianBridge No. 51-0076Y. Remove bridge.
2391
1C410$922$56
Subtotal: $978
2019-20$1,125$1,055
$50$350
$2,580Total Project Cost: $3,558
05120001394/8/2020
10/15/201912/3/2018PA&ED:
RTL:R/W Cert:
10/6/2020Begin Con:
05-Santa Barbara-154 Prior18-19Prior19-20
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R2.6
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 225 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Barbara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn Carpinteria, from Casitas Pass Overcrossing to0.2 miles north of Sheffield AvenueUndercrossing. Rehabilitate roadway.2426
1C820$119,100
$5,560
Subtotal: $124,660
2019-20$9,200$9,530
$940$30,800
$50,470Total Project Cost: $175,130
05120002362/28/20192/5/2019
11/27/2017PA&ED:
RTL:R/W Cert:
10/29/2019Begin Con:
05-Santa Barbara-101 PriorPriorPrior19-20
201.12026.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.6/9.2
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
Near Santa Maria, from Solomon Road to Route166. Pavement rehabilitation.
2586
1G130$9,583
$795
Subtotal: $10,378
2019-20$515$916$104$905
$2,440Total Project Cost: $12,818
051400011011/1/20198/1/20197/2/2018PA&ED:
RTL:R/W Cert:
5/21/2020Begin Con:
05-Santa Barbara-1 Prior18-1918-1919-20
201.12118.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R36.4/49.2
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Gaviota, from 1.0 mile south of GaviotaGorge Tunnel to 0.1 mile north of Nojoqui CreekBridge. Upgrade guard railing, widen shoulders,place High Friction Surface Treatment (HSFT),construct retaining walls, cold plane pavement,Place Hot Mix Asphalt (HMA) and RubberizedHot Mix Asphalt concrete (RHMA).
2700
1H860$59,218
$21
Subtotal: $59,239
2021-22$2,160$2,648
$74$5,026
$9,908Total Project Cost: $69,147
05170000029/22/20215/21/202112/2/2019PA&ED:
RTL:R/W Cert:
5/2/2022Begin Con:
05-Santa Barbara-101 Prior19-2019-2021-22
201.12127.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
46.2/R52.3
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Santa Maria, from Lakeview Road toRoute 101. Upgrade ADA curb ramps, cold planepavement, and place Rubberized Hot Mix Asphaltconcrete (RHMA).
2629
1G970$14,372
$378
Subtotal: $14,750
2020-21 $1,869$1,832$2,396
$6,097Total Project Cost: $20,847
051600000811/19/20209/30/20206/16/2017PA&ED:
RTL:R/W Cert:
5/24/2021Begin Con:
05-Santa Barbara-135PriorPrior20-21
201.12124.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.7/17.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 226 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Barbara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In Lompoc, at combined segment of Route 246and Route 1; on Route 246, from 0.3 mile west ofV Street to H Street; also on Route 1, from HStreet to 12th Street. Upgrade ADA curb ramps,cold plane pavement and place hot mix asphaltconcrete (HMA).
2632
1H010$6,900
$350
Subtotal: $7,250
2021-22 $3,630$2,460$1,750
$7,840Total Project Cost: $15,090
051600001212/15/202112/10/20214/24/2017PA&ED:
RTL:R/W Cert:
7/27/2022Begin Con:
05-Santa Barbara-246PriorPrior21-22
201.1219 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Gaviota State Park. Rehabilitate andupgrade existing drainage system.
3330
0K330$3,600
$146
Subtotal: $3,746
2019-20$780
$1,430$245
$1,111
$3,566Total Project Cost: $7,312
05120000686/15/20206/15/20208/27/2018PA&ED:
RTL:R/W Cert:
12/4/2020Begin Con:
05-Santa Barbara-101 PriorPriorPrior19-20
201.1511 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
45.5
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYIn Santa Ynez, from 0.2 mile east to 0.1 mile westof Edison Street/Baseline Avenue. Construct aroundabout to improve operations and safety. 2674
1H310$6,827
$888
Subtotal: $7,715
2021-22$793
$1,440$418
$1,614
$4,265Total Project Cost: $11,980
051600006011/30/202111/12/20212/13/2020PA&ED:
RTL:R/W Cert:
7/22/2022Begin Con:
05-Santa Barbara-154 18-1920-2120-2121-22
201.31010 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R5.8/R6.1
Con Sup:
Operational Improvements
Const:R/W:
CountySanta Barbara
PA&ED:PS&E:
R/W Sup:Con Sup:
$11,144$310,472
R/W:
Subtotal: $321,616
Const:$28,975$49,781$8,164
$67,139
$154,059
Total (Capital + Support): $475,675
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 227 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Clara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Gilroy, at Sargent Bridge and Overhead No.39-0006L. Permanent restoration of roadwaysettlement and southern abutment wingwallmovement.
1453B
4J030$1,381
$87
Subtotal: $1,468
2020-21$650$780$52
$650
$2,132Total Project Cost: $3,600
04150002452/1/20211/2/2021
12/1/2019PA&ED:
RTL:R/W Cert:
6/15/2021Begin Con:
04-Santa Clara-101 18-1919-2019-2020-21
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.8
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONIn and near Morgan Hill, from south of MastenAvenue to East Main Avenue. Install edgelineand shoulder rumble strips, concrete barrier andenhanced wet-night visibility striping.
1483F
2J890$1,760
$10
Subtotal: $1,770
2018-19$230$300$75
$450
$1,055Total Project Cost: $2,825
04150000225/6/20194/8/2019
5/17/2018PA&ED:
RTL:R/W Cert:
1/23/2020Begin Con:
04-Santa Clara-101 Prior18-1918-1918-19
201.01085 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R9.0/R16.8
Con Sup:
Safety Improvements
Const:R/W:
Near Gilroy, from east of Dunne Street/SanFelipe Road to the Merced County line. Placemedian barrier. 0480K
0J800$10,984
$60
Subtotal: $11,044
2019-20$1,800$1,227
$65$1,766
$4,858Total Project Cost: $15,902
04140000675/15/20205/8/2020
12/3/2018PA&ED:
RTL:R/W Cert:
3/1/2021Begin Con:
04-Santa Clara-152 Prior18-1918-1919-20
201.01079 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.8/R35.2
Con Sup:
Safety Improvements
Const:R/W:
In Cupertino, at northbound offramp to FoothillExpressway. Upgrade traffic signal system forright-turn movement.1488N
3J710$982$180
Subtotal: $1,162
2019-20$432$285$45
$285
$1,047Total Project Cost: $2,209
04150001844/30/20203/31/2020
12/31/2018PA&ED:
RTL:R/W Cert:
10/30/2020Begin Con:
04-Santa Clara-280 Prior18-1918-1919-20
201.01020 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.3
Con Sup:
Safety Improvements
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 228 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Clara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
On various routes, in various cities, at variouslocations. Replace pedestrian push-buttons andsignal heads with Accessible Pedestrian Signals(APS) and countdown timers and refreshcrosswalk markings to enhance pedestrian safety.
1492E
0K080$10,711
$23
Subtotal: $10,734
2021-22$939
$1,241$36
$1,417
$3,633Total Project Cost: $14,367
04160000493/18/20223/2/2022
7/15/2020PA&ED:
RTL:R/W Cert:
7/29/2022Begin Con:
04-Santa Clara-Var 18-1920-2121-2221-22
201.01530 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
In Santa Clara County, on Routes 9, 17, 85, 87,101, 152, 237, 280, 680, and 880 at variouslocations. Relocate or shield existing electricalcontroller cabinets, and install 28 new maintenance vehicle pullouts.
1486A
2J950$6,924
$50
Subtotal: $6,974
2021-22$1,300$1,400
$45$1,600
$4,345Total Project Cost: $11,319
04150000433/15/20222/1/2022
11/10/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
04-Santa Clara-9 18-1920-2120-2121-22
201.01566 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Gilroy, from Llagas Creek Bridge to theMerced County line. Construct maintenancevehicle pull-outs and vegetation control underexisting guardrail to improve highway workersafety.
1452E
2K800$6,590
$10
Subtotal: $6,600
2021-22$800
$1,000$45
$700
$2,545Total Project Cost: $9,145
041700002511/30/202110/29/20218/31/2020PA&ED:
RTL:R/W Cert:
6/20/2022Begin Con:
04-Santa Clara-152 18-1919-2019-2020-21
201.23588 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
11.2/R35.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near San Jose, from Route 101 to Route17/880 Separation. Pave extended gore areas andnarrow strips to improve highway worker safety.1492D
4J960$3,835
$170
Subtotal: $4,005
2021-22$780$770$62
$503
$2,115Total Project Cost: $6,120
041600002412/1/202110/1/20216/1/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
04-Santa Clara-280 18-1919-2021-2221-22
201.23539 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R0.0/L5.4
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 229 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Clara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Jose and Milpitas, from Route 101 to ScottCreek Road at various locations. Constructmaintenance worker safety improvements.0481T
0J660$8,814
$10
Subtotal: $8,824
2018-19$440
$1,320$110
$1,320
$3,190Total Project Cost: $12,014
04140000231/15/20191/8/2019
9/26/2017PA&ED:
RTL:R/W Cert:
7/15/2019Begin Con:
04-Santa Clara-680 PriorPriorPrior18-19
201.235160 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
M0.0/M9.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Sunnyvale, Mountain View, Los Altos, andPalo Alto, from Knickerbocker Drive to SanMateo County line. Upgrade pedestrian facilitiesto make compliant with the ADA standards.
1495G
0K010$6,193$1,614
Subtotal: $7,807
2021-22$1,300$1,600
$706$1,600
$5,206Total Project Cost: $13,013
04160000205/2/20224/1/20226/1/2020PA&ED:
RTL:R/W Cert:
11/15/2022Begin Con:
04-Santa Clara-82 19-2020-2120-2121-22
201.36114 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
18.2/26.4
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Cupertino, Sunnyvale and Mountain View,from Stevens Creek Boulevard to Route 101; alsoin various cities, on Route 80 (PM 2.5/8.0), atvarious locations. Install and/or upgrade existingcurb ramps and pedestrian facilities to ADAstandards.
0434G
2G730$1,853
$50
Subtotal: $1,903
2018-19$442$663$102$730
$1,937Total Project Cost: $3,840
04000212025/16/20195/1/2019
9/26/2017PA&ED:
RTL:R/W Cert:
12/23/2019Begin Con:
04-Santa Clara-85 PriorPriorPrior18-19
201.36138 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
18.0/24.1
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONNear Saratoga, at Saratoga Creek Bridge No. 37-0074. Replace bridge.
0386F
3G630$11,668$6,779
Subtotal: $18,447
2019-20$2,800$1,400
$396$1,526
$6,122Total Project Cost: $24,569
04120004095/6/2020
4/15/20206/15/2018PA&ED:
RTL:R/W Cert:
10/19/2020Begin Con:
04-Santa Clara-9 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.9
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 230 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Clara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In various cities, on Routes 101 and 237 atvarious locations. Bridge rail upgrade at 8locations.0481H
0J560$10,711
$30
Subtotal: $10,741
2019-20$1,800$2,250
$30$2,700
$6,780Total Project Cost: $17,521
04140000136/15/20203/16/20209/14/2018PA&ED:
RTL:R/W Cert:
12/21/2020Begin Con:
04-Santa Clara-101 Prior18-1918-1919-20
201.1125956 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In San Jose, at Bird Avenue Overcrossing No. 37-0267 (PM R2.78); also in Los Altos Hills at Arastradero Road Undercrossing Bridge No. 37 -0251L/R (PM 17.8). Bridge seismic restoration.
1483K
2J750$2,414
$90
Subtotal: $2,504
2018-19$1,144$1,034
$66$550
$2,794Total Project Cost: $5,298
04150003383/15/20193/1/2019
2/27/2018PA&ED:
RTL:R/W Cert:
10/28/2019Begin Con:
04-Santa Clara-280 PriorPriorPrior18-19
201.1133 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R2.9/17.8
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In various cities, on various routes at SaratogaCreek Bridge, Carnadero Creek Bridge, SanFrancisco Creek Bridge, San Tomas AquinoCreek Bridge, and Bodfish Creek Bridge. Bridgepreventative maintenance.
1482R
2J780$2,391
$10
Subtotal: $2,401
2019-20$900$750$44
$600
$2,294Total Project Cost: $4,695
04150000176/1/20205/1/2020
10/1/2018PA&ED:
RTL:R/W Cert:
12/22/2020Begin Con:
04-Santa Clara-Var Prior18-1918-1919-20
201.1195 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONIn and near Los Gatos, Campbell and San Jose,from Hebard Way to Route 280. Pavement rehabilitation.1480B
1J970$30,141
$20
Subtotal: $30,161
2019-20$1,750$2,750
$150$3,150
$7,800Total Project Cost: $37,961
04140004041/27/20201/17/20207/2/2018PA&ED:
RTL:R/W Cert:
7/15/2020Begin Con:
04-Santa Clara-17 Prior18-1918-1919-20
201.12150 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.8/13.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 231 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Clara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the cities of San Jose and Santa Clara, fromMcKendrie Street to El Camino Real. Pavementrehabilitation and ADA upgrades.1490Q
4J282$2,711
$180
Subtotal: $2,891
2018-19 $603$180$703
$1,486Total Project Cost: $4,377
04170005203/1/2019
1/15/20197/14/2017PA&ED:
RTL:R/W Cert:
9/11/2019Begin Con:
04-Santa Clara-8218-1918-1918-19
201.1213.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.8/R10.4
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Mountain View, Los Altos, and Palo Alto,from 0.05 mile north of Route 237 to Sand HillRoad. Pavement rehabilitation.1498F
4J890$22,885
$360
Subtotal: $23,245
2021-22$888
$1,974$99
$1,974
$4,935Total Project Cost: $28,180
04160000238/11/20217/6/20213/3/2020PA&ED:
RTL:R/W Cert:
11/30/2021Begin Con:
04-Santa Clara-82 19-2020-2120-2121-22
201.12143 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
19.2/26.4
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In Gilroy, from 0.3 miles west of Santa TeresaBoulevard to Route 101. Rehabilitate pavement.
1452D
2K750$14,165
$10
Subtotal: $14,175
2019-20$1,400$1,600
$58$1,800
$4,858Total Project Cost: $19,033
041700001910/1/20188/15/20186/15/2018PA&ED:
RTL:R/W Cert:
3/18/2019Begin Con:
04-Santa Clara-152 Prior18-1918-1919-20
201.1217.9 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.6/M10.2
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Los Altos, Los Altos Hills, and PaloAlto, from Foothill Boulevard to north of SandHill Road (also, in San Mateo County PMR0.0/R2.1). Pavement rehabilitation.
0449A
3J320$47,574
$50
Subtotal: $47,624
2018-19$1,853$3,284
$48$6,661
$11,846Total Project Cost: $59,470
04150001315/1/20194/1/2019
12/1/2017PA&ED:
RTL:R/W Cert:
10/8/2019Begin Con:
04-Santa Clara-280 PriorPriorPrior18-19
201.12190 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
11.5/20.6
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 232 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Clara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In San Jose, from Route 85 to West Julian Street.Roadway Rehabilitation.
1492C
4J910$55,263
$304
Subtotal: $55,567
2021-22$2,767$4,425
$50$6,581
$13,823Total Project Cost: $69,390
04160000106/30/20224/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
2/1/2023Begin Con:
04-Santa Clara-87 Prior20-2120-2121-22
201.12229.5 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/6.1
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
MOBILITYIn San Jose, in the eastbound direction fromNorth First Street to Zanker Road. Constructauxiliary lane.1492A
0K240$8,030
$255
Subtotal: $8,285
2021-22$3,120$2,080
$130$1,560
$6,890Total Project Cost: $15,175
04160000602/1/20221/2/20226/1/2020PA&ED:
RTL:R/W Cert:
6/15/2022Begin Con:
04-Santa Clara-237 18-1919-2019-2021-22
201.310521 Daily vehicle hour(s) of delay (DVHD)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
7.0/8.0
Con Sup:
Operational Improvements
Const:R/W:
In San Jose, in the westbound direction fromZanker Road to North First Street. Constructauxiliary lane.1492B
0K250$13,819$57,823
Subtotal: $71,642
2021-22$3,120$2,080
$481$1,750
$7,431Total Project Cost: $79,073
04160000616/1/20225/2/20228/3/2020PA&ED:
RTL:R/W Cert:
2/1/2023Begin Con:
04-Santa Clara-237 Prior20-2120-2121-22
201.310121 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.0/8.0
Con Sup:
Operational Improvements
Const:R/W:
ROADSIDE PRESERVATIONIn the cities of San Jose, Santa Clara, andSunnyvale, from Route 85 to Route 237; also, onRoute 85 (PM 0.0 to 1.1), and Route 237 (PM 2.2to R4.9). Repair and modernized roadsideirrigation facilities.
2020J
4J930$2,009
$15
Subtotal: $2,024
2020-21$375$500$63
$625
$1,563Total Project Cost: $3,587
04160000175/11/20212/16/2021
10/10/2019PA&ED:
RTL:R/W Cert:
9/15/2021Begin Con:
04-Santa Clara-101 18-1919-2019-2020-21
201.21012 Acre(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R26.4/46.4
Con Sup:
Highway Planting Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 233 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Clara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountySanta Clara
PA&ED:PS&E:
R/W Sup:Con Sup:
$68,190$283,808
R/W:
Subtotal: $351,998
Const:$31,030$35,316$3,138
$41,201
$110,685
Total (Capital + Support): $462,683
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 234 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Cruz($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn and near Santa Cruz, from 0.1 mile south ofRoute 1/17 Separation to 0.4 mile south ofPasatiempo Overcrossing; also on Route 17 (PM0.0/0.3). Realign southbound Route 17Connector to southbound Route 1.
2636
1H060$5,811
$658
Subtotal: $6,469
2019-20$792
$1,930$217
$1,973
$4,912Total Project Cost: $11,381
051600002011/1/20198/1/2019
11/1/2017PA&ED:
RTL:R/W Cert:
5/1/2020Begin Con:
05-Santa Cruz-1 PriorPriorPrior19-20
201.010140 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.7/17.0
Con Sup:
Safety Improvements
Const:R/W:
Near Watsonville, at Lakeview Road. Constructroundabout and improve street lighting.
2625
1G990$4,481
$749
Subtotal: $5,230
2019-20$782
$1,341$441
$1,335
$3,899Total Project Cost: $9,129
05160000106/1/20204/1/2020
11/1/2017PA&ED:
RTL:R/W Cert:
11/1/2020Begin Con:
05-Santa Cruz-129 PriorPriorPrior19-20
201.01046 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.4
Con Sup:
Safety Improvements
Const:R/W:
In Santa Cruz and Monterey Counties, from southof Salinas Road to south of Larkin Valley RoadUndercrossing. Construct maintenance vehiclepull outs, repairing guardrail, improve gate accessand relocate irrigation equipment.
2452
1C980$2,900
$5
Subtotal: $2,905
2018-19$652
$1,097$49
$1,225
$3,023Total Project Cost: $5,928
05130000213/26/2019
12/31/201811/1/2017PA&ED:
RTL:R/W Cert:
11/21/2019Begin Con:
05-Santa Cruz-1 PriorPriorPrior18-19
201.23569 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R0.0/R8.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn and near the city of Santa Cruz, from Route 1to north of Fall Creek Drive. Stormwaterimprovements.2569
1F920$2,356
$214
Subtotal: $2,570
2019-20$745
$1,192$1,287
$812
$4,036Total Project Cost: $6,606
05140000755/4/2020
4/27/202010/4/2017PA&ED:
RTL:R/W Cert:
10/30/2020Begin Con:
05-Santa Cruz-9 PriorPriorPrior19-20
201.3357.96 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.1/7.5
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 235 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Cruz($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Ben Lomond, from Holiday Lane to 4.7miles north of the northern junction of Routes236/9. Replace failed culverts systems and construct energy dissipaters.
2627
1G950$5,361
$271
Subtotal: $5,632
2021-22$1,445$2,377$1,078$2,025
$6,925Total Project Cost: $12,557
05160000053/29/20223/1/20228/3/2020PA&ED:
RTL:R/W Cert:
9/7/2022Begin Con:
05-Santa Cruz-9 18-1920-2120-2121-22
201.33516 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
8.5/25.5
Con Sup:
Storm Water Mitigation
Const:R/W:
In Santa Cruz, from 0.7 mile north of Route 1/17Separation to Beulah Park Undercrossing.Landscape mitigation for EA 05-0Q600.1989Y
0Q601$507
Subtotal: $507
2018-19 $500$18
$537
$1,055Total Project Cost: $1,562
05140001456/5/20194/5/2019
8/28/2014PA&ED:
RTL:R/W Cert:
1/22/2020Begin Con:
05-Santa Cruz-17PriorPrior18-19
201.33510 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.7/1.4
Con Sup:
Storm Water Mitigation
Const:R/W:
In Santa Cruz County, on Routes 1, 9, 17, 129,and 152 at various locations. Install AccessiblePedestrian Signals (APS).2590
1G160$1,700
$11
Subtotal: $1,711
2018-19$272$883$20
$486
$1,661Total Project Cost: $3,372
05140001181/11/201911/8/20188/1/2017PA&ED:
RTL:R/W Cert:
7/15/2019Begin Con:
05-Santa Cruz-Var PriorPriorPrior18-19
201.361176 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Near Watsonville, from 0.1 mile east of BeverlyDrive to Holohan Road/College Road. Constructpedestrian bridge next to the Corralitos CreekBridge, concrete barrier, retaining wall, curb,gutter and sidewalk to meet ADA standards.
2530
1F620$3,205
$247
Subtotal: $3,452
2021-22$1,621$2,430
$376$1,776
$6,203Total Project Cost: $9,655
05140000395/2/20224/1/20227/1/2020PA&ED:
RTL:R/W Cert:
10/22/2022Begin Con:
05-Santa Cruz-152 18-1920-2120-2121-22
201.3615 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
1.9/R2.0
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 236 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Cruz($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Boulder Creek, at San Lorenzo River BridgeNo. 36-0052 (PM 13.61) and Kings Creek BridgeNo. 36-0054 (PM 15.49). Replace bridges to maintain standards of safety and reliability.
2655
1H470$11,928
$660
Subtotal: $12,588
2021-22$2,692$2,884
$888$4,158
$10,622Total Project Cost: $23,210
051600007810/29/2021
9/3/20214/10/2020PA&ED:
RTL:R/W Cert:
3/4/2022Begin Con:
05-Santa Cruz-9 Prior19-2019-2021-22
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.6/15.5
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near the city of Santa Cruz, on Routes 1 and 17 atvarious locations. Bridge rail replacement andupgrades.2585
1F520$4,167
Subtotal: $4,167
2018-19 $902$47
$1,059
$2,008Total Project Cost: $6,175
05140000056/1/20183/1/20185/2/2015PA&ED:
RTL:R/W Cert:
12/1/2018Begin Con:
05-Santa Cruz-1PriorPriorPrior
201.1121375 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
In Capitola, at Soquel Creek Bridge No. 36-0013.Place Rock Slope Protection (RSP) to protectbridge foundation.2736
1H480$2,228
$546
Subtotal: $2,774
2021-22$1,591$1,370
$196$1,772
$4,929Total Project Cost: $7,703
05160000797/1/2021
4/29/202112/31/2019PA&ED:
RTL:R/W Cert:
2/1/2022Begin Con:
05-Santa Cruz-1 Prior19-2019-2021-22
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.3
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONNear the city of Santa Cruz, from North AptosUnderpass to Route 9. Rehabilitate pavement.
2432
1C850$14,952
$19
Subtotal: $14,971
2018-19$606
$1,030$10
$1,082
$2,728Total Project Cost: $17,699
05120002406/1/20186/1/2018
8/22/2016PA&ED:
RTL:R/W Cert:
2/1/2019Begin Con:
05-Santa Cruz-1 PriorPriorPrior18-19
201.12132 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.2/17.5
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 237 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Santa Cruz($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Davenport, from 1.4 miles north of SwantonRoad to 0.6 mile south of Waddell Creek.Replace and upgrade existing Corrugated MetalPipe (CMP) culverts with Reinforced ConcretePipe (RCP) culverts.
1967
0J200$3,570
$84
Subtotal: $3,654
2021-22$964
$1,940$344
$1,365
$4,613Total Project Cost: $8,267
05120000697/19/20217/9/2021
1/30/2020PA&ED:
RTL:R/W Cert:
12/27/2021Begin Con:
05-Santa Cruz-1 Prior19-2019-2021-22
201.1514 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
31.9/35.7
Con Sup:
Drainage System Restoration
Const:R/W:
ROADSIDE PRESERVATIONNear Scotts Valley, from 0.06 miles south ofLaurel Road to 0.25 miles north of Laurel Road.Construct wildlife Undercrossing.
Funding for PA&ED, PS&E and R/W only.Local contributions to fund remainingcomponents.
2593
1G260 $138
Subtotal: $138
2019-20$738
$2,013$226
$2,977Total Project Cost: $3,115
05140001312/4/2021
8/13/20207/17/2018PA&ED:
RTL:R/W Cert:
9/20/2021Begin Con:
05-Santa Cruz-17 Prior18-1918-19
201.2401 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.4/9.6
* Con Sup:
Roadside Enhancement
* Const, * Con Sup phase(s) are NOT authorized
* Const:R/W:
CountySanta Cruz
PA&ED:PS&E:
R/W Sup:Con Sup:
$3,602$63,166
R/W:
Subtotal: $66,768
Const:$12,900$21,889$5,197
$19,605
$59,591
Total (Capital + Support): $126,359
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 238 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Shasta($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Viola, from 0.4 mile east to 1.1 miles east ofBridge Creek Road. Curve Improvement.
3673
2H990$3,100
$14
Subtotal: $3,114
2019-20$670$810$80
$730
$2,290Total Project Cost: $5,404
02170000451/2/2020
12/2/20191/16/2019PA&ED:
RTL:R/W Cert:
5/5/2020Begin Con:
02-Shasta-44 Prior18-1918-1919-20
201.01014 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
51.6/52.2
Con Sup:
Safety Improvements
Const:R/W:
Near Shasta Lake City, at O’Brien SafetyRoadside Rest Area (SRRA). Upgrade potablewater system and wastewater systems.3552
4G580$3,007
$3
Subtotal: $3,010
2019-20$400
$1,180$140$940
$2,660Total Project Cost: $5,670
021400002710/1/20197/1/2019
12/1/2017PA&ED:
RTL:R/W Cert:
3/1/2020Begin Con:
02-Shasta-5 PriorPriorPrior19-20
201.2351 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R31.0/R31.7
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Redding, from 0.1 mile north of South ReddingUnderpass to 0.1 mile north of California Street.Construct ADA compliant ramps and sidewalks.3626
1H720$2,400
$402
Subtotal: $2,802
2021-22$0
$1,200$750
$1,050
$3,000Total Project Cost: $5,802
02160000338/13/20217/9/2021
9/30/2016PA&ED:
RTL:R/W Cert:
2/4/2022Begin Con:
02-Shasta-27318-1918-1921-22
201.37819 ADA unit(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
14.9/15.7
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
BRIDGE PRESERVATION Near Dunsmuir, at Crag View DriveUndercrossing Bridge No. 06-0095 (PM 66.8);also, at Sims Road Undercrossing No. 06-0111(PM 57.4). Replace bridges.
3543
4G41U$16,860
$36
Subtotal: $16,896
2018-19$1,250$2,880
$260$4,799
$9,189Total Project Cost: $26,085
02180000473/26/20192/22/20192/1/2018PA&ED:
RTL:R/W Cert:
8/27/2019Begin Con:
02-Shasta-5 PriorPriorPrior18-19
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 239 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Shasta($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Lakehead, at O’Brien Undercrossing No. 06-0148L. Rehabilitate bridge deck with concreteoverlay, upgrade bridge rails, and constructapproach slabs.
3630
1H390$2,215
$7
Subtotal: $2,222
2020-21$250$600$40
$580
$1,470Total Project Cost: $3,692
021600004110/26/20209/25/202011/5/2019PA&ED:
RTL:R/W Cert:
2/16/2021Begin Con:
02-Shasta-5 18-1919-2019-2020-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R32.2
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
ROADWAY PRESERVATIONIn and near Anderson, from Route 273 toSacramento River Bridge. Roadwayrehabilitation, update signage and lighting, andadd Intelligent Transportation System (ITS)elements.
3702
3H730$18,081$1,221
Subtotal: $19,302
2018-19$0
$3,000$220
$3,900
$7,120Total Project Cost: $26,422
02180000243/26/20192/22/20198/11/2017PA&ED:
RTL:R/W Cert:
9/24/2019Begin Con:
02-Shasta-5PriorPrior18-19
201.1206.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R3.8/R7.0
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In and near Anderson, from south of RiversideAvenue Overcrossing to south of SouthBonnyview Road/Churn Creek RoadOvercrossing. Rehabilitate roadway, upgrademedian barrier, update signage and lighting, andadd Intelligent Transportation System (ITS)elements. This project is combined with anexisting STIP project 02-4C403.
3670
2H880$13,900
Subtotal: $13,900
2018-19
$2,200
$2,200Total Project Cost: $16,100
02170000265/4/2018
11/30/20152/28/2013PA&ED:
RTL:R/W Cert:
10/30/2018Begin Con:
02-Shasta-5
18-19
201.12120.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R6.2/R11.7
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Burney, from 2.6 miles east of Carberry FlatRoad to 0.3 mile east of Burney Mountain PowerRoad. Rehabilitate pavement, upgrade guardrail,and make curbs ADA compliant.
3618
1H570$11,165
$436
Subtotal: $11,601
2021-22$1,430$1,300$1,020$2,430
$6,180Total Project Cost: $17,781
02160000364/4/20223/4/20229/8/2020PA&ED:
RTL:R/W Cert:
8/30/2022Begin Con:
02-Shasta-299 18-1920-2119-2021-22
201.12121.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
67.8/77.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 240 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Shasta($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyShasta
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,119$70,728
R/W:
Subtotal: $72,847
Const:$4,000
$10,970$2,510
$16,629
$34,109
Total (Capital + Support): $106,956
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 241 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sierra($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Sierra, Nevada, and El Dorado Counties onRoutes 49, 89 and 193 at various locations.Upgrade guard rail to current standards.7778
4F630$1,410
$60
Subtotal: $1,470
2018-19$85
$605$10
$590
$1,290Total Project Cost: $2,760
03140002319/1/20188/1/2018
7/25/2017PA&ED:
RTL:R/W Cert:
3/1/2019Begin Con:
03-Sierra-49 PriorPriorPrior18-19
201.0154 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/15.9
Con Sup:
Collision Severity Reduction
Const:R/W:
ROADWAY PRESERVATIONNear Truckee and Floriston, from 1.3 miles eastof the Nevada County line to the Nevada Stateline. Stabilize cut-slope erosion and preventrockfall by flattening the slope or installing adrapery system, concrete barrier, and drainage gutter.
7926
2H010$5,100
$80
Subtotal: $5,180
2021-22$370$860$210$900
$2,340Total Project Cost: $7,520
031700004510/15/202110/1/20218/1/2019PA&ED:
RTL:R/W Cert:
4/1/2022Begin Con:
03-Sierra-80 18-1919-2019-2021-22
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
1.3/1.6
Con Sup:
Roadway Protective Betterments
Const:R/W:
CountySierra
PA&ED:PS&E:
R/W Sup:Con Sup:
$140$6,510
R/W:
Subtotal: $6,650
Const:$455
$1,465$220
$1,490
$3,630
Total (Capital + Support): $10,280
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 242 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Siskiyou($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn and near various cities, at various locations,from Shasta County line to Oregon State line (PMR69.293). Enhance traffic safety by improvingthe roadside clear recovery zone.
3507
4F520$3,540
$95
Subtotal: $3,635
2021-22$1,000$1,000
$200$1,250
$3,450Total Project Cost: $7,085
02130000028/23/20217/23/20215/1/2020PA&ED:
RTL:R/W Cert:
12/14/2021Begin Con:
02-Siskiyou-5 18-1920-2120-2121-22
201.01560 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/R69.2
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Weed, from 0.2 mile south to 0.3 mile northof Weed Airport Safety Roadside Rest Area.Upgrade wastewater and water systems.3657
2H130$1,663
$11
Subtotal: $1,674
2020-21$260$770$30
$680
$1,740Total Project Cost: $3,414
02160001149/16/20208/12/2020
10/16/2019PA&ED:
RTL:R/W Cert:
4/14/2021Begin Con:
02-Siskiyou-5 18-1919-2019-2020-21
201.2352 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R25.4/R25.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
BRIDGE PRESERVATIONNorth of Fort Jones, from 0.3 mile south to 0.3mile north of West Moffett Creek Road at MoffettCreek Bridge No. 02-0042. Bridge replacement.3546
4G440$3,920
$237
Subtotal: $4,157
2020-21$1,340
$700$80
$1,540
$3,660Total Project Cost: $7,817
02140000138/28/20207/31/20209/6/2019PA&ED:
RTL:R/W Cert:
2/26/2021Begin Con:
02-Siskiyou-3 Prior19-2019-2020-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
38.0/38.6
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Dunsmuir, from Central DunsmuirUndercrossing to 0.1 mile north of SiskiyouAvenue at Sacramento River Bridge andOverhead No. 02-0002. Replace southboundbridge deck.
3614
1H480$14,350
$269
Subtotal: $14,619
2021-22$1,440$2,660
$450$3,480
$8,030Total Project Cost: $22,649
02160000191/21/2022
12/15/20214/15/2020PA&ED:
RTL:R/W Cert:
9/20/2022Begin Con:
02-Siskiyou-5 Prior19-2019-2021-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.5/3.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 243 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Siskiyou($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Mt. Shasta, at Azalea Road OvercrossingNo. 02-0126. Rehabilitate bridge.
3631
1H400$1,851
$7
Subtotal: $1,858
2020-21$320$750$40
$710
$1,820Total Project Cost: $3,678
021600004210/26/20209/25/202010/7/2019PA&ED:
RTL:R/W Cert:
4/10/2021Begin Con:
02-Siskiyou-5 18-1919-2019-2020-21
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R8.3
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In and near Yreka at Louie Road Overcrossing(OC) No. 02-0137 (PM R31.2), Moonlit OaksAvenue Undercrossing (UC) No. 02-0159R&L(PM R45.6), Miner Street UC No. 02-0158R&L(PM R47.6), and North Yreka Separation No. 02-0150R&L (PM R48.2); also, in Redding, ShastaCounty, at N273-N5 Connector OC No. 06 -0137G (PM R18.5). Establish standard verticalclearance and improve to standard truck capacity.
ACCELERATED BRIDGE (PA&ED Only)
3696
3H640$28,200
$149
Subtotal: $28,349
2020-21$2,790$1,820
$90$6,200
$10,900Total Project Cost: $39,249
02180000037/21/20206/19/20203/1/2019PA&ED:
RTL:R/W Cert:
12/22/2020Begin Con:
02-Siskiyou-5 Prior19-2019-2020-21
201.3228 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
ROADWAY PRESERVATIONIn Yreka, from 0.4 mile north of Laura Lane toJuniper Drive; also on Route 263 from Route 3 to1.0 mile south of Long Gulch Road (PM 49.07 to49.41). Reconstruct pavement structural section,replace sidewalk, driveways, curb ramps andpedestrian signals to meet current ADA standards,designate bikeways with new signage andpavement delineation.
3643
1H520$52,950$1,482
Subtotal: $54,432
2021-22$1,830$2,200$5,880$9,650
$19,560Total Project Cost: $73,992
02170000093/21/20223/4/2022
11/4/2019PA&ED:
RTL:R/W Cert:
9/27/2022Begin Con:
02-Siskiyou-3 18-1919-2019-2021-22
201.12012.95 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R46.8/R48.0
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In and near Dunsmuir and Mt. Shasta, fromSacramento River Bridge Overhead to BlackButte Overhead. Roadway rehabilitation.3685
3H320$116,040
$135
Subtotal: $116,175
2021-22$1,620$5,090
$80$12,860
$19,650Total Project Cost: $135,825
02170000973/10/202210/4/202110/2/2020PA&ED:
RTL:R/W Cert:
9/27/2022Begin Con:
02-Siskiyou-5 Prior20-2120-2121-22
201.12225.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.7/R15.9
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 244 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Siskiyou($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Happy Camp, from 0.3 miles west ofSwillup Creek Bridge to Route 263. Drainagesystem restoration.3601
1H090$2,070
$200
Subtotal: $2,270
2019-20$1,040
$730$530
$1,060
$3,360Total Project Cost: $5,630
02150001053/2/2020
2/17/20203/29/2019PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
02-Siskiyou-96 Prior18-1918-1919-20
201.15120 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
23.0/103.4
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYIn Siskiyou and Shasta Counties, on Routes 5 and89 at various locations. Upgrade TransportationManagement System (TMS) field elements.3556
4G630$3,600
$196
Subtotal: $3,796
2018-19$390$710$140$720
$1,960Total Project Cost: $5,756
02140000301/28/20191/22/2019
12/15/2017PA&ED:
RTL:R/W Cert:
8/6/2019Begin Con:
02-Siskiyou-5 PriorPriorPrior18-19
201.31516 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
CountySiskiyou
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,781$228,184
R/W:
Subtotal: $230,965
Const:$12,030$16,430$7,520
$38,150
$74,130
Total (Capital + Support): $305,095
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 245 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Solano($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONIn Benicia, from north of Industrial Way to southof Lake Herman Road. Repair slip-outs andstabilize slope.1498M
4J040$1,040
$38
Subtotal: $1,078
2019-20$560$514$22
$521
$1,617Total Project Cost: $2,695
04150002464/16/2019
11/20/20197/31/2018PA&ED:
RTL:R/W Cert:
7/17/2019Begin Con:
04-Solano-680 Prior18-1918-1919-20
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R1.9/R2.0
Con Sup:
Permanent Restoration
Const:R/W:
BRIDGE PRESERVATIONNear Rio Vista, at Miner Slough Bridge No. 23-0035. Replace bridge.
0886
0G660$24,500$2,884
Subtotal: $27,384
2018-19$300
$3,500$1,098$3,500
$8,398Total Project Cost: $35,782
040000034311/30/2018
8/1/20189/29/2017PA&ED:
RTL:R/W Cert:
7/22/2019Begin Con:
04-Solano-84 PriorPriorPrior18-19
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
12.1/12.2
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Fairfield, at Suisun Creek Bridge No. 23-0007. Scour mitigation.
0487R
4G872$760
$5
Subtotal: $765
2019-20$1,200
$600$20
$600
$2,420Total Project Cost: $3,185
04160001534/1/20204/1/20209/3/2018PA&ED:
RTL:R/W Cert:
10/1/2020Begin Con:
04-Solano-80 Prior18-1918-1919-20
201.1112 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
14.6
Con Sup:
Bridge Scour Mitigation
Const:R/W:
In and near Vallejo, Dixon and Vacaville, atRoute 80/29 Separation Bridge No. 23-0087,McCune Creek Bridge No. 23-0084L/R andHorse Creek Bridge No. 23-0077L. Bridgepreventative maintenance.
0480N
0J600$1,379
$423
Subtotal: $1,802
2019-20$990$880$66
$880
$2,816Total Project Cost: $4,618
04140000175/31/20202/28/20208/31/2018PA&ED:
RTL:R/W Cert:
11/2/2020Begin Con:
04-Solano-80 Prior18-1918-1919-20
201.1194 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.1/34.5
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 246 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Solano($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Rio Vista, at the Cache Slough FerryCrossing. Upgrade the existing fender systems,concrete ramps, and swing gate systems, modifythe ferry boat deck surface, and install trafficcounter and Vehicle Detection Systems (VDS).
0480D
4H060$12,630
$350
Subtotal: $12,980
2021-22$2,080$2,080
$260$2,080
$6,500Total Project Cost: $19,480
04130000816/1/20225/1/2022
10/1/2020PA&ED:
RTL:R/W Cert:
12/1/2022Begin Con:
04-Solano-84 18-1920-2120-2121-22
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
2.5
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In Vallejo, at Route 80/29 Separation Bridge No.23-0087. Replace bridge.
ACCELERATED BRIDGE (PA&ED Only) 1452F
2K840$11,922
$15
Subtotal: $11,937
2019-20$2,057$2,624
$22$2,416
$7,119Total Project Cost: $19,056
04170000316/8/20205/4/2020
12/3/2018PA&ED:
RTL:R/W Cert:
1/15/2021Begin Con:
04-Solano-80 19-2019-2019-2019-20
201.3221 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
1.1
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
In Vallejo, from Magazine Street OvercrossingNo. 23-0066 to Redwood Street Overcrossing No.23-0114. Increase vertical clearance at sixovercrossing structures.
ACCELERATED BRIDGE
0481R
0J710$15,951
$10
Subtotal: $15,961
2018-19$1,870$2,154
$154$1,859
$6,037Total Project Cost: $21,998
041400002911/1/20197/1/2019
6/29/2018PA&ED:
RTL:R/W Cert:
6/1/2020Begin Con:
04-Solano-80 Prior18-1918-1918-19
201.3226 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.8/4.4
Con Sup:
Trans Permit Requirements for Bridges
Const:R/W:
ROADWAY PRESERVATIONIn and near Rio Vista, from Currie Road toSacramento County line. Roadway rehabilitation.
0480P
0J630$73,200$2,983
Subtotal: $76,183
2021-22$5,780$5,780$2,890
$11,560
$26,010Total Project Cost: $102,193
04140000202/1/20222/1/2022
10/1/2019PA&ED:
RTL:R/W Cert:
8/1/2022Begin Con:
04-Solano-12 Prior19-2019-2021-22
201.1209.7 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
20.6/26.4
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 247 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Solano($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountySolano
PA&ED:PS&E:
R/W Sup:Con Sup:
$6,708$141,382
R/W:
Subtotal: $148,090
Const:$14,837$18,132$4,532
$23,416
$60,917
Total (Capital + Support): $209,007
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 248 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sonoma($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Jenner, from 0.3 to 0.4 mile north of MyersGrade Road. Permanent restoration of roadwayslip-outs.0482T
0J300$13,856
$215
Subtotal: $14,071
2020-21$2,106$2,496
$208$2,288
$7,098Total Project Cost: $21,169
041300043312/15/20209/15/20204/15/2019PA&ED:
RTL:R/W Cert:
8/15/2021Begin Con:
04-Sonoma-1 18-1918-1918-1920-21
201.1312 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
26.7/27.0
Con Sup:
Permanent Restoration
Const:R/W:
Near Petaluma, north of Pepper Road. Repairslide.
0481B
0J100$800$850
Subtotal: $1,650
2018-19$423$850$150$850
$2,273Total Project Cost: $3,923
04130004083/15/2019
12/13/20186/15/2018PA&ED:
RTL:R/W Cert:
8/30/2019Begin Con:
04-Sonoma-101 Prior18-19Prior18-19
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.0
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONNear Schellville, from north of Tolay CreekBridge to south of Yellow Creek Bridge. Widenfor standard shoulders, upgrade curves tostandard, and install rumble strips.
0738
0G680$25,000$6,264
Subtotal: $31,264
2019-20$2,500$3,750$1,800$4,200
$12,250Total Project Cost: $43,514
04000200076/15/20206/1/2020
6/30/2018PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
04-Sonoma-121 Prior18-19Prior19-20
201.01013 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.4/6.5
Con Sup:
Safety Improvements
Const:R/W:
In Sonoma County, on Routes 12 and 116 atvarious locations; also, in Marine County onRoutes 1 and 131 at various locations; and inNapa County on Routes 29 and 121 at variouslocations. Install hybrid beacons, stop and yieldlines, crosswalks and bulbouts, and upgrade curbramps to enhance pedestrian safety.
1492G
0K130$2,777
$36
Subtotal: $2,813
2021-22$800$960$70
$850
$2,680Total Project Cost: $5,493
04160000451/2/20229/1/20215/1/2020PA&ED:
RTL:R/W Cert:
6/1/2022Begin Con:
04-Sonoma-12 18-1919-2019-2021-22
201.01527 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 249 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sonoma($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In various cities, on Routes 12, 101, and 116 atvarious locations; also in Marin County on Route101 at various locations. Highway worker safetyimprovements.
0480E
0J680$2,190
$10
Subtotal: $2,200
2018-19$308$550$44
$550
$1,452Total Project Cost: $3,652
04140000255/1/2019
3/20/201910/31/2017PA&ED:
RTL:R/W Cert:
12/10/2019Begin Con:
04-Sonoma-12 PriorPriorPrior18-19
201.23527 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
9.5/31.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESNear Monte Rio and Cloverdale, on Routes 116and 128; also in Marin County, on Route 101, at0.4 mile north of Sir Francis Drake Boulevard(PM 9.25). Stabilized soil and erosion control tomitigate for storm water quality.
1487F
2J840$2,816
$370
Subtotal: $3,186
2019-20$685$670$80
$655
$2,090Total Project Cost: $5,276
041500008512/1/2019
11/30/20199/30/2018PA&ED:
RTL:R/W Cert:
5/15/2020Begin Con:
04-Sonoma-116 Prior18-19Prior19-20
201.33512.08 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.5/10.5
Con Sup:
Storm Water Mitigation
Const:R/W:
Near Guerneville, from Brookside Lane to RiverRoad. Upgrade curb ramps and sidewalk, andinstall Accessible Pedestrian Signal (APS)pushbuttons to make facilities compliant with theADA standards.
1491B
4J460$2,990
$68
Subtotal: $3,058
2021-22$300$850$225$850
$2,225Total Project Cost: $5,283
04150003515/2/2022
1/20/20224/1/2020PA&ED:
RTL:R/W Cert:
11/11/2022Begin Con:
04-Sonoma-116 18-1919-2019-2021-22
201.36118 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
11.8/R12.2
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONIn and near Sonoma, at Sonoma Creek Bridge No.20-0027 and Hooker Creek Bridge No. 20-0030.Scour mitigation.0269M
4H050$9,000
$150
Subtotal: $9,150
2019-20$1,519$2,650
$500$2,000
$6,669Total Project Cost: $15,819
04130000802/7/2020
12/16/20196/1/2018PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
04-Sonoma-12 PriorPriorPrior19-20
201.1112 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
25.8/33.3
Con Sup:
Bridge Scour Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 250 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sonoma($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Santa Rosa, at Todd RoadOvercrossing (OC) No. 20-0172 (PM 16.54) andBaker Avenue OC No. 20-0173 (PM 19.00); also,in Marin County near Navato, at Miller CreekRoad OC No. 27-0082 (PM 15.57). Upgradebridge rails.
1451A
2K240$4,343
$116
Subtotal: $4,459
2021-22$650$780$130$988
$2,548Total Project Cost: $7,007
04160003949/1/20218/1/2021
10/1/2019PA&ED:
RTL:R/W Cert:
3/1/2021Begin Con:
04-Sonoma-101 18-1919-2019-2021-22
201.1121395 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
16.5/19.0
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Petaluma, at San Antonio Creek Bridges No.20-0019L/R. Abutment scour mitigation andchannel sediment cleaning to address flooding.1487D
3J080$997$160
Subtotal: $1,157
2021-22$982$416$24
$468
$1,890Total Project Cost: $3,047
041500007812/1/202112/1/202110/1/2020PA&ED:
RTL:R/W Cert:
6/1/2022Begin Con:
04-Sonoma-101 Prior20-2120-2121-22
201.1192 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONIn and near Santa Rosa, from Llano Road toFarmers Lane. Rehabilitate pavement, upgradeguardrail to make standard, and upgrade curbramps to make ADA compliant.
1493M
0K520$27,681
$280
Subtotal: $27,961
2021-22$2,084$2,900
$66$3,350
$8,400Total Project Cost: $36,361
041600009812/1/202111/1/20214/1/2020PA&ED:
RTL:R/W Cert:
5/2/2022Begin Con:
04-Sonoma-12 18-1919-2019-2021-22
201.12122 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
11.0/T17.4
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Sonoma, from Vallejo Avenue to eastof Leveroni Road/Napa Road. Pavementrehabilitation.0488K
1J360$6,208
$5
Subtotal: $6,213
2019-20$808$870$62
$746
$2,486Total Project Cost: $8,699
04140002022/1/20201/2/20204/1/2018PA&ED:
RTL:R/W Cert:
7/30/2020Begin Con:
04-Sonoma-12 PriorPriorPrior19-20
201.1217.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
35.1/38.9
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 251 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sonoma($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Windsor, Healdsburg, and Cloverdale,from Old Redwood Highway to 2 miles south ofMendocino County line. Roadway rehabilitation.1482F
0J642$68,200
$890
Subtotal: $69,090
2018-19$5,149$6,799
$170$7,600
$19,718Total Project Cost: $88,808
04140004766/28/20196/20/20196/30/2018PA&ED:
RTL:R/W Cert:
11/1/2019Begin Con:
04-Sonoma-101 PriorPriorPrior18-19
201.12243.2 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
29.3/R54.3
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Near Jenner, from south of Fort Ross Road tonorth of Moon Rock Campground at various locations. Rehabilitate drainage culverts.1453J
1K730$4,256
$321
Subtotal: $4,577
2021-22$744
$1,369$429
$1,385
$3,927Total Project Cost: $8,504
04160003076/1/2022
6/15/202210/15/2020PA&ED:
RTL:R/W Cert:
1/1/2023Begin Con:
04-Sonoma-1 Prior20-2120-2121-22
201.15122 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
30.8/40.6
Con Sup:
Drainage System Restoration
Const:R/W:
Near Gualala, from north of Moon RockCampground to 0.1 mile north of Vantage Road.Rehabilitate drainage culverts.1462M
1K750$4,761
$382
Subtotal: $5,143
2021-22$1,050$1,571
$286$1,040
$3,947Total Project Cost: $9,090
04160003096/15/20226/15/2022
10/15/2020PA&ED:
RTL:R/W Cert:
1/16/2023Begin Con:
04-Sonoma-1 Prior20-2120-2121-22
201.15126 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
41.5/54.6
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYNear Vallejo, at east of Route 121. ReplaceWeigh In Motion (WIM) systems.
0763L
1A210$2,280
$10
Subtotal: $2,290
2018-19$506$592$20
$554
$1,672Total Project Cost: $3,962
04140004878/15/20197/15/20194/1/2018PA&ED:
RTL:R/W Cert:
12/30/2019Begin Con:
04-Sonoma-37 PriorPriorPrior18-19
201.3212 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
2.6
Con Sup:
Weigh Stations
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 252 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sonoma($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountySonoma
PA&ED:PS&E:
R/W Sup:Con Sup:
$10,127$178,155
R/W:
Subtotal: $188,282
Const:$20,614$28,073$4,264
$28,374
$81,325
Total (Capital + Support): $269,607
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 253 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Stanislaus($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Westley, at the Westley Safety RoadsideRest Area (SRRA). Upgrade water andwastewater systems.3009
0W630$4,001
$5
Subtotal: $4,006
2018-19$260$904
$6$806
$1,976Total Project Cost: $5,982
10120000218/1/20187/2/2018
6/30/2015PA&ED:
RTL:R/W Cert:
3/1/2019Begin Con:
10-Stanislaus-5 PriorPriorPrior18-19
201.2351 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
27.0/27.5
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Turlock, from north of Golf Road tonorth of Taylor Road. Highway worker safety improvements.3143
0X660$2,093
$3
Subtotal: $2,096
2018-19$306$595$18
$574
$1,493Total Project Cost: $3,589
101300024911/15/201810/15/2018
7/7/2017PA&ED:
RTL:R/W Cert:
5/2/2019Begin Con:
10-Stanislaus-99 PriorPriorPrior18-19
201.23540 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R1.1/R7.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In and near Modesto, at various locations from0.1 mile south of Modesto Undercrossing toWoodland Avenue. Pave areas behind the goreand at slopes, upgrade guardrail and placevegetative control, and construct maintenancevehicle pullouts to reduce maintenance andimprove highway worker safety.
3189
0X670$3,692
$8
Subtotal: $3,700
2019-20$330
$1,232$0
$673
$2,235Total Project Cost: $5,935
101600002710/1/20199/15/20193/1/2019PA&ED:
RTL:R/W Cert:
4/15/2020Begin Con:
10-Stanislaus-99 18-1918-19
19-20
201.23531 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R13.8/R17.6
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Modesto, from 0.1 mile south of KansasAvenue and 0.4 mile north of Route 132 Separation; also, on adopted Route 132 alignmentright-of-way from 0.2 mile west of Emerald Avenue and 0.3 mile east of Emerald Avenue (PM 13.7/14.3). Hazardous waste mitigation.
3125
1E700$2,400
$27
Subtotal: $2,427
2018-19$813$916$18
$900
$2,647Total Project Cost: $5,074
101500011511/1/201810/1/20183/15/2018PA&ED:
RTL:R/W Cert:
3/1/2019Begin Con:
10-Stanislaus-99 PriorPriorPrior18-19
201.3303 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R16.5/R16.7
Con Sup:
Hazardous Waste Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 254 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Stanislaus($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Riverbank, at 2nd Street and 4th Street.Upgrade curb ramps, sidewalk and crosswalks.
3010B
0W902$310$87
Subtotal: $397
2018-19 $715$180$200
$1,095Total Project Cost: $1,492
10170001556/14/20195/31/2019
PA&ED:
RTL:R/W Cert:
1/31/2020Begin Con:
10-Stanislaus-108PriorPrior18-19
201.3616 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In Waterford, from Reinway Avenue to F Street.Upgrade pedestrian facilities to make compliantwith the ADA standards.3241
1G420$2,000
$84
Subtotal: $2,084
2021-22$683
$1,337$723$718
$3,461Total Project Cost: $5,545
10170000139/1/20218/2/2021
5/29/2019PA&ED:
RTL:R/W Cert:
3/18/2022Begin Con:
10-Stanislaus-132 18-1918-1918-1921-22
201.36173 ADA unit(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
27.2/28.0
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
ROADWAY PRESERVATIONIn and near Riverbank, at 8th Street. Repair slopewith retaining wall.
5411
0H480$1,824
$52
Subtotal: $1,876
2018-19 $1,439$98
$631
$2,168Total Project Cost: $4,044
10120001934/17/20192/28/20196/30/2015PA&ED:
RTL:R/W Cert:
10/30/2019Begin Con:
10-Stanislaus-108PriorPrior18-19
201.1502 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
33.2
Con Sup:
Roadway Protective Betterments
Const:R/W:
In and near Ceres and Modesto, at variouslocations from Mitchell Road to Kansas Avenue;also, in Merced County on Route 59 near the cityof Merced, at Childs Avenue (PM 14.0). Upgrade drainage pump plants.
3251
1E620$6,440
$13
Subtotal: $6,453
2020-21$278
$1,142$93
$1,991
$3,504Total Project Cost: $9,957
10160000179/9/2020
8/10/20206/29/2019PA&ED:
RTL:R/W Cert:
3/26/2021Begin Con:
10-Stanislaus-99 18-1919-2019-2020-21
201.1516 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R10.0/R16.8
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 255 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Stanislaus($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MOBILITYNear Ceres and Modesto, in the northbounddirection from Hatch Road onramp to S. 9thStreet offramp. Construct auxiliary lane.0037
0L870$3,750$1,259
Subtotal: $5,009
2019-20$1,110$1,427
$141$1,012
$3,690Total Project Cost: $8,699
10150000036/1/20205/1/20202/1/2018PA&ED:
RTL:R/W Cert:
11/16/2020Begin Con:
10-Stanislaus-99 PriorPriorPrior19-20
201.310110 1,000 vehicle hour(s)/yrPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R13.4/R13.8
Con Sup:
Operational Improvements
Const:R/W:
In San Joaquin, Merced, Stanislaus, andSacramento Counties, at various routes andlocations. Upgrade TTI System. 3286
1G440$1,619
$6
Subtotal: $1,625
2019-20$163$377
$4$401
$945Total Project Cost: $2,570
10180000834/7/2020
1/28/20207/1/2019PA&ED:
RTL:R/W Cert:
8/17/2020Begin Con:
10-Stanislaus-99 18-1918-1918-1919-20
201.315161 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Transportation Management Systems
Const:R/W:
CountyStanislaus
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,544$28,129
R/W:
Subtotal: $29,673
Const:$3,943
$10,084$1,281$7,906
$23,214
Total (Capital + Support): $52,887
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 256 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Sutter($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONIn Live Oak, at Elm Street and Pennington Road.Intersection safety improvements.
8381
2H230$3,800
$100
Subtotal: $3,900
2019-20$500$630$620$660
$2,410Total Project Cost: $6,310
03170000839/1/20199/1/20198/1/2017PA&ED:
RTL:R/W Cert:
3/1/2020Begin Con:
03-Sutter-99 PriorPriorPrior19-20
201.01051 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
40.0/40.5
Con Sup:
Safety Improvements
Const:R/W:
ROADWAY PRESERVATIONIn Live Oak, from 0.1 mile north of ColemanAvenue to 0.2 mile north of Ramsdell Drive.Roadway rehabilitation.8378
1H150$18,100
Subtotal: $18,100
2019-20$20
$380$50
$1,500
$1,950Total Project Cost: $20,050
03160000619/1/20199/1/20199/1/2018PA&ED:
RTL:R/W Cert:
3/1/2020Begin Con:
03-Sutter-99 Prior19-20Prior19-20
201.1204.8 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
39.4/41.0
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
ROADSIDE PRESERVATIONIn Sutter, Glenn, Colusa, Yuba, Placer, Yolo, andSacramento Counties at various locations.Advance mitigation credit purchases for futureSHOPP construction projects expected to impactsensitive species.
8380
1H520 $1,400
Subtotal: $1,400
2018-19$62$4
$43$1
$110Total Project Cost: $1,510
03160001763/4/20193/4/20192/1/2019PA&ED:
RTL:R/W Cert:
5/1/2019Begin Con:
03-Sutter-99 Prior19-2019-2018-19
201.2409 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/42.4
Con Sup:
Roadside Enhancement
Const:R/W:
CountySutter
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,500$21,900
R/W:
Subtotal: $23,400
Const:$582
$1,014$713
$2,161
$4,470
Total (Capital + Support): $27,870
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 257 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tehama($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Red Bluff, from 2.3 miles east to 2.8 mileseast of Dry Creek Bridge. Curve improvement.
3640
1H970$3,000
$109
Subtotal: $3,109
2019-20$390$670$210$670
$1,940Total Project Cost: $5,049
02160000518/16/20197/19/20195/10/2018PA&ED:
RTL:R/W Cert:
11/29/2019Begin Con:
02-Tehama-36 Prior18-1918-1919-20
201.01020 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
12.6/13.1
Con Sup:
Safety Improvements
Const:R/W:
Near Red Bluff, from west of Basler Road to eastof Diamond Star Road. Curve improvement.
3663
2H630$3,200
$476
Subtotal: $3,676
2019-20$695$885$685
$1,200
$3,465Total Project Cost: $7,141
02160001563/26/20202/24/2020
11/20/2018PA&ED:
RTL:R/W Cert:
7/14/2020Begin Con:
02-Tehama-36 Prior18-1918-1919-20
201.01016 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
26.6/27.6
Con Sup:
Safety Improvements
Const:R/W:
Near Mineral, from 0.1 mile to 1.2 miles east ofRoute 89. Curve improvement.
3641
1H740$4,324
$401
Subtotal: $4,725
2019-20$840$751$50
$1,240
$2,881Total Project Cost: $7,606
02160000527/1/2019
5/31/20193/2/2018PA&ED:
RTL:R/W Cert:
10/15/2019Begin Con:
02-Tehama-36 PriorPriorPrior19-20
201.01024 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
87.8/88.8
Con Sup:
Safety Improvements
Const:R/W:
Near Red Bluff, from Nine Mile HillOvercrossing to 0.1 mile north of Bowman RoadOvercrossing. Improve median clear recoveryzone and widen inside shoulder to make standardfor enhanced errant vehicle safety.
3632
1H470$4,530
$470
Subtotal: $5,000
2020-21$930$800$40
$1,030
$2,800Total Project Cost: $7,800
02160000443/22/20212/19/20213/2/2020PA&ED:
RTL:R/W Cert:
8/17/2021Begin Con:
02-Tehama-5 18-1919-2019-2020-21
201.01530 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
36.3/41.6
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 258 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tehama($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MANDATESNear Los Molinos, from Josephine Street to LosMolinos Creek Bridge. Construct curb ramps,sidewalks, lighting and drainage improvements.3606
1H320$4,600
$891
Subtotal: $5,491
2018-19$310$460$230$640
$1,640Total Project Cost: $7,131
02150001263/19/20192/12/2019
12/15/2017PA&ED:
RTL:R/W Cert:
8/3/2019Begin Con:
02-Tehama-99 PriorPriorPrior18-19
201.37828 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
12.0/12.6
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
BRIDGE PRESERVATIONNear Los Molinos, from 0.2 mile south to 0.2mile north of Champlin Slough Bridge No. 08-0006. Replace bridge to correct scour criticalconditions.
3642
1H510$4,370
$90
Subtotal: $4,460
2021-22$850
$1,170$90
$990
$3,100Total Project Cost: $7,560
021600014811/24/202110/22/2021
5/5/2020PA&ED:
RTL:R/W Cert:
4/19/2022Begin Con:
02-Tehama-99 18-1919-2019-2021-22
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
9.0/9.3
Con Sup:
Bridge Scour Mitigation
Const:R/W:
In Red Bluff, at Sacramento River Bridge No. 08-0095L/R. Retrofit bridges.
3515
4F590$22,100
$56
Subtotal: $22,156
2019-20$1,592$1,659
$280$3,962
$7,493Total Project Cost: $29,649
021300001012/25/201911/24/20197/17/2018PA&ED:
RTL:R/W Cert:
6/24/2020Begin Con:
02-Tehama-5 Prior18-1918-1919-20
201.1132 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R25.4
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In Tehama County, on Routes 5, 32, and 36 atvarious locations; also in Shasta County onRoutes 5 and 44; also in Lassen County on Route299 at various locations. Bridge scour preventionat 9 bridges.
3549
4G530$1,400
$147
Subtotal: $1,547
2019-20$780$720$50
$600
$2,150Total Project Cost: $3,697
02140000233/30/20202/28/20202/18/2019PA&ED:
RTL:R/W Cert:
8/26/2020Begin Con:
02-Tehama-Var Prior18-1918-1919-20
201.1199 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 259 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tehama($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn Red Bluff, from east of Baker Road to east ofEast Sand Slough Bridge. Pavement rehabilitation.3558
4G540$6,600
$57
Subtotal: $6,657
2019-20$700$650$240
$1,020
$2,610Total Project Cost: $9,267
02140000248/2/20197/2/2019
12/22/2017PA&ED:
RTL:R/W Cert:
2/19/2020Begin Con:
02-Tehama-36 PriorPriorPrior19-20
201.12110.1 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
40.3/42.1
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Red Bluff, from Shasta County line to Route32 at various locations. Drainage systemrestoration.3550
4G560$2,525
$351
Subtotal: $2,876
2019-20$760$660$620
$1,310
$3,350Total Project Cost: $6,226
021400002510/10/2019
9/3/20197/23/2018PA&ED:
RTL:R/W Cert:
2/13/2020Begin Con:
02-Tehama-36 Prior18-1918-1919-20
201.15125 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.0/100.0
Con Sup:
Drainage System Restoration
Const:R/W:
MOBILITYNear Red Bluff, from 0.3 mile north of SnivelyRoad Overcrossing to 0.4 mile north of BowmanRoad Overcrossing. Upgrade southboundCottonwood Commercial Vehicle EnforcementFacility (CVEF).
3611
1H680$13,200
$35
Subtotal: $13,235
2021-22$450
$2,170$50
$2,320
$4,990Total Project Cost: $18,225
021600001011/8/202110/8/20215/5/2020PA&ED:
RTL:R/W Cert:
5/17/2022Begin Con:
02-Tehama-5 18-1919-2019-2021-22
201.3211 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
39.0/41.9
Con Sup:
Weigh Stations
Const:R/W:
ROADSIDE PRESERVATIONIn Tehama, Lassen, Modoc, Plumas, Shasta, andTrinity Counties at various locations. Advancemitigation credit purchases for future SHOPPconstruction projects expected to impact sensitivehabitats.
3627
1H640$0
$1,357
Subtotal: $1,357
2018-19$0$0
$100$0
$100Total Project Cost: $1,457
02160000319/14/20189/14/20187/2/2018PA&ED:
RTL:R/W Cert:
10/15/2018Begin Con:
02-Tehama-Var
Prior
201.2406 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Roadside Enhancement
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 260 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tehama($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyTehama
PA&ED:PS&E:
R/W Sup:Con Sup:
$4,440$69,849
R/W:
Subtotal: $74,289
Const:$8,297
$10,595$2,645
$14,982
$36,519
Total (Capital + Support): $110,808
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 261 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Trinity($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Platina, from 3.7 miles to 3.0 miles west ofHayfork Creek Bridge. Curve improvement.
3653
2H050$5,280
$52
Subtotal: $5,332
2019-20$760
$1,130$130
$1,680
$3,700Total Project Cost: $9,032
02160000932/18/20202/4/20202/1/2019PA&ED:
RTL:R/W Cert:
7/15/2020Begin Con:
02-Trinity-36 Prior18-1918-1919-20
201.01012 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R34.7/R35.3
Con Sup:
Safety Improvements
Const:R/W:
Near Salyer, from 0.1 mile west to 0.4 mile westof White House Gulch Road. Improve roadsideclear recovery zone.3557
4G500$2,732
$7
Subtotal: $2,739
2019-20$550
$1,220$70
$1,540
$3,380Total Project Cost: $6,119
02140000319/16/20198/16/20194/27/2018PA&ED:
RTL:R/W Cert:
3/3/2020Begin Con:
02-Trinity-299 Prior18-1918-1919-20
201.0153 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.9/2.1
Con Sup:
Collision Severity Reduction
Const:R/W:
In Trinity County, on Route 299 and Route 3 atvarious locations; also, in Shasta County onRoute 299 at PM 0.1. Make worker safetyimprovements.
3555
4G610$2,500
$79
Subtotal: $2,579
2018-19$425$745$160$775
$2,105Total Project Cost: $4,684
02140000283/18/20192/11/201911/9/2017PA&ED:
RTL:R/W Cert:
8/13/2019Begin Con:
02-Trinity-299 PriorPriorPrior18-19
201.23512 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Near Salyer, at the Francis B. Matthews SafetyRoadside Rest Area (SRRA). Upgrade potable water system and wastewater system. 3559
4G620$2,300
$0
Subtotal: $2,300
2019-20$470$860$50
$590
$1,970Total Project Cost: $4,270
02140000298/15/20197/1/2019
8/16/2018PA&ED:
RTL:R/W Cert:
4/8/2020Begin Con:
02-Trinity-299 Prior18-19Prior19-20
201.2351 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
3.6
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 262 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Trinity($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MANDATESNear Douglas City, at various locations from 1.2miles east of Lewiston Road to 0.5 mile west ofShasta County line. Perform storm watermitigation improvements at 16 locations to meetStatewide NPDES permit mandate goals.
3637
1H700$3,200
$345
Subtotal: $3,545
2021-22$860
$1,200$380
$1,100
$3,540Total Project Cost: $7,085
02160000493/28/20222/25/20229/8/2020PA&ED:
RTL:R/W Cert:
8/30/2022Begin Con:
02-Trinity-299 18-1920-2120-2121-22
201.335108 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
64.7/71.7
Con Sup:
Storm Water Mitigation
Const:R/W:
BRIDGE PRESERVATIONNear Trinity Center, from north of PreacherMeadows Road to north of El Dorado Way.Replace Swift Creek Bridge No. 05-0059.3485
4F220$8,627
$820
Subtotal: $9,447
2019-20$930
$1,680$100
$2,090
$4,800Total Project Cost: $14,247
02120000735/21/20204/16/20201/17/2019PA&ED:
RTL:R/W Cert:
12/1/2020Begin Con:
02-Trinity-3 Prior18-1918-1919-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
58.7/61.9
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In Trinity County, at Dobbins Gulch Bridge No.05-0042 (PM 0.6), Stuart Fork Bridge No. 05-0055 (PM 43.9), and Mule Creek Bridge No. 05-0056 (PM 48.5); also, on Route 299 at GrassValley Creek Bridge No. 05-0013 (PM 65.5). Repair unsound concrete, replace bearings andjoint seals, repair bridge decks, and install barrierand approach slabs.
3633
1H500$6,300
$206
Subtotal: $6,506
2021-22$900
$1,030$230
$2,060
$4,220Total Project Cost: $10,726
02160000452/22/20221/21/20227/2/2020PA&ED:
RTL:R/W Cert:
8/9/2022Begin Con:
02-Trinity-3 Prior20-2120-2121-22
201.1194 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
In Trinity County, on Routes 299 and 36 and inSiskiyou County on Route 96 at various locations.Bridge preventative maintenance at 9 bridges.3516
4F600$6,771
$22
Subtotal: $6,793
2019-20$950
$1,400$150
$1,910
$4,410Total Project Cost: $11,203
02130000129/13/20199/6/2019
9/28/2018PA&ED:
RTL:R/W Cert:
2/14/2020Begin Con:
02-Trinity-299 Prior18-1918-1919-20
201.1199 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 263 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Trinity($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONNear Burnt Ranch, from 0.4 mile east ofHennessey Road to 0.3 mile west of Burnt RanchRoad. Install rockfall drapery system. 3579
0H410$2,079
$0
Subtotal: $2,079
2019-20$200$470$50
$500
$1,220Total Project Cost: $3,299
021500001910/11/2019
9/4/20197/24/2018PA&ED:
RTL:R/W Cert:
2/13/2020Begin Con:
02-Trinity-299 Prior18-1918-1919-20
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
10.9/11.2
Con Sup:
Roadway Protective Betterments
Const:R/W:
Near Junction City, at west of Canyon CreekBridge. Install rockfall drapery system
3592
0H690$2,495
$15
Subtotal: $2,510
2019-20$330$580$200$630
$1,740Total Project Cost: $4,250
021500005510/11/2019
9/4/20197/24/2018PA&ED:
RTL:R/W Cert:
2/13/2020Begin Con:
02-Trinity-299 Prior18-1918-1919-20
201.1507 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
43.1/43.3
Con Sup:
Roadway Protective Betterments
Const:R/W:
Near Trinity Center, from 0.9 miles south ofTrinity River Bridge to Siskiyou County line atvarious locations. Drainage system restoration.3586
0H540$3,443
$365
Subtotal: $3,808
2019-20$1,390
$850$1,450$1,580
$5,270Total Project Cost: $9,078
021500004910/10/2019
9/3/20199/1/2018PA&ED:
RTL:R/W Cert:
2/13/2020Begin Con:
02-Trinity-3 Prior18-1918-1919-20
201.15135 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
30.0/T85.0
Con Sup:
Drainage System Restoration
Const:R/W:
Near Salyer, at various locations from 0.1 milewest of White House Gulch Road to 0.4 mile westof Slattery Pond Road. Rehabilitate culverts.3668
2H810$5,390
$311
Subtotal: $5,701
2021-22$930$980$330$990
$3,230Total Project Cost: $8,931
02170000128/19/20217/19/20216/3/2020PA&ED:
RTL:R/W Cert:
12/14/2021Begin Con:
02-Trinity-299 Prior20-2120-2121-22
201.15118 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.6/45.2
Con Sup:
Drainage System Restoration
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 264 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Trinity($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyTrinity
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,222$51,117
R/W:
Subtotal: $53,339
Const:$8,695
$12,145$3,300
$15,445
$39,585
Total (Capital + Support): $92,924
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 265 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tulare($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Porterville, from west of Route 65 to S.Plano Road. Landscape Mitigation.
3032A
0S311$400
Subtotal: $400
2018-19 $330
$490
$820Total Project Cost: $1,220
061800008811/2/201810/2/20187/19/2016PA&ED:
RTL:R/W Cert:
5/3/2019Begin Con:
06-Tulare-19018-19
18-19
201.0100 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R15.1/16.9
Con Sup:
Safety Improvements
Const:R/W:
In and near Porterville, from 0.4 mile north ofAvenue 136 to 0.2 mile north of Linda VistaAvenue; also on Route 190 from 0.2 mile west ofthe Route 65/190 Separation to Blue HeronParkway. Construct MVPs, gore paving, drainageimprovements, new fencing and relocation ofpullboxes and controller cabinets.
6813
0U730$4,400
$13
Subtotal: $4,413
2020-21$610$940$18
$710
$2,278Total Project Cost: $6,691
06160000287/15/20207/1/2020
7/15/2019PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
06-Tulare-65 18-1919-2019-2020-21
201.23529 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
17.5/22.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Near Tipton, at the Philip S. Raine SafetyRoadside Rest Area. Upgrade water, sewer andirrigation facilities.6885
0U770$8,000
$50
Subtotal: $8,050
2021-22$550
$1,750$12
$2,250
$4,562Total Project Cost: $12,612
06160000358/4/20212/2/2021
7/18/2019PA&ED:
RTL:R/W Cert:
1/3/2022Begin Con:
06-Tulare-99 18-1919-2019-2021-22
201.2352 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
22.3
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Tulare, from north of Bardsley Avenue to northof Prosperity Avenue. Roadside safetyimprovements.6700
0R170$2,700
Subtotal: $2,700
2018-19$255$624$24
$430
$1,333Total Project Cost: $4,033
06140000513/1/20192/1/2019
8/25/2017PA&ED:
RTL:R/W Cert:
8/1/2019Begin Con:
06-Tulare-99 PriorPriorPrior18-19
201.23526 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.9/31.0
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 266 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tulare($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Kingsburg, from 0.2 mile south to 0.4 milenorth of Avenue 384 Overcrossing at the C. H.Warlow Safety Roadside Rest Area. Upgrade water and wastewater systems to comply withFederal and State statutes and regulatoryrequirements.
6882
0V760$4,241
$170
Subtotal: $4,411
2021-22$869
$1,666$36
$1,705
$4,276Total Project Cost: $8,687
06160002203/25/20223/21/20221/2/2020PA&ED:
RTL:R/W Cert:
9/1/2022Begin Con:
06-Tulare-99 18-1919-2019-2021-22
201.2351 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
51.6/52.2
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
BRIDGE PRESERVATIONIn Tipton, at Avenue 152 Overcrossing No. 46-019. Replace bridge.
6679
0Q910$7,521
$343
Subtotal: $7,864
2019-20$453
$1,730$54
$1,354
$3,591Total Project Cost: $11,455
06140000053/2/20202/3/20202/1/2018PA&ED:
RTL:R/W Cert:
8/3/2020Begin Con:
06-Tulare-99 PriorPriorPrior19-20
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
19.4
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Woodlake, at Yokohl Creek Bridge No. 46-0011 (PM 1.39); also at Kaweah River BridgeNo. 46-0073 (PM 4.19). Replace bridges toupgrade to current standards, facilitate bike laneshoulders, and upgrade guard railing.
6787
0U280$12,100
$395
Subtotal: $12,495
2020-21$1,325$2,260
$645$1,940
$6,170Total Project Cost: $18,665
06150002934/26/20214/15/2021
12/13/2019PA&ED:
RTL:R/W Cert:
10/5/2021Begin Con:
06-Tulare-245 Prior19-2019-2020-21
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
1.4
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In and near Pixley, at Avenue 48 Overcrossing(OC) No. 46-0165 (PM 6.2), Davis Avenue OCNo. 46-0172 (PM 12.6), and Avenue 100 OC No.46-0173 (PM 12.8). Upgrade bridge railing tocurrent standards and install approach railings.
6788
0U270$2,120
$108
Subtotal: $2,228
2020-21$740
$1,122$30
$1,048
$2,940Total Project Cost: $5,168
06150002952/1/2021
1/15/202111/20/2019PA&ED:
RTL:R/W Cert:
10/15/2021Begin Con:
06-Tulare-99 18-1919-2019-2020-21
201.1121493 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 267 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tulare($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Kingsburg, on Route 201 at Sand Creek andFriant-Kern Canal Bridge; also on Route 216 atKaweah River Bridge. Bridge rail replacement.6521
0H200$9,371
$450
Subtotal: $9,821
2018-19$1,728$3,900
$617$2,357
$8,602Total Project Cost: $18,423
06120001576/22/20176/21/20174/20/2015PA&ED:
RTL:R/W Cert:
1/21/2019Begin Con:
06-Tulare-201 PriorPriorPrior18-19
201.1121188 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
ROADWAY PRESERVATIONIn Tulare, Fresno and Madera Counties, on Route99 at various locations. Upgrade existing pumpsand control systems at 11 pumping plants.6795
0U230$5,140
$65
Subtotal: $5,205
2019-20$650
$2,060$620
$2,230
$5,560Total Project Cost: $10,765
061500029711/20/201911/8/20197/13/2018PA&ED:
RTL:R/W Cert:
5/11/2020Begin Con:
06-Tulare-99 Prior18-1918-1919-20
201.15111 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Drainage System Restoration
Const:R/W:
Between Springville and Camp Nelson, from eastof Balch Park Road to west of Wishon Drive.Replace deteriorated culverts and upgradeexisting Guardrail.
6286
0H140$2,850
$246
Subtotal: $3,096
2019-20$800$950$210$800
$2,760Total Project Cost: $5,856
06160001943/15/20203/1/2020
11/17/2018PA&ED:
RTL:R/W Cert:
2/1/2021Begin Con:
06-Tulare-190 PriorPriorPrior19-20
201.1517 Drainage system(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
34.7/39.7
Con Sup:
Drainage System Restoration
Const:R/W:
CountyTulare
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,840$58,843
R/W:
Subtotal: $60,683
Const:$7,980
$17,332$2,266
$15,314
$42,892
Total (Capital + Support): $103,575
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 268 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tuolumne($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONAt various locations, from Sonora to Dardanelle;also, on Route 49 in Sonora (PM 17.4 to 17.6)and in Stanislaus County on Route 108 in andnear Riverbank (PM 28.5 to 33.4). Upgradeguardrail to make standard.
3234
1C400$3,087
$173
Subtotal: $3,260
2021-22$634$972$11
$554
$2,171Total Project Cost: $5,431
101700002511/30/202110/18/202111/2/2020PA&ED:
RTL:R/W Cert:
7/1/2022Begin Con:
10-Tuolumne-108 18-1920-2120-2121-22
201.01531 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
L1.3/53.3
Con Sup:
Collision Severity Reduction
Const:R/W:
ROADWAY PRESERVATIONNear Long Barn, from 0.1 mile east of the eastjunction of Long Barn Road to 2.3 miles east ofCow Creek Road. Pavement rehabilitation.0157
46210$17,970
$88
Subtotal: $18,058
2020-21$687
$1,152$8
$2,092
$3,939Total Project Cost: $21,997
10130002661/1/2021
12/1/202010/1/2019PA&ED:
RTL:R/W Cert:
7/15/2021Begin Con:
10-Tuolumne-108 Prior19-2019-2020-21
201.12151.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R18.9/38.8
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Buck Meadows, from Elder Lane toYosemite National Park boundary. Pavementrehabilitation.0335
0E960$20,520
$6
Subtotal: $20,526
2018-19$931
$1,070$55
$2,793
$4,849Total Project Cost: $25,375
101300025412/7/201811/7/20183/3/2018PA&ED:
RTL:R/W Cert:
7/10/2019Begin Con:
10-Tuolumne-120 PriorPriorPrior18-19
201.1212 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
32.7/R56.5
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Near Strawberry, from east of Old StrawberryRoad to west of Beardsley Road. Rockfallmitigation at 4 locations.3137
0Y800$2,628
$43
Subtotal: $2,671
2018-19$750$625$75
$560
$2,010Total Project Cost: $4,681
10150000071/15/2019
12/31/201811/1/2017PA&ED:
RTL:R/W Cert:
8/30/2019Begin Con:
10-Tuolumne-108 PriorPriorPrior18-19
201.1504 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
32.3/34.6
Con Sup:
Roadway Protective Betterments
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 269 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Tuolumne($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Haden Flat, from east of Cherry Lake Roadto west of Packard Canyon Road. Stabilize slopeerosion at two locations.3136
0Y790$1,874
$12
Subtotal: $1,886
2018-19$650$493$48
$363
$1,554Total Project Cost: $3,440
10150000061/15/201912/1/20189/1/2017PA&ED:
RTL:R/W Cert:
6/26/2019Begin Con:
10-Tuolumne-120 PriorPriorPrior18-19
201.1502 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
48.8/R50.5
Con Sup:
Roadway Protective Betterments
Const:R/W:
CountyTuolumne
PA&ED:PS&E:
R/W Sup:Con Sup:
$322$46,079
R/W:
Subtotal: $46,401
Const:$3,652$4,312
$197$6,362
$14,523
Total (Capital + Support): $60,924
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 270 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Ventura($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONIn Ventura County, south of Point Mugu StatePark (PM 4.0) and Sycamore Canyon Road (PM4.2). Construct secant walls at two locations as apermanent slope restoration solution to stabilize the slope and prevent continued erosion. Twoprevious Director Orders: 07-4X370 and 07 -4X760 were executed to remove slide materialand repair embankment, roadway and drainagesystems.
4930
31820$27,179
$766
Subtotal: $27,945
2019-20$1,200$1,900
$100$2,600
$5,800Total Project Cost: $33,745
071500028612/16/2019
9/3/20199/28/2018PA&ED:
RTL:R/W Cert:
7/16/2020Begin Con:
07-Ventura-1 Prior18-1918-1919-20
201.1312 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.0/4.2
Con Sup:
Permanent Restoration
Const:R/W:
Near Point Mugu State Park, at Big SycamoreCreek No. 52-0011. Shoreline embankmentrestoration by replacing Rock Slope Protection(RSP), constructing seawalls and secant retainingwall, and upgrade guardrail.
5181
33350$11,099
$442
Subtotal: $11,541
2021-22$2,300$3,240$1,000$3,880
$10,420Total Project Cost: $21,961
07160003128/2/20217/1/20217/1/2019PA&ED:
RTL:R/W Cert:
3/2/2022Begin Con:
07-Ventura-1 Prior19-2019-2021-22
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
4.5/4.6
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONNear Ojai, north of North Fork Matilija CreekBridge No. 52-450. Widen the roadway by fourfeet, upgrade rock block barrier, and place HighFriction Surface Treatment (HFST).
5145
33230$3,080
$64
Subtotal: $3,144
2021-22$660
$1,460$40
$1,550
$3,710Total Project Cost: $6,854
071600025712/15/202111/15/20213/30/2021PA&ED:
RTL:R/W Cert:
7/10/2022Begin Con:
07-Ventura-33 18-1920-2120-2121-22
201.01529 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
18.9/19.1
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near various cities, at various locations,from 0.2 mile south of Lakeview Canyon Road toHobson Road Undercrossing. Upgradeguardrails, end treatments, and bridgeconnections, and add vegetation control underguardrails. Remove and replace dikes.
5231
33900$6,470
$80
Subtotal: $6,550
2021-22$950
$2,800$35
$2,000
$5,785Total Project Cost: $12,335
071700010810/4/20218/23/20219/30/2019PA&ED:
RTL:R/W Cert:
5/5/2022Begin Con:
07-Ventura-101 18-1919-2021-2221-22
201.015345 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/R38.9
Con Sup:
Collision Severity Reduction
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 271 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Ventura($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near various cities, at various locations,from 0.2 mile north of Westlake Boulevard to0.3mile north of Hobson Road. Upgrade guardrails,end treatments, and bridge connections, and addvegetation control under guardrails. Remove andreplace dikes.
5082
33110$9,776
$29
Subtotal: $9,805
2021-22$392
$1,733$20
$1,750
$3,895Total Project Cost: $13,700
071600022510/4/20218/23/20219/30/2019PA&ED:
RTL:R/W Cert:
5/5/2020Begin Con:
07-Ventura-101 18-1918-1919-2021-22
201.01593 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.9/R39.2
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Thousand Oaks, from Los AngelesCounty line to 0.3 mile north of CamarilloSprings Road. Construct access trails and MVPs,relocate irrigation facilities, install access gates,railings and breakaway post sleeves, pave gore, narrow and slope areas.
5030
32560$4,915
$20
Subtotal: $4,935
2020-21$514
$1,523$46
$2,117
$4,200Total Project Cost: $9,135
071600008612/1/202010/1/202010/1/2019PA&ED:
RTL:R/W Cert:
7/1/2021Begin Con:
07-Ventura-101 18-1919-2020-2120-21
201.23594 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/11.1
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
In Simi Valley, from First Street to YosemiteStreet. Construct maintenance vehicle pulloutsand access roads, pave gore areas, install smartirrigation controllers and access gates. Plantvines at bridge wingwalls.
4894
31650$3,250
$10
Subtotal: $3,260
2018-19$677
$1,369$39
$1,292
$3,377Total Project Cost: $6,637
07150002102/1/2019
11/15/20186/26/2017PA&ED:
RTL:R/W Cert:
10/1/2019Begin Con:
07-Ventura-118 PriorPriorPrior18-19
201.235100 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R24.1/R29.7
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
MANDATESIn Ventura County, at various locations; also onRoute 101 (PM 22.0/43.6), Route 34 (PM4.3/17.7) and Route 150 (PM 2.5/34.4).Construct and install stormwater treatment BMPsincluding biofiltration swales, gross solid removaldevices and Austin Vault Sand Filters.
5012
32270$10,340
$126
Subtotal: $10,466
2021-22$2,500$2,650
$40$3,750
$8,940Total Project Cost: $19,406
071600006712/15/202111/1/20217/2/2020PA&ED:
RTL:R/W Cert:
7/5/2022Begin Con:
07-Ventura-1 18-1920-2118-1921-22
201.33590.61 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/28.5
Con Sup:
Storm Water Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 272 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Ventura($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In the city of Ventura, from south of SeawardAvenue to Ventura River. Stabilize soil anderosion control.4813
31130$1,823
$20
Subtotal: $1,843
2018-19$95
$1,196$24
$959
$2,274Total Project Cost: $4,117
071500000912/14/201810/5/20186/9/2017PA&ED:
RTL:R/W Cert:
6/19/2019Begin Con:
07-Ventura-101 PriorPriorPrior18-19
201.33522.5 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
27.5/31.0
Con Sup:
Storm Water Mitigation
Const:R/W:
Near the city of Ventura, from County Drive toSanta Clara River. Construct stormwatertreatment BMP infiltration basin.5204
33600$6,011
$10
Subtotal: $6,021
2021-22$950
$1,961$44
$1,680
$4,635Total Project Cost: $10,656
07160003759/15/20217/15/2021
12/30/2019PA&ED:
RTL:R/W Cert:
4/15/2022Begin Con:
07-Ventura-118 18-1919-2019-2021-22
201.33542.01 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
1.2/1.8
Con Sup:
Storm Water Mitigation
Const:R/W:
In Santa Paula, from Peck Road to Santa PaulaCreek. Stabilize soil and install irrigation system.
4815
31150$2,431
$30
Subtotal: $2,461
2018-19$130$916$102
$1,379
$2,527Total Project Cost: $4,988
071500001211/30/201810/1/20186/28/2017PA&ED:
RTL:R/W Cert:
7/8/2019Begin Con:
07-Ventura-126 PriorPriorPrior18-19
201.33522.5 Acre(s) treated/pollutantPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R10.2/R12.7
Con Sup:
Storm Water Mitigation
Const:R/W:
Near Ventura and Ojai, from north of SycamoreDrive to Fairview Road. Construct and upgradecurb ramps, sidewalks and driveways to meetcurrent ADA standards.
5010
32320$6,481$4,141
Subtotal: $10,622
2021-22$980
$4,620$1,100$3,798
$10,498Total Project Cost: $21,120
071600006212/15/202111/1/20219/3/2019PA&ED:
RTL:R/W Cert:
7/15/2022Begin Con:
07-Ventura-33 18-1918-1919-2021-22
201.36164 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
6.5/12.8
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 273 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Ventura($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near Ventura and Moorpark, from NorthRoute 126 Junction to 0.3 mile west of PrincetonAvenue. Reconstruct curb ramps, construct newsidewalks, install accessible pedestrian signalsand upgrade thermoplastic pavement markingcrosswalks.
5233
33920$3,944$2,941
Subtotal: $6,885
2021-22$1,000$2,000$1,624$1,500
$6,124Total Project Cost: $13,009
07170001193/15/20223/1/2022
3/15/2020PA&ED:
RTL:R/W Cert:
8/15/2022Begin Con:
07-Ventura-118 18-1919-2019-2021-22
201.36193 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.5/T18.8
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
In and near cities of Ojal and Santa Paula, fromRoute 33 to Route 126. Construct and upgradecurb ramps and sidewalks to comply with ADAstandards.
4746
30670$4,549
$556
Subtotal: $5,105
2019-20$908
$1,000$100
$1,000
$3,008Total Project Cost: $8,113
07140001793/30/20205/1/20197/2/2018PA&ED:
RTL:R/W Cert:
10/1/2020Begin Con:
07-Ventura-150 Prior18-1918-1919-20
201.361134 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.6/34.4
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONNear the city of Ventura, at Ventura OverheadNo. 52-0040. Replace corroded steel spans ofbridge and upgrade bridge railing to currentstandards.
4972
31960$3,565
$983
Subtotal: $4,548
2021-22$1,200$2,500
$540$1,650
$5,890Total Project Cost: $10,438
071600002512/15/202111/15/202112/14/2018PA&ED:
RTL:R/W Cert:
8/15/2022Begin Con:
07-Ventura-1 Prior18-1918-1921-22
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
21.5
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Oak View, at San Antonio Creek Bridge No.52-0065. Scour mitigation and bridge railupgrade.4496
29130$2,460$2,750
Subtotal: $5,210
2018-19$1,640$1,112
$600$1,460
$4,812Total Project Cost: $10,022
07120000831/25/20191/4/2019
6/30/2017PA&ED:
RTL:R/W Cert:
9/6/2019Begin Con:
07-Ventura-33 PriorPriorPrior18-19
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
7.6
Con Sup:
Bridge Scour Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 274 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Ventura($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Sea Cliff, at Willow Creek Bridge No. 52-003; also in Ojai, on Route 33 at North ForkMatilija Bridges No. 52-0044 (PM 15.8) and No.52-0173 (PM16.1). Upgrade bridge railings tomeet current standards.
4601
29650$2,657
$818
Subtotal: $3,475
2020-21$958
$2,300$465
$2,000
$5,723Total Project Cost: $9,198
07130000991/23/20201/3/2020
11/5/2018PA&ED:
RTL:R/W Cert:
7/8/2020Begin Con:
07-Ventura-1 Prior20-2120-2120-21
201.112724 Linear feetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
28.2
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Ojai, at North Fork Matilija Creek No. 52-0173. Paint steel portion of bridge and replacemissing rivets of bottom flanges for preventativemaintenance to preserve and extend the life ofbridge.
5008
32300$660$30
Subtotal: $690
2021-22$320$850$50
$620
$1,840Total Project Cost: $2,530
071600006010/31/2021
9/1/202112/15/2018PA&ED:
RTL:R/W Cert:
6/2/2022Begin Con:
07-Ventura-33 Prior18-1918-1921-22
201.1191 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.1
Con Sup:
Bridge Preventative Maintenance
Const:R/W:
ROADWAY PRESERVATIONIn the city of Ventura, from North 101 Junction -Solimar Undercrossing to Hobson County ParkRoad. Cold plane and overlay pavement, upgradeguardrail/end treatment, install traffic signs andcrosswalks.
5018
32390$10,200
$14
Subtotal: $10,214
2021-22$625
$1,850$60
$3,350
$5,885Total Project Cost: $16,099
071600007212/15/202111/1/20217/15/2020PA&ED:
RTL:R/W Cert:
8/5/2022Begin Con:
07-Ventura-1 19-2020-2120-2121-22
201.12111.7 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
21.3/27.1
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
In and near Ojai, Mira Monte and Meiners Oaks,from Burham Road to Gorham Road; also onRoute 33 from 33/150 Junction to Meiners Road.Cold plane and overlay pavement, upgradeguardrail and signs.
5014
32370$5,588
$221
Subtotal: $5,809
2020-21$600
$1,500$250
$1,700
$4,050Total Project Cost: $9,859
071600006910/5/20208/5/20209/3/2019PA&ED:
RTL:R/W Cert:
4/8/2021Begin Con:
07-Ventura-150 18-1919-2019-2020-21
201.12115.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
R13.3/19.0
Con Sup:
Pavement Rehabilitation (CAPM)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 275 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Ventura($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
In and near cities of Thousand Oaks andMoorpark, from Route 101 to Route 118.Rehabilitate pavement.4688
30250$92,445
$860
Subtotal: $93,305
2018-19$1,300$7,500
$100$17,000
$25,900Total Project Cost: $119,205
07130004796/14/20195/15/20199/29/2017PA&ED:
RTL:R/W Cert:
7/9/2020Begin Con:
07-Ventura-23 PriorPriorPrior18-19
201.12257 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R3.3/R11.5
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
Near Sea Cliff, from Padre Juan Canyon RoadOvercrossing to Punta Gorda PedestrianUndercrossing. Rehabilitate roadway.4687
30240$19,270
$70
Subtotal: $19,340
2019-20$100
$1,700$200
$2,100
$4,100Total Project Cost: $23,440
07130004882/14/20202/11/20199/21/2018PA&ED:
RTL:R/W Cert:
8/28/2020Begin Con:
07-Ventura-101 Prior18-1918-1919-20
201.12221.6 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R36.7/R40.3
Con Sup:
Roadway Rehabilitation (2R)
Const:R/W:
MOBILITYIn Thousand Oaks and Camarillo, from WendyDrive to Pleasant Valle Road, at the northboundand southbound Commercial VehicleEnforcement Facilities. Replace concrete slabsand repair and replace asphalt concrete.
5081
33100$2,006
$8
Subtotal: $2,014
2020-21$0
$1,550$20
$850
$2,420Total Project Cost: $4,434
07160002208/10/20206/15/20206/29/2016PA&ED:
RTL:R/W Cert:
3/10/2021Begin Con:
07-Ventura-10118-1918-1920-21
201.3212 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
9.0/9.2
Con Sup:
Weigh Stations
Const:R/W:
In and near Moorepark, at the eastbound andwestbound Commercial Vehicle EnforcementFacilities. Construct new modular office facilityand install overhead truck scale on/off messagesigns.
5255
34160$1,150
$44
Subtotal: $1,194
2021-22$300$800$16
$400
$1,516Total Project Cost: $2,710
071700019410/15/2021
8/1/20218/18/2019PA&ED:
RTL:R/W Cert:
5/1/2022Begin Con:
07-Ventura-118 18-1919-2019-2021-22
201.3212 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
13.3/15.6
Con Sup:
Weigh Stations
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 276 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Ventura($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyVentura
PA&ED:PS&E:
R/W Sup:Con Sup:
$15,033$241,349
R/W:
Subtotal: $256,382
Const:$20,299$50,030$6,615
$60,385
$137,329
Total (Capital + Support): $393,711
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 277 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Yolo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear West Sacramento, from 3.7 miles north ofClarksburg Road to Levee Access Road.Permanent restoration of damaged pavement andsupporting levee embankment.
9058
2H460$51,950$7,200
Subtotal: $59,150
2019-20$2,080$1,930
$990$5,890
$10,890Total Project Cost: $70,040
03170001141/1/2020
12/1/20198/15/2018PA&ED:
RTL:R/W Cert:
9/1/2020Begin Con:
03-Yolo-84 Prior18-1918-1919-20
201.1311 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.3/15.7
Con Sup:
Permanent Restoration
Const:R/W:
COLLISION REDUCTIONNear Cadenasso, from 0.4 mile west of CountyRoad 79 to 0.4 mile east of County Road 79; alsofrom Esparto to 0.2 mile west of Route 505.Shoulder widening, curve correction, left-turnchannelization, signalization and two-way left- turn lanes.
8655A
0C472$19,390$7,989
Subtotal: $27,379
2018-19 $2,570$2,500$4,850
$9,920Total Project Cost: $37,299
031400027212/15/201712/12/20176/24/2015PA&ED:
RTL:R/W Cert:
3/26/2018Begin Con:
03-Yolo-16PriorPrior18-19
201.010330 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
20.5/31.6
Con Sup:
Safety Improvements
Const:R/W:
Near Capay, from Capay Canal Bridge to CountyRoad 85; also, in Esparto from Orleans Street toCounty Road 21A (PM 27.5/28.3). Improvepedestrian safety and operations for bicycles andmotorists.
8663
4F170$1,492
$408
Subtotal: $1,900
2018-19$380$490$140$390
$1,400Total Project Cost: $3,300
031400006312/1/2018
11/15/201812/1/2017PA&ED:
RTL:R/W Cert:
6/1/2019Begin Con:
03-Yolo-16 PriorPriorPrior18-19
201.01529 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
25.2/28.3
Con Sup:
Collision Severity Reduction
Const:R/W:
In and near Woodland, from the SacramentoCounty line to Colusa County line. Improvements to reduce maintenance workerexposure.
8572
4F830$1,940
$10
Subtotal: $1,950
2018-19$240$400$20
$420
$1,080Total Project Cost: $3,030
031400030011/1/20189/1/2018
10/10/2017PA&ED:
RTL:R/W Cert:
5/15/2019Begin Con:
03-Yolo-5 PriorPriorPrior18-19
201.23532 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.4/R28.9
Con Sup:
Roadside Safety Improvements/ FreewayMaintenance Access
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 278 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Yolo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MANDATESIn and near Woodland, from County Road 102 toCounty Road 13 at various locations; also, in thecity of Sacramento, from Seamas Avenue toRichards Boulevard (PM 19.3/24.7) at variouslocations. Upgrade ADA facilities.
5833
3F140$690
Subtotal: $690
2018-19$110$140$30
$170
$450Total Project Cost: $1,140
03120000728/15/20188/1/2018
12/1/2017PA&ED:
RTL:R/W Cert:
1/3/2019Begin Con:
03-Yolo-5 PriorPriorPrior18-19
201.36154 Curb ramp(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
5.5/R17.6
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
BRIDGE PRESERVATIONIn West Sacramento, at the Sacramento RiverBridge and Overhead No. 22-0026L/R.Rehabilitate bridge.8901
0F250$32,760
$482
Subtotal: $33,242
2019-20$990
$1,550$75
$3,640
$6,255Total Project Cost: $39,497
03000000754/1/20203/1/20209/1/2018PA&ED:
RTL:R/W Cert:
10/1/2020Begin Con:
03-Yolo-80 Prior18-1918-1919-20
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R11.3
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Winters, at Putah Creek Bridge No. 22-0072L/R, from Solano County line to 0.4 milesouth of Route 128; also in Solano County from0.3 mile south to the Yolo County line (PM R10.3to R10.6). Seismic retrofit of two parallelbridges.
9504
2H450$13,960
$215
Subtotal: $14,175
2021-22$941
$1,755$371
$2,662
$5,729Total Project Cost: $19,904
03170001133/15/20223/1/20222/1/2020PA&ED:
RTL:R/W Cert:
7/15/2022Begin Con:
03-Yolo-505 18-1919-2019-2021-22
201.1132 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
New
0.0/0.2
Con Sup:
Bridge Seismic Restoration
Const:R/W:
Near Woodland, at County Road 96 Overcrossing(OC) No. 22-0155 (PM R14.27), County Road 95OC No. 22-0156 (PM R15.85), and Zamora OCNo. 22-0157 (PM R17.62); also in Colusa Countyin and near Williams at E Street OC No. 15-0067(PM R17.98) and Lurline Avenue OC No. 15-0075 (PM R22.74). Establish standard verticalclearance.
ACCELERATED BRIDGE (PA&ED Only)
5869
3H391$15,700
$620
Subtotal: $16,320
2019-20$1,700$1,570
$430$2,470
$6,170Total Project Cost: $22,490
03170003494/15/20204/1/20202/1/2019PA&ED:
RTL:R/W Cert:
9/15/2020Begin Con:
03-Yolo-5 Prior19-2019-2019-20
201.3225 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 279 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Yolo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Woodland, at Wye Line Road Overcrossing(OC) No. 22-0158 (PM 4.49), County Road 6 OCNo. 22-0138 (PM R25.57), County Line Road OCNo. 22-0139 (R28.92). Establish standardvertical clearance.
ACCELERATED BRIDGE (PA&ED Only)
8563
0F760$11,032
$655
Subtotal: $11,687
2020-21$744
$1,885$98
$3,901
$6,628Total Project Cost: $18,315
03170000314/1/20213/1/2021
10/1/2019PA&ED:
RTL:R/W Cert:
10/1/2021Begin Con:
03-Yolo-5 Prior20-2120-2120-21
201.3223 Bridge(s)Performance Measure
Program Code
PA&ED:* PS&E:
* R/W Sup:
Carryover
4.4/R28.9
* Con Sup:
Trans Permit Requirements for Bridges
* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized
* Const:* R/W:
MOBILITYIn various counties, on various routes at variouslocations. Repair and install permanentAutomatic Vehicle Classification (AVC) truckdata collection stations.
8571
0H410$9,400
$80
Subtotal: $9,480
2018-19$1,000$1,000
$190$1,900
$4,090Total Project Cost: $13,570
031500016510/1/20189/1/20181/1/2018PA&ED:
RTL:R/W Cert:
3/1/2019Begin Con:
03-Yolo-5 PriorPriorPrior18-19
201.31569 Field element(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
Con Sup:
Transportation Management Systems
Const:R/W:
CountyYolo
PA&ED:PS&E:
R/W Sup:Con Sup:
$17,659$158,314
R/W:
Subtotal: $175,973
Const:$8,185
$13,290$4,844
$26,293
$52,612
Total (Capital + Support): $228,585
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 280 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Yuba($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Marysville, from Laurellen Road to SouthHoncut Creek Bridge. Widen shoulders andimprove clear recovery zone.9819
4F380$70,735$9,858
Subtotal: $80,593
2019-20$3,906$4,884$6,227$6,094
$21,111Total Project Cost: $101,704
03140001535/20/20205/5/20203/1/2018PA&ED:
RTL:R/W Cert:
11/20/2020Begin Con:
03-Yuba-70 PriorPriorPrior19-20
201.01080 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
16.2/25.8
Con Sup:
Safety Improvements
Const:R/W:
Near Smartsville, from the Yuba River Bridge toeast of Smartsville Road. Realign and widen roadway.9590
3F510$48,500$2,750
Subtotal: $51,250
2018-19$4,700$3,500$1,000$6,871
$16,071Total Project Cost: $67,321
03130000205/1/2019
4/16/20199/1/2017PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
03-Yuba-20 PriorPriorPrior18-19
201.01520 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R18.0/20.3
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Linda and Marysville, from 0.3 mile southof Feather River Boulevard to Yuba River Bridge.Install concrete median barrier. 9821
0H510$5,200
$10
Subtotal: $5,210
2018-19$350$500$40
$590
$1,480Total Project Cost: $6,690
031500020110/15/20189/15/20188/27/2017PA&ED:
RTL:R/W Cert:
4/1/2019Begin Con:
03-Yuba-70 PriorPriorPrior18-19
201.0153 Collision(s) reducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
R11.0/13.6
Con Sup:
Collision Severity Reduction
Const:R/W:
BRIDGE PRESERVATIONIn Marysville, at the Feather River Bridge No. 18-009. Scour mitigation and retrofit piers.
8140
3F560$26,441$1,887
Subtotal: $28,328
2020-21$1,240$2,700
$200$4,100
$8,240Total Project Cost: $36,568
03130000334/1/20213/1/20212/1/2019PA&ED:
RTL:R/W Cert:
7/1/2021Begin Con:
03-Yuba-20 Prior20-2120-2120-21
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
0.1
Con Sup:
Bridge Scour Mitigation
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 281 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Yuba($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Marysville, from 0.1 mile north of BinneyJunction Underpass to 0.3 mile north of LaurellenRoad, at Simmerly Slough Bridge No. 16-0019.Replace bridge.
9812
1E060$68,500$3,800
Subtotal: $72,300
2018-19$1,600$3,050
$750$5,200
$10,600Total Project Cost: $82,900
03120000686/1/20195/1/2019
6/21/2017PA&ED:
RTL:R/W Cert:
12/1/2019Begin Con:
03-Yuba-70 PriorPriorPrior18-19
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
15.5/16.5
Con Sup:
Bridge Scour Mitigation
Const:R/W:
ROADWAY PRESERVATIONNear Marysville, from 0.1 mile east of Loma RicaRoad to 0.2 mile west of Spring Valley Road.Rehabilitate roadway.9587
2F320$10,700$1,400
Subtotal: $12,100
2018-19$1,160$1,610
$950$1,600
$5,320Total Project Cost: $17,420
03000205943/15/20183/1/2018
6/13/2016PA&ED:
RTL:R/W Cert:
1/2/2019Begin Con:
03-Yuba-20 18-19PriorPrior18-19
201.1204.4 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
8.0/10.2
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
Near Marysville, from Marysville Road to YubaRiver (Parks Bar) bridge. Rehabilitate roadway.
9579
0A570$38,100$6,800
Subtotal: $44,900
2018-19$3,700$2,210$2,300$6,900
$15,110Total Project Cost: $60,010
03000205934/15/20194/1/20198/1/2017PA&ED:
RTL:R/W Cert:
12/29/2019Begin Con:
03-Yuba-20 PriorPriorPrior18-19
201.1209.9 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
13.3/R17.6
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
In and near Marysville, from 14th Street toCemetery Road. Roadway rehabilitation.
9820
0H160$85,000$5,000
Subtotal: $90,000
2020-21$3,000$3,500$2,500$5,500
$14,500Total Project Cost: $104,500
031500008210/2/20209/18/20201/2/2019PA&ED:
RTL:R/W Cert:
3/26/2021Begin Con:
03-Yuba-70 Prior18-1918-1920-21
201.1205 Lane mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Carryover
14.9/15.6
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 282 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Yuba($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
CountyYuba
PA&ED:PS&E:
R/W Sup:Con Sup:
$31,505$353,176
R/W:
Subtotal: $384,681
Const:$19,656$21,954$13,967$36,855
$92,432
Total (Capital + Support): $477,113
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 283 of 284
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Project List
Support
Yuba($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 284 of 284
DRAFT
12-06
-17
Long Lead Project List
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Del Norte($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MAJOR DAMAGE RESTORATIONNear Crescent City, at Last Chance Grade, fromWilson Creek Bridge to 3.8 miles north of WilsonCreek Bridge. Permanent roadway restorationand realignment. PA&ED and R/W funds arerequested for geotechnical evaluation of thecurrent seven alternatives and for theenvironmental clearance needed to performgeotechnical work.
1112
0F280 $75
Subtotal: $75
2030-31$5,000
$5,000Total Project Cost: $5,075
01150000999/2/20307/1/2030
2/16/2026PA&ED:
RTL:R/W Cert:
10/14/2031Begin Con:
01-Del Norte-101 Prior25-2625-2630-31
201.1311 Location(s)Performance Measure
Program Code
* PA&ED:PS&E:
R/W Sup:
Long Lead
12.0/15.5
Con Sup:
Permanent Restoration
* R/W, * PA&ED phase(s) are authorized
Const:* R/W:
Approximate project estimates: PA&ED $52,600,000, R/W $89,600,000,Con $1,610,000,000.
CountyDel Norte
PA&ED:PS&E:
R/W Sup:Con Sup:
$75R/W:
Subtotal: $75
Const:$5,000
$5,000
Total (Capital + Support): $5,075
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 1 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Humboldt($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Hoopa, at Trinity River Bridge No. 04-0137.Upgrade bridge rails, widen for pedestrian access,and strengthen for truck permit load capacity.2432
0F600$29,764$1,576
Subtotal: $31,340
2022/23$2,621$2,895$1,138$3,287
$9,941Total Project Cost: $41,281
01160000292/1/2023
12/27/202212/27/2021PA&ED:
RTL:R/W Cert:
9/1/2023Begin Con:
01-Humboldt-96 18-1921-2221-2222-23
201.1121328 Linear FeetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
12.3
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
Near Weitchpec, at Klamath River Bridge No. 04-0144. Seismically retrofit bridge, upgrade bridgerails, and provide shoulders and pedestrianaccess.
2423
0F350$34,640
$138
Subtotal: $34,778
2022/23$2,434$2,648
$342$6,931
$12,355Total Project Cost: $47,133
01150001148/23/20227/7/2022
4/25/2020PA&ED:
RTL:R/W Cert:
1/12/2023Begin Con:
01-Humboldt-96 18-1919-2019-2022-23
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
22.9
Con Sup:
Bridge Seismic Restoration
Const:R/W:
In Rio Dell, at Eel River Bridge No. 04-0016R.Seismic retrofit.
2301B
0A111$26,813
$44
Subtotal: $26,857
2022-23$5,433$5,113
$216$4,632
$15,394Total Project Cost: $42,251
01160001488/1/20228/1/20225/1/2021PA&ED:
RTL:R/W Cert:
1/1/2023Begin Con:
01-Humboldt-101 Prior20-2120-2122-23
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
M53.9
Con Sup:
Bridge Seismic Restoration
Const:R/W:
CountyHumboldt
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,758$91,217
R/W:
Subtotal: $92,975
Const:$10,488$10,656$1,696
$14,850
$37,690
Total (Capital + Support): $130,665
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 2 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Inyo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MANDATESNear Bishop, from North See Vee Lane to NorthBarlow Lane. Upgrade ADA curb ramps,driveways, and pedestrian push buttons, refreshstriping, relocate signals, and construct newpedestrian and bicycle facilities.
2641
36680$9,901$6,378
Subtotal: $16,279
2023/24$1,530$3,340$1,670$2,190
$8,730Total Project Cost: $25,009
091600002111/20/202310/2/202310/1/2020PA&ED:
RTL:R/W Cert:
6/19/2024Begin Con:
09-Inyo-395 18-1920-2120-2123-24
201.36115 ADA Unit(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
117.3/117.8
Con Sup:
Americans with Disabilities Act New Curb Ramps
Const:R/W:
CountyInyo
PA&ED:PS&E:
R/W Sup:Con Sup:
$6,378$9,901
R/W:
Subtotal: $16,279
Const:$1,530$3,340$1,670$2,190
$8,730
Total (Capital + Support): $25,009
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 3 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Kern($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONNear Bakersfield, from 0.1 miles east of AsheRoad to Route 99 Separation. Rehabilitateroadway including reconstruction of travel laneswith Jointed Plain Concrete Pavement (JPCP),widen intersections and shoulders to meet currentstandards, add bicycle lanes, median lane toaccommodate two-way turning, install drainage inlets and stormwater basin, sidewalks andupgrade ADA ramps to current standards.
6805
0V610$26,500$14,200
Subtotal: $40,700
2023-24$3,200$2,500$6,300$4,600
$16,600Total Project Cost: $57,300
061600022210/2/20239/1/20239/1/2020PA&ED:
RTL:R/W Cert:
3/1/2024Begin Con:
06-Kern-119 Prior20-2120-2123-24
201.12010.0 Lane Mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
28.2/31.3
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
CountyKern
PA&ED:PS&E:
R/W Sup:Con Sup:
$14,200$26,500
R/W:
Subtotal: $40,700
Const:$3,200$2,500$6,300$4,600
$16,600
Total (Capital + Support): $57,300
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 4 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Mendocino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Hopland, from 0.1 mile south to 0.3 milenorth of Russian River Bridge No. 10-0082 (PM9.24). Bridge seismic and rail upgrade and widenfor standard shoulders with partial or complete structure replacement.
4526
0A130$44,499
$600
Subtotal: $45,099
2022/23$1,176$1,953
$165$9,351
$12,645Total Project Cost: $57,744
01160000012/1/2023
1/15/202310/1/2021PA&ED:
RTL:R/W Cert:
8/1/2023Begin Con:
01-Mendocino-101 18-1921-2221-2222-23
201.1131 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
9.2/9.9
Con Sup:
Bridge Seismic Restoration
Const:R/W:
CountyMendocino
PA&ED:PS&E:
R/W Sup:Con Sup:
$600$44,499
R/W:
Subtotal: $45,099
Const:$1,176$1,953
$165$9,351
$12,645
Total (Capital + Support): $57,744
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 5 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Mono($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Bridgeport, from north of Route 270Junction to Green Creek Road. Widen shouldersto eight feet, install rumble strips, improve sightdistance, and upgrade signing and striping tocurrent standards.
2639
36940$7,623
$471
Subtotal: $8,094
2023/24$1,300$1,240
$590$2,330
$5,460Total Project Cost: $13,554
09170000147/14/20234/18/20234/1/2021PA&ED:
RTL:R/W Cert:
1/23/2024Begin Con:
09-Mono-395 18-1920-2120-2123-24
201.01554 Collisions ReducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
69.9/71.9
Con Sup:
Collision Severity Reduction
Const:R/W:
Near Bridgeport, from Burcham Flat Road to 0.3mile south of Route 395/108 Junction. Widenshoulders, install rumble strips, and correctsuperelevation at three curves.
2460
36800$12,567$1,855
Subtotal: $14,422
2022/23$1,395$1,764
$395$2,084
$5,638Total Project Cost: $20,060
09170000116/8/20236/8/20236/1/2021PA&ED:
RTL:R/W Cert:
12/14/2023Begin Con:
09-Mono-395 18-1920-2120-2122-23
201.01555 Collisions ReducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
91.6/93.4
Con Sup:
Collision Severity Reduction
Const:R/W:
CountyMono
PA&ED:PS&E:
R/W Sup:Con Sup:
$2,326$20,190
R/W:
Subtotal: $22,516
Const:$2,695$3,004
$985$4,414
$11,098
Total (Capital + Support): $33,614
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 6 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Monterey($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Lucia from 0.1 mile south to 0.2 mile northof Limekiln Creek Bridge No. 44-0058. Replacebridge.2524
1F510$64,644
$704
Subtotal: $65,348
2024-25$3,500
$0$416
$13,865
$17,781Total Project Cost: $83,129
05140000044/3/20253/5/2025
12/2/2021PA&ED:
RTL:R/W Cert:
Begin Con:
05-Monterey-1 Prior21-2221-2224-25
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
20.9/21.3
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Carmel-by-the-Sea, at the Garrapata CreekBridge No. 44-0018. Replace bridge railing tomeet current traffic safety standards.2696
1H800$3,000
$5
Subtotal: $3,005
2022/23$1,600$1,900
$130$1,300
$4,930Total Project Cost: $7,935
05160001632/14/2023
10/21/20224/2/2021PA&ED:
RTL:R/W Cert:
Begin Con:
05-Monterey-1 18-1920-2120-2122-23
201.112603 Linear FeetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
63.0
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
ROADWAY PRESERVATIONNear Lucia, north of Mill Creek Bridge. Stabilizehighway segment caused by erosion.
3030
0P300$9,402
$100
Subtotal: $9,502
2024/25$2,376$2,748
$185$4,400
$9,709Total Project Cost: $19,211
05160000471/2/2025
12/1/20249/1/2021PA&ED:
RTL:R/W Cert:
6/1/2025Begin Con:
05-Monterey-1 18-1921-2221-2224-25
201.1501 Location(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
18.5/18.7
Con Sup:
Roadway Protective Betterments
Const:R/W:
CountyMonterey
PA&ED:PS&E:
R/W Sup:Con Sup:
$809$77,046
R/W:
Subtotal: $77,855
Const:$7,476$4,648
$731$19,565
$32,420
Total (Capital + Support): $110,275
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 7 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Napa($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONIn St. Helena, at Sulphur Creek Bridge No. 21-0016 and York Creek Bridge No. 21-0017.Upgrade bridge rails.1462K
2K150$4,188
$748
Subtotal: $4,936
2022/23$1,040
$800$500$800
$3,140Total Project Cost: $8,076
04160003754/3/20231/3/20233/1/2021PA&ED:
RTL:R/W Cert:
10/2/2023Begin Con:
04-Napa-29 18-1920-2120-2122-23
201.112328 Linear FeetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
28.4/29.3
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
CountyNapa
PA&ED:PS&E:
R/W Sup:Con Sup:
$748$4,188
R/W:
Subtotal: $4,936
Const:$1,040
$800$500$800
$3,140
Total (Capital + Support): $8,076
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 8 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Sacramento($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONIn the city of Sacramento, at the West EndViaduct No. 24-0069L/R. Improve to standardtruck capacity.5863
1H610$120,000
$900
Subtotal: $120,900
2021/22$5,700$5,800
$400$24,000
$35,900Total Project Cost: $156,800
03160001905/11/20223/11/20224/2/2020PA&ED:
RTL:R/W Cert:
8/24/2022Begin Con:
03-Sacramento-5 18-1919-2019-2021-22
201.3222 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
23.6/24.3
Con Sup:
Trans Permit Requirements for Bridges
Const:R/W:
CountySacramento
PA&ED:PS&E:
R/W Sup:Con Sup:
$900$120,000
R/W:
Subtotal: $120,900
Const:$5,700$5,800
$400$24,000
$35,900
Total (Capital + Support): $156,800
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 9 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
San Bernardino($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Near Needles, from Park Moabi Road to TopockRoad at the Colorado River Bridge No. 54-0415.Bridge rehabilitation and/or replacement. Caltrans will be the lead agency and will sharehalf of all costs with ADOT as indicated via asigned Letter of Intent.
3001S
0R380$28,800
$169
Subtotal: $28,969
2023-24$2,650$3,759
$431$8,332
$15,172Total Project Cost: $44,141
08120000678/15/20232/1/20232/1/2021PA&ED:
RTL:R/W Cert:
4/15/2024Begin Con:
08-San Bernardino-40 Prior20-2120-2123-24
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
153.9/154.7
Con Sup:
Const:R/W:
CountySan Bernardino
PA&ED:PS&E:
R/W Sup:Con Sup:
$169$28,800
R/W:
Subtotal: $28,969
Const:$2,650$3,759
$431$8,332
$15,172
Total (Capital + Support): $44,141
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 10 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
San Diego($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONIn the city of San Diego and Coronado from SanDiego-Coronado Bay Bridge to the Route 75/5Connector Overcrossing. Bridge rehabilitation.1065
40940
Subtotal: $0
TBD$2,593
$2,593Total Project Cost: $2,593
1112000071TBDTBD
6/29/2018PA&ED:
RTL:R/W Cert:
TBDBegin Con:
11-San Diego-75 Prior18-1918-19TBD
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
R20.5/R22.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
In the city of San Diego, at various locations fromQuince Street Overcrossing Bridge No. 57-0216Kto Washington Street Overcrossing Bridge No. 57-0220. Replace bridge rail within CabrilloFreeway Historic District.
1276
43013$9,473
$256
Subtotal: $9,729
2024/25$4,740$2,409
$212$3,633
$10,994Total Project Cost: $20,723
11170001713/7/2025
1/16/20257/29/2022PA&ED:
RTL:R/W Cert:
7/11/2025Begin Con:
11-San Diego-163 18-1922-2322-2324-25
201.1121959 Linear FeetPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
1.6/2.8
Con Sup:
Bridge Rail Replacement and Upgrade
Const:R/W:
CountySan Diego
PA&ED:PS&E:
R/W Sup:Con Sup:
$256$9,473
R/W:
Subtotal: $9,729
Const:$7,333$2,409
$212$3,633
$13,587
Total (Capital + Support): $23,316
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 11 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
San Joaquin($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONIn Stockton, at the Stockton Channel ViaductBridge No. 29-0176L/R. Bridge rehabilitation toaddress structural and load carrying capacitydeficiencies.
3133
0X460$815,000
$0
Subtotal: $815,000
TBD$4,169
$4,169Total Project Cost: $819,169
10120002599/30/2024
10/30/2020PA&ED:
RTL:R/W Cert:
5/30/2025Begin Con:
10-San Joaquin-5 Prior20-2120-21TBD
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
26.5
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
CountySan Joaquin
PA&ED:PS&E:
R/W Sup:Con Sup:
$0$815,000
R/W:
Subtotal: $815,000
Const:$4,169
$4,169
Total (Capital + Support): $819,169
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 12 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
San Luis Obispo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATIONNear Guadalupe, at the Santa Maria River BridgeNo. 49-0042; also in Santa Barbara County (PM50.3/50.6). The bridge is scour critical and needs to be replaced. The existing bridge will be usedfor traffic handling during construction and thendemolished. The highway will need to berealigned as a result of the new bridge location.The new bridge will provide standard lane andshoulder widths and include a protected walkway.
2650
1H440$28,461
$530
Subtotal: $28,991
2022-23$2,294$4,290
$455$9,660
$16,699Total Project Cost: $45,690
051600007410/1/20229/1/20223/1/2020PA&ED:
RTL:R/W Cert:
Begin Con:
05-San Luis Obispo-1 Prior19-2019-2022-23
201.1101 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
0.0/0.3
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
CountySan Luis Obispo
PA&ED:PS&E:
R/W Sup:Con Sup:
$530$28,461
R/W:
Subtotal: $28,991
Const:$2,294$4,290
$455$9,660
$16,699
Total (Capital + Support): $45,690
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 13 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
San Mateo($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
MANDATESIn Burlingame, Hillsborough, and Millbrae, fromBarroilhet Avenue to Millbrae Avenue. Upgradecurb ramps and sidewalks to ADA standards. 0730D
1G900$9,120
$844
Subtotal: $9,964
2022-23$3,320$1,200
$700$1,000
$6,220Total Project Cost: $16,184
04000206192/1/20232/1/20238/1/2020PA&ED:
RTL:R/W Cert:
9/1/2023Begin Con:
04-San Mateo-82 Prior20-2120-2122-23
201.378385 ADA Unit(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
12.9/15.9
Con Sup:
Americans with Disabilities Act PedestrianInfrastructure
Const:R/W:
ROADWAY PRESERVATIONIn the cities of San Mateo and Burlingame, fromEast Santa Inez Avenue to Murchison Drive.Rehabilitate roadway, improve drainage, andupgrade existing curb ramps and sidewalks toADA standards.
1496J
0K810$86,061$2,215
Subtotal: $88,276
2023-24$8,181$8,181$4,091
$12,270
$32,723Total Project Cost: $120,999
04160001422/1/2024
11/1/202311/1/2021PA&ED:
RTL:R/W Cert:
8/1/2024Begin Con:
04-San Mateo-82 Prior21-2221-2223-24
201.12015.2 Lane Mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
12.3/15.8
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
CountySan Mateo
PA&ED:PS&E:
R/W Sup:Con Sup:
$3,059$95,181
R/W:
Subtotal: $98,240
Const:$11,501$9,381$4,791
$13,270
$38,943
Total (Capital + Support): $137,183
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 14 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Santa Barbara($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
COLLISION REDUCTIONNear Santa Maria, from 0.2 mile north of Route135 Junction to Route 166 Junction. Widenshoulders, install rumble strips, upgradeguardrails and relocate objects from within theclear recovery zone.
2667
1H610$15,401$4,053
Subtotal: $19,454
2023/24$1,736$1,942$1,237$4,379
$9,294Total Project Cost: $28,748
05160000977/14/20237/14/20234/13/2021PA&ED:
RTL:R/W Cert:
2/22/2024Begin Con:
05-Santa Barbara-1 18-1920-2120-2123-24
201.015103 Collisions ReducedPerformance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
R35.0/49.2
Con Sup:
Collision Severity Reduction
Const:R/W:
BRIDGE PRESERVATIONNear Goleta, at Refugio Road Undercrossing No.51-0215L/R. Replace bridges.
2448
1C950$34,640
$20
Subtotal: $34,660
2022-23$2,200
$0$100
$0
$2,300Total Project Cost: $36,960
05130000182/21/2023
12/21/20224/3/2020PA&ED:
RTL:R/W Cert:
Begin Con:
05-Santa Barbara-101 Prior19-2019-2022-23
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
R36.6
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
CountySanta Barbara
PA&ED:PS&E:
R/W Sup:Con Sup:
$4,073$50,041
R/W:
Subtotal: $54,114
Const:$3,936$1,942$1,337$4,379
$11,594
Total (Capital + Support): $65,708
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 15 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Shasta($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
ROADWAY PRESERVATIONIn and near the town of Shasta, from west ofCrystal Creek Road to Trinity Alley. Roadwayrehabilitation.3680
3H310$69,236$6,269
Subtotal: $75,505
2024-25$4,130$5,110
$490$6,820
$16,550Total Project Cost: $92,055
02170000837/22/20246/21/20245/2/2022PA&ED:
RTL:R/W Cert:
3/4/2025Begin Con:
02-Shasta-299 Prior21-2221-2224-25
201.12014.4 Lane Mile(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
R7.6/18.3
Con Sup:
Roadway Rehabilitation (3R)
Const:R/W:
CountyShasta
PA&ED:PS&E:
R/W Sup:Con Sup:
$6,269$69,236
R/W:
Subtotal: $75,505
Const:$4,130$5,110
$490$6,820
$16,550
Total (Capital + Support): $92,055
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 16 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Siskiyou($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
BRIDGE PRESERVATION Near Somes Bar, from 0.6 mile east to 1.3 mileseast of Irving Creek Bridge at Stanshaw Creek(PM R8.2); also, from 1.6 miles east of IrvingCreek Bridge to 1.6 miles west of Ti CreekBridge at Sandy Bar Creek (PM 9.1). Replacedeteriorated large-diameter culverts with natural-bottom structures, reduce fish passage barriers,and adjust new approaches.
3622
1H780$16,830
$37
Subtotal: $16,867
2023/24$1,910$2,730
$170$4,660
$9,470Total Project Cost: $26,337
02160000352/20/20241/19/202410/1/2021PA&ED:
RTL:R/W Cert:
8/27/2024Begin Con:
02-Siskiyou-96 18-1921-2221-2223-24
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
R7.9/R9.4
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Happy Camp, from 0.9 mile west to 0.4 milewest of Gordons Ferry Road at Cade Creek (PM43.4 to 43.8); also, near Seiad Valley atPortuguese Creek (PM 57.0). Replacedeteriorated large-diameter culverts with natural-bottom structures, reduce fish passage barriers,and adjust new approaches.
3620
1H590$6,760
$48
Subtotal: $6,808
2023/24$1,720$2,740
$160$2,840
$7,460Total Project Cost: $14,268
02160000251/29/2024
12/29/20239/7/2021PA&ED:
RTL:R/W Cert:
7/2/2024Begin Con:
02-Siskiyou-96 18-1921-2221-2223-24
201.1102 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
43.4/57.0
Con Sup:
Bridge Major Rehabilitation
Const:R/W:
Near Horse Creek, at Horse Creek Bridge No. 02-0117, from 0.4 mile west of Klamath RiverBridge to 2.0 miles west of Kohl Creek. Replacebridge on new alignment to correct scour criticalconditions, improve safety, and reduce operational deficiencies.
3629
1H360$19,760
$993
Subtotal: $20,753
2023/24$2,640$2,810
$830$4,300
$10,580Total Project Cost: $31,333
021600004010/1/20233/1/20239/1/2021PA&ED:
RTL:R/W Cert:
4/27/2024Begin Con:
02-Siskiyou-96 18-1921-2221-2223-24
201.1111 Bridge(s)Performance Measure
Program Code
PA&ED:PS&E:
R/W Sup:
Long Lead
76.8/78.0
Con Sup:
Bridge Scour Mitigation
Const:R/W:
CountySiskiyou
PA&ED:PS&E:
R/W Sup:Con Sup:
$1,078$43,350
R/W:
Subtotal: $44,428
Const:$6,270$8,280$1,160
$11,800
$27,510
Total (Capital + Support): $71,938
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 17 of 18
DRAFT
12-06
-17
Post Mile
Location/DescriptionPPNO EA
Program Year Capital
V3.0 2018 SHOPP Long Lead Project List
Support
Siskiyou($1,000)
EFIS Milestones
RteDist- Co- COSAllocation
FY
Sorted by: County, Program Category, Program Code, Route and Post Miles Page 18 of 18
DRAFT
12-06
-17
California Department of Transportation1120 N Street Sacramento, CA 95814 www.dot.ca.gov