STATE HIGHWAY OPERATION AND PROTECTION PROGRAM Fiscal Years 2018-19 through 2021-22 Prepared by the CALIFORNIA DEPARTMENT OF TRANSPORTATION In accordance with Government Code section 14526.5 December 6, 2017 2018 DRAFT SHOPP

Transcript of 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot...

Page 1: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

STATE HIGHWAY OPERATION AND PROTECTION PROGRAM

Fiscal Years 2018-19 through 2021-22

Prepared by the CALIFORNIA DEPARTMENT OF

TRANSPORTATION In accordance with Government Code section 14526.5

December 6, 2017

2018 DRAFT SHOPP

Page 2: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”

STATE OF CALIFORNIA------- CALIFORNIA STATE TRANSPORTATION AGENCY EDMUND G. BROWN Jr., Governor

DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PROGRAMMING P.O. BOX 942873, MS-82 SACRAMENTO, CA 94273-0001 PHONE (916) 654-4013 TTY 711 www.dot.ca.gov

Making Conservation a California Way of Life.

December 6, 2017

Executive Directors Regional Transportation Agencies

Dear Executive Directors:

I am pleased to provide the attached Draft 2018 State Highway Operations and Protection Program (SHOPP) Project List for review and comment, consistent with Senate Bill 486 (DeSaulnier, 2014). Senate Bill 486 requires that the draft SHOPP Project List be made available to Regional Transportation Planning Agencies for review and comment prior to the document’s submittal to the California Transportation Commission (Commission) for their adoption and submittal to the Legislature and the Governor not later than April 1 of even-number years. The California Department of Transportation’s (Department) 2018 SHOPP will be submitted, including comments received through this review process, to the Commission no later than January 31, 2018.

The SHOPP is based on Government Code Section 14526.5 and Streets and Highways Code Section 164.6. The 2018 SHOPP continues the Department’s transition to a full Asset Management approach to protecting, preserving and rehabilitating the State Highway System (SHS). Asset Management will be fully implemented in the 2020 SHOPP as required by Senate Bill 486 and further amplified by requirements of Senate Bill 1 (Beall, 2017). The SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project List includes approximately $4.0 billion in projects for fiscal years 2018-19 through 2021-22.

In its simplest terms, the SHOPP, consistent with Asset Management, is the State’s fix-it-first program that prioritizes and funds capital projects that protect, preserve and rehabilitate State Highway System (SHS) infrastructure. The SHS includes State owned roadways and bridges, and their supporting infrastructure such as culverts, intelligent transportation systems, maintenance stations and other tangible physical assets. Very importantly, the SHOPP also provides capital funding to respond to emergency and safety issues. Projects funded by the SHOPP are limited to capital improvements to the SHS that do not add capacity, such as new highway lanes. There are several "reservations" within the SHOPP Program for specific, not-yet-identified investments for emergency, safety, mandates, and Advance Environmental Mitigation projects. This broad list of project categories constitute the Draft 2018 SHOPP

Page 3: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Executive Directors December 6, 2017 Page 2

“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”

Project List that is the set of projects which the Department is proposing for the next four years to meet safety, emergency, mandates, and fix-it-first needs. As individual SHOPP projects are developed and implemented, there are also often opportunities to accomplish additional non-capacity increasing goals such as improving pedestrian access, accommodating bicyclists, reducing air pollutants and greenhouse gas emissions, and responding to SHS impacts to wildlife. Such additional benefits from SHOPP projects will be captured and reported in the respective project development documents for each project. All comments regarding the Draft 2018 SHOPP Project List must be submitted to Caltrans in writing no later than January 2, 2018 to: http://www.dot.ca.gov/hq/transprog/SHOPP/draft_2018_shopp.html

Should you need clarification regarding the listed projects or SHOPP process, please contact Donna Berry, Office Chief for the SHOPP, Division of Transportation Programming at (916) 654-4327. Sincerely,

BRUCE DE TERRA, Chief Division of Transportation Programming Enclosure

Page 4: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Project List

Page 5: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Berkeley and Albany, from Route 13 to east ofEl Cerrito Separation. Install median safety lighting and replace median concrete barrier. 1488S

3J700$14,587

$25

Subtotal: $14,612

2019-20$2,750$2,750

$100$2,625

$8,225Total Project Cost: $22,837

04150001834/1/20204/1/20202/1/2019PA&ED:

RTL:R/W Cert:

11/30/2020Begin Con:

04-Alameda-80 Prior18-1918-1919-20

201.010185 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.5/R7.6

Con Sup:

Safety Improvements

Const:R/W:

In Fremont, from north end of Dumbarton Bridgeto south of the Toll Plaza. Install outer separationbarrier between route and frontage road.1493F

4J750$15,560$3,280

Subtotal: $18,840

2019-20$2,000$2,500

$240$2,500

$7,240Total Project Cost: $26,080

04160000054/1/20203/1/2020

9/30/2018PA&ED:

RTL:R/W Cert:

12/7/2020Begin Con:

04-Alameda-84 Prior18-1918-1919-20

201.01023 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.7/R3.1

Con Sup:

Safety Improvements

Const:R/W:

In Fremont, from Route 238 (Mission Boulevard)to Route 680. Widen shoulders, install trafficsignals and upgrade barriers. 0076B

2A332$19,500$2,000

Subtotal: $21,500

2018-19$11,000$2,800

$500$4,000

$18,300Total Project Cost: $39,800

04140000394/16/20192/1/2019

10/30/2017PA&ED:

RTL:R/W Cert:

12/8/2019Begin Con:

04-Alameda-84 PriorPriorPrior18-19

201.01090 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.8/18.0

Con Sup:

Safety Improvements

Const:R/W:

Near Livermore, from Flynn Road to Grant LineRoad. Install safety lighting and establishelectrical service connection. 1495F

0K680$4,211

$493

Subtotal: $4,704

2019-20$962$806$104$962

$2,834Total Project Cost: $7,538

04160001256/1/20205/1/20206/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

04-Alameda-580 Prior19-2019-2019-20

201.01065 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R1.3/R6.0

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 1 of 284

DRAFT

12-06

-17

Page 6: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Leandro, at the southbound Route 880/238 Connector offramp to Washington Avenue.Reconstruct and signalize offramp.1491G

4J730$3,445

$150

Subtotal: $3,595

2019-20$1,200$1,250

$125$1,250

$3,825Total Project Cost: $7,420

04160000015/4/20202/4/20207/2/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

04-Alameda-880 Prior18-1918-1919-20

201.01074 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.9

Con Sup:

Safety Improvements

Const:R/W:

In Alameda County on Routes 80, 84, and 880 atvarious locations; also, in Contra Costa Countyon Routes 24 and 680 at various locations. InstallHigh Friction Surface Treatment (HFST) at spot locations to enhance wet pavement conditions.

1481B

1J780$6,311

$10

Subtotal: $6,321

2020-21$1,118$1,274

$104$1,534

$4,030Total Project Cost: $10,351

04140003576/1/20213/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

04-Alameda-Var 18-1919-2019-2021-22

201.01566 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In Alameda County, on Routes 13, 24, 580, 680,and 880 at various locations; also in Contra CostaCounty on Routes 4, 24, 80, 160, and 680 atvarious locations. Install Rectangular RapidFlashing Beacons (RRFBs) to enhance pedestriansafety at ramp termini and uncontrolledpedestrian crossings.

1492F

0K120$8,237

$290

Subtotal: $8,527

2021-22$1,261$1,145

$229$1,345

$3,980Total Project Cost: $12,507

04160000545/5/20223/1/20226/1/2020PA&ED:

RTL:R/W Cert:

11/2/2022Begin Con:

04-Alameda-13 18-1919-2020-2121-22

201.01580 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In various cities, on Routes 13, 61, and 123 atvarious locations; also in Contra Costa County,on Route 123, at Eureka Avenue. Crosswalksafety enhancements.

0488Q

0J470$3,320

$260

Subtotal: $3,580

2018-19$788

$1,393$200$680

$3,061Total Project Cost: $6,641

041400000311/1/2018

10/18/201812/1/2017PA&ED:

RTL:R/W Cert:

4/23/2019Begin Con:

04-Alameda-13 PriorPriorPrior18-19

201.01533 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 2 of 284

DRAFT

12-06

-17

Page 7: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In various cities, on various routes, at variouslocations. Crosswalk safety enhancements.

1487Q

3J110$4,040

$50

Subtotal: $4,090

2018-19$786

$1,000$214$572

$2,572Total Project Cost: $6,662

04150000885/1/20194/1/20191/3/2018PA&ED:

RTL:R/W Cert:

12/30/2019Begin Con:

04-Alameda-13 PriorPriorPrior18-19

201.015939 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

In Oakland, San Leandro, Hayward and Fremonton Routes 84, 92, 112, 185 and 238 at variouslocations. Crosswalk safety enhancements.0448R

1J600$2,803

$150

Subtotal: $2,953

2018-19$453$657$23

$453

$1,586Total Project Cost: $4,539

04140002874/5/2019

1/15/20199/26/2017PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

04-Alameda-84 PriorPriorPrior18-19

201.01527 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

In Oakland, San Leandro, Hayward, Union Cityand Fremont on Routes 185, 238, and 262 atvarious locations. Crosswalk safetyenhancements.

1487P

3J190$1,711

$10

Subtotal: $1,721

2018-19$550$550$66

$550

$1,716Total Project Cost: $3,437

04150000995/1/20194/1/2019

2/15/2018PA&ED:

RTL:R/W Cert:

12/13/2019Begin Con:

04-Alameda-185 PriorPriorPrior18-19

201.015231 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

In various cities, on Routes 580, 680, 880, and980 at various locations. Enhance pedestriansafety by installing Accessible Pedestrian Signal(APS) systems and countdown timers andupgrading crosswalk markings.

1487M

3J130$6,068

$20

Subtotal: $6,088

2021-22$940$940$130

$1,030

$3,040Total Project Cost: $9,128

04150000907/15/20217/1/20214/1/2020PA&ED:

RTL:R/W Cert:

1/19/2022Begin Con:

04-Alameda-580 18-1919-2019-2021-22

201.015264 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 3 of 284

DRAFT

12-06

-17

Page 8: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Alameda County, on Routes 580 and 680 atvarious locations; also in Contra Costa County onRoutes 160 and 680 at various locations. Installconcrete barrier to shield structure column fromerrant vehicles, and upgrade existing guardrails tocurrent standards.

1495E

0K650$3,156

$70

Subtotal: $3,226

2020-21$500$800$166$800

$2,266Total Project Cost: $5,492

04160001236/1/20213/1/20212/2/2020PA&ED:

RTL:R/W Cert:

12/8/2021Begin Con:

04-Alameda-580 18-1919-2019-2020-21

201.01515 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In Alameda and Contra Costa Counties, onvarious routes, at various locations. Upgradeadvance warning signs to make standard.1496A

0K770$2,638

$108

Subtotal: $2,746

2021-22$700$700$10

$700

$2,110Total Project Cost: $4,856

04160001376/30/20216/1/20216/1/2020PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

04-Alameda-580 18-1919-2019-2021-22

201.01531 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Livermore, from San Joaquin countyline to 0.7 mile west of Greenville Road.Highway worker safety improvements.1494D

4J940$1,997

$183

Subtotal: $2,180

2021-22$625$400$75

$525

$1,625Total Project Cost: $3,805

04160000251/15/202211/1/20214/1/2020PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

04-Alameda-580 18-1919-2019-2021-22

201.23514 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.1/R9.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Fremont, from north of Auto Mall Parkway tosouth of Fremont Boulevard at various locations.Highway worker safety improvements.1483N

2J810$4,918

$10

Subtotal: $4,928

2018-19$660$880$44

$880

$2,464Total Project Cost: $7,392

04150000086/3/2019

5/23/20196/7/2018PA&ED:

RTL:R/W Cert:

12/20/2019Begin Con:

04-Alameda-880 Prior18-1918-1918-19

201.23583 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.8/11.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 4 of 284

DRAFT

12-06

-17

Page 9: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Oakland, from south of 5th Avenue to north of7th Street. Pave narrow strips and miscellaneousareas, construct MVPs, and upgrade crashcushions to reduce maintenance work andenhance highway worker safety.

1452N

2K820$2,170

$5

Subtotal: $2,175

2020-21$500$350$100$450

$1,400Total Project Cost: $3,575

04170000352/1/20211/1/20219/1/2019PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

04-Alameda-880 18-1919-2019-2020-21

201.23520 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

30.2/R33.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Oakland, Union City, and Fremont, and onRoute 80 in Berkeley (PM 4.7) at various locations; also in Santa Clara County in Milpitasat PM 8.9. Construct permanent Best Management Practices (BMPs) to achieveStatewide NPDES permit compliance units (CUs)for trash capture.

1453D

4J980$5,801

$25

Subtotal: $5,826

2020-21$1,060

$800$26

$1,000

$2,886Total Project Cost: $8,712

04160000366/1/20215/1/20213/1/2020PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

04-Alameda-880 18-1919-2020-2121-22

201.33560 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.9/24.8

Con Sup:

Storm Water Mitigation

Const:R/W:

In Hayward, from A Street to Rose Street (PM0.39 to 0.90); also, in Oakland, from 55th Avenueto 50th Avenue (PM 9.75 to 10.09). Upgradecurb ramps, driveways, and sidewalks to makecompliant with ADA standards.

0434J

2G740$5,017

$195

Subtotal: $5,212

2021-22$700$950$95

$950

$2,695Total Project Cost: $7,907

04000212156/1/20222/1/20226/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

04-Alameda-185 18-1919-2019-2021-22

201.36131 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.4/10.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Oakland and Berkeley, from Hiller Drive to Claremont Avenue at various locations. UpgradeADA facilities. 0144A

2G660$2,673

$200

Subtotal: $2,873

2018-19$870$740$140$580

$2,330Total Project Cost: $5,203

04000211036/3/2019

5/20/20192/14/2018PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

04-Alameda-13 PriorPriorPrior18-19

201.37836.7 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

T9.8/10.8

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 5 of 284

DRAFT

12-06

-17

Page 10: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Berkeley, from Claremont Avenue to west ofShattuck Avenue. Upgrade curb ramps and repairsidewalks to meet ADA standards.0124M

2G460$1,389

$120

Subtotal: $1,509

2019-20$619$543$75

$423

$1,660Total Project Cost: $3,169

040002085911/1/2019

10/25/20197/11/2018PA&ED:

RTL:R/W Cert:

4/24/2020Begin Con:

04-Alameda-13 Prior18-1918-1919-20

201.37847.9 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.8/12.1

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

In Berkeley, from Shattuck Avenue to 7th Street.Upgrade curb ramps and sidewalks.

0124L

2G482$3,500

$125

Subtotal: $3,625

2018-19$455

$1,000$200$793

$2,448Total Project Cost: $6,073

04150003627/31/20187/2/20182/1/2016PA&ED:

RTL:R/W Cert:

3/29/2019Begin Con:

04-Alameda-13 PriorPriorPrior18-19

201.37834 Structure(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

12.1/13.4

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

In Oakland and San Leandro, from Plaza Drive to55th Avenue; also in Contra Costa County, in ElCerrito on Route 123 (PM 0.18/0.29) and inPleasant Hill on Route 680 (PM 16.85), at variouslocations. Reinstall and/or upgrade existing curbramps and sidewalks to ADA standards.

0091P

1G910$2,252

$50

Subtotal: $2,302

2019-20$446$655$102$450

$1,653Total Project Cost: $3,955

04000205828/1/20197/1/20193/1/2018PA&ED:

RTL:R/W Cert:

2/28/2020Begin Con:

04-Alameda-185 PriorPriorPrior19-20

201.37866.16 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.3/9.8

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

BRIDGE PRESERVATIONIn Fremont, at Alameda Creek Bridge No. 33-36.Replace bridge.

0084B

16030$24,000

$275

Subtotal: $24,275

2018-19$6,500$6,500

$299$5,000

$18,299Total Project Cost: $42,574

04000004294/1/20193/1/2019

9/25/2017PA&ED:

RTL:R/W Cert:

12/8/2019Begin Con:

04-Alameda-84 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.0/13.6

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 6 of 284

DRAFT

12-06

-17

Page 11: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Livermore, near Greenville Road atGreenville Overhead No. 33-0121R. Rehabilitatewestbound structure.0480J

0J520$5,979

$140

Subtotal: $6,119

2019-20$600$900$120

$1,000

$2,620Total Project Cost: $8,739

041400000910/1/20199/2/2019

1/15/2018PA&ED:

RTL:R/W Cert:

2/3/2020Begin Con:

04-Alameda-580 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R8.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Oakland, at Foothill Boulevard UndercrossingNo. 33-0334K. Bridge deck rehabilitation.

1494K

0K470$360

Subtotal: $360

2019-20 $398$21

$212

$631Total Project Cost: $991

04160000911/31/2020

12/31/20195/27/2017PA&ED:

RTL:R/W Cert:

8/31/2020Begin Con:

04-Alameda-580PriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R35.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Fremont, from 0.5 mile south to 0.5 mile north of Patterson Slough Bridge No. 33-0250 (PM11.8). Bridge rehabilitation. 0480A

0J530$11,784

$427

Subtotal: $12,211

2019-20$2,200$1,980

$704$2,420

$7,304Total Project Cost: $19,515

04140000105/27/20205/13/20205/22/2019PA&ED:

RTL:R/W Cert:

2/10/2021Begin Con:

04-Alameda-880 Prior19-2019-2019-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.3/12.3

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Sunol, at Arroyo De La Laguna Bridge No.33-0043. Bridge scour mitigation and bridge railupgrade.0481M

0J550$6,970

$5

Subtotal: $6,975

2019-20$1,863$2,392

$23$2,461

$6,739Total Project Cost: $13,714

04140000126/1/20206/1/2020

9/15/2018PA&ED:

RTL:R/W Cert:

1/18/2021Begin Con:

04-Alameda-84 Prior18-1918-1919-20

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

17.2

Con Sup:

Bridge Scour Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 7 of 284

DRAFT

12-06

-17

Page 12: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Hayward, San Leandro, and Oakland, atTennyson Road Overcrossing (OC) No. 33-0236(PM 15.65), Washington Avenue OC No. 33 -0166 (PM 20.82), and Damon Slough Southboudonramp No. 33-0142K (PM 26.53); also, onRoute 77 in Oakland at San Leandro OC No. 33-0284 (PM 0.29). Upgrade bridge rails, replacejoint seals.

1450C

2K170$10,300

$25

Subtotal: $10,325

2021-22$800

$1,500$250

$2,200

$4,750Total Project Cost: $15,075

04160003781/21/2022

12/17/20213/16/2020PA&ED:

RTL:R/W Cert:

9/26/2022Begin Con:

04-Alameda-880 18-1919-2019-2021-22

201.1122123 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

15.6/26.5

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In Oakland, at East Creek Slough Bridge No. 33-0143. Mitigate eroded channel side-slope tidalscour and replace bridge approach slabs.1483D

2J760$2,307

$100

Subtotal: $2,407

2021-22$1,000

$850$160

$1,170

$3,180Total Project Cost: $5,587

04150000051/15/2022

12/15/20216/15/2020PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

04-Alameda-880 Prior20-2120-2121-22

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

27.2

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In Oakland, at the Routes 80/580/680 MacArthurMaze Bridge No. 33-0061R, 33-0061L, 33-0061Land 33-0611. Establish standard verticalclearance.

ACCELERATED BRIDGE (PA&ED Only)

1460R

4K810$105,489

$500

Subtotal: $105,989

2019-20$6,600$7,800

$260$7,800

$22,460Total Project Cost: $128,449

04170003636/1/20205/2/20201/1/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

04-Alameda-80 19-2019-2019-2019-20

201.3224 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

In Berkeley, at University Avenue OvercrossingNo. 33-0023. Establish standard verticalclearance.

ACCELERATED BRIDGE (PA&ED Only)

1452H

2K830$27,678

$35

Subtotal: $27,713

2019-20$3,380$3,000

$300$5,400

$12,080Total Project Cost: $39,793

04170000306/1/20205/1/20201/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

04-Alameda-80 19-2019-2019-2019-20

201.3221 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

5.8

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 8 of 284

DRAFT

12-06

-17

Page 13: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn the city of Alameda, from Broadway/EncinalAvenue to Sherman Street. Pavementrehabilitation, upgrade ADA curb ramps, andimprove crosswalks.

1452J

2K710$4,874

$5

Subtotal: $4,879

2020-21$1,220$1,200

$22$1,500

$3,942Total Project Cost: $8,821

04170000135/1/20213/1/20212/1/2020PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

04-Alameda-61 Prior19-2019-2020-21

201.1215.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

19.8/21.2

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Fremont, from Route 880 (PM 6.922) to Route238. Rehabilitate pavement and upgrade curbramps to make ADA compliant.1454C

2K690$12,874

$173

Subtotal: $13,047

2021-22$2,080$2,340

$780$2,080

$7,280Total Project Cost: $20,327

04170000092/1/2022

12/1/20214/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-Alameda-84 18-1919-2019-2021-22

201.12111.96 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

6.9/10.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Hayward and San Leandro, from AStreet to Davis Street. Rehabilitate pavement andupgrade curb ramps to ADA standards. 1494C

0K490$14,928

$40

Subtotal: $14,968

2021-22$1,417$2,093

$375$2,405

$6,290Total Project Cost: $21,258

04160000948/2/20217/1/2021

12/1/2019PA&ED:

RTL:R/W Cert:

2/23/2022Begin Con:

04-Alameda-185 18-1919-2020-2121-22

201.12124.1 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.4/5.7

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Fremont, from Santa Clara County line to northof Fremont Boulevard Overcrossing. Cold planepavement, overlay with Rubberized Hot MixAsphalt (RHMA-G) and Open Graded FrictionCourse (OGFC), upgrade ADA curb ramps,upgrade metal beam guardrail, and replace loopdetectors.

1454G

2K700$57,166

$50

Subtotal: $57,216

2021-22$3,000$5,000

$620$5,400

$14,020Total Project Cost: $71,236

041700001011/1/20219/1/20213/2/2020PA&ED:

RTL:R/W Cert:

6/4/2022Begin Con:

04-Alameda-880 18-1919-2019-2021-22

201.12190.19 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.0/11.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 9 of 284

DRAFT

12-06

-17

Page 14: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Livermore, from San Joaquin county line toeast of Greenville Overcrossing; also on Route205 (PM 0.0/1.0) from San Joaquin county line toMidway Road Undercrossing. Environmentalmitigation for EA 04-3G590.

8315X

3G59C $2,100

Subtotal: $2,100

2018-19$150

$150Total Project Cost: $2,250

04160001579/30/20187/18/20189/15/2014PA&ED:

RTL:R/W Cert:

2/28/2019Begin Con:

04-Alameda-580

Prior

201.12253 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/7.8

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In and near Pleasanton and Dublin, from north ofRoute 84 to Alcosta Boulevard. Roadwayrehabilitation.0481P

0J620$109,853

$75

Subtotal: $109,928

2019-20$7,150$7,150$1,500

$16,400

$32,200Total Project Cost: $142,128

04140000196/1/20206/1/20203/1/2019PA&ED:

RTL:R/W Cert:

3/30/2021Begin Con:

04-Alameda-680 Prior18-1918-1919-20

201.12263 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R12.4/R21.9

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

MOBILITYIn various counties, on various routes at variouslocations. Restore non-operational TransportationManagement System (TMS) field elements by useof on-call Task Order service contracts.

1464M

0P380$15,990

$10

Subtotal: $16,000

2019-20$450

$1,340$10

$3,000

$4,800Total Project Cost: $20,800

041700043112/30/20198/15/20194/15/2019PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

04-Alameda-Var Prior18-1918-1919-20

201.315800 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

In Emeryville and Oakland, from San Francisco-Oakland Bay Bridge Toll Plaza to north of PowellStreet; also in Oakland on Routes 580 and 880, atvarious locations. Upgrade/replaceTransportation Management System elements.

1483H

2J830$5,135

$12

Subtotal: $5,147

2019-20$760$760$260

$1,044

$2,824Total Project Cost: $7,971

04150000065/1/20204/1/20203/1/2019PA&ED:

RTL:R/W Cert:

12/24/2020Begin Con:

04-Alameda-80 Prior18-1918-1919-20

201.31529 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.9/4.0

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 10 of 284

DRAFT

12-06

-17

Page 15: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Oakland and San Leandro, fromRoute 238 to Route 80. Install and upgradeTransportation Management System elements.1487A

3J050$17,970

$10

Subtotal: $17,980

2019-20$2,700$2,700

$50$3,600

$9,050Total Project Cost: $27,030

04150000756/15/20204/16/202010/1/2018PA&ED:

RTL:R/W Cert:

11/16/2020Begin Con:

04-Alameda-580 Prior18-1918-1919-20

201.31589 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R30.8/46.5

Con Sup:

Transportation Management Systems

Const:R/W:

In and near Fremont, Pleasanton, and Dublin,from 0.3 mile south of Scott Creek Road to 0.3mile north of Alcosta Boulevard. Install rampmeters, ramp HOV bypass lanes, and TrafficOperations Systems (TOS).

1463D

4G113$28,300

$800

Subtotal: $29,100

2018-19 $5,600$100

$5,600

$11,300Total Project Cost: $40,400

04140003056/15/20186/15/2018

11/16/2016PA&ED:

RTL:R/W Cert:

1/28/2019Begin Con:

04-Alameda-680PriorPrior18-19

201.31546 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

M0.0/R21.9

Con Sup:

Transportation Management Systems

Const:R/W:

In Oakland, at the District 4 TransportationManagement Center (TMC). Upgrade or replacelegacy TMC hardware components and relatedsoftware by service contract to improve reliabilityand functionality.

1464L

0P370$2,570

$10

Subtotal: $2,580

2019-20$110$392$10

$262

$774Total Project Cost: $3,354

041700043012/1/20199/1/2019

10/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

04-Alameda-980 Prior18-1918-1919-20

201.3151 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.2

Con Sup:

Transportation Management Systems

Const:R/W:

In Hayward, at 500 feet north of IndustrialParkway West. Install weigh-in-motion system inboth directions.1482G

2J320$3,540

$5

Subtotal: $3,545

2018-19 $1,121$63

$1,121

$2,305Total Project Cost: $5,850

04140004884/26/2019

12/28/20186/29/2015PA&ED:

RTL:R/W Cert:

11/29/2019Begin Con:

04-Alameda-880PriorPrior18-19

201.3212 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

14.7

Con Sup:

Weigh Stations

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 11 of 284

DRAFT

12-06

-17

Page 16: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alameda($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADSIDE PRESERVATIONIn Oakland, from north of Redwood Road tonorth of La Salle Avenue; also, on Route 238 inSan Leandro, from Hesperian Boulevard to Route880 (PM 16.3/16.7); and in Solano County onRoute 80 in Vallejo, at Redwood Parkway (PM4.0 to PM 4.5). Highway planting and irrigationsystem rehabilitation.

1453H

2K790$2,530

$5

Subtotal: $2,535

2020-21$600$420$50

$510

$1,580Total Project Cost: $4,115

04170000231/15/2021

11/15/202010/15/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

04-Alameda-13 18-1919-2019-2020-21

201.2104.5 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

6.0/7.8

Con Sup:

Highway Planting Restoration

Const:R/W:

FACILITIESIn Oakland, at the California Department ofTransportation District 4 headquarters officebuilding, 111 Grand Avenue. Rehabilitate theexisting 13 building elevators with new systemsto extend service life, increase efficiency, andcorrect performance failures.

1462A

4K980$4,728

$0

Subtotal: $4,728

2019-20$260$325

$0$710

$1,295Total Project Cost: $6,023

04170003832/27/20202/28/20203/30/2019PA&ED:

RTL:R/W Cert:

6/3/2020Begin Con:

04-Alameda- 18-1919-20

19-20

201.3531 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Office Facilities

Const:R/W:

MISCELLANEOUSIn Oakland, at the District 4 TransportationManagement Center (TMC). Upgrade or replacelegacy TMC software applications and interfacecomponents, and related system devices byservice contract.

1499J

1K670$3,687

Subtotal: $3,687

2019-20$111$553$12

$431

$1,107Total Project Cost: $4,794

041600028412/1/20199/1/2019

10/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

04-Alameda-980 Prior18-1918-1919-20

201.9991 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.2

Con Sup:

Miscellaneous

Const:R/W:

CountyAlameda

PA&ED:PS&E:

R/W Sup:Con Sup:

$12,631$604,316

R/W:

Subtotal: $616,947

Const:$73,744$81,197$9,207

$96,778

$260,926

Total (Capital + Support): $877,873

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 12 of 284

DRAFT

12-06

-17

Page 17: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Alpine($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Markleeville, on Routes 88, 89 and 4 atvarious locations. Bridge rail upgrade on fourbridges.3134

0X750$5,451

$313

Subtotal: $5,764

2019-20$496

$1,460$110

$1,484

$3,550Total Project Cost: $9,314

10130000094/17/20202/10/20207/2/2018PA&ED:

RTL:R/W Cert:

9/8/2020Begin Con:

10-Alpine-88 19-2019-2019-2019-20

201.112550 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

ROADWAY PRESERVATIONIn Alpine County, on Routes 4, 88, and 89 atvarious locations. Rehabilitate culverts.

3142

0S680$3,319

$71

Subtotal: $3,390

2019-20$870

$1,176$359$851

$3,256Total Project Cost: $6,646

10140001001/2/2020

10/13/20197/2/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

10-Alpine-4 Prior18-1918-1919-20

201.15132 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

Const:R/W:

In Alpine County, on Routes 4, 88 and 207; inAmador County on Routes 16 and 49; and in Tuolumne County on Route 108; at variouslocations. Rehabilitate culverts.

3138

0S750$4,290

$269

Subtotal: $4,559

2019-20$698

$1,043$317$762

$2,820Total Project Cost: $7,379

10140000991/15/202012/1/20197/2/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

10-Alpine-88 Prior18-1918-1919-20

201.15150 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

Const:R/W:

CountyAlpine

PA&ED:PS&E:

R/W Sup:Con Sup:

$653$13,060

R/W:

Subtotal: $13,713

Const:$2,064$3,679

$786$3,097

$9,626

Total (Capital + Support): $23,339

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 13 of 284

DRAFT

12-06

-17

Page 18: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Amador($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Jackson, from 0.5 mile east of Route 104 to5.5 miles west of Kirkwood Meadows Road atvarious locations. Upgrade guardrail to makestandard.

3199

1C360$2,613

$10

Subtotal: $2,623

2020-21$536$851

$0$711

$2,098Total Project Cost: $4,721

10160001364/15/20214/1/20217/1/2020PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

10-Amador-88 18-1920-21

20-21

201.01569 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

7.9/R65.8

Con Sup:

Collision Severity Reduction

Const:R/W:

BRIDGE PRESERVATIONNear Jackson, at Mokelumne River Bridge No. 26-0012. Upgrade bridge rails and widen shoulders.

3219

0X752$3,914

$185

Subtotal: $4,099

2021-22$1,590$2,010

$135$2,055

$5,790Total Project Cost: $9,889

10170000045/2/2022

4/28/20226/30/2020PA&ED:

RTL:R/W Cert:

12/27/2022Begin Con:

10-Amador-49 18-1920-2120-2121-22

201.112810 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

ROADWAY PRESERVATIONIn Amador County, on Route 88 and in TuolumneCounty of Routes 120,108 and 49, at variouslocations. Rehabilitate culverts.3119

1C690$2,328

$26

Subtotal: $2,354

2018-19$250$448$65

$616

$1,379Total Project Cost: $3,733

10150000041/2/2019

12/1/20183/1/2018PA&ED:

RTL:R/W Cert:

8/15/2019Begin Con:

10-Amador-88 PriorPriorPrior18-19

201.15135 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

Const:R/W:

CountyAmador

PA&ED:PS&E:

R/W Sup:Con Sup:

$221$8,855

R/W:

Subtotal: $9,076

Const:$2,376$3,309

$200$3,382

$9,267

Total (Capital + Support): $18,343

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 14 of 284

DRAFT

12-06

-17

Page 19: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Butte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Chico, from West Sacramento Avenue (East)to West Sacramento Avenue (West). Constructtwo roundabouts.2114

2H240$2,332$1,789

Subtotal: $4,121

2019-20$650$663$756$565

$2,634Total Project Cost: $6,755

03170000843/1/20202/1/20209/3/2018PA&ED:

RTL:R/W Cert:

7/30/2020Begin Con:

03-Butte-32 Prior18-1918-1919-20

201.01058 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.6/7.9

Con Sup:

Safety Improvements

Const:R/W:

Near Oroville, from Yuba County Line to southof East Gridley Road/Stimpson Road; also, inYuba County on Route 70 from PM 25.7 to PM25.8. Widen for two-way left-turn lane andstandard shoulders.

2296

3H930$20,610$3,218

Subtotal: $23,828

2020-21$3,400$3,000$2,500$3,200

$12,100Total Project Cost: $35,928

031800010210/15/20209/15/20202/20/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-Butte-70 Prior18-1918-1920-21

201.01035 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/3.8

Con Sup:

Safety Improvements

Const:R/W:

Near Oroville, from 0.3 mile north of Cox Lane tosouth of Palermo Road. Widen for two-way left-turn lane and standard shoulders, and provide aroadside clear recovery zone.

2295

3H720$25,350$3,220

Subtotal: $28,570

2019-20$980

$2,180$1,590$3,540

$8,290Total Project Cost: $36,860

03180000546/1/2019

5/15/20197/18/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

03-Butte-70 Prior18-1918-1919-20

201.01035 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.6/8.8

Con Sup:

Safety Improvements

Const:R/W:

Near Oroville, from south of Palermo Road tonorth of Ophir Road. Widen for two-way left-turn lane and standard shoulders, and provide aroadside clear recovery zone.

2294

3H710$23,130

$480

Subtotal: $23,610

2019-20$850

$2,240$2,320$3,700

$9,110Total Project Cost: $32,720

03180000531/2/2019

12/1/20187/18/2018PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

03-Butte-70 Prior18-1918-1919-20

201.01058 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.8/11.8

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 15 of 284

DRAFT

12-06

-17

Page 20: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Butte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Oroville, from Foothill Boulevard tothe Gold Country Casino entrance. Constructtwo-way left-turn lane and widen shoulders.2635

2H630$14,075$1,645

Subtotal: $15,720

2019-20$927

$1,769$2,023$1,913

$6,632Total Project Cost: $22,352

03170001663/20/20203/5/2020

12/1/2018PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

03-Butte-162 Prior18-1918-1919-20

201.01050 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.4/19.9

Con Sup:

Safety Improvements

Const:R/W:

MANDATESIn Chico, from Walnut Street to Poplar Street.Upgrade ADA facilities.

2112

4F800$2,900

Subtotal: $2,900

2018-19$405$650$375$935

$2,365Total Project Cost: $5,265

03140002888/25/20188/1/2018

10/2/2017PA&ED:

RTL:R/W Cert:

4/1/2019Begin Con:

03-Butte-32 PriorPriorPrior18-19

201.36134 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R8.8/9.5

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONNear Oroville, at West Branch Feather RiverBridge No. 12-0134. Rehabilitate bridge byplacing a polyester overlay, and replacing jointseals and catwalk surface.

2288

1H120$11,150

$120

Subtotal: $11,270

2021-22$620

$1,190$40

$1,850

$3,700Total Project Cost: $14,970

031600005810/15/202110/1/20218/1/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

03-Butte-70 18-1919-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

28.2

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Richvale, at Cottonwood Creek Bridge No.12-0120. Replace scour-critical bridge.

2425

0F290$6,200

$590

Subtotal: $6,790

2019-20$700

$1,390$270

$2,200

$4,560Total Project Cost: $11,350

031400010110/15/201910/1/20195/1/2018PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

03-Butte-99 PriorPriorPrior19-20

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

15.4

Con Sup:

Bridge Scour Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 16 of 284

DRAFT

12-06

-17

Page 21: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Butte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Chico, from north of Route 162 tonorth of Broyles Road. Bridge rail upgrade at sixlocations.2433

0H330$5,235

$363

Subtotal: $5,598

2019-20$610

$1,230$160

$1,425

$3,425Total Project Cost: $9,023

03150001458/15/20198/15/20192/1/2018PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

03-Butte-99 PriorPriorPrior19-20

201.112999 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.2/45.9

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

ROADWAY PRESERVATIONNear Pulga, from 3.0 miles west of Coal CanyonRoad to Plumas County line at various locations.Drainage system restoration.3588

0H560$2,525

$290

Subtotal: $2,815

2019-20$780$760

$1,060$850

$3,450Total Project Cost: $6,265

021500005110/11/2019

9/4/20199/1/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Butte-70 Prior18-1918-1919-20

201.15125 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

22.0/48.0

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYIn and near Chico, from Estates Drive to GarnerLane. Install Intelligent Transportation System(ITS) elements.2437

1H860$8,470

$35

Subtotal: $8,505

2020-21$561

$1,177$41

$1,352

$3,131Total Project Cost: $11,636

03170000108/1/20207/2/20207/2/2019PA&ED:

RTL:R/W Cert:

1/2/2021Begin Con:

03-Butte-99 Prior19-2019-2020-21

201.3159.4 Mile(s) of cablePerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.3/T37.8

Con Sup:

Transportation Management Systems

Const:R/W:

ROADSIDE PRESERVATIONIn Butte County, on Route 70 at approximately7.0 miles south of Oroville; also, in ColusaCounty on Route 20 at approximately 4.0 mileseast of Colusa. Advance mitigation creditpurchases for future SHOPP construction projectsexpected to impact sensitive habitats.

2438

2H140 $1,764

Subtotal: $1,764

2019-20$53$16$61

$130Total Project Cost: $1,894

0317000067

10/1/20218/1/2019PA&ED:

RTL:R/W Cert:

10/15/2021Begin Con:

03-Butte-70 Prior19-2019-20

201.2402 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 17 of 284

DRAFT

12-06

-17

Page 22: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Butte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyButte

PA&ED:PS&E:

R/W Sup:Con Sup:

$13,514$121,977

R/W:

Subtotal: $135,491

Const:$10,536$16,265$11,196$21,530

$59,527

Total (Capital + Support): $195,018

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 18 of 284

DRAFT

12-06

-17

Page 23: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Calaveras($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Mokelumne Hill and West Point, at variouslocations from 5.4 miles west of Ridge Road tothe Amador County line. Stabilize failing anderoded slopes.

3132

0V480$10,548$1,817

Subtotal: $12,365

2021-22$1,323$1,978

$31$3,242

$6,574Total Project Cost: $18,939

10130002646/1/20226/1/20228/1/2020PA&ED:

RTL:R/W Cert:

1/2/2023Begin Con:

10-Calaveras-26 18-1920-2120-2121-22

201.13126 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

21.4/38.3

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONIn Calaveras and Amador Counties, on Routes 4and 26 at various locations. Install centerline andedge-line rumble strips.3220

1F740$2,300

$5

Subtotal: $2,305

2018-19$60

$840$5

$640

$1,545Total Project Cost: $3,850

10170000428/31/20187/16/2018

11/28/2017PA&ED:

RTL:R/W Cert:

3/5/2019Begin Con:

10-Calaveras-4 PriorPriorPrior18-19

201.01024 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Safety Improvements

Const:R/W:

BRIDGE PRESERVATIONNear Angels Camp, at West Branch CherokeeCreek Bridge No. 30-0036. Replace bridge.

3255

1H500$2,000

$278

Subtotal: $2,278

2021-22$605

$1,392$103

$1,241

$3,341Total Project Cost: $5,619

10170001548/11/20212/4/20218/6/2019PA&ED:

RTL:R/W Cert:

2/28/2022Begin Con:

10-Calaveras-4 Prior19-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near West Point, at South Fork Mokelumne RiverBridge No. 30-0022 (PM 30.0), and at North ForkMokelumne River Bridge No. 30-0049 (PM38.3); also, on Route 4 in Angels Camp, atAngels Creek Bridge No. 30-0008 (PM R21.4).Upgrade bridge railing at three structures, alsoseismic retrofit at one location.

3247

0X751$4,536

$8

Subtotal: $4,544

2021-22$757

$1,604$60

$1,540

$3,961Total Project Cost: $8,505

10150001288/2/20215/3/20218/3/2020PA&ED:

RTL:R/W Cert:

1/3/2022Begin Con:

10-Calaveras-26 18-1920-2120-2121-22

201.112808 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 19 of 284

DRAFT

12-06

-17

Page 24: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Calaveras($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MOBILITYNear Murphys, from Pennsylvania Gulch Road toMain Street/Lawrence Street. Traffic operationalimprovements.3245

0W870$2,161

$10

Subtotal: $2,171

2020-21$524

$1,306$30

$772

$2,632Total Project Cost: $4,803

10170000061/20/20219/21/20209/25/2019PA&ED:

RTL:R/W Cert:

7/19/2021Begin Con:

10-Calaveras-4 18-1919-2019-2020-21

201.31041.44 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

29.2/29.4

Con Sup:

Operational Improvements

Const:R/W:

CountyCalaveras

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,118$21,545

R/W:

Subtotal: $23,663

Const:$3,269$7,120

$229$7,435

$18,053

Total (Capital + Support): $41,716

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 20 of 284

DRAFT

12-06

-17

Page 25: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Colusa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Colusa, from Niagara Avenue to 0.3 milewest of Steidlmayer Road. Widen shoulders to 8feet to provide adequate recoverable space forerrant vehicles.

2951

0H650$5,900$4,700

Subtotal: $10,600

2021-22$860

$1,120$580

$1,460

$4,020Total Project Cost: $14,620

03160000034/1/20224/1/20227/2/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

03-Colusa-20 18-1920-2120-2121-22

201.01579 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

34.8/36.5

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Maxwell, at the Maxwell Safety RoadsideRest Area. Upgrade water and wastewatersystems to current standards. 2793

4F430$3,880

$16

Subtotal: $3,896

2018-19$420$460$30

$810

$1,720Total Project Cost: $5,616

03140001621/2/2019

12/1/20182/1/2018PA&ED:

RTL:R/W Cert:

6/1/2019Begin Con:

03-Colusa-5 PriorPriorPrior18-19

201.2351 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R24.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

CountyColusa

PA&ED:PS&E:

R/W Sup:Con Sup:

$4,716$9,780

R/W:

Subtotal: $14,496

Const:$1,280$1,580

$610$2,270

$5,740

Total (Capital + Support): $20,236

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 21 of 284

DRAFT

12-06

-17

Page 26: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Contra Costa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTION In Orinda and Lafayette, from east of theCaldecott Tunnel to east of Camino Pablo and atAcalanes Road (PM R4.2/R4.99); also in Oaklandon Route 13, at Redwood Road (PM 5.2/5.5). Install safety lighting.

1418C

1J990$2,955

$313

Subtotal: $3,268

2018-19$736$420$64

$480

$1,700Total Project Cost: $4,968

04140004116/17/20193/30/20185/1/2018PA&ED:

RTL:R/W Cert:

11/12/2018Begin Con:

04-Contra Costa-24 Prior18-1918-1918-19

201.01065 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.0/R2.5

Con Sup:

Safety Improvements

Const:R/W:

In various cities, from Alameda County line to0.6 mile west of Solano County line; also, inAlameda County in Albany, from 0.4 mile west tothe Contra Costa County line (PM R7.6/8.0). Install lighting and upgrade concrete barrier.

1497F

0K160$52,621

$254

Subtotal: $52,875

2021-22$6,869$6,869$1,374$7,327

$22,439Total Project Cost: $75,314

04160000444/1/20221/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

10/1/2022Begin Con:

04-Contra Costa-80 Prior20-2120-2121-22

201.010460 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/13.5

Con Sup:

Safety Improvements

Const:R/W:

In Contra Costa County, on Routes 4, 24, 80, 123,242, 580, and 680 at various locations. InstallAccessible Pedestrian Signal (APS) systems andpedestrian countdown timers, and refreshcrosswalk markings with high-visibility stripingto enhance pedestrian safety.

1487N

3J140$7,487

$20

Subtotal: $7,507

2021-22$1,108$1,108

$80$1,400

$3,696Total Project Cost: $11,203

04150000918/1/20216/1/20211/1/2020PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

04-Contra Costa-4 18-1919-2019-2021-22

201.015333 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Hercules, Martinez, and Concord, atvarious locations from Route 80 to 0.3 mile eastof Bailey Road. Upgrade guardrail to make standard.

0481U

0J480$12,400

$10

Subtotal: $12,410

2021-22$1,000$1,400

$52$1,500

$3,952Total Project Cost: $16,362

041400000410/1/20216/1/20212/3/2020PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

04-Contra Costa-4 19-2019-2020-2121-22

201.015225 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/R20.4

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 22 of 284

DRAFT

12-06

-17

Page 27: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Contra Costa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Antioch and Brentwood, from 0.6mile east of Route 160 to Old River Bridge.Construct and modify MVPs to improve highwayworker safety.

1492H

4J950$1,234

$72

Subtotal: $1,306

2021-22$928$663$40

$530

$2,161Total Project Cost: $3,467

04160000263/1/20222/1/2022

11/1/2020PA&ED:

RTL:R/W Cert:

10/1/2022Begin Con:

04-Contra Costa-4 18-1920-2121-2221-22

201.23515 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R31.0/48.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In various cities, from the Alameda County line tothe Solano County line; also on Route 242, 580,and 680 at various locations. Constructmaintenance worker safety improvements

1483P

2J820$2,630

$5

Subtotal: $2,635

2019-20$455$637

$5$692

$1,789Total Project Cost: $4,424

04150000098/30/20198/9/20191/2/2018PA&ED:

RTL:R/W Cert:

3/24/2020Begin Con:

04-Contra Costa-80 PriorPriorPrior19-20

201.23527 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/14.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

BRIDGE PRESERVATIONIn Richmond, at Stege Drain Bridge No. 28-0091.Bridge rehabilitation.

1482Q

2J720$5,828

$5

Subtotal: $5,833

2019-20$700$876$117$876

$2,569Total Project Cost: $8,402

04150000164/20/20208/1/2019

11/30/2018PA&ED:

RTL:R/W Cert:

10/12/2020Begin Con:

04-Contra Costa-580 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.2

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Orinda, at St. Stephens Drive Overcrossing No.28-0111. Seismic retrofit.

1493A

4J840$2,067

$38

Subtotal: $2,105

2021-22$925

$1,175$175$375

$2,650Total Project Cost: $4,755

04160000271/1/20221/1/20222/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

04-Contra Costa-24 18-1919-2019-2021-22

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R3.5

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 23 of 284

DRAFT

12-06

-17

Page 28: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Contra Costa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn and near Concord and Pittsburg, from Route242 to Loveridge Road. Rehabilitate pavement,upgrade curb ramps to make ADA compliant, andupgrade guardrail to make standard.

1462R

2K720$55,281

$93

Subtotal: $55,374

2021-22$2,720$6,400

$780$8,320

$18,220Total Project Cost: $73,594

04170000146/1/20223/1/20226/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

04-Contra Costa-4 18-1920-2120-2121-22

201.12195 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R14.3/24.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Concord, from Route 680 to Route 4.Pavement rehabilitation.

0269H

26980$11,774

$15

Subtotal: $11,789

2019-20$990

$1,210$110

$1,430

$3,740Total Project Cost: $15,529

041200015911/1/20198/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

3/30/2020Begin Con:

04-Contra Costa-242 PriorPriorPrior19-20

201.12120.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R3.4

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Hercules, Rodeo, and Crocket, fromRoute 4 to the Carquinez Bridge. RoadwayRehabilitation.1487E

3J070$61,317

$28

Subtotal: $61,345

2021-22$3,083$4,624

$206$7,501

$15,414Total Project Cost: $76,759

04150000772/1/2022

12/1/20214/1/2020PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

04-Contra Costa-80 Prior19-2019-2021-22

201.12221.9 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.1/13.5

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

CountyContra Costa

PA&ED:PS&E:

R/W Sup:Con Sup:

$853$215,594

R/W:

Subtotal: $216,447

Const:$19,514$25,382$3,003

$30,431

$78,330

Total (Capital + Support): $294,777

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 24 of 284

DRAFT

12-06

-17

Page 29: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Del Norte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Crescent City, at 0.2 mile north of CushingCreek Viaduct. Restore roadway to pre-slidecondition.1122

0G210$10,148

$18

Subtotal: $10,166

2019-20$1,488$2,276

$116$3,974

$7,854Total Project Cost: $18,020

01160001373/1/2020

2/15/202012/1/2018PA&ED:

RTL:R/W Cert:

11/15/2020Begin Con:

01-Del Norte-101 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.2

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONNear Gasquet, from 0.7 to 0.3 mile south ofHardscrabble Creek Bridge. Install high frictionsurface treatment (HFST), signs, guardrail, andcenterline rumble strip.

1121

0G130$1,570

$25

Subtotal: $1,595

2019-20$402$507$93

$393

$1,395Total Project Cost: $2,990

01160001281/13/2020

12/16/201912/1/2018PA&ED:

RTL:R/W Cert:

6/6/2020Begin Con:

01-Del Norte-199 Prior18-1918-1919-20

201.01020 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.2/10.7

Con Sup:

Safety Improvements

Const:R/W:

MANDATESIn and near Crescent City, from south of ElkValley Road to north of WilsonAvenue/Burtschell Street. Upgrade ADAfacilities and construct traffic calming measuresto improve operations and safety for non-motorized users.

1095

0C660$3,527

$432

Subtotal: $3,959

2018-19$669$467

$1,234$180

$2,550Total Project Cost: $6,509

01130000235/1/20194/1/2019

3/15/2018PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

01-Del Norte-101 PriorPriorPrior18-19

201.36187 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

25.8/27.3

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONNear Crescent City, from 0.2 mile north of theSmith River Overflow Bridge. Replace bridge.

0100V

43640$50,448$3,900

Subtotal: $54,348

2018-19$10,942$3,700

$650$12,250

$27,542Total Project Cost: $81,890

01000001933/1/20192/1/20192/1/2018PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

01-Del Norte-101 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

36.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 25 of 284

DRAFT

12-06

-17

Page 30: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Del Norte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near the Smith River community, at DominieCreek. Replace box culvert with new bridge andremediate fish passage barrier. 1113

0F310$5,852

$151

Subtotal: $6,003

2019-20$1,068$1,141

$154$1,643

$4,006Total Project Cost: $10,009

01150001081/17/20201/3/2020

1/15/2019PA&ED:

RTL:R/W Cert:

7/22/2020Begin Con:

01-Del Norte-101 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

39.8

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Klamath, at Panther Creek Bridge No. 01-0025 and at Hunter Creek Bridge No. 01-0003.Seismic retrofit.1072

0B090$13,756$5,589

Subtotal: $19,345

2018-19$2,159$3,720

$373$3,282

$9,534Total Project Cost: $28,879

01000204448/1/20197/1/20197/1/2018PA&ED:

RTL:R/W Cert:

6/15/2020Begin Con:

01-Del Norte-101 Prior18-1918-1918-19

201.1132 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.2/8.7

Con Sup:

Bridge Seismic Restoration

Const:R/W:

ROADWAY PRESERVATIONIn Del Norte County, at various locations fromnorth of Elk Valley Cross Road to south of theOregon State Line. Culvert rehabilitation and fishpassage.

1055

48800$4,998

$166

Subtotal: $5,164

2019-20$1,100$1,135

$82$1,221

$3,538Total Project Cost: $8,702

01140000743/1/20202/1/20201/1/2019PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

01-Del Norte-199 Prior18-1918-1919-20

201.15118 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.1/36.3

Con Sup:

Drainage System Restoration

Const:R/W:

Near the Oregon State Line, from 0.1 mile to 0.5mile north of Collier Safety Roadside Rest Area(SRRA). Upgrade lighting and power controlsystem at the Randolph Collier Tunnel No. 01-0049.

1115

0F430$2,082

$0

Subtotal: $2,082

2020-21$355

$1,213$86

$949

$2,603Total Project Cost: $4,685

01160000058/1/20207/1/20204/1/2019PA&ED:

RTL:R/W Cert:

1/1/2021Begin Con:

01-Del Norte-199 18-1918-1918-1920-21

201.170158 Lighting fixture(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

33.5/33.9

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 26 of 284

DRAFT

12-06

-17

Page 31: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Del Norte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MOBILITYIn Klamath, from 0.2 mile south to 0.3 mile northof Ehlers Way. Extend the left turn pocket, installacceleration lane for left turns, and extendacceleration lane for right turns at the intersectionof Ehlers Way and Route 101.

1110

0F240$1,581

$446

Subtotal: $2,027

2021-22$697$847$15

$649

$2,208Total Project Cost: $4,235

011500009411/1/202110/1/202110/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

01-Del Norte-101 18-1920-2120-2121-22

201.310.2 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R5.1/R5.6

Con Sup:

Operational Improvements

Const:R/W:

FACILITIESNear Gasquet, at the Idlewild MaintenanceStation. Construct new office space building, andrehabilitate water system and septic system.1117

0F760$3,960

$20

Subtotal: $3,980

2021-22$561

$1,565$43

$2,038

$4,207Total Project Cost: $8,187

01160000608/1/20217/1/20214/1/2020PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

01-Del Norte-199 18-1919-2019-2021-22

201.3521 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

28.1

Con Sup:

Maintenance Facilities

Const:R/W:

CountyDel Norte

PA&ED:PS&E:

R/W Sup:Con Sup:

$10,747$97,922

R/W:

Subtotal: $108,669

Const:$19,441$16,571$2,846

$26,579

$65,437

Total (Capital + Support): $174,106

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 27 of 284

DRAFT

12-06

-17

Page 32: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

El Dorado($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Placerville, at 1.1 miles north of the SouthFork American River Bridge (PM 22.8/22.9); alsoat 2.5 miles north of the South Fork AmericanRiver Bridge (PM 24.2/24.3). Restoreembankment slope slip-outs.

3631

1H600$6,042

$13

Subtotal: $6,055

2018-19$1,039$1,201

$106$1,144

$3,490Total Project Cost: $9,545

03160001882/28/20192/1/20197/1/2018PA&ED:

RTL:R/W Cert:

9/15/2019Begin Con:

03-El Dorado-193 Prior18-1918-1918-19

201.1312 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

22.8/24.3

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONIn Cameron Park, at Cameron Park Drive.Improve sight distance and upgrade curb ramps.

3316

1H440$1,200

$83

Subtotal: $1,283

2018-19$150$530

$9$450

$1,139Total Project Cost: $2,422

031600015310/1/201810/1/201812/1/2017PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

03-El Dorado-50 PriorPriorPrior18-19

201.01016 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.5

Con Sup:

Safety Improvements

Const:R/W:

Near Placerville and Camino, from 0.1 mile westof Still Meadows Road to 0.1 mile east of UpperCarson Road. Install median barrier, widenshoulders and construct acceleration/decelerationlane.

3290

4E620$32,000$2,000

Subtotal: $34,000

2018-19$2,500$3,500$1,200$5,800

$13,000Total Project Cost: $47,000

03140000395/1/20195/1/20192/2/2018PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

03-El Dorado-50 PriorPriorPrior18-19

201.010108 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R22.0/24.3

Con Sup:

Safety Improvements

Const:R/W:

In Yolo, Sacramento and El Dorado Counties, inand near the cities of West Sacramento,Sacramento, Rancho Cordova, Folsom, andPlacerville, from Route 80 to Route 89 at variouslocations. Upgrade guardrail to make standard.

3318

1H870$2,000

$5

Subtotal: $2,005

2020-21$271$461$129$570

$1,431Total Project Cost: $3,436

031700001110/1/20209/1/20208/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-El Dorado-50 18-1919-2019-2021-22

201.01520 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/70.6

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 28 of 284

DRAFT

12-06

-17

Page 33: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

El Dorado($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In El Dorado County, from the SacramentoCounty line to east of Stateline Avenue. Upgradeguard rail to current standards. 3311

0H500$3,450

$16

Subtotal: $3,466

2018-19$150$360$55

$475

$1,040Total Project Cost: $4,506

031500020010/1/201810/1/20184/11/2017PA&ED:

RTL:R/W Cert:

4/1/2019Begin Con:

03-El Dorado-50 PriorPriorPrior18-19

201.0155 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/80.4

Con Sup:

Collision Severity Reduction

Const:R/W:

In El Dorado, Butte, Placer, Sacramento, Sutter,and Yolo Counties, on Routes 50, 65, 70, 80, 89,and 99 at various locations. Upgrade crashcushions and sand barrel arrays to make moredurable.

3313

0H680$2,600

$10

Subtotal: $2,610

2020-21$90

$170$30

$460

$750Total Project Cost: $3,360

031600001010/1/202010/1/20207/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-El Dorado-50 18-1919-2019-2020-21

201.01520 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R11.0/R31.6

Con Sup:

Collision Severity Reduction

Const:R/W:

BRIDGE PRESERVATIONNear Pollock Pines, at Sawmill UndercrossingNo. 25-0041; also at Sly Park Road (PMR30.17/R31.3). Replace bridge, restore culverts,and add highway lighting.

6923

0H341$8,850

$53

Subtotal: $8,903

2019-20$230$690$11

$1,660

$2,591Total Project Cost: $11,494

03170001529/1/2019

8/15/201911/15/2017PA&ED:

RTL:R/W Cert:

12/15/2019Begin Con:

03-El Dorado-50 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R27.9/R29.8

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

ROADWAY PRESERVATIONNear Cameron Park and Shingle Springs, fromeast of Silva Valley Parkway to west of ElDorado Road. Rehabilitate culverts.3315

1H040$3,900

$180

Subtotal: $4,080

2021-22$630$570$540$940

$2,680Total Project Cost: $6,760

03160000502/1/20222/1/20222/1/2020PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

03-El Dorado-50 18-1919-2019-2021-22

201.15128 Culvert(s) (ea)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R2.7/R13.8

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 29 of 284

DRAFT

12-06

-17

Page 34: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

El Dorado($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Placerville, from west of El DoradoRoad to 0.1 mile east of Braeburn Lane.Rehabilitate deteriorated culverts and provideaccess for wildlife crossing the route.

3317

1H800$3,700

$930

Subtotal: $4,630

2021-22$290$890$180

$1,440

$2,800Total Project Cost: $7,430

03170000038/15/20218/1/20215/1/2020PA&ED:

RTL:R/W Cert:

12/15/2021Begin Con:

03-El Dorado-50 18-1919-2019-2021-22

201.15141 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R13.7/22.5

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYIn El Dorado County, from the SacramentoCounty line to east of Stateline Avenue. Upgradenew Transportation Management Systemelements.

3312

0H520$9,150

$150

Subtotal: $9,300

2019-20$500

$1,000$580

$1,620

$3,700Total Project Cost: $13,000

03150002022/1/2020

1/15/20209/1/2017PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

03-El Dorado-50 PriorPriorPrior19-20

201.31551 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/80.4

Con Sup:

Transportation Management Systems

Const:R/W:

CountyEl Dorado

PA&ED:PS&E:

R/W Sup:Con Sup:

$3,440$72,892

R/W:

Subtotal: $76,332

Const:$5,850$9,372$2,840

$14,559

$32,621

Total (Capital + Support): $108,953

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 30 of 284

DRAFT

12-06

-17

Page 35: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Selma, from Kings County Line to EastMountain View Avenue. Construct rumble stripsand update pavement delineation.6886

0V980$1,026

Subtotal: $1,026

2018-19 $750$22

$202

$974Total Project Cost: $2,000

06170000829/17/20188/1/2018

6/26/2017PA&ED:

RTL:R/W Cert:

3/15/2019Begin Con:

06-Fresno-43PriorPrior18-19

201.01016 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/7.3

Con Sup:

Safety Improvements

Const:R/W:

In Fresno County, between Shepherd Avenue andLockwood Lane and Lodge Road Park and Rideand Tollhouse/Auberry Roads. Constructcenterline rumble strip.

6866

0V320$742

$1

Subtotal: $743

2018-19$220$635

$1$404

$1,260Total Project Cost: $2,003

06160001369/10/20189/3/2018

2/15/2018PA&ED:

RTL:R/W Cert:

1/10/2019Begin Con:

06-Fresno-168 PriorPriorPrior18-19

201.01026 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.7/R36.2

Con Sup:

Safety Improvements

Const:R/W:

Near Coalinga and Kettleman City, at theCoalinga-Avenal Safety Roadside Rest Area fromKings County line to Quist Undercrossing; also inKings County, from 0.2 mile south of AvenalCutoff Road to Fresno County line (PM26.4/26.7). Repair aging water and wastewatersystems.

6736

0T230$4,350

$102

Subtotal: $4,452

2018-19$122$783

$4$1,000

$1,909Total Project Cost: $6,361

06150000401/11/201911/5/201810/2/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

06-Fresno-5 PriorPriorPrior18-19

201.2352 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/1.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Firebaugh, from south of Morris Kyle Drive toClyde Fannon Drive. Construct continuousaccessible pedestrian path to comply with ADAstandards.

6747

0T250$2,085

$273

Subtotal: $2,358

2018-19$221$780$240$475

$1,716Total Project Cost: $4,074

06150000434/1/2019

3/29/20196/9/2017PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

06-Fresno-33 PriorPriorPrior18-19

201.36129 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

69.3/70.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 31 of 284

DRAFT

12-06

-17

Page 36: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Mendota, at Tumey Gulch Bridge No. 42-0246L/R. Replace bridge.

6725

0S830$10,898

$79

Subtotal: $10,977

2019-20$850

$1,900$4

$2,800

$5,554Total Project Cost: $16,531

06150000462/3/20201/3/2020

7/31/2018PA&ED:

RTL:R/W Cert:

7/3/2020Begin Con:

06-Fresno-5 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

44.4/45.4

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Squaw Valley, at Mill Creek Bridge No. 42-0080; also near Cedar Grove at South ForkKings River Bridge No. 42-0024 (PM 130.1).Bridge rail upgrade.

6766

0Q900$3,153

$4

Subtotal: $3,157

2018-19$480$923$10

$814

$2,227Total Project Cost: $5,384

06140000472/25/20191/21/20191/15/2018PA&ED:

RTL:R/W Cert:

9/2/2019Begin Con:

06-Fresno-180 PriorPriorPrior18-19

201.112535 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

92.2

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In Fresno County, at Colony Main Canal BridgeNo. 42-0031, Helm Canal Bridge No. 42-0033 and Poso Canal Bridge No. 42-0034; also in KernCounty on Route 58 at Main Drain Canal BridgeNo. 50-0013. Repair erosion, clean and encasepiers in concrete.

6773

0U000$1,782

$375

Subtotal: $2,157

2020-21$538$893$334$805

$2,570Total Project Cost: $4,727

06150002962/1/20211/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

7/15/2021Begin Con:

06-Fresno-33 Prior19-2019-2020-21

201.1194 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In Fresno, at the South Fresno Viaduct No. 42-0226L/R. Replace failed joint seals andrehabilitate worn bridge decks with polyesterconcrete overlay

6771

0U160$7,050

$291

Subtotal: $7,341

2018-19$237$750$20

$1,574

$2,581Total Project Cost: $9,922

06150003109/1/20187/1/2018

9/29/2017PA&ED:

RTL:R/W Cert:

2/15/2019Begin Con:

06-Fresno-41 PriorPriorPrior18-19

201.1192 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R22.0/R22.6

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 32 of 284

DRAFT

12-06

-17

Page 37: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn and near Selma and Fowler, from 0.1 south ofRose Avenue Undercrossing to Merced Street Undercrossing. Replace pavement withContinuous Reinforced Concrete Pavement (CRCP). Update curb ramps to meet current ADA standards.

6800

0U420$86,000

$56

Subtotal: $86,056

2019-20$845

$2,000$24

$11,000

$13,869Total Project Cost: $99,925

06160000041/24/2020

12/13/201912/3/2018PA&ED:

RTL:R/W Cert:

9/2/2020Begin Con:

06-Fresno-99 Prior18-1918-1919-20

201.12032.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R5.7/11.1

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

Near Prather, from Sample Road to Oak CreekRoad. Upgrade barrier railing, cold planepavement, place Hot Mix Asphalt (HMA) andRubberized Hot Mix Asphalt concrete (RHMA).

6809

0U450$5,000

$5

Subtotal: $5,005

2019-20$750

$1,230$1

$1,140

$3,121Total Project Cost: $8,126

06150002983/26/20203/13/20202/15/2019PA&ED:

RTL:R/W Cert:

9/18/2020Begin Con:

06-Fresno-168 Prior18-1918-1919-20

201.12114.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.6/T25.5

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Kingburg, from Route 201 to south ofSecond Street. Roadway rehabilitation.

6727

0S460$24,086

$25

Subtotal: $24,111

2018-19$577

$1,496$43

$2,705

$4,821Total Project Cost: $28,932

061500003811/6/201810/4/20188/3/2017PA&ED:

RTL:R/W Cert:

6/4/2019Begin Con:

06-Fresno-99 PriorPriorPrior18-19

201.1228.1 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.9/R5.0

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In Fresno County, at various locations; also inKern County on Route 119 at various locations.Replace damaged drainage systems.6802

0R110$1,206

$165

Subtotal: $1,371

2018-19 $1,184$463$454

$2,101Total Project Cost: $3,472

06140000304/1/20193/1/2019

5/22/2017PA&ED:

RTL:R/W Cert:

10/14/2019Begin Con:

06-Fresno-198PriorPrior18-19

201.1517 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R14.5/R18.2

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 33 of 284

DRAFT

12-06

-17

Page 38: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MOBILITYNear Fresno, from the northbound Ashlan Avenueonramp to the northbound Shaw Avenue offramp.Construct northbound auxiliary lane and add anadditional lane to the Shaw Avenue offramp.

6879

0W170$14,700

$7

Subtotal: $14,707

2021-22$1,300$2,400

$150$4,400

$8,250Total Project Cost: $22,957

06170001038/23/20217/23/2021

11/15/2019PA&ED:

RTL:R/W Cert:

2/18/2022Begin Con:

06-Fresno-41 18-1919-2019-2021-22

201.31059.4 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R27.6/R28.3

Con Sup:

Operational Improvements

Const:R/W:

In and near the city of Fresno, from 0.1 milesouth of North Avenue to the Madera Countyline; also on Route 99 (PM 19.36 to PM 21.9),Route 168 (PM R0.2L/R to PM R9.7), and Route180 (PM R58.55 to PM R59.85). Replace and upgrade existing communication elements for theTraffic Management System (TMS).

6881

0V780$16,010

$30

Subtotal: $16,040

2020-21$619

$1,809$165

$1,791

$4,384Total Project Cost: $20,424

06160002343/1/20211/4/2021

12/1/2018PA&ED:

RTL:R/W Cert:

8/16/2021Begin Con:

06-Fresno-41 Prior18-1918-1920-21

201.31589 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R20.0/33.4

Con Sup:

Transportation Management Systems

Const:R/W:

In Fresno County, on Routes 99, 41, 168, and 180at various locations; also in Madera County onRoute 99 at various locations. Repair vehicledetection systems.

6883

0V930$3,036

$119

Subtotal: $3,155

2019-20$800

$1,017$450

$1,056

$3,323Total Project Cost: $6,478

061700006712/16/201912/2/20199/3/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

06-Fresno-99 Prior18-1918-1919-20

201.31520 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

ROADSIDE PRESERVATIONIn the city of Fresno, from 0.1 mile south ofJensen Avenue Overcrossing to Alluvial AvenueUndercrossing. Replace irrigation system with awater efficient system.

6888

0V750$1,576

$1

Subtotal: $1,577

2019-20$0

$552$1

$460

$1,013Total Project Cost: $2,590

06160002098/7/20197/1/20192/7/2017PA&ED:

RTL:R/W Cert:

2/28/2020Begin Con:

06-Fresno-4118-1918-1919-20

201.210214 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R21.0/R31.0

Con Sup:

Highway Planting Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 34 of 284

DRAFT

12-06

-17

Page 39: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Fresno and Clovis, at various locationsbetween Route 180/168 Separation and ShepherdAvenue. Replace black potable water irrigationvalves with purple scrubber valves for recycledirrigation water.

6851

0U760$1,449

$2

Subtotal: $1,451

2020-21$2

$524$2

$370

$898Total Project Cost: $2,349

06160000347/10/20206/1/2020

9/30/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

06-Fresno-168 18-1919-2019-2020-21

201.21030 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.0/R11.7

Con Sup:

Highway Planting Restoration

Const:R/W:

CountyFresno

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,535$184,149

R/W:

Subtotal: $185,684

Const:$7,561

$19,626$1,934

$31,450

$60,571

Total (Capital + Support): $246,255

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 35 of 284

DRAFT

12-06

-17

Page 40: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Glenn($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn and near Willows and Orland, from north ofCounty Road 68 to north of County Road 7. Pavebeyond the gore areas, install vegetation controlunder guardrail, construct MVPs, and trim treesand shrubs to improve highway worker safety.

3709

3F500$2,000

$10

Subtotal: $2,010

2020-21$280$420$80

$540

$1,320Total Project Cost: $3,330

03130000198/1/20207/2/20207/1/2019PA&ED:

RTL:R/W Cert:

2/15/2021Begin Con:

03-Glenn-5 18-1919-2019-2020-21

201.23550 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R3.2/R27.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Near Willows, at the Willows Safety RoadsideRest Area (SRRA). Upgrade potable water andwastewater systems.3710

4F420$4,100

$20

Subtotal: $4,120

2019-20$540$550$60

$1,180

$2,330Total Project Cost: $6,450

03140001617/2/20197/2/2019

10/1/2018PA&ED:

RTL:R/W Cert:

2/15/2020Begin Con:

03-Glenn-5 Prior18-1918-1919-20

201.2351 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R14.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Orland, from Route 5 to Woodward Avenue.Upgrade pedestrian infrastructure to meet ADArequirements.3788

4F810$700$88

Subtotal: $788

2019-20$240$405$465$260

$1,370Total Project Cost: $2,158

031400029110/1/20199/1/20194/1/2018PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

03-Glenn-32 PriorPriorPrior19-20

201.361113 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

L0.0/0.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONAt Butte City, from Route 45 to 0.1 mile east ofMcDougall Street. Replace Sacramento River Bridge No. 11-0017.2633

3F060$65,000$1,000

Subtotal: $66,000

2020-21$5,500$5,500$1,200

$10,000

$22,200Total Project Cost: $88,200

031200005210/15/202010/1/20208/1/2018PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-Glenn-162 Prior18-1918-1920-21

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

76.3/78.6

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 36 of 284

DRAFT

12-06

-17

Page 41: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Glenn($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyGlenn

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,118$71,800

R/W:

Subtotal: $72,918

Const:$6,560$6,875$1,805

$11,980

$27,220

Total (Capital + Support): $100,138

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 37 of 284

DRAFT

12-06

-17

Page 42: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Carlotta, from 0.1 mile east of RiversidePark Road to 0.4 mile east of Riverside ParkRoad. Curve correction.2415

0F160$2,240

$309

Subtotal: $2,549

2019-20$910$904$174$537

$2,525Total Project Cost: $5,074

01150000761/15/20201/1/2020

1/15/2019PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

01-Humboldt-36 Prior18-1918-1919-20

201.01020 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.5/10.8

Con Sup:

Safety Improvements

Const:R/W:

In Eureka, on 4th Street from Broadway to YStreet. Restripe to add traffic and bicycle lanes,construct pedestrian bulb-outs and ADA ramps,and install or modify signals.

2393

0E680$6,254

$360

Subtotal: $6,614

2018-19$1,114

$690$362

$1,236

$3,402Total Project Cost: $10,016

01140001236/15/20196/1/20197/1/2018PA&ED:

RTL:R/W Cert:

1/23/2020Begin Con:

01-Humboldt-101 Prior18-1918-1918-19

201.010503 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

78.1/79.6

Con Sup:

Safety Improvements

Const:R/W:

In and near Arcata, between West End Road andSchool Road at four locations. Construct shoulder rumble strip, upgrade guardrail, construct guardrail slope retaining wall, and placeHigh Friction Surface Treatment (HFST).

7024

0G510$1,301

Subtotal: $1,301

2019-20$394$582$90

$616

$1,682Total Project Cost: $2,983

011700001311/1/201911/1/20194/1/2019PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.01030 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

87.8/R91.5

Con Sup:

Safety Improvements

Const:R/W:

Near Blue Lake, from 2.2 miles east of SimpsonRoad to 3.2 miles east of Simpson Road. Widenshoulders, and install rumble strips andguardrailing.

2435

0F690$1,386

Subtotal: $1,386

2019-20$498$697

$9$642

$1,846Total Project Cost: $3,232

01160000457/1/20197/1/20199/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

01-Humboldt-299 Prior18-1918-1919-20

201.01013 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R14.7/R15.7

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 38 of 284

DRAFT

12-06

-17

Page 43: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Willow Creek, from 1.5 mile east of EastBair Road to 0.4 mile west of Cedar Creek Road,at various locations. Widen shoulders.2427

0F460$6,886

$127

Subtotal: $7,013

2019-20$986$864$21

$921

$2,792Total Project Cost: $9,805

01160000108/1/20198/1/20198/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

01-Humboldt-299 Prior18-1918-1919-20

201.01040 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.5/30.2

Con Sup:

Safety Improvements

Const:R/W:

Near Willow Creek, from 0.1 mile east of CedarCreek Road to 1.1 miles west of Route 96. Widen shoulders, place high-friction surfacetreatment (HFST), install rumble strips, guardrail,and cable net drapery.

2426

0F470$11,388

$19

Subtotal: $11,407

2019-20$1,640$1,668

$45$2,518

$5,871Total Project Cost: $17,278

01160000118/1/20197/1/20197/1/2018PA&ED:

RTL:R/W Cert:

1/1/2020Begin Con:

01-Humboldt-299 Prior18-1918-1919-20

201.010118 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

30.7/37.7

Con Sup:

Safety Improvements

Const:R/W:

Near Willow Creek, from 0.1 mile west ofWillow Way to Panther Road. Widen shoulders,upgrade ADA curb ramps, and install a bus turn-out.

2434

0F680$2,594

$211

Subtotal: $2,805

2019-20$1,108$1,306

$238$1,103

$3,755Total Project Cost: $6,560

01160000446/1/20206/1/20209/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

01-Humboldt-299 Prior19-2019-2019-20

201.01018 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

38.9/39.5

Con Sup:

Safety Improvements

Const:R/W:

Near Fortuna, from Route 101 to River Bar Road.Shoulder widening.

2379

0E010$7,187$2,727

Subtotal: $9,914

2019-20$910$886$592$955

$3,343Total Project Cost: $13,257

01130000903/1/20202/1/20209/1/2018PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

01-Humboldt-36 Prior18-1918-1919-20

201.01523 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.1/1.6

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 39 of 284

DRAFT

12-06

-17

Page 44: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Eureka, from PMs 80.0 to 87.8. Upgrademetal beam guardrail.

2375

0C970$1,763

$118

Subtotal: $1,881

2018-19$510$300$48

$267

$1,125Total Project Cost: $3,006

011300009410/15/201810/1/20181/10/2017PA&ED:

RTL:R/W Cert:

6/20/2019Begin Con:

01-Humboldt-101 18-19PriorPrior18-19

201.01539 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

80.8/87.8

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Arcata, from Saint Louis RoadOvercrossing to 0.7 mile north of Giuntoli LaneOvercrossing. Install guardrail and upgrade endtreatments, place longitudinal drainage system,pave the median, reconstruct thrie-beam barrier,and construct a Class I bike path.

2460

0G580$5,561

$346

Subtotal: $5,907

2021-22$896

$1,066$104

$1,649

$3,715Total Project Cost: $9,622

01170000238/1/2021

7/15/20213/1/2020PA&ED:

RTL:R/W Cert:

3/13/2022Begin Con:

01-Humboldt-101 18-1919-2019-2021-22

201.01548 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

87.5/89.5

Con Sup:

Collision Severity Reduction

Const:R/W:

In Arcata, at Route 299. Realign ramp curve.

2397

0E650$3,220

$600

Subtotal: $3,820

2019-20$901$662$164$613

$2,340Total Project Cost: $6,160

01140001171/1/2020

12/1/20199/1/2018PA&ED:

RTL:R/W Cert:

5/1/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.01524 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

88.2/88.3

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Fortuna, from 0.5 mile south of Route36 to 0.4 mile south of Hookton Road. Removevegetated strips in median area to improve highway worker safety.

2461

0G610$7,297

$912

Subtotal: $8,209

2021-22$799$879$175

$1,256

$3,109Total Project Cost: $11,318

01170000272/1/2022

1/15/20223/1/2020PA&ED:

RTL:R/W Cert:

8/22/2022Begin Con:

01-Humboldt-101 18-1919-2019-2021-22

201.235172 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

57.1/67.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 40 of 284

DRAFT

12-06

-17

Page 45: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MANDATESNear Bridgeville, at 0.2 mile east of Golden GateDrive. Construct erosion control BMP measuresto achieve Statewide NPDES permit complianceunit (CU) credits that will stabilize the adjacentroadway slope erosion and reduce storm watersediment discharge to the impaired Van DuzenRiver.

2366

0C150$2,174

$152

Subtotal: $2,326

2021-22$726$873$334

$1,452

$3,385Total Project Cost: $5,711

011300001610/1/20219/1/20219/1/2020PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

01-Humboldt-36 18-1920-2120-2121-22

201.3355.5 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

21.5

Con Sup:

Storm Water Mitigation

Const:R/W:

Near Phillipsville, at 0.7 mile south of MapleHills Road. Replace existing Fish Creek concretebox culvert with a bridge to eliminate fishpassage barrier and decrease sediment loads toachieve compliance unit (CU) credits towardsStatewide NPDES permit mandate goals. $5million in funds from AB 95 are designated forthis project.

2403

0E790$10,578

$34

Subtotal: $10,612

2021-22$1,742$1,863

$173$2,909

$6,687Total Project Cost: $17,299

01150000213/14/20222/14/20223/1/2021PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

01-Humboldt-254 18-1920-2120-2121-22

201.33579 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

4.2

Con Sup:

Storm Water Mitigation

Const:R/W:

Near Blue Lake, from north of Simpson Road tonorth of Chezem Road at various locations.Install erosion control Storm Water Mitigationmeasures at 3 locations.

2378

0E030$3,008

$19

Subtotal: $3,027

2019-20$425$880$89

$648

$2,042Total Project Cost: $5,069

01130000998/1/20197/1/20192/1/2018PA&ED:

RTL:R/W Cert:

1/1/2020Begin Con:

01-Humboldt-299 PriorPriorPrior19-20

201.33514.33 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R16.1/R16.4

Con Sup:

Storm Water Mitigation

Const:R/W:

In Eureka, from Wabash Avenue to CommercialStreet. Upgrade curb ramps, driveways, andsidewalk, and add Accessible Pedestrian Signal(APS) upgrades to make compliant with ADAstandards; also, install fiber optic communicationsconnection from traffic signals to the Caltransdistrict office.

2456

0G420$4,505

$180

Subtotal: $4,685

2021-22$1,089

$965$979

$1,079

$4,112Total Project Cost: $8,797

01160001869/1/2021

8/15/202112/1/2019PA&ED:

RTL:R/W Cert:

4/26/2022Begin Con:

01-Humboldt-101 18-1919-2019-2021-22

201.36127 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

77.3/78.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 41 of 284

DRAFT

12-06

-17

Page 46: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Eureka, from north of Herrick AvenueOvercrossing to south of the Eureka SloughBridge. Upgrade curb ramps, sidewalks, andsignal push-buttons to ADA standards.

2346

0B620$5,589

$695

Subtotal: $6,284

2019-20$462$921$644$660

$2,687Total Project Cost: $8,971

01120001563/1/2020

2/15/202011/1/2018PA&ED:

RTL:R/W Cert:

6/20/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.37850 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

75.3/77.6

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

BRIDGE PRESERVATIONNear Orick, at 0.2 mile south of Lost Man CreekBridge. Remove fish passage barrier.

2447

0F960$4,919$1,523

Subtotal: $6,442

2018-19$966$644$193

$1,933

$3,736Total Project Cost: $10,178

01160001093/15/20193/1/20193/1/2018PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

01-Humboldt-101 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

124.5

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Bridgeville, at Hely Creek Bridge No. 04-0092, Little Larabee Creek Bridge No. 04-0102(PM 25.3), and Butte Creek Bridge No. 04-0116.Upgrade bridge rails and widen at three bridges.

2363

0C500$14,689

$502

Subtotal: $15,191

2018-19$2,947$3,646

$268$4,325

$11,186Total Project Cost: $26,377

01120002925/1/2019

4/15/20199/1/2018PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

01-Humboldt-36 Prior18-1918-1918-19

201.112905.5 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.4/34.5

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Weitchpec and Orleans, at Aikens CreekBridge No. 04-0059 (PM 28.07), Bluff CreekBridge No. 04-0063 (PM 28.27), Bluff CreekBridge No. 04-0225 (PM R28.91), and SlateCreek Bridge No. 04-0061 (PM 29.92); also, onRoute 169 at Rube Creek Bridge No. 04-0215(PM 27.57). Upgrade bridge rails at fivelocations and also strengthen for truck permit loadcapacity at two locations.

2449

0G140$10,486

$278

Subtotal: $10,764

2021-22$1,050$2,127

$110$2,242

$5,529Total Project Cost: $16,293

011600012912/15/202110/5/20214/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

01-Humboldt-96 18-1919-2019-2021-22

201.1122508 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 42 of 284

DRAFT

12-06

-17

Page 47: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Eureka, at various locations from 0.2 milessouth of Eureka Slough Bridge to 0.2 miles northof Gannon Slough Bridge. Upgrade bridge rails and replace bridge.

2376

0E000$4,249

$196

Subtotal: $4,445

2018-19$1,480$1,514

$63$892

$3,949Total Project Cost: $8,394

01130000914/1/2019

3/15/20191/10/2017PA&ED:

RTL:R/W Cert:

11/21/2019Begin Con:

01-Humboldt-101 18-19PriorPrior18-19

201.112300 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

79.8/84.7

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In Humboldt County, on Routes 96 and 101 atvarious locations. Seismic retrofit 3 bridges.

2302

0A120$6,171$1,089

Subtotal: $7,260

2019-20$1,419$1,856

$171$1,948

$5,394Total Project Cost: $12,654

01130001092/15/20202/1/20202/1/2019PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

01-Humboldt-96 PriorPrior18-1919-20

201.1133 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Near Myers Flat, at South Fork Eel River BridgeNo. 04-0123. Seismic retrofit.

2301

0A110$6,078

$44

Subtotal: $6,122

2019-20$4,641$2,072

$215$1,855

$8,783Total Project Cost: $14,905

01120002111/1/20201/1/20209/1/2018PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

27.7

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In Eureka, at the Eureka Slough Bridge No. 04-0022L. Seismic retrofit.

2417

0F200$3,695$3,837

Subtotal: $7,532

2019-20$709

$1,574$75

$1,206

$3,564Total Project Cost: $11,096

01150000883/1/20202/1/20202/1/2019PA&ED:

RTL:R/W Cert:

10/3/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

79.5/80.2

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 43 of 284

DRAFT

12-06

-17

Page 48: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Bridgeville, at Van Duzen River Bridge No.04-0284 (PM 17.94) and Van Duzen River BridgeNo. 04-0293 (PM R23.91); also, on Route 211near Ferndale at Salt River Bridge No. 04-131(PM R75.15), in Lake County on Route 29 nearLakeport at Hill Road East Overcrossing No. 14-0039 (PM R43.75), and in Mendocino County onRoute 101 near Longvale at Long Valley CreekRest Area Bridge No. 10-0240Y (PM 61.82).Apply polyester concrete overlay or methacrylatetreatment to bridge decks.

2429

0F500$1,480

$3

Subtotal: $1,483

2021-22$268$757$42

$772

$1,839Total Project Cost: $3,322

01160000149/8/2021

7/20/20215/15/2020PA&ED:

RTL:R/W Cert:

4/11/2022Begin Con:

01-Humboldt-36 18-1919-2019-2021-22

201.1195 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

17.9/R23.9

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In Humboldt County, at South Fork Eel RiverBridge and Separation No. 04-0065, South ForkEel River Bridge No. 04-0076 (PM 35.5), andArcata Overhead No. 04-0079R. Strengthen threebridge structures.

2400

0E770$10,109$1,359

Subtotal: $11,468

2018-19$1,010$1,355

$65$2,102

$4,532Total Project Cost: $16,000

01150000091/1/20201/1/20201/1/2019PA&ED:

RTL:R/W Cert:

12/25/2020Begin Con:

01-Humboldt-101 Prior18-1918-1918-19

201.3223 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R17.9/87.8

Con Sup:

Trans Permit Requirements for Bridges

Const:R/W:

Near Arcata, from 1.5 miles east to 2.0 miles eastof Route 101 at the Route 200/299 Separation No.04-0184. Establish standard vertical clearance.2430

0F530$4,028

$31

Subtotal: $4,059

2019-20$564$857$26

$1,124

$2,571Total Project Cost: $6,630

01160000183/3/20202/4/20208/1/2019PA&ED:

RTL:R/W Cert:

8/4/2020Begin Con:

01-Humboldt-299 18-1919-2019-2019-20

201.3221 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R1.5/R2.0

Con Sup:

Trans Permit Requirements for Bridges

Const:R/W:

ROADWAY PRESERVATIONNear Redcrest, from Englewood ParkUndercrossing to Eel River Bridge and Overhead.Pavement rehabilitation.2422

0F360$14,515

$6

Subtotal: $14,521

2018-19$579$680$85

$1,518

$2,862Total Project Cost: $17,383

01150001152/1/20192/1/20194/1/2018PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

01-Humboldt-101 PriorPriorPrior18-19

201.12136.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R39.2/R48.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 44 of 284

DRAFT

12-06

-17

Page 49: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Eureka, on 4th Street from Broadway toEureka Slough Bridge; also on 5th street from OStreet to Eureka Slough Bridge. Pavementrehabilitation.

2380

0E040$3,135

$21

Subtotal: $3,156

2018-19$107$167$104$725

$1,103Total Project Cost: $4,259

01130001003/15/20193/1/20195/1/2018PA&ED:

RTL:R/W Cert:

10/3/2019Begin Con:

01-Humboldt-101 Prior18-1918-1918-19

201.1217 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

78.0/79.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Trinidad, from 1.3 miles south of SchoolRoad to 0.4 mile north of Big Lagoon Bridge.Pavement rehabilitation.2439

0F820$45,355

$12

Subtotal: $45,367

2020-21$332$561$84

$4,287

$5,264Total Project Cost: $50,631

011600006711/15/202011/1/20208/1/2019PA&ED:

RTL:R/W Cert:

6/1/2021Begin Con:

01-Humboldt-101 Prior19-2019-2020-21

201.12177.7 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R90.1/109.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Eureka, from south of Fields LandingOverhead to north of Herrick Avenue Overcrossing. Roadway rehabilitation.2382

0C570$31,243

$366

Subtotal: $31,609

2019-20$646

$1,258$52

$6,696

$8,652Total Project Cost: $40,261

01130000092/1/2020

1/15/202010/15/2018PA&ED:

RTL:R/W Cert:

7/6/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.12221.1 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

69.9/75.2

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Near Garberville, from north of Redwood Driveto 1.3 miles south of Myers Flat; also, inMendocino County on Route 271 near Piercy,from 0.5 mile north of Confusion Hill to 0.5 milenorth of Route 101 Separation (PM 16.1 to 20.0).Rehabilitate or replace drainage culverts.

7002

48770$2,806

$403

Subtotal: $3,209

2020-21$878$866$309$909

$2,962Total Project Cost: $6,171

01140000713/1/20213/1/20213/1/2020PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

01-Humboldt-101 Prior19-2019-2020-21

201.15119 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R11.8/26.7

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 45 of 284

DRAFT

12-06

-17

Page 50: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Miranda, from 2.3 miles south of MirandaPost Office to 0.9 mile south of Bear CreekBridge. Upgrade drainage systems.2270

40950$1,453

$305

Subtotal: $1,758

2018-19$513$838$151$403

$1,905Total Project Cost: $3,663

010000015812/1/201812/1/20189/29/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

01-Humboldt-254 PriorPriorPrior18-19

201.1517 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.8/42.1

Con Sup:

Drainage System Restoration

Const:R/W:

Near Blue Lake and Willow Creek, from 0.1 mileeast of Route 200 to 0.5 mile east of Boise CreekCampground. Rehabilitate drainage culverts.2433

0F620$4,268

$920

Subtotal: $5,188

2021-22$904$958$77

$1,615

$3,554Total Project Cost: $8,742

01160000358/1/20218/1/20215/1/2020PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

01-Humboldt-299 Prior20-2120-2121-22

201.15124 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R1.9/37.8

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYIn and near Eureka and Arcata, from south ofCole Avenue to north of Route 255. Operationalimprovements.2418

0F220$6,807

$240

Subtotal: $7,047

2018-19$414$667$114$830

$2,025Total Project Cost: $9,072

01150000922/15/20192/1/2019

1/10/2017PA&ED:

RTL:R/W Cert:

10/3/2019Begin Con:

01-Humboldt-101 PriorPriorPrior18-19

201.31023 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

79.9/86.1

Con Sup:

Operational Improvements

Const:R/W:

In Arcata, from north of Route 299/Route 101Connector to 0.2 mile south of Guintoli LaneOvercrossing. Construct auxiliary lane toimprove merging movements.

2424

0E890$4,098

$15

Subtotal: $4,113

2021-22$1,008$1,329

$90$1,546

$3,973Total Project Cost: $8,086

011500004311/1/202111/1/202110/1/2020PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

01-Humboldt-101 18-1918-1920-2121-22

201.31036 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

88.3/88.6

Con Sup:

Operational Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 46 of 284

DRAFT

12-06

-17

Page 51: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

FACILITIESIn Eureka, at the District 1 Materials Laboratorylocated at the District Office complex (1726Albee Street). Replace District 1 Materials Lab(L5731) at alternative site to address health,safety, accessibility, and operational deficiencies.

2355

0C110$4,284$1,388

Subtotal: $5,672

2020-21$1,134$1,380

$567$1,702

$4,783Total Project Cost: $10,455

01120002299/4/20207/1/20204/1/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

01-Humboldt-101 18-1918-1918-1920-21

201.3541 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Material Labs

Const:R/W:

CountyHumboldt

PA&ED:PS&E:

R/W Sup:Con Sup:

$19,347$266,799

R/W:

Subtotal: $286,146

Const:$36,679$41,112$7,102

$57,691

$142,584

Total (Capital + Support): $428,730

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 47 of 284

DRAFT

12-06

-17

Page 52: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Imperial($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn San Diego and Imperial Counties, at variouslocations, on Routes 7, 8, 78, 79, 86, 94, 98, 111,115, 186, and 188. Upgrade and install curvewarning signs.

1201

42500$1,712

$0

Subtotal: $1,712

2021-22$317$493

$0$462

$1,272Total Project Cost: $2,984

11160000951/13/202212/6/2021

11/16/2020PA&ED:

RTL:R/W Cert:

10/14/2022Begin Con:

11-Imperial-Var 19-2020-21

21-22

201.01535 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near El Centro, at various locations onRoutes 8 and 111. Pave slopes under structures.

1252

41200$2,070

$0

Subtotal: $2,070

2021-22$385$585

$0$571

$1,541Total Project Cost: $3,611

11120001587/30/20216/11/20218/7/2020PA&ED:

RTL:R/W Cert:

12/30/2021Begin Con:

11-Imperial-8 19-2020-21

21-22

201.23518 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R32.4/R46.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Calexico, from Ollie Avenue to RockwoodAvenue. Construct and upgrade pedestrian curbramps.1240

42780$2,141

$0

Subtotal: $2,141

2021-22$169$650

$0$661

$1,480Total Project Cost: $3,621

11170000219/3/2021

8/13/20219/23/2019PA&ED:

RTL:R/W Cert:

1/10/2022Begin Con:

11-Imperial-98 18-1919-20

21-22

201.36122 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

32.1/32.5

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

ROADWAY PRESERVATIONIn Imperial County, from west of Midway WellRoad to east of Mitchell Camp Road at variouslocations. Culvert replacement.1283

42050$687

Subtotal: $687

2019-20$177$409

$201

$787Total Project Cost: $1,474

11150000528/26/20197/18/20198/23/2018PA&ED:

RTL:R/W Cert:

4/27/2020Begin Con:

11-Imperial-78 Prior18-19

19-20

201.1516 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

62.3/73.8

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 48 of 284

DRAFT

12-06

-17

Page 53: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Imperial($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Imperial County, from north of Alamo RiverBridge to north of Gonder Road. Culvertreplacement.0602

42060$417

Subtotal: $417

2019-20$165$371

$190

$726Total Project Cost: $1,143

11150000537/8/20196/4/20197/5/2018PA&ED:

RTL:R/W Cert:

3/6/2020Begin Con:

11-Imperial-115 Prior18-19

19-20

201.1514 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

L10.4/19.8

Con Sup:

Drainage System Restoration

Const:R/W:

CountyImperial

PA&ED:PS&E:

R/W Sup:Con Sup:

$0$7,027

R/W:

Subtotal: $7,027

Const:$1,213$2,508

$0$2,085

$5,806

Total (Capital + Support): $12,833

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 49 of 284

DRAFT

12-06

-17

Page 54: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Inyo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn and near Bishop, from west of Meadow Laneto east of Pioneer Lane. Construct a two-way leftturn lane.2617

36370$1,238

$0

Subtotal: $1,238

2019-20$236$545

$8$677

$1,466Total Project Cost: $2,704

091400003011/14/20198/19/2019

10/31/2018PA&ED:

RTL:R/W Cert:

5/20/2020Begin Con:

09-Inyo-168 18-1919-2018-1919-20

201.01510 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

16.0/17.7

Con Sup:

Collision Severity Reduction

Const:R/W:

ROADWAY PRESERVATIONNear Shoshone, from east of Route 127 toChicago Valley Road. Replace and installculverts.0653

36340$2,210

$800

Subtotal: $3,010

2019-20$405$620$150$405

$1,580Total Project Cost: $4,590

09150000023/20/20203/1/20207/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

09-Inyo-178 PriorPriorPrior19-20

201.1513 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

43.4/44.2

Con Sup:

Drainage System Restoration

Const:R/W:

ROADSIDE PRESERVATIONNear Cartago, 3.0 miles north of Route 190Junction. Protect, enhance, preserve, and restorewetland and riparian habitat at Cartago WildlifeArea. This work will also serve as advancemitigation credit purchases for future SHOPPconstruction projects.

0661

36490$1,840

$31

Subtotal: $1,871

2021-22$890$380$100$460

$1,830Total Project Cost: $3,701

091500001811/1/202111/1/20215/1/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

09-Inyo-395 18-1919-2019-2021-22

201.24016 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

37.6

Con Sup:

Roadside Enhancement

Const:R/W:

CountyInyo

PA&ED:PS&E:

R/W Sup:Con Sup:

$831$5,288

R/W:

Subtotal: $6,119

Const:$1,531$1,545

$258$1,542

$4,876

Total (Capital + Support): $10,995

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 50 of 284

DRAFT

12-06

-17

Page 55: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn and near Wasco, from 0.7 mile west of BrownMaterial Road to Scofield Avenue. Install centerline and shoulder rumble strips.6865

0W410$1,309

$5

Subtotal: $1,314

2018-19$375$525

$5$390

$1,295Total Project Cost: $2,609

06170002143/22/20192/2/20197/2/2018PA&ED:

RTL:R/W Cert:

9/26/2019Begin Con:

06-Kern-46 Prior18-1918-1918-19

201.01017 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

26.8/47.0

Con Sup:

Safety Improvements

Const:R/W:

Near Lamont, from 0.1 mile south to 0.1 milenorth of Sunset Boulevard. Construct roundaboutat intersection of Route 184/Sunset Boulevard.6791

0V280$3,600

$950

Subtotal: $4,550

2019-20$1,100$1,300

$530$970

$3,900Total Project Cost: $8,450

06160001243/16/20203/2/20208/1/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

06-Kern-184 Prior18-1918-1919-20

201.01016 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

L0.9/L1.1

Con Sup:

Safety Improvements

Const:R/W:

In and near Arvin, at Derby Street. Install trafficsignals.

6709

0S510$1,396

$74

Subtotal: $1,470

2018-19$348$775$345$530

$1,998Total Project Cost: $3,468

06140001629/1/2018

8/15/20188/10/2015PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

06-Kern-223 PriorPriorPrior18-19

201.0106 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.0/21.3

Con Sup:

Safety Improvements

Const:R/W:

In Kern, Mono, Inyo, and San BernardinoCounties on Routes 14, 89, 108, 120, 127, 168,178, 182, 190, 202, and 395 at various locations.Upgrade guardrails, end treatments, and bridgetransition railings to current standards.

2631

36770$2,831

$1

Subtotal: $2,832

2020-21$240$570$10

$910

$1,730Total Project Cost: $4,562

091700000110/16/2020

5/1/202011/1/2019PA&ED:

RTL:R/W Cert:

5/15/2021Begin Con:

09-Kern-178 18-1919-2019-2020-21

201.01527 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 51 of 284

DRAFT

12-06

-17

Page 56: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Tehachapi, from 0.2 mile west to 0.2 mileeast of Cummings Valley Road East. Construct aleft turn lane from southbound Route 202 toCummings Valley Road East.

2620

36720$1,260

$933

Subtotal: $2,193

2021-22$311$970$620$950

$2,851Total Project Cost: $5,044

09160000168/15/20217/15/20214/1/2019PA&ED:

RTL:R/W Cert:

2/23/2022Begin Con:

09-Kern-202 18-1918-1918-1921-22

201.01539 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R4.7/R5.1

Con Sup:

Collision Severity Reduction

Const:R/W:

In Bakersfield, from M Street to east of FairfaxRoad at various locations. Roadside safetyimprovements.3729

0E320$2,644

Subtotal: $2,644

2018-19$220$587$10

$808

$1,625Total Project Cost: $4,269

06130000379/3/20188/1/20182/7/2017PA&ED:

RTL:R/W Cert:

2/4/2019Begin Con:

06-Kern-178 PriorPriorPrior18-19

201.23561 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.7/6.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Bakersfield, from 0.2 mile west of H StreetOvercrossing to 0.2 mile east of Cottonwood Road Undercrossing. Upgrade curb ramps tomeet current ADA standards.

6757

0T000$3,226

$100

Subtotal: $3,326

2020-21$407

$1,064$865$775

$3,111Total Project Cost: $6,437

06150000031/4/2021

12/2/20201/2/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

06-Kern-58 18-1918-1918-1920-21

201.36125 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R53.2/R55.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Bakersfield, from Route 204/58 Separation toL street; also, on Route 58 (PM R54.2/R54.6).Upgrade curb ramps and Accessible PedestrianSignals (APS) to meet current ADA standards.

6871

0W150$2,845

$337

Subtotal: $3,182

2021-22$1,105$1,600$1,486$1,292

$5,483Total Project Cost: $8,665

06170000968/2/2021

7/15/20218/1/2019PA&ED:

RTL:R/W Cert:

1/20/2022Begin Con:

06-Kern-204 18-1919-2019-2021-22

201.36191 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.0/4.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 52 of 284

DRAFT

12-06

-17

Page 57: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Mettler, at California Aqueduct Bridge No.50-0323. Bridge rehabilitation.

6726

0S050$7,300

$130

Subtotal: $7,430

2018-19$1,045$1,650

$100$2,100

$4,895Total Project Cost: $12,325

06150000474/1/2020

3/15/20207/15/2018PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

06-Kern-166 Prior18-1918-1918-19

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

17.3/17.7

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near the Grapevine, at the California AqueductNo. 50-0321L/R. Improve to standard loadcapacity.

ACCELERATED BRIDGE (PA&ED Only)

6877

0W460$4,100

$10

Subtotal: $4,110

2018-19$1,910

$430$10

$1,000

$3,350Total Project Cost: $7,460

06170002258/1/20187/2/20184/2/2018PA&ED:

RTL:R/W Cert:

12/14/2018Begin Con:

06-Kern-5 18-1918-1918-1918-19

201.3222 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

12.5

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

Near the Grapevine, at the Route 5/99 SeparationNo. 50-0240R. Lower roadway profile to obtainstandard vertical clearance.

ACCELERATED BRIDGE (PA&ED Only)

6876

0W430$4,500

$10

Subtotal: $4,510

2018-19$1,600

$470$10

$1,200

$3,280Total Project Cost: $7,790

06170002228/1/20187/2/20184/2/2018PA&ED:

RTL:R/W Cert:

12/14/2018Begin Con:

06-Kern-5 18-1918-1918-1918-19

201.3221 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

R15.8

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

In Bakersfield, at Panama Lane Overcrossing andWhite Lane Overcrossing. Lower highwayprofile below overcrossings to accommodateclearance requirement for permit vehicles.

6681

0Q920$8,173

$30

Subtotal: $8,203

2019-20$700

$1,200$20

$1,100

$3,020Total Project Cost: $11,223

06140000103/2/20201/1/20203/1/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

06-Kern-99 PriorPriorPrior19-20

201.3222 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

19.5/21.1

Con Sup:

Trans Permit Requirements for Bridges

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 53 of 284

DRAFT

12-06

-17

Page 58: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONNear Bakersfield, from south of Hickory Lane to north of Brundage Lane. Upgrade ADA curbramps, install bike lanes, cold plane pavement,place Hot Mix Asphalt (HMA) and RubberizedHot Mix Asphalt concrete (RHMA).

6803

0U290$17,700$2,230

Subtotal: $19,930

2021-22$2,425$3,175$2,630$3,750

$11,980Total Project Cost: $31,910

06160000018/16/20218/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

06-Kern-184 Prior19-2019-2021-22

201.12018.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.8/8.2

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In and near Bakersfield, from 0.2 mile south ofEdison Highway to Route 178. Upgrade ADAcurbs and barrier railing, widen shoulders, coldplane pavement, place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt concrete(RHMA) to rehabilitate roadway.

6798

0U430$7,600

$350

Subtotal: $7,950

2020-21$1,020$1,520

$50$1,600

$4,190Total Project Cost: $12,140

061600003310/2/20209/9/20201/2/2019PA&ED:

RTL:R/W Cert:

4/11/2021Begin Con:

06-Kern-184 Prior18-1918-1920-21

201.12011 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.1/12.1

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

Near Bakersfield, from Route 119 to south ofNoriega Road; also on Route 119 from Enos Laneto Route 5 (PM 18.1/19.8). Pavementrehabilitation.

6755

0U100$12,700

$23

Subtotal: $12,723

2019-20$450$435$81

$650

$1,616Total Project Cost: $14,339

06150002114/1/20203/2/20208/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

06-Kern-43 Prior18-1918-1919-20

201.12122.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.1/9.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Wasco, from Magnolia Avenue toRoute 43 South. Upgrade ADA curb ramps, coldplane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete(RHMA).

6810

0U480$4,600

$90

Subtotal: $4,690

2019-20$710$950$360$900

$2,920Total Project Cost: $7,610

06150002995/1/20204/3/2020

7/19/2018PA&ED:

RTL:R/W Cert:

10/29/2020Begin Con:

06-Kern-46 Prior18-1918-1919-20

201.1216.3 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

49.0/50.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 54 of 284

DRAFT

12-06

-17

Page 59: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Bakersfield, from Route 43 to 0.1mile west of Allen Road. Pavementrehabilitation.6756

0U110$8,500

$350

Subtotal: $8,850

2021-22$1,400$1,200

$250$1,900

$4,750Total Project Cost: $13,600

06150002123/1/20221/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

06-Kern-58 18-1920-2121-2221-22

201.12112.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

39.9/46.0

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Bakersfield, from F Street to Route 99. Coldplane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt concrete(RHMA).

6889

0U490$3,290

$10

Subtotal: $3,300

2019-20$450$740$65

$550

$1,805Total Project Cost: $5,105

061600000212/10/201911/15/20198/13/2018PA&ED:

RTL:R/W Cert:

6/15/2020Begin Con:

06-Kern-204 Prior18-1918-1919-20

201.1214.7 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.1/6.7

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Kettleman City, from 0.34 mile south ofTwisselman Road Overcrossing to Kings Countyline. Cold plane pavement, repair concretepavement panels, place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt concrete(RHMA) to rehabilitate roadway.

6820

0U470$21,500

$65

Subtotal: $21,565

2019-20$440

$1,200$25

$1,900

$3,565Total Project Cost: $25,130

061500030110/4/20199/6/20198/3/2018PA&ED:

RTL:R/W Cert:

4/12/2020Begin Con:

06-Kern-5 Prior18-1918-1919-20

201.12221 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

82.0/87.0

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In Rosamond and Mojave, from 0.5 mile south ofDawn Road Overcrossing (OC) to 0.5 mile northof Silver Queen Road OC. Rehabilitate lanes andramps by replacing slabs and grinding lane 1,construct Continuously Reinforced Concrete Pavement (CRCP) lane 2, cold plane and overlayramps with Rubberized Hot Mix Asphalt(RHMA-G). Replace guardrail, construct rumblestrip, replace signs using retroreflective sheeting,and refresh pavement delineation.

2633

36740$40,515

$22

Subtotal: $40,537

2019-20$370

$1,460$190

$3,010

$5,030Total Project Cost: $45,567

09160000251/23/20201/3/20207/2/2018PA&ED:

RTL:R/W Cert:

10/15/2020Begin Con:

09-Kern-14 Prior18-1918-1919-20

201.12227.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R5.7/R12.6

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 55 of 284

DRAFT

12-06

-17

Page 60: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Bakersfield, from Route 5 to PanamaLane. Roadway rehabilitation.

6731

0T200$31,500

$120

Subtotal: $31,620

2018-19$1,160$1,600

$100$3,600

$6,460Total Project Cost: $38,080

06150000355/1/2018

1/15/20189/22/2017PA&ED:

RTL:R/W Cert:

1/15/2019Begin Con:

06-Kern-99 PriorPriorPrior18-19

201.12258.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/19.5

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In Kern and Kings Counties, on Route 99, 198and 204 at various locations. Upgrade existingpumps and control systems at 11 pumping plants.6796

0U240$5,080

$122

Subtotal: $5,202

2019-20$650

$2,190$610

$2,150

$5,600Total Project Cost: $10,802

061500029411/20/201911/8/20197/13/2018PA&ED:

RTL:R/W Cert:

5/11/2020Begin Con:

06-Kern-Var Prior18-1918-1919-20

201.15111 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

Const:R/W:

Near Lebec, from north Lebec Road to south ofGrapevine Road. Rehabilitate drainage systems.

6749

0Q820$5,100

$150

Subtotal: $5,250

2018-19$375$670$100$690

$1,835Total Project Cost: $7,085

06130002433/30/20192/1/20194/1/2018PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

06-Kern-5 PriorPriorPrior18-19

201.1515 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.6/8.8

Con Sup:

Drainage System Restoration

Const:R/W:

In Kern County, from 2.4 miles north of FortTejon Overcrossing to 1.2 miles south of Grapevine Undercrossing at four locations.Repair reinforced concrete box culverts.

6884

0W160$8,162

$132

Subtotal: $8,294

2019-20$955

$2,173$29

$2,763

$5,920Total Project Cost: $14,214

06170000973/1/20202/1/20203/1/2019PA&ED:

RTL:R/W Cert:

9/16/2020Begin Con:

06-Kern-5 Prior18-1918-1919-20

201.1514 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R7.5/R9.0

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 56 of 284

DRAFT

12-06

-17

Page 61: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MOBILITYIn Bakersfield from 0.3 mile south of BelleTerrace Overcrossing to 0.1 mile north of Route58; also on Route 58 from Route 99 to 0.2 mileeast of Route 99 (PM R52.3 to R52.5). Constructan auxilary lane, reconstruct an Overcrossing, andrealign connector ramp.

6891

48464$30,960

Subtotal: $30,960

2018-19 $300

$4,500

$4,800Total Project Cost: $35,760

06180000197/1/20188/1/2017

12/5/2015PA&ED:

RTL:R/W Cert:

8/1/2018Begin Con:

06-Kern-9918-19

18-19

201.310648 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

22.8/23.6

Con Sup:

Operational Improvements

Const:R/W:

ROADSIDE PRESERVATIONIn Bakersfield, from Planz Road to north ofCalifornia Avenue. Upgrade irrigation system toimprove water efficiency.6735

0T280$1,156

$1

Subtotal: $1,157

2018-19$41

$200$3

$180

$424Total Project Cost: $1,581

06150000522/7/2019

12/1/20186/22/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

06-Kern-99 PriorPriorPrior18-19

201.21012.36 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.6/24.7

Con Sup:

Highway Planting Restoration

Const:R/W:

FACILITIESIn Tehachapi, at the Tehachapi MaintenanceStation near Routes 58 and 202 at 320 WestTehachapi Boulevard. Construct a new Tehachapi Maintenance Station at existing oralternative site to replace the old, undersizedfacility that is in constant need of repairs.

2634

36750$8,867$1,001

Subtotal: $9,868

2021-22$930

$2,630$432

$2,778

$6,770Total Project Cost: $16,638

09160000326/24/20226/23/20226/4/2020PA&ED:

RTL:R/W Cert:

1/4/2023Begin Con:

09-Kern- 18-1921-2220-2121-22

201.3521 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Maintenance Facilities

Const:R/W:

CountyKern

PA&ED:PS&E:

R/W Sup:Con Sup:

$7,246$250,414

R/W:

Subtotal: $257,660

Const:$20,737$31,584$8,936

$42,946

$104,203

Total (Capital + Support): $361,863

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 57 of 284

DRAFT

12-06

-17

Page 62: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kings($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONIn Kings and Tulare Counties, on Routes 63,99,137, 198 and 216. Repair and replace stolenand damaged electrical systems and protectelectrical and irrigation facilities. The work isrequired to restore incident management,emergency readiness, mobility, functionality, andoperation efficiency.

6797

0U300$15,000

$60

Subtotal: $15,060

2019-20$640

$1,880$1,000$1,850

$5,370Total Project Cost: $20,430

061600002710/1/20199/5/2019

11/1/2017PA&ED:

RTL:R/W Cert:

4/8/2020Begin Con:

06-Kings-Var PriorPriorPrior19-20

201.131296 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONIn and near Lemoore and Hanford, from Route 41to 10th Avenue Undercrossing. Pave areas beyond gore and bridge slopes.6737

0T290$4,700

$13

Subtotal: $4,713

2018-19$350$950$40

$600

$1,940Total Project Cost: $6,653

06150000537/3/20187/2/2018

1/24/2017PA&ED:

RTL:R/W Cert:

2/4/2019Begin Con:

06-Kings-198 PriorPriorPrior18-19

201.23547 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.3/R19.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Near Hanford, from 0.4 mile east of 10th AvenueOvercrossing to 1.5 miles east of Route 43/198Separation. Upgrade gore areas, construct MVPsand slope paving at bridges.

6799

0U790$3,790

$3

Subtotal: $3,793

2020-21$510$770$35

$540

$1,855Total Project Cost: $5,648

06160000378/24/20207/1/2020

10/1/2019PA&ED:

RTL:R/W Cert:

2/15/2021Begin Con:

06-Kings-198 18-1919-2019-2020-21

201.23515 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R19.4/22.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

BRIDGE PRESERVATIONIn and near Stratford, from 22nd Street to LaurelAvenue at the Kings River Bridge No. 45-0007.Replace 73 year old bridge due to extensivesuperstructure and substructure distress andsusceptibility to liquefaction.

6873

0V110$21,400

$94

Subtotal: $21,494

2021-22$2,300$2,700

$400$6,400

$11,800Total Project Cost: $33,294

061600020810/1/20219/1/20214/2/2020PA&ED:

RTL:R/W Cert:

5/11/2022Begin Con:

06-Kings-41 Prior19-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

30.6/33.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 58 of 284

DRAFT

12-06

-17

Page 63: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Kings($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADSIDE PRESERVATIONIn and near Hanford, from 0.3 mile west of 12thAvenue to 0.5 mile east of Route 43/198Separation. Electrical upgrade of booster pumps,replace irrigation mainline, valves and valvewiring.

6815

0V820$1,550

$7

Subtotal: $1,557

2020-21$270$590$22

$520

$1,402Total Project Cost: $2,959

06170000108/7/20207/3/20207/5/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

06-Kings-198 18-1919-2019-2020-21

201.21017.9 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R16.6/R21.5

Con Sup:

Highway Planting Restoration

Const:R/W:

CountyKings

PA&ED:PS&E:

R/W Sup:Con Sup:

$177$46,440

R/W:

Subtotal: $46,617

Const:$4,070$6,890$1,497$9,910

$22,367

Total (Capital + Support): $68,984

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 59 of 284

DRAFT

12-06

-17

Page 64: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Lake($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Upper Lake, from 0.4 mile west to 0.2 mileeast of Witter Springs Road. Curve improvement,shoulder widening, and add left-turn pocket andrumble strips.

4647

0G330$7,441

$234

Subtotal: $7,675

2019-20$1,463$1,877

$144$1,870

$5,354Total Project Cost: $13,029

01160001704/15/20204/1/20204/8/2019PA&ED:

RTL:R/W Cert:

12/3/2020Begin Con:

01-Lake-20 Prior18-1918-1919-20

201.01014 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.1/5.7

Con Sup:

Safety Improvements

Const:R/W:

Near Lower Lake, at various locations. Widenfor truck climbing lanes and shoulders.

3203

0E730$5,646

$459

Subtotal: $6,105

2019-20$1,355$1,216

$62$2,039

$4,672Total Project Cost: $10,777

011500000410/15/20199/26/201910/1/2018PA&ED:

RTL:R/W Cert:

2/5/2020Begin Con:

01-Lake-29 Prior18-1918-1919-20

201.01045 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Safety Improvements

Const:R/W:

Near Lower Lake, from north of Spruce GroveRoad to south of Hofacker Lane. Widenshoulders.3102

0E720$8,813

$502

Subtotal: $9,315

2019-20$1,280$1,119

$88$2,464

$4,951Total Project Cost: $14,266

011500000310/15/201910/1/201910/1/2018PA&ED:

RTL:R/W Cert:

4/15/2020Begin Con:

01-Lake-29 Prior18-1918-1919-20

201.01018 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

12.8/14.4

Con Sup:

Safety Improvements

Const:R/W:

Near Kelseyville, from north of Route 29/281Junction to north of Route 29/175 Junction.Improve road condition.3099

29811$38,578$9,777

Subtotal: $48,355

2018-19$4,000$4,638$1,920$7,137

$17,695Total Project Cost: $66,050

01140000431/15/2019

12/15/201811/30/2016PA&ED:

RTL:R/W Cert:

8/3/2019Begin Con:

01-Lake-29 PriorPriorPrior18-19

201.01083 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.5/31.6

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 60 of 284

DRAFT

12-06

-17

Page 65: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Lake($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Lake and Mendocino Counties, on variousroutes at various locations. Upgrade guardrail,end treatments, and transition railings to currentstandards and install vegetation control measures.

7018

0E850$3,800

$12

Subtotal: $3,812

2018-19$742$812$81

$1,266

$2,901Total Project Cost: $6,713

01150000373/1/2019

2/15/20197/13/2018PA&ED:

RTL:R/W Cert:

9/2/2019Begin Con:

01-Lake-1 Prior18-1918-1918-19

201.015246 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

BRIDGE PRESERVATIONNear Upper Lake, at Bachelor Creek Bridge No.14-0001. Replace multi-plate steel culvert bridgewith precast concrete box culverts and wingwalls.3107

0F490$3,330

$21

Subtotal: $3,351

2020-21$577$708$14

$595

$1,894Total Project Cost: $5,245

01160000137/15/20206/24/2019

12/26/2018PA&ED:

RTL:R/W Cert:

12/17/2020Begin Con:

01-Lake-20 Prior18-1918-1920-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.8

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Lake County, on Routes 20, 29 and 175 atvarious locations. Replace and upgrade bridgerails on 5 bridges. 3098

0E080$5,621

$263

Subtotal: $5,884

2019-20$943

$1,136$324

$1,601

$4,004Total Project Cost: $9,888

01130001228/15/20197/1/20191/1/2019PA&ED:

RTL:R/W Cert:

1/1/2020Begin Con:

01-Lake-20 Prior18-1918-1919-20

201.112853 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

MOBILITYIn Lake and Mendocino Counties, on Routes 20,29, 101, 175, and 281 at various locations.Upgrade the existing Transportation ManagementSystem (TMS) elements to improve trafficmonitoring and data transmission.

7017

0E830$2,087

$30

Subtotal: $2,117

2020-21$587$852$50

$1,021

$2,510Total Project Cost: $4,627

01150000348/1/2020

6/25/20207/1/2019PA&ED:

RTL:R/W Cert:

12/17/2020Begin Con:

01-Lake-29 Prior19-2019-2020-21

201.31521 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 61 of 284

DRAFT

12-06

-17

Page 66: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Lake($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Lake County, on Routes 20, 29, 53, and 175 atvarious locations. Upgrade the existingTransportation Management System (TMS)elements to improve traffic monitoring and datatransmission.

3104

0E820$2,123

$39

Subtotal: $2,162

2020-21$618$844$186

$1,073

$2,721Total Project Cost: $4,883

01150000338/1/2020

6/25/20207/1/2019PA&ED:

RTL:R/W Cert:

12/17/2020Begin Con:

01-Lake-53 Prior19-2019-2020-21

201.31530 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

MISCELLANEOUSNear Clearlake Oaks, at the Clearlake OaksMaintenance Station. Transportationinfrastructure improvement for zero-emissionvehicle charging.

3112

0G700$361

$6

Subtotal: $367

2018-19$230$150$32

$133

$545Total Project Cost: $912

01170000511/15/2019

12/24/20186/17/2018PA&ED:

RTL:R/W Cert:

5/15/2019Begin Con:

01-Lake-20 Prior18-1918-1918-19

201.9991 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.4

Con Sup:

Miscellaneous

Const:R/W:

CountyLake

PA&ED:PS&E:

R/W Sup:Con Sup:

$11,343$77,800

R/W:

Subtotal: $89,143

Const:$11,795$13,352$2,901

$19,199

$47,247

Total (Capital + Support): $136,390

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 62 of 284

DRAFT

12-06

-17

Page 67: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Lassen($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Susanville, from 0.3 mile west to 0.4 mileeast of Big Springs Road. Curve improvement.

3609

1H440$2,896

$104

Subtotal: $3,000

2018-19$484$645$187$859

$2,175Total Project Cost: $5,175

02160000057/5/2018

6/15/20188/1/2017PA&ED:

RTL:R/W Cert:

10/23/2018Begin Con:

02-Lassen-44 PriorPriorPrior18-19

201.01016 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

31.9/32.6

Con Sup:

Safety Improvements

Const:R/W:

BRIDGE PRESERVATIONNear Westwood, at Goodrich Creek Bridge No.07-0048. Replace bridge.

3512

4F560$3,611

$45

Subtotal: $3,656

2019-20$1,500$1,280

$60$1,419

$4,259Total Project Cost: $7,915

02130000068/14/20198/1/20195/1/2018PA&ED:

RTL:R/W Cert:

1/24/2020Begin Con:

02-Lassen-36 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.2/7.4

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

ROADWAY PRESERVATIONNear Westwood, from 1.2 miles west of GoodrichCreek Bridge to 1.3 miles west of Willard CreekRoad. Rehabilitate roadway. 3468

4E460$22,789$1,302

Subtotal: $24,091

2019-20$1,650$1,600

$340$2,173

$5,763Total Project Cost: $29,854

02000202878/14/20198/1/20195/1/2018PA&ED:

RTL:R/W Cert:

1/24/2020Begin Con:

02-Lassen-36 PriorPriorPrior19-20

201.12020.9 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.1/14.3

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

Near Adin, from west of Boyd Hill Lookout Roadto Butte Creek Bridge; also in Modoc Countyfrom Ash Creek Bridge to east of County Road 87(PM 0.0/0.5 and PM 1.0/1.8). Roadway rehabilitation.

3467

4E450$14,317

$281

Subtotal: $14,598

2019-20$1,540$1,330

$280$2,150

$5,300Total Project Cost: $19,898

02000202862/21/20201/17/20201/17/2019PA&ED:

RTL:R/W Cert:

8/25/2020Begin Con:

02-Lassen-299 Prior18-1918-1919-20

201.12016.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.5/25.6

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 63 of 284

DRAFT

12-06

-17

Page 68: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Lassen($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

FACILITIESNear Adin, at the Adin Maintenance Station(L5701). Construct new facility.

3600

1H110$12,850

$20

Subtotal: $12,870

2018-19$260

$2,650$40

$3,200

$6,150Total Project Cost: $19,020

02150001063/15/20197/13/20189/29/2017PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

02-Lassen-299 PriorPriorPrior18-19

201.3521 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

25.6

Con Sup:

Maintenance Facilities

Const:R/W:

CountyLassen

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,752$56,463

R/W:

Subtotal: $58,215

Const:$5,434$7,505

$907$9,801

$23,647

Total (Capital + Support): $81,862

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 64 of 284

DRAFT

12-06

-17

Page 69: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONIn Malibu, south of Big Rock Drive. Shorelineembankment restoration by installing Rock SlopeProtection (RSP) armament.5059

4X970$3,300$4,900

Subtotal: $8,200

2021-22$1,600$2,400

$950$2,750

$7,700Total Project Cost: $15,900

071600033512/13/202111/5/20219/5/2019PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-1 Prior19-2019-2021-22

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

42.5

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONIn the city of Los Angeles, at the westboundRoute 10 Connector to southbound Route 5.Apply High Friction Surface Treatment (HFST)and upgrade lighting.

5153

33270$2,600

$10

Subtotal: $2,610

2018-19$215

$1,152$15

$1,095

$2,477Total Project Cost: $5,087

07160002903/29/20192/19/20192/27/2018PA&ED:

RTL:R/W Cert:

3/2/2020Begin Con:

07-Los Angeles-5 PriorPriorPrior18-19

201.01062 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.3

Con Sup:

Safety Improvements

Const:R/W:

Near Culver City, from Arlington Avenue toBroadway Street. Replace raised islands onmainline and collector-distributor roads withconcrete barrier (Type 60) and install new lightsfrom Arlington Avenue to Hoover Street (PMR12.3/14.2). Also install high mast LED lightingat Route 10/110 Interchange.

5152

33260$18,394

$63

Subtotal: $18,457

2019-20$1,391$3,888

$276$3,544

$9,099Total Project Cost: $27,556

07160002873/18/20202/4/20209/4/2018PA&ED:

RTL:R/W Cert:

5/19/2021Begin Con:

07-Los Angeles-10 18-1918-1918-1919-20

201.010404 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R12.3/R15.5

Con Sup:

Safety Improvements

Const:R/W:

In the city of Los Angeles, at the northboundRoute 110 Connector to eastbound Route 91.Apply High Friction Bauxite Surface Treatment(HFBST), install high visibility thermoplasticlane and edge lines and upgrade guardrail tocurrent standards.

5084

33160$1,585

$10

Subtotal: $1,595

2018-19$304$558$13

$756

$1,631Total Project Cost: $3,226

07160002339/20/20187/13/2018

12/20/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.01030 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.7

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 65 of 284

DRAFT

12-06

-17

Page 70: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of Los Angeles and South Pasadena,between Figueroa Street and Orange Grove Avenue. Convert outside lane to a dynamiclane/shoulder that can switch between the twodepending on prevailing traffic conditions. Thiswill require Dynamic Message Signs (DMS)monitored by the TMC.

5083

33150$25,284$4,982

Subtotal: $30,266

2019-20$2,835$3,735$1,318$5,390

$13,278Total Project Cost: $43,544

07160002316/1/2020

5/15/202012/18/2018PA&ED:

RTL:R/W Cert:

2/26/2021Begin Con:

07-Los Angeles-110 Prior18-1918-1919-20

201.010504 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

25.8/30.6

Con Sup:

Safety Improvements

Const:R/W:

In Highland Park and South Pasadena, from southof Avenue 60 to north of Avenue of 64. PlaceHigh Friction Surface Treatment (HFST). 5037

32660$2,059

$11

Subtotal: $2,070

2018-19$600

$1,265$15

$885

$2,765Total Project Cost: $4,835

071600011710/1/20188/17/20181/22/2018PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.010436 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.7/29.4

Con Sup:

Safety Improvements

Const:R/W:

In Palmdale, at the intersection of Avenue R-8.Upgrade traffic signal system, curb ramps andinstall drainage inlets.5155

33290$888$141

Subtotal: $1,029

2019-20$329$988$140$711

$2,168Total Project Cost: $3,197

07160002978/2/2019

6/19/20198/10/2018PA&ED:

RTL:R/W Cert:

3/11/2020Begin Con:

07-Los Angeles-138 Prior18-1918-1919-20

201.01017 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

49.5

Con Sup:

Safety Improvements

Const:R/W:

In Irwindale, at the Route 605 northbound rampto westbound Live Oak Avenue. Realign andwiden ramp, construct retaining wall, installconcrete barrier and replace guardrail.

4963

31880$3,520$1,077

Subtotal: $4,597

2019-20 $1,232$276

$1,340

$2,848Total Project Cost: $7,445

07160000014/8/2020

2/18/20206/29/2016PA&ED:

RTL:R/W Cert:

7/7/2020Begin Con:

07-Los Angeles-605PriorPrior19-20

201.010203 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

23.4/23.6

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 66 of 284

DRAFT

12-06

-17

Page 71: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Los Angeles and Ventura Counties, on variousroutes and locations. Upgrade and install newcurve warning signs.4969

31930$2,090

$10

Subtotal: $2,100

2020-21$594

$1,571$12

$878

$3,055Total Project Cost: $5,155

071600002210/1/20209/1/2020

7/15/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

07-Los Angeles-Var 18-1919-2019-2020-21

201.01520 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In Long Beach, at Lakewood Boulevard (Route19) and Los Alamitos Traffic Circle. Installpavement delineation, overhead guide signs andassociated roadway improvements.

4632

29910$2,326

$11

Subtotal: $2,337

2018-19$478

$1,028$20

$607

$2,133Total Project Cost: $4,470

07130003023/29/20192/28/20197/10/2018PA&ED:

RTL:R/W Cert:

12/18/2019Begin Con:

07-Los Angeles-1 Prior18-1918-1918-19

201.01559 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.5

Con Sup:

Collision Severity Reduction

Const:R/W:

In Los Angeles County, in Angeles NationalForest, from 0.3 mile east of Bay Tree Road to0.7 mile west of Big Pines Highway at variouslocations. Upgrade existing guardrail and installnew guardrail, and install stormwater TreatmentBMPs.

5151

33250$16,507

$28

Subtotal: $16,535

2020-21$1,020$2,670

$20$2,600

$6,310Total Project Cost: $22,845

07160002703/20/20211/20/20217/15/2019PA&ED:

RTL:R/W Cert:

9/28/2021Begin Con:

07-Los Angeles-2 18-1919-2019-2020-21

201.015129 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

26.7/79.2

Con Sup:

Collision Severity Reduction

Const:R/W:

In the cities of Monterey Park, Rosemead, and ElMonte, from 0.7 mile west of South FremontAvenue Undercrossing to 0.5 mile east of DurfeeAvenue Undercrossing. Upgrade 27 overheadsign posts, associated pedestals, and concretebarriers to current standards to reduce thepotential snagging for out of control vehicles.

5077

33030$4,046

$200

Subtotal: $4,246

2021-22$635

$1,820$531

$1,945

$4,931Total Project Cost: $9,177

071600021312/31/202110/29/20218/30/2019PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-10 18-1919-2019-2021-22

201.01563 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

21.6/31.0

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 67 of 284

DRAFT

12-06

-17

Page 72: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Azusa, from 0.9 mile north of North ForkSan Gabriel Bridge No. 53-2245 to 0.2 mile northof Crystal Lake Road (PM T32.1 to 38.4).Upgrade guardrail and end treatments to currentstandards.

5046

32760$4,190

$20

Subtotal: $4,210

2020-21$486

$1,893$10

$1,284

$3,673Total Project Cost: $7,883

07160001322/5/2021

12/17/20204/12/2019PA&ED:

RTL:R/W Cert:

10/8/2021Begin Con:

07-Los Angeles-39 18-1918-1920-2120-21

201.01540 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

32.2/38.4

Con Sup:

Collision Severity Reduction

Const:R/W:

In the cities of Compton, Paramount andBellflower; also on Route 105 (PMR0.50/R18.14), Route 110 (PM 1.23/R11.89) andRoute 405 (PM 0.27/28.51). Construct shoulderrumble strips ground-in indentations where rightshoulder is less than four feet.

4968

31920$2,300

$10

Subtotal: $2,310

2020-21$156$400$30

$550

$1,136Total Project Cost: $3,446

071600002012/1/202011/1/20202/28/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

07-Los Angeles-91 18-1919-2019-2020-21

201.015372 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

6.3/18.1

Con Sup:

Collision Severity Reduction

Const:R/W:

In the city of Los Angeles, from HighlandAvenue to south of Parkway Calabasas. Upgrademedian concrete barrier to meet the currentstandards.

4709

30370$20,100

$20

Subtotal: $20,120

2019-20$550

$2,325$15

$3,050

$5,940Total Project Cost: $26,060

07140000356/14/20195/15/2019

12/29/2017PA&ED:

RTL:R/W Cert:

8/13/2020Begin Con:

07-Los Angeles-101 PriorPriorPrior19-20

201.01560 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.7/27.7

Con Sup:

Collision Severity Reduction

Const:R/W:

In the city of Los Angeles, from Vernon Avenueto Route 101. Upgrade Metal Beam Guardrail toMidwest Guardrail System, end treatments, andcrash attenuators.

4785

30910$4,520

$25

Subtotal: $4,545

2018-19$306

$2,280$45

$1,357

$3,988Total Project Cost: $8,533

07140002643/21/2019

10/15/20187/2/2018PA&ED:

RTL:R/W Cert:

8/30/2019Begin Con:

07-Los Angeles-110 Prior18-1918-1918-19

201.01513 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.8/23.8

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 68 of 284

DRAFT

12-06

-17

Page 73: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Fernando and Sylmar, from Pacoima Washto Balboa Boulevard. Construct MVPs, accessroads and gates, relocate irrigation facilities, pavebeyond gore and under guardrail.

4975

31990$2,588

$31

Subtotal: $2,619

2020-21$495

$1,322$16

$1,140

$2,973Total Project Cost: $5,592

07160000281/29/2021

12/31/20208/30/2019PA&ED:

RTL:R/W Cert:

8/31/2021Begin Con:

07-Los Angeles-5 18-1919-2019-2020-21

201.23582 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

39.2/R44.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the cities of Los Angeles and Santa Monica,from Route 1/10 Separation bridge to west ofCrenshaw Boulevard. Roadside safetyimprovements.

4715

30420$5,464

$30

Subtotal: $5,494

2018-19$100

$1,560$48

$1,100

$2,808Total Project Cost: $8,302

07140000553/1/20192/1/2019

12/29/2017PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

07-Los Angeles-10 PriorPriorPrior18-19

201.235214 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R2.1/R11.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the city of Los Angeles, from Route 5 to westof Route 710. Roadside safety improvements.

4716

30430$2,553

$30

Subtotal: $2,583

2018-19$139

$1,100$34

$1,060

$2,333Total Project Cost: $4,916

07140000583/1/20192/1/20193/1/2018PA&ED:

RTL:R/W Cert:

9/30/2019Begin Con:

07-Los Angeles-10 PriorPriorPrior18-19

201.235106 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.3/21.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Santa Clarita, from Route 5 toCanyon Park Boulevard. Construct roadsidesafety improvements.4809

31080$2,552

Subtotal: $2,552

2018-19$118$429

$5$548

$1,100Total Project Cost: $3,652

07150000073/1/20192/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

11/27/2019Begin Con:

07-Los Angeles-14 PriorPriorPrior18-19

201.23595 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R24.8/R31.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 69 of 284

DRAFT

12-06

-17

Page 74: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Santa Clarita, from Canyon ParkBoulevard to Spring Canyon RoadUndercrossing. Place vegetation control underguardrail, minor concrete beyond gore, slope pavebeneath abutments, rock blanket at narrow areas,cable mesh drapery systems and install sign postsleeves beyond gore.

4976

32000$3,063

$19

Subtotal: $3,082

2020-21$459

$1,047$55

$954

$2,515Total Project Cost: $5,597

071600002912/15/202011/30/2020

4/1/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

07-Los Angeles-14 18-1918-1918-1920-21

201.23572 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R31.4/36.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Lancaster, from Vincent RampUndercrossing to Avenue K 8 Overcrossing.Roadside safety improvements.4811

31110$3,257

$30

Subtotal: $3,287

2019-20$118

$1,200$48

$1,430

$2,796Total Project Cost: $6,083

071500000610/1/20198/30/20192/1/2018PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

07-Los Angeles-14 PriorPriorPrior19-20

201.23592 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R54.6/R66.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Near Glenview, from Entrado Drive to WoodlandCrest Drive. Enhance highway worker safety byinstalling weed control under existing guardrail.4652

29960$1,100

Subtotal: $1,100

2018-19$101$700$10

$389

$1,200Total Project Cost: $2,300

07130003145/18/20173/9/2017

6/29/2015PA&ED:

RTL:R/W Cert:

12/7/2018Begin Con:

07-Los Angeles-27 PriorPriorPrior18-19

201.23512 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.9/10.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Diamond Bar, from Orange Countyline to 0.1 mile west of Hospital Overcrossing.Construct MVPs, pave beyond gore areas andconstruct biofiltration swales.

5023

32480$2,885

$15

Subtotal: $2,900

2021-22$183$585$22

$666

$1,456Total Project Cost: $4,356

071600007810/21/20219/22/20214/21/2020PA&ED:

RTL:R/W Cert:

5/2/2022Begin Con:

07-Los Angeles-57 18-1919-2021-2221-22

201.23523 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.0/5.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 70 of 284

DRAFT

12-06

-17

Page 75: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Dimas and Glendora, from Route 10 toRoute 210. Roadside safety improvements.

4706

30180$2,768

$30

Subtotal: $2,798

2018-19$100

$1,200$48

$1,150

$2,498Total Project Cost: $5,296

07140000323/1/20192/1/2019

1/19/2018PA&ED:

RTL:R/W Cert:

11/27/2019Begin Con:

07-Los Angeles-57 PriorPriorPrior18-19

201.23555 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R7.7/R11.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Long Beach, Bellflower and Cerritos, from 0.2mile west of Downey Avenue Undercrossing to0.2 mile east of San Gabriel River Bridge.Roadside safety improvements.

4714

30410$3,601

$90

Subtotal: $3,691

2018-19$99

$1,720$48

$1,320

$3,187Total Project Cost: $6,878

07140000573/1/20192/1/2019

12/29/2017PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

07-Los Angeles-91 PriorPriorPrior18-19

201.23523 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R13.9/R16.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the city of Los Angeles, from Wilton PlaceOvercrossing to Barham Boulevard Overcrossing.Place minor concrete at narrow paving areas andslopes, pave areas beyond gore, replace fencingand gates, install sign post sleeves and constructMVPs.

5072

32960$3,185

$15

Subtotal: $3,200

2021-22$518

$1,520$20

$1,465

$3,523Total Project Cost: $6,723

071600020312/1/202111/1/20218/15/2020PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-101 18-1920-2120-2121-22

201.235142 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R6.2/R9.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Downey, from Garfield Avenue toeast of Woodruff Avenue. Roadside safetyimprovements.4893

31640$1,301

$30

Subtotal: $1,331

2019-20$125$900$30

$705

$1,760Total Project Cost: $3,091

071500020912/6/2019

11/20/20199/7/2018PA&ED:

RTL:R/W Cert:

6/5/2020Begin Con:

07-Los Angeles-105 Prior18-1918-1919-20

201.23581 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R14.1/R17.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 71 of 284

DRAFT

12-06

-17

Page 76: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Carson, from West Anaheim Street toE 228th Street. Construct MVPs, rock blankets,access roads fences/gates, stairways to accessslopes, relocate controller cabinets and signs.

5214

33650$2,128

$42

Subtotal: $2,170

2021-22$730

$1,701$46

$1,129

$3,606Total Project Cost: $5,776

07160004017/30/20217/15/2021

11/30/2019PA&ED:

RTL:R/W Cert:

3/30/2022Begin Con:

07-Los Angeles-110 18-1919-2019-2021-22

201.23538 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

3.5/6.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the city of Los Angeles, from ExpositionBoulevard to Temple Street. Pave beyond gore,slope paving under structures, construct MVPs,upgrade end treatment to Smart cushion crashattenuator and place vegetation control underguardrail.

4973

31970$2,427

$9

Subtotal: $2,436

2020-21$512

$1,460$93

$964

$3,029Total Project Cost: $5,465

07160000263/18/20211/26/2021

12/24/2019PA&ED:

RTL:R/W Cert:

12/22/2021Begin Con:

07-Los Angeles-110 18-1919-2019-2020-21

201.23576 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

20.0/23.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the cities of Granada Hills and Porter Ranch,from 700 feet west of Tampa Avenue to WoodleyAvenue. Construct MVPs, pave beyond gore,repave side slopes, relocate irrigation controller,and provide access gates.

5216

33680$2,669

$163

Subtotal: $2,832

2021-22$659

$1,677$53

$1,513

$3,902Total Project Cost: $6,734

071700001412/1/202110/1/20219/1/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

07-Los Angeles-118 19-2020-2120-2121-22

201.23530 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R4.5/R9.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Mission Hills, from Woodley Avenue to Route405. Pave areas beyond gore, install access gates,construct maintenance vehicle and shoulderpullouts, upgrade and relocate irrigation systems.

4808

31070$2,654

$20

Subtotal: $2,674

2018-19$118

$1,058$20

$1,027

$2,223Total Project Cost: $4,897

071500000411/28/20189/28/20186/27/2017PA&ED:

RTL:R/W Cert:

5/20/2019Begin Con:

07-Los Angeles-118 PriorPriorPrior18-19

201.23530 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R9.0/R10.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 72 of 284

DRAFT

12-06

-17

Page 77: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of Los Angeles and NorthHollywood, from 170/134 Junction to OxnardStreet Undercrossing. Construct MVPs, accesstrail, minor concrete beyond gore and alongramps, rock blanket at ramps, install fencing andgates, vandal resistant pedestrian undercrossingenclosures.

5073

32970$3,262

$41

Subtotal: $3,303

2021-22$526

$1,313$34

$1,025

$2,898Total Project Cost: $6,201

071600020412/1/202111/1/20218/15/2020PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-170 18-1920-2120-2121-22

201.23584 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R14.5/R16.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Pasadena, at the Route 210/134/710Interchange. Roadside safety improvements.

4810

31100$2,970

$30

Subtotal: $3,000

2019-20$118$950$30

$990

$2,088Total Project Cost: $5,088

071500000510/21/20199/23/20193/16/2018PA&ED:

RTL:R/W Cert:

5/4/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior19-20

201.23553 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R24.6/R25.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Pasadena, Arcadia and Monrovia, from Route710 to Huntington Drive. Roadside safetyimprovements.4708

30360$2,624

$30

Subtotal: $2,654

2018-19$144$854$31

$850

$1,879Total Project Cost: $4,533

07140000313/1/20192/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

9/30/2019Begin Con:

07-Los Angeles-210 PriorPriorPrior18-19

201.23547 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R25.0/R32.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the cities of Monrovia, Duarte, Irwindale,Azusa and Glendora, from Huntington Drive toRoute 57. Roadside safety improvements.4707

30190$5,488

$30

Subtotal: $5,518

2018-19$220

$1,270$26

$1,252

$2,768Total Project Cost: $8,286

071400003012/3/201811/1/20186/20/2017PA&ED:

RTL:R/W Cert:

5/17/2019Begin Con:

07-Los Angeles-210 PriorPriorPrior18-19

201.23544 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R32.8/R44.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 73 of 284

DRAFT

12-06

-17

Page 78: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Long Beach and Carson, from the Route710/405 interchange to Route 110/405interchange. Construct access roads, pave aroundgore areas, construct MVPs, minor/patternedconcrete paving on slopes, upgrade guardrail andend treatment, vegetation management control.

5000

32180$2,267

$23

Subtotal: $2,290

2021-22$440

$1,500$60

$1,200

$3,200Total Project Cost: $5,490

07160000529/3/2021

7/14/20211/6/2020PA&ED:

RTL:R/W Cert:

1/7/2022Begin Con:

07-Los Angeles-405 18-1920-2120-2121-22

201.23530 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

7.0/12.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In various cities, from 405/110Junction to northof 405/105 Junction. Construct MVPs, accessroad, rock blanket at islands and between rampsand upgrade irrigation systems.

5227

33870$3,806

$29

Subtotal: $3,835

2021-22$522

$1,420$102

$1,311

$3,355Total Project Cost: $7,190

07170000639/1/20218/2/20218/1/2019PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

07-Los Angeles-405 18-1920-2120-2121-22

201.23561 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

12.9/R21.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Lakewood, from Los Angeles Countyline to 183rd Street. Construct MVPs, anchorassemblies for sign post sleeves, access roads,cable railing, and gates.

5229

33890$1,794

$20

Subtotal: $1,814

2021-22$498

$1,219$42

$926

$2,685Total Project Cost: $4,499

07170000741/26/2022

11/11/20219/11/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

07-Los Angeles-605 18-1920-2120-2121-22

201.23546 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.0/R4.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Industry, from south of Route 60 toValley Boulevard. Roadside safetyimprovements.4713

30400$2,779

Subtotal: $2,779

2018-19$168$900$60

$1,283

$2,411Total Project Cost: $5,190

07140000568/15/20187/2/20186/5/2017PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

07-Los Angeles-605 PriorPriorPrior18-19

201.23560 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R17.0/R19.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 74 of 284

DRAFT

12-06

-17

Page 79: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of South Gate, Bell Gardens andCommerce, from 800 feet north of RosecransAvenue to Atlantic Boulevard. Construct MVPs,pave narrow and gore areas, install fences/gates.

5078

33050$2,368

$10

Subtotal: $2,378

2021-22$613

$1,578$12

$1,253

$3,456Total Project Cost: $5,834

071600021410/1/20219/1/2021

7/15/2019PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

07-Los Angeles-710 18-1919-2019-2021-22

201.23536 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R15.1/21.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn and near South El Monte, on RosemeadBoulevard (SR-164) from Gallatin Road to RushStreet. Relinquishment Financial ContributionOnly to the county of Los Angeles.

5193

33470$1,500

$0

Subtotal: $1,500

2018-19$0$0$0$0

$0Total Project Cost: $1,500

07160003451/30/20181/30/20186/27/2017PA&ED:

RTL:R/W Cert:

4/30/2018Begin Con:

07-Los Angeles-164

201.1602.6 Centerline mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.4/4.0

Con Sup:

Relinquishments

Const:R/W:

In Los Angeles and Ventura Counties, on variousroutes, at various locations. Stabilize soil anderosion control.4913

31770$1,545

$85

Subtotal: $1,630

2019-20$400

$1,310$70

$772

$2,552Total Project Cost: $4,182

07150002619/30/20198/15/20197/16/2018PA&ED:

RTL:R/W Cert:

3/30/2020Begin Con:

07-Los Angeles-1 Prior18-1918-1919-20

201.335.9 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.3/9.9

Con Sup:

Storm Water Mitigation

Const:R/W:

In various cities, from Calle Mayor to VenturaCounty line; also on Routes 23 and 27, at variouslocations. Construct storm water treatment BestManagement Practices.

4722

30490$4,740

$427

Subtotal: $5,167

2018-19$800

$1,961$62

$1,691

$4,514Total Project Cost: $9,681

07140000863/29/20192/20/20193/30/2018PA&ED:

RTL:R/W Cert:

10/31/2019Begin Con:

07-Los Angeles-1 PriorPriorPrior18-19

201.33524 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

17.4/62.8

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 75 of 284

DRAFT

12-06

-17

Page 80: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Los Angeles County, in various cities on routes60, 66, 164 and 210 at various locations.Construct and install storm water treatment BestManagement Practices.

4420

28830$6,790

$50

Subtotal: $6,840

2019-20$995

$2,447$95

$2,200

$5,737Total Project Cost: $12,577

070002102412/13/201911/27/20199/28/2018PA&ED:

RTL:R/W Cert:

9/30/2020Begin Con:

07-Los Angeles-2 Prior18-1918-1919-20

201.33548.4 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.1/14.3

Con Sup:

Storm Water Mitigation

Const:R/W:

In the city of Los Angeles, from Bundy DriveUndercrossing to Sepulveda BoulevardUndercrossing; also on Route 405 from OlympicBoulevard to National Boulevard Undercrossing(PM 29.1/30.8). Install irrigation system andplant vegetation to stabilize soil.

5091

33200$1,281

$10

Subtotal: $1,291

2021-22$497

$1,054$16

$1,028

$2,595Total Project Cost: $3,886

071600025411/1/20219/1/20213/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

07-Los Angeles-10 18-1919-2019-2021-22

201.33538.53 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R4.5/R5.6

Con Sup:

Storm Water Mitigation

Const:R/W:

In the cities of Los Angeles, Alhambra, El Monte,Monterey Park and Rosemead, from CentralAvenue to Cogswell Road; also on Route 405from Cherry Avenue to South Alameda Street(PM 4.8/8.5). Construct storm water treatmentBest Management Practices.

3923

26080$24,000

$480

Subtotal: $24,480

2019-20$3,000$3,305

$578$5,500

$12,383Total Project Cost: $36,863

07120001043/12/20202/12/2020

11/30/2018PA&ED:

RTL:R/W Cert:

8/24/2020Begin Con:

07-Los Angeles-10 Prior18-1918-1919-20

201.33533 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.6/30.1

Con Sup:

Storm Water Mitigation

Const:R/W:

In Claremont and Pomona, from east of N.Orange Grove Avenue Undercrossing to east of S.Indian Hill Boulevard Undercrossing; also on Route 71 from north of 9th Street to south ofRoute 60/71 Interchange (PM 1.9/4.7). Constructpermanent treatment BMPs.

4971

31950$10,200

$94

Subtotal: $10,294

2020-21$2,100$2,100

$200$3,400

$7,800Total Project Cost: $18,094

071600002412/1/202010/1/20207/1/2019PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

07-Los Angeles-10 18-1919-2019-2020-21

201.33540.74 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

46.0/48.0

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 76 of 284

DRAFT

12-06

-17

Page 81: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near South El Monte, Industry, HaciendaHeights, and Rowland Heights, from Peck Roadto Nogales Street. Construct and installstormwater quality BMPs.

4980

32040$10,168

$102

Subtotal: $10,270

2020-21$1,407$2,999

$28$2,064

$6,498Total Project Cost: $16,768

07160000403/22/20211/14/20217/20/2019PA&ED:

RTL:R/W Cert:

10/10/2021Begin Con:

07-Los Angeles-60 18-1919-2020-2121-22

201.33552.5 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

11.0/20.0

Con Sup:

Storm Water Mitigation

Const:R/W:

In and near Diamond Bar, from Fullerton Road toDiamond Bar Boulevard. Construct and installstormwater treatment BMPs includingbiofiltration swales/strips and GSRDs.

5025

32500$5,215

$28

Subtotal: $5,243

2020-21$1,035$2,094

$27$2,188

$5,344Total Project Cost: $10,587

07160000807/14/20206/15/20207/15/2019PA&ED:

RTL:R/W Cert:

1/14/2021Begin Con:

07-Los Angeles-60 18-1919-2019-2020-21

201.33539.4 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

20.0/R26.0

Con Sup:

Storm Water Mitigation

Const:R/W:

In and near Pomona, from Phillips Ranch Road toReservoir Street. Construct and installstormwater treatment BMPs includingbiofiltration swales/strips, detention basin andmedia filters.

5011

32330$6,078

$15

Subtotal: $6,093

2020-21$1,200$2,865

$90$2,380

$6,535Total Project Cost: $12,628

07160000632/18/2021

12/17/20209/6/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

07-Los Angeles-60 18-1919-2019-2020-21

201.33518.5 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R28.0/R30.4

Con Sup:

Storm Water Mitigation

Const:R/W:

In the city of Los Angeles, from Routes5/10/60/101 Interchange to Figueroa Street. Plantvegetation an install supporting irrigation systemto stabilize soil.

4977

32010$2,650

$30

Subtotal: $2,680

2021-22$420

$1,010$50

$1,000

$2,480Total Project Cost: $5,160

07160000309/1/2021

7/15/20211/1/2019PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

07-Los Angeles-101 18-1919-2019-2021-22

201.33519.48 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

S0.0/1.5

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 77 of 284

DRAFT

12-06

-17

Page 82: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of Los Angeles, from Beaudry Avenueto 0.1 mile south of N. Gower Street. Stabilizesoil and erosion control.4814

31140$4,468

$30

Subtotal: $4,498

2018-19$310

$1,200$48

$1,043

$2,601Total Project Cost: $7,099

07150000103/1/20192/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

12/31/2019Begin Con:

07-Los Angeles-101 PriorPriorPrior18-19

201.33550 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.7/6.8

Con Sup:

Storm Water Mitigation

Const:R/W:

In Willowbrook and Lynwood, from Main Streetto Mona Boulevard. Storm water mitigationincluding planting of vegetation and theinstallation of irrigation systems.

4908

31740$2,765

$30

Subtotal: $2,795

2018-19$150$890$50

$1,250

$2,340Total Project Cost: $5,135

07150002412/1/2019

1/15/20198/2/2017PA&ED:

RTL:R/W Cert:

8/14/2019Begin Con:

07-Los Angeles-105 PriorPriorPrior18-19

201.33517.5 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R7.8/R10.3

Con Sup:

Storm Water Mitigation

Const:R/W:

In the cities of Los Angeles and Carson, from LStreet to 223rd Street. Construct storm watertreatment Best Management Practices.4174

27610$9,900

$65

Subtotal: $9,965

2018-19$940

$1,568$300

$1,900

$4,708Total Project Cost: $14,673

07000005253/29/20193/1/2019

3/15/2018PA&ED:

RTL:R/W Cert:

6/25/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.33529.55 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.8/6.5

Con Sup:

Storm Water Mitigation

Const:R/W:

In the city of Los Angeles, from 120th Street to3rd Street at various locations. Construct grosssolid removal devices, biofiltration devices, anddetention basin.

3279

23830$11,000

$10

Subtotal: $11,010

2018-19$740

$1,855$30

$2,234

$4,859Total Project Cost: $15,869

07140000812/1/2019

12/31/20183/15/2018PA&ED:

RTL:R/W Cert:

8/30/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.33530.8 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.4/23.1

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 78 of 284

DRAFT

12-06

-17

Page 83: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of Granada Hills and Porter Ranch,from Topango Canyon Boulevard to SepulvedaBoulevard. Construct and install stormwatertreatment BMPs including biofiltrationswales/strips, detention basin, media filters and aGSRD.

5027

32530$7,945

$55

Subtotal: $8,000

2020-21$1,600$3,300

$170$3,300

$8,370Total Project Cost: $16,370

07160000832/18/2021

12/17/20207/1/2019PA&ED:

RTL:R/W Cert:

9/1/2021Begin Con:

07-Los Angeles-118 18-1919-2019-2020-21

201.33525.31 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R1.5/R10.2

Con Sup:

Storm Water Mitigation

Const:R/W:

In the city of Los Angeles, from Arleta Avenue toRoute 210. Construct stormwater treatmentBMPs.5001

32200$11,750

$300

Subtotal: $12,050

2021-22$2,000$4,000

$250$3,500

$9,750Total Project Cost: $21,800

071600005312/10/202110/15/2021

7/1/2020PA&ED:

RTL:R/W Cert:

6/24/2022Begin Con:

07-Los Angeles-118 18-1920-2120-2121-22

201.33520 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R11.0/R14.0

Con Sup:

Storm Water Mitigation

Const:R/W:

In and near Burbank, from Bob Hope Drive toVictory Boulevard/Riverside Drive. Stabilize soiland erosion control.4816

31160$2,318

$30

Subtotal: $2,348

2019-20$120

$1,050$48

$1,100

$2,318Total Project Cost: $4,666

071500001111/1/201910/1/20192/1/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

07-Los Angeles-134 PriorPriorPrior19-20

201.33512.5 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.6/4.8

Con Sup:

Storm Water Mitigation

Const:R/W:

Near Sylmar, San Fernando and Sunland, fromRoute 5 to Wheatland Avenue. Construct stormwater treatment Best Management Practices toreduce Trash Total Maximum Daily Load(TMDL).

3884

25940$15,000

$106

Subtotal: $15,106

2018-19$700

$3,600$100

$3,000

$7,400Total Project Cost: $22,506

07140001043/28/20192/15/20193/15/2018PA&ED:

RTL:R/W Cert:

1/6/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior18-19

201.33533 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R9.7

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 79 of 284

DRAFT

12-06

-17

Page 84: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of Monrovia, Duarte, Irwindale andAzusa, from Myrtle Avenue to Azusa Avenue.Stabilize soil and erosion control.4705

30170$3,662

$30

Subtotal: $3,692

2019-20$144

$1,175$30

$1,054

$2,403Total Project Cost: $6,095

071400003310/1/20199/16/20193/1/2018PA&ED:

RTL:R/W Cert:

4/6/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior19-20

201.33518.3 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R33.7/R39.8

Con Sup:

Storm Water Mitigation

Const:R/W:

In and near Azusa, from 0.1 mile east of HighlandAvenue Undercrossing to S. Citrus AvenueOvercrossing. Construct and install stormwatertreatment BMPs including biofiltration swalesand Austin Vault Sand Filters.

5009

32310$10,045

$37

Subtotal: $10,082

2021-22$1,890$2,836

$189$3,098

$8,013Total Project Cost: $18,095

07160000619/30/20218/5/2021

12/30/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

07-Los Angeles-210 18-1919-2019-2021-22

201.33539.95 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R36.0/R40.6

Con Sup:

Storm Water Mitigation

Const:R/W:

In Glendora, at various locations from 0.2 mileeast of S. Barranca Avenue Overcrossing to 0.1mile west of Amelia Avenue Undercrossing.Construct and install various stormwatertreatment BMPs including biofiltrationswales/strips/trenches, infiltration basins andvault sand filters.

5005

32260$7,149

$61

Subtotal: $7,210

2020-21$1,575$2,729

$242$2,730

$7,276Total Project Cost: $14,486

071600005710/29/2021

9/6/20211/30/2020PA&ED:

RTL:R/W Cert:

5/16/2022Begin Con:

07-Los Angeles-210 18-1919-2019-2020-21

201.33542.16 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R41.3/R44.6

Con Sup:

Storm Water Mitigation

Const:R/W:

In and near La Verne, at various locations from0.4 mile east of S Lone Hill AvenueUndercrossing to 0.2 mile west of Base LineRoad Overcrossing. Construct stormwatertreatment BMPs including GSRDs, biofiltrationswales/strips and infiltration trenches.

5068

32850$7,490

$69

Subtotal: $7,559

2021-22$1,900$2,601

$160$2,800

$7,461Total Project Cost: $15,020

07160001788/30/20217/5/2021

11/29/2019PA&ED:

RTL:R/W Cert:

3/15/2022Begin Con:

07-Los Angeles-210 18-1919-2019-2021-22

201.33543.45 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R44.7/R52.1

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 80 of 284

DRAFT

12-06

-17

Page 85: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of Los Angeles, Van Nuys, and SanFernando, from Burbank Boulevard to Route5/405 Separation. Plant vegetation, installirrigation, concrete paving, rock blankets andmats.

4978

32020$3,900

$30

Subtotal: $3,930

2020-21$610

$1,590$30

$1,122

$3,352Total Project Cost: $7,282

07160000311/15/2021

11/30/20207/30/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

07-Los Angeles-405 18-1919-2020-2120-21

201.33541 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

40.1/48.6

Con Sup:

Storm Water Mitigation

Const:R/W:

In the cities of Los Alamitos, Cerritos, Lakewood,Bellflower and Norwalk, from Orange Countyline to Route 5. Construct stormwater treatmentBMPs including biofiltration swales/strips,detention basin, MVPs and install infiltrationdevices.

4997

32150$15,050

$20

Subtotal: $15,070

2021-22$1,450$3,255

$25$3,556

$8,286Total Project Cost: $23,356

07160000481/31/2022

12/30/20219/1/2020PA&ED:

RTL:R/W Cert:

8/31/2022Begin Con:

07-Los Angeles-605 18-1920-2120-2121-22

201.33570.57 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.0/R9.6

Con Sup:

Storm Water Mitigation

Const:R/W:

In and near Santa Fe Springs, from Santa AnaFreeway Undercrossing to 0.1 mile north of RoseHills Road Overcrossing. Install stormwatertreatment BMPs.

5212

33610$8,633

$72

Subtotal: $8,705

2021-22$1,593$3,402

$202$2,969

$8,166Total Project Cost: $16,871

071600039311/30/202110/5/20212/27/2020PA&ED:

RTL:R/W Cert:

6/15/2022Begin Con:

07-Los Angeles-605 18-1919-2019-2021-22

201.33539.85 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R9.6/R15.7

Con Sup:

Storm Water Mitigation

Const:R/W:

Near El Monte, at various locations, from 0.1mile south of Peck Road Overcrossing to 0.1 milenorth of Valley Boulevard Undercrossing.Construct and install stormwater treatment BMPs including biofiltration swales/strips, linear radialGSRDs, infiltration basins and an Austin Vault Sand Filter.

5234

33930$12,901

$96

Subtotal: $12,997

2021-22$1,500$4,550

$202$3,320

$9,572Total Project Cost: $22,569

071700014312/30/202111/5/20213/30/2020PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

07-Los Angeles-605 18-1919-2019-2021-22

201.33554.82 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R16.5/R19.5

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 81 of 284

DRAFT

12-06

-17

Page 86: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near El Monte, from 0.2 mile south of Route 10to 0.2 mile north of Route 210. Construct andinstall stormwater treatment BMPs includingbiofiltration swales/strips, GSRDs and a DesignPollution Prevention Infiltration Area.

5236

33940$15,187

$89

Subtotal: $15,276

2021-22$1,576$3,971

$237$4,308

$10,092Total Project Cost: $25,368

07170001441/31/202212/6/20214/30/2020PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

07-Los Angeles-605 18-1919-2019-2021-22

201.33552.15 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R20.0/R26.0

Con Sup:

Storm Water Mitigation

Const:R/W:

In East Los Angeles, from Route 5 to north ofFloral Drive; also on Route 60 (PM R2.9/R3.8),from west of Marina Avenue PedestrianOvercrossing to Mednick Avenue. Stabilize soiland erosion control.

4717

30440$3,425

$30

Subtotal: $3,455

2018-19$54

$910$63

$1,138

$2,165Total Project Cost: $5,620

07140000618/1/20187/9/2018

6/30/2017PA&ED:

RTL:R/W Cert:

2/8/2019Begin Con:

07-Los Angeles-710 PriorPriorPrior18-19

201.33546.4 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

23.3/25.6

Con Sup:

Storm Water Mitigation

Const:R/W:

In the city of Los Angeles, from 3rd Street toRoute 10 interchange. Install irrigation systemsand plant vegetation to stabilize soil.5089

33180$3,420

$16

Subtotal: $3,436

2021-22$600

$1,250$50

$1,250

$3,150Total Project Cost: $6,586

071600025211/23/20219/21/20215/12/2020PA&ED:

RTL:R/W Cert:

5/6/2022Begin Con:

07-Los Angeles-710 18-1920-2120-2121-22

201.33534.23 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

24.4/26.7

Con Sup:

Storm Water Mitigation

Const:R/W:

In La Verne and Pomona, from Baseline Road toTowne Avenue. Construct and upgrade curbramps and sidewalks to comply with ADAstandards.

4744

30650$3,800

Subtotal: $3,800

2018-19$753$800$30

$650

$2,233Total Project Cost: $6,033

07140001774/12/20193/12/20197/2/2018PA&ED:

RTL:R/W Cert:

9/24/2019Begin Con:

07-Los Angeles-66 Prior18-1918-1918-19

201.36167 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/3.2

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 82 of 284

DRAFT

12-06

-17

Page 87: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Whittier, from Valley Home Avenue toEsperanza Avenue. Construct and upgrade curbramps, sidewalks, driveways, pedestrian pathways, Class III bikeway lanes, accessiblepedestrian signals and push buttons to meetcurrent ADA standards.

5158

33310$5,781$1,000

Subtotal: $6,781

2021-22$900

$4,000$4,600$2,200

$11,700Total Project Cost: $18,481

07160002993/17/20223/2/2022

2/28/2020PA&ED:

RTL:R/W Cert:

11/7/2022Begin Con:

07-Los Angeles-72 18-1920-2120-2121-22

201.361170 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/6.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Torrance, from Route 1 to Redondo BeachBoulevard. Construct curb ramps and reconstructdriveways/sidewalks to meet ADA standards.4749

30700$4,546$1,055

Subtotal: $5,601

2018-19$961

$2,553$1,223$2,508

$7,245Total Project Cost: $12,846

07140001983/19/20192/15/20192/8/2018PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

07-Los Angeles-107 PriorPriorPrior18-19

201.361107 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/4.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Palmdale, from Route 14 Junction (South) toAvenue T. Upgrade curb ramps, traffic signalsand sidewalks to meet current standards.5185

33370$8,385

$703

Subtotal: $9,088

2021-22$695

$3,795$1,401$3,225

$9,116Total Project Cost: $18,204

07160003162/18/2022

12/20/202112/20/2019PA&ED:

RTL:R/W Cert:

10/4/2022Begin Con:

07-Los Angeles-138 18-1919-2019-2021-22

201.36166 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

43.4/51.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In the cities of Wittier, South Monte andRosemead, from Gallatin Road to RudellUnderpass. Upgrade curb ramps, sidewalks andpathways to meet current ADA standards.

4982

32080$5,803

$952

Subtotal: $6,755

2021-22$1,034$3,150

$916$2,714

$7,814Total Project Cost: $14,569

071600004210/28/20219/29/20219/25/2019PA&ED:

RTL:R/W Cert:

4/25/2022Begin Con:

07-Los Angeles-164 18-1919-2020-2121-22

201.36176 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.4/6.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 83 of 284

DRAFT

12-06

-17

Page 88: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In La Crescenta and La Canada Flintridge, fromwest of Sunland Boulevard to Baseline Road,near the San Bernardino County line.Reconstruct curb ramps to meet ADA standards,install accessible pedestrian signals, relocate pullboxes and traffic signal poles.

4985

32680$4,480$4,098

Subtotal: $8,578

2021-22$1,400$7,000$2,450$7,000

$17,850Total Project Cost: $26,428

07160001198/30/20217/30/202112/1/2019PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

07-Los Angeles-210 18-1921-2221-2221-22

201.361264 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R9.7/R51.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In the cities of Rancho Palos Verdes, Lomita andLos Angeles, from W 25th Street to W CarsonStreet at various locations. Upgrade curb ramps,sidewalks and driveways to meet ADA standards.

4743

30660$4,244

$176

Subtotal: $4,420

2018-19$1,087

$500$50

$500

$2,137Total Project Cost: $6,557

07140001783/8/2019

2/15/20197/2/2018PA&ED:

RTL:R/W Cert:

9/20/2019Begin Con:

07-Los Angeles-213 Prior18-1918-1918-19

201.361188 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/8.0

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONIn Malibu, from Guernsey Avenue to TrancasCanyon Road/Broad Beach Road. Replacebridge.4498

29140$5,488$2,021

Subtotal: $7,509

2018-19$2,342$2,123

$740$1,251

$6,456Total Project Cost: $13,965

07120000946/28/2019

10/15/20186/30/2017PA&ED:

RTL:R/W Cert:

1/15/2020Begin Con:

07-Los Angeles-1 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

56.5/56.9

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In El Monte, at Rio Hondo Busway Bridge No. 53-2637. Replace bridge deck.

4902

31680$2,553

$15

Subtotal: $2,568

2019-20$550

$1,346$27

$1,627

$3,550Total Project Cost: $6,118

071500022012/30/201911/27/20199/28/2018PA&ED:

RTL:R/W Cert:

7/10/2020Begin Con:

07-Los Angeles-10S Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.3

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 84 of 284

DRAFT

12-06

-17

Page 89: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Long Beach, at the eastbound Route 91 tonorthbound Route 710 Connector Bridge No. 53-2241G over Connector from northbound Route710 to eastbound Route 91. Lower profile ofconnector to achieve standard vertical clearance

4967

31910$3,230

$40

Subtotal: $3,270

2020-21$910

$2,468$43

$2,073

$5,494Total Project Cost: $8,764

07160000173/15/20212/15/2021

10/15/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

07-Los Angeles-91 18-1919-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R11.8

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Encino, at Encino Pedestrian Overcrossing.Replace pedestrian Overcrossing.

4915

31790$6,685$1,067

Subtotal: $7,752

2018-19$1,033$3,205

$500$1,361

$6,099Total Project Cost: $13,851

07150002773/21/20192/21/20193/26/2018PA&ED:

RTL:R/W Cert:

9/19/2019Begin Con:

07-Los Angeles-101 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In the city of Los Angeles, at the Union PacificOverhead No. 53-2626. Replace the bridge deckwith composite reinforced concrete.5004

32250$12,478$1,730

Subtotal: $14,208

2021-22$669

$3,482$376

$4,228

$8,755Total Project Cost: $22,963

07160000561/30/2022

12/31/202111/12/2019PA&ED:

RTL:R/W Cert:

8/28/2022Begin Con:

07-Los Angeles-103 18-1919-2018-1921-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Irwindale, on the San Gabriel River Bridge No.53-1867. Reconstruct hinge diaphragms at hinge4 and hinge 6, upgrade bridge railing and reinstallelectroliers.

5026

32520$18,697

$596

Subtotal: $19,293

2020-21$1,061$3,665

$444$4,244

$9,414Total Project Cost: $28,707

07160000821/6/2021

11/6/202010/4/2019PA&ED:

RTL:R/W Cert:

10/28/2021Begin Con:

07-Los Angeles-210 18-1919-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R36.8

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 85 of 284

DRAFT

12-06

-17

Page 90: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Azusa, at the North Fork San Gabriel RiverBridge No. 53-2245. Replace bridge.

5298

34340$11,742

$10

Subtotal: $11,752

2018-19 $1,930$20

$4,476

$6,426Total Project Cost: $18,178

071800001811/1/20189/3/2018

9/20/2017PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

07-Los Angeles-39PriorPrior18-19

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R31.2

Con Sup:

Bridge Scour Mitigation

Const:R/W:

In Long Beach, at the San Gabriel River BridgeNo. 53-1185 and SB LA-605 to NB I-405connector Bridge No. 53-1737H; also in OrangeCounty on I-405 at the SB 405 to NB 605connector Bridge No. 55-0413F; 12-Ora-405-PM24.1. Retrofit scour critical bridges to preservethe structural integrity of the bridges by enlargingand deepening pile cap, adding Cast in DrilledHole (CIDH) piles and reinforcing the area with Rock Slope Protection (RSP).

4984

32100$15,831

$254

Subtotal: $16,085

2021-22$2,140$6,840

$300$5,840

$15,120Total Project Cost: $31,205

07160000443/20/20222/16/20229/15/2019PA&ED:

RTL:R/W Cert:

11/4/2022Begin Con:

07-Los Angeles-405 Prior19-2019-2021-22

201.1113 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0

Con Sup:

Bridge Scour Mitigation

Const:R/W:

In the city of Los Angeles, at the 5th StreetOvercrossing No. 53-0685 and 6th StreetOvercrossing No. 53-0746. Upgrade bridgerailing.

5002

32230$3,520

$30

Subtotal: $3,550

2020-21$465

$1,673$30

$1,632

$3,800Total Project Cost: $7,350

07160000548/26/20207/15/20202/21/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

07-Los Angeles-110 18-1919-2019-2020-21

201.1121565 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

22.8

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In Pasadena, at the Arroyo Seco Bridge No. 53-0166. Replace/upgrade bridge railing.

5003

32240$5,420$2,530

Subtotal: $7,950

2021-22$1,300$2,500

$200$2,860

$6,860Total Project Cost: $14,810

071600005512/30/20217/15/20219/20/2019PA&ED:

RTL:R/W Cert:

2/26/2022Begin Con:

07-Los Angeles-134 18-1921-2221-2221-22

201.1123434 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R12.6

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 86 of 284

DRAFT

12-06

-17

Page 91: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Kern County line, at the Tejon PassOvercrossing No. 53-1779. Seismic retrofit ofbridge, widen bridge abutments, add steel casingto bent columns, retrofit bent foundation andinstall micro piles.

5032

32590$1,800

$50

Subtotal: $1,850

2021-22$700

$1,500$400

$1,500

$4,100Total Project Cost: $5,950

07160000917/15/20216/15/202110/1/2019PA&ED:

RTL:R/W Cert:

1/5/2022Begin Con:

07-Los Angeles-5 18-1920-2120-2121-22

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R87.4

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In Compton, at Compton Creek Bridge OverheadNo. 53-2235 and offramp No. 53-2237S andArtesia-Santa Fe Undercrossing No. 53-2238K;also in Long Beach on Routes 710 and 110, atHarbor Scenic Drive Overhead No. 53-2934 (PM6.0) and Gaffy Street Bridge No. 53-0397Y (PMR0.8). Bridge seismic retrofit and bridge railupgrade.

4704

30160$10,712

$50

Subtotal: $10,762

2019-20$2,260$3,500

$150$3,500

$9,410Total Project Cost: $20,172

07140000243/30/20202/28/20208/30/2018PA&ED:

RTL:R/W Cert:

12/30/2020Begin Con:

07-Los Angeles-91 Prior18-1918-1919-20

201.1135 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R10.2/R10.4

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In Pasadena, at Orange Grove Boulevard-E134/134 Overcrossing No. 53-2269S; also onRoute 710, at Union Street Overcrossing No. 53-2537 (PM R32.5). Bridge seismic retrofit andbridge rail upgrade.

4591

29180$5,360

$20

Subtotal: $5,380

2018-19 $2,400$63

$2,000

$4,463Total Project Cost: $9,843

071200009611/2/20187/31/20187/3/2017PA&ED:

RTL:R/W Cert:

12/27/2019Begin Con:

07-Los Angeles-134PriorPrior18-19

201.1132 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R13.1

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In and near Palmdale, Azusa and Pomona, at theCalifornia Aqueduct Bridge No. 53-2174; also onRoute 39 at the San Gabriel River Bridge No. 53-0113 (PM 17.81) and Route 71 at the RidgewayStreet Undercrossing Bridge No. 53-2052 (PMR0.92). Seismic retrofit, barrier replacement,paint San Gabriel River Bridge

5035

32620$19,329

$101

Subtotal: $19,430

2021-22$1,372$4,549

$488$5,686

$12,095Total Project Cost: $31,525

071600011310/3/20218/7/20218/1/2019PA&ED:

RTL:R/W Cert:

6/10/2022Begin Con:

07-Los Angeles-138 Prior19-2019-2021-22

201.1133 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

70.3

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 87 of 284

DRAFT

12-06

-17

Page 92: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In various cities, on Routes 210, 405 and 605 atvarious locations. Bridge seismic retrofit andbridge rail upgrade at five locations.4788

30930$6,395

$130

Subtotal: $6,525

2019-20$225

$1,137$20

$1,600

$2,982Total Project Cost: $9,507

071400028111/19/20198/30/20199/22/2017PA&ED:

RTL:R/W Cert:

4/10/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior19-20

201.1135 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R38.6/R38.9

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In the city of Los Angeles, at WilmingtonOverhead No. 53-0352. Paint and repair bridgedeck.4729

30560$3,883

$245

Subtotal: $4,128

2019-20$305

$1,237$203$826

$2,571Total Project Cost: $6,699

07140001023/24/20202/14/20207/11/2018PA&ED:

RTL:R/W Cert:

5/4/2020Begin Con:

07-Los Angeles-1 Prior18-1918-1919-20

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.9

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In the city of Los Angeles, at Sun ValleyOverhead No. 53-1134. Paint bridge and replacedeck drain systems.4853

31420$7,200

$49

Subtotal: $7,249

2019-20$500

$1,200$200

$1,800

$3,700Total Project Cost: $10,949

07150001168/20/20197/10/2019

10/31/2017PA&ED:

RTL:R/W Cert:

1/17/2020Begin Con:

07-Los Angeles-5 PriorPriorPrior19-20

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

34.6

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In the city of El Monte, from Baldwin AvenueOvercrossing to Route 605 at Rio Hondo BridgeNo. 53-657, East El Monte Overhead No. 53-0867 and San Gabriel River Bridge No. 53-109L/R. Replace overhang joints with reinforced concrete closure pours.

5067

32830$8,140$1,262

Subtotal: $9,402

2021-22$813

$3,927$915

$3,526

$9,181Total Project Cost: $18,583

07160001752/1/20221/3/2022

10/1/2019PA&ED:

RTL:R/W Cert:

9/25/2022Begin Con:

07-Los Angeles-10 18-1919-2019-2021-22

201.1193 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

28.2/31.0

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 88 of 284

DRAFT

12-06

-17

Page 93: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In El Monte, at Peck Road Undercrossing No. 53-0661. Paint steel portion of bridge forpreventative maintenance to preserve and extendthe life of bridge.

5070

32870$1,632

$10

Subtotal: $1,642

2021-22$141$550$25

$522

$1,238Total Project Cost: $2,880

07160001822/17/20221/12/20226/1/2019PA&ED:

RTL:R/W Cert:

9/23/2022Begin Con:

07-Los Angeles-10 Prior19-2019-2021-22

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

29.4

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In the city of South Gate, at Paramount BoulevardOvercrossing No. 53-2425; also in the city ofDowney, at Ardis Avenue Overcrossing No. 53-2572. Remove and install new joint assemblies,apply waterproof coating, replace joint seals andapply methacrylate to Ardis Avenue Overcrossingdeck.

5069

32860$1,340

$27

Subtotal: $1,367

2020-21$259$891$26

$1,022

$2,198Total Project Cost: $3,565

071600018012/1/202010/1/20208/1/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

07-Los Angeles-105 18-1919-2019-2020-21

201.1192 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R14.6/R16.4

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In Carson, at Dolores Yard Overhead No. 53-1168. Upgrade bridge drainage system.

4721

30480$1,574

$395

Subtotal: $1,969

2019-20$301$525$203$351

$1,380Total Project Cost: $3,349

07140000843/30/20202/14/20207/18/2018PA&ED:

RTL:R/W Cert:

1/6/2020Begin Con:

07-Los Angeles-405 Prior18-1918-1919-20

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.8

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In Los Angeles County, at various locations.Establish standard vertical clearance.

ACCELERATED BRIDGE (PA&ED Only)5281

34210$221,390$152,980

Subtotal: $374,370

2019-20$15,640$41,760$10,980$61,790

$130,170Total Project Cost: $504,540

07170002443/30/20202/28/20204/18/2019PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

07-Los Angeles-5 19-2019-2019-2019-20

201.32212 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

27.0/66.5

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 89 of 284

DRAFT

12-06

-17

Page 94: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of Los Angeles, at the NormandieAvenue Undercrossing Bridge No. 53-1565.Strengthen girders with epoxy and reinforcementsteel.

4966

31900$2,253

$22

Subtotal: $2,275

2021-22$508

$1,493$5

$1,188

$3,194Total Project Cost: $5,469

071600001610/21/20219/22/20217/15/2020PA&ED:

RTL:R/W Cert:

5/22/2022Begin Con:

07-Los Angeles-10 18-1920-2120-2121-22

201.3221 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R13.3

Con Sup:

Trans Permit Requirements for Bridges

Const:R/W:

In the City of Industry at Hacienda BoulevardUndercrossing (UC) No. 53-1789 (PM 15.93),Stemson Avenue UC No. 53-1784 (PM 16.30),Azusa Avenue Overcrossing No. 53-1785 (PM17.97) and Fullerton Road UC No. 53-1786 (PM19.46). Improve freight corridor movement bymodifying and replacing bridges to meet verticalclearance and load carrying capacity standards.

ACCELERATED BRIDGE (PA&ED Only)

5297

34330$37,600$1,000

Subtotal: $38,600

2020-21$3,320$3,984

$500$8,466

$16,270Total Project Cost: $54,870

07180000096/30/20205/29/2020

10/31/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

07-Los Angeles-60 Prior20-2120-2120-21

201.3224 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

15.9/19.5

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

ROADWAY PRESERVATIONIn Baldwin Park and West Covina, from Route605 to Citrus Avenue. Rehabilitate roadway.

4712

30390$60,496

$147

Subtotal: $60,643

2019-20$990

$4,670$23

$8,444

$14,127Total Project Cost: $74,770

071400004411/19/20198/30/20192/14/2018PA&ED:

RTL:R/W Cert:

5/7/2020Begin Con:

07-Los Angeles-10 PriorPriorPrior19-20

201.12050.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

31.2/37.2

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In and near Redondo Beach, from Orange Countyline to south of Topaz Street. Upgrade ADA curbramps, upgrade metal beam guardrail, cold plane pavement, and place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt concrete (RHMA) to rehabilitate pavement.

4998

32160$38,220$1,554

Subtotal: $39,774

2021-22$1,680$4,886

$920$7,684

$15,170Total Project Cost: $54,944

07160000493/30/20222/26/2022

12/15/2018PA&ED:

RTL:R/W Cert:

11/6/2022Begin Con:

07-Los Angeles-1 Prior18-1918-1921-22

201.12199.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/19.0

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 90 of 284

DRAFT

12-06

-17

Page 95: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Redondo Beach, from Topaz Street toDewey Street. Upgrade ADA curb ramps andmetal beam guardrail, repair concrete pavement,replace asphalt concrete pavement with portland cement concrete at intersections, cold planepavement, and place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt concrete (RHMA) to rehabilitate pavement.

5034

32580$45,900$1,900

Subtotal: $47,800

2021-22$1,960$6,770

$780$8,770

$18,280Total Project Cost: $66,080

07160000903/30/20222/26/2022

12/15/2018PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

07-Los Angeles-1 Prior18-1918-1921-22

201.121104.9 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

19.0/33.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near the city of Los Angeles, fromCentinela Avenue to Cotner Avenue, North LaBrea Avenue to North Oxford Avenue and NorthHollywood Boulevard to Allesandro Street. Cold plane and overlay pavement, upgrade curb ramps, reconstruct curb and gutter, construct bus pads and replace traffic signals at several locations.

5184

33360$19,810

$38

Subtotal: $19,848

2021-22$1,900$5,000

$160$5,000

$12,060Total Project Cost: $31,908

07160003133/1/20221/5/20227/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

07-Los Angeles-2 18-1920-2120-2121-22

201.12117.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.3/14.2

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Castaic and Valencia, from 0.2 mile north ofLake Hughes Road Undercrossing to 0.7 milesouth of Vista Del Lago Road Overcrossing.Cold plane pavement and place Rubberized HotMix Asphalt concrete (RHMA), repair drainagesystems, and perform upgrades to overhead signs,drainage curbs and guardrail.

5013

32340$43,080

$55

Subtotal: $43,135

2020-21$100

$2,549$50

$4,006

$6,705Total Project Cost: $49,840

07160000647/30/20217/9/2021

10/30/2019PA&ED:

RTL:R/W Cert:

10/26/2023Begin Con:

07-Los Angeles-5 Prior19-2019-2020-21

201.121112 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R59.7/R73.7

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Long Beach, from Route 1 to San GabrielUndercrossing. Cold plane pavement and overlaywith Rubberized Hot Mixed Asphalt - Type G(RHMA-G), upgrade curb ramps to current ADA standards, install guardrail and construct buspads.

5022

32440$4,376

$126

Subtotal: $4,502

2020-21$670

$2,523$12

$1,967

$5,172Total Project Cost: $9,674

071600007712/15/202011/5/20209/15/2019PA&ED:

RTL:R/W Cert:

9/5/2021Begin Con:

07-Los Angeles-22 18-1919-2019-2020-21

201.1217.37 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/1.5

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 91 of 284

DRAFT

12-06

-17

Page 96: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Canoga Park, from Pacific CoastHighway to Entrada Road; also near WoodlandCrest Drive to near Devonshire Street (PM10.11/18.62). Cold plane and overlay asphaltpavement, repair damaged structural and upgradecurb ramps to meet ADA standards.

5007

32290$30,550

$499

Subtotal: $31,049

2021-22$1,593$4,405

$576$5,540

$12,114Total Project Cost: $43,163

071600005910/21/20219/21/20213/28/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

07-Los Angeles-27 18-1920-2120-2121-22

201.12153.47 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/4.7

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Diamond Bar, from the OrangeCounty line to Route 60. Pavement rehabilitation.

4718

30450$18,750

$90

Subtotal: $18,840

2018-19$50

$1,800$10

$2,000

$3,860Total Project Cost: $22,700

071400006710/23/20183/19/20197/26/2017PA&ED:

RTL:R/W Cert:

9/3/2019Begin Con:

07-Los Angeles-57 PriorPriorPrior18-19

201.12144.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R4.5

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In the cities of Los Angeles, Calabasas andAgoura Hills, from Route 170 to Kanan Road.Rehabilitate pavement, construct and upgradeADA curb ramps.

4770

30750$9,995$2,389

Subtotal: $12,384

2019-20$370

$2,224$124

$1,607

$4,325Total Project Cost: $16,709

07140002173/19/2020

12/19/20193/26/2018PA&ED:

RTL:R/W Cert:

8/20/2020Begin Con:

07-Los Angeles-101 PriorPriorPrior19-20

201.121.1 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.8/35.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Torrance, from Route 1 to Redondo BeachBoulevard. Pavement rehabilitation.

4818

31180$10,900

Subtotal: $10,900

2018-19$137

$1,289$100

$1,744

$3,270Total Project Cost: $14,170

07150000143/19/20192/15/2019

10/11/2016PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

07-Los Angeles-107 PriorPriorPrior18-19

201.12136.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/4.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 92 of 284

DRAFT

12-06

-17

Page 97: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of Los Angeles, Burbank, Glendaleand Pasadena, from Route 170 to Route 210.Rehabilitate pavement, upgrade guardrail andADA curb ramps to current standards.

4817

31170$34,034

$376

Subtotal: $34,410

2018-19$973

$3,800$254

$5,735

$10,762Total Project Cost: $45,172

071500001312/28/201810/3/2018

12/15/2017PA&ED:

RTL:R/W Cert:

5/23/2019Begin Con:

07-Los Angeles-134 PriorPriorPrior18-19

201.121112 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R13.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Gorman and Lancaster, from Route 5 toRoute 14. Rehabilitate pavement.

4804

31040$21,879

$128

Subtotal: $22,007

2018-19$510

$1,810$22

$2,115

$4,457Total Project Cost: $26,464

071500000112/14/201810/12/20182/10/2017PA&ED:

RTL:R/W Cert:

12/10/2020Begin Con:

07-Los Angeles-138 18-19PriorPrior18-19

201.12177 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/36.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In the cities of Irwindale and Baldwin Park, fromRoute 10 Interchange to the end of the freeway atRoute 210. Grind mainline pavement and replacedamaged stabs with Jointed Plain ConcretePavement (JPCP) rapid strength concrete and/orIndividual Precast Slab Replacement (IPSR), coldplane and overlay median, shoulders, ramps with Hot Mix Asphalt (HMA), construct additionallane on southbound Arrow Highwayofframp/modify signal, install and upgradeguardrail.

5029

32550$16,410$2,721

Subtotal: $19,131

2021-22$1,375$6,856

$138$6,242

$14,611Total Project Cost: $33,742

071600008511/8/20218/9/2021

12/1/2018PA&ED:

RTL:R/W Cert:

9/6/2022Begin Con:

07-Los Angeles-605 Prior19-2019-2021-22

201.12139.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.2/26.0

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In San Fernando, from Route 118 to Route 210.Rehabilitate roadway.

4805

30970$41,600

$120

Subtotal: $41,720

2019-20$1,013$5,710

$150$7,421

$14,294Total Project Cost: $56,014

071400030011/27/20199/27/20198/1/2018PA&ED:

RTL:R/W Cert:

6/10/2020Begin Con:

07-Los Angeles-5 PriorPriorPrior19-20

201.12246.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

39.2/R43.8

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 93 of 284

DRAFT

12-06

-17

Page 98: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Palmdale and Lancaster, from Avenue P-8 tothe Kern County line. Replace distressedlanes/shoulders, cold plane and overlay ramps,upgrade guardrail, dikes, sign panels, curb rampsand traffic loop detectors.

4887

31600$142,660

$210

Subtotal: $142,870

2020-21$3,000

$21,200$280

$25,800

$50,280Total Project Cost: $193,150

071500019411/6/20209/2/2020

4/11/2019PA&ED:

RTL:R/W Cert:

2/24/2021Begin Con:

07-Los Angeles-14 18-1918-1918-1920-21

201.12282.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R60.7/R77.0

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In the cities of Los Angeles, Pacoima, SanFernando, and Sylmar from Route 5 to NorthWheatland Avenue. Rehabilitate roadway.4801

30960$104,084

$358

Subtotal: $104,442

2018-19$500

$6,000$500

$14,000

$21,000Total Project Cost: $125,442

07140002993/28/20192/15/20199/29/2017PA&ED:

RTL:R/W Cert:

1/6/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior18-19

201.12251.7 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R9.7

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In various cities, from Orange County line toTelegraph Road. Replace structural section onlanes 3 and 4 and other damaged concrete slabson other lanes. Cold plane and overlay Rubberized Hot Mix Asphalt (RHMA-G) on rightshoulders and apply High Friction SurfaceTreatment (HFST) onramps and connectors.

4979

32030$99,810

$25

Subtotal: $99,835

2021-22$1,960$9,290

$150$24,620

$36,020Total Project Cost: $135,855

07160000332/15/2022

10/15/20212/15/2019PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

07-Los Angeles-605 Prior18-1918-1921-22

201.122104 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R10.2

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In Santa Clarita, from 1.1 mile north of PlaceritaCanyon Road to 0.2 mile south of Golden ValleyRoad. Regrade slopes, construct drainage ditchesand install erosion control system.

5237

33960$24,600

$36

Subtotal: $24,636

2021-22$1,090$2,720

$49$3,750

$7,609Total Project Cost: $32,245

07170001571/1/2022

11/1/20213/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

07-Los Angeles-14 18-1919-2019-2021-22

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R29.2/R29.4

Con Sup:

Roadway Protective Betterments

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 94 of 284

DRAFT

12-06

-17

Page 99: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of Los Angeles and Malibu, fromsouth of Tenescal Canyon Road to VenturaCounty line; also in Ventura County, from LosAngeles County line to Tonga Street (PM0.0/0.9). Rehabilitate culverts.

4846

31350$4,384

$182

Subtotal: $4,566

2018-19$1,950$2,000

$70$1,535

$5,555Total Project Cost: $10,121

07150000903/6/20192/4/20197/2/2018PA&ED:

RTL:R/W Cert:

8/22/2019Begin Con:

07-Los Angeles-1 Prior18-1918-1918-19

201.15120 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

37.7/62.8

Con Sup:

Drainage System Restoration

Const:R/W:

In the cities of Los Angeles, Hollywood, LongBeach and Signal Hill from Simons Underpass toEastern Avenue; on Routes 101, 405 and 710 atvarious locations. Replace 9 pump plants.

4910

31750$4,803

$10

Subtotal: $4,813

2018-19$360

$1,038$30

$1,500

$2,928Total Project Cost: $7,741

07150002461/30/2019

12/31/201812/1/2017PA&ED:

RTL:R/W Cert:

8/14/2019Begin Con:

07-Los Angeles-5 PriorPriorPrior18-19

201.1519 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.0/13.9

Con Sup:

Drainage System Restoration

Const:R/W:

In various cities, on Route 5 (PM 19.75/35.99),Route 10 (PM 22.32/23.88), Route 91 (PMR11.80), Route 605 (PM R14.07) and Route 710(PM 18.7/21.01). Replace pumps withsubmersible pumps.

5024

32490$5,946

$14

Subtotal: $5,960

2020-21$254

$1,075$73

$1,110

$2,512Total Project Cost: $8,472

07160000792/28/20211/1/2021

12/1/2019PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

07-Los Angeles-5 18-1919-2020-2120-21

201.15115 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

19.8/36.0

Con Sup:

Drainage System Restoration

Const:R/W:

In the city of Los Angeles, on the northboundconnector at the Route 5/110 Separation. Replacecompromised 18 inch Reinforced ConcreteCulvert (RCP).

5223

33800$1,654

$10

Subtotal: $1,664

2019-20$709

$2,548$123

$2,462

$5,842Total Project Cost: $7,506

071700005310/1/20199/1/2019

7/15/2018PA&ED:

RTL:R/W Cert:

5/1/2020Begin Con:

07-Los Angeles-5 Prior18-1918-1919-20

201.1511 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.8

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 95 of 284

DRAFT

12-06

-17

Page 100: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Pyramid Lake, 4.4 miles north of TemplinHighway. Remove and replace two sections ofdamaged reinforced concrete pipe.4847

31360$1,384

$20

Subtotal: $1,404

2019-20$180$350$20

$970

$1,520Total Project Cost: $2,924

07150000929/10/20187/31/20186/1/2017PA&ED:

RTL:R/W Cert:

3/25/2019Begin Con:

07-Los Angeles-5 PriorPriorPrior19-20

201.1512 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R70.4

Con Sup:

Drainage System Restoration

Const:R/W:

In the City of Santa Clarita, near southboundofframp to Sierra Highway. Replace damageddrainage system that includes 17 culverts.5219

33760$2,719

$10

Subtotal: $2,729

2019-20$556

$1,881$23

$1,262

$3,722Total Project Cost: $6,451

071700003610/1/20199/3/2019

7/13/2018PA&ED:

RTL:R/W Cert:

5/1/2020Begin Con:

07-Los Angeles-14 Prior18-1918-1919-20

201.1511 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.9

Con Sup:

Drainage System Restoration

Const:R/W:

In Long Beach, at Henry Ford Avenue offramp.Construct larger pump plant facility includingreplacing undersized pumps.5043

32730$22,593$1,646

Subtotal: $24,239

2020-21$1,198$2,586

$420$3,954

$8,158Total Project Cost: $32,397

07160001263/30/20211/15/2021

12/31/2019PA&ED:

RTL:R/W Cert:

10/1/2021Begin Con:

07-Los Angeles-103 18-1919-2019-2020-21

201.1511 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.1/0.1

Con Sup:

Drainage System Restoration

Const:R/W:

Near Gardena, south of Redondo BeachBoulevard. Replace culvert.

4849

31380$2,820

$50

Subtotal: $2,870

2018-19$110

$1,325$20

$1,200

$2,655Total Project Cost: $5,525

07150000953/29/20192/28/20191/17/2018PA&ED:

RTL:R/W Cert:

3/13/2020Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.1511 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.0

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 96 of 284

DRAFT

12-06

-17

Page 101: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Glendale, from east of Concord StreetOvercrossing to west of Chevy Chase DriveUndercrossing at three locations. Restore culvertsystems.

4848

31370$1,810

$10

Subtotal: $1,820

2018-19$200

$1,200$50

$1,175

$2,625Total Project Cost: $4,445

07150000939/10/20187/31/2018

10/19/2017PA&ED:

RTL:R/W Cert:

3/25/2019Begin Con:

07-Los Angeles-134 PriorPriorPrior18-19

201.1513 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R6.3/R8.2

Con Sup:

Drainage System Restoration

Const:R/W:

In Rancho Palos Verdes, from Caddington Driveto Peninsula Verde Drive. Replace two damageddrainage systems.3734

25310$1,662

$260

Subtotal: $1,922

2019-20$234$923$310$423

$1,890Total Project Cost: $3,812

07000004573/30/20202/28/20208/17/2018PA&ED:

RTL:R/W Cert:

10/31/2019Begin Con:

07-Los Angeles-213 Prior18-1918-1919-20

201.1513 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.7/3.9

Con Sup:

Drainage System Restoration

Const:R/W:

In the cities of Los Angeles and Monterey Park,from Olympic Boulevard to Ramona Boulevard.Rehabilitate culverts. 4845

31340$1,207

$50

Subtotal: $1,257

2018-19$100$155$47

$205

$507Total Project Cost: $1,764

07150000894/30/20191/11/20196/30/2017PA&ED:

RTL:R/W Cert:

9/30/2019Begin Con:

07-Los Angeles-710 PriorPriorPrior18-19

201.15110 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

23.6/26.3

Con Sup:

Drainage System Restoration

Const:R/W:

In Santa Monica, at McClure Tunnel Bridge No.53-0008. Enhance safety lighting inside tunnel.

4903

31690$5,180

$15

Subtotal: $5,195

2018-19$150$592$50

$1,903

$2,695Total Project Cost: $7,890

071500022711/30/201810/9/20186/30/2017PA&ED:

RTL:R/W Cert:

6/14/2019Begin Con:

07-Los Angeles-1 PriorPriorPrior18-19

201.170150 Lighting fixture(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

35.1/35.4

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 97 of 284

DRAFT

12-06

-17

Page 102: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Los Angeles County, from 4th StreetOvercrossing to San Bernardino County line.Replace sign panels with ASTM Type XI retroreflective sheeting and remove overhead signlighting and catwalks.

5201

33530$7,823

$50

Subtotal: $7,873

2020-21$588

$2,700$60

$1,900

$5,248Total Project Cost: $13,121

071600036310/16/202010/1/20208/23/2019PA&ED:

RTL:R/W Cert:

5/14/2021Begin Con:

07-Los Angeles-10 18-1919-2019-2020-21

201.170599 Sign(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.2/48.3

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

In various cities, from Route 5 to San BernardinoCounty line; also on Route 710, from Ocean Boulevard to Valley Boulevard (PM 5.6/T27.4).Replace existing signs with retro-reflectivesheeting.

4906

31730$2,665

$15

Subtotal: $2,680

2019-20$398

$1,081$5

$1,156

$2,640Total Project Cost: $5,320

07150002372/28/20201/10/20208/24/2018PA&ED:

RTL:R/W Cert:

1/27/2021Begin Con:

07-Los Angeles-60 Prior18-1918-1919-20

201.17096 Lighting fixture(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R30.5

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

In various cities, from 9th Street/Gaffey Street toend of freeway. Replace sign panels withretroreflective sheeting ASTM Type XI, removeoverhead lighting and catwalks.

5074

32980$5,360

$10

Subtotal: $5,370

2020-21$418

$2,342$21

$1,573

$4,354Total Project Cost: $9,724

07160002063/18/20211/15/20211/16/2020PA&ED:

RTL:R/W Cert:

10/26/2021Begin Con:

07-Los Angeles-110 18-1919-2019-2020-21

201.170500 Sign(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/31.9

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

MOBILITYIn Pasadena and South Pasadena, at the Fair OaksAvenue northbound offramp. Widen ramp fromtwo lanes to four lanes. City of South Pasadena will AAA the project.

5196

33520$1$0

Subtotal: $1

2021-22$1,400$2,372

$0$0

$3,772Total Project Cost: $3,773

07160003558/1/2021

6/30/20213/1/2020PA&ED:

RTL:R/W Cert:

4/20/2022Begin Con:

07-Los Angeles-110 18-1920-21

201.31023.4 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

31.0/31.0

Con Sup:

Operational Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 98 of 284

DRAFT

12-06

-17

Page 103: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of Sherman Oaks, at southboundonramp from Ventura Boulevard. Widen theonramp to two lanes plus a High OccupancyVehicle (HOV) lane.

2681

20490$3,120

$29

Subtotal: $3,149

2021-22$785

$1,918$141

$1,343

$4,187Total Project Cost: $7,336

071700002210/21/20219/21/20213/23/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

07-Los Angeles-405 18-1920-2120-2121-22

201.31012.5 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

39.1

Con Sup:

Operational Improvements

Const:R/W:

In and near Santa Monica, from LincolnBoulevard to McClure Tunnel; also on Route 10(PM 2.1/18.3), Route 2 (PM R18.7), Route 101(PM 11.8), and Route 105 (PM R1.95). Upgradethe existing Transportation Management System(TMS) elements to improve traffic monitoring,data transmission, and network connectivityincluding the Los Angeles RegionalTransportation Management Center (LARTMC)and communication hubs at Route 10, Route 101and Route 105.

5041

32720$17,264

$327

Subtotal: $17,591

2020-21$539

$3,159$43

$3,284

$7,025Total Project Cost: $24,616

071600012110/15/20208/22/2020

12/15/2018PA&ED:

RTL:R/W Cert:

5/13/2021Begin Con:

07-Los Angeles-1 Prior18-1918-1920-21

201.315129 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R34.5/35.2

Con Sup:

Transportation Management Systems

Const:R/W:

In and near the city of Los Angeles, from EBRoute 60/5 Separation to Route 605; also onRoute 2 (PM R18.7), Route 5 (PM 6.8), Route 10(PM 18.3), and Route 605 (PM 20.2). Upgradethe existing Transportation Management System(TMS) elements to improve traffic monitoring,data transmission, and network connectivityincluding the Los Angeles RegionalTransportation Management Center (LARTMC)on Route 2, Route 5, Route 10, and Route 605.

5040

32710$6,674

$153

Subtotal: $6,827

2020-21$30

$1,028$45

$1,450

$2,553Total Project Cost: $9,380

071600012010/21/20208/21/20206/15/2018PA&ED:

RTL:R/W Cert:

5/22/2021Begin Con:

07-Los Angeles-60 Prior19-2019-2020-21

201.31562 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.6/11.8

Con Sup:

Transportation Management Systems

Const:R/W:

In and near Carson, from Route 110 to OrangeCounty line; also on Route 2 (PM R18.7), Route 5(PM 6.8), Route 405 (PM 21.1). Upgrade theexisting Transportation Management System(TMS) elements to improve traffic monitoring,data transmission, and network connectivityincluding the various communication hubs onRoute 2, Route 5, and Route 405.

5226

33860$10,851

$590

Subtotal: $11,441

2021-22$511

$2,630$150

$2,237

$5,528Total Project Cost: $16,969

07170000601/3/20228/3/2021

12/12/2018PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-91 Prior18-1918-1921-22

201.31568 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R6.1/R20.7

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 99 of 284

DRAFT

12-06

-17

Page 104: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In various ciites, from Routes 5/10 to Route 405,Route 2 at Route 134 (PM R18.7) and Route 10 atRoute 5/10 (PM 18.3). Upgrade TransportationManagement System (TMS) elements includingClosed Circuit Television (CCTV) cameras,Ramp Metering Systems (RMS), Vehicle Detection Stations (VDS), Highway AdvisoryRadio (HAR), Changeable Message Signs (CMS)and the communication system network.

5221

33780$9,718

$13

Subtotal: $9,731

2021-22$438

$3,008$162

$1,863

$5,471Total Project Cost: $15,202

07170000541/3/20229/3/2021

7/15/2018PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-101 Prior18-1918-1921-22

201.31598 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R17.1

Con Sup:

Transportation Management Systems

Const:R/W:

In the cities of San Pedro, Carson, Gardena andLos Angeles, from Gaffey Street To Route 5; alsoon Route 2 at the TMC Building (PM 18.7),Route 5 at Route 10 Interchange (PM 16.9) andRoute 405 at Route 105 Interchange (PM 21.3).Upgrade and completion of TMS.

4830

31200$29,000

$702

Subtotal: $29,702

2018-19$20

$3,720$105

$5,000

$8,845Total Project Cost: $38,547

07150000512/20/20197/13/2018

11/30/2017PA&ED:

RTL:R/W Cert:

8/15/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.315219 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.7/25.7

Con Sup:

Transportation Management Systems

Const:R/W:

In the cities of Los Angeles, Wilmington, andCarson, from Gaffey Street to Route 405; also onRoute 210 (PM R0.0/R35.8), Route 605 (PM19.9/26.0), Route 710 (PM 5.0/9.4) and Route 2(PM R18.7). Install wireless Bluetooth™detection system to monitor travel time.

5188

33500$1,373

$10

Subtotal: $1,383

2020-21$40

$200

$300

$540Total Project Cost: $1,923

071600034610/21/20207/21/2020

12/28/2018PA&ED:

RTL:R/W Cert:

4/22/2021Begin Con:

07-Los Angeles-110 Prior18-19

20-21

201.31576 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.7/8.8

Con Sup:

Transportation Management Systems

Const:R/W:

In the city of Los Angeles, from Route 170 toRoutes 210/710; also on Route 2 at Route 134(PM R18.7), on Route 10 at Routes 5/10 (PM18.3), and on Route 101 near Pleasant ValleyRoad (PM 11.8). Upgrade TransportationManagement System (TMS) elements includingClosed Circuit Television (CCTV) cameras,Ramp Metering Systems (RMS), Vehicle Detection Stations (VDS), Highway AdvisoryRadio (HAR), Changeable Message Signs (CMS)and the communication system network.

5222

33790$7,559

$13

Subtotal: $7,572

2021-22$454

$2,840$154

$1,953

$5,401Total Project Cost: $12,973

07170000521/3/20228/3/2021

7/15/2018PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-134 Prior18-1918-1921-22

201.31569 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R13.3

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 100 of 284

DRAFT

12-06

-17

Page 105: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In various cities, from Orange County line toRoute 210; also on Route 2 at the TMC (PMR18.7) and Route 5 (PM 6.8). Upgrade Transportation Management System.

4819

31190$10,562

Subtotal: $10,562

2018-19$20

$2,299$2

$2,490

$4,811Total Project Cost: $15,373

07150000163/5/20192/1/20196/9/2015PA&ED:

RTL:R/W Cert:

2/27/2020Begin Con:

07-Los Angeles-605 18-19PriorPrior18-19

201.315115 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/26.0

Con Sup:

Transportation Management Systems

Const:R/W:

In Santa Clarita, from 0.4 mile north of RyeCanyon Road to 1.4 miles south of Route 5/126interchange. Replace office structure andinspection enclosure and upgrade floor slab lighting with LED lighting.

5071

32880$850$10

Subtotal: $860

2020-21$550

$2,000$20

$1,200

$3,770Total Project Cost: $4,630

07160001838/20/20202/20/20209/15/2019PA&ED:

RTL:R/W Cert:

5/15/2021Begin Con:

07-Los Angeles-5 18-1919-2019-2020-21

201.3211 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R54.4/R54.8

Con Sup:

Weigh Stations

Const:R/W:

In Van Nuys, near Saticoy Street. Replace andinstall Weight In Motion system.

4724

30510$2,195

Subtotal: $2,195

2018-19$528$983$12

$890

$2,413Total Project Cost: $4,608

07140000971/4/2019

12/7/201812/1/2017PA&ED:

RTL:R/W Cert:

8/12/2019Begin Con:

07-Los Angeles-405 PriorPriorPrior18-19

201.3211 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

42.9

Con Sup:

Weigh Stations

Const:R/W:

ROADSIDE PRESERVATIONIn La Crescenta and La Canada Flintridge, fromLowell Avenue to Arroyo Boulevard. Restoreexisting irrigation to functionality, upgraderemaining older irrigation controllers to webconnect "smart controllers.

5080

33070$3,528

$10

Subtotal: $3,538

2020-21$375

$1,077$20

$1,383

$2,855Total Project Cost: $6,393

071600021712/18/202010/14/20209/16/2019PA&ED:

RTL:R/W Cert:

8/20/2021Begin Con:

07-Los Angeles-210 18-1919-2019-2020-21

201.21022 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

15.6/22.6

Con Sup:

Highway Planting Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 101 of 284

DRAFT

12-06

-17

Page 106: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Los Angeles($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

FACILITIESIn the city of Los Angeles, at the CaliforniaDepartment of Transportation District 7headquarters office building, 100 S. Main Street.Repair damaged roof.

5287

34240$2,300

$0

Subtotal: $2,300

2018-19$0

$450$10

$450

$910Total Project Cost: $3,210

07170002778/15/20187/15/20186/29/2017PA&ED:

RTL:R/W Cert:

12/15/2018Begin Con:

07-Los Angeles-10118-1918-1918-19

201.3531 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Office Facilities

Const:R/W:

MISCELLANEOUSIn Kern County, at the Tejon Safety RoadsideRest Area (PM 0.8). Install concrete pavementsolar panels along the rest area shoulders.5159

33320$2,739

$61

Subtotal: $2,800

2020-21$500$340$20

$340

$1,200Total Project Cost: $4,000

07160003019/2/20208/3/20206/3/2019PA&ED:

RTL:R/W Cert:

5/1/2021Begin Con:

07-Los Angeles-5 18-1919-2019-2020-21

201.9991 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.8

Con Sup:

Miscellaneous

Const:R/W:

In and near the city of Los Angeles, from DitmanAvenue southbound offramp to Route 134; alsoon Route 2 (PM R18.7) and Route 101 (PM 11.8).Multi-objective Asset Management project thatincludes widening and extending decelerationlength on the Indiana Street/Calzona Streetsouthbound offramp, upgrade guardrail and TMS,construct highway worker safety features.

5157

33300$16,927

$147

Subtotal: $17,074

2021-22$650

$2,800$25

$4,100

$7,575Total Project Cost: $24,649

07160002982/28/20221/31/20228/9/2019PA&ED:

RTL:R/W Cert:

9/30/2022Begin Con:

07-Los Angeles-5 18-1919-2019-2021-22

201.999101 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

14.7/26.9

Con Sup:

Miscellaneous

Const:R/W:

CountyLos Angeles

PA&ED:PS&E:

R/W Sup:Con Sup:

$202,589$1,830,553

R/W:

Subtotal: $2,033,142

Const:$128,388$392,070$42,378

$451,509

?

Total (Capital + Support): $3,047,487

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 102 of 284

DRAFT

12-06

-17

Page 107: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Madera($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear the city of Madera, at Cottonwood CreekBridge No. 41-065R, No. 41-0065L, and No. 41-0065S. Replace bridges to mitigate corrosion bychloride latent concrete.

6857

0V120$24,500

$137

Subtotal: $24,637

2021-22$2,400$3,200

$100$6,100

$11,800Total Project Cost: $36,437

06160002077/26/20217/7/20217/1/2020PA&ED:

RTL:R/W Cert:

3/2/2022Begin Con:

06-Madera-99 Prior20-2120-2121-22

201.1103 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R7.0/R7.5

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near the city of Madera, at South Gateway DriveOvercrossing No. 41-0046K. Replace bridgerailing, grind deck, and place reinforced PortlandCement Concrete (PCC) to rehabilitate bridge.

6887

0U170$2,700

$30

Subtotal: $2,730

2019-20$950

$1,600$1

$1,300

$3,851Total Project Cost: $6,581

06160002065/1/20204/2/2020

3/15/2019PA&ED:

RTL:R/W Cert:

10/28/2020Begin Con:

06-Madera-99 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.7

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

ROADWAY PRESERVATIONNear Fresno, from north of Avenue 15 to south ofRoute 145. Roadway rehabilitation. Additional$22,000 from Local/Private contribution.6708

0R210$10,184$3,160

Subtotal: $13,344

2019-20$2,463$2,390$1,296$2,722

$8,871Total Project Cost: $22,215

06140000583/1/20202/1/20209/1/2019PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

06-Madera-41 Prior19-2019-2019-20

201.12021.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.3/9.2

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In and near Madera, from 0.3 mile north ofAvenue 16 Overcrossing to 0.9 mile north ofAvenue 20 Overcrossing. Rehabilitate pavementon mainline and ramps.

6789

0U520$11,210

$27

Subtotal: $11,237

2018-19 $1,118$19

$1,379

$2,516Total Project Cost: $13,753

06160000031/23/201912/1/20185/11/2016PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

06-Madera-99PriorPrior18-19

201.12126 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.1/19.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 103 of 284

DRAFT

12-06

-17

Page 108: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Madera($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Chowchilla, from Route 152 to theMerced County line. Roadway rehabilitation.

6732

0T210$17,000

$30

Subtotal: $17,030

2018-19$499

$1,885$30

$2,507

$4,921Total Project Cost: $21,951

06150000373/23/20182/1/20183/1/2017PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

06-Madera-99 PriorPriorPrior18-19

201.12226 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

22.7/29.4

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

ROADSIDE PRESERVATIONIn various counties, on various routes. Establishmitigation bank for future Caltrans projects inDistricts 6 and 10 to protect the California TigerSalamander.

6750

0U020$1,800

Subtotal: $1,800

2018-19$5

$130$5

$60

$200Total Project Cost: $2,000

06150001761/2/2019

12/3/20188/25/2017PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

06-Madera-Var PriorPriorPrior18-19

201.2405 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

Const:R/W:

CountyMadera

PA&ED:PS&E:

R/W Sup:Con Sup:

$3,384$67,394

R/W:

Subtotal: $70,778

Const:$6,317

$10,323$1,451

$14,068

$32,159

Total (Capital + Support): $102,937

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 104 of 284

DRAFT

12-06

-17

Page 109: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Marin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Sausalito, at 0.1 mile south of AlexanderAvenue. Restore damaged drainage systems.

1492J

4J420$909$13

Subtotal: $922

2019-20$837$850$100$850

$2,637Total Project Cost: $3,559

04150003442/1/20202/1/20201/1/2019PA&ED:

RTL:R/W Cert:

7/8/2020Begin Con:

04-Marin-101 Prior18-1918-1919-20

201.1312 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.2

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONIn San Rafael, at Route 580; and in SonomaCounty in Santa Rosa from PM 19.7 to PM 20.7;in Solano County on Route 37 in Vallejo fromPM R9.4 to PM R10.4 and on Route 80 in andnear Vallejo and Fairfield from PM 6.5 to 17.5;also, in Napa County on Route 29 in and near thecities of Napa and Yountville from PM 11.0 to21.0. Upgrade fencing to reduce maintenanceworker exposure.

1452K

2K810$3,142

$100

Subtotal: $3,242

2021-22$550$550$100$550

$1,750Total Project Cost: $4,992

04170000284/15/20221/15/20226/1/2020PA&ED:

RTL:R/W Cert:

10/15/2022Begin Con:

04-Marin-101 18-1919-2019-2021-22

201.23541 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

9.4/10.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn San Rafael, at Manuel T Freitas Parkway.Upgrade curb ramps, sidewalk, and otherfacilities to make compliant with ADA standards.1495K

0K800$2,239

$125

Subtotal: $2,364

2021-22$300$850$120$850

$2,120Total Project Cost: $4,484

04160001415/2/20221/3/20226/1/2020PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

04-Marin-101 18-1919-2019-2021-22

201.3618 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

13.7

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In and near Tiburon, at BlackfieldDrive/Greenwood Cove Drive. Intersectionimprovements to make compliant with the ADAincluding removal of traffic islands, upgradingcurb ramps and sidewalk, installing new trafficsignals, and installing Accessible PedestrianSignal (APS) pushbuttons and countdown timers.

1491A

4J450$1,488

$55

Subtotal: $1,543

2019-20$400$409$220$450

$1,479Total Project Cost: $3,022

04150003506/30/20205/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

12/9/2020Begin Con:

04-Marin-131 18-1918-1918-1919-20

201.3617 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 105 of 284

DRAFT

12-06

-17

Page 110: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Marin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Almonte, near Route 101 offramp to Route 1;also from Coyote Creek to Flamingo Road.Upgrade pedestrian facilities.0434H

2G690$1,976

$842

Subtotal: $2,818

2018-19$510

$1,000$300$850

$2,660Total Project Cost: $5,478

040002121111/16/201810/31/20186/16/2017PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

04-Marin-1 PriorPriorPrior18-19

201.37828 Structure(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/0.8

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

BRIDGE PRESERVATIONNear Point Reyes Station, at Lagunitas CreekBridge No. 27-0023. Replace bridge.

0756K

0G642$11,552$2,691

Subtotal: $14,243

2019-20$4,187$1,400

$685$1,756

$8,028Total Project Cost: $22,271

04130003508/1/2019

7/25/20191/25/2018PA&ED:

RTL:R/W Cert:

2/7/2020Begin Con:

04-Marin-1 PriorPriorPrior19-20

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.5

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Near Point Reyes Station, at Millerton GulchBridge No. 27-0114. Repair damagedembankment and construct retaining wall.0480C

0J570$4,020

$450

Subtotal: $4,470

2018-19$1,620$1,080

$180$830

$3,710Total Project Cost: $8,180

04140000146/21/20196/7/2019

12/1/2017PA&ED:

RTL:R/W Cert:

2/4/2020Begin Con:

04-Marin-1 PriorPriorPrior18-19

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

33.4

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In San Rafael, at Irwin Creek Bridge No. 27-0097. Rehabilitate corrugated metal arch culvertbridge and adjoining deteriorated culvertstructures.

1493K

0K510$1,903

$944

Subtotal: $2,847

2021-22$1,100

$880$215$610

$2,805Total Project Cost: $5,652

04160000966/1/20225/1/20228/1/2020PA&ED:

RTL:R/W Cert:

9/15/2022Begin Con:

04-Marin-101 Prior20-2120-2121-22

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.3

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 106 of 284

DRAFT

12-06

-17

Page 111: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Marin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONNear Point Reyes Station and Olema, from OlemaCreek Bridge to north of Cypress Road; also, nearTomales, from south of Tomales-Petaluma Roadto south of Valley Ford Road (PM 45.0/50.5).Pavement rehabilitation.

1480A

1J960$13,783

$517

Subtotal: $14,300

2019-20$1,320$1,254

$66$1,540

$4,180Total Project Cost: $18,480

04140004031/9/2020

12/2/201910/1/2018PA&ED:

RTL:R/W Cert:

7/9/2020Begin Con:

04-Marin-1 Prior18-1918-1919-20

201.12127.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

22.8/31.2

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

MOBILITYIn and near Sausalito, Corte Madera, andLarkspur, from north of Golden Gate Bridge to0.3 mile north of Sir Francis Drake Boulevard.Install ramp metering and Traffic OperationsSystem (TOS) elements.

0334J

15161$9,700

$110

Subtotal: $9,810

2018-19 $1,500$50

$1,600

$3,150Total Project Cost: $12,960

04140004466/1/20185/1/20185/7/2014PA&ED:

RTL:R/W Cert:

1/16/2019Begin Con:

04-Marin-101PriorPrior18-19

201.31511 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.3/9.0

Con Sup:

Transportation Management Systems

Const:R/W:

CountyMarin

PA&ED:PS&E:

R/W Sup:Con Sup:

$5,847$50,712

R/W:

Subtotal: $56,559

Const:$10,824$9,773$2,036$9,886

$32,519

Total (Capital + Support): $89,078

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 107 of 284

DRAFT

12-06

-17

Page 112: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mariposa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn the community of Mariposa, from Route 49 to12th Street. Improve pedestrian access facilitiesto reduce collision severity.3131

0Y600$1,550

$159

Subtotal: $1,709

2019-20$296$528$411$390

$1,625Total Project Cost: $3,334

10130002449/19/20198/16/20194/13/2018PA&ED:

RTL:R/W Cert:

3/18/2020Begin Con:

10-Mariposa-140 Prior18-1918-1919-20

201.01524 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.2/21.8

Con Sup:

Collision Severity Reduction

Const:R/W:

MANDATESIn the Mariposa community, from 3rd Street to7th street. Upgrade pedestrian facilities to makecompliant with the ADA standards.3151

0Y590$1,326

$55

Subtotal: $1,381

2021-22$739$626$453$592

$2,410Total Project Cost: $3,791

10130002405/1/2022

4/15/20224/15/2020PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

10-Mariposa-140 18-1919-2019-2021-22

201.36120 ADA unit(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

21.2/21.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

ROADWAY PRESERVATIONNear the community of Mariposa, from MaderaCounty line to the south junction with Route 140.Pavement rehabilitation.3233

1C040$16,197

$7

Subtotal: $16,204

2019-20$403

$1,032$9

$2,150

$3,594Total Project Cost: $19,798

10170000342/18/202010/1/201910/9/2018PA&ED:

RTL:R/W Cert:

9/27/2020Begin Con:

10-Mariposa-49 Prior18-1918-1919-20

201.12134.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.3/18.5

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near the Mariposa community, from 1.7miles east of Catheys Valley Park to the northRoute 49 Junction. Rehabilitate pavement andupgrade ADA ramps.

3252

0Y770$17,363$1,989

Subtotal: $19,352

2021-22$1,025$1,095

$416$1,689

$4,225Total Project Cost: $23,577

10150000086/1/20225/1/20222/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

10-Mariposa-140 18-1919-2019-2021-22

201.12126.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

12.0/22.0

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 108 of 284

DRAFT

12-06

-17

Page 113: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mariposa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near the Mariposa community and El Portal,from East Whitlock Road to Yosemite NationalPark entrance. Pavement rehabilitation.3167

0Y780$23,765

$162

Subtotal: $23,927

2021-22$900

$1,900$30

$2,330

$5,160Total Project Cost: $29,087

101600002510/1/20219/1/20215/1/2020PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

10-Mariposa-140 18-1919-2019-2021-22

201.12154.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

25.3/51.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Briceburg, at 2.1 miles west of Bull CreekRoad. Repair slope slip-out and erosion damageat large culvert pipe outlet. 3194

0Y340$1,850

$40

Subtotal: $1,890

2020-21$0

$955$155$925

$2,035Total Project Cost: $3,925

10140001829/30/20208/30/20207/29/2016PA&ED:

RTL:R/W Cert:

4/30/2021Begin Con:

10-Mariposa-14018-1918-1920-21

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

32.2

Con Sup:

Roadway Protective Betterments

Const:R/W:

Near Fish Camp, from south of Miami MountainRoad to south of Yosemite National Parkboundary; also, in Madera County (PMD0.639/D1.841). Rehabilitate culverts.

3158

1E770$1,893

$16

Subtotal: $1,909

2018-19$435$929$84

$905

$2,353Total Project Cost: $4,262

101500011312/4/201812/3/2018

10/27/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

10-Mariposa-41 PriorPriorPrior18-19

201.15119 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.1/4.9

Con Sup:

Drainage System Restoration

Const:R/W:

CountyMariposa

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,428$63,944

R/W:

Subtotal: $66,372

Const:$3,798$7,065$1,558$8,981

$21,402

Total (Capital + Support): $87,774

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 109 of 284

DRAFT

12-06

-17

Page 114: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mendocino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Dos Rios, from 1.4 to 1.7 miles east ofRodeo Creek Bridge. Construct soldier pile wallsand drainage galleries.4553

0B530$7,630

$355

Subtotal: $7,985

2018-19$2,060$1,650

$170$1,700

$5,580Total Project Cost: $13,565

01140000356/30/20196/15/20197/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

01-Mendocino-162 Prior18-1918-1918-19

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.5/11.8

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONNear Gualala, from 0.4 mile north of HavensNeck Drive to 0.5 mile south of Iverson Road.Widen shoulders and install edge-line rumblestrips and guardrail.

4630

0F710$519$433

Subtotal: $952

2019-20$940$978$472$728

$3,118Total Project Cost: $4,070

01160000473/1/2020

2/15/20201/11/2019PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.0106 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.5/9.5

Con Sup:

Safety Improvements

Const:R/W:

Near Albion, from 1.5 miles north of Route 128to 0.1 mile south of Navarro Ridge Road. Widenfor standard shoulders, and install rumble stripsand guardrail.

4578

0C550$1,702

$462

Subtotal: $2,164

2019-20$622$326$223$608

$1,779Total Project Cost: $3,943

01120003003/13/20202/28/2020

12/14/2018PA&ED:

RTL:R/W Cert:

8/14/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.01016 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

41.8/42.3

Con Sup:

Safety Improvements

Const:R/W:

Near Fort Bragg, from 0.03 mile south to 0.07mile north of Abalobadiah Creek. Curve improvement and shoulder widening.4639

0G060$1,991

$263

Subtotal: $2,254

2019-20$874

$1,094$190$783

$2,941Total Project Cost: $5,195

01160001203/1/2020

2/15/20203/8/2019PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.01016 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

71.2/71.4

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 110 of 284

DRAFT

12-06

-17

Page 115: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mendocino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Fort Bragg, from 0.34 mile west of Road200A to 0.13 mile west of Road 200A. Widenshoulders, install center and edge-line rumblestrips, and install guardrail.

4613

0E860$1,339

$88

Subtotal: $1,427

2018-19$782

$1,117$129

$1,063

$3,091Total Project Cost: $4,518

01150000383/13/20202/28/2020

10/15/2018PA&ED:

RTL:R/W Cert:

9/11/2020Begin Con:

01-Mendocino-20 Prior18-1918-1918-19

201.01014 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.9/17.2

Con Sup:

Safety Improvements

Const:R/W:

Near Willits, from 1.0 mile to 0.8 mile west ofThree Chop Road. Widen eastbound shoulders, construct guard railing, place High Friction Surface Treatment (HFST), and extend anexisting culvert.

4650

0G430$1,303

$17

Subtotal: $1,320

2019-20$603$843$175$718

$2,339Total Project Cost: $3,659

01160001883/15/20203/1/20202/1/2019PA&ED:

RTL:R/W Cert:

8/15/2020Begin Con:

01-Mendocino-20 Prior18-1918-1919-20

201.0108 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

24.7/24.9

Con Sup:

Safety Improvements

Const:R/W:

Near Dos Rios, from 1.0 mile east of the MiddleWay to 1.3 miles east of the Middle Way. Increase safety by improving roadway cross slopeat curve, installing High Friction SurfaceTreatment (HFST), and installing an underdrain system.

4652

0G480$1,042

$6

Subtotal: $1,048

2018-19$553$672$123$723

$2,071Total Project Cost: $3,119

011700000912/15/201812/1/20184/1/2018PA&ED:

RTL:R/W Cert:

5/15/2019Begin Con:

01-Mendocino-162 PriorPriorPrior18-19

201.01014 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

17.4/17.8

Con Sup:

Safety Improvements

Const:R/W:

In Mendocino, Lake, Del Norte, and HumboldtCounties on Routes 1, 20, 29, 96, 101, 128, 162,169, 175, 199, 253, 254, 271, 281, and 299, atvarious locations. Replace curve warning signs tomake standard.

7022

0G050$2,322

$9

Subtotal: $2,331

2019-20$413

$1,067$58

$986

$2,524Total Project Cost: $4,855

01160001189/1/20199/1/20192/1/2019PA&ED:

RTL:R/W Cert:

1/1/2020Begin Con:

01-Mendocino-Var 18-1918-1918-1919-20

201.01530 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 111 of 284

DRAFT

12-06

-17

Page 116: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mendocino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Laytonville, at Moss Cove Safety RoadsideRest Area (SRRA); also at Irvine Lodge SRRA(PM 61.8) and Empire Camp SRRA (PM 82.5).Upgrade potable and wastewater systems.

4574

0C450$6,322

$3

Subtotal: $6,325

2019-20$365

$2,260$46

$1,232

$3,903Total Project Cost: $10,228

01120002856/15/20206/1/20204/1/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

01-Mendocino-101 PriorPriorPrior19-20

201.2353 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

58.9/82.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Fort Bragg, from Route 20 to Pudding CreekBridge. Construct ADA compliant curb ramps and sidewalk, add high visibility signing andstriping at crosswalks, construct retaining walls,and upgrade drainage.

4546

0B220$4,218

$256

Subtotal: $4,474

2020-21$750

$1,246$511

$1,588

$4,095Total Project Cost: $8,569

011200011012/1/2020

11/15/20209/1/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

01-Mendocino-1 18-1919-2019-2020-21

201.37868 Structure(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

59.8/62.1

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

BRIDGE PRESERVATIONNear Albion, from 2.2 miles north of Route 128Junction to 0.2 mile north of Salmon CreekBridge No. 10-0134. Bridge replacement.4491

40140$36,775$6,324

Subtotal: $43,099

2019-20$5,800$5,593

$810$6,290

$18,493Total Project Cost: $61,592

01000001552/14/20201/31/2020

11/15/2018PA&ED:

RTL:R/W Cert:

3/1/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

42.4/43.3

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Albion, from 3.0 miles north of Route 128Junction to 0.2 mile north of Albion River BridgeNo. 10-0136. Bridge Replacement.4490

40110$53,699$7,748

Subtotal: $61,447

2019-20$5,500$5,220

$828$5,950

$17,498Total Project Cost: $78,945

01000001546/30/20203/13/20205/17/2019PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

01-Mendocino-1 Prior19-2019-2019-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

43.3/44.2

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 112 of 284

DRAFT

12-06

-17

Page 117: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mendocino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Ukiah, from east of Route 101 to east ofRoad 144 at Russian River Bridge and OverheadNo. 10-0182. Rehabilitate bridge deck.4587

0E090$25,832

$250

Subtotal: $26,082

2019-20$2,087$3,129

$260$7,824

$13,300Total Project Cost: $39,382

01130001233/1/2020

2/15/20202/15/2019PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

01-Mendocino-20 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

33.3/34.4

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In and near Fort Bragg, at Little River Bridge No.10-0178, at Jack Peters Bridge No. 10-0150 andat Pudding Creek Bridge No. 10-0158. Upgradeand replace barrier rails and bridge replacement.

4507

43480$15,650$1,099

Subtotal: $16,749

2019-20$3,806$2,825

$341$3,650

$10,622Total Project Cost: $27,371

01000006723/6/2020

2/28/202012/14/2018PA&ED:

RTL:R/W Cert:

9/4/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.1121463 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Fort Bragg, at Elk Creek Bridge No. 10-0120. Replace and upgrade bridge rails.

4588

0E110$7,325

$333

Subtotal: $7,658

2019-20$1,363$1,445

$191$1,759

$4,758Total Project Cost: $12,416

01130001253/12/20212/26/20219/13/2019PA&ED:

RTL:R/W Cert:

8/27/2021Begin Con:

01-Mendocino-1 Prior19-2019-2019-20

201.112321.5 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

31.4

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near the Mendocino community, at RussianGulch Bridge No. 10-0151 (PM 52.64). Replaceor upgrade bridge to address bridge rail standards,functionality, structural integrity, and provideaccess for pedestrians and bicycles.

4636

43481$34,109$7,128

Subtotal: $41,237

2021-22$2,637$2,808

$396$13,142

$18,983Total Project Cost: $60,220

01160001013/18/20223/4/2022

8/14/2020PA&ED:

RTL:R/W Cert:

10/14/2022Begin Con:

01-Mendocino-1 18-1920-2120-2121-22

201.1121134 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R52.4/R52.9

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 113 of 284

DRAFT

12-06

-17

Page 118: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mendocino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Fort Bragg, at Hare Creek Bridge No. 10-0175. Upgrade bridge rails and widen to makestandard.4588B

0E111$12,452

$474

Subtotal: $12,926

2021-22$2,770$2,979

$183$3,498

$9,430Total Project Cost: $22,356

01150001095/1/20224/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

01-Mendocino-1 18-1920-2120-2121-22

201.112868 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

59.7

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Piercy, at South Fork Eel River Bridge No.10-0218 (PM R106.57): also in Humboldt County(PM T0.0 to T0.1). Seismic bridge retrofit,bridge rail upgrade, restripe for wider shouldersand bicycle access, and upgrade deck drainage.

4627

0F510$3,605

$26

Subtotal: $3,631

2021-22$739

$1,028$248

$1,278

$3,293Total Project Cost: $6,924

01160000151/15/20221/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

01-Mendocino-101 18-1920-2120-2121-22

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R106.4/T106.8

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Near Longvale, from 8.2 miles to 8.3 miles east of Route 101 at Eel River Bridge No. 10-0236.Bridge seismic retrofit.4692

0A131$6,383

$618

Subtotal: $7,001

2021-22$737

$1,295$127

$4,179

$6,338Total Project Cost: $13,339

01170002231/15/2022

12/30/202110/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

01-Mendocino-162 18-1920-2120-2121-22

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

8.2

Con Sup:

Bridge Seismic Restoration

Const:R/W:

ROADWAY PRESERVATIONIn and near Point Arena, from Sonoma CountyLine to 0.1 mile south of Mill Street. Pavementrehabilitation.4626

0F440$12,585

$15

Subtotal: $12,600

2019-20$623$704$85

$2,590

$4,002Total Project Cost: $16,602

011600000810/1/20199/17/201912/1/2018PA&ED:

RTL:R/W Cert:

3/15/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.12131.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/15.0

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 114 of 284

DRAFT

12-06

-17

Page 119: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mendocino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Fort Bragg, from Pudding CreekBridge to 0.6 mile north of Wages Creek Bridge.Pavement rehabilitation.0154T

36270$13,582

$1

Subtotal: $13,583

2018-19$336$501$36

$657

$1,530Total Project Cost: $15,113

01160000315/15/20195/1/20199/1/2018PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

01-Mendocino-1 Prior18-1918-1918-19

201.12132.9 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

62.1/78.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Hopland, from 0.7 mile south of GeysersRoad to Hopland Overhead. Pavementrehabilitation.4442

46630$13,289

$1

Subtotal: $13,290

2018-19$362$635

$4$1,724

$2,725Total Project Cost: $16,015

01160000245/15/20195/1/20199/1/2018PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

01-Mendocino-101 Prior18-1918-1918-19

201.12136.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.1/R9.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Albion, at Navarro Ridge Road. Improvedrainage, repair erosion, widen shoulders, andrepair roadway.4616

0E940$1,102

$168

Subtotal: $1,270

2019-20$415$405$67

$370

$1,257Total Project Cost: $2,527

01150000483/13/20202/28/2020

12/14/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

42.3/42.5

Con Sup:

Roadway Protective Betterments

Const:R/W:

ROADSIDE PRESERVATIONNear Point Arena and Fort Bragg, from 0.6 milenorth of Haven Neck Drive to 0.1 mile north ofSouth Fork Cotteneva Creek Bridge. Advancemitigation credit purchases (14 credits) for futureSHOPP construction projects expected to impactwetlands.

4693

0H440 $8,820

Subtotal: $8,820

2019-20$57

$1,700$7

$1,764Total Project Cost: $10,584

01170002223/15/20193/1/2019

4/15/2018PA&ED:

RTL:R/W Cert:

6/15/2019Begin Con:

01-Mendocino-1 PriorPriorPrior

201.2407 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.8/87.9

Con Sup:

Roadside Enhancement

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 115 of 284

DRAFT

12-06

-17

Page 120: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mendocino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Manchester and Fort Bragg, from GarciaRiver Bridge to 0.1 mile north of AbalobadiahCreek. Advance mitigation credit purchases (7credits) for future SHOPP construction projectsexpected to impact sensitive streams.

4699

0H441 $4,410

Subtotal: $4,410

2018-19$29

$850$3

$882Total Project Cost: $5,292

01180000776/15/20198/1/2019

4/15/2018PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

01-Mendocino-1 PriorPriorPrior

201.2404 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.5/71.4

Con Sup:

Roadside Enhancement

Const:R/W:

CountyMendocino

PA&ED:PS&E:

R/W Sup:Con Sup:

$39,307$264,776

R/W:

Subtotal: $304,083

Const:$35,223$42,370$5,683

$63,040

$146,316

Total (Capital + Support): $450,399

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 116 of 284

DRAFT

12-06

-17

Page 121: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Merced($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear the city of Merced, at various locations,from Route 5 to 6 miles east of the city ofMerced. Upgrade metal beam guardrails3018

0Y110$2,940

$928

Subtotal: $3,868

2019-20$1,442

$873$280$704

$3,299Total Project Cost: $7,167

101300010811/15/201911/1/2019

11/17/2017PA&ED:

RTL:R/W Cert:

5/29/2020Begin Con:

10-Merced-140 PriorPriorPrior19-20

201.01536 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/42.1

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near the cities of Gustine and Merced,from Outside Canal Bridge No. 39-0055 to 1.3miles west of Mariposa County line, at variouslocations. Replace bridge approach guardrail ontwo bridges and removal of obstructions fromclear recovery zone at 11 locations.

3074

0Y130$4,225

$355

Subtotal: $4,580

2021-22$1,279

$769$252

$1,172

$3,472Total Project Cost: $8,052

10130002432/1/2022

11/15/202111/1/2019PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

10-Merced-140 19-2020-2120-2121-22

201.01539 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.3/49.0

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Los Banos, from 0.3 mile east ofRoute 5 to 0.2 mile west of Route 59. Upgradeguardrail to make standard. 3740

1C370$2,598

$13

Subtotal: $2,611

2020-21$650$939$12

$745

$2,346Total Project Cost: $4,957

10170000435/4/2021

8/26/20202/7/2020PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

10-Merced-152 18-1919-2019-2020-21

201.01525 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

14.1/R40.7

Con Sup:

Collision Severity Reduction

Const:R/W:

MANDATESIn Los Banos, from 0.3 mile south of Route 152to Dove Street at various locations. UpgradeADA facilities.3149

0X520$968

$1,280

Subtotal: $2,248

2019-20$347$477

$1,280$505

$2,609Total Project Cost: $4,857

10130000024/20/20203/16/20207/5/2017PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

10-Merced-165 PriorPriorPrior19-20

201.361100 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.5/10.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 117 of 284

DRAFT

12-06

-17

Page 122: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Merced($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONIn Merced County, on Routes 152, 140, and 59 atvarious locations. Seismic retrofit and bridge railupgrade of 7 bridges.3122

0G830$6,530

$416

Subtotal: $6,946

2019-20$982$649$19

$1,984

$3,634Total Project Cost: $10,580

10120003162/21/20202/7/20201/2/2019PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

10-Merced-152 Prior18-1918-1919-20

201.1137 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In Merced, San Joaquin, Mariposa and Stanislauscounties on various routes at various locations.Scour mitigation and preventative structuralmaintenance measures at 13 bridges.

3102

1C810$2,100$1,894

Subtotal: $3,994

2020-21$819$950$542

$1,100

$3,411Total Project Cost: $7,405

101500003812/18/202012/1/20207/2/2018PA&ED:

RTL:R/W Cert:

7/23/2021Begin Con:

10-Merced-5 Prior18-1918-1920-21

201.11913 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONIn and near the city of Merced, from south ofChilds Avenue to south of Franklin Road. Roadway rehabilitation.3089

1C170$46,000

$95

Subtotal: $46,095

2019-20$1,600$3,700

$122$12,400

$17,822Total Project Cost: $63,917

10140001445/15/20204/15/20204/2/2018PA&ED:

RTL:R/W Cert:

11/13/2020Begin Con:

10-Merced-99 PriorPriorPrior19-20

201.12219.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R12.7/17.6

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In and near Atwater, from 0.4 mile south ofBuhach Road to south of Westside Boulevard.Roadway rehabilitation.5431

3A720$60,600$3,369

Subtotal: $63,969

2018-19$1,973$5,200

$677$10,000

$17,850Total Project Cost: $81,819

10130002596/21/20196/14/201911/3/2017PA&ED:

RTL:R/W Cert:

2/14/2020Begin Con:

10-Merced-99 Prior18-1918-1918-19

201.12216.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.1/24.3

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 118 of 284

DRAFT

12-06

-17

Page 123: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Merced($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Merced County, on Routes 152, 59, and 99 andin San Joaquin County on Routes 5 and 12, atvarious locations. Rehabilitate culverts.3139

0S120$1,768

$151

Subtotal: $1,919

2019-20$622$743$124$765

$2,254Total Project Cost: $4,173

10150000055/1/20194/1/20196/4/2018PA&ED:

RTL:R/W Cert:

1/3/2020Begin Con:

10-Merced-152 Prior18-1918-1919-20

201.15120 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYNear Los Banos, at Route 33 Interchange; also,on Route 5 (PM 6.3) at Route 165 Interchange.Improve the truck turn radius.3214

0T680$2,216

$274

Subtotal: $2,490

2021-22$495$850$64

$630

$2,039Total Project Cost: $4,529

101700000512/1/2021

11/15/20215/15/2020PA&ED:

RTL:R/W Cert:

6/15/2022Begin Con:

10-Merced-152 18-1919-2019-2021-22

201.31048 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

11.3

Con Sup:

Operational Improvements

Const:R/W:

ROADSIDE PRESERVATIONNear Los Banos and Firebaugh, at the John"Chuck" Erreca Safety Roadside Rest Area(SRRA). Upgrade northbound and southboundSRRA facilities.

3215

1C790$16,700

$5

Subtotal: $16,705

2021-22$925

$2,970$10

$3,150

$7,055Total Project Cost: $23,760

10160000468/2/2021

1/15/20218/12/2019PA&ED:

RTL:R/W Cert:

2/11/2022Begin Con:

10-Merced-5 18-1919-2019-2021-22

201.2502 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.4/0.8

Con Sup:

Safety Roadside Rest Area Restoration

Const:R/W:

CountyMerced

PA&ED:PS&E:

R/W Sup:Con Sup:

$8,780$146,645

R/W:

Subtotal: $155,425

Const:$11,134$18,120$3,382

$33,155

$65,791

Total (Capital + Support): $221,216

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 119 of 284

DRAFT

12-06

-17

Page 124: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Modoc($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Cedarville, from 0.6 mile west of CedarPass Ski Tow Road to Cedar Pass Ski Tow Road.Curve improvement.3607

1H330$3,214

$15

Subtotal: $3,229

2018-19$580$680$90

$840

$2,190Total Project Cost: $5,419

02150001506/4/20185/4/2018

9/19/2017PA&ED:

RTL:R/W Cert:

9/18/2018Begin Con:

02-Modoc-299 PriorPriorPrior18-19

201.01018 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

51.9/52.5

Con Sup:

Safety Improvements

Const:R/W:

CountyModoc

PA&ED:PS&E:

R/W Sup:Con Sup:

$15$3,214

R/W:

Subtotal: $3,229

Const:$580$680$90

$840

$2,190

Total (Capital + Support): $5,419

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 120 of 284

DRAFT

12-06

-17

Page 125: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mono($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Tom’s place, from 2.4 miles south of LowerRock Creek Road to 0.3 mile north of LowerRock Creek Road. Widen shoulders, flattenslopes, install ground in rumble strips, reconstructand install guardrail.

0662

36070$13,740

$368

Subtotal: $14,108

2020-21$922

$2,037$485

$2,799

$6,243Total Project Cost: $20,351

09140000036/30/20206/30/20208/27/2018PA&ED:

RTL:R/W Cert:

10/7/2020Begin Con:

09-Mono-395 18-1918-1918-1920-21

201.01532.4 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

6.9/9.6

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Lee Vining, from Route 167 Junction to 0.2mile north of Conway Ranch Road. Widenshoulders, install shoulder rumble strip, correctcompound curve, and improve chain control area.

2624

36640$5,490

$506

Subtotal: $5,996

2021-22$520$830$590

$1,440

$3,380Total Project Cost: $9,376

09160000064/1/20224/1/20224/1/2020PA&ED:

RTL:R/W Cert:

10/1/2022Begin Con:

09-Mono-395 18-1919-2019-2021-22

201.01560 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

58.2/60.2

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Bridgeport, from north of Devils GateSummit to Burcham Flat Road. Widen shouldersand add rumble strip.2600

34940$7,352$1,299

Subtotal: $8,651

2018-19$2,170$1,280

$350$1,729

$5,529Total Project Cost: $14,180

091200003310/31/201810/31/2018

5/3/2017PA&ED:

RTL:R/W Cert:

4/29/2019Begin Con:

09-Mono-395 PriorPriorPrior18-19

201.01549.5 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

88.4/91.6

Con Sup:

Collision Severity Reduction

Const:R/W:

In Mono County, on Route 395 at variouslocations; also, in Mono County on Route 6 atapproximately 7.0 miles north of Bishop (PM7.0). Improve the chain control turnouts bywidening and lengthening the pavement area,install lighting, improve signage, construct amedian cross-over, and construct two new chaincontrol turnouts.

2616

36660$5,710

$5

Subtotal: $5,715

2020-21$260$300$10

$740

$1,310Total Project Cost: $7,025

09160000082/1/2021

12/1/202011/1/2019PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

09-Mono-395 18-1919-2019-2020-21

201.23513 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R2.2/R69.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 121 of 284

DRAFT

12-06

-17

Page 126: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Mono($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADSIDE PRESERVATIONIn Mono County, at various locations. Advancemitigation banking credits.

2621

36670$2,300

$600

Subtotal: $2,900

2019-20$200$200$100$150

$650Total Project Cost: $3,550

09160000096/26/20205/15/20202/15/2019PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

09-Mono-395 Prior18-1918-1919-20

201.24011 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

Const:R/W:

CountyMono

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,778$34,592

R/W:

Subtotal: $37,370

Const:$4,072$4,647$1,535$6,858

$17,112

Total (Capital + Support): $54,482

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 122 of 284

DRAFT

12-06

-17

Page 127: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Monterey($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Monterey, Santa Cruz and San BenitoCounties, on various routes at various locations.Replace and install advance curve warning signs.2595

1G310$1,852

$48

Subtotal: $1,900

2018-19$754

$1,044$35

$552

$2,385Total Project Cost: $4,285

05140001405/1/2019

4/29/20197/3/2018PA&ED:

RTL:R/W Cert:

10/11/2019Begin Con:

05-Monterey-Var Prior18-1918-1918-19

201.0151107 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near King City, from 0.1 mile south ofBroadway Street to 0.1 mile north of BroadwayStreet and from Jolon Road to 0.2 mile north ofJolon Road. Landscape mitigation.

2312Y

0T991$816

Subtotal: $816

2019-20 $344

$483

$827Total Project Cost: $1,643

05160001254/24/20209/9/2019

1/29/2015PA&ED:

RTL:R/W Cert:

11/30/2020Begin Con:

05-Monterey-101Prior

19-20

201.0152 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R41.5/49.8

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Salinas, from 0.1 mile north of EastMarket Street to 0.1 mile south of Sherwood Drive. Lengthen the onramp to improve mergingconflicts.

2635

1H050$4,750

$5

Subtotal: $4,755

2021-22$700

$1,900$190

$2,000

$4,790Total Project Cost: $9,545

05160000188/6/2021

4/23/20217/1/2019PA&ED:

RTL:R/W Cert:

2/23/2022Begin Con:

05-Monterey-101 18-1919-2019-2021-22

201.0153 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

87.4/87.8

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Bradley, at Camp Roberts Safety RoadsideRest Area (SRRA). Upgrade northbound andsouthbound SRRA facilities.2633

1H020$4,873

$6

Subtotal: $4,879

2019-20 $1,763$29

$1,240

$3,032Total Project Cost: $7,911

05160000134/1/2020

12/2/20196/15/2017PA&ED:

RTL:R/W Cert:

11/12/2020Begin Con:

05-Monterey-10118-1918-1919-20

201.2354 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 123 of 284

DRAFT

12-06

-17

Page 128: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Monterey($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Monterey and San Benito Counties, from northof North Gonzalez Overcrossing to the SantaClara County line. Roadside safetyimprovements.

2571

1F900$4,368

$456

Subtotal: $4,824

2019-20$715

$1,216$175

$1,355

$3,461Total Project Cost: $8,285

051400007312/24/201912/10/20194/13/2018PA&ED:

RTL:R/W Cert:

6/15/2020Begin Con:

05-Monterey-101 PriorPriorPrior19-20

201.23552 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

73.0/96.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Pacific Grove, from 17 Mile Drive to CongressAvenue. Construct ADA compliant pathwayalong eastbound Route 68, upgrade curb rampsand sidewalk to meet ADA standards. Relocatestreetlight pole and signs, remove and replanttrees.

2647

1H220$755$20

Subtotal: $775

2021-22$313$790$48

$586

$1,737Total Project Cost: $2,512

05160000418/2/20214/1/20217/1/2019PA&ED:

RTL:R/W Cert:

2/22/2022Begin Con:

05-Monterey-68 18-1919-2019-2021-22

201.3618 ADA unit(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.5/0.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Seaside, from El Monte Road to FremontBoulevard. Construct new sidewalks/upgradepedestrian pathway and construct/upgrade curbramps to meet current standards.

2648

1H230$1,122

$356

Subtotal: $1,478

2021-22$630

$1,269$1,016

$547

$3,462Total Project Cost: $4,940

051600004210/1/20217/1/20217/1/2019PA&ED:

RTL:R/W Cert:

4/22/2022Begin Con:

05-Monterey-218 18-1919-2019-2021-22

201.36123 ADA unit(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.2/L0.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONNear Carmel-By-The Sea, at Garrapata Creek No.44-0018. Rehabilitate bridge to extend the servicelife and mitigate corrosion by applyingElectrochemical Chloride Extraction (ECE)process and waterproofing to the structure.

2654

1H460$7,400

Subtotal: $7,400

2020-21$700

$1,500$90

$2,100

$4,390Total Project Cost: $11,790

05160000771/8/2021

9/15/20204/18/2019PA&ED:

RTL:R/W Cert:

7/12/2021Begin Con:

05-Monterey-1 Prior18-1918-1920-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

63.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 124 of 284

DRAFT

12-06

-17

Page 129: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Monterey($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Soledad, from Route 146 to Front Street atthe North Soledad Overhead No. 44-91R.Rehabilitate bridge.9700

0F970$7,358$1,578

Subtotal: $8,936

2019-20$34

$2,006$58

$1,535

$3,633Total Project Cost: $12,569

051300001711/1/20197/1/20199/2/2014PA&ED:

RTL:R/W Cert:

5/27/2020Begin Con:

05-Monterey-101 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

62.1/63.2

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Big Sur, at the Castro Canon Bridge No. 44-0035. Upgrade bridge railing and approachrailings to meet current standards.2656

1H490$1,605

$41

Subtotal: $1,646

2020-21$608

$1,345$141$762

$2,856Total Project Cost: $4,502

05160000814/1/2021

12/1/202010/1/2019PA&ED:

RTL:R/W Cert:

12/1/2021Begin Con:

05-Monterey-1 18-1919-2019-2020-21

201.112542 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

43.1/43.1

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Castroville, from Route 183 to CastrovilleBoulevard. Upgrade bridge railing and widenoverhead.0900A

0A090$5,050

$467

Subtotal: $5,517

2019-20$70

$1,800$130

$1,340

$3,340Total Project Cost: $8,857

051300002811/22/2019

7/5/20199/2/2014PA&ED:

RTL:R/W Cert:

5/27/2020Begin Con:

05-Monterey-156 PriorPriorPrior19-20

201.112392 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R1.1/R2.1

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Paso Robles, at San Antonio River BridgeNo 44-0141L/R. Bridge seismic restoration.

2565

1F820$7,734

$841

Subtotal: $8,575

2019-20$1,529$1,800

$15$2,236

$5,580Total Project Cost: $14,155

05140000644/29/20202/11/20209/7/2018PA&ED:

RTL:R/W Cert:

12/30/2020Begin Con:

05-Monterey-101 Prior18-1918-1919-20

201.1132 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R6.7

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 125 of 284

DRAFT

12-06

-17

Page 130: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Monterey($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn and near Big Sur and Carmel, from TorreCanyon Bridge to San Luis Avenue. Pavementrehabilitation.2534

1F680$24,335

$31

Subtotal: $24,366

2018-19$858

$1,427$41

$2,828

$5,154Total Project Cost: $29,520

05140000466/11/20195/28/20195/31/2018PA&ED:

RTL:R/W Cert:

1/2/2020Begin Con:

05-Monterey-1 Prior18-1918-1918-19

201.12172.1 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

39.8/74.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Pacific Grove, from Forest Avenue toRoute 1. Upgrade ADA curb ramps, cold planepavement and place Rubberized Hot Mix Asphalt concrete (RHMA).

2631

1H000$7,996

$70

Subtotal: $8,066

2020-21$482

$1,638$312

$1,675

$4,107Total Project Cost: $12,173

051600001112/11/202010/26/20202/26/2019PA&ED:

RTL:R/W Cert:

7/15/2021Begin Con:

05-Monterey-68 Prior18-1918-1920-21

201.1216.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.1/L4.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Salinas, from north of North GonzalesOvercrossing to East Market Street. Pavementrehabilitation.2540

1F700$19,400

$70

Subtotal: $19,470

2018-19 $2,100$90

$2,300

$4,490Total Project Cost: $23,960

051400005510/29/2018

4/4/20186/30/2016PA&ED:

RTL:R/W Cert:

5/8/2019Begin Con:

05-Monterey-101PriorPrior18-19

201.12154 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

73.8/87.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near King City, from south of Paris Valley RoadOvercrossing to Rancho Undercrossing.Roadway rehabilitation.2546

1F740$26,950

Subtotal: $26,950

2018-19$11

$1,820$42

$3,490

$5,363Total Project Cost: $32,313

051400004912/7/20188/1/20187/1/2014PA&ED:

RTL:R/W Cert:

6/22/2020Begin Con:

05-Monterey-101 PriorPriorPrior18-19

201.12210.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R28.0/R30.6

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 126 of 284

DRAFT

12-06

-17

Page 131: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Monterey($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Salinas, from 0.4 mile south of EspinosaRoad Undercrossing to San Benito County line.Reconstruct embankment, widen shoulders,improve drainage systems, upgrade barrierrailing, cold plane pavement, place RubberizedHot Mix Asphalt concrete (RHMA) and place HotMix Asphalt (HMA) to rehabilitate roadway.

2679

1H690$104,000

$393

Subtotal: $104,393

2021-22$4,500$6,300$1,300

$12,600

$24,700Total Project Cost: $129,093

05160001408/3/2021

5/12/20219/3/2019PA&ED:

RTL:R/W Cert:

2/25/2022Begin Con:

05-Monterey-101 Prior19-2019-2021-22

201.12249 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R91.5/101.3

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Near Lucia, at 0.6 mile south of Limekiln CreekBridge. Replace culvert.

2230

0Q500$1,527

$23

Subtotal: $1,550

2019-20$936

$1,124$113$575

$2,748Total Project Cost: $4,298

05000202882/3/2020

10/28/201910/1/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

05-Monterey-1 Prior18-1918-1919-20

201.1511 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.4

Con Sup:

Drainage System Restoration

Const:R/W:

In Monterey and Santa Cruz Counties, on VariousRoutes and locations. Replace overhead signs.

2634

1H040$1,680

Subtotal: $1,680

2019-20 $1,000$38

$537

$1,575Total Project Cost: $3,255

051600001511/22/2019

7/2/20196/9/2016PA&ED:

RTL:R/W Cert:

6/17/2020Begin Con:

05-Monterey-Var18-1918-1919-20

201.17062 Sign(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

MOBILITYIn various counties, on various routes, and atvarious locations. Replace and upgrade existingdetection field elements for the TrafficManagement System (TMS).

2735

1H990$3,200

$21

Subtotal: $3,221

2019-20$585

$1,160$20

$465

$2,230Total Project Cost: $5,451

05170000474/1/20201/3/20209/5/2018PA&ED:

RTL:R/W Cert:

11/6/2020Begin Con:

05-Monterey-Var Prior18-1918-1919-20

201.31578 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 127 of 284

DRAFT

12-06

-17

Page 132: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Monterey($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Salinas, from 0.4 mile north ofAirport Boulevard Overcrossing to 0.3 mile southof San Miguel Canyon Road Overcrossing.Install vehicle detection systems, changeablemessage signs, cameras, and a vehicle pullout.

0064Q

0N200$1,500

$9

Subtotal: $1,509

2018-19$260

$1,000$45

$420

$1,725Total Project Cost: $3,234

05160000164/15/20191/11/20197/16/2018PA&ED:

RTL:R/W Cert:

9/16/2019Begin Con:

05-Monterey-101 Prior18-1918-1918-19

201.31511 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

86.0/95.8

Con Sup:

Transportation Management Systems

Const:R/W:

ROADSIDE PRESERVATIONIn Santa Barbara, San Luis Obispo, Monterey andSan Benito Counties, at various locations.Advance mitigation banking credits.2704

1H970 $2,919

Subtotal: $2,919

2018-19 $140$80

$220Total Project Cost: $3,139

0517000040

6/9/2017PA&ED:

RTL:R/W Cert:

Begin Con:

05-Monterey-VarPriorPrior

201.2403 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

Const:R/W:

MISCELLANEOUSAt Camp Roberts Safety Roadside Rest Areas;also in San Luis Obispo County on Route 46 atShandon Safety Roadside Rest Area (PM 49.5).Transportation infrastructure improvement forzero-emission vehicle charging.

2705

1J040$1,210

$5

Subtotal: $1,215

2018-19 $480$18

$715

$1,213Total Project Cost: $2,428

051700005411/1/2018

10/24/20181/31/2017PA&ED:

RTL:R/W Cert:

3/20/2019Begin Con:

05-Monterey-101PriorPrior18-19

201.9993 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R3.1/R5.2

Con Sup:

Miscellaneous

Const:R/W:

In Castroville from Del Monte Ave toWashington Street, a multi-objective AssetManagement Pilot Project. Predominate mobilityproject.

2678

1H650$13,300$2,300

Subtotal: $15,600

2021-22$2,600$3,000$6,600$3,200

$15,400Total Project Cost: $31,000

05160001184/15/20224/14/20223/5/2020PA&ED:

RTL:R/W Cert:

10/26/2022Begin Con:

05-Monterey-183 18-1919-2019-2021-22

201.9991 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R8.4/R9.8

Con Sup:

Miscellaneous

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 128 of 284

DRAFT

12-06

-17

Page 133: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Monterey($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyMonterey

PA&ED:PS&E:

R/W Sup:Con Sup:

$9,659$252,781

R/W:

Subtotal: $262,440

Const:$16,285$37,966$10,626$43,541

$108,418

Total (Capital + Support): $370,858

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 129 of 284

DRAFT

12-06

-17

Page 134: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Napa, at northbound ramps and 1st Street.Construct roundabout.

1488P

2J100$3,780

$280

Subtotal: $4,060

2018-19 $250

$1,144

$1,394Total Project Cost: $5,454

04140004263/30/20182/23/20187/18/2016PA&ED:

RTL:R/W Cert:

2/22/2019Begin Con:

04-Napa-29Prior

18-19

201.01048 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.4

Con Sup:

Safety Improvements

Const:R/W:

Near Napa, at Huichica Creek (PM 0.75).Roadway widening.

0775G

4G210$8,700

$220

Subtotal: $8,920

2018-19$1,750$1,530

$90$900

$4,270Total Project Cost: $13,190

04120003105/31/20195/31/2019

12/29/2017PA&ED:

RTL:R/W Cert:

3/13/2020Begin Con:

04-Napa-121 PriorPriorPrior18-19

201.0100 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.7

Con Sup:

Safety Improvements

Const:R/W:

MANDATESNear Calistoga, at 0.3 mile south of Bothe-NapaValley State Park entrance at Ritchie CreekBridge No. 21-0057. Replace bridge and providefinancial contributions to improve fish passagebarriers at the site and within the adjacent StatePark for compliance unit credits towardsStatewide NPDES permit mandate goals.

1464K

4J990$7,566

$590

Subtotal: $8,156

2021-22$1,820$1,300

$167$1,300

$4,587Total Project Cost: $12,743

04160000376/1/20225/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

04-Napa-28 18-1920-2120-2121-22

201.33570 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

33.1

Con Sup:

Storm Water Mitigation

Const:R/W:

In and near the cities of American Canyon andNapa, from Kimberly Drive to Salvador Avenue.Upgrade curb ramps and pedestrian push buttons,and install new sidewalk to make facilitiescompliant with ADA requirements.

1496E

0K000$989$80

Subtotal: $1,069

2021-22$275$276$92

$203

$846Total Project Cost: $1,915

04160000401/2/2022

10/1/20213/1/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

04-Napa-29 18-1920-2118-1921-22

201.36127 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.2/14.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 130 of 284

DRAFT

12-06

-17

Page 135: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Napa, at Capell Creek Bridge No. 21-0064.Bridge rehabilitation.

1489K

4J210$2,440

$225

Subtotal: $2,665

2019-20$490$735$100$735

$2,060Total Project Cost: $4,725

04150002884/15/20203/1/20209/1/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

04-Napa-121 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.6

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Rutherford, at Hopper Slough Bridge No. 20-0019. Replace bridge.

1451C

4J830$7,864$1,514

Subtotal: $9,378

2021-22$2,074$1,988

$206$2,014

$6,282Total Project Cost: $15,660

04160000385/2/20224/4/2022

10/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

04-Napa-128 18-1920-2119-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

5.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Calistoga, at Napa River Bridge No. 21-0018.Environmental mitigation and plant establishmentfor bridge replacement project.0587M

3G64A$500$85

Subtotal: $585

2018-19 $640$400$150

$1,190Total Project Cost: $1,775

04160003496/28/20196/14/20192/9/2015PA&ED:

RTL:R/W Cert:

12/27/2019Begin Con:

04-Napa-29PriorPrior18-19

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

37.0

Con Sup:

Bridge Scour Mitigation

Const:R/W:

In and near the cities of Napa and Yountville, atCraig Creek Bridge No. 21-0048 (PM 14.11), DryCreek Bridge No. 21-0014 (PM 16.48), PerfumeCreek Bridge No. 21-0051 (PM 17.81), and California Drive Undercrossing No. 21-0047 (PM19.04). Upgrade bridge rails and widen shouldersto make standard.

1494E

0K630$7,111

$295

Subtotal: $7,406

2021-22$1,600$1,200

$350$1,500

$4,650Total Project Cost: $12,056

04160001114/15/20221/31/20226/30/2020PA&ED:

RTL:R/W Cert:

12/15/2022Begin Con:

04-Napa-29 18-1920-2120-2121-22

201.112682 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

14.1/19.0

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 131 of 284

DRAFT

12-06

-17

Page 136: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Saint Helena and Calistoga, at MillCreek Bridge No. 21-0056, Garnett Creek BranchBridge No. 21-0111, and No Name Creek BridgeNo. 21-0100. Bridge preventive maintenance.

1482P

2J770$2,844

$495

Subtotal: $3,339

2019-20$900$710$236$850

$2,696Total Project Cost: $6,035

04150000034/15/20203/1/20209/1/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

04-Napa-29 Prior18-1918-1919-20

201.1193 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

32.1/42.8

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Near Calistoga, at Garnett Creek Bridge No. 21-0005. Bridge preventative maintenance.

1483E

2J880$1,100

$317

Subtotal: $1,417

2019-20$1,320$1,100

$330$1,100

$3,850Total Project Cost: $5,267

04150000214/15/20203/1/20209/1/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

04-Napa-29 Prior18-1918-1919-20

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

39.1

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONIn and near St. Helena and Calistoga, from YorkCreek Bridge to Route 128. Pavementrehabilitation.1490D

4J300$9,647

$20

Subtotal: $9,667

2020-21$900

$1,100$44

$1,100

$3,144Total Project Cost: $12,811

041500032011/2/202010/1/202010/1/2019PA&ED:

RTL:R/W Cert:

6/30/2021Begin Con:

04-Napa-29 Prior19-2019-2020-21

201.12115.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

29.3/36.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In American Canyon, at Rio Del Mar; also, nearAmerican Canyon at 0.3 mile south of NorthKelly Road (PM 5.1). Rehabilitate culverts.1453K

4J410$3,336

$294

Subtotal: $3,630

2021-22$1,086

$786$350$706

$2,928Total Project Cost: $6,558

04150003436/30/20225/2/2022

11/2/2020PA&ED:

RTL:R/W Cert:

1/11/2023Begin Con:

04-Napa-29 Prior20-2120-2121-22

201.1512 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.7/5.1

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 132 of 284

DRAFT

12-06

-17

Page 137: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyNapa

PA&ED:PS&E:

R/W Sup:Con Sup:

$4,415$55,877

R/W:

Subtotal: $60,292

Const:$12,215$11,615$2,365

$11,702

$37,897

Total (Capital + Support): $98,189

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 133 of 284

DRAFT

12-06

-17

Page 138: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Nevada City, from 0.1 mile east of WhiteCloud Campground to 0.9 mile west of Washington Road. Curve improvement, shoulderwidening and improve clear recovery zone.

3994

0H240$8,237

$613

Subtotal: $8,850

2019-20$1,096

$976$291

$1,286

$3,649Total Project Cost: $12,499

03150001165/1/20205/1/20202/1/2019PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

03-Nevada-20 Prior18-1918-1919-20

201.01046 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

29.7/30.9

Con Sup:

Safety Improvements

Const:R/W:

Near Emigrant Gap, from 0.3 mile west ofExcelsior Point Road to 1.3 mile west ofZeibright Road. Curve improvement and widen shoulders.

4000

2H620$27,480$1,380

Subtotal: $28,860

2019-20$3,920$2,810

$410$3,480

$10,620Total Project Cost: $39,480

03170001655/15/20204/15/20202/1/2019PA&ED:

RTL:R/W Cert:

11/15/2020Begin Con:

03-Nevada-20 Prior18-1918-1919-20

201.01052 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

37.1/39.8

Con Sup:

Safety Improvements

Const:R/W:

Near Rollins Lake, from Maple Way to You BetRoad. Realign roadway curves.

4451

4F370$17,000$2,503

Subtotal: $19,503

2018-19$1,700$2,100$2,300$3,200

$9,300Total Project Cost: $28,803

03140001522/1/20192/1/20199/2/2016PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

03-Nevada-174 18-19PriorPrior18-19

201.01072 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.7/4.7

Con Sup:

Safety Improvements

Const:R/W:

In and near Truckee, from east of KingvaleUndercrossing to west of Union Mills Bridge andOverhead. Replace guardrail with concretebarrier.

4288

4F600$6,220

$62

Subtotal: $6,282

2018-19$410$660$30

$770

$1,870Total Project Cost: $8,152

031400022811/1/2018

10/15/20188/23/2017PA&ED:

RTL:R/W Cert:

4/1/2019Begin Con:

03-Nevada-80 PriorPriorPrior18-19

201.01524 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/20.0

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 134 of 284

DRAFT

12-06

-17

Page 139: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Truckee, at various locations from 1.0mile east of Donner Lake Undercrossing to theSierra County Line. Replace guardrail withconcrete barrier at 21 locations to reducemaintenance repairs.

4297

1H840$3,200

$30

Subtotal: $3,230

2020-21$120$180$30

$360

$690Total Project Cost: $3,920

031700000810/15/202010/1/20207/15/2019PA&ED:

RTL:R/W Cert:

4/15/2021Begin Con:

03-Nevada-80 18-1919-2019-2020-21

201.01530 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R10.0/31.7

Con Sup:

Collision Severity Reduction

Const:R/W:

MANDATESIn Grass Valley, from Park Street to Route 20.Upgrade pedestrian infrastructure to meet ADArequirements.4450

3F680$1,660

$150

Subtotal: $1,810

2018-19$180$330$86

$360

$956Total Project Cost: $2,766

03130000473/15/20203/5/20204/5/2018PA&ED:

RTL:R/W Cert:

9/2/2020Begin Con:

03-Nevada-174 PriorPriorPrior18-19

201.36185.7 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.7/10.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

ROADWAY PRESERVATIONNear Truckee and Floriston, from 0.2 mile east ofTruckee River Bridge to 0.8 mile west of FaradRoad. Construct measures to address cut-slopeerosion and rockfall.

4293

1H010$11,400

$90

Subtotal: $11,490

2020-21$570

$1,150$160

$1,020

$2,900Total Project Cost: $14,390

031600004610/15/20209/15/20208/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-Nevada-80 18-1919-2019-2020-21

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

28.3/28.7

Con Sup:

Roadway Protective Betterments

Const:R/W:

Near Truckee, from east of Floriston Road to westof Farad Undercrossing. Stabilize cut-slope.

4287

3F250$9,690

$200

Subtotal: $9,890

2018-19$570$840$110

$1,110

$2,630Total Project Cost: $12,520

03120001335/31/20195/15/20194/1/2018PA&ED:

RTL:R/W Cert:

11/30/2019Begin Con:

03-Nevada-80 PriorPriorPrior18-19

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

29.1/29.4

Con Sup:

Roadway Protective Betterments

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 135 of 284

DRAFT

12-06

-17

Page 140: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Truckee and Floriston, from Farad Road to2.17 mile west of Sierra County line. Mitigaterockfall and stabilize cut-slope erosion withdraped mesh and a drainage ditch.

4298

2H000$3,400

$90

Subtotal: $3,490

2020-21$440$750$280$610

$2,080Total Project Cost: $5,570

031700004410/15/202010/1/20201/2/2019PA&ED:

RTL:R/W Cert:

4/15/2021Begin Con:

03-Nevada-80 18-1918-1918-1920-21

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

29.5/29.7

Con Sup:

Roadway Protective Betterments

Const:R/W:

Near Truckee and Floriston, from 1.9 miles eastof Farad Road to the Sierra County line.Construct mitigation measures to reduce rockfallonto the roadway.

4299

2H690$6,200

$30

Subtotal: $6,230

2021-22$410$890$120

$1,080

$2,500Total Project Cost: $8,730

031700017210/15/202110/1/20218/1/2019PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

03-Nevada-80 18-1919-2019-2021-22

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

31.3/31.8

Con Sup:

Roadway Protective Betterments

Const:R/W:

Near Higgins Corner, from the Placer County lineto 0.3 mile north of Lime Kiln Road; also, inPlacer County at PM R8.42 and PM R10.23.Rehabilitate drainage systems.

4124

0H210$3,257

$325

Subtotal: $3,582

2021-22$513$743$547$607

$2,410Total Project Cost: $5,992

031500011210/15/202110/1/20211/2/2020PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

03-Nevada-49 Prior19-2019-2021-22

201.15124 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/7.5

Con Sup:

Drainage System Restoration

Const:R/W:

In and near Grass Valley, from Lime Kiln Roadto Route 20. Rehabilitate culverts.

4123

0H220$2,970

$80

Subtotal: $3,050

2018-19$440$550$350$590

$1,930Total Project Cost: $4,980

03150001134/30/20194/15/20198/31/2017PA&ED:

RTL:R/W Cert:

10/30/2019Begin Con:

03-Nevada-49 PriorPriorPrior18-19

201.15138 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.5/R14.4

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 136 of 284

DRAFT

12-06

-17

Page 141: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MOBILITYNear Nevada City and Emigrant Gap, at west ofPine Needle Way (PM 25.15), and at west of LastChance Mine Road (PM 37.05); also, in PlacerCounty on Route 193 near Newcastle, at variouslocations from PM 6.7 to 8.5. Operational improvements to upgrade or construct roadwayturnouts at five locations.

3997

0H690$1,280

$110

Subtotal: $1,390

2020-21$170$280$120$460

$1,030Total Project Cost: $2,420

031600000610/1/20209/1/20207/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-Nevada-20 18-1919-2019-2020-21

201.31020 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

25.1/25.2

Con Sup:

Operational Improvements

Const:R/W:

Near Nevada City and Junction House, from eastof Conservation Road (Washington Ridge Road)to east of Washington Road. Operationalimprovements to widen for left-turn pockets androadway turnouts.

3996

0H660$1,900

$90

Subtotal: $1,990

2020-21$340$470$60

$530

$1,400Total Project Cost: $3,390

03160000043/1/20212/1/20212/1/2020PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

03-Nevada-20 18-1919-2019-2020-21

201.31020 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

28.0/32.4

Con Sup:

Operational Improvements

Const:R/W:

Near Bear Valley and Emigrant Gap, from 2.0miles east of Chalk Bluff Road to 0.2 mile west ofExcelsior Point Road. Operational improvement to make existing roadway turnout standard widthwith shoulders.

3999

1H810$1,900

$20

Subtotal: $1,920

2020-21$340$530$140$410

$1,420Total Project Cost: $3,340

031700000510/15/202010/1/202010/1/2019PA&ED:

RTL:R/W Cert:

4/15/2021Begin Con:

03-Nevada-20 18-1919-2019-2020-21

201.31010 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

36.8/37.0

Con Sup:

Operational Improvements

Const:R/W:

In various counties, on various routes at variouslocations. Repair and install vehicle census countstations.4125

0H420$9,200

$30

Subtotal: $9,230

2019-20$1,000$1,000

$180$1,800

$3,980Total Project Cost: $13,210

031500016610/1/20199/1/20191/1/2018PA&ED:

RTL:R/W Cert:

4/15/2020Begin Con:

03-Nevada-49 PriorPriorPrior19-20

201.315470 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 137 of 284

DRAFT

12-06

-17

Page 142: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyNevada

PA&ED:PS&E:

R/W Sup:Con Sup:

$5,803$114,994

R/W:

Subtotal: $120,797

Const:$12,219$14,259$5,214

$17,673

$49,365

Total (Capital + Support): $170,162

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 138 of 284

DRAFT

12-06

-17

Page 143: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Huntington Beach, at 6th Street; also in SealBeach at Seal Beach Boulevard (PM 32.7). Modify traffic signals and install additionallighting.

2527

0N850$835$67

Subtotal: $902

2019-20$150$412$221$386

$1,169Total Project Cost: $2,071

12140001166/15/20196/5/2019

1/22/2018PA&ED:

RTL:R/W Cert:

12/11/2019Begin Con:

12-Orange-1 PriorPriorPrior19-20

201.01047 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

24.9

Con Sup:

Safety Improvements

Const:R/W:

In Huntington Beach, from Seapoint Street toWarner Avenue at Boisa Chica State Beach.Construct rumble strips and install outerseparation barrier in southbound direction.

2470A

0Q280$1,148

Subtotal: $1,148

2019-20$515$605

$492

$1,612Total Project Cost: $2,760

12160001201/30/20201/15/2020

12/15/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

12-Orange-1 Prior18-19

19-20

201.0102 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

27.0/29.9

Con Sup:

Safety Improvements

Const:R/W:

In Anaheim, on the northbound Harbor Boulevardofframp; also on the southbound HarborBoulevard onramp. Modify traffic signal systemand apply High Friction Surface Treatment(HFST).

2861F

0Q300$1,432

$18

Subtotal: $1,450

2018-19 $1,285

$493

$1,778Total Project Cost: $3,228

12160001236/5/20195/3/2019

6/16/2017PA&ED:

RTL:R/W Cert:

11/15/2019Begin Con:

12-Orange-5Prior

18-19

201.01038 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

37.3/37.4

Con Sup:

Safety Improvements

Const:R/W:

In Garden Grove, at westbound onramp fromEuclid Street. Overlay with open graded frictioncourse.2930

0P980$430

Subtotal: $430

2018-19 $381

$251

$632Total Project Cost: $1,062

12160000708/1/20187/2/2018

6/16/2017PA&ED:

RTL:R/W Cert:

4/3/2019Begin Con:

12-Orange-22Prior

18-19

201.01017 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R6.9

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 139 of 284

DRAFT

12-06

-17

Page 144: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of Orange and Santa Ana, fromLewis Street Overcrossing to east of Bristol StreetUndercrossing; also on Route 57, from PM10.9/11.9. Replace concrete median barrier andadd lighting in median.

2981

0P520$3,815

$5

Subtotal: $3,820

2019-20$591

$1,247

$1,257

$3,095Total Project Cost: $6,915

12150001373/2/20202/1/20208/7/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

12-Orange-22 Prior18-19

19-20

201.01036 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R9.4/R10.1

Con Sup:

Safety Improvements

Const:R/W:

In Huntington Beach, Westminster and GardenGrove, at the intersections of Heil Avenue (PM5.14), MacDonald Street (PM 5.30) and TraskAvenue (PM 8.14); also on Route 90 in Brea atthe intersection of Castlegate Lane/PlacentiaAvenue (PM 5.93). Modify existing signals andlighting and upgrade ADA facilities to currentstandards.

3167

0P010$1,570

$400

Subtotal: $1,970

2018-19$500$750$420$720

$2,390Total Project Cost: $4,360

12150000226/7/20196/3/2019

12/5/2017PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

12-Orange-39 PriorPriorPrior18-19

201.010141 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.1/8.1

Con Sup:

Safety Improvements

Const:R/W:

In the city of La Habra, at Fashion Square Lane.Modify traffic signal and add lighting.

3279

0Q290$709$10

Subtotal: $719

2018-19$185$320

$260

$765Total Project Cost: $1,484

12160001226/1/20195/1/20198/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

12-Orange-39 Prior18-19

18-19

201.01025 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

19.4

Con Sup:

Safety Improvements

Const:R/W:

In Tustin, on the 4th Street northbound offramp.Modify traffic signals and install additionallighting.3510

0N630$646$11

Subtotal: $657

2018-19$100$427

$318

$845Total Project Cost: $1,502

12140000731/2/2019

12/11/201812/2/2017PA&ED:

RTL:R/W Cert:

6/11/2019Begin Con:

12-Orange-55 PriorPrior

18-19

201.01011 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.7

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 140 of 284

DRAFT

12-06

-17

Page 145: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Laguna Beach, on southbound Route 73, fromRoute 133 to 0.2 mile north of Route 133.Modify superelevation, install drainage inlets,place OGAC and place pavement delineation.

4096P

0N840$980

Subtotal: $980

2018-19 $637

$410

$1,047Total Project Cost: $2,027

121400011512/10/201811/15/20183/21/2017PA&ED:

RTL:R/W Cert:

7/29/2019Begin Con:

12-Orange-73Prior

18-19

201.01057 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.8/17.1

Con Sup:

Safety Improvements

Const:R/W:

In Newport Beach, on the Route 73 southboundofframp to MacArthur Boulevard. Widen ramp,install traffic signal and guardrail.4096R

0N860$4,202

$19

Subtotal: $4,221

2019-20$500

$1,500$30

$1,052

$3,082Total Project Cost: $7,303

12140001232/28/20202/3/20203/1/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

12-Orange-73 PriorPriorPrior19-20

201.01082 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

24.0

Con Sup:

Safety Improvements

Const:R/W:

Near San Juan Capistrano, from east of AntonioParkway/La Pata Avenue to west of Conrockentrance. Landscape and plant establishmentproject.

4124B

0L722$850$20

Subtotal: $870

2018-19 $400

$620

$1,020Total Project Cost: $1,890

121400010412/30/2018

8/1/20184/1/2018PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

12-Orange-74Prior

18-19

201.0108 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.9/5.1

Con Sup:

Safety Improvements

Const:R/W:

In the Cleveland National Forest, from 0.9 milewest of San Juan Fire Station to theOrange/Riverside County line. Super elevationcorrections, shoulder widening, Open GradedAsphalt Concrete (OGAC) overlay and applyHigh Friction Surface Treatment (HFST).

4218

0P030$35,611

$719

Subtotal: $36,330

2019-20$2,965$4,826$1,018$7,206

$16,015Total Project Cost: $52,345

12150000246/2/20206/1/2020

10/3/2018PA&ED:

RTL:R/W Cert:

1/4/2021Begin Con:

12-Orange-74 Prior18-1918-1919-20

201.010160 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.5/16.6

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 141 of 284

DRAFT

12-06

-17

Page 146: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Buena Park, on the 91 eastbound connectorfrom northbound Route 39 (Beach Boulevard).Overlay Hot Mix Asphalt (HMA) Open GradedFriction Course (OGFC).

4533A

0Q040$540

Subtotal: $540

2018-19 $360

$320

$680Total Project Cost: $1,220

121600007810/1/20187/1/2018

6/16/2017PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

12-Orange-91Prior

18-19

201.01017 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R2.8

Con Sup:

Safety Improvements

Const:R/W:

In Laguna Beach, at and north of Canyon AcresDrive. Extend the northbound lane reductiontransition.4769

0N870$1,189

$536

Subtotal: $1,725

2018-19 $1,100$150$789

$2,039Total Project Cost: $3,764

121400012411/1/201810/1/20181/4/2016PA&ED:

RTL:R/W Cert:

6/19/2019Begin Con:

12-Orange-133PriorPrior18-19

201.01034 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.9/1.2

Con Sup:

Safety Improvements

Const:R/W:

In Laguna Beach, from 1700 feet south to 1300feet north of El Toro Road. Extend lanes in bothdirections.4793

0N060$6,032$1,230

Subtotal: $7,262

2019-20$1,215$1,820

$550$2,109

$5,694Total Project Cost: $12,956

12130000975/22/20204/3/20209/1/2017PA&ED:

RTL:R/W Cert:

2/5/2021Begin Con:

12-Orange-133 PriorPriorPrior19-20

201.01065 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.1/3.6

Con Sup:

Safety Improvements

Const:R/W:

In Irvine, from Walnut Road to north ofnorthbound Jamboree Road Overcrossing. Install double thrie-beam barrier to prevent cross-mediancollisions.

4926F

0Q130$510

$0

Subtotal: $510

2018-19$0

$412$0

$320

$732Total Project Cost: $1,242

121600009111/15/201811/1/20186/19/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

12-Orange-26118-19

18-19

201.0103 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/0.3

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 142 of 284

DRAFT

12-06

-17

Page 147: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Irvine and Costa Mesa, from Jamboree Road toRoute 73. Replace existing temporary railing withpermanent concrete barrier.4995A

0P220$2,710

Subtotal: $2,710

2018-19$200

$1,300

$1,000

$2,500Total Project Cost: $5,210

121500005312/3/2018

11/15/20188/31/2017PA&ED:

RTL:R/W Cert:

6/11/2019Begin Con:

12-Orange-405 PriorPrior

18-19

201.0108 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.9/10.3

Con Sup:

Safety Improvements

Const:R/W:

In the cities of San Juan Capistrano, LagunaNigel, Laguna Hills, Aliso Viejo, Laguna Beach,Irvine, Newport Beach, and Costa Mesa fromRoute 5 to Route 405. Upgrade highway safetyfeatures.

4051A

0N720$16,500

Subtotal: $16,500

2019-20$730

$2,600$58

$3,200

$6,588Total Project Cost: $23,088

12140000932/5/2020

12/20/20198/31/2017PA&ED:

RTL:R/W Cert:

9/18/2020Begin Con:

12-Orange-73 PriorPriorPrior19-20

201.015108 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.0/28.0

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Laguna Beach and Irvine, from ElToro Road to Route 241. Flatten steepembankments, replace and upgrade guardrail andterminal systems, install thrie-beam medianbarrier and replace K-rail with concrete barrier.

4795A

0N660$9,500

Subtotal: $9,500

2018-19$830

$1,943$70

$2,165

$5,008Total Project Cost: $14,508

12140000774/5/2019

3/15/201912/15/2017PA&ED:

RTL:R/W Cert:

9/9/2019Begin Con:

12-Orange-133 PriorPriorPrior18-19

201.01563 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.4/13.6

Con Sup:

Collision Severity Reduction

Const:R/W:

In Santa Ana, from south of 4th Street toBroadway. Roadside safety improvements.

2841

0N510$1,900

Subtotal: $1,900

2018-19$285$390

$325

$1,000Total Project Cost: $2,900

12140000543/1/20192/1/20194/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

12-Orange-5 PriorPrior

18-19

201.23536 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

31.0/33.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 143 of 284

DRAFT

12-06

-17

Page 148: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Anaheim, from Santa Ana Bridge No.55-0811 to 0.6 mile south of Harbor BoulevardOvercrossing. Enhance highway worker safetyby access trails and access gates, relocatingfacilities away from traffic, and installing featuresto reduce repetitive maintenance activities.

2860N

0P900$2,000

$0

Subtotal: $2,000

2020-21$270$400

$0$330

$1,000Total Project Cost: $3,000

121600004610/1/20209/1/20208/1/2019PA&ED:

RTL:R/W Cert:

9/1/2021Begin Con:

12-Orange-5 18-1918-19

20-21

201.23540 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

34.5/36.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Anaheim, from north of Anaheim Boulevard toSanta Ana Street. Enhance highway workersafety by access trails and access gates, relocatingfacilities away from traffic, and installing featuresto reduce repetitive maintenance activities.

2861E

0P910$2,000

$0

Subtotal: $2,000

2020-21$200$400

$0$400

$1,000Total Project Cost: $3,000

12160000472/1/2021

12/1/202012/1/2019PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

12-Orange-5 18-1918-19

20-21

201.23540 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

36.8/38.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Anaheim, from Santa Ana Street Overcrossing(OC) to 0.3 mile south of Magnolia Avenue OC.Enhance highway worker safety by pavingmiscellaneous areas, install access gates, andrelocate irrigation facilities away from the edge ofthe road.

2861Z

0P920$2,000

$0

Subtotal: $2,000

2021-22$200$400

$0$400

$1,000Total Project Cost: $3,000

121600004410/1/20219/1/20218/1/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

12-Orange-5 19-2020-21

21-22

201.23540 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

38.5/41.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Fullerton and Buena Park, from MagnoliaAvenue to Stanton Avenue; also, on Route 91from Stanton Avenue to Brookhurst Street (PMR2.8/1.2). Enhance highway worker safety byaccess trails and access gates, relocating facilitiesaway from traffic, and installing features toreduce repetitive maintenance activities.

2862H

0P930$2,000

$0

Subtotal: $2,000

2021-22$200$400

$0$400

$1,000Total Project Cost: $3,000

12160000454/1/20222/1/20221/1/2021PA&ED:

RTL:R/W Cert:

4/1/2023Begin Con:

12-Orange-5 19-2020-21

21-22

201.23580 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

41.9/43.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 144 of 284

DRAFT

12-06

-17

Page 149: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of Orange, from La Veta Avenue toRoute 91. Roadside safety improvements.

3535

0N530$2,000

Subtotal: $2,000

2019-20$300$440

$360

$1,100Total Project Cost: $3,100

12140000563/30/20203/1/20204/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

12-Orange-55 Prior18-19

19-20

201.23532 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.2/R17.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Irvine, and Costa Mesa, from Von KarmenAvenue to west of Harbor Boulevard. Roadsidesafety improvements.4999D

0N520$1,900

Subtotal: $1,900

2019-20$285$390

$325

$1,000Total Project Cost: $2,900

121400005511/30/201910/1/201910/1/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

12-Orange-405 Prior18-19

19-20

201.23520 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.3/11.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Newport Beach, from 815 feet south of ReefPoint Drive to 1,850 feet north of Crystal HeightsDrive. Restore bioswales.2322B

0P660$1,827

$0

Subtotal: $1,827

2020-21$271$628

$0$501

$1,400Total Project Cost: $3,227

12150001587/1/20205/1/20207/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

12-Orange-1 18-1919-20

20-21

201.3359 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

12.2/13.3

Con Sup:

Storm Water Mitigation

Const:R/W:

In San Juan Capistrano, from El Horno Street tosouth of Junipero Serra Road; also in Irvine, fromRoute 133 to south of Sand Canyon Avenue (PM23.2/R23.7). Reconstruct slopes and applyvegetation to control sediment transport.

2632A

0P090$2,729

Subtotal: $2,729

2019-20$400$600$50

$650

$1,700Total Project Cost: $4,429

12150000342/3/2020

12/2/201910/5/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

12-Orange-5 Prior18-1918-1919-20

201.3352.5 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.1/10.6

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 145 of 284

DRAFT

12-06

-17

Page 150: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Brea, from south of Lambert Road toLos Angeles County Line (PM R22.551).Construct storm water treatment BestManagement Practices (BMP) in the form of newdetention basin to reduce Trash Total MaximumDaily Load (TMDL) to the San Gabriel-CoyoteCreek watershed.

3846B

0Q270$6,797

$0

Subtotal: $6,797

2021-22$887

$1,200$0

$1,500

$3,587Total Project Cost: $10,384

12160001173/1/20222/1/20225/1/2020PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

12-Orange-57 18-1919-20

21-22

201.33514.9 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

20.8/R22.6

Con Sup:

Storm Water Mitigation

Const:R/W:

In Brea, from east of Chino Hills State Parkentrance to east of Olinda Drive. Storm watermitigation.5380A

0N730$3,100

$200

Subtotal: $3,300

2019-20$456$800$380$785

$2,421Total Project Cost: $5,721

12140000956/2/20205/4/2020

10/1/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

12-Orange-142 Prior18-1918-1919-20

201.3351.74 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.5/4.7

Con Sup:

Storm Water Mitigation

Const:R/W:

In Laguna Beach, from 7th Avenue to north ofMoss Street. Upgrade existing curb ramps,sidewalks, and driveways to ADA standards.2255

0P690$1,909$3,121

Subtotal: $5,030

2020-21$0

$3,399$2,864$3,551

$9,814Total Project Cost: $14,844

121600000310/1/20209/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

12-Orange-118-1918-1920-21

201.36156 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

5.5/7.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In San Juan Capistrano, from Route 5 to the SanJuan Capistrano city line. Upgrade pedestrianfacilities to meet current ADA standards.4097C

0M090$1,620

$122

Subtotal: $1,742

2018-19$327$940$600

$1,128

$2,995Total Project Cost: $4,737

12000203026/15/20196/3/20197/3/2017PA&ED:

RTL:R/W Cert:

3/5/2020Begin Con:

12-Orange-74 PriorPriorPrior18-19

201.36148 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.1/1.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 146 of 284

DRAFT

12-06

-17

Page 151: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Laguna Beach, from south of Ruby Street toLedroit Street. Upgrade pedestrian facilities toADA standards.2300

0M820$3,566

$815

Subtotal: $4,381

2019-20$1,225$1,825$1,450$1,600

$6,100Total Project Cost: $10,481

12140000417/19/20197/5/2019

12/5/2017PA&ED:

RTL:R/W Cert:

2/10/2020Begin Con:

12-Orange-1 PriorPriorPrior19-20

201.378187 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.9/10.5

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

BRIDGE PRESERVATIONIn Laguna Beach, at Route 133 (BroadwayStreet). Replace bridge.

2293

0M990$1,550

$800

Subtotal: $2,350

2019-20$270$650$790$600

$2,310Total Project Cost: $4,660

12130000865/28/20195/28/201912/1/2017PA&ED:

RTL:R/W Cert:

11/19/2019Begin Con:

12-Orange-1 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.3

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Costa Mesa, at the Route 55/73 ConnectorOvercrossing Bridge No. 55-538F (PM 4.74),Route 91 Carmenita Road PedestrianOvercrossing Bridge No. 55-0473 (PM 0.02) andRoute 405 Laguna Canyon Road OvercrossingBridge No. 55-0247 (PM 2.20). Seismicrestoration.

3450A

0Q390$15,456

Subtotal: $15,456

2020-21$1,048$2,279

$11$5,381

$8,719Total Project Cost: $24,175

12170000032/2/20211/1/2021

9/25/2019PA&ED:

RTL:R/W Cert:

9/9/2021Begin Con:

12-Orange-Var 18-1919-2019-2020-21

201.1133 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Bridge Seismic Restoration

Const:R/W:

ROADWAY PRESERVATIONIn Laguna Beach and Newport Beach, from southof Vista Del Sol to Newport Coast Drive. Coldplane pavement and place Rubberized Hot MixAsphalt concrete (RHMA).

2246

0H150$12,160

$65

Subtotal: $12,225

2019-20 $3,200

$2,950

$6,150Total Project Cost: $18,375

12160000556/1/2020

12/24/20198/30/2005PA&ED:

RTL:R/W Cert:

1/4/2021Begin Con:

12-Orange-1Prior

19-20

201.12136 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.7/14.1

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 147 of 284

DRAFT

12-06

-17

Page 152: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Huntington Beach, from Warner Avenue toLos Angeles County line. Upgrade ADA curbramps, cold plane pavement, and place Rubberized Hot Mix Asphalt concrete (RHMA).

2499A

0P590$8,770

$111

Subtotal: $8,881

2019-20$1,720$2,932$1,245$2,358

$8,255Total Project Cost: $17,136

12150001495/15/20205/1/2020

10/15/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

12-Orange-1 Prior18-1918-1919-20

201.12114.9 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

29.9/33.7

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Brea, from Harbor Boulevard toRandolph Avenue. Cold plane pavement andplace Rubberized Hot Mix Asphalt concrete(RHMA).

4337

0P580$8,208

Subtotal: $8,208

2019-20$478

$1,249$129

$2,269

$4,125Total Project Cost: $12,333

12150001481/30/202012/3/201911/1/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

12-Orange-90 Prior18-1918-1919-20

201.12111.7 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.6/5.1

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In the city of Anaheim, from west of LakeviewAvenue to Orange/Riverside County line.Pavement rehabilitation.4609B

0N320$5,750

Subtotal: $5,750

2018-19 $1,740

$1,740

$3,480Total Project Cost: $9,230

12130001964/1/20193/1/20196/3/2015PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

12-Orange-91Prior

18-19

201.12190 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R9.8/R18.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Newport Beach, from north of SuperiorAvenue to 60th Street. Rehabilitate drainagesystem.2403A

0N930$1,095

$10

Subtotal: $1,105

2018-19$250$400

$400

$1,050Total Project Cost: $2,155

12150000094/2/20192/1/2019

10/20/2017PA&ED:

RTL:R/W Cert:

11/6/2019Begin Con:

12-Orange-1 PriorPrior

18-19

201.15114 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.5/20.9

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 148 of 284

DRAFT

12-06

-17

Page 153: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Clemente, adjacent to northbound AvenidaPico offramp. Restore hydraulic capacity of channel by repairing concrete panels in channelslope and bottom.

2563

0P700$4,303

$15

Subtotal: $4,318

2019-20$452$963$111

$1,080

$2,606Total Project Cost: $6,924

12160000046/1/20205/1/20203/1/2019PA&ED:

RTL:R/W Cert:

12/11/2020Begin Con:

12-Orange-5 Prior18-1918-1919-20

201.1511 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.3

Con Sup:

Drainage System Restoration

Const:R/W:

In Garden Grove, at Haster Street westboundofframp. Upgrade drainage system.

2948

0N920$1,149

$326

Subtotal: $1,475

2019-20$234$410$30

$468

$1,142Total Project Cost: $2,617

12150000105/1/20194/1/20198/1/2017PA&ED:

RTL:R/W Cert:

1/2/2020Begin Con:

12-Orange-22 PriorPriorPrior19-20

201.1518 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R9.1

Con Sup:

Drainage System Restoration

Const:R/W:

In Buena Park, from Auto Center Drive to CraigAvenue. Rehabilitate drainage systems, installnew inlets, reinforced concrete pipes (RCP) andreplace flood damaged sections of curb andgutters.

3230A

0F970$2,226

$414

Subtotal: $2,640

2019-20 $870$153$906

$1,929Total Project Cost: $4,569

121200003111/15/201911/1/20196/26/2017PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

12-Orange-39PriorPrior19-20

201.15124 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

15.2/15.9

Con Sup:

Drainage System Restoration

Const:R/W:

In Orange County, from 0.3 mile south of El ToroRoad to 0.2 mile north of Route 73/133 Interchange. Construct detention basin,reconstruct channel, extend reinforced concretebox and regrade to prevent adverse flow.

4792

0Q360$2,095$1,467

Subtotal: $3,562

2019-20$1,125$1,712

$766$1,188

$4,791Total Project Cost: $8,353

12160001336/15/20204/17/202010/2/2018PA&ED:

RTL:R/W Cert:

1/5/2021Begin Con:

12-Orange-133 Prior18-1918-1919-20

201.1512 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.1/R4.3

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 149 of 284

DRAFT

12-06

-17

Page 154: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MOBILITYIn the cities of Santa Ana and Tustin, from DyerRoad onramp to Edinger Avenue offramp. Construct northbound auxiliary lane.3483

0G950$13,100$24,500

Subtotal: $37,600

2019-20$200

$3,500$2,700$2,800

$9,200Total Project Cost: $46,800

12150000456/15/20206/3/2019

9/11/2017PA&ED:

RTL:R/W Cert:

12/23/2020Begin Con:

12-Orange-55 PriorPriorPrior19-20

201.3102216 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R8.0/R9.2

Con Sup:

Operational Improvements

Const:R/W:

In Irvine, from SB 5/SB 133 Connector to SB133/NB 405 Connector. Construct a newauxiliary lane to improve traffic flow.4846

0N890$14,926

$253

Subtotal: $15,179

2021-22$1,503$3,224

$652$4,544

$9,923Total Project Cost: $25,102

121400013010/1/20219/1/2021

11/1/2019PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

12-Orange-133 18-1919-2019-2021-22

201.310221 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

8.5/M9.3

Con Sup:

Operational Improvements

Const:R/W:

In Irvine, from Route 133 to Sand CanyonAvenue; also from Sand Canyon Avenue toUniversity Drive/Jeffery Road. Constructsouthbound auxiliary lanes.

4956A

0H045$6,000

Subtotal: $6,000

2018-19

$2,200

$2,200Total Project Cost: $8,200

12120000527/1/20183/1/2018

3/22/2016PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

12-Orange-405

18-19

201.310771 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.4/3.9

Con Sup:

Operational Improvements

Const:R/W:

At various locations, on various routes. Replaceand upgrade existing field elements for the TrafficManagement System (TMS).1203

0Q690$6,530

$24

Subtotal: $6,554

2019-20 $2,060

$1,800

$3,860Total Project Cost: $10,414

12170000885/1/20202/1/2020

6/22/2017PA&ED:

RTL:R/W Cert:

1/1/2021Begin Con:

12-Orange-VarPrior

19-20

201.315754 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 150 of 284

DRAFT

12-06

-17

Page 155: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of Orange, Anaheim, Santa Ana,Fullerton and Buena Park, from PM 33.0 to PM43.2, also on Route 57, from PM 10.7 to PM 16.6,also on Route 91, from PM R2.6 to PM R4.1 andPM 0.0 to PM 7.2. Install and modify IntelligentTransportation System (ITS) elements.

2859B

0P42U$8,820

Subtotal: $8,820

2019-20$1,323$2,030

$180$2,030

$5,563Total Project Cost: $14,383

12160000974/10/20201/9/20207/1/2018PA&ED:

RTL:R/W Cert:

1/4/2021Begin Con:

12-Orange-Var Prior18-1918-1919-20

201.31524.8 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/0.0

Con Sup:

Transportation Management Systems

Const:R/W:

In the cities of Newport Beach, Huntington Beachand Seal Beach, from Crystal Heights Drive toFirst Street. Replace traffic signals, upgrade non-standard curb ramps to meet ADA standards andmodify drainage.

2330

0P680$12,925

$191

Subtotal: $13,116

2020-21$1,891$4,299$1,244$3,537

$10,971Total Project Cost: $24,087

12160000025/30/20215/15/20211/5/2019PA&ED:

RTL:R/W Cert:

1/30/2022Begin Con:

12-Orange-1 Prior18-1918-1920-21

201.31520 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.0/33.6

Con Sup:

Transportation Management Systems

Const:R/W:

In and near Anaheim, from south of Route 22 tosouth of Route 39; also on Route 57 (PM10.7/16.6) and Route 91 (PM R2.6/R4.1 and (PM0.0/7.2). Create interoperability of TMS byupgrading Intelligent Transportation System(ITS) elements between Caltrans and localagencies.

2859C

0P670$13,673

Subtotal: $13,673

2019-20$2,380$3,650

$320$3,650

$10,000Total Project Cost: $23,673

12150001606/1/20205/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

12-Orange-5 Prior18-1918-1919-20

201.315311 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

33.0/43.2

Con Sup:

Transportation Management Systems

Const:R/W:

In Anaheim, at the Commercial VehicleEnforcement Facility (CVEF) Peralta WeighStation (Eastbound). Rehabilitate and upgradeCVEF.

4642A

0N490$6,847

Subtotal: $6,847

2018-19$624

$1,391$10

$1,332

$3,357Total Project Cost: $10,204

12140000502/1/20191/2/20198/1/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

12-Orange-91 PriorPriorPrior18-19

201.3211 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R13.6

Con Sup:

Weigh Stations

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 151 of 284

DRAFT

12-06

-17

Page 156: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyOrange

PA&ED:PS&E:

R/W Sup:Con Sup:

$35,469$270,140

R/W:

Subtotal: $305,609

Const:$27,285$71,096$16,202$76,856

$191,439

Total (Capital + Support): $497,048

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 152 of 284

DRAFT

12-06

-17

Page 157: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Placer($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Auburn, from 0.3 mile south of LincolnWay/Borland Avenue to Lincoln Way/BorlandAvenue. Realign curves.4785

1H240$1,697

$764

Subtotal: $2,461

2019-20$732

$1,003$306$819

$2,860Total Project Cost: $5,321

03160000775/1/2020

4/15/202012/15/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

03-Placer-49 Prior18-1918-1919-20

201.01050 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.2/2.4

Con Sup:

Safety Improvements

Const:R/W:

In and near various cities, at various locations,from 0.3 mile west of Douglas Boulevard to 0.2mile east of Hampshire Rocks Undercrossing. Upgrade guardrail to current standards.

5026

0H720$2,600

$0

Subtotal: $2,600

2020-21$40

$440$120$550

$1,150Total Project Cost: $3,750

03160000088/15/20207/15/20201/15/2019PA&ED:

RTL:R/W Cert:

3/1/2021Begin Con:

03-Placer-80 18-1918-1919-2020-21

201.01521 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.6/R66.5

Con Sup:

Collision Severity Reduction

Const:R/W:

BRIDGE PRESERVATIONIn Placer and Nevada Counties, at variouslocations. Rehabilitate or replace bridges at sixlocations.5097

2F570$32,200

$200

Subtotal: $32,400

2019-20$2,720$6,350

$485$6,430

$15,985Total Project Cost: $48,385

03000206155/7/2020

4/20/20202/15/2018PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

03-Placer-80 PriorPriorPrior19-20

201.1106 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.7/R63.5

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

ROADWAY PRESERVATIONNear Weimar, from west of Applegate Road towest of Weimar Cross Road. Drainage systemrehabilitation.5105

4F250$3,070

$70

Subtotal: $3,140

2018-19$220$430$140$610

$1,400Total Project Cost: $4,540

031400008610/11/201810/1/201810/2/2017PA&ED:

RTL:R/W Cert:

2/15/2019Begin Con:

03-Placer-80 PriorPriorPrior18-19

201.15126 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

25.9/28.5

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 153 of 284

DRAFT

12-06

-17

Page 158: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Placer($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Colfax, from west of IllinoistownOvercrossing to east of Cape HornUndercrossing. Drainage system rehabilitation.5079

1E050$3,170

$150

Subtotal: $3,320

2019-20$230$440$140$600

$1,410Total Project Cost: $4,730

030002060012/15/201912/15/2019

9/1/2017PA&ED:

RTL:R/W Cert:

8/5/2020Begin Con:

03-Placer-80 PriorPriorPrior19-20

201.15122 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

31.5/36.9

Con Sup:

Drainage System Restoration

Const:R/W:

Near Magra, from Secret Town Overcrossing tothe Gold Run Safety Roadside Rest Area.Rehabilitate drainage systems.5114

1H030$3,069

$220

Subtotal: $3,289

2020-21$429$667$195$806

$2,097Total Project Cost: $5,386

03160000494/20/20214/10/2021

12/15/2019PA&ED:

RTL:R/W Cert:

12/5/2021Begin Con:

03-Placer-80 Prior19-2019-2020-21

201.15132 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

38.3/41.5

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYIn Roseville, at the Atlantic Street/Eureka Roadwestbound onramp. Install ramp meters andwiden ramp for storage capacity.5113

0H460$5,500

$650

Subtotal: $6,150

2018-19$700$700$130$850

$2,380Total Project Cost: $8,530

03150001743/15/20193/15/20199/15/2017PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

03-Placer-80 18-19PriorPrior18-19

201.310563 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.8

Con Sup:

Operational Improvements

Const:R/W:

In various counties, on various routes at variouslocations. Upgrade Extinguishable MessageSigns (EMS) to LED.4291

0H400$1,600

Subtotal: $1,600

2019-20$190$210$30

$500

$930Total Project Cost: $2,530

03150001648/1/20197/1/20191/1/2018PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

03-Placer-80 PriorPriorPrior19-20

201.31562 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 154 of 284

DRAFT

12-06

-17

Page 159: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Placer($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADSIDE PRESERVATIONNear Lincoln, on McCourtney Road betweenRiosa Road and Kilaga Springs Road at the CoonCreek Conservation (C4) Ranch. Advancemitigation construction (4 acres) for futureSHOPP projects expected to impact wetland,riparian and to other waters.

4899

1H530$1,175

$64

Subtotal: $1,239

2019-20$653$434

$7$306

$1,400Total Project Cost: $2,639

03160001775/15/20205/1/2020

10/15/2019PA&ED:

RTL:R/W Cert:

10/20/2020Begin Con:

03-Placer-65 Prior19-2019-2019-20

201.2401 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R19.5

Con Sup:

Roadside Enhancement

Const:R/W:

CountyPlacer

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,118$54,081

R/W:

Subtotal: $56,199

Const:$5,914

$10,674$1,553

$11,471

$29,612

Total (Capital + Support): $85,811

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 155 of 284

DRAFT

12-06

-17

Page 160: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Plumas($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Quincy, at various locations from 0.3 milewest of Butterfly Valley Road to 0.2 mile west ofTwo Rivers Road; also, on Route 89 nearGreenville, from 0.9 mile north to 1.4 miles northof Wolf Creek Road (PM 25.1/25.3). Upgraderock fall fence to reduce maintenance andhighway worker exposure.

3639

1H790$1,760

$40

Subtotal: $1,800

2020-21$350$450$20

$450

$1,270Total Project Cost: $3,070

02160000431/21/2021

12/21/202011/5/2019PA&ED:

RTL:R/W Cert:

6/15/2021Begin Con:

02-Plumas-70 18-1919-2019-2020-21

201.2359 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

36.8/R62.4

Con Sup:

Roadside Safety Improvements/ Freeway Maintenance Access

Const:R/W:

ROADWAY PRESERVATIONIn and near Cromberg and Portola, from 0.2 mileeast of Gill Ranch Road to 0.2 mile west of BigGrizzly Creek Bridge. Rehabilitate roadway,repair or replace culverts, upgrade guardrail,upgrade bridge railing at Humbug Creek BridgeNo. 09-0022, and make pedestrian facilities ADAcompliant.

3619

1H580$88,050

$514

Subtotal: $88,564

2021-22$3,490$2,620$1,120$6,810

$14,040Total Project Cost: $102,604

02160000243/28/20222/25/202211/5/2020PA&ED:

RTL:R/W Cert:

9/27/2022Begin Con:

02-Plumas-70 18-1920-2120-2121-22

201.12045.7 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

58.4/R78.4

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In Plumas and Lassen Counties, near Chilcoot,from west of Summit School Drive Road to Route395 (Lassen PM 0.0/3.9). Roadwayrehabilitation.

3599

0H760$20,547

$0

Subtotal: $20,547

2018-19$1,030

$900$70

$1,440

$3,440Total Project Cost: $23,987

02150000863/28/20192/25/20192/2/2018PA&ED:

RTL:R/W Cert:

8/27/2019Begin Con:

02-Plumas-70 PriorPriorPrior18-19

201.12218 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

90.3/96.0

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In Plumas County, from Butte County line to eastof Moach Road at various locations. Drainagerehabilitation.3587

0H550$2,525

$290

Subtotal: $2,815

2019-20$1,060

$710$1,090

$920

$3,780Total Project Cost: $6,595

02150000507/11/20196/4/20199/1/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Plumas-70 Prior18-1918-1919-20

201.15150 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/70.0

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 156 of 284

DRAFT

12-06

-17

Page 161: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Plumas($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyPlumas

PA&ED:PS&E:

R/W Sup:Con Sup:

$844$112,882

R/W:

Subtotal: $113,726

Const:$5,930$4,680$2,300$9,620

$22,530

Total (Capital + Support): $136,256

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 157 of 284

DRAFT

12-06

-17

Page 162: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Blythe, from north of Palo Verde Dam Roadto the San Bernardino County line. Restore stormeroded embankments with rock slope protectionand replace culverts. A previous EmergencyOpening EA 08-1F800 repaired roadway.

3002U

1G000$8,170

$600

Subtotal: $8,770

2019-20$926$901$63

$2,462

$4,352Total Project Cost: $13,122

08150001075/1/20202/3/2020

11/1/2018PA&ED:

RTL:R/W Cert:

2/16/2021Begin Con:

08-Riverside-95 Prior18-1918-1919-20

201.13120 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

14.0/36.2

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONIn Moreno Valley, at the Sunnymead Boulevardeastbound onramp. Install traffic signal.

3006X

1H140$646$90

Subtotal: $736

2018-19$397$546$99

$566

$1,608Total Project Cost: $2,344

08160001622/4/20191/2/20191/2/2018PA&ED:

RTL:R/W Cert:

9/2/2019Begin Con:

08-Riverside-60 PriorPriorPrior18-19

201.01014 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.6

Con Sup:

Safety Improvements

Const:R/W:

Near Beaumont, from Gilman Springs Road to1.4 miles west of Jack Rabbit Trail. Constructleft and right shoulders for westbound direction.0045G

0Q180$25,000

$250

Subtotal: $25,250

2018-19$2,000$1,500

$200$3,700

$7,400Total Project Cost: $32,650

08000202201/2/2018

12/4/20175/2/2016PA&ED:

RTL:R/W Cert:

8/24/2018Begin Con:

08-Riverside-60 PriorPriorPrior18-19

201.010330 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

22.2/26.6

Con Sup:

Safety Improvements

Const:R/W:

Near Lake Elsinore, from the Orange CountyLine to Monte Vista Street. Widen for standardlane widths and shoulders and construct ground-in rumble strips.

0050P

1C850$53,600

$20

Subtotal: $53,620

2019-20$3,934$2,590

$20$4,985

$11,529Total Project Cost: $65,149

08130000473/26/20202/26/2020

12/20/2018PA&ED:

RTL:R/W Cert:

9/10/2020Begin Con:

08-Riverside-74 Prior18-1918-1919-20

201.010298 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/5.8

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 158 of 284

DRAFT

12-06

-17

Page 163: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Temecula, from 3.1 miles north of Route371 to 1.1 miles south of Pauba Road. Construct8 foot shoulders and rumble strip.3006G

1G670$43,272$1,705

Subtotal: $44,977

2021-22$4,900$4,700

$751$7,700

$18,051Total Project Cost: $63,028

081600004911/19/202110/19/202111/19/2019PA&ED:

RTL:R/W Cert:

8/19/2022Begin Con:

08-Riverside-79 Prior19-2019-2021-22

201.010108 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.4/11.4

Con Sup:

Safety Improvements

Const:R/W:

In Murrieta, from 0.2 mile north of Clinton KeithRoad Overcrossing to 0.5 mile south of ScottRoad Overcrossing. Install concrete barrier at edge of shoulder.

3005N

1G870$2,990

$10

Subtotal: $3,000

2018-19$600$732$10

$770

$2,112Total Project Cost: $5,112

08160000943/1/20192/1/20193/2/2018PA&ED:

RTL:R/W Cert:

9/5/2019Begin Con:

08-Riverside-215 PriorPriorPrior18-19

201.01023 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R12.7/R15.0

Con Sup:

Safety Improvements

Const:R/W:

MANDATESIn and near Lake Elsinore, from 1.7 miles east ofEl Cariso Road to Lehr Drive. Stabilize slopes todecrease sediment transport.3001Y

1C590$2,918

$10

Subtotal: $2,928

2018-19$310$452$20

$495

$1,277Total Project Cost: $4,205

08120003346/17/20194/15/20197/13/2018PA&ED:

RTL:R/W Cert:

2/18/2020Begin Con:

08-Riverside-74 Prior18-1918-1918-19

201.33512 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.0/R14.4

Con Sup:

Storm Water Mitigation

Const:R/W:

In Murrieta and Menifee, from Route 215 to northof Scott Road. Stabilize slopes to decreasesediment transport.3002A

1C660$7,080

$10

Subtotal: $7,090

2019-20$1,184$1,795

$20$1,209

$4,208Total Project Cost: $11,298

081200034112/11/201910/24/20197/15/2018PA&ED:

RTL:R/W Cert:

8/12/2020Begin Con:

08-Riverside-215 Prior18-1918-1919-20

201.33536 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R9.0/R16.0

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 159 of 284

DRAFT

12-06

-17

Page 164: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Hemet, from Warren Avenue to Soboba Street.Construct and upgrade pedestrian facilities tocurrent ADA standards.3003P

1F590$2,188

$246

Subtotal: $2,434

2019-20$710

$1,815$467

$1,100

$4,092Total Project Cost: $6,526

08140002563/16/2020

12/20/20194/16/2018PA&ED:

RTL:R/W Cert:

11/17/2020Begin Con:

08-Riverside-74 PriorPriorPrior19-20

201.361121 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

36.9/43.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Hemet, from East Florida Avenue to EastMenlo Avenue. Construct and upgrade pedestrianfacilities to current ADA standards.3002R

1F600$1,117

$379

Subtotal: $1,496

2019-20$450$900$670$600

$2,620Total Project Cost: $4,116

08140002573/10/20202/18/20204/10/2018PA&ED:

RTL:R/W Cert:

11/10/2020Begin Con:

08-Riverside-79 PriorPriorPrior19-20

201.361102 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

25.6/26.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Palm Springs, from Gateway Drive to GolfClub Drive. Reconstruct and construct curbramps.3007U

0R302$5,300$2,125

Subtotal: $7,425

2019-20 $1,547$3,339$2,590

$7,476Total Project Cost: $14,901

08170002306/15/20206/12/20206/29/2016PA&ED:

RTL:R/W Cert:

12/14/2020Begin Con:

08-Riverside-111PriorPrior19-20

201.378130 Structure(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

47.3/55.3

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

BRIDGE PRESERVATIONNear Palm Springs, at Whitewater River BridgeNo. 56-0004L/R. Bridge rehabilitation and scourmitigation.3002F

1E570$10,431

$20

Subtotal: $10,451

2018-19$953

$1,645$8

$2,076

$4,682Total Project Cost: $15,133

08140000516/18/20196/3/20195/2/2018PA&ED:

RTL:R/W Cert:

1/21/2020Begin Con:

08-Riverside-10 Prior18-1918-1918-19

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

27.7

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 160 of 284

DRAFT

12-06

-17

Page 165: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Desert Center, from Krume Ditch to WideDitch. Replace existing Rock Slope Protection(RSP) to prevent further scour damage andpreserve the integrity of 24 bridges.

3008N

1H200$10,440

$190

Subtotal: $10,630

2021-22$967

$1,232$259

$3,648

$6,106Total Project Cost: $16,736

08160001773/16/20222/16/20229/23/2020PA&ED:

RTL:R/W Cert:

11/4/2022Begin Con:

08-Riverside-10 18-1920-2120-2121-22

201.11024 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R92.9/R101.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Desert Center, from Coxcomb Ditch toCopa Ditch. Replace existing Rock SlopeProtection (RSP) to prevent further scour damageand preserve the structural integrity of 16 bridges.

3008M

1H190$7,356

$140

Subtotal: $7,496

2021-22$825

$1,282$217

$2,336

$4,660Total Project Cost: $12,156

08160001743/16/20222/16/20229/23/2020PA&ED:

RTL:R/W Cert:

12/12/2022Begin Con:

08-Riverside-10 18-1920-2120-2121-22

201.11016 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R106.6/R113.8

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Blythe, from Rubble Ditch to PalowallaDitch. Replace existing Rock Slope Protection(RSP) to prevent further scour damage andpreserve the structural integrity of 18 bridges.

3008P

1H210$8,832

$131

Subtotal: $8,963

2021-22$938

$1,442$281

$2,732

$5,393Total Project Cost: $14,356

08160001763/16/20222/16/20229/23/2020PA&ED:

RTL:R/W Cert:

11/16/2022Begin Con:

08-Riverside-10 18-1920-2120-2121-22

201.11018 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R120.7/R142.7

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Lake Elsinore, at Morrill Canyon BridgeNo. 56-0169; also, near Hemet at StrawberryCreek Bridge No. 56-0180 (PM 53.4/54.7).Replace structures/upgrade rails.

3005Q

1G470$6,824

$653

Subtotal: $7,477

2021-22$1,690$1,295

$150$2,390

$5,525Total Project Cost: $13,002

08160000013/30/20222/28/20222/22/2021PA&ED:

RTL:R/W Cert:

11/30/2022Begin Con:

08-Riverside-74 18-1920-2120-2121-22

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.9/3.2

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 161 of 284

DRAFT

12-06

-17

Page 166: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Desert Center, at Palen Ditch Bridge No. 56-0040L/R. Bridge rail replacement.

3002L

1F410$592$10

Subtotal: $602

2018-19$139$342$10

$119

$610Total Project Cost: $1,212

08140002161/4/2019

12/3/201812/15/2017PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

08-Riverside-10 PriorPriorPrior18-19

201.112440 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R110.5

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In and near the cities of Lake Elsinore, Perris,Menifee and Hemet, at Leach Canyon ChannelBridge No. 56-0750 and Blue Ridge Wash BridgeNo. 56-0257; also on Routes 79 and 371, at Arroyo Seco Bridge, Temecula Creek Bridge, andCahuilla Bridge. Bridge rail replacement.

3002C

1C680$2,884

$20

Subtotal: $2,904

2019-20$505$859$11

$532

$1,907Total Project Cost: $4,811

08120003438/1/20196/3/20194/2/2018PA&ED:

RTL:R/W Cert:

3/2/2020Begin Con:

08-Riverside-74 PriorPriorPrior19-20

201.1121391 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.2/34.0

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In Riverside County, on Routes 10 and 91, atvarious locations; also in San Bernardino County,on Routes 10 and 15, at various locations. Repairbridge decks.

3002G

1E720$1,472

$30

Subtotal: $1,502

2018-19$350$660$20

$660

$1,690Total Project Cost: $3,192

08140000878/3/2018

6/20/201810/31/2017PA&ED:

RTL:R/W Cert:

4/30/2019Begin Con:

08-Riverside-10 PriorPriorPrior18-19

201.1197 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R74.1

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONIn and near Terra Cotta, from Nichols Road tonorth of Glen Ivy. Concrete pavement slabreplacement.3003L

1F142$20,762

$10

Subtotal: $20,772

2018-19$1,108

$926$10

$3,347

$5,391Total Project Cost: $26,163

08150002325/1/20192/1/2019

11/1/2017PA&ED:

RTL:R/W Cert:

1/15/2020Begin Con:

08-Riverside-15 PriorPriorPrior18-19

201.12157 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

23.9/33.4

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 162 of 284

DRAFT

12-06

-17

Page 167: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Corona, from south of OntarioAvenue to Route 60. Concrete pavement slabreplacement.3003M

1F143$24,040

$10

Subtotal: $24,050

2018-19$1,022

$930$10

$4,771

$6,733Total Project Cost: $30,783

08150002333/15/20191/7/20192/1/2018PA&ED:

RTL:R/W Cert:

1/15/2020Begin Con:

08-Riverside-15 PriorPriorPrior18-19

201.12179.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

38.2/51.5

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Beaumont, from Gilman Springs Road to1.4 miles west of Jack Rabbit Trail. Rehabilitatepavement.0033N

1C090$15,000

Subtotal: $15,000

2018-19

Total Project Cost: $15,000

08120002871/2/2018

12/4/20175/2/2016PA&ED:

RTL:R/W Cert:

8/24/2018Begin Con:

08-Riverside-60

201.12117.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

22.1/26.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Yucca Valley and Twentynine Palms,from north of Indian Avenue to Utah Trail; also,in San Bernardino County (PM 0.0/15.1 and PM29.3/33.6). Pavement rehabilitation.

0023C

1E840$35,355$2,209

Subtotal: $37,564

2019-20$1,450$2,800$1,110$4,520

$9,880Total Project Cost: $47,444

08140001133/16/2020

12/16/20196/28/2016PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

08-Riverside-62 19-20PriorPrior19-20

201.12185.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R6.7/9.2

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Temecula, from San Diego County line toTemecula city limits. Pavement rehabilitation.

0066Q

1F690$8,742

$10

Subtotal: $8,752

2018-19$240$560$17

$800

$1,617Total Project Cost: $10,369

08150000165/10/20194/12/20195/15/2018PA&ED:

RTL:R/W Cert:

2/14/2020Begin Con:

08-Riverside-79 Prior18-1918-1918-19

201.12132.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/15.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 163 of 284

DRAFT

12-06

-17

Page 168: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Coachella, from 0.5 mile east ofCoachella Canal to Hazy Gulch Bridge. Coldplane pavement and overlay with PortlandCement Concrete (PCC). Construct eastboundtruck climbing lane. A one-lane temporary detourwill be constructed in the median for traffic handling.

3008A

1C081$157,000

$10

Subtotal: $157,010

2021-22$7,000

$15,800$90

$22,000

$44,890Total Project Cost: $201,900

08160000865/27/20224/22/20228/28/2020PA&ED:

RTL:R/W Cert:

1/13/2013Begin Con:

08-Riverside-10 Prior20-2120-2121-22

201.12252.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R60.9/R74.0

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Near Blythe, from Rice Road/SR-177 to TeedDitch Bridge. Cold plane mainline pavement andoverlay with Portland Cement Concrete (PCC).The shoulders and ramps will be milled andoverlaid with Hot Mix Asphalt (HMA-A). A twolane temporary detour will be constructed in themedian for traffic handling.

3008Y

1C082$263,010

$10

Subtotal: $263,020

2019-20$16,900$21,800

$153$37,500

$76,353Total Project Cost: $339,373

08160000875/29/20204/24/20206/28/2019PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

08-Riverside-10 Prior19-2019-2019-20

201.122116 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R105.0/R134.0

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In and near Blythe, from Teed Ditch Bridge toArizona State line. Cold plane mainline pavementand overlay with Portland Cement Concrete(PCC). The shoulders and ramps will be milledand overlaid with Hot Mix Asphalt (HMA-A). Atwo lane temporary detour will be constructed inthe median for traffic handling.

3009K

1C083$207,000

$10

Subtotal: $207,010

2021-22$9,000

$21,000$117

$29,000

$59,117Total Project Cost: $266,127

08160000905/27/20224/22/20228/28/2020PA&ED:

RTL:R/W Cert:

1/10/2023Begin Con:

08-Riverside-10 Prior20-2120-2121-22

201.12290 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R134.0/R156.5

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In and near Temecula, from Rainbow ValleyBoulevard to Front Street. Rehabilitate roadway.

3003K

1F141$34,890

$10

Subtotal: $34,900

2019-20$1,014$1,200

$10$5,181

$7,405Total Project Cost: $42,305

08150002312/3/20208/1/20192/1/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

08-Riverside-15 PriorPriorPrior19-20

201.12224 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/3.0

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 164 of 284

DRAFT

12-06

-17

Page 169: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Lake Elsinore, at 0.8 mile west of GrandAvenue. Stabilize slope to protect safety oftraveling public.3002J

1E770$1,082

$10

Subtotal: $1,092

2018-19$140$250$20

$400

$810Total Project Cost: $1,902

08140001028/30/20187/30/2018

10/24/2017PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

08-Riverside-74 PriorPriorPrior18-19

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.0

Con Sup:

Roadway Protective Betterments

Const:R/W:

In Riverside County, on Routes 10, 15, 71 and215 at various locations. Replace existing guidesigns with Type XI reflectivity.3005C

1F372$3,449

$10

Subtotal: $3,459

2018-19$333$722$45

$508

$1,608Total Project Cost: $5,067

08150001625/1/20192/1/2019

9/13/2017PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

08-Riverside-10 PriorPriorPrior18-19

201.170307 Sign(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R156.4

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

In the cities of Eastvale, Jurupa Valley, Riversideand Moreno Valley, from Hamner Avenue toGilman Spring Road; also on Route 91 from Route 15 to Madison Street. Replace existingguide signs with retro-reflective sheeting.

0022K

1F371$1,592

$10

Subtotal: $1,602

2019-20$125$260$15

$210

$610Total Project Cost: $2,212

08150001633/2/20209/3/20197/2/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

08-Riverside-60 Prior18-1918-1919-20

201.170221 Lighting fixture(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/22.3

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

MOBILITYIn the cities from Corona and Riverside, fromRoute 15/91 separator to Adams Street Overcrossing. Convert existing limited accessHOV lanes to continuous access HOV lanes to allow safer ingress and egress movements forHOV.

3005X

1G192$463$10

Subtotal: $473

2018-19$33$96$10

$162

$301Total Project Cost: $774

08160001942/25/2019

12/28/20183/26/2018PA&ED:

RTL:R/W Cert:

7/29/2019Begin Con:

08-Riverside-91 PriorPriorPrior18-19

201.310126 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.4/15.6

Con Sup:

Operational Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 165 of 284

DRAFT

12-06

-17

Page 170: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Riverside($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Riverside and San Bernardino Counties, onvarious routes and at various locations. Repairand replace vehicle detection equipmentimpacting the operations of the District TMC.

3006W

1H530$4,260

$10

Subtotal: $4,270

2018-19$346$912$90

$1,274

$2,622Total Project Cost: $6,892

081700007410/15/20189/14/20182/15/2018PA&ED:

RTL:R/W Cert:

6/14/2019Begin Con:

08-Riverside-Var PriorPriorPrior18-19

201.315188 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

ROADSIDE PRESERVATIONIn Riverside County, on Routes 10, 62, 74, 86,86S, 111 and 95 at various locations. AdvanceMitigation. Financial Contribution Only. 3002Q

1F560 $7,600

Subtotal: $7,600

2018-19$150

$15

$165Total Project Cost: $7,765

08140002494/15/2019

9/14/2017PA&ED:

RTL:R/W Cert:

Begin Con:

08-Riverside-10 Prior

Prior

201.24030 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.0/70.0

Con Sup:

Roadside Enhancement

Const:R/W:

MISCELLANEOUSIn and near Hemet, from Winchester Road toFairview Avenue. Multi-objective project torehabilitate pavement, install fiber optic/vehicledetection stations and upgrade curb ramps to meetADA standards.

3008L

1H060$26,536

$408

Subtotal: $26,944

2021-22$3,000$3,300$1,300$3,850

$11,450Total Project Cost: $38,394

08160001305/16/20224/15/20229/15/2020PA&ED:

RTL:R/W Cert:

1/17/2023Begin Con:

08-Riverside-74 18-1920-2120-2121-22

201.99949 Centerline mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

34.3/45.1

Con Sup:

Miscellaneous

Const:R/W:

CountyRiverside

PA&ED:PS&E:

R/W Sup:Con Sup:

$16,976$1,004,293

R/W:

Subtotal: $1,021,269

Const:$63,639$96,791$9,627

$154,193

$324,250

Total (Capital + Support): $1,345,519

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 166 of 284

DRAFT

12-06

-17

Page 171: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Rio Vista, at Route 160. Intersectionimprovements.

5961

2H640$2,468

$6

Subtotal: $2,474

2019-20$310$560$100

$1,030

$2,000Total Project Cost: $4,474

031700016712/1/2019

11/15/20198/1/2018PA&ED:

RTL:R/W Cert:

4/5/2020Begin Con:

03-Sacramento-12 Prior18-1918-1919-20

201.01026 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.4/1.0

Con Sup:

Safety Improvements

Const:R/W:

In Sacramento County, on Routes 5, 80, and 99 atvarious locations; also in Yolo County on Route80 (PM 0.0/R11.7). Upgrade guard rail to currentstandards.

5850

4F640$2,280

$15

Subtotal: $2,295

2018-19$335$565$115$295

$1,310Total Project Cost: $3,605

031400023210/1/20189/1/20187/7/2017PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

03-Sacramento-5 PriorPriorPrior18-19

201.0158 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.1/34.6

Con Sup:

Collision Severity Reduction

Const:R/W:

Near the city of Sacramento, at the ElkhornSafety Roadside Rest Area (SRRA). Upgradepotable water and wastewater systems. 5848

4F580$3,000

$4

Subtotal: $3,004

2018-19$380$370$50

$810

$1,610Total Project Cost: $4,614

03140001861/18/20191/11/20199/8/2017PA&ED:

RTL:R/W Cert:

7/20/2019Begin Con:

03-Sacramento-5 PriorPriorPrior18-19

201.2351 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

33.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Sacramento, from Stockton Boulevard toFolsom Boulevard. Construct textured pavementin narrow areas, pave partial slopes, relocate andreconstruct irrigation system, and install plantingsand mulch to reduce maintenance and improvehighway worker safety.

6246

1H050$4,000

$10

Subtotal: $4,010

2020-21$170$520$40

$480

$1,210Total Project Cost: $5,220

031600005110/1/20209/15/20207/1/2019PA&ED:

RTL:R/W Cert:

5/1/2021Begin Con:

03-Sacramento-50 18-1919-2019-2020-21

201.23576 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.5/R3.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 167 of 284

DRAFT

12-06

-17

Page 172: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of Sacramento, from 0.1 mile south ofB Street Underpass to 0.4 mile north of ArdenWay. Pave areas behind the gore and at narrowand miscellaneous locations, place vegetationcontrol, and construct maintenance vehiclepullouts to reduce maintenance and improvehighway worker safety.

6413

2H110$4,000

$10

Subtotal: $4,010

2021-22$280$530$50

$1,120

$1,980Total Project Cost: $5,990

03170000648/1/20217/1/2021

10/1/2020PA&ED:

RTL:R/W Cert:

1/1/2022Begin Con:

03-Sacramento-51 19-2020-2120-2121-22

201.23561 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.6/4.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near the city of Sacramento, from Del PasoPark Separation to 0.4 mile north of Route 80/244Separation; also, on Route 51 from PM 8.3 to 8.6and Route 244 from PM 0.0 to 0.9. Pave areasbehind the gore and at narrow and miscellaneouslocations, place vegetation control, and constructmaintenance vehicle pullouts to reducemaintenance and improve highway worker safety.

6716

2H150$3,700

$0

Subtotal: $3,700

2020-21$250$570$10

$1,050

$1,880Total Project Cost: $5,580

03170000684/6/20214/6/2021

6/15/2020PA&ED:

RTL:R/W Cert:

9/30/2021Begin Con:

03-Sacramento-80 19-2019-2020-2120-21

201.23549 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

M9.1/R11.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Citrus Heights, from 0.4 mile north ofthe Route 80/244 Separation to the Placer Countyline. Pave areas behind the gore and at narrowand miscellaneous locations, place vegetationcontrol, and construct maintenance vehiclepullouts to reduce maintenance and improvehighway worker safety.

6715

2H120$2,500

$0

Subtotal: $2,500

2021-22$260$500$10

$1,000

$1,770Total Project Cost: $4,270

03170000655/6/2022

4/16/20226/15/2021PA&ED:

RTL:R/W Cert:

9/30/2022Begin Con:

03-Sacramento-80 20-2120-2121-2221-22

201.23567 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R11.4/18.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

BRIDGE PRESERVATIONIn and near Rio Vista, at the Sacramento RiverBridge No. 23-0024; also, in Solano County fromPM 26.3 to PM 26.4. Rehabilitate movablebridge electrical and mechanical systems andupgrade ADA facilities.

5960

1H130$16,400

$100

Subtotal: $16,500

2021-22$760

$2,460$20

$3,120

$6,360Total Project Cost: $22,860

03160000597/1/20216/1/20217/1/2019PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

03-Sacramento-12 18-1919-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/0.4

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 168 of 284

DRAFT

12-06

-17

Page 173: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of Sacramento, at the American RiverBridge No. 24-0003. Widen and replace bridgedeck.6402

3F070$105,300

$1,000

Subtotal: $106,300

2019-20$4,340

$10,130$360

$16,120

$30,950Total Project Cost: $137,250

03120000545/1/20205/1/20201/2/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

03-Sacramento-51 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.6/3.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In the city of Sacramento, at 21st AvenueUndercrossing No. 24-0154. Replace bridgedeck.6923B

0H342$2,240

$5

Subtotal: $2,245

2019-20$210$240

$3$580

$1,033Total Project Cost: $3,278

031700015310/1/20189/1/2018

11/1/2017PA&ED:

RTL:R/W Cert:

4/15/2019Begin Con:

03-Sacramento-99 19-20PriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.9/23.6

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

On Route 99, at South Lagoon Creek Bridge No.24-0028L, Lagoon Creek Bridge No. 24-0045L(PM 5.0), and North Lagoon Creek Bridge No. 24-0027L (PM 5.1); also on Route 160 (PM R44.5)at American River Bridge No. 24-0001L. Scourmitigation and bridge replacement.

6916

3F540$20,270

$500

Subtotal: $20,770

2018-19$872

$2,000$50

$3,100

$6,022Total Project Cost: $26,792

03130001364/1/2019

3/15/201910/1/2017PA&ED:

RTL:R/W Cert:

7/17/2019Begin Con:

03-Sacramento-99 PriorPriorPrior18-19

201.1114 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.9

Con Sup:

Bridge Scour Mitigation

Const:R/W:

In and near the city of Sacramento, from west ofRio Linda Boulevard Undercrossing (UC) No. 24-0203 to east of Winters Street UC No. 24-0205;also, on Route 51 from south of Route 51/244, 80Separation No. 24-0291L to north of Route51/244, 80 Connector No. 24-0293R (PM 8.2 to8.6). Upgrade bridge rails at 4 structures andwiden for standard shoulders.

6412

1H910$20,104

$6

Subtotal: $20,110

2021-22$1,300$3,000

$500$4,300

$9,100Total Project Cost: $29,210

03170000321/15/20221/3/2022

10/1/2019PA&ED:

RTL:R/W Cert:

5/15/2022Begin Con:

03-Sacramento-80 18-1919-2019-2021-22

201.1124413 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

M6.5/M8.8

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 169 of 284

DRAFT

12-06

-17

Page 174: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Elk Grove, from 0.3 mile south ofDillard Road Overcrossing to south of Grant LineRoad (replace Consumnes River Bridge No. 24-0020L/R, and Consumnes River OverflowBridge No. 24-0021L/R; upgrade bridge rails at Dillard Road Overcrossing No. 24-0163; construct new McConnell Overhead No. 24-0048L. Bridge seismic retrofit, bridge scour retrofit, bridge rail replacement, and bridgereplacement.

6912

0F280$113,000

$6,000

Subtotal: $119,000

2019-20$1,700$3,500

$600$14,200

$20,000Total Project Cost: $139,000

03120000695/1/20204/1/20207/1/2019PA&ED:

RTL:R/W Cert:

10/15/2020Begin Con:

03-Sacramento-99 PriorPriorPrior19-20

201.1123178 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.1/9.4

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In the city of Sacramento, at Southbound Route99/5 Connector Overcrossing No. 24-0241F; also,on Route 80 at Longview Ramp Overcrossing No.24-0281K (PM M9.15). Seismic retrofit twostructures.

6707

4F100$1,900

Subtotal: $1,900

2019-20$321$759$18

$691

$1,789Total Project Cost: $3,689

031400002412/15/201911/1/20194/1/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

03-Sacramento-99 PriorPriorPrior19-20

201.1132 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R32.1

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In the city of Sacramento, from the Sacramento River Viaduct (Pioneer Bridge) to 4th Street; also,on Route 5 from 0.2 mile south of Broadway to SStreet (PM 22.15 to 22.91). Clean and paint steelbridge girders within Route 5/50 interchange.

6247

1H100$16,700

$20

Subtotal: $16,720

2020-21$350$940$10

$3,010

$4,310Total Project Cost: $21,030

03160000562/1/20212/1/20217/1/2019PA&ED:

RTL:R/W Cert:

9/1/2021Begin Con:

03-Sacramento-50 18-1919-2019-2020-21

201.11911 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

L0.0/L0.5

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In the city of Sacramento, from 0.5 mile south ofRoute 50 to Route 80 at South ConnectorUndercrossing No. 24-0267 (PM 22.42) and at American River Viaduct No. 24-0068L/R (PM24.82). Improve to standard truck capacity.

ACCELERATED BRIDGE (PA&ED Only)

5868

3H390$176,700

$3,110

Subtotal: $179,810

2021-22$16,780$19,340$2,910

$28,390

$67,420Total Project Cost: $247,230

031700034011/15/202111/1/202112/1/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

03-Sacramento-5 Prior21-2221-2221-22

201.3223 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

22.1/26.7

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 170 of 284

DRAFT

12-06

-17

Page 175: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn the city of Sacramento, from Route 5 to WattAvenue. Roadway rehabilitation.

6177

0H080$216,000

$3,900

Subtotal: $219,900

2019-20$7,800

$17,000$1,800

$31,800

$58,400Total Project Cost: $278,300

03150000742/14/20202/3/2020

12/1/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

03-Sacramento-50 Prior19-20Prior19-20

201.12056 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

L0.6/R5.3

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In and near the city of Sacramento, from west ofWest El Camino Avenue to east of Route 244. Pavement rehabilitation.6711

0H470$10,515

$25

Subtotal: $10,540

2018-19$550

$1,110$105

$2,000

$3,765Total Project Cost: $14,305

03150001971/11/2019

12/11/201810/3/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

03-Sacramento-80 PriorPriorPrior18-19

201.121.1 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

M1.2/R11.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near the city of Sacramento, from 0.2 mile east ofLongview Drive to 0.4 mile east of MadisonAvenue. Pavement rehabilitation.6714

1H190$14,000

$100

Subtotal: $14,100

2021-22$50

$1,500$80

$2,500

$4,130Total Project Cost: $18,230

031600006510/15/20219/20/20218/1/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

03-Sacramento-80 Prior19-2019-2021-22

201.12135.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

M9.6/12.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Galt, from the San Joaquin County line toSimmerhorn Road; also, in the cities of Elk Groveand Sacramento, from 0.7 mile south of ElkGrove Boulevard to Martin Luther King Jr.Boulevard (PM 11.9/21.5). Pavementrehabilitation.

6924

0H480$38,760

$22

Subtotal: $38,782

2018-19$850

$1,700$80

$3,600

$6,230Total Project Cost: $45,012

031500019811/16/201811/1/20185/15/2017PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

03-Sacramento-99 PriorPriorPrior18-19

201.12167.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.2/1.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 171 of 284

DRAFT

12-06

-17

Page 176: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MOBILITYIn the city of Sacramento, from 65th Street to eastof Howe Avenue. Construct westbound auxiliarylane.6200

1F190$3,080

$6

Subtotal: $3,086

2018-19$155$265

$4$420

$844Total Project Cost: $3,930

03000011053/1/20192/1/20195/3/2017PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

03-Sacramento-50 18-19PriorPrior18-19

201.31032 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R2.6/R3.8

Con Sup:

Operational Improvements

Const:R/W:

In the city of Sacramento, at Hornet Driveeastbound offramp. Widen ramp, add signal andright-turn lane.6242

0H580$1,300

$130

Subtotal: $1,430

2018-19$250$450$130$460

$1,290Total Project Cost: $2,720

031500021110/7/201810/1/2018

12/10/2016PA&ED:

RTL:R/W Cert:

4/9/2019Begin Con:

03-Sacramento-50 18-19PriorPrior18-19

201.3101000 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R3.5

Con Sup:

Operational Improvements

Const:R/W:

In and near Rancho Cordova, from BradshawRoad to Mather Field Road. Operationalimprovements that construct auxiliary lanes inboth westbound and eastbound directions.

6197

1F150$7,250

$150

Subtotal: $7,400

2020-21$396$659$103$940

$2,098Total Project Cost: $9,498

030000110111/15/202011/1/20207/1/2019PA&ED:

RTL:R/W Cert:

5/15/2021Begin Con:

03-Sacramento-50 19-2020-2120-2120-21

201.310450 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R7.7/R9.5

Con Sup:

Operational Improvements

Const:R/W:

In the city of Sacramento, at various locations androutes at the Route 5/99 interchange Connectorramps and the eastbound Route 51/160interchange Connector ramp. Install connectorramp meters.

6411

1H850$3,000

$20

Subtotal: $3,020

2020-21$320$660$20

$1,020

$2,020Total Project Cost: $5,040

03170000098/1/20207/1/20208/1/2019PA&ED:

RTL:R/W Cert:

1/1/2021Begin Con:

03-Sacramento-5 Prior18-1918-1920-21

201.3154 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 172 of 284

DRAFT

12-06

-17

Page 177: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Placer, Sacramento, and Yolo Counties, onroutes 5, 80, 99, and 113. Replace obsoleteMicrowave Vehicle Detection System (MVDS)elements.

8920

2H700$1,403

$15

Subtotal: $1,418

2018-19$148$249$22

$507

$926Total Project Cost: $2,344

031700017310/1/20189/15/20184/1/2018PA&ED:

RTL:R/W Cert:

5/5/2019Begin Con:

03-Sacramento-5 PriorPriorPrior18-19

201.31548 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

In Sacramento, from 1.1 miles south of Elk GroveBoulevard to Route 50. Install fiber optic cable.

5846

4F450$6,600

$600

Subtotal: $7,200

2018-19$540$900$440

$1,500

$3,380Total Project Cost: $10,580

03140001646/30/20174/24/20176/23/2016PA&ED:

RTL:R/W Cert:

6/30/2018Begin Con:

03-Sacramento-5 PriorPriorPrior18-19

201.31513 Mile(s) of cablePerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.7/22.7

Con Sup:

Transportation Management Systems

Const:R/W:

In and near the cities of Sacramento, RanchoCordova, and Folsom, from Yolo County line toFolsom Boulevard; also, in Yolo County in WestSacramento, from Route 80 to Sacramento County line (PM 0.0 to 3.156), and on Route 80from Enterprise Boulevard to Route 50 (PM 9.2to R9.552). Install Transportation ManagementSystem (TMS) field elements.

6250

3H330$38,400

$200

Subtotal: $38,600

2020-21$940

$2,700$520

$3,900

$8,060Total Project Cost: $46,660

031700032510/1/20209/15/20203/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-Sacramento-50 18-1918-1918-1920-21

201.315122 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

L0.0/17.5

Con Sup:

Transportation Management Systems

Const:R/W:

In and near Rancho Cordova and Folsom, fromSunrise Boulevard to the county line; also in ElDorado County near El Dorado Hills, from thecounty line to Silva Valley Parkway (PM 0.0/1.7).Install fiber optic cable.

6248

1H820$4,650

$21

Subtotal: $4,671

2020-21$240$950$110

$1,050

$2,350Total Project Cost: $7,021

03170000067/1/2020

6/15/202011/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

03-Sacramento-50 Prior18-1918-1920-21

201.31512.3 Mile(s) of cablePerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

12.5/23.1

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 173 of 284

DRAFT

12-06

-17

Page 178: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In various counties, on various routes. Repair orreplace damaged inductive loop vehicle detectionelements.6717

2H570$922$15

Subtotal: $937

2018-19$94

$211$22

$365

$692Total Project Cost: $1,629

031700015710/1/20189/15/20184/1/2018PA&ED:

RTL:R/W Cert:

5/5/2019Begin Con:

03-Sacramento-80 PriorPriorPrior18-19

201.315300 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

In and near the cities of Sacramento and CitrusHeights, from east of the Yolo County line to thePlacer County line.; also in Placer County in thecity of Roseville from the Sacramento Countyline to east of the Sacramento County line (PM0.0/0.7). Install fiber optic communication line.

6713

0H540$12,200

$50

Subtotal: $12,250

2019-20$1,200$1,200

$300$1,800

$4,500Total Project Cost: $16,750

031500020411/15/201911/1/20193/1/2018PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

03-Sacramento-80 PriorPriorPrior19-20

201.31518.4 Mile(s) of cablePerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

M0.1/18.0

Con Sup:

Transportation Management Systems

Const:R/W:

In and near the cities of Elk Grove andSacramento, from Grant Line Road to Route 50;also, on Route 51 from Route 50 to 0.1 mile southof the Fort Sutter Viaduct (PM 0.0 to 0.1). Installfiber optic cable.

6925

0H670$9,000

$100

Subtotal: $9,100

2021-22$700

$1,000$50

$1,300

$3,050Total Project Cost: $12,150

031600000510/1/20219/1/2021

10/1/2020PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

03-Sacramento-99 Prior20-2120-2121-22

201.31514 Mile(s) of cablePerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.0/R24.3

Con Sup:

Transportation Management Systems

Const:R/W:

In Citrus Heights, from east of ElkhornBoulevard/Greenback Lane to west of RiversideAvenue. Upgrade weigh-in-motion (WIM)station and widen the westbound auxiliary lane tothe Antelope Truck Scales.

6712

0H530$3,700

$50

Subtotal: $3,750

2018-19$350$600$100$740

$1,790Total Project Cost: $5,540

03150002033/15/20193/1/20193/1/2018PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

03-Sacramento-80 PriorPriorPrior18-19

201.3211 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

15.2/17.0

Con Sup:

Weigh Stations

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 174 of 284

DRAFT

12-06

-17

Page 179: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADSIDE PRESERVATIONIn the city of Sacramento, from south ofBroadway to 0.12 mile south of R Street.Highway planting rehabilitation.5865

2H130$2,500

$10

Subtotal: $2,510

2021-22$230$520$80

$430

$1,260Total Project Cost: $3,770

03170000668/1/2021

7/25/20218/1/2020PA&ED:

RTL:R/W Cert:

3/5/2022Begin Con:

03-Sacramento-5 19-2020-2120-2121-22

201.21016 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

22.0/22.9

Con Sup:

Highway Planting Restoration

Const:R/W:

CountySacramento

PA&ED:PS&E:

R/W Sup:Con Sup:

$16,200$867,842

R/W:

Subtotal: $884,042

Const:$43,431$77,658$8,812

$133,628

$263,529

Total (Capital + Support): $1,147,571

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 175 of 284

DRAFT

12-06

-17

Page 180: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Benito($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Pinnacles National Park, from 0.7 milesnorth of San Benito Lateral/Old Hernandez Roadto 2.4 miles south of Route 146. Improve curveand flatten slope.

2697

1H810$4,265

$363

Subtotal: $4,628

2019-20$1,181$1,756

$345$1,506

$4,788Total Project Cost: $9,416

05160001644/6/2020

2/19/202011/13/2018PA&ED:

RTL:R/W Cert:

10/28/2020Begin Con:

05-San Benito-25 Prior18-1918-1919-20

201.01014 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.8/19.1

Con Sup:

Safety Improvements

Const:R/W:

CountySan Benito

PA&ED:PS&E:

R/W Sup:Con Sup:

$363$4,265

R/W:

Subtotal: $4,628

Const:$1,181$1,756

$345$1,506

$4,788

Total (Capital + Support): $9,416

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 176 of 284

DRAFT

12-06

-17

Page 181: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Hesperia, from Cleghorn RoadUndercrossing to Route 138 at the southboundCajon Truck Facility. Reconstruct southboundtruck scale that was destroyed by the Blue CutFire.

3006U

1H390$2,146

$10

Subtotal: $2,156

2018-19$289$488$20

$550

$1,347Total Project Cost: $3,503

081700003210/1/20189/1/20186/1/2018PA&ED:

RTL:R/W Cert:

6/30/2019Begin Con:

08-San Bernardino-15 PriorPriorPrior18-19

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R20.6/R20.9

Con Sup:

Permanent Restoration

Const:R/W:

In Victorville, near Palmdale Road (Route 18)and Route 15. Restore vegetation and irrigationsystem due to fire damage.3006T

1H271$1,061

$10

Subtotal: $1,071

2018-19$206$493$54

$577

$1,330Total Project Cost: $2,401

081700002412/15/201811/15/20184/16/2018PA&ED:

RTL:R/W Cert:

6/18/2019Begin Con:

08-San Bernardino-15 PriorPriorPrior18-19

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

40.3/40.7

Con Sup:

Permanent Restoration

Const:R/W:

Near Baker, at 1.6 miles south of Afton RoadOvercrossing. Reconstruct eroded earthen dikethat protects the highway from inundation andflooding. The failed section of berm is located750 yards from the southbound 1-15 outsideshoulder.

3005L

1G740$1,691

$128

Subtotal: $1,819

2019-20$1,000

$540$102$540

$2,182Total Project Cost: $4,001

08160000605/18/20204/15/20206/18/2019PA&ED:

RTL:R/W Cert:

1/4/2021Begin Con:

08-San Bernardino-15 Prior19-2019-2019-20

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R110.0

Con Sup:

Permanent Restoration

Const:R/W:

In Barstow, at 0.4 mile east of Route 15/40Separation. Reconstruct a damaged section oftrapezoidal channel.3006V

1H400$6,951

$10

Subtotal: $6,961

2019-20$390$780$20

$975

$2,165Total Project Cost: $9,126

081700003112/27/201911/22/2019

1/4/2019PA&ED:

RTL:R/W Cert:

7/10/2020Begin Con:

08-San Bernardino-40 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.4

Con Sup:

Permanent Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 177 of 284

DRAFT

12-06

-17

Page 182: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Vidal Junction, from west of Route 95 towest of Parker Dam Road. Restore storm erodedembankments with rock slope protection. Aprevious Emergency Opening EA 08-1F660repaired roadway.

3005P

1G010$8,435

$107

Subtotal: $8,542

2019-20$1,279

$902$76

$1,940

$4,197Total Project Cost: $12,739

08150001065/1/20202/3/2020

11/1/2018PA&ED:

RTL:R/W Cert:

2/16/2021Begin Con:

08-San Bernardino-62 Prior18-1918-1919-20

201.13110 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

124.0/142.0

Con Sup:

Permanent Restoration

Const:R/W:

Near Cedar Glen, at 0.1 mile south of HospitalRoad. Widen shoulder and replace guard railwith concrete barrier mounted on soldier pilewall.

3006J

1H290$2,345

$10

Subtotal: $2,355

2019-20$713

$1,080$93

$1,376

$3,262Total Project Cost: $5,617

08170000064/15/20203/13/2020

11/15/2018PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

08-San Bernardino-173 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.7

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONIn Victorville, from Amargosa Road to CobaltRoad. Construct raised curb median.

3006F

1E060$5,087

$884

Subtotal: $5,971

2019-20$920

$1,150$480

$1,050

$3,600Total Project Cost: $9,571

08130001405/1/20204/1/2020

7/30/2018PA&ED:

RTL:R/W Cert:

9/30/2020Begin Con:

08-San Bernardino-18 Prior18-1918-1919-20

201.01025 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

97.0/99.5

Con Sup:

Safety Improvements

Const:R/W:

In Twentynine Palms, from 0.1 mile west of to0.4 mile east of Utah Trail.

3005K

1G450$826$25

Subtotal: $851

2018-19$397$486$42

$590

$1,515Total Project Cost: $2,366

08150002389/14/20188/14/20186/30/2017PA&ED:

RTL:R/W Cert:

4/15/2019Begin Con:

08-San Bernardino-62 PriorPriorPrior18-19

201.01013 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

34.1/34.6

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 178 of 284

DRAFT

12-06

-17

Page 183: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Needles, from Route 62 to 0.8 mile south ofRoute 40. Construct ground-in shoulder andcenterline rumble strips.3006H

1F780$1,390

$10

Subtotal: $1,400

2019-20$650$700$30

$450

$1,830Total Project Cost: $3,230

081500004711/30/201810/30/2018

2/8/2018PA&ED:

RTL:R/W Cert:

5/30/2019Begin Con:

08-San Bernardino-95 PriorPriorPrior19-20

201.01057 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.6/56.5

Con Sup:

Safety Improvements

Const:R/W:

In and near Barstow, from 0.1 mile north ofBoone Road to 0.7 mile south of Rimrock Road.Construct ground-in shoulder and centerlinerumble strips.

3006K

1F770$1,953

$10

Subtotal: $1,963

2019-20$600$720$60

$550

$1,930Total Project Cost: $3,893

08150000517/30/20187/10/2018

12/15/2017PA&ED:

RTL:R/W Cert:

10/23/2018Begin Con:

08-San Bernardino-247 PriorPriorPrior19-20

201.01065 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.3/76.8

Con Sup:

Safety Improvements

Const:R/W:

Near Barstow, from Harvard Road to Rasor Road.Regrade and flatten median cross slope.

3002E

1C720$12,248

$10

Subtotal: $12,258

2019-20$890$920$50

$3,160

$5,020Total Project Cost: $17,278

08130000031/30/2020

12/30/201912/20/2017PA&ED:

RTL:R/W Cert:

10/22/2020Begin Con:

08-San Bernardino-15 PriorPriorPrior19-20

201.01587 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R96.1/R124.3

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Barstow, from 1.7 miles east of Fort CadyRoad Overcrossing to Crucero Road Undercrossing. Regrade median cross slopes.3007X

0R170$28,488$2,075

Subtotal: $30,563

2021-22$3,200$1,900

$300$3,300

$8,700Total Project Cost: $39,263

08120000282/28/20221/31/2022

11/30/2020PA&ED:

RTL:R/W Cert:

11/30/2022Begin Con:

08-San Bernardino-40 18-1920-2120-2121-22

201.01575 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R25.0/R50.0

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 179 of 284

DRAFT

12-06

-17

Page 184: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Essex, from west of Kelbaker Road to EssexRoad. Regrade and flatten median cross slope.

3001R

0R150$21,178$5,010

Subtotal: $26,188

2018-19$3,000$2,500

$200$3,200

$8,900Total Project Cost: $35,088

08120000255/31/20194/30/20198/31/2018PA&ED:

RTL:R/W Cert:

1/31/2020Begin Con:

08-San Bernardino-40 Prior18-1918-1918-19

201.015150 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R75.0/R100.0

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Needles, from Essex Road Overcrossing to4.5 miles east of Homer Wash Bridge. Regrademedian cross slopes.3002W

0R141$25,500$5,006

Subtotal: $30,506

2020-21$3,300$2,500

$300$3,500

$9,600Total Project Cost: $40,106

08150002004/30/20213/31/20213/31/2020PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

08-San Bernardino-40 18-1919-2019-2020-21

201.015164 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R100.0/R125.0

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Needles, from 4.5 miles east ofHomer Wash to Arizona state line. Regrade andflatten median cross slope. 3003J

0R142$19,134$5,006

Subtotal: $24,140

2019-20$2,900$2,300

$200$2,800

$8,200Total Project Cost: $32,340

08150002012/28/20201/31/2020

11/30/2018PA&ED:

RTL:R/W Cert:

11/30/2020Begin Con:

08-San Bernardino-40 Prior18-1918-1919-20

201.01588 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R125.0/R154.6

Con Sup:

Collision Severity Reduction

Const:R/W:

In Loma Linda and Redlands, from RichardsonStreet Overcrossing to 0.1 mile west of WabashAvenue Overcrossing. Roadside safetyimprovements.

3003F

1C29U$7,377

$10

Subtotal: $7,387

2018-19$350$695$30

$860

$1,935Total Project Cost: $9,322

08170002191/25/2019

12/14/20183/1/2018PA&ED:

RTL:R/W Cert:

6/21/2019Begin Con:

08-San Bernardino-10 18-19PriorPrior18-19

201.235487 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

26.8/34.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 180 of 284

DRAFT

12-06

-17

Page 185: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Redlands and Yucaipa, from Wabash Avenueto County Line Road. Construct roadside safetyimprovements.3001U

1C300$1,899

$7

Subtotal: $1,906

2019-20$358$417$43

$362

$1,180Total Project Cost: $3,086

08120002709/19/20198/15/20197/11/2018PA&ED:

RTL:R/W Cert:

6/15/2020Begin Con:

08-San Bernardino-10 Prior18-1918-1919-20

201.235120 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

34.2/R39.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESAt various locations, from Eagle Mountain Driveto Route 38/18 Separation. Sediment control andstabilization.3008W

0R432$576$150

Subtotal: $726

2019-20 $86$50

$200

$336Total Project Cost: $1,062

08170002327/5/2019

3/20/201710/24/2016PA&ED:

RTL:R/W Cert:

3/27/2020Begin Con:

08-San Bernardino-38PriorPrior19-20

201.33527 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

50.4/59.4

Con Sup:

Storm Water Mitigation

Const:R/W:

BRIDGE PRESERVATIONIn Colton, from 0.3 mile south to 0.3 north ofWashington Avenue Overcrossing No. 54-0530.Replace overcrossing.3002S

1F730$17,871$3,726

Subtotal: $21,597

2019-20$1,125$2,870

$296$1,790

$6,081Total Project Cost: $27,678

08150000342/21/202011/8/201912/1/2017PA&ED:

RTL:R/W Cert:

6/12/2020Begin Con:

08-San Bernardino-215 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.4/3.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Needles, at the Halfway Hills Wash BridgeNo. 54-0799L/R. Retrofit bridge footings,replace and expand RSP limits.3008K

1G830$9,652

$30

Subtotal: $9,682

2021-22$1,393$1,903

$55$2,538

$5,889Total Project Cost: $15,571

08160000793/15/20222/22/20229/14/2020PA&ED:

RTL:R/W Cert:

11/2/2022Begin Con:

08-San Bernardino-40 18-1920-2120-2121-22

201.1112 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

101.3

Con Sup:

Bridge Scour Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 181 of 284

DRAFT

12-06

-17

Page 186: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Victorville, at Mojave River Bridge No. 54-0307; also on Route 10 at Colton Overhead No.54-0464R (PM 22.36) and Route 215North/Route 10 East Connector Overhead No. 54-0482G. Various repairs to 3 bridges.

3006C

1G280$2,639

$62

Subtotal: $2,701

2021-22$320$780$100$690

$1,890Total Project Cost: $4,591

081500019210/15/20219/17/20213/6/2020PA&ED:

RTL:R/W Cert:

4/29/2022Begin Con:

08-San Bernardino-18 18-1919-2019-2021-22

201.1193 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

95.4

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In San Bernardino County, at the Etiwanda SanSevain FCC Br. No. 54-0454L, Colton OverheadNo. 54-0464R; also on Route 60 at RamonaAvenue Overcrossing No. 54-0745 (PM R1.37).In Riverside County, on Route 10 at HighlandSprings Avenue Undercrossing No. 56-0432 (PM9.3) and at Eagle Mountain Road Bridge No. 56-0575L/R (PM R102.0). Improve freight corridormovement by modifying and replacing bridges tomeet vertical clearance and load-carrying capacitystandards.

ACCELERATED BRIDGE (PA&ED Only)

3009R

1J210$60,900$1,000

Subtotal: $61,900

2020-21$5,822$6,370

$350$8,000

$20,542Total Project Cost: $82,442

08170002403/10/20212/12/2021

12/11/2019PA&ED:

RTL:R/W Cert:

1/5/2022Begin Con:

08-San Bernardino-10 Prior20-2120-2120-21

201.3226 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

11.6/R22.4

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

ROADWAY PRESERVATIONIn Barstow, from Outlet Center Drive to MojaveRiver Bridge. Rehabilitate pavement.

3003V

0K123$26,798

$10

Subtotal: $26,808

2019-20$600

$1,200$10

$2,100

$3,910Total Project Cost: $30,718

081500024210/2/20198/9/2019

9/14/2017PA&ED:

RTL:R/W Cert:

8/3/2020Begin Con:

08-San Bernardino-15 PriorPriorPrior19-20

201.12164.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

64.6/75.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Adelanto, from Route 395 Junction toLos Angeles County Line. Cold plane pavementand place Hot Mix Asphalt (HMA) andRubberized Hot Mix Asphalt concrete (RHMA).

3007M

1G520$16,442

$65

Subtotal: $16,507

2020-21$564

$1,588$77

$2,366

$4,595Total Project Cost: $21,102

08160000202/16/2021

11/16/20207/15/2019PA&ED:

RTL:R/W Cert:

10/15/2021Begin Con:

08-San Bernardino-18 18-1919-2019-2020-21

201.12137.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

100.9/115.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 182 of 284

DRAFT

12-06

-17

Page 187: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Vidal, from west of Route 95 to NevadaState line; also on Route 95 at various locations.Rehabilitate pavement and upgrade guardrail.3004A

1F133$8,666

$65

Subtotal: $8,731

2019-20$400$300$10

$1,400

$2,110Total Project Cost: $10,841

08160000032/21/20201/7/20205/4/2018PA&ED:

RTL:R/W Cert:

10/26/2020Begin Con:

08-San Bernardino-62 Prior18-1918-1919-20

201.12142.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

121.5/142.7

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Needles, from Route 62 to south of HavasuLake Road. Rehabilitate pavement.

3002V

1F131$9,567

$65

Subtotal: $9,632

2019-20$450$320$10

$1,500

$2,280Total Project Cost: $11,912

08150002112/21/20201/7/20205/4/2018PA&ED:

RTL:R/W Cert:

10/26/2020Begin Con:

08-San Bernardino-95 Prior18-1918-1919-20

201.12147.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.7/33.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Needles, from Goffs Road to Nevada Stateline. Rehabilitate pavement.

3003Y

1F132$4,389

$65

Subtotal: $4,454

2019-20$200$150$10

$690

$1,050Total Project Cost: $5,504

08150002122/21/20201/7/20205/4/2018PA&ED:

RTL:R/W Cert:

10/26/2020Begin Con:

08-San Bernardino-95 Prior18-1918-1919-20

201.12132 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

64.5/80.5

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Fontana, from Sierra Avenue to DevoreRoad. Rehabilitate roadway.

3003T

0K121$22,104

$10

Subtotal: $22,114

2019-20$570$900$10

$2,350

$3,830Total Project Cost: $25,944

081500024512/2/20199/9/2019

1/10/2018PA&ED:

RTL:R/W Cert:

8/3/2020Begin Con:

08-San Bernardino-15 PriorPriorPrior19-20

201.12216 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

12.8/14.8

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 183 of 284

DRAFT

12-06

-17

Page 188: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Hesperia and Victorville, from Route 395 tonorth of Mojave Drive. Rehabilitate roadway.

3003U

0K122$159,029

$10

Subtotal: $159,039

2019-20$900

$1,500$10

$11,700

$14,110Total Project Cost: $173,149

08150002442/3/2020

11/4/20193/1/2018PA&ED:

RTL:R/W Cert:

10/29/2020Begin Con:

08-San Bernardino-15 PriorPriorPrior19-20

201.12273 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

30.8/42.5

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Near Smiley Park, from 6.9 miles south ofRunning Spring to 3.4 miles east of Fork CityCreek Bridge. Construct rockfall barrier tostabilize hillside slopes.

3002H

1E780$2,011

$20

Subtotal: $2,031

2018-19$370$400$20

$470

$1,260Total Project Cost: $3,291

081400010312/3/201811/1/20181/15/2018PA&ED:

RTL:R/W Cert:

6/17/2019Begin Con:

08-San Bernardino-330 PriorPriorPrior18-19

201.1502 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

37.1/39.8

Con Sup:

Roadway Protective Betterments

Const:R/W:

In and near Arrowhead, from 48th Street to Route138. Repair, reline and replace culverts.

0184C

0G691$7,185

$385

Subtotal: $7,570

2021-22$742

$1,090$1,240$1,059

$4,131Total Project Cost: $11,701

08150001845/2/2022

2/15/20225/1/2020PA&ED:

RTL:R/W Cert:

1/17/2023Begin Con:

08-San Bernardino-18 Prior20-2120-2121-22

201.15163 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

T8.0/R17.8

Con Sup:

Drainage System Restoration

Const:R/W:

Near Big Bear and Lucerne Valley, at variouslocations, from Route 38 at Big Bear Lake Damto Artic Canyon Wash. Reline or replace.0181J

0G690$4,107

$700

Subtotal: $4,807

2021-22$1,192$1,493$2,708$1,417

$6,810Total Project Cost: $11,617

08120001101/18/202212/1/20217/5/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

08-San Bernardino-18 18-1920-2120-2121-22

201.15141 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

44.3/68.5

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 184 of 284

DRAFT

12-06

-17

Page 189: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Big Bear Lake, from Zaca Road to Route18. Replace culverts.

0205C

0G800$2,397

$697

Subtotal: $3,094

2019-20$600

$1,040$1,900

$800

$4,340Total Project Cost: $7,434

08120001113/16/20203/2/2020

10/17/2018PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

08-San Bernardino-38 Prior18-1918-1919-20

201.15143 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

47.5/59.4

Con Sup:

Drainage System Restoration

Const:R/W:

In Pomona, Chino and Ontario, from Los AngelesCounty line to Riverside County line. Replaceexisting signs with retro-reflective sheeting.0178P

1F361$1,271

$10

Subtotal: $1,281

2019-20$125$289$12

$250

$676Total Project Cost: $1,957

08150001603/2/20209/3/20197/2/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

08-San Bernardino-60 Prior18-1918-1919-20

201.17068 Sign(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R9.9

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

In San Bernardino County, on Routes 71, 210,215 and 259 at various locations. Replaceexisting guide signs with Type XI reflectivity.3005A

1F362$1,846

$10

Subtotal: $1,856

2018-19$301$614$32

$425

$1,372Total Project Cost: $3,228

08160000115/1/20192/1/2019

9/13/2017PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

08-San Bernardino-210 PriorPriorPrior18-19

201.17089 Sign(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R21.7/R33.2

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

MOBILITYIn Ontario, from Haven Avenue to MillikenAvenue/Hamner Avenue. Construct auxiliarylane and widen connector and ramps.3003N

0E33U$20,955

$710

Subtotal: $21,665

2019-20$2,700$4,170

$20$7,107

$13,997Total Project Cost: $35,662

08170000755/15/20205/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

3/1/2021Begin Con:

08-San Bernardino-60 Prior18-1918-1919-20

201.3101827 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R7.3/R10.0

Con Sup:

Operational Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 185 of 284

DRAFT

12-06

-17

Page 190: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Redlands, from Route 210/10Junction to the Riverside County line. Installwireless VDS pole, CMS, CCTV, Data Node Cabinet and Fiber Optic elements.

3009A

38423$7,654

$10

Subtotal: $7,664

2018-19$300

$1,000$10

$1,600

$2,910Total Project Cost: $10,574

08150001686/3/20195/1/20196/1/2018PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

08-San Bernardino-10 Prior18-1918-1918-19

201.31526 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

29.4/R39.2

Con Sup:

Transportation Management Systems

Const:R/W:

Near Chino Hills, from the Los Angeles Countyline to the Riverside County line; also in Riverside County, from San Bernardino Countyline to Route 91 (PM R0.0 to PM R3.0). Replaceand upgrade existing communication elements,and install Closed Circuit Television Cameras(CCTV) for the Traffic Management System(TMS).

3009N

0G790$11,167

$99

Subtotal: $11,266

2019-20$561

$1,361$113

$1,657

$3,692Total Project Cost: $14,958

08140001765/1/20201/6/2020

12/3/2018PA&ED:

RTL:R/W Cert:

1/5/2021Begin Con:

08-San Bernardino-71 Prior18-1918-1919-20

201.31531 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R8.5

Con Sup:

Transportation Management Systems

Const:R/W:

In Rancho Cucamonga and Fontana, from EastAvenue to west of Beech Avenue; also on Route15 at Route 210/15 Separation. InstallTransportation Management System elements.

3003X

1G210$2,295

$10

Subtotal: $2,305

2018-19$135$390$10

$450

$985Total Project Cost: $3,290

08150001703/15/20192/26/2019

10/27/2017PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

08-San Bernardino-210 PriorPriorPrior18-19

201.3154 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.5/12.7

Con Sup:

Transportation Management Systems

Const:R/W:

In and near the city of San Bernardino, fromRoute 215/10 Connector to Route 215/15Junction; also on Route 259 from Route 259/215Separation to Route 259/210 Junction. Installwireless VDS, CMS, CCTV and Fiber Opticelements.

3007S

47642$9,238

$10

Subtotal: $9,248

2019-20$376$842$37

$1,930

$3,185Total Project Cost: $12,433

08160001866/1/20205/1/20202/1/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

08-San Bernardino-215 Prior18-1918-1919-20

201.31532 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.0/17.8

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 186 of 284

DRAFT

12-06

-17

Page 191: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Newberry Springs, at 5.6 miles east of FortCady Road Overcrossing. Replace the existingWeigh-in-Motion (WIM) system to meet currentstandards.

3007N

1G550$2,136

$11

Subtotal: $2,147

2020-21$310$593$32

$664

$1,599Total Project Cost: $3,746

081600003510/1/20209/1/2020

10/1/2019PA&ED:

RTL:R/W Cert:

5/1/2021Begin Con:

08-San Bernardino-40 18-1919-2019-2020-21

201.3211 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R28.9

Con Sup:

Weigh Stations

Const:R/W:

ROADSIDE PRESERVATIONNear Needles, west of Goffs Road at John WilkieSafety Roadside Rest Area. Reconstruct safetyroadside rest areas.0206L

0G860$5,340

$10

Subtotal: $5,350

2019-20$1,400$1,940

$10$2,300

$5,650Total Project Cost: $11,000

08140001325/1/2020

1/15/20208/1/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

08-San Bernardino-40 Prior18-1918-1919-20

201.2502 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R105.3/R105.6

Con Sup:

Safety Roadside Rest Area Restoration

Const:R/W:

FACILITIESIn Fontana, near the southeast quadrant of Route15/210 Interchange. Construct new maintenance facility (L5758) adjacent to the SouthernRegional Laboratory.

3005R

0R420$19,800

$10

Subtotal: $19,810

2021-22$1,500

$0$10

$3,600

$5,110Total Project Cost: $24,920

08120000769/5/2021

8/15/20217/15/2019PA&ED:

RTL:R/W Cert:

5/10/2022Begin Con:

08-San Bernardino-15 18-19

19-2021-22

201.3521 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Maintenance Facilities

Const:R/W:

In the city of San Bernardino, at San BernardinoMaintenance Station (L5726) at 175 ClusterStreet. Reconstruct maintenance station.3001P

0K840$6,670

$10

Subtotal: $6,680

2018-19$897

$1,248$42

$1,755

$3,942Total Project Cost: $10,622

08000205633/28/20192/28/2019

10/17/2017PA&ED:

RTL:R/W Cert:

11/21/2019Begin Con:

08-San Bernardino-215 PriorPriorPrior18-19

201.3521 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Maintenance Facilities

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 187 of 284

DRAFT

12-06

-17

Page 192: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MISCELLANEOUSAt Clyde V. Kane Roadside Rest Areas.Transportation infrastructure improvement forzero-emission vehicle charging.3007E

1H660$560$10

Subtotal: $570

2018-19$259$415$33

$265

$972Total Project Cost: $1,542

08170001033/18/20192/15/20196/18/2018PA&ED:

RTL:R/W Cert:

9/17/2019Begin Con:

08-San Bernardino-15 Prior18-1918-1918-19

201.9992 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R107.4

Con Sup:

Miscellaneous

Const:R/W:

CountySan Bernardino

PA&ED:PS&E:

R/W Sup:Con Sup:

$26,298$590,974

R/W:

Subtotal: $617,272

Const:$44,554$53,423$9,317

$86,853

$194,147

Total (Capital + Support): $811,419

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 188 of 284

DRAFT

12-06

-17

Page 193: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONAt various locations, on Routes 5, 8, 15, 52, 54,56, 67, 75, 76, 78, 94, 125, 163, 805 and 905.Upgrade and install curve warning signs.1200

42490$2,350

$0

Subtotal: $2,350

2020-21$498$561

$0$497

$1,556Total Project Cost: $3,906

11160000941/15/2021

12/15/202011/18/2019PA&ED:

RTL:R/W Cert:

10/15/2021Begin Con:

11-San Diego-Var 18-1919-20

20-21

201.01530 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In San Diego County, on Routes 8, 67, 79, and 94at various locations. Widen and grade existinghinges at end treatment platforms, and to upgradeguardrails and end treatments to currentstandards.

1189

42460$4,552

$0

Subtotal: $4,552

2020-21$526

$1,046$0

$824

$2,396Total Project Cost: $6,948

111600007511/20/202010/16/20207/12/2019PA&ED:

RTL:R/W Cert:

5/4/2021Begin Con:

11-San Diego-8 18-1919-20

20-21

201.01543 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In the city of San Diego and Santee, from Route 5to Route 125. Construct rumble strips, enhancepavement delineation and install barrier.1135

42030$4,121

Subtotal: $4,121

2019-20$478

$1,015

$1,317

$2,810Total Project Cost: $6,931

11150000267/15/20197/2/2019

3/28/2018PA&ED:

RTL:R/W Cert:

3/16/2020Begin Con:

11-San Diego-52 PriorPrior

19-20

201.01590 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/14.8

Con Sup:

Collision Severity Reduction

Const:R/W:

In San Diego County, on various routes at variouslocations. Construct maintenance vehicle pullouts, pave areas beyond the gore, upgradecrash cushions, reduce maintenance intensivelandscaping and relocate irrigation controls.

1168

41134$3,618

$3

Subtotal: $3,621

2018-19$409

$1,469$2

$522

$2,402Total Project Cost: $6,023

11150001345/10/20193/29/20195/4/2018PA&ED:

RTL:R/W Cert:

9/20/2019Begin Con:

11-San Diego-Var Prior18-1918-1918-19

201.23521 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 189 of 284

DRAFT

12-06

-17

Page 194: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of San Diego, from east of Route 163to east of Route 805; also on Route 805 fromnorth of Adams Avenue to south of Route 8 (PM17.3/17.5). Roadside safety improvements.

1165

41131$5,209

$3

Subtotal: $5,212

2018-19$603

$2,167$3

$770

$3,543Total Project Cost: $8,755

11140001186/7/2019

4/19/20195/18/2018PA&ED:

RTL:R/W Cert:

10/18/2019Begin Con:

11-San Diego-8 Prior18-1918-1918-19

201.23548 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.8/5.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the city of San Diego, from east of Route 805to east of Route 15; also on Route 15 from northof Adams Avenue to north of Route 8 (PMM5.8/R6.3). Roadside safety improvements.

1166

41132$3,278

$3

Subtotal: $3,281

2018-19$371

$1,330$2

$474

$2,177Total Project Cost: $5,458

11150001324/12/20192/14/20194/13/2018PA&ED:

RTL:R/W Cert:

10/18/2019Begin Con:

11-San Diego-8 PriorPriorPrior18-19

201.23525 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.0/6.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the city of San Diego and La Mesa, from westof Mission Gorge Road to west of Route 125.Roadside safety improvements.1167

41133$4,959

$3

Subtotal: $4,962

2019-20$565

$2,029$3

$721

$3,318Total Project Cost: $8,280

11150001333/6/2020

1/17/20207/27/2018PA&ED:

RTL:R/W Cert:

7/17/2020Begin Con:

11-San Diego-8 Prior18-1918-1919-20

201.23564 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.0/12.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In El Cajon, at various locations, from 0.5 mileeast of Grossmont Boulevard Overcrossing toSecond Street Undercrossing. Construct MVPs,pave beyond gore areas, relocate irrigation controllers and reduce high maintenancelandscaping.

1146

41160$4,740

$0

Subtotal: $4,740

2020-21$444

$1,202$0

$1,009

$2,655Total Project Cost: $7,395

11120001451/21/202110/1/20203/13/2019PA&ED:

RTL:R/W Cert:

7/13/2021Begin Con:

11-San Diego-8 18-1918-19

20-21

201.23584 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

13.0/17.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 190 of 284

DRAFT

12-06

-17

Page 195: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near El Cajon, at various locations, fromGreenfield Drive to 0.4 mile east of Los CochesRoad Undercrossing. Pave beyond gore areas,reduce high maintenance landscaping and relocateirrigation components.

1250

41210$1,896

$0

Subtotal: $1,896

2021-22$346$536

$0$448

$1,330Total Project Cost: $3,226

11120001597/16/20215/28/20217/30/2020PA&ED:

RTL:R/W Cert:

1/7/2022Begin Con:

11-San Diego-8 19-2020-21

21-22

201.2355 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R18.7/R20.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Near Pine Valley, at Buckman Springs SafetyRoadside Rest Area (SRRA). Rehabilitate SRRAsewer and water systems.1085

40910$3,275

$20

Subtotal: $3,295

2018-19$698

$1,251

$1,034

$2,983Total Project Cost: $6,278

11120000436/28/20195/7/2019

3/30/2016PA&ED:

RTL:R/W Cert:

11/26/2019Begin Con:

11-San Diego-8 PriorPrior

18-19

201.2351 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

49.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the city of San Diego, from 0.1 mile east ofRoute 5 to 0.1 mile east of Convoy Street.Construct MVPs, pave slopes under bridgestructures, pave narrow areas and beyond gores.

1219

41180$3,296

$0

Subtotal: $3,296

2020-21$394

$1,118$0

$539

$2,051Total Project Cost: $5,347

11120001559/30/20208/30/20207/31/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

11-San Diego-52 18-1919-20

20-21

201.23528 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.4/5.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the city of San Diego, from El Camino RealUndercrossing to Route 56/15 Separation. Pavebeyond gore areas, relocate irrigation controlvalve boxes, construct rumble strip.

1251

41190$2,007

$0

Subtotal: $2,007

2021-22$284$629

$0$429

$1,342Total Project Cost: $3,349

111200015710/8/20218/2/2021

2/11/2020PA&ED:

RTL:R/W Cert:

1/27/2022Begin Con:

11-San Diego-56 19-2020-21

21-22

201.235106 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.3/9.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 191 of 284

DRAFT

12-06

-17

Page 196: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of San Diego and Lemon Grove, atvarious locations from 0.2 mile west of 47thStreet Overcrossing to 0.6 mile west of CollegeAvenue Undercrossing. Construct MVPs, pave areas beyond gore, upgrade guardrail, installconcrete barrier/crash cushions, relocate irrigation/electrical equipment and upgrade curbramps to current ADA standards.

1253

41220$2,973

$0

Subtotal: $2,973

2020-21$340$901

$0$858

$2,099Total Project Cost: $5,072

11120001601/27/2021

11/22/20208/16/2019PA&ED:

RTL:R/W Cert:

9/17/2021Begin Con:

11-San Diego-94 18-1919-20

20-21

201.23538 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

4.4/7.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the cities of Lemon Grove and San Diego,from 0.1 mile south of Elkelton PlaceUndercrossing to Route 94/125 Separation.Construct MVPs, pave beyond gore areas, replacecrash cushions, guardrail with concrete barrier,install access gates, relocate irrigation equipmentand remove high maintenance landscaping.

1141

41140$5,074

$0

Subtotal: $5,074

2020-21$431$864

$0$1,660

$2,955Total Project Cost: $8,029

11120001438/20/20207/17/20206/6/2019PA&ED:

RTL:R/W Cert:

5/17/2021Begin Con:

11-San Diego-125 18-1919-20

20-21

201.235103 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

9.6/13.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In the city of San Diego, at various locations,from Linda Vista Road Overcrossing to Route805/52 Separation. Construct MVPs, installaccess gates, pave beyond gore areas, reduce highmaintenance landscaping, relocate irrigationcontrols, and upgrade crash cushions.

1142

41150$6,542

$50

Subtotal: $6,592

2020-21$453

$1,033$26

$1,038

$2,550Total Project Cost: $9,142

11120001441/21/20211/8/2021

3/14/2019PA&ED:

RTL:R/W Cert:

7/13/2021Begin Con:

11-San Diego-805 18-1919-2019-2020-21

201.23597 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

20.7/23.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Imperial Beach, from Georgia Street to 0.2mile north of Rainbow Drive. Relinquishroadway to Imperial Beach. FinancialContribution Only.

1204

42040$5,276

$0

Subtotal: $5,276

2018-19$348

$0$0$0

$348Total Project Cost: $5,624

1115000034

9/28/2018PA&ED:

RTL:R/W Cert:

Begin Con:

11-San Diego-75 18-19

201.1601.2 Centerline mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

10.0/11.2

Con Sup:

Relinquishments

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 192 of 284

DRAFT

12-06

-17

Page 197: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of San Diego, from Carmel MountainRoad Undercrossing to 0.05 mile west of Route5/56 Separation. Stabilize existing slopes andlandscaping from further erosion and sedimentdeposition into the Los Penasquitos Lagoon.

1203

42200$1,533

$0

Subtotal: $1,533

2020-21$283$632

$0$892

$1,807Total Project Cost: $3,340

11150001738/20/20207/16/20208/21/2019PA&ED:

RTL:R/W Cert:

3/4/2021Begin Con:

11-San Diego-5 18-1919-20

20-21

201.33510.02 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R31.8/R32.2

Con Sup:

Storm Water Mitigation

Const:R/W:

In the city of San Diego, from 0.8 mile to 1.0 milenorth of Del Mar Heights Road. Repair and enhance detention basin and regrade overflowchannel and access road.

1164

41750$1,875

Subtotal: $1,875

2019-20$241$526

$702

$1,469Total Project Cost: $3,344

11140000289/20/20198/2/2019

7/20/2018PA&ED:

RTL:R/W Cert:

2/14/2020Begin Con:

11-San Diego-5 Prior18-19

19-20

201.33573 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R34.6/R35.1

Con Sup:

Storm Water Mitigation

Const:R/W:

In Oceanside, from 0.8 mile to 0.6 mile west ofCollege Boulevard. Stormwater mitigation andslope erosion repair.1125

41740$3,547

$120

Subtotal: $3,667

2018-19$276$651$50

$984

$1,961Total Project Cost: $5,628

11140000271/29/2019

12/20/20181/29/2018PA&ED:

RTL:R/W Cert:

9/25/2019Begin Con:

11-San Diego-78 Prior18-1918-1918-19

201.3354.28 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.5/2.7

Con Sup:

Storm Water Mitigation

Const:R/W:

In San Diego County, on routes 5, 15, 75 and 163at various locations. Construct and upgrade curbramps, driveways and sidewalks to comply withADA standards.

1127

41810$2,766

$110

Subtotal: $2,876

2019-20$881

$2,425$101

$1,658

$5,065Total Project Cost: $7,941

11140000561/15/202012/9/20197/6/2018PA&ED:

RTL:R/W Cert:

6/30/2020Begin Con:

11-San Diego-Var Prior18-1918-1919-20

201.361108 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 193 of 284

DRAFT

12-06

-17

Page 198: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of San Diego, from Mission CenterRoad to College Avenue. Construct and upgradepedestrian curb ramps to meet ADA standards.Replaced damaged sidewalk and install accessiblepedestrian signals.

1227

42710$1,107

$25

Subtotal: $1,132

2021-22$326

$1,148$0

$545

$2,019Total Project Cost: $3,151

111600015411/15/20217/21/20217/15/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

11-San Diego-8 19-2020-21

21-22

201.36118 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

3.0/8.5

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In and near the cities of San Diego and LemonGrove, from 32nd Street Undercrossing toBancroff Drive Undercrossing. Construct andupgrade pedestrian curb ramps and sidewalks tomeet current standards.

1191

42510$2,660

$465

Subtotal: $3,125

2020-21$776

$1,847$714$833

$4,170Total Project Cost: $7,295

11160000778/28/20204/17/20207/1/2019PA&ED:

RTL:R/W Cert:

12/30/2020Begin Con:

11-San Diego-94 18-1919-2019-2020-21

201.36151 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.6/R11.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In various cities, from Main Street/Auto ParkDrive Undercrossing to Market StreetOvercrossing. Construct and upgrade pedestriancurb ramps to meet ADA standards. Replacepedestrian signal heads, push buttons and relocatepull boxes, light poles and controller cabinet.

1248

42900$3,098

$12

Subtotal: $3,110

2021-22$843

$1,960$0

$1,189

$3,992Total Project Cost: $7,102

111700004511/15/20217/21/20217/15/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

11-San Diego-805 19-2020-21

21-22

201.36149 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

3.5/13.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONIn the city of San Diego, at the east Route 8 tosouth Route 163 Connector Overcrossing No. 57-0355G. Bridge rail replacement.1256

26410$1,441

$426

Subtotal: $1,867

2020-21$374$969

$0$848

$2,191Total Project Cost: $4,058

111600004511/6/2020

10/26/20207/2/2019PA&ED:

RTL:R/W Cert:

3/11/2021Begin Con:

11-San Diego-8 18-1919-20

20-21

201.112318 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.2

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 194 of 284

DRAFT

12-06

-17

Page 199: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Diego County, at various locations. Applymethacrylate to bridge decks, replace joint seals,repair unsound concrete and replace approachslabs.

1221

42690$3,542

Subtotal: $3,542

2018-19 $663

$733

$1,396Total Project Cost: $4,938

111600014412/7/201812/5/2018

12/15/2016PA&ED:

RTL:R/W Cert:

4/5/2019Begin Con:

11-San Diego-VarPrior

Prior

201.11935 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONIn and near National City and Chula Vista, fromRoute 54/5 Separation to the Route 54/125Junction. Rehabilitate flexible and rigidpavement on the traveled way, shoulders, rampsand connectors, upgrade guard rail and dike.

1188

42480$21,329

$297

Subtotal: $21,626

2021-22$709

$2,260$24

$2,513

$5,506Total Project Cost: $27,132

111600006810/20/20218/27/20212/3/2020PA&ED:

RTL:R/W Cert:

5/5/2022Begin Con:

11-San Diego-54 18-1919-2019-2021-22

201.12143.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/6.4

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Escondido, from west of NorthBroadway to Teepee Drive. Pavement rehabilitation.1162

41930$17,731$3,136

Subtotal: $20,867

2019-20$1,180$2,790$2,168$2,643

$8,781Total Project Cost: $29,648

11150000421/23/20201/7/2020

7/13/2018PA&ED:

RTL:R/W Cert:

9/2/2020Begin Con:

11-San Diego-78 Prior18-1918-1919-20

201.12113.9 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

N17.6/R21.4

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In the city of San Diego, from Spring Street toRoute 54. Pavement rehabilitation.

1177

42000$11,312

$159

Subtotal: $11,471

2019-20$505

$1,252$10

$1,537

$3,304Total Project Cost: $14,775

111500004111/26/201910/28/20191/19/2018PA&ED:

RTL:R/W Cert:

6/16/2020Begin Con:

11-San Diego-94 PriorPriorPrior19-20

201.12121.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R10.4/14.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 195 of 284

DRAFT

12-06

-17

Page 200: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near La Mesa and in Santee, from 0.2 mile southof Route 125/94 Separation to Mission GorgeRoad. Rehabilitate pavement by grinding andreplacing concrete slabs and cold plane andoverlay shoulders with Rubberized Hot MixAsphalt (RHMA-G).

1257

42380$34,185

$252

Subtotal: $34,437

2021-22$1,383$2,541

$53$3,863

$7,840Total Project Cost: $42,277

111600006111/9/20219/30/202112/2/2019PA&ED:

RTL:R/W Cert:

6/8/2022Begin Con:

11-San Diego-125 Prior19-2019-2021-22

201.12149.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.0/22.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Alpine, from Viejas Creek Bridge to PineValley Creek Bridge. Grind, remove and replaceJointed Plain Concrete Pavement (JPCP) lanes,remove and replace asphalt concrete outsideshoulders and cold plane and overlay insideshoulders. Upgrade guardrail, replaceapproach/departure slabs and construct rumblestrips.

1255

42370$43,768

Subtotal: $43,768

2021-22$936

$3,276

$5,479

$9,691Total Project Cost: $53,459

111600005911/3/20219/21/202112/4/2019PA&ED:

RTL:R/W Cert:

3/14/2022Begin Con:

11-San Diego-8 Prior19-20

21-22

201.12222.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R31.8/R41.7

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In San Diego County, on various routes at variouslocations. Culvert rehabilitation.

1134

41820$2,646

$483

Subtotal: $3,129

2018-19$568$988$418$718

$2,692Total Project Cost: $5,821

11140000636/3/2019

5/22/20197/20/2018PA&ED:

RTL:R/W Cert:

10/18/2019Begin Con:

11-San Diego-Var Prior18-1918-1918-19

201.1517 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

Const:R/W:

In San Diego County, at various locations, from0.5 mile west of Midway Drive Undercrossing to0.6 mile west of Flinn Springs Road Undercrossing. Repair, rehabilitate and replaceculvert systems.

1246

42810$8,367

$80

Subtotal: $8,447

2019-20$1,173$1,590

$2,020

$4,783Total Project Cost: $13,230

11170000283/30/20202/4/2020

11/26/2018PA&ED:

RTL:R/W Cert:

10/8/2020Begin Con:

11-San Diego-8 Prior18-19

19-20

201.15165 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

L0.7/R23.0

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 196 of 284

DRAFT

12-06

-17

Page 201: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Diego County, from 0.7 mile west of FlinnSprings Road Undercrossing to 0.2 mile east ofCrestwood Road Undercrossing. Rehabilitateculverts and energy dissipaters.

1194

42210$11,773

$75

Subtotal: $11,848

2019-20$1,077$2,346

$519$2,836

$6,778Total Project Cost: $18,626

11150001787/24/20195/23/20192/2/2018PA&ED:

RTL:R/W Cert:

3/20/2020Begin Con:

11-San Diego-8 PriorPriorPrior19-20

201.15127 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R23.0/R61.3

Con Sup:

Drainage System Restoration

Const:R/W:

In San Diego County, at various locations from0.1 mile east of Route 78/5 Separation to Route15/78 Separation. Rehabilitate and replaceculverts including invert paving, joint repairgrouting, Cured-in-Place Pipeliner (CIPP) anddrainage inlet lid repair.

1247

42230$8,519

$204

Subtotal: $8,723

2021-22$811

$1,469$212

$2,047

$4,539Total Project Cost: $13,262

111500018012/10/202112/10/20213/18/2020PA&ED:

RTL:R/W Cert:

6/13/2022Begin Con:

11-San Diego-78 Prior19-2019-2021-22

201.15165 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R16.5

Con Sup:

Drainage System Restoration

Const:R/W:

In San Diego County, at various locations onvarious routes. Replace aging roadside signpanels with retroreflective sheeting.1237

42550$1,962

$0

Subtotal: $1,962

2019-20$0

$355$0

$325

$680Total Project Cost: $2,642

111600009711/21/20197/16/20196/30/2016PA&ED:

RTL:R/W Cert:

7/14/2020Begin Con:

11-San Diego-518-19

19-20

201.170936 Sign(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.4/72.4

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

MOBILITYIn the city of San Diego, from north of La JollaVillage Drive to south of Genesee Avenue, onsouthbound. Construct a 1/2 mile auxiliary lane.1136

2T215$5,000

Subtotal: $5,000

2018-19 $1,000

$750

$1,750Total Project Cost: $6,750

111400007410/12/2018

7/5/20186/30/2011PA&ED:

RTL:R/W Cert:

1/31/2019Begin Con:

11-San Diego-5Prior

18-19

201.310464 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R28.6/R29.3

Con Sup:

Operational Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 197 of 284

DRAFT

12-06

-17

Page 202: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Carlsbad, from Palomar Airport Road toCannon Road. Construct auxiliary lane insouthbound direction for operational efficiency.1279

43017$5,501

$23

Subtotal: $5,524

2021-22$207

$1,052$0

$1,243

$2,502Total Project Cost: $8,026

11170002066/30/20213/30/20212/25/2020PA&ED:

RTL:R/W Cert:

2/18/2022Begin Con:

11-San Diego-5 18-1919-20

21-22

201.31077 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R47.0/R48.0

Con Sup:

Operational Improvements

Const:R/W:

In San Diego County, on various routes at various locations. Replace Changeable Message Sign(CMS) panels with Advanced Variable MessageSign (AVMS) panels.

1171

42070$4,401

Subtotal: $4,401

2019-20 $585

$886

$1,471Total Project Cost: $5,872

111500005712/12/201910/14/20196/19/2015PA&ED:

RTL:R/W Cert:

9/4/2020Begin Con:

11-San Diego-VarPrior

19-20

201.31525 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

In San Diego County, on various routes at variouslocations. Replace Changeable Message Sign(CMS) panels with Advanced Variable MessageSign (AVMS) panels.

1174

42080$4,586

Subtotal: $4,586

2018-19$389$585

$886

$1,860Total Project Cost: $6,446

11150000605/25/20182/22/20183/24/2017PA&ED:

RTL:R/W Cert:

1/23/2019Begin Con:

11-San Diego-Var PriorPrior

18-19

201.31525 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

In San Diego County, at various locations.Repair and install Vehicle Detection Station(VDS) elements including Microwave VehicleDetection Systems (MVDS) and loop detectors.

1262

42970$11,535

Subtotal: $11,535

2019-20$911

$2,160

$2,264

$5,335Total Project Cost: $16,870

111700010212/13/201911/15/20198/22/2018PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

11-San Diego-Var Prior18-19

19-20

201.315239 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 198 of 284

DRAFT

12-06

-17

Page 203: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Diego County, at various locations; also onRoute 905 (PM 2.5/5.4) and Route 805 (PM0.2/14.0). Install fiber optic communication linesto improve regional traffic operations andmobility near the U.S./Mexico border.

1241

42750$19,827

$375

Subtotal: $20,202

2020-21$818

$1,721$62

$4,404

$7,005Total Project Cost: $27,207

11160001777/3/2020

4/10/20202/8/2019PA&ED:

RTL:R/W Cert:

3/29/2021Begin Con:

11-San Diego-5 Prior18-1918-1920-21

201.31513.8 Mile(s) of cablePerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.3/R15.2

Con Sup:

Transportation Management Systems

Const:R/W:

In San Diego County, from 0.6 mile south ofRoute 5/ 8 Separation to 1.5 miles north of Route5/76 Separation. Install VDS, CMS, CCTV,Ramp Metering, Traffic Signal and Fiber OpticNetwork elements.

1281

42560$19,621

$3

Subtotal: $19,624

2019-20 $1,497$122

$2,995

$4,614Total Project Cost: $24,238

11160001013/17/20208/2/2019

10/23/2013PA&ED:

RTL:R/W Cert:

6/16/2020Begin Con:

11-San Diego-5PriorPrior19-20

201.315103 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R19.5/R55.4

Con Sup:

Transportation Management Systems

Const:R/W:

In San Diego County, at various locations.Update Microwave Vehicle Detection System(MVDS) elements for traffic flow monitoring anddata collections.

1263

42980$3,324

Subtotal: $3,324

2018-19$372$865

$654

$1,891Total Project Cost: $5,215

11170001035/8/20193/8/2019

4/18/2018PA&ED:

RTL:R/W Cert:

12/13/2019Begin Con:

11-San Diego-15 PriorPrior

18-19

201.31562 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.5/31.2

Con Sup:

Transportation Management Systems

Const:R/W:

ROADSIDE PRESERVATIONIn the city of San Diego, from Camino de la PlazaOvercrossing to Otay River Bridge; also on Route805 from Route 805/5 Separation to San YsidroBoulevard Undercrossing. Convert potableirrigation system to recycled water.

1245

42890$10,670

$40

Subtotal: $10,710

2020-21$384

$1,243$3

$1,361

$2,991Total Project Cost: $13,701

11170000391/8/2021

12/2/20201/9/2020PA&ED:

RTL:R/W Cert:

7/20/2021Begin Con:

11-San Diego-5 18-1919-2019-2020-21

201.210132 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.3/R5.0

Con Sup:

Highway Planting Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 199 of 284

DRAFT

12-06

-17

Page 204: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of San Diego, from Iris StreetOvercrossing to Otay River Bridge. Replacedeteriorated water supply lines and plantlandscaping for erosion control.

1205

41880$1,320

$0

Subtotal: $1,320

2020-21$304$564

$0$534

$1,402Total Project Cost: $2,722

11140001157/8/20206/3/20207/9/2019PA&ED:

RTL:R/W Cert:

1/19/2021Begin Con:

11-San Diego-5 18-1919-20

20-21

201.2104.6 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

3.4/5.0

Con Sup:

Highway Planting Restoration

Const:R/W:

In the city of San Diego, from San YsidroBoulevard Undercrossing to Otay River Bridge;also on Route 905 from 0.3 mile east of PicadorBoulevard Undercrossing to Caliente AvenueOvercrossing. Convert potable irrigation systemsto recycled water.

1244

42880$8,220

$30

Subtotal: $8,250

2020-21$327

$1,149$3

$1,174

$2,653Total Project Cost: $10,903

111700003810/9/20209/3/2020

10/10/2019PA&ED:

RTL:R/W Cert:

4/23/2021Begin Con:

11-San Diego-805 18-1919-2019-2020-21

201.210139 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.7/3.3

Con Sup:

Highway Planting Restoration

Const:R/W:

In Chula Vista, from 0.3 mile south of MainStreet Undercrossing to Palomar Street Overcrossing. Convert potable irrigation systemsto recycled water.

1243

42870$4,097

$20

Subtotal: $4,117

2020-21$284$721

$3$888

$1,896Total Project Cost: $6,013

11170000377/10/20206/5/2020

7/11/2019PA&ED:

RTL:R/W Cert:

1/21/2021Begin Con:

11-San Diego-805 18-1919-2019-2020-21

201.21040 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

3.4/5.1

Con Sup:

Highway Planting Restoration

Const:R/W:

MISCELLANEOUSIn the city of San Diego, from Sorrento ValleyRoad to Del Mar Heights Road. Constructrumble strips on both shoulders, rehabilitate bikepath, install fiber optic cable/CCTVs andrehabilitate 48 inch culvert. Asset ManagementPilot Project.

1218

42650$3,824

$0

Subtotal: $3,824

2020-21$471

$1,304$40

$678

$2,493Total Project Cost: $6,317

111600012510/30/202010/13/2021

9/1/2019PA&ED:

RTL:R/W Cert:

4/30/2021Begin Con:

11-San Diego-5 18-1919-2019-2020-21

201.9990 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R30.2/R34.2

Con Sup:

Miscellaneous

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 200 of 284

DRAFT

12-06

-17

Page 205: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountySan Diego

PA&ED:PS&E:

R/W Sup:Con Sup:

$6,417$348,253

R/W:

Subtotal: $354,670

Const:$23,997$61,285$4,538

$63,222

$153,042

Total (Capital + Support): $507,712

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 201 of 284

DRAFT

12-06

-17

Page 206: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Francisco($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn the city and county of San Francisco, from SanMateo County Line to Route 101/80 Junction.Overlay existing pavement with open gradedasphalt, groove concrete pavement, and upgradedrainage system.

1490F

4J390$21,970

$20

Subtotal: $21,990

2019-20$1,500$1,700

$30$3,000

$6,230Total Project Cost: $28,220

04150003406/1/20205/1/2020

10/1/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

04-San Francisco-101 Prior18-1918-1919-20

201.010261 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/4.2

Con Sup:

Safety Improvements

Const:R/W:

In the city of San Francisco, on Routes 1, 35, 80,101 and 280 at various locations. Crosswalksafety enhancements.1489B

3J890$7,060

$5

Subtotal: $7,065

2018-19$440$914$91

$914

$2,359Total Project Cost: $9,424

04150002216/28/20196/7/2019

1/15/2018PA&ED:

RTL:R/W Cert:

1/7/2020Begin Con:

04-San Francisco-1 PriorPriorPrior18-19

201.015252 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

In the city and county of San Francisco, fromBayshore Boulevard Overcrossing (OC) to SouthVan Ness Avenue; also, on Route 280 fromMonterey Boulevard onramp OC to King Streetonramp (PM R2.8 to T7.2). Install vandalism-resistant security fence and gates to reducemaintenance repairs and enhance highway workersafety.

1493G

4J970$6,196

$3

Subtotal: $6,199

2020-21$950

$1,000$95

$1,520

$3,565Total Project Cost: $9,764

04160000486/30/20215/31/2021

11/29/2019PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

04-San Francisco-101 18-1919-2019-2020-21

201.23580 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.5/R5.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn the city of San Francisco, at Presidio NationalPark. Water quality improvements.

1067C

1A905$785

$1,050

Subtotal: $1,835

2019-20$1,020

$315$50

$336

$1,721Total Project Cost: $3,556

04140003406/29/20206/15/20203/1/2019PA&ED:

RTL:R/W Cert:

2/10/2021Begin Con:

04-San Francisco-1 Prior18-1918-1919-20

201.3359.6 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.0

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 202 of 284

DRAFT

12-06

-17

Page 207: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Francisco($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear San Francisco, at Alemany CircleUndercrossing No. 34-0033. Rehabilitate bridge.

0587D

3G620$32,400

$20

Subtotal: $32,420

2018-19$4,000$3,000

$20$3,250

$10,270Total Project Cost: $42,690

04120001415/1/2019

4/15/201911/15/2017PA&ED:

RTL:R/W Cert:

8/26/2019Begin Con:

04-San Francisco-101 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In the city and county of San Francisco, at theCentral Viaduct No. 34-0077 from south of 17th Street to S. Van Ness Avenue ; also, on Route 80at the Bayshore Viaduct No. 34-0088 from Route101 to 4th Street (PM 3.9/4.8). Paintsuperstructure steel members.

1483S

2J800$100,793

$62

Subtotal: $100,855

2019-20$2,500$9,200

$300$13,000

$25,000Total Project Cost: $125,855

04150000346/1/20205/1/2020

12/1/2018PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

04-San Francisco-101 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.1/R5.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In the city and county of San Francisco, atAlemany Circle Undercrossing (UC) No. 34 -0064K, Alemany Circle UC No. 34-0063S, andBayshore Boulevard UC No. 34-0047S; also, inSan Mateo County in Pacifica, at Paloma AvenueOvercrossing No. 35-0187 (PM R44.21). Upgrade bridge rails.

1450E

2K190$5,461

$10

Subtotal: $5,471

2020-21$657

$1,751$164

$1,805

$4,377Total Project Cost: $9,848

04160003803/1/20211/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

10/1/2021Begin Con:

04-San Francisco-101 18-1919-2019-2020-21

201.1122249 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.0/2.9

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

ROADWAY PRESERVATIONIn the city and county of San Francisco, fromnorth of Lake Street to south of Route 101 at theMcArthur Tunnel. Replace existing lightingsystem with LED lighting system.

1490A

3J300$3,956

$5

Subtotal: $3,961

2018-19$220$440$25

$790

$1,475Total Project Cost: $5,436

04150001473/1/2019

2/15/20191/17/2018PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

04-San Francisco-1 PriorPriorPrior18-19

201.170380 Lighting fixture(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.3/6.6

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 203 of 284

DRAFT

12-06

-17

Page 208: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Francisco($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

FACILITIESIn the city and county of San Francisco, at theDistrict 4 Materials Laboratory beneath Route101 (325 San Bruno Avenue). Constructpermanent District 4 Materials Lab at alternativestate-owned site to replace obsolete facility closedin March 2015 due to unsafe conditions.

1453E

2K950$12,087

$255

Subtotal: $12,342

2021-22$2,210$1,820

$130$3,086

$7,246Total Project Cost: $19,588

04170000572/1/2022

12/1/20214/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-San Francisco-101 18-1919-2019-2021-22

201.3541 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

4.2

Con Sup:

Material Labs

Const:R/W:

CountySan Francisco

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,430$190,708

R/W:

Subtotal: $192,138

Const:$13,497$20,140

$905$27,701

$62,243

Total (Capital + Support): $254,381

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 204 of 284

DRAFT

12-06

-17

Page 209: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Holt, from 0.3 mile west to 0.5 mile east ofMiddle River Bridge. Realign curve, widenshoulders, upgrade guard rail, and install flashingbeacons.

3177

1F460$7,335$1,358

Subtotal: $8,693

2019-20$1,081$1,453

$274$2,006

$4,814Total Project Cost: $13,507

10160001396/22/20206/15/202012/3/2018PA&ED:

RTL:R/W Cert:

10/21/2020Begin Con:

10-San Joaquin-4 Prior18-1918-1919-20

201.01050 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.1/4.9

Con Sup:

Safety Improvements

Const:R/W:

Near Clements, at Liberty Road. Improveintersection.

3207

1E531$972$266

Subtotal: $1,238

2019-20$434

$1,068$154$948

$2,604Total Project Cost: $3,842

10160000315/29/20205/15/20207/31/2018PA&ED:

RTL:R/W Cert:

11/30/2020Begin Con:

10-San Joaquin-88 Prior18-1918-1919-20

201.01018 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

22.1

Con Sup:

Safety Improvements

Const:R/W:

In San Joaquin, Stanislaus, and TuolumneCounties, on Routes 4, 5, 99, 120, and 205 atvarious locations. Improve wet roadway surfaceconditions at 12 locations.

3231

1E590$4,150

Subtotal: $4,150

2018-19$288$642$31

$547

$1,508Total Project Cost: $5,658

10170000145/1/2018

2/16/201810/26/2017PA&ED:

RTL:R/W Cert:

9/30/2018Begin Con:

10-San Joaquin-205 PriorPriorPrior18-19

201.010264 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Safety Improvements

Const:R/W:

In San Joaquin and Stanislaus Counties, on Route5 at various locations; also, in Merced County onRoute 152 at various locations. Install new orupgrade existing safety devices to shield objectsfrom errant vehicles.

3190

1C970$1,361

$14

Subtotal: $1,375

2019-20$445

$1,104$0

$872

$2,421Total Project Cost: $3,796

10160000211/15/2020

12/15/20193/1/2019PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

10-San Joaquin-5 18-1918-19

19-20

201.01513 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 205 of 284

DRAFT

12-06

-17

Page 210: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Stockton, from Garfield Avenue to Route 99 atvarious locations. Highway worker safetyimprovements.3110

0X690$3,520

$60

Subtotal: $3,580

2018-19$650$740$10

$600

$2,000Total Project Cost: $5,580

10130002411/15/2019

12/15/20188/10/2017PA&ED:

RTL:R/W Cert:

7/22/2019Begin Con:

10-San Joaquin-4 PriorPriorPrior18-19

201.235102 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R15.7/R19.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Lathrop and Stockton, from south ofLouise Avenue to Charter Way; also, from southof Hammer Lane to north of Eight Mile Road(PM 32.3/35.7). Highway worker safetyimprovements.

3112

0X720$2,770

$10

Subtotal: $2,780

2018-19$200$470$10

$480

$1,160Total Project Cost: $3,940

10130002426/5/2018

5/16/201810/3/2017PA&ED:

RTL:R/W Cert:

1/23/2019Begin Con:

10-San Joaquin-5 PriorPriorPrior18-19

201.23561 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R16.1/25.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Stockton and Lodi, at variouslocations from French Camp Road to KettlemanLane; also at the Route 4 (PM R15.7 to R16.6)and Route 5 (PM 25.8 to 26.6) interchange. Paveareas behind the gore, slopes, and at narrowlocations, and construct access gates and maintenance vehicle pullouts to reducemaintenance and improve highway worker safety.

3237

1C760$1,922

$23

Subtotal: $1,945

2020-21$495

$1,130$15

$790

$2,430Total Project Cost: $4,375

101700001510/15/20208/21/20207/2/2019PA&ED:

RTL:R/W Cert:

4/21/2021Begin Con:

10-San Joaquin-99 18-1919-2019-2020-21

201.23588 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

11.5/29.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Manteca, from east of McKinleyAvenue to Route 99. Highway worker safetyimprovements.3120

0X710$3,491

$11

Subtotal: $3,502

2018-19$409$723

$9$808

$1,949Total Project Cost: $5,451

10130002471/29/20191/15/20191/3/2018PA&ED:

RTL:R/W Cert:

7/2/2019Begin Con:

10-San Joaquin-120 PriorPriorPrior18-19

201.23538 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R2.6/T7.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 206 of 284

DRAFT

12-06

-17

Page 211: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Tracy, from Hansen Road to ParadiseRoad. Highway worker safety improvements.

3111

0X700$3,727

$33

Subtotal: $3,760

2018-19$225$877$10

$861

$1,973Total Project Cost: $5,733

101300024811/1/201810/1/20189/14/2017PA&ED:

RTL:R/W Cert:

5/6/2019Begin Con:

10-San Joaquin-205 PriorPriorPrior18-19

201.23541 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.3/R9.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Lodi, from Stockton Street to Route 99.Upgrade pedestrian facilities to make compliantwith the ADA standards.3254

1G510$850$479

Subtotal: $1,329

2021-22$286$770$915$560

$2,531Total Project Cost: $3,860

101700001611/1/20219/30/20215/28/2019PA&ED:

RTL:R/W Cert:

5/12/2022Begin Con:

10-San Joaquin-12 18-1918-1918-1921-22

201.36172 ADA unit(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

17.4/18.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Ripon, at Main Street Overcrossing; also inLodi at Turner Road Overcrossing (PM 31.6). Upgrade pedestrian facilities to comply withADA requirements.

3156

1C060$1,553

$8

Subtotal: $1,561

2018-19$97

$530$58

$550

$1,235Total Project Cost: $2,796

10140001025/17/20185/1/2018

6/26/2017PA&ED:

RTL:R/W Cert:

1/2/2019Begin Con:

10-San Joaquin-99 PriorPriorPrior18-19

201.36140 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONIn Stockton, at the Stockton Channel Viaduct No.29-0176L/R. Bridge deck rehabilitation at spotlocations.3193

1C940$4,766

$5

Subtotal: $4,771

2019-20$335

$1,030$10

$1,950

$3,325Total Project Cost: $8,096

10160000201/3/2020

9/20/20197/13/2018PA&ED:

RTL:R/W Cert:

7/13/2020Begin Con:

10-San Joaquin-5 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

26.5

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 207 of 284

DRAFT

12-06

-17

Page 212: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Stockton, at Route 26/99 Separation No. 29-0142 (PM 1.11). Establish standard verticalclearance.3169

1F170$6,112

$7

Subtotal: $6,119

2020-21$598

$1,827$13

$3,221

$5,659Total Project Cost: $11,778

10160000321/15/2021

12/15/20205/1/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

10-San Joaquin-26 18-1918-1918-1920-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In San Joaquin County, on Routes 5 and 580 andin Stanislaus County on Route 99, at variouslocations. Seismic retrofit of 4 bridges.3118

0P540$8,758

$263

Subtotal: $9,021

2019-20$515

$1,992$73

$1,783

$4,363Total Project Cost: $13,384

101300025111/15/201911/1/2019

10/10/2017PA&ED:

RTL:R/W Cert:

5/6/2020Begin Con:

10-San Joaquin-5 PriorPriorPrior19-20

201.1134 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Near Discovery Bay, at Old River Bridge No. 29-0045. Upgrade mechanical and electricalequipment on movable bridge.3113

1C800$4,079$2,000

Subtotal: $6,079

2019-20$490

$1,358$55

$1,319

$3,222Total Project Cost: $9,301

10150000375/4/20204/3/2020

8/15/2018PA&ED:

RTL:R/W Cert:

10/21/2020Begin Con:

10-San Joaquin-4 Prior18-1918-1919-20

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In Stockton, at Crosstown Freeway Viaduct No.29-0269. Reconstruct hinge 32 (left and right)and three ramp joint seals. 3198

1C860$3,428

$115

Subtotal: $3,543

2018-19$648$848$37

$631

$2,164Total Project Cost: $5,707

10160000233/15/20193/1/2019

11/15/2017PA&ED:

RTL:R/W Cert:

11/29/2019Begin Con:

10-San Joaquin-4 PriorPriorPrior18-19

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R16.6/R17.8

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 208 of 284

DRAFT

12-06

-17

Page 213: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Terminous, at Little Potato Slough BridgeNo. 29-0101. Replace joint seals and bearing padsusing temporary pile supports.3273

1F760$3,028

$925

Subtotal: $3,953

2020-21$553$905

$2$1,232

$2,692Total Project Cost: $6,645

10170000245/20/20212/17/20217/20/2020PA&ED:

RTL:R/W Cert:

12/15/2021Begin Con:

10-San Joaquin-12 Prior20-2120-2120-21

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R4.4

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Near Stockton, at Wilson Way Overcrossing No.29-0118C. Remove existing damaged girder andbuild new overhang and barrier, resulting inreduced bridge width and increased verticalclearance.

3206

1C880$1,170

$4

Subtotal: $1,174

2018-19$172$562

$7$420

$1,161Total Project Cost: $2,335

10160000227/5/20186/5/2018

7/13/2017PA&ED:

RTL:R/W Cert:

11/22/2018Begin Con:

10-San Joaquin-99 PriorPriorPrior18-19

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.7

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In and near Lathrop, at Deuel Overhead No. 29-0262L/R. Improve to standard truck capacity.(PA&ED Only)3235B

1H342$7,700

$440

Subtotal: $8,140

2019-20$498$925$70

$1,700

$3,193Total Project Cost: $11,333

10180000782/28/20201/30/2020

12/30/2017PA&ED:

RTL:R/W Cert:

8/26/2020Begin Con:

10-San Joaquin-5 Prior19-2019-2019-20

201.3222 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

10.7

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

In Stockton, at Route 4/99 Separation(Farmington Road) Bridge No. 29-0155. Replacestructure to provide standard vertical clearance.3148

0X310$5,776

$115

Subtotal: $5,891

2019-20$673

$2,092$147

$1,984

$4,896Total Project Cost: $10,787

101300026512/16/201912/2/201911/9/2017PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

10-San Joaquin-99 PriorPriorPrior19-20

201.3221 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

17.2

Con Sup:

Trans Permit Requirements for Bridges

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 209 of 284

DRAFT

12-06

-17

Page 214: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn Stockton, from 0.1 mile east of Fresno Avenueto west of Center Street. Roadway rehabilitation.

3165

1C500$30,576

$48

Subtotal: $30,624

2019-20$538

$2,324$19

$4,589

$7,470Total Project Cost: $38,094

101600002611/10/201910/10/2019

5/7/2018PA&ED:

RTL:R/W Cert:

7/11/2020Begin Con:

10-San Joaquin-4 Prior18-1918-1919-20

201.1229.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

T15.5/R16.6

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

In San Joaquin County, on Routes 4, 5, and 99 atvarious locations. Rehabilitate culverts.

3140

1C200$3,178

$71

Subtotal: $3,249

2019-20$870$725$199$597

$2,391Total Project Cost: $5,640

10140000986/22/20205/22/20209/4/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

10-San Joaquin-5 Prior18-1918-1919-20

201.15131 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.5/49.0

Con Sup:

Drainage System Restoration

Const:R/W:

Near Lockeford, from 0.1 mile south of East JackTone Road to north of North Tully Road intersection; also, near Kirkwood in AlpineCounty (PM 0.3/2.4). Replace culverts.

3141

0S740$3,160

$335

Subtotal: $3,495

2020-21$795$900$290$875

$2,860Total Project Cost: $6,355

101300026012/20/202012/5/202012/3/2018PA&ED:

RTL:R/W Cert:

7/21/2021Begin Con:

10-San Joaquin-88 Prior18-1918-1920-21

201.15130 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.5/14.1

Con Sup:

Drainage System Restoration

Const:R/W:

In and near Stockton and Lodi, at variouslocations from Eastside Underpass to AcampoRoad; also, on Route 4 at the Route 4/5Separation (PM R16.10), and on Route 120 inLathrop at Mossdale Underpass (PM R0.5). Upgrade drainage pump plants.

3229

1E610$5,169

$260

Subtotal: $5,429

2021-22$439

$1,530$59

$1,289

$3,317Total Project Cost: $8,746

10170000221/13/2022

12/13/20219/9/2019PA&ED:

RTL:R/W Cert:

7/5/2022Begin Con:

10-San Joaquin-99 18-1919-2019-2021-22

201.1515 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

19.7/33.6

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 210 of 284

DRAFT

12-06

-17

Page 215: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Joaquin County, on Routes 5 and 99, andin Stanislaus County, on Routes 5, at variouslocations. Upgrade sign panels and replaceoverhead sign structures.

3129

1C530$1,538

$8

Subtotal: $1,546

2018-19$353$889$52

$543

$1,837Total Project Cost: $3,383

101500000212/3/20188/15/20185/16/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

10-San Joaquin-5 PriorPriorPrior18-19

201.17023 Lighting fixture(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Signs and Lighting Rehabilitation

Const:R/W:

MOBILITYNear Linden, from 0.3 mile east of Fine Road to0.1 mile west of Podesta Lane. Widen travel lanes and shoulders to improve the existingconditions for Surface Transportation AssistanceAct (STAA) trucks.

3275

0H560$1,250

$540

Subtotal: $1,790

2019-20 $425$230$680

$1,335Total Project Cost: $3,125

10130001488/14/20197/3/2019

6/30/2017PA&ED:

RTL:R/W Cert:

2/28/2020Begin Con:

10-San Joaquin-2618-1918-1919-20

201.31034 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

13.1/R13.8

Con Sup:

Operational Improvements

Const:R/W:

In Lodi, from south of Route 12 (Victor Road) tosouth of Turner Road. Realign northboundonramp, lower mainline ramp vertical profile forincreased vertical clearance, and constructauxiliary lane.

3145

1C280$7,136

$92

Subtotal: $7,228

2018-19$910

$1,296$75

$1,575

$3,856Total Project Cost: $11,084

10140001345/28/20195/17/2019

12/29/2017PA&ED:

RTL:R/W Cert:

1/6/2020Begin Con:

10-San Joaquin-99 PriorPriorPrior18-19

201.31080 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

30.9/31.3

Con Sup:

Operational Improvements

Const:R/W:

In Stockton, from Route 5 to Route 99. Installramp meters, traffic monitoring systems, closed-circuit television (CCTV), and synchronizeintersection signals with ramp metering.

3274

1F180$37,521$1,269

Subtotal: $38,790

2021-22$2,177$5,813

$667$9,058

$17,715Total Project Cost: $56,505

10160000774/15/20223/15/20229/15/2019PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

10-San Joaquin-4 18-1919-2019-2021-22

201.31530 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R16.0/R19.4

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 211 of 284

DRAFT

12-06

-17

Page 216: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In various counties, on various routes, at variouslocations. Upgrade Transportation ManagementSystem (TMS) elements.3147

1C620$3,462

$15

Subtotal: $3,477

2018-19$333$881$138$697

$2,049Total Project Cost: $5,526

10150000016/14/20195/7/2019

5/16/2017PA&ED:

RTL:R/W Cert:

12/27/2019Begin Con:

10-San Joaquin-5 PriorPriorPrior18-19

201.31524 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

In and near Stockton, on Routes 5, 4 (PM14.6/21.2), and 99 (PM 15.8/18.5) at variouslocations. Install Intelligent TransportationSystem (ITS) elements.

3250

1F400$8,960

$80

Subtotal: $9,040

2021-22$820

$2,550$380

$1,805

$5,555Total Project Cost: $14,595

101600005312/22/202111/23/20218/28/2018PA&ED:

RTL:R/W Cert:

7/14/2022Begin Con:

10-San Joaquin-5 Prior18-1918-1921-22

201.31522 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R21.4/27.9

Con Sup:

Transportation Management Systems

Const:R/W:

In San Joaquin, Merced, and Stanislaus Counties,on Routes 5, 12, 59, 99, and 152 at variouslocations. Upgrade or replace inefficient anddamaged Traffic Monitoring Station elements.

3227

1G750$6,862

$7

Subtotal: $6,869

2019-20$1,202$1,719

$465$1,310

$4,696Total Project Cost: $11,565

10170000363/16/20202/14/20204/1/2019PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

10-San Joaquin-99 Prior18-1918-1919-20

201.315101 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

In San Joaquin, Amador, Calaveras, Merced,Mariposa, Stanislaus, and Tuolumne Counties, onRoutes 4, 5, 26, 33, 49, 59, 88, 99, 104, 108, 120,132, 140, 152 and 205 at various locations.Repair or replace damaged and nonfunctioningTraffic Management System (TMS) elements.

3226

1G990$2,065

$33

Subtotal: $2,098

2020-21$632

$1,191$107

$1,243

$3,173Total Project Cost: $5,271

10170000741/5/2021

11/5/20204/26/2019PA&ED:

RTL:R/W Cert:

7/6/2021Begin Con:

10-San Joaquin-120 Prior18-1918-1920-21

201.31559 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 212 of 284

DRAFT

12-06

-17

Page 217: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Manteca and Lathrop, from Route 5to Route 99; also, on Route 5 at PM R13.34, andon Route 99 at PM 4.56. Install IntelligentTransportation System (ITS) field elements.

3230

1C960$3,550

$68

Subtotal: $3,618

2020-21$373

$1,221$5

$1,121

$2,720Total Project Cost: $6,338

10170000211/29/202112/3/20208/17/2018PA&ED:

RTL:R/W Cert:

9/13/2021Begin Con:

10-San Joaquin-120 Prior18-1918-1920-21

201.31559 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.6/R6.1

Con Sup:

Transportation Management Systems

Const:R/W:

In and near Tracy and Lathrop, from Route 580 toRoute 5. Install ramp meters and other IntelligentTransportation System (ITS) elements.3146

1C330$10,857

$10

Subtotal: $10,867

2019-20$1,057$1,772

$6$2,333

$5,168Total Project Cost: $16,035

101400014610/15/2019

3/1/20218/15/2018PA&ED:

RTL:R/W Cert:

5/19/2020Begin Con:

10-San Joaquin-205 Prior18-1918-1919-20

201.3157 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

L0.0/R13.4

Con Sup:

Transportation Management Systems

Const:R/W:

CountySan Joaquin

PA&ED:PS&E:

R/W Sup:Con Sup:

$8,972$201,752

R/W:

Subtotal: $210,724

Const:$19,591$44,282$4,592

$50,977

$119,442

Total (Capital + Support): $330,166

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 213 of 284

DRAFT

12-06

-17

Page 218: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Luis Obispo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn the city of San Luis Obispo, from north of Marsh Street Bridge to Broad Street; also inAtascadero on Route 41 from Old Morro Road toAtascadero Creek Bridge (PM 12.5/13.3). Upgrade highway safety features.

2508

1F370$3,800

$7

Subtotal: $3,807

2019-20$834$970$92

$843

$2,739Total Project Cost: $6,546

05130001354/1/2020

3/20/20207/3/2018PA&ED:

RTL:R/W Cert:

12/16/2020Begin Con:

05-San Luis Obispo-101 Prior18-1918-1919-20

201.01533 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Atascadero, from Santa MargaritaCreek to South Paso Robles Overhead. Improveclear recovery and install barrier.2518

1F490$2,687

$50

Subtotal: $2,737

2019-20$395

$1,097$50

$805

$2,347Total Project Cost: $5,084

05140000023/2/2020

11/1/20198/1/2018PA&ED:

RTL:R/W Cert:

7/20/2020Begin Con:

05-San Luis Obispo-101 Prior18-1918-1919-20

201.01529 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

36.6/55.7

Con Sup:

Collision Severity Reduction

Const:R/W:

MANDATESIn Atascadero, from San Gabriel Road to Route101 Southbound ramps. Improve and constructnew ADA accessible pedestrian pathways andinstall Accessible Pedestrian Signal (APS)systems.

2532

1F630$3,550

$679

Subtotal: $4,229

2018-19$827

$1,333$1,082$1,141

$4,383Total Project Cost: $8,612

05140000406/20/20196/20/201910/5/2017PA&ED:

RTL:R/W Cert:

2/20/2020Begin Con:

05-San Luis Obispo-41 PriorPriorPrior18-19

201.361126 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

14.2/15.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONIn Morro Bay, at Toro Creek Bridge No. 49-0068R. Replace bridge.

0072

0L721$5,200

$906

Subtotal: $6,106

2019-20$1,424$2,300

$275$2,400

$6,399Total Project Cost: $12,505

05150000976/29/20204/17/20206/18/2018PA&ED:

RTL:R/W Cert:

2/4/2021Begin Con:

05-San Luis Obispo-1 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

32.6

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 214 of 284

DRAFT

12-06

-17

Page 219: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Luis Obispo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Morro Bay, at Old Creek Bridge No. 05-49-0070R. Replace bridge.

0072A

0L722$4,200

$450

Subtotal: $4,650

2019-20$1,399$1,900

$200$1,900

$5,399Total Project Cost: $10,049

05150000984/28/20201/2/2020

11/2/2017PA&ED:

RTL:R/W Cert:

11/13/2020Begin Con:

05-San Luis Obispo-1 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

34.5

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Santa Margarita, at Trout Creek Bridge No.05-49-0091. Replace bridge.

0072B

0L723$5,987

$308

Subtotal: $6,295

2019-20$1,419$2,500

$210$2,900

$7,029Total Project Cost: $13,324

05150000991/8/2020

12/2/201911/1/2017PA&ED:

RTL:R/W Cert:

8/12/2020Begin Con:

05-San Luis Obispo-58 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

ROADWAY PRESERVATIONIn San Luis Obispo County, near Paso Roblesfrom 0.1 mile south to 0.1 mile north of SanMarcos Creek Bridge and from 0.1 mile south to0.1 mile north of South San MiguelUndercrossing. Landscape mitigation.

0040C

0G041$270

Subtotal: $270

2018-19 $223$28

$479

$730Total Project Cost: $1,000

05150000196/3/2019

3/15/20199/4/2013PA&ED:

RTL:R/W Cert:

11/18/2019Begin Con:

05-San Luis Obispo-101PriorPrior18-19

201.1208 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

63.5/R65.2

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In and near Pismo Beach, from Gracia Way toNorth Pismo (Route 101/Route 1) Separation.Upgrade ADA curb ramps, cold plane pavementand place Rubberized Hot Mix Asphalt concrete(RHMA).

2630

1G980$8,618

$303

Subtotal: $8,921

2021-22$1,156$1,751$1,670$1,568

$6,145Total Project Cost: $15,066

05160000094/6/20224/6/20222/1/2019PA&ED:

RTL:R/W Cert:

8/23/2022Begin Con:

05-San Luis Obispo-1 Prior18-1918-1921-22

201.12113.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.0/16.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 215 of 284

DRAFT

12-06

-17

Page 220: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Luis Obispo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near San Simeon, from the Arroyo de la CruzBridge to 0.3 mile north of the Arroyo de la CruzBridge. Plant propagation. 4928X

49284$140

Subtotal: $140

2018-19 $110

$229

$339Total Project Cost: $479

05170000453/18/201910/1/20188/11/2010PA&ED:

RTL:R/W Cert:

9/25/2019Begin Con:

05-San Luis Obispo-1Prior

18-19

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R66.9/R67.2

Con Sup:

Roadway Protective Betterments

Const:R/W:

Near San Simeon, from the Arroyo de la CruzBridge to 0.3 mile north of the Arroyo de la CruzBridge. Planting, wetland and California Red-legged Frog mitigation.

4928Y

49285$7,464

$11

Subtotal: $7,475

2019-20 $1,057$56

$2,424

$3,537Total Project Cost: $11,012

05170000467/25/20192/27/20198/11/2010PA&ED:

RTL:R/W Cert:

3/5/2020Begin Con:

05-San Luis Obispo-1PriorPrior19-20

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R66.9/R67.2

Con Sup:

Roadway Protective Betterments

Const:R/W:

MOBILITYIn San Luis Obispo County, from 0.3 mile northof Reservoir Canyon Road to 0.3 mile north ofNorth Paso Robles Overhead at various locations.Install vehicle detection systems, changeablemessage signs, cameras, and loop detectors.

4022

0N220$2,865

$5

Subtotal: $2,870

2020-21$380

$1,095$78

$702

$2,255Total Project Cost: $5,125

051600000712/1/20208/3/20202/1/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

05-San Luis Obispo-101 Prior18-1918-1920-21

201.315107 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

31.5/59.1

Con Sup:

Transportation Management Systems

Const:R/W:

CountySan Luis Obispo

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,719$44,781

R/W:

Subtotal: $47,500

Const:$7,834

$14,336$3,741

$15,391

$41,302

Total (Capital + Support): $88,802

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 216 of 284

DRAFT

12-06

-17

Page 221: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Mateo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONIn South San Francisco, at 0.1 mile north ofFrancisco Drive. Permanent embankmentrestoration by installing retaining wall anddrainage improvements.

1450J

0K670$1,590

$10

Subtotal: $1,600

2020-21$500$710$60

$800

$2,070Total Project Cost: $3,670

041600012411/30/2019

6/4/20209/7/2018PA&ED:

RTL:R/W Cert:

6/29/2020Begin Con:

04-San Mateo-82 Prior18-1918-1920-21

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

19.8

Con Sup:

Permanent Restoration

Const:R/W:

In San Bruno, from Jenevein Avenue to 0.1 milesouth of San Bruno Avenue. Reconstruct failedconcrete ditch and place Rock Slope Protection(RSP) at slope washouts as storm damagepermanent restoration.

1499H

4J080$1,093

$168

Subtotal: $1,261

2019-20$390$650$78

$390

$1,508Total Project Cost: $2,769

04150002526/1/20204/1/2020

10/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

04-San Mateo-280 18-1918-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R20.3/R20.6

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONNear Burlingame and Hillsborough city limits, atthe intersection of Route 82 and FloribundaAvenue. Install left turn signal.0686

1G020$2,610$1,765

Subtotal: $4,375

2019-20$2,900$1,300

$450$700

$5,350Total Project Cost: $9,725

04000020116/15/20206/7/2020

5/15/2019PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

04-San Mateo-82 Prior19-2019-2019-20

201.010120 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.7

Con Sup:

Safety Improvements

Const:R/W:

In and near various cities, on Routes 1, 35, 82, 84,92, 101, 109, 114, 280, and 380 at variouslocations. Enhance pedestrian safety byupgrading signals with Accessible PedestrianSignal (APS) audible indicators, pushbuttons, andcountdown timers, and upgrading crosswalkmarkings.

1491J

0K070$5,832

$57

Subtotal: $5,889

2021-22$1,250$1,250

$175$1,250

$3,925Total Project Cost: $9,814

04160000332/1/2022

12/1/20214/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

04-San Mateo-Var 18-1919-2019-2021-22

201.01563 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 217 of 284

DRAFT

12-06

-17

Page 222: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Mateo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Woodside, at various locations (alsoSanta Clara County PM 20.4); also in the city andcounty of San Francisco on Route 101 at SanBruno Avenue offramp (PM 1.7). Constructmaintenance worker safety improvements.

0481J

0J670$2,678

$10

Subtotal: $2,688

2018-19$440$800$110$770

$2,120Total Project Cost: $4,808

04140000241/30/2019

12/18/201810/31/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

04-San Mateo-280 PriorPriorPrior18-19

201.23561 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.2/R3.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESNear Redwood City, north of Edgewood Road;also on Route 84 from Hildebrand Road to northof La Honda Creek Bridge (PM 9.4/10.0).Stabilize soil and erosion control to mitigate forstorm water quality.

1487G

0J720$2,008

$204

Subtotal: $2,212

2019-20$874$763$77

$564

$2,278Total Project Cost: $4,490

041400003010/1/20199/1/2019

7/30/2018PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

04-San Mateo-280 Prior18-1918-1919-20

201.3357.8 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.0/7.7

Con Sup:

Storm Water Mitigation

Const:R/W:

BRIDGE PRESERVATIONNear Pescadero, at Pescadero Creek Bridge No.35-0028. Upgrade bridge rails and repairapproach slabs.1494G

4J870$4,434

$260

Subtotal: $4,694

2021-22$1,200$1,000

$8$1,200

$3,408Total Project Cost: $8,102

04160000295/1/20224/1/2022

11/1/2020PA&ED:

RTL:R/W Cert:

12/15/2022Begin Con:

04-San Mateo-1 18-1920-2120-2121-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

14.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Redwood City, at Cordilleras Creek Bridge No.35-0019. Replace bridge to restore structuralintegrity.1483C

2J730$26,570$4,285

Subtotal: $30,855

2021-22$4,500$4,500$1,125$7,500

$17,625Total Project Cost: $48,480

04150000046/30/20226/30/202210/2/2020PA&ED:

RTL:R/W Cert:

1/11/2023Begin Con:

04-San Mateo-101 18-1920-2120-2121-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

7.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 218 of 284

DRAFT

12-06

-17

Page 223: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Mateo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In East Palo Alto, Redwood City, Belmont,Burlingame, Millbrae, South San Francisco, andBrisbane, from University Avenue Overcrossingto Sierra Point offramp Separation. Upgradebridge rails at 8 structures.

1485K

2J740$7,748

$64

Subtotal: $7,812

2021-22$1,326$1,586

$130$1,456

$4,498Total Project Cost: $12,310

04150000103/1/20222/1/20213/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-San Mateo-101 18-1919-2019-2021-22

201.1123706 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.1/23.4

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In and near Menlo Park and San Bruno, fromAlpine Road to Route 380 at Alpine RoadUndercrossing No. 35-0009L/R (PM R0.05),Sand Hill Road Overcrossing (OC) (South) No.35-0007 (PM R1.56), Sand Hill Road OC (North)No. 35-0008 (PM R1.62), and Route 280/380 Separation No. 35-0217L/R (PM R20.97).Structure seismic retrofit.

1498G

4J850$7,470

$262

Subtotal: $7,732

2021-22$600

$1,000$100

$1,000

$2,700Total Project Cost: $10,432

04160000284/1/20225/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

10/1/2022Begin Con:

04-San Mateo-280 Prior20-2120-2121-22

201.1136 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R21.0

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In Half Moon Bay, at the Pilarcitos Creek BridgeNo. 35-0139L/R; also, on Route 84 at SanGregorio Creek Bridge No. 35-0166 (PM 7.55).Retrofit scour critical bridges to preserve thestructural integrity of the bridges by reinforcingwith Rock Slope Protection (RSP).

1483M

2J790$1,936

$343

Subtotal: $2,279

2021-22$1,250$1,040

$260$1,300

$3,850Total Project Cost: $6,129

04150000144/1/20222/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

04-San Mateo-1 18-1920-2120-2121-22

201.1193 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

28.9

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONNear Pescadero, from Santa Cruz County Line tosouth of Bean Hollow Road. Pavementrehabilitation.0622B

0C930$11,671

$10

Subtotal: $11,681

2019-20$1,403$1,081

$46$1,081

$3,611Total Project Cost: $15,292

04140000949/1/20196/1/20197/2/2018PA&ED:

RTL:R/W Cert:

1/15/2020Begin Con:

04-San Mateo-1 Prior18-1918-1919-20

201.12121.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/10.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 219 of 284

DRAFT

12-06

-17

Page 224: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Mateo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Woodside and Redwood City, fromRoute 280 to Route 101. Rehabilitate pavement,make curb ramps and sidewalks ADA compliant,and upgrade guardrails to make standard.

1497A

0K780$18,225

$566

Subtotal: $18,791

2021-22$2,340$2,860

$39$3,120

$8,359Total Project Cost: $27,150

04160001384/1/20223/1/20226/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

04-San Mateo-84 18-1919-2019-2021-22

201.12116.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

21.5/25.7

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In the cities of Burlingame, Millbrae, San Brunoand South San Francisco, from Broadway toOyster Point Boulevard. Pavement rehabilitation.1487J

3J060$16,500

$100

Subtotal: $16,600

2019-20$1,056$1,342

$132$1,628

$4,158Total Project Cost: $20,758

041500008011/1/2019

10/15/20194/2/2018PA&ED:

RTL:R/W Cert:

4/29/2020Begin Con:

04-San Mateo-101 PriorPriorPrior19-20

201.12158.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.5/23.0

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Redwood City, San Carlos and Belmont,from Edgewood Road to Route 92 and nearHillsborough at PM R12.7; also, in Santa ClaraCounty in and near Mountain View and PaloAlto, at various spot locations (PM 11.6, 12.8,12.9, 18.8). Replace failing culverts and restoredamaged slopes, pavement, and bridgeapproaches at 6 locations.

0732J

2A970$16,404

$13

Subtotal: $16,417

2021-22$1,800$2,000

$260$3,000

$7,060Total Project Cost: $23,477

041200016111/1/202110/1/20212/1/2020PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

04-San Mateo-280 18-1919-2019-2021-22

201.15128 Culvert(s) (ea)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

6.7/10.5

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYIn and near the cities of Half Moon Bay, Pacificaand Daly City, from south of Miramontes PointRoad to Clarinada Avenue Undercrossing, atvarious locations. Install Bluetooth DetectionSystems and Variable Message Signs (VMS), enable two existing Changeable Message Signs(CMS), modify Advanced TransportationManagement System (ATMS), and constructMaintenance Vehicle Pullouts (MVP) to improvethe system performance.

1452A

2K880$2,408

$36

Subtotal: $2,444

2021-22$430$444$30

$444

$1,348Total Project Cost: $3,792

04170000409/1/20218/1/20214/1/2020PA&ED:

RTL:R/W Cert:

1/15/2022Begin Con:

04-San Mateo-1 18-1919-2020-2121-22

201.31513 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

26.4/R47.3

Con Sup:

Transportation Management Systems

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 220 of 284

DRAFT

12-06

-17

Page 225: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

San Mateo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MISCELLANEOUSNear Redwood City, at Edgewood Road atEdgewood Park-and-Ride lot. Transportationinfrastructure improvement for zero-emissionvehicle charging.

1453N

3K270$523$10

Subtotal: $533

2018-19$130$260$25

$260

$675Total Project Cost: $1,208

0417000122

PA&ED:

RTL:R/W Cert:

Begin Con:

04-San Mateo-280 Prior18-1918-1918-19

201.9991 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.7

Con Sup:

Miscellaneous

Const:R/W:

CountySan Mateo

PA&ED:PS&E:

R/W Sup:Con Sup:

$8,163$129,700

R/W:

Subtotal: $137,863

Const:$22,389$22,586$3,105

$26,463

$74,543

Total (Capital + Support): $212,406

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 221 of 284

DRAFT

12-06

-17

Page 226: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Barbara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Santa Barbara, San Luis Obispo, Monterey,and Santa Cruz Counties on Routes 1, 101, 129,135, 156, and 246 at various locations. InstallAccessible Pedestrian Signal (APS) push buttons,Countdown Pedestrian Signal (CPS) heads,pedestrian barricades, and crosswalk signage toimprove pedestrian and bicycle safety.

2628

1G960$2,232

$16

Subtotal: $2,248

2020-21$879$940$71

$746

$2,636Total Project Cost: $4,884

05160000062/1/20212/1/20214/2/2019PA&ED:

RTL:R/W Cert:

9/15/2021Begin Con:

05-Santa Barbara-Var 18-1918-1918-1920-21

201.01532 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In Santa Barbara and San Luis Obispo Counties,on various routes at various locations. Replaceand install advance curve warning signs.2594

1G300$2,084

$48

Subtotal: $2,132

2018-19$780

$1,125$41

$629

$2,575Total Project Cost: $4,707

05140001386/10/20192/28/20197/9/2018PA&ED:

RTL:R/W Cert:

11/27/2019Begin Con:

05-Santa Barbara-Var Prior18-1918-1918-19

201.0151277 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Buellton, from Gaviota State ParkEntrance to north of Alisos Canyon Road.Roadside safety improvements. 2460

1E000$2,578

$3

Subtotal: $2,581

2019-20$520$840$34

$698

$2,092Total Project Cost: $4,673

05130000232/3/2020

10/7/201910/5/2017PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.23556 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

46.5/68.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Near Gaviota, at the Gaviota Safety RoadsideRest Area. Upgrade wastewater system.

2462

1E010$2,800

$5

Subtotal: $2,805

2018-19$240

$1,060$10

$1,180

$2,490Total Project Cost: $5,295

05130000242/1/2019

10/1/20182/22/2016PA&ED:

RTL:R/W Cert:

9/3/2019Begin Con:

05-Santa Barbara-101 PriorPriorPrior18-19

201.2352 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

46.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 222 of 284

DRAFT

12-06

-17

Page 227: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Barbara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Santa Barbara and San Luis Obispo (PM0.0/8.4) Counties, from Alisos Canyon Road toLos Berros Road at various locations. Roadsidesafety improvements.

2699

1H850$2,142

$25

Subtotal: $2,167

2020-21$714

$1,123$35

$1,003

$2,875Total Project Cost: $5,042

05170000012/19/2021

10/15/202010/24/2019PA&ED:

RTL:R/W Cert:

9/30/2021Begin Con:

05-Santa Barbara-101 18-1919-2019-2020-21

201.23566 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

68.7/91.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn the city of Santa Barbara, at Butterfly LanePedestrian Undercrossing. Construct pedestrianramps and sidewalks to comply with ADAstandards.

2468

1E040$2,904

$970

Subtotal: $3,874

2019-20$70

$1,875$303

$1,136

$3,384Total Project Cost: $7,258

05130000274/22/2020

12/26/201911/1/2016PA&ED:

RTL:R/W Cert:

11/24/2020Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.3612 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.0

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONIn Goleta, at San Jose Creek Bridge No. 51-0163L/R. Replace bridges to maintain standardsof safety and reliability. 2649

1H430$9,240

$40

Subtotal: $9,280

2021-22$1,400$2,730

$70$3,480

$7,680Total Project Cost: $16,960

051600007310/1/20217/1/2021

4/20/2020PA&ED:

RTL:R/W Cert:

6/15/2022Begin Con:

05-Santa Barbara-101 Prior19-2019-2021-22

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.6

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Los Alamos, at Route 101/135 Separation No.51-0073L/R. Replace bridge decks.

2522

1F500$7,000

$100

Subtotal: $7,100

2019-20$650

$1,800$250

$2,100

$4,800Total Project Cost: $11,900

05140000038/15/20197/15/201912/1/2017PA&ED:

RTL:R/W Cert:

3/16/2020Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

70.9

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 223 of 284

DRAFT

12-06

-17

Page 228: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Barbara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Lake Cachuma at Cold Spring CanyonBridge No. 51-0037. Install inspection accesssystem below bridge and paint structure.2392

1C420$19,000

$50

Subtotal: $19,050

2020-21$1,100$1,500

$75$1,500

$4,175Total Project Cost: $23,225

05120001414/15/2021

12/15/20207/15/2019PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

05-Santa Barbara-154 Prior19-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

22.9/23.2

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In the city of Santa Barabara, at La Colina RoadUndercrossing (UC) No. 51-0256 (PM R31.82)and at Primavera Road UC No. 51-0257 (PMR32.07). Upgrade bridge railing and reconstructabutment for bridge rehabilitation.

2651

1H450$6,416

$3

Subtotal: $6,419

2021-22$928

$2,135$52

$2,186

$5,301Total Project Cost: $11,720

05160000757/30/20214/15/2021

12/20/2019PA&ED:

RTL:R/W Cert:

1/5/2022Begin Con:

05-Santa Barbara-154 Prior19-2019-2021-22

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R31.8/R32.1

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Goleta, from 0.2 mile south to 0.4 milenorth of San Jose Creek Bridge No. 51-0217. Replace bridge.2386

1C360$18,600

$158

Subtotal: $18,758

2021-22$3,887$3,459

$156$4,550

$12,052Total Project Cost: $30,810

051200013410/19/20218/18/20216/20/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

05-Santa Barbara-217 Prior19-20Prior21-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.8/1.4

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Lompoc, at San Antonio Creek Bridge No.51-0237L/R. Bridge scour mitigation.

2563

1F810$1,241

$83

Subtotal: $1,324

2021-22$688

$1,692$99

$1,029

$3,508Total Project Cost: $4,832

05140000637/7/20212/4/20217/5/2019PA&ED:

RTL:R/W Cert:

1/4/2022Begin Con:

05-Santa Barbara-1 Prior19-2019-2021-22

201.1112 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

M33.1

Con Sup:

Bridge Scour Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 224 of 284

DRAFT

12-06

-17

Page 229: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Barbara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Carpinteria, at Arroyo Parida Creek BridgeNo. 51-113. Replace bridge (scour).

0335

39610$6,845

$905

Subtotal: $7,750

2019-20$960

$4,266$692

$1,310

$7,228Total Project Cost: $14,978

05000005141/21/20209/3/2019

6/29/2009PA&ED:

RTL:R/W Cert:

8/7/2020Begin Con:

05-Santa Barbara-192 PriorPriorPrior19-20

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

15.4/15.6

Con Sup:

Bridge Scour Mitigation

Const:R/W:

Near Buellton, at Nojoqui Creek Bridge No. 51-0018L/R. Bridge rail replacement and widening.

2561

1F790$4,890

$412

Subtotal: $5,302

2019-20$910

$1,490$130

$1,000

$3,530Total Project Cost: $8,832

05140000611/29/202011/1/20198/29/2018PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

05-Santa Barbara-101 Prior18-1918-1919-20

201.112768 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

56.0

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Los Alamos, at San Antonio Creek BridgeNo. 51-0006. Bridge seismic restoration.

2567

1F830$1,978

$132

Subtotal: $2,110

2019-20$676

$1,228$23

$640

$2,567Total Project Cost: $4,677

05140000653/9/20209/1/20197/2/2018PA&ED:

RTL:R/W Cert:

9/17/2020Begin Con:

05-Santa Barbara-135 PriorPriorPrior19-20

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R7.2

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Near Los Olivos, at Alamo Pintado PedestrianBridge No. 51-0076Y. Remove bridge.

2391

1C410$922$56

Subtotal: $978

2019-20$1,125$1,055

$50$350

$2,580Total Project Cost: $3,558

05120001394/8/2020

10/15/201912/3/2018PA&ED:

RTL:R/W Cert:

10/6/2020Begin Con:

05-Santa Barbara-154 Prior18-19Prior19-20

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R2.6

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 225 of 284

DRAFT

12-06

-17

Page 230: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Barbara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn Carpinteria, from Casitas Pass Overcrossing to0.2 miles north of Sheffield AvenueUndercrossing. Rehabilitate roadway.2426

1C820$119,100

$5,560

Subtotal: $124,660

2019-20$9,200$9,530

$940$30,800

$50,470Total Project Cost: $175,130

05120002362/28/20192/5/2019

11/27/2017PA&ED:

RTL:R/W Cert:

10/29/2019Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.12026.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.6/9.2

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

Near Santa Maria, from Solomon Road to Route166. Pavement rehabilitation.

2586

1G130$9,583

$795

Subtotal: $10,378

2019-20$515$916$104$905

$2,440Total Project Cost: $12,818

051400011011/1/20198/1/20197/2/2018PA&ED:

RTL:R/W Cert:

5/21/2020Begin Con:

05-Santa Barbara-1 Prior18-1918-1919-20

201.12118.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R36.4/49.2

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Gaviota, from 1.0 mile south of GaviotaGorge Tunnel to 0.1 mile north of Nojoqui CreekBridge. Upgrade guard railing, widen shoulders,place High Friction Surface Treatment (HSFT),construct retaining walls, cold plane pavement,Place Hot Mix Asphalt (HMA) and RubberizedHot Mix Asphalt concrete (RHMA).

2700

1H860$59,218

$21

Subtotal: $59,239

2021-22$2,160$2,648

$74$5,026

$9,908Total Project Cost: $69,147

05170000029/22/20215/21/202112/2/2019PA&ED:

RTL:R/W Cert:

5/2/2022Begin Con:

05-Santa Barbara-101 Prior19-2019-2021-22

201.12127.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

46.2/R52.3

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Santa Maria, from Lakeview Road toRoute 101. Upgrade ADA curb ramps, cold planepavement, and place Rubberized Hot Mix Asphaltconcrete (RHMA).

2629

1G970$14,372

$378

Subtotal: $14,750

2020-21 $1,869$1,832$2,396

$6,097Total Project Cost: $20,847

051600000811/19/20209/30/20206/16/2017PA&ED:

RTL:R/W Cert:

5/24/2021Begin Con:

05-Santa Barbara-135PriorPrior20-21

201.12124.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.7/17.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 226 of 284

DRAFT

12-06

-17

Page 231: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Barbara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In Lompoc, at combined segment of Route 246and Route 1; on Route 246, from 0.3 mile west ofV Street to H Street; also on Route 1, from HStreet to 12th Street. Upgrade ADA curb ramps,cold plane pavement and place hot mix asphaltconcrete (HMA).

2632

1H010$6,900

$350

Subtotal: $7,250

2021-22 $3,630$2,460$1,750

$7,840Total Project Cost: $15,090

051600001212/15/202112/10/20214/24/2017PA&ED:

RTL:R/W Cert:

7/27/2022Begin Con:

05-Santa Barbara-246PriorPrior21-22

201.1219 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Gaviota State Park. Rehabilitate andupgrade existing drainage system.

3330

0K330$3,600

$146

Subtotal: $3,746

2019-20$780

$1,430$245

$1,111

$3,566Total Project Cost: $7,312

05120000686/15/20206/15/20208/27/2018PA&ED:

RTL:R/W Cert:

12/4/2020Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.1511 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

45.5

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYIn Santa Ynez, from 0.2 mile east to 0.1 mile westof Edison Street/Baseline Avenue. Construct aroundabout to improve operations and safety. 2674

1H310$6,827

$888

Subtotal: $7,715

2021-22$793

$1,440$418

$1,614

$4,265Total Project Cost: $11,980

051600006011/30/202111/12/20212/13/2020PA&ED:

RTL:R/W Cert:

7/22/2022Begin Con:

05-Santa Barbara-154 18-1920-2120-2121-22

201.31010 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R5.8/R6.1

Con Sup:

Operational Improvements

Const:R/W:

CountySanta Barbara

PA&ED:PS&E:

R/W Sup:Con Sup:

$11,144$310,472

R/W:

Subtotal: $321,616

Const:$28,975$49,781$8,164

$67,139

$154,059

Total (Capital + Support): $475,675

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 227 of 284

DRAFT

12-06

-17

Page 232: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Clara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Gilroy, at Sargent Bridge and Overhead No.39-0006L. Permanent restoration of roadwaysettlement and southern abutment wingwallmovement.

1453B

4J030$1,381

$87

Subtotal: $1,468

2020-21$650$780$52

$650

$2,132Total Project Cost: $3,600

04150002452/1/20211/2/2021

12/1/2019PA&ED:

RTL:R/W Cert:

6/15/2021Begin Con:

04-Santa Clara-101 18-1919-2019-2020-21

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.8

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONIn and near Morgan Hill, from south of MastenAvenue to East Main Avenue. Install edgelineand shoulder rumble strips, concrete barrier andenhanced wet-night visibility striping.

1483F

2J890$1,760

$10

Subtotal: $1,770

2018-19$230$300$75

$450

$1,055Total Project Cost: $2,825

04150000225/6/20194/8/2019

5/17/2018PA&ED:

RTL:R/W Cert:

1/23/2020Begin Con:

04-Santa Clara-101 Prior18-1918-1918-19

201.01085 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R9.0/R16.8

Con Sup:

Safety Improvements

Const:R/W:

Near Gilroy, from east of Dunne Street/SanFelipe Road to the Merced County line. Placemedian barrier. 0480K

0J800$10,984

$60

Subtotal: $11,044

2019-20$1,800$1,227

$65$1,766

$4,858Total Project Cost: $15,902

04140000675/15/20205/8/2020

12/3/2018PA&ED:

RTL:R/W Cert:

3/1/2021Begin Con:

04-Santa Clara-152 Prior18-1918-1919-20

201.01079 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.8/R35.2

Con Sup:

Safety Improvements

Const:R/W:

In Cupertino, at northbound offramp to FoothillExpressway. Upgrade traffic signal system forright-turn movement.1488N

3J710$982$180

Subtotal: $1,162

2019-20$432$285$45

$285

$1,047Total Project Cost: $2,209

04150001844/30/20203/31/2020

12/31/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

04-Santa Clara-280 Prior18-1918-1919-20

201.01020 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.3

Con Sup:

Safety Improvements

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 228 of 284

DRAFT

12-06

-17

Page 233: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Clara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

On various routes, in various cities, at variouslocations. Replace pedestrian push-buttons andsignal heads with Accessible Pedestrian Signals(APS) and countdown timers and refreshcrosswalk markings to enhance pedestrian safety.

1492E

0K080$10,711

$23

Subtotal: $10,734

2021-22$939

$1,241$36

$1,417

$3,633Total Project Cost: $14,367

04160000493/18/20223/2/2022

7/15/2020PA&ED:

RTL:R/W Cert:

7/29/2022Begin Con:

04-Santa Clara-Var 18-1920-2121-2221-22

201.01530 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

In Santa Clara County, on Routes 9, 17, 85, 87,101, 152, 237, 280, 680, and 880 at variouslocations. Relocate or shield existing electricalcontroller cabinets, and install 28 new maintenance vehicle pullouts.

1486A

2J950$6,924

$50

Subtotal: $6,974

2021-22$1,300$1,400

$45$1,600

$4,345Total Project Cost: $11,319

04150000433/15/20222/1/2022

11/10/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-Santa Clara-9 18-1920-2120-2121-22

201.01566 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Gilroy, from Llagas Creek Bridge to theMerced County line. Construct maintenancevehicle pull-outs and vegetation control underexisting guardrail to improve highway workersafety.

1452E

2K800$6,590

$10

Subtotal: $6,600

2021-22$800

$1,000$45

$700

$2,545Total Project Cost: $9,145

041700002511/30/202110/29/20218/31/2020PA&ED:

RTL:R/W Cert:

6/20/2022Begin Con:

04-Santa Clara-152 18-1919-2019-2020-21

201.23588 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

11.2/R35.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near San Jose, from Route 101 to Route17/880 Separation. Pave extended gore areas andnarrow strips to improve highway worker safety.1492D

4J960$3,835

$170

Subtotal: $4,005

2021-22$780$770$62

$503

$2,115Total Project Cost: $6,120

041600002412/1/202110/1/20216/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-Santa Clara-280 18-1919-2021-2221-22

201.23539 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R0.0/L5.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 229 of 284

DRAFT

12-06

-17

Page 234: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Clara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Jose and Milpitas, from Route 101 to ScottCreek Road at various locations. Constructmaintenance worker safety improvements.0481T

0J660$8,814

$10

Subtotal: $8,824

2018-19$440

$1,320$110

$1,320

$3,190Total Project Cost: $12,014

04140000231/15/20191/8/2019

9/26/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

04-Santa Clara-680 PriorPriorPrior18-19

201.235160 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

M0.0/M9.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Sunnyvale, Mountain View, Los Altos, andPalo Alto, from Knickerbocker Drive to SanMateo County line. Upgrade pedestrian facilitiesto make compliant with the ADA standards.

1495G

0K010$6,193$1,614

Subtotal: $7,807

2021-22$1,300$1,600

$706$1,600

$5,206Total Project Cost: $13,013

04160000205/2/20224/1/20226/1/2020PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

04-Santa Clara-82 19-2020-2120-2121-22

201.36114 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

18.2/26.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Cupertino, Sunnyvale and Mountain View,from Stevens Creek Boulevard to Route 101; alsoin various cities, on Route 80 (PM 2.5/8.0), atvarious locations. Install and/or upgrade existingcurb ramps and pedestrian facilities to ADAstandards.

0434G

2G730$1,853

$50

Subtotal: $1,903

2018-19$442$663$102$730

$1,937Total Project Cost: $3,840

04000212025/16/20195/1/2019

9/26/2017PA&ED:

RTL:R/W Cert:

12/23/2019Begin Con:

04-Santa Clara-85 PriorPriorPrior18-19

201.36138 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

18.0/24.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONNear Saratoga, at Saratoga Creek Bridge No. 37-0074. Replace bridge.

0386F

3G630$11,668$6,779

Subtotal: $18,447

2019-20$2,800$1,400

$396$1,526

$6,122Total Project Cost: $24,569

04120004095/6/2020

4/15/20206/15/2018PA&ED:

RTL:R/W Cert:

10/19/2020Begin Con:

04-Santa Clara-9 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.9

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 230 of 284

DRAFT

12-06

-17

Page 235: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Clara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In various cities, on Routes 101 and 237 atvarious locations. Bridge rail upgrade at 8locations.0481H

0J560$10,711

$30

Subtotal: $10,741

2019-20$1,800$2,250

$30$2,700

$6,780Total Project Cost: $17,521

04140000136/15/20203/16/20209/14/2018PA&ED:

RTL:R/W Cert:

12/21/2020Begin Con:

04-Santa Clara-101 Prior18-1918-1919-20

201.1125956 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In San Jose, at Bird Avenue Overcrossing No. 37-0267 (PM R2.78); also in Los Altos Hills at Arastradero Road Undercrossing Bridge No. 37 -0251L/R (PM 17.8). Bridge seismic restoration.

1483K

2J750$2,414

$90

Subtotal: $2,504

2018-19$1,144$1,034

$66$550

$2,794Total Project Cost: $5,298

04150003383/15/20193/1/2019

2/27/2018PA&ED:

RTL:R/W Cert:

10/28/2019Begin Con:

04-Santa Clara-280 PriorPriorPrior18-19

201.1133 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R2.9/17.8

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In various cities, on various routes at SaratogaCreek Bridge, Carnadero Creek Bridge, SanFrancisco Creek Bridge, San Tomas AquinoCreek Bridge, and Bodfish Creek Bridge. Bridgepreventative maintenance.

1482R

2J780$2,391

$10

Subtotal: $2,401

2019-20$900$750$44

$600

$2,294Total Project Cost: $4,695

04150000176/1/20205/1/2020

10/1/2018PA&ED:

RTL:R/W Cert:

12/22/2020Begin Con:

04-Santa Clara-Var Prior18-1918-1919-20

201.1195 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONIn and near Los Gatos, Campbell and San Jose,from Hebard Way to Route 280. Pavement rehabilitation.1480B

1J970$30,141

$20

Subtotal: $30,161

2019-20$1,750$2,750

$150$3,150

$7,800Total Project Cost: $37,961

04140004041/27/20201/17/20207/2/2018PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

04-Santa Clara-17 Prior18-1918-1919-20

201.12150 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.8/13.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 231 of 284

DRAFT

12-06

-17

Page 236: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Clara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the cities of San Jose and Santa Clara, fromMcKendrie Street to El Camino Real. Pavementrehabilitation and ADA upgrades.1490Q

4J282$2,711

$180

Subtotal: $2,891

2018-19 $603$180$703

$1,486Total Project Cost: $4,377

04170005203/1/2019

1/15/20197/14/2017PA&ED:

RTL:R/W Cert:

9/11/2019Begin Con:

04-Santa Clara-8218-1918-1918-19

201.1213.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.8/R10.4

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Mountain View, Los Altos, and Palo Alto,from 0.05 mile north of Route 237 to Sand HillRoad. Pavement rehabilitation.1498F

4J890$22,885

$360

Subtotal: $23,245

2021-22$888

$1,974$99

$1,974

$4,935Total Project Cost: $28,180

04160000238/11/20217/6/20213/3/2020PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

04-Santa Clara-82 19-2020-2120-2121-22

201.12143 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

19.2/26.4

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In Gilroy, from 0.3 miles west of Santa TeresaBoulevard to Route 101. Rehabilitate pavement.

1452D

2K750$14,165

$10

Subtotal: $14,175

2019-20$1,400$1,600

$58$1,800

$4,858Total Project Cost: $19,033

041700001910/1/20188/15/20186/15/2018PA&ED:

RTL:R/W Cert:

3/18/2019Begin Con:

04-Santa Clara-152 Prior18-1918-1919-20

201.1217.9 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.6/M10.2

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Los Altos, Los Altos Hills, and PaloAlto, from Foothill Boulevard to north of SandHill Road (also, in San Mateo County PMR0.0/R2.1). Pavement rehabilitation.

0449A

3J320$47,574

$50

Subtotal: $47,624

2018-19$1,853$3,284

$48$6,661

$11,846Total Project Cost: $59,470

04150001315/1/20194/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

10/8/2019Begin Con:

04-Santa Clara-280 PriorPriorPrior18-19

201.12190 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.5/20.6

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 232 of 284

DRAFT

12-06

-17

Page 237: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Clara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In San Jose, from Route 85 to West Julian Street.Roadway Rehabilitation.

1492C

4J910$55,263

$304

Subtotal: $55,567

2021-22$2,767$4,425

$50$6,581

$13,823Total Project Cost: $69,390

04160000106/30/20224/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

2/1/2023Begin Con:

04-Santa Clara-87 Prior20-2120-2121-22

201.12229.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/6.1

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

MOBILITYIn San Jose, in the eastbound direction fromNorth First Street to Zanker Road. Constructauxiliary lane.1492A

0K240$8,030

$255

Subtotal: $8,285

2021-22$3,120$2,080

$130$1,560

$6,890Total Project Cost: $15,175

04160000602/1/20221/2/20226/1/2020PA&ED:

RTL:R/W Cert:

6/15/2022Begin Con:

04-Santa Clara-237 18-1919-2019-2021-22

201.310521 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

7.0/8.0

Con Sup:

Operational Improvements

Const:R/W:

In San Jose, in the westbound direction fromZanker Road to North First Street. Constructauxiliary lane.1492B

0K250$13,819$57,823

Subtotal: $71,642

2021-22$3,120$2,080

$481$1,750

$7,431Total Project Cost: $79,073

04160000616/1/20225/2/20228/3/2020PA&ED:

RTL:R/W Cert:

2/1/2023Begin Con:

04-Santa Clara-237 Prior20-2120-2121-22

201.310121 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.0/8.0

Con Sup:

Operational Improvements

Const:R/W:

ROADSIDE PRESERVATIONIn the cities of San Jose, Santa Clara, andSunnyvale, from Route 85 to Route 237; also, onRoute 85 (PM 0.0 to 1.1), and Route 237 (PM 2.2to R4.9). Repair and modernized roadsideirrigation facilities.

2020J

4J930$2,009

$15

Subtotal: $2,024

2020-21$375$500$63

$625

$1,563Total Project Cost: $3,587

04160000175/11/20212/16/2021

10/10/2019PA&ED:

RTL:R/W Cert:

9/15/2021Begin Con:

04-Santa Clara-101 18-1919-2019-2020-21

201.21012 Acre(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R26.4/46.4

Con Sup:

Highway Planting Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 233 of 284

DRAFT

12-06

-17

Page 238: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Clara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountySanta Clara

PA&ED:PS&E:

R/W Sup:Con Sup:

$68,190$283,808

R/W:

Subtotal: $351,998

Const:$31,030$35,316$3,138

$41,201

$110,685

Total (Capital + Support): $462,683

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 234 of 284

DRAFT

12-06

-17

Page 239: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Cruz($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn and near Santa Cruz, from 0.1 mile south ofRoute 1/17 Separation to 0.4 mile south ofPasatiempo Overcrossing; also on Route 17 (PM0.0/0.3). Realign southbound Route 17Connector to southbound Route 1.

2636

1H060$5,811

$658

Subtotal: $6,469

2019-20$792

$1,930$217

$1,973

$4,912Total Project Cost: $11,381

051600002011/1/20198/1/2019

11/1/2017PA&ED:

RTL:R/W Cert:

5/1/2020Begin Con:

05-Santa Cruz-1 PriorPriorPrior19-20

201.010140 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.7/17.0

Con Sup:

Safety Improvements

Const:R/W:

Near Watsonville, at Lakeview Road. Constructroundabout and improve street lighting.

2625

1G990$4,481

$749

Subtotal: $5,230

2019-20$782

$1,341$441

$1,335

$3,899Total Project Cost: $9,129

05160000106/1/20204/1/2020

11/1/2017PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

05-Santa Cruz-129 PriorPriorPrior19-20

201.01046 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.4

Con Sup:

Safety Improvements

Const:R/W:

In Santa Cruz and Monterey Counties, from southof Salinas Road to south of Larkin Valley RoadUndercrossing. Construct maintenance vehiclepull outs, repairing guardrail, improve gate accessand relocate irrigation equipment.

2452

1C980$2,900

$5

Subtotal: $2,905

2018-19$652

$1,097$49

$1,225

$3,023Total Project Cost: $5,928

05130000213/26/2019

12/31/201811/1/2017PA&ED:

RTL:R/W Cert:

11/21/2019Begin Con:

05-Santa Cruz-1 PriorPriorPrior18-19

201.23569 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R8.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn and near the city of Santa Cruz, from Route 1to north of Fall Creek Drive. Stormwaterimprovements.2569

1F920$2,356

$214

Subtotal: $2,570

2019-20$745

$1,192$1,287

$812

$4,036Total Project Cost: $6,606

05140000755/4/2020

4/27/202010/4/2017PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

05-Santa Cruz-9 PriorPriorPrior19-20

201.3357.96 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.1/7.5

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 235 of 284

DRAFT

12-06

-17

Page 240: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Cruz($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Ben Lomond, from Holiday Lane to 4.7miles north of the northern junction of Routes236/9. Replace failed culverts systems and construct energy dissipaters.

2627

1G950$5,361

$271

Subtotal: $5,632

2021-22$1,445$2,377$1,078$2,025

$6,925Total Project Cost: $12,557

05160000053/29/20223/1/20228/3/2020PA&ED:

RTL:R/W Cert:

9/7/2022Begin Con:

05-Santa Cruz-9 18-1920-2120-2121-22

201.33516 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

8.5/25.5

Con Sup:

Storm Water Mitigation

Const:R/W:

In Santa Cruz, from 0.7 mile north of Route 1/17Separation to Beulah Park Undercrossing.Landscape mitigation for EA 05-0Q600.1989Y

0Q601$507

Subtotal: $507

2018-19 $500$18

$537

$1,055Total Project Cost: $1,562

05140001456/5/20194/5/2019

8/28/2014PA&ED:

RTL:R/W Cert:

1/22/2020Begin Con:

05-Santa Cruz-17PriorPrior18-19

201.33510 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.7/1.4

Con Sup:

Storm Water Mitigation

Const:R/W:

In Santa Cruz County, on Routes 1, 9, 17, 129,and 152 at various locations. Install AccessiblePedestrian Signals (APS).2590

1G160$1,700

$11

Subtotal: $1,711

2018-19$272$883$20

$486

$1,661Total Project Cost: $3,372

05140001181/11/201911/8/20188/1/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

05-Santa Cruz-Var PriorPriorPrior18-19

201.361176 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Near Watsonville, from 0.1 mile east of BeverlyDrive to Holohan Road/College Road. Constructpedestrian bridge next to the Corralitos CreekBridge, concrete barrier, retaining wall, curb,gutter and sidewalk to meet ADA standards.

2530

1F620$3,205

$247

Subtotal: $3,452

2021-22$1,621$2,430

$376$1,776

$6,203Total Project Cost: $9,655

05140000395/2/20224/1/20227/1/2020PA&ED:

RTL:R/W Cert:

10/22/2022Begin Con:

05-Santa Cruz-152 18-1920-2120-2121-22

201.3615 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.9/R2.0

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 236 of 284

DRAFT

12-06

-17

Page 241: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Cruz($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Boulder Creek, at San Lorenzo River BridgeNo. 36-0052 (PM 13.61) and Kings Creek BridgeNo. 36-0054 (PM 15.49). Replace bridges to maintain standards of safety and reliability.

2655

1H470$11,928

$660

Subtotal: $12,588

2021-22$2,692$2,884

$888$4,158

$10,622Total Project Cost: $23,210

051600007810/29/2021

9/3/20214/10/2020PA&ED:

RTL:R/W Cert:

3/4/2022Begin Con:

05-Santa Cruz-9 Prior19-2019-2021-22

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.6/15.5

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near the city of Santa Cruz, on Routes 1 and 17 atvarious locations. Bridge rail replacement andupgrades.2585

1F520$4,167

Subtotal: $4,167

2018-19 $902$47

$1,059

$2,008Total Project Cost: $6,175

05140000056/1/20183/1/20185/2/2015PA&ED:

RTL:R/W Cert:

12/1/2018Begin Con:

05-Santa Cruz-1PriorPriorPrior

201.1121375 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

In Capitola, at Soquel Creek Bridge No. 36-0013.Place Rock Slope Protection (RSP) to protectbridge foundation.2736

1H480$2,228

$546

Subtotal: $2,774

2021-22$1,591$1,370

$196$1,772

$4,929Total Project Cost: $7,703

05160000797/1/2021

4/29/202112/31/2019PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

05-Santa Cruz-1 Prior19-2019-2021-22

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.3

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONNear the city of Santa Cruz, from North AptosUnderpass to Route 9. Rehabilitate pavement.

2432

1C850$14,952

$19

Subtotal: $14,971

2018-19$606

$1,030$10

$1,082

$2,728Total Project Cost: $17,699

05120002406/1/20186/1/2018

8/22/2016PA&ED:

RTL:R/W Cert:

2/1/2019Begin Con:

05-Santa Cruz-1 PriorPriorPrior18-19

201.12132 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.2/17.5

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 237 of 284

DRAFT

12-06

-17

Page 242: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Santa Cruz($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Davenport, from 1.4 miles north of SwantonRoad to 0.6 mile south of Waddell Creek.Replace and upgrade existing Corrugated MetalPipe (CMP) culverts with Reinforced ConcretePipe (RCP) culverts.

1967

0J200$3,570

$84

Subtotal: $3,654

2021-22$964

$1,940$344

$1,365

$4,613Total Project Cost: $8,267

05120000697/19/20217/9/2021

1/30/2020PA&ED:

RTL:R/W Cert:

12/27/2021Begin Con:

05-Santa Cruz-1 Prior19-2019-2021-22

201.1514 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

31.9/35.7

Con Sup:

Drainage System Restoration

Const:R/W:

ROADSIDE PRESERVATIONNear Scotts Valley, from 0.06 miles south ofLaurel Road to 0.25 miles north of Laurel Road.Construct wildlife Undercrossing.

Funding for PA&ED, PS&E and R/W only.Local contributions to fund remainingcomponents.

2593

1G260 $138

Subtotal: $138

2019-20$738

$2,013$226

$2,977Total Project Cost: $3,115

05140001312/4/2021

8/13/20207/17/2018PA&ED:

RTL:R/W Cert:

9/20/2021Begin Con:

05-Santa Cruz-17 Prior18-1918-19

201.2401 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.4/9.6

* Con Sup:

Roadside Enhancement

* Const, * Con Sup phase(s) are NOT authorized

* Const:R/W:

CountySanta Cruz

PA&ED:PS&E:

R/W Sup:Con Sup:

$3,602$63,166

R/W:

Subtotal: $66,768

Const:$12,900$21,889$5,197

$19,605

$59,591

Total (Capital + Support): $126,359

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 238 of 284

DRAFT

12-06

-17

Page 243: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Shasta($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Viola, from 0.4 mile east to 1.1 miles east ofBridge Creek Road. Curve Improvement.

3673

2H990$3,100

$14

Subtotal: $3,114

2019-20$670$810$80

$730

$2,290Total Project Cost: $5,404

02170000451/2/2020

12/2/20191/16/2019PA&ED:

RTL:R/W Cert:

5/5/2020Begin Con:

02-Shasta-44 Prior18-1918-1919-20

201.01014 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

51.6/52.2

Con Sup:

Safety Improvements

Const:R/W:

Near Shasta Lake City, at O’Brien SafetyRoadside Rest Area (SRRA). Upgrade potablewater system and wastewater systems.3552

4G580$3,007

$3

Subtotal: $3,010

2019-20$400

$1,180$140$940

$2,660Total Project Cost: $5,670

021400002710/1/20197/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

3/1/2020Begin Con:

02-Shasta-5 PriorPriorPrior19-20

201.2351 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R31.0/R31.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Redding, from 0.1 mile north of South ReddingUnderpass to 0.1 mile north of California Street.Construct ADA compliant ramps and sidewalks.3626

1H720$2,400

$402

Subtotal: $2,802

2021-22$0

$1,200$750

$1,050

$3,000Total Project Cost: $5,802

02160000338/13/20217/9/2021

9/30/2016PA&ED:

RTL:R/W Cert:

2/4/2022Begin Con:

02-Shasta-27318-1918-1921-22

201.37819 ADA unit(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

14.9/15.7

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

BRIDGE PRESERVATION Near Dunsmuir, at Crag View DriveUndercrossing Bridge No. 06-0095 (PM 66.8);also, at Sims Road Undercrossing No. 06-0111(PM 57.4). Replace bridges.

3543

4G41U$16,860

$36

Subtotal: $16,896

2018-19$1,250$2,880

$260$4,799

$9,189Total Project Cost: $26,085

02180000473/26/20192/22/20192/1/2018PA&ED:

RTL:R/W Cert:

8/27/2019Begin Con:

02-Shasta-5 PriorPriorPrior18-19

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 239 of 284

DRAFT

12-06

-17

Page 244: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Shasta($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Lakehead, at O’Brien Undercrossing No. 06-0148L. Rehabilitate bridge deck with concreteoverlay, upgrade bridge rails, and constructapproach slabs.

3630

1H390$2,215

$7

Subtotal: $2,222

2020-21$250$600$40

$580

$1,470Total Project Cost: $3,692

021600004110/26/20209/25/202011/5/2019PA&ED:

RTL:R/W Cert:

2/16/2021Begin Con:

02-Shasta-5 18-1919-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R32.2

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

ROADWAY PRESERVATIONIn and near Anderson, from Route 273 toSacramento River Bridge. Roadwayrehabilitation, update signage and lighting, andadd Intelligent Transportation System (ITS)elements.

3702

3H730$18,081$1,221

Subtotal: $19,302

2018-19$0

$3,000$220

$3,900

$7,120Total Project Cost: $26,422

02180000243/26/20192/22/20198/11/2017PA&ED:

RTL:R/W Cert:

9/24/2019Begin Con:

02-Shasta-5PriorPrior18-19

201.1206.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R3.8/R7.0

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In and near Anderson, from south of RiversideAvenue Overcrossing to south of SouthBonnyview Road/Churn Creek RoadOvercrossing. Rehabilitate roadway, upgrademedian barrier, update signage and lighting, andadd Intelligent Transportation System (ITS)elements. This project is combined with anexisting STIP project 02-4C403.

3670

2H880$13,900

Subtotal: $13,900

2018-19

$2,200

$2,200Total Project Cost: $16,100

02170000265/4/2018

11/30/20152/28/2013PA&ED:

RTL:R/W Cert:

10/30/2018Begin Con:

02-Shasta-5

18-19

201.12120.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R6.2/R11.7

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Burney, from 2.6 miles east of Carberry FlatRoad to 0.3 mile east of Burney Mountain PowerRoad. Rehabilitate pavement, upgrade guardrail,and make curbs ADA compliant.

3618

1H570$11,165

$436

Subtotal: $11,601

2021-22$1,430$1,300$1,020$2,430

$6,180Total Project Cost: $17,781

02160000364/4/20223/4/20229/8/2020PA&ED:

RTL:R/W Cert:

8/30/2022Begin Con:

02-Shasta-299 18-1920-2119-2021-22

201.12121.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

67.8/77.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 240 of 284

DRAFT

12-06

-17

Page 245: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Shasta($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyShasta

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,119$70,728

R/W:

Subtotal: $72,847

Const:$4,000

$10,970$2,510

$16,629

$34,109

Total (Capital + Support): $106,956

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 241 of 284

DRAFT

12-06

-17

Page 246: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sierra($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Sierra, Nevada, and El Dorado Counties onRoutes 49, 89 and 193 at various locations.Upgrade guard rail to current standards.7778

4F630$1,410

$60

Subtotal: $1,470

2018-19$85

$605$10

$590

$1,290Total Project Cost: $2,760

03140002319/1/20188/1/2018

7/25/2017PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

03-Sierra-49 PriorPriorPrior18-19

201.0154 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/15.9

Con Sup:

Collision Severity Reduction

Const:R/W:

ROADWAY PRESERVATIONNear Truckee and Floriston, from 1.3 miles eastof the Nevada County line to the Nevada Stateline. Stabilize cut-slope erosion and preventrockfall by flattening the slope or installing adrapery system, concrete barrier, and drainage gutter.

7926

2H010$5,100

$80

Subtotal: $5,180

2021-22$370$860$210$900

$2,340Total Project Cost: $7,520

031700004510/15/202110/1/20218/1/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

03-Sierra-80 18-1919-2019-2021-22

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.3/1.6

Con Sup:

Roadway Protective Betterments

Const:R/W:

CountySierra

PA&ED:PS&E:

R/W Sup:Con Sup:

$140$6,510

R/W:

Subtotal: $6,650

Const:$455

$1,465$220

$1,490

$3,630

Total (Capital + Support): $10,280

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 242 of 284

DRAFT

12-06

-17

Page 247: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Siskiyou($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn and near various cities, at various locations,from Shasta County line to Oregon State line (PMR69.293). Enhance traffic safety by improvingthe roadside clear recovery zone.

3507

4F520$3,540

$95

Subtotal: $3,635

2021-22$1,000$1,000

$200$1,250

$3,450Total Project Cost: $7,085

02130000028/23/20217/23/20215/1/2020PA&ED:

RTL:R/W Cert:

12/14/2021Begin Con:

02-Siskiyou-5 18-1920-2120-2121-22

201.01560 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/R69.2

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Weed, from 0.2 mile south to 0.3 mile northof Weed Airport Safety Roadside Rest Area.Upgrade wastewater and water systems.3657

2H130$1,663

$11

Subtotal: $1,674

2020-21$260$770$30

$680

$1,740Total Project Cost: $3,414

02160001149/16/20208/12/2020

10/16/2019PA&ED:

RTL:R/W Cert:

4/14/2021Begin Con:

02-Siskiyou-5 18-1919-2019-2020-21

201.2352 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R25.4/R25.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

BRIDGE PRESERVATIONNorth of Fort Jones, from 0.3 mile south to 0.3mile north of West Moffett Creek Road at MoffettCreek Bridge No. 02-0042. Bridge replacement.3546

4G440$3,920

$237

Subtotal: $4,157

2020-21$1,340

$700$80

$1,540

$3,660Total Project Cost: $7,817

02140000138/28/20207/31/20209/6/2019PA&ED:

RTL:R/W Cert:

2/26/2021Begin Con:

02-Siskiyou-3 Prior19-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

38.0/38.6

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Dunsmuir, from Central DunsmuirUndercrossing to 0.1 mile north of SiskiyouAvenue at Sacramento River Bridge andOverhead No. 02-0002. Replace southboundbridge deck.

3614

1H480$14,350

$269

Subtotal: $14,619

2021-22$1,440$2,660

$450$3,480

$8,030Total Project Cost: $22,649

02160000191/21/2022

12/15/20214/15/2020PA&ED:

RTL:R/W Cert:

9/20/2022Begin Con:

02-Siskiyou-5 Prior19-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.5/3.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 243 of 284

DRAFT

12-06

-17

Page 248: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Siskiyou($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Mt. Shasta, at Azalea Road OvercrossingNo. 02-0126. Rehabilitate bridge.

3631

1H400$1,851

$7

Subtotal: $1,858

2020-21$320$750$40

$710

$1,820Total Project Cost: $3,678

021600004210/26/20209/25/202010/7/2019PA&ED:

RTL:R/W Cert:

4/10/2021Begin Con:

02-Siskiyou-5 18-1919-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R8.3

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In and near Yreka at Louie Road Overcrossing(OC) No. 02-0137 (PM R31.2), Moonlit OaksAvenue Undercrossing (UC) No. 02-0159R&L(PM R45.6), Miner Street UC No. 02-0158R&L(PM R47.6), and North Yreka Separation No. 02-0150R&L (PM R48.2); also, in Redding, ShastaCounty, at N273-N5 Connector OC No. 06 -0137G (PM R18.5). Establish standard verticalclearance and improve to standard truck capacity.

ACCELERATED BRIDGE (PA&ED Only)

3696

3H640$28,200

$149

Subtotal: $28,349

2020-21$2,790$1,820

$90$6,200

$10,900Total Project Cost: $39,249

02180000037/21/20206/19/20203/1/2019PA&ED:

RTL:R/W Cert:

12/22/2020Begin Con:

02-Siskiyou-5 Prior19-2019-2020-21

201.3228 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

ROADWAY PRESERVATIONIn Yreka, from 0.4 mile north of Laura Lane toJuniper Drive; also on Route 263 from Route 3 to1.0 mile south of Long Gulch Road (PM 49.07 to49.41). Reconstruct pavement structural section,replace sidewalk, driveways, curb ramps andpedestrian signals to meet current ADA standards,designate bikeways with new signage andpavement delineation.

3643

1H520$52,950$1,482

Subtotal: $54,432

2021-22$1,830$2,200$5,880$9,650

$19,560Total Project Cost: $73,992

02170000093/21/20223/4/2022

11/4/2019PA&ED:

RTL:R/W Cert:

9/27/2022Begin Con:

02-Siskiyou-3 18-1919-2019-2021-22

201.12012.95 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R46.8/R48.0

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In and near Dunsmuir and Mt. Shasta, fromSacramento River Bridge Overhead to BlackButte Overhead. Roadway rehabilitation.3685

3H320$116,040

$135

Subtotal: $116,175

2021-22$1,620$5,090

$80$12,860

$19,650Total Project Cost: $135,825

02170000973/10/202210/4/202110/2/2020PA&ED:

RTL:R/W Cert:

9/27/2022Begin Con:

02-Siskiyou-5 Prior20-2120-2121-22

201.12225.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.7/R15.9

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 244 of 284

DRAFT

12-06

-17

Page 249: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Siskiyou($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Happy Camp, from 0.3 miles west ofSwillup Creek Bridge to Route 263. Drainagesystem restoration.3601

1H090$2,070

$200

Subtotal: $2,270

2019-20$1,040

$730$530

$1,060

$3,360Total Project Cost: $5,630

02150001053/2/2020

2/17/20203/29/2019PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

02-Siskiyou-96 Prior18-1918-1919-20

201.15120 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

23.0/103.4

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYIn Siskiyou and Shasta Counties, on Routes 5 and89 at various locations. Upgrade TransportationManagement System (TMS) field elements.3556

4G630$3,600

$196

Subtotal: $3,796

2018-19$390$710$140$720

$1,960Total Project Cost: $5,756

02140000301/28/20191/22/2019

12/15/2017PA&ED:

RTL:R/W Cert:

8/6/2019Begin Con:

02-Siskiyou-5 PriorPriorPrior18-19

201.31516 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

CountySiskiyou

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,781$228,184

R/W:

Subtotal: $230,965

Const:$12,030$16,430$7,520

$38,150

$74,130

Total (Capital + Support): $305,095

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 245 of 284

DRAFT

12-06

-17

Page 250: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Solano($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONIn Benicia, from north of Industrial Way to southof Lake Herman Road. Repair slip-outs andstabilize slope.1498M

4J040$1,040

$38

Subtotal: $1,078

2019-20$560$514$22

$521

$1,617Total Project Cost: $2,695

04150002464/16/2019

11/20/20197/31/2018PA&ED:

RTL:R/W Cert:

7/17/2019Begin Con:

04-Solano-680 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R1.9/R2.0

Con Sup:

Permanent Restoration

Const:R/W:

BRIDGE PRESERVATIONNear Rio Vista, at Miner Slough Bridge No. 23-0035. Replace bridge.

0886

0G660$24,500$2,884

Subtotal: $27,384

2018-19$300

$3,500$1,098$3,500

$8,398Total Project Cost: $35,782

040000034311/30/2018

8/1/20189/29/2017PA&ED:

RTL:R/W Cert:

7/22/2019Begin Con:

04-Solano-84 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

12.1/12.2

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Fairfield, at Suisun Creek Bridge No. 23-0007. Scour mitigation.

0487R

4G872$760

$5

Subtotal: $765

2019-20$1,200

$600$20

$600

$2,420Total Project Cost: $3,185

04160001534/1/20204/1/20209/3/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

04-Solano-80 Prior18-1918-1919-20

201.1112 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

14.6

Con Sup:

Bridge Scour Mitigation

Const:R/W:

In and near Vallejo, Dixon and Vacaville, atRoute 80/29 Separation Bridge No. 23-0087,McCune Creek Bridge No. 23-0084L/R andHorse Creek Bridge No. 23-0077L. Bridgepreventative maintenance.

0480N

0J600$1,379

$423

Subtotal: $1,802

2019-20$990$880$66

$880

$2,816Total Project Cost: $4,618

04140000175/31/20202/28/20208/31/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

04-Solano-80 Prior18-1918-1919-20

201.1194 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.1/34.5

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 246 of 284

DRAFT

12-06

-17

Page 251: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Solano($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Rio Vista, at the Cache Slough FerryCrossing. Upgrade the existing fender systems,concrete ramps, and swing gate systems, modifythe ferry boat deck surface, and install trafficcounter and Vehicle Detection Systems (VDS).

0480D

4H060$12,630

$350

Subtotal: $12,980

2021-22$2,080$2,080

$260$2,080

$6,500Total Project Cost: $19,480

04130000816/1/20225/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

04-Solano-84 18-1920-2120-2121-22

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.5

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In Vallejo, at Route 80/29 Separation Bridge No.23-0087. Replace bridge.

ACCELERATED BRIDGE (PA&ED Only) 1452F

2K840$11,922

$15

Subtotal: $11,937

2019-20$2,057$2,624

$22$2,416

$7,119Total Project Cost: $19,056

04170000316/8/20205/4/2020

12/3/2018PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

04-Solano-80 19-2019-2019-2019-20

201.3221 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

1.1

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

In Vallejo, from Magazine Street OvercrossingNo. 23-0066 to Redwood Street Overcrossing No.23-0114. Increase vertical clearance at sixovercrossing structures.

ACCELERATED BRIDGE

0481R

0J710$15,951

$10

Subtotal: $15,961

2018-19$1,870$2,154

$154$1,859

$6,037Total Project Cost: $21,998

041400002911/1/20197/1/2019

6/29/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

04-Solano-80 Prior18-1918-1918-19

201.3226 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.8/4.4

Con Sup:

Trans Permit Requirements for Bridges

Const:R/W:

ROADWAY PRESERVATIONIn and near Rio Vista, from Currie Road toSacramento County line. Roadway rehabilitation.

0480P

0J630$73,200$2,983

Subtotal: $76,183

2021-22$5,780$5,780$2,890

$11,560

$26,010Total Project Cost: $102,193

04140000202/1/20222/1/2022

10/1/2019PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

04-Solano-12 Prior19-2019-2021-22

201.1209.7 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

20.6/26.4

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 247 of 284

DRAFT

12-06

-17

Page 252: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Solano($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountySolano

PA&ED:PS&E:

R/W Sup:Con Sup:

$6,708$141,382

R/W:

Subtotal: $148,090

Const:$14,837$18,132$4,532

$23,416

$60,917

Total (Capital + Support): $209,007

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 248 of 284

DRAFT

12-06

-17

Page 253: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sonoma($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Jenner, from 0.3 to 0.4 mile north of MyersGrade Road. Permanent restoration of roadwayslip-outs.0482T

0J300$13,856

$215

Subtotal: $14,071

2020-21$2,106$2,496

$208$2,288

$7,098Total Project Cost: $21,169

041300043312/15/20209/15/20204/15/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

04-Sonoma-1 18-1918-1918-1920-21

201.1312 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

26.7/27.0

Con Sup:

Permanent Restoration

Const:R/W:

Near Petaluma, north of Pepper Road. Repairslide.

0481B

0J100$800$850

Subtotal: $1,650

2018-19$423$850$150$850

$2,273Total Project Cost: $3,923

04130004083/15/2019

12/13/20186/15/2018PA&ED:

RTL:R/W Cert:

8/30/2019Begin Con:

04-Sonoma-101 Prior18-19Prior18-19

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.0

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONNear Schellville, from north of Tolay CreekBridge to south of Yellow Creek Bridge. Widenfor standard shoulders, upgrade curves tostandard, and install rumble strips.

0738

0G680$25,000$6,264

Subtotal: $31,264

2019-20$2,500$3,750$1,800$4,200

$12,250Total Project Cost: $43,514

04000200076/15/20206/1/2020

6/30/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

04-Sonoma-121 Prior18-19Prior19-20

201.01013 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.4/6.5

Con Sup:

Safety Improvements

Const:R/W:

In Sonoma County, on Routes 12 and 116 atvarious locations; also, in Marine County onRoutes 1 and 131 at various locations; and inNapa County on Routes 29 and 121 at variouslocations. Install hybrid beacons, stop and yieldlines, crosswalks and bulbouts, and upgrade curbramps to enhance pedestrian safety.

1492G

0K130$2,777

$36

Subtotal: $2,813

2021-22$800$960$70

$850

$2,680Total Project Cost: $5,493

04160000451/2/20229/1/20215/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

04-Sonoma-12 18-1919-2019-2021-22

201.01527 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 249 of 284

DRAFT

12-06

-17

Page 254: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sonoma($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In various cities, on Routes 12, 101, and 116 atvarious locations; also in Marin County on Route101 at various locations. Highway worker safetyimprovements.

0480E

0J680$2,190

$10

Subtotal: $2,200

2018-19$308$550$44

$550

$1,452Total Project Cost: $3,652

04140000255/1/2019

3/20/201910/31/2017PA&ED:

RTL:R/W Cert:

12/10/2019Begin Con:

04-Sonoma-12 PriorPriorPrior18-19

201.23527 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.5/31.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESNear Monte Rio and Cloverdale, on Routes 116and 128; also in Marin County, on Route 101, at0.4 mile north of Sir Francis Drake Boulevard(PM 9.25). Stabilized soil and erosion control tomitigate for storm water quality.

1487F

2J840$2,816

$370

Subtotal: $3,186

2019-20$685$670$80

$655

$2,090Total Project Cost: $5,276

041500008512/1/2019

11/30/20199/30/2018PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

04-Sonoma-116 Prior18-19Prior19-20

201.33512.08 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.5/10.5

Con Sup:

Storm Water Mitigation

Const:R/W:

Near Guerneville, from Brookside Lane to RiverRoad. Upgrade curb ramps and sidewalk, andinstall Accessible Pedestrian Signal (APS)pushbuttons to make facilities compliant with theADA standards.

1491B

4J460$2,990

$68

Subtotal: $3,058

2021-22$300$850$225$850

$2,225Total Project Cost: $5,283

04150003515/2/2022

1/20/20224/1/2020PA&ED:

RTL:R/W Cert:

11/11/2022Begin Con:

04-Sonoma-116 18-1919-2019-2021-22

201.36118 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

11.8/R12.2

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONIn and near Sonoma, at Sonoma Creek Bridge No.20-0027 and Hooker Creek Bridge No. 20-0030.Scour mitigation.0269M

4H050$9,000

$150

Subtotal: $9,150

2019-20$1,519$2,650

$500$2,000

$6,669Total Project Cost: $15,819

04130000802/7/2020

12/16/20196/1/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

04-Sonoma-12 PriorPriorPrior19-20

201.1112 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

25.8/33.3

Con Sup:

Bridge Scour Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 250 of 284

DRAFT

12-06

-17

Page 255: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sonoma($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Santa Rosa, at Todd RoadOvercrossing (OC) No. 20-0172 (PM 16.54) andBaker Avenue OC No. 20-0173 (PM 19.00); also,in Marin County near Navato, at Miller CreekRoad OC No. 27-0082 (PM 15.57). Upgradebridge rails.

1451A

2K240$4,343

$116

Subtotal: $4,459

2021-22$650$780$130$988

$2,548Total Project Cost: $7,007

04160003949/1/20218/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

3/1/2021Begin Con:

04-Sonoma-101 18-1919-2019-2021-22

201.1121395 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

16.5/19.0

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Petaluma, at San Antonio Creek Bridges No.20-0019L/R. Abutment scour mitigation andchannel sediment cleaning to address flooding.1487D

3J080$997$160

Subtotal: $1,157

2021-22$982$416$24

$468

$1,890Total Project Cost: $3,047

041500007812/1/202112/1/202110/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

04-Sonoma-101 Prior20-2120-2121-22

201.1192 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONIn and near Santa Rosa, from Llano Road toFarmers Lane. Rehabilitate pavement, upgradeguardrail to make standard, and upgrade curbramps to make ADA compliant.

1493M

0K520$27,681

$280

Subtotal: $27,961

2021-22$2,084$2,900

$66$3,350

$8,400Total Project Cost: $36,361

041600009812/1/202111/1/20214/1/2020PA&ED:

RTL:R/W Cert:

5/2/2022Begin Con:

04-Sonoma-12 18-1919-2019-2021-22

201.12122 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

11.0/T17.4

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Sonoma, from Vallejo Avenue to eastof Leveroni Road/Napa Road. Pavementrehabilitation.0488K

1J360$6,208

$5

Subtotal: $6,213

2019-20$808$870$62

$746

$2,486Total Project Cost: $8,699

04140002022/1/20201/2/20204/1/2018PA&ED:

RTL:R/W Cert:

7/30/2020Begin Con:

04-Sonoma-12 PriorPriorPrior19-20

201.1217.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

35.1/38.9

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 251 of 284

DRAFT

12-06

-17

Page 256: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sonoma($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Windsor, Healdsburg, and Cloverdale,from Old Redwood Highway to 2 miles south ofMendocino County line. Roadway rehabilitation.1482F

0J642$68,200

$890

Subtotal: $69,090

2018-19$5,149$6,799

$170$7,600

$19,718Total Project Cost: $88,808

04140004766/28/20196/20/20196/30/2018PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

04-Sonoma-101 PriorPriorPrior18-19

201.12243.2 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

29.3/R54.3

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Near Jenner, from south of Fort Ross Road tonorth of Moon Rock Campground at various locations. Rehabilitate drainage culverts.1453J

1K730$4,256

$321

Subtotal: $4,577

2021-22$744

$1,369$429

$1,385

$3,927Total Project Cost: $8,504

04160003076/1/2022

6/15/202210/15/2020PA&ED:

RTL:R/W Cert:

1/1/2023Begin Con:

04-Sonoma-1 Prior20-2120-2121-22

201.15122 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

30.8/40.6

Con Sup:

Drainage System Restoration

Const:R/W:

Near Gualala, from north of Moon RockCampground to 0.1 mile north of Vantage Road.Rehabilitate drainage culverts.1462M

1K750$4,761

$382

Subtotal: $5,143

2021-22$1,050$1,571

$286$1,040

$3,947Total Project Cost: $9,090

04160003096/15/20226/15/2022

10/15/2020PA&ED:

RTL:R/W Cert:

1/16/2023Begin Con:

04-Sonoma-1 Prior20-2120-2121-22

201.15126 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

41.5/54.6

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYNear Vallejo, at east of Route 121. ReplaceWeigh In Motion (WIM) systems.

0763L

1A210$2,280

$10

Subtotal: $2,290

2018-19$506$592$20

$554

$1,672Total Project Cost: $3,962

04140004878/15/20197/15/20194/1/2018PA&ED:

RTL:R/W Cert:

12/30/2019Begin Con:

04-Sonoma-37 PriorPriorPrior18-19

201.3212 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.6

Con Sup:

Weigh Stations

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 252 of 284

DRAFT

12-06

-17

Page 257: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sonoma($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountySonoma

PA&ED:PS&E:

R/W Sup:Con Sup:

$10,127$178,155

R/W:

Subtotal: $188,282

Const:$20,614$28,073$4,264

$28,374

$81,325

Total (Capital + Support): $269,607

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 253 of 284

DRAFT

12-06

-17

Page 258: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Stanislaus($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Westley, at the Westley Safety RoadsideRest Area (SRRA). Upgrade water andwastewater systems.3009

0W630$4,001

$5

Subtotal: $4,006

2018-19$260$904

$6$806

$1,976Total Project Cost: $5,982

10120000218/1/20187/2/2018

6/30/2015PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

10-Stanislaus-5 PriorPriorPrior18-19

201.2351 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

27.0/27.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Turlock, from north of Golf Road tonorth of Taylor Road. Highway worker safety improvements.3143

0X660$2,093

$3

Subtotal: $2,096

2018-19$306$595$18

$574

$1,493Total Project Cost: $3,589

101300024911/15/201810/15/2018

7/7/2017PA&ED:

RTL:R/W Cert:

5/2/2019Begin Con:

10-Stanislaus-99 PriorPriorPrior18-19

201.23540 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R1.1/R7.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In and near Modesto, at various locations from0.1 mile south of Modesto Undercrossing toWoodland Avenue. Pave areas behind the goreand at slopes, upgrade guardrail and placevegetative control, and construct maintenancevehicle pullouts to reduce maintenance andimprove highway worker safety.

3189

0X670$3,692

$8

Subtotal: $3,700

2019-20$330

$1,232$0

$673

$2,235Total Project Cost: $5,935

101600002710/1/20199/15/20193/1/2019PA&ED:

RTL:R/W Cert:

4/15/2020Begin Con:

10-Stanislaus-99 18-1918-19

19-20

201.23531 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R13.8/R17.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Modesto, from 0.1 mile south of KansasAvenue and 0.4 mile north of Route 132 Separation; also, on adopted Route 132 alignmentright-of-way from 0.2 mile west of Emerald Avenue and 0.3 mile east of Emerald Avenue (PM 13.7/14.3). Hazardous waste mitigation.

3125

1E700$2,400

$27

Subtotal: $2,427

2018-19$813$916$18

$900

$2,647Total Project Cost: $5,074

101500011511/1/201810/1/20183/15/2018PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

10-Stanislaus-99 PriorPriorPrior18-19

201.3303 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R16.5/R16.7

Con Sup:

Hazardous Waste Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 254 of 284

DRAFT

12-06

-17

Page 259: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Stanislaus($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Riverbank, at 2nd Street and 4th Street.Upgrade curb ramps, sidewalk and crosswalks.

3010B

0W902$310$87

Subtotal: $397

2018-19 $715$180$200

$1,095Total Project Cost: $1,492

10170001556/14/20195/31/2019

PA&ED:

RTL:R/W Cert:

1/31/2020Begin Con:

10-Stanislaus-108PriorPrior18-19

201.3616 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In Waterford, from Reinway Avenue to F Street.Upgrade pedestrian facilities to make compliantwith the ADA standards.3241

1G420$2,000

$84

Subtotal: $2,084

2021-22$683

$1,337$723$718

$3,461Total Project Cost: $5,545

10170000139/1/20218/2/2021

5/29/2019PA&ED:

RTL:R/W Cert:

3/18/2022Begin Con:

10-Stanislaus-132 18-1918-1918-1921-22

201.36173 ADA unit(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

27.2/28.0

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

ROADWAY PRESERVATIONIn and near Riverbank, at 8th Street. Repair slopewith retaining wall.

5411

0H480$1,824

$52

Subtotal: $1,876

2018-19 $1,439$98

$631

$2,168Total Project Cost: $4,044

10120001934/17/20192/28/20196/30/2015PA&ED:

RTL:R/W Cert:

10/30/2019Begin Con:

10-Stanislaus-108PriorPrior18-19

201.1502 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

33.2

Con Sup:

Roadway Protective Betterments

Const:R/W:

In and near Ceres and Modesto, at variouslocations from Mitchell Road to Kansas Avenue;also, in Merced County on Route 59 near the cityof Merced, at Childs Avenue (PM 14.0). Upgrade drainage pump plants.

3251

1E620$6,440

$13

Subtotal: $6,453

2020-21$278

$1,142$93

$1,991

$3,504Total Project Cost: $9,957

10160000179/9/2020

8/10/20206/29/2019PA&ED:

RTL:R/W Cert:

3/26/2021Begin Con:

10-Stanislaus-99 18-1919-2019-2020-21

201.1516 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R10.0/R16.8

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 255 of 284

DRAFT

12-06

-17

Page 260: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Stanislaus($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MOBILITYNear Ceres and Modesto, in the northbounddirection from Hatch Road onramp to S. 9thStreet offramp. Construct auxiliary lane.0037

0L870$3,750$1,259

Subtotal: $5,009

2019-20$1,110$1,427

$141$1,012

$3,690Total Project Cost: $8,699

10150000036/1/20205/1/20202/1/2018PA&ED:

RTL:R/W Cert:

11/16/2020Begin Con:

10-Stanislaus-99 PriorPriorPrior19-20

201.310110 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R13.4/R13.8

Con Sup:

Operational Improvements

Const:R/W:

In San Joaquin, Merced, Stanislaus, andSacramento Counties, at various routes andlocations. Upgrade TTI System. 3286

1G440$1,619

$6

Subtotal: $1,625

2019-20$163$377

$4$401

$945Total Project Cost: $2,570

10180000834/7/2020

1/28/20207/1/2019PA&ED:

RTL:R/W Cert:

8/17/2020Begin Con:

10-Stanislaus-99 18-1918-1918-1919-20

201.315161 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Transportation Management Systems

Const:R/W:

CountyStanislaus

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,544$28,129

R/W:

Subtotal: $29,673

Const:$3,943

$10,084$1,281$7,906

$23,214

Total (Capital + Support): $52,887

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 256 of 284

DRAFT

12-06

-17

Page 261: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Sutter($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONIn Live Oak, at Elm Street and Pennington Road.Intersection safety improvements.

8381

2H230$3,800

$100

Subtotal: $3,900

2019-20$500$630$620$660

$2,410Total Project Cost: $6,310

03170000839/1/20199/1/20198/1/2017PA&ED:

RTL:R/W Cert:

3/1/2020Begin Con:

03-Sutter-99 PriorPriorPrior19-20

201.01051 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

40.0/40.5

Con Sup:

Safety Improvements

Const:R/W:

ROADWAY PRESERVATIONIn Live Oak, from 0.1 mile north of ColemanAvenue to 0.2 mile north of Ramsdell Drive.Roadway rehabilitation.8378

1H150$18,100

Subtotal: $18,100

2019-20$20

$380$50

$1,500

$1,950Total Project Cost: $20,050

03160000619/1/20199/1/20199/1/2018PA&ED:

RTL:R/W Cert:

3/1/2020Begin Con:

03-Sutter-99 Prior19-20Prior19-20

201.1204.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

39.4/41.0

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

ROADSIDE PRESERVATIONIn Sutter, Glenn, Colusa, Yuba, Placer, Yolo, andSacramento Counties at various locations.Advance mitigation credit purchases for futureSHOPP construction projects expected to impactsensitive species.

8380

1H520 $1,400

Subtotal: $1,400

2018-19$62$4

$43$1

$110Total Project Cost: $1,510

03160001763/4/20193/4/20192/1/2019PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

03-Sutter-99 Prior19-2019-2018-19

201.2409 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/42.4

Con Sup:

Roadside Enhancement

Const:R/W:

CountySutter

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,500$21,900

R/W:

Subtotal: $23,400

Const:$582

$1,014$713

$2,161

$4,470

Total (Capital + Support): $27,870

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 257 of 284

DRAFT

12-06

-17

Page 262: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tehama($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Red Bluff, from 2.3 miles east to 2.8 mileseast of Dry Creek Bridge. Curve improvement.

3640

1H970$3,000

$109

Subtotal: $3,109

2019-20$390$670$210$670

$1,940Total Project Cost: $5,049

02160000518/16/20197/19/20195/10/2018PA&ED:

RTL:R/W Cert:

11/29/2019Begin Con:

02-Tehama-36 Prior18-1918-1919-20

201.01020 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

12.6/13.1

Con Sup:

Safety Improvements

Const:R/W:

Near Red Bluff, from west of Basler Road to eastof Diamond Star Road. Curve improvement.

3663

2H630$3,200

$476

Subtotal: $3,676

2019-20$695$885$685

$1,200

$3,465Total Project Cost: $7,141

02160001563/26/20202/24/2020

11/20/2018PA&ED:

RTL:R/W Cert:

7/14/2020Begin Con:

02-Tehama-36 Prior18-1918-1919-20

201.01016 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

26.6/27.6

Con Sup:

Safety Improvements

Const:R/W:

Near Mineral, from 0.1 mile to 1.2 miles east ofRoute 89. Curve improvement.

3641

1H740$4,324

$401

Subtotal: $4,725

2019-20$840$751$50

$1,240

$2,881Total Project Cost: $7,606

02160000527/1/2019

5/31/20193/2/2018PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

02-Tehama-36 PriorPriorPrior19-20

201.01024 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

87.8/88.8

Con Sup:

Safety Improvements

Const:R/W:

Near Red Bluff, from Nine Mile HillOvercrossing to 0.1 mile north of Bowman RoadOvercrossing. Improve median clear recoveryzone and widen inside shoulder to make standardfor enhanced errant vehicle safety.

3632

1H470$4,530

$470

Subtotal: $5,000

2020-21$930$800$40

$1,030

$2,800Total Project Cost: $7,800

02160000443/22/20212/19/20213/2/2020PA&ED:

RTL:R/W Cert:

8/17/2021Begin Con:

02-Tehama-5 18-1919-2019-2020-21

201.01530 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

36.3/41.6

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 258 of 284

DRAFT

12-06

-17

Page 263: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tehama($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MANDATESNear Los Molinos, from Josephine Street to LosMolinos Creek Bridge. Construct curb ramps,sidewalks, lighting and drainage improvements.3606

1H320$4,600

$891

Subtotal: $5,491

2018-19$310$460$230$640

$1,640Total Project Cost: $7,131

02150001263/19/20192/12/2019

12/15/2017PA&ED:

RTL:R/W Cert:

8/3/2019Begin Con:

02-Tehama-99 PriorPriorPrior18-19

201.37828 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

12.0/12.6

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

BRIDGE PRESERVATIONNear Los Molinos, from 0.2 mile south to 0.2mile north of Champlin Slough Bridge No. 08-0006. Replace bridge to correct scour criticalconditions.

3642

1H510$4,370

$90

Subtotal: $4,460

2021-22$850

$1,170$90

$990

$3,100Total Project Cost: $7,560

021600014811/24/202110/22/2021

5/5/2020PA&ED:

RTL:R/W Cert:

4/19/2022Begin Con:

02-Tehama-99 18-1919-2019-2021-22

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

9.0/9.3

Con Sup:

Bridge Scour Mitigation

Const:R/W:

In Red Bluff, at Sacramento River Bridge No. 08-0095L/R. Retrofit bridges.

3515

4F590$22,100

$56

Subtotal: $22,156

2019-20$1,592$1,659

$280$3,962

$7,493Total Project Cost: $29,649

021300001012/25/201911/24/20197/17/2018PA&ED:

RTL:R/W Cert:

6/24/2020Begin Con:

02-Tehama-5 Prior18-1918-1919-20

201.1132 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R25.4

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In Tehama County, on Routes 5, 32, and 36 atvarious locations; also in Shasta County onRoutes 5 and 44; also in Lassen County on Route299 at various locations. Bridge scour preventionat 9 bridges.

3549

4G530$1,400

$147

Subtotal: $1,547

2019-20$780$720$50

$600

$2,150Total Project Cost: $3,697

02140000233/30/20202/28/20202/18/2019PA&ED:

RTL:R/W Cert:

8/26/2020Begin Con:

02-Tehama-Var Prior18-1918-1919-20

201.1199 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 259 of 284

DRAFT

12-06

-17

Page 264: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tehama($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn Red Bluff, from east of Baker Road to east ofEast Sand Slough Bridge. Pavement rehabilitation.3558

4G540$6,600

$57

Subtotal: $6,657

2019-20$700$650$240

$1,020

$2,610Total Project Cost: $9,267

02140000248/2/20197/2/2019

12/22/2017PA&ED:

RTL:R/W Cert:

2/19/2020Begin Con:

02-Tehama-36 PriorPriorPrior19-20

201.12110.1 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

40.3/42.1

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Red Bluff, from Shasta County line to Route32 at various locations. Drainage systemrestoration.3550

4G560$2,525

$351

Subtotal: $2,876

2019-20$760$660$620

$1,310

$3,350Total Project Cost: $6,226

021400002510/10/2019

9/3/20197/23/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Tehama-36 Prior18-1918-1919-20

201.15125 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/100.0

Con Sup:

Drainage System Restoration

Const:R/W:

MOBILITYNear Red Bluff, from 0.3 mile north of SnivelyRoad Overcrossing to 0.4 mile north of BowmanRoad Overcrossing. Upgrade southboundCottonwood Commercial Vehicle EnforcementFacility (CVEF).

3611

1H680$13,200

$35

Subtotal: $13,235

2021-22$450

$2,170$50

$2,320

$4,990Total Project Cost: $18,225

021600001011/8/202110/8/20215/5/2020PA&ED:

RTL:R/W Cert:

5/17/2022Begin Con:

02-Tehama-5 18-1919-2019-2021-22

201.3211 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

39.0/41.9

Con Sup:

Weigh Stations

Const:R/W:

ROADSIDE PRESERVATIONIn Tehama, Lassen, Modoc, Plumas, Shasta, andTrinity Counties at various locations. Advancemitigation credit purchases for future SHOPPconstruction projects expected to impact sensitivehabitats.

3627

1H640$0

$1,357

Subtotal: $1,357

2018-19$0$0

$100$0

$100Total Project Cost: $1,457

02160000319/14/20189/14/20187/2/2018PA&ED:

RTL:R/W Cert:

10/15/2018Begin Con:

02-Tehama-Var

Prior

201.2406 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 260 of 284

DRAFT

12-06

-17

Page 265: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tehama($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyTehama

PA&ED:PS&E:

R/W Sup:Con Sup:

$4,440$69,849

R/W:

Subtotal: $74,289

Const:$8,297

$10,595$2,645

$14,982

$36,519

Total (Capital + Support): $110,808

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 261 of 284

DRAFT

12-06

-17

Page 266: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Trinity($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Platina, from 3.7 miles to 3.0 miles west ofHayfork Creek Bridge. Curve improvement.

3653

2H050$5,280

$52

Subtotal: $5,332

2019-20$760

$1,130$130

$1,680

$3,700Total Project Cost: $9,032

02160000932/18/20202/4/20202/1/2019PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

02-Trinity-36 Prior18-1918-1919-20

201.01012 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R34.7/R35.3

Con Sup:

Safety Improvements

Const:R/W:

Near Salyer, from 0.1 mile west to 0.4 mile westof White House Gulch Road. Improve roadsideclear recovery zone.3557

4G500$2,732

$7

Subtotal: $2,739

2019-20$550

$1,220$70

$1,540

$3,380Total Project Cost: $6,119

02140000319/16/20198/16/20194/27/2018PA&ED:

RTL:R/W Cert:

3/3/2020Begin Con:

02-Trinity-299 Prior18-1918-1919-20

201.0153 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.9/2.1

Con Sup:

Collision Severity Reduction

Const:R/W:

In Trinity County, on Route 299 and Route 3 atvarious locations; also, in Shasta County onRoute 299 at PM 0.1. Make worker safetyimprovements.

3555

4G610$2,500

$79

Subtotal: $2,579

2018-19$425$745$160$775

$2,105Total Project Cost: $4,684

02140000283/18/20192/11/201911/9/2017PA&ED:

RTL:R/W Cert:

8/13/2019Begin Con:

02-Trinity-299 PriorPriorPrior18-19

201.23512 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Near Salyer, at the Francis B. Matthews SafetyRoadside Rest Area (SRRA). Upgrade potable water system and wastewater system. 3559

4G620$2,300

$0

Subtotal: $2,300

2019-20$470$860$50

$590

$1,970Total Project Cost: $4,270

02140000298/15/20197/1/2019

8/16/2018PA&ED:

RTL:R/W Cert:

4/8/2020Begin Con:

02-Trinity-299 Prior18-19Prior19-20

201.2351 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

3.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 262 of 284

DRAFT

12-06

-17

Page 267: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Trinity($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MANDATESNear Douglas City, at various locations from 1.2miles east of Lewiston Road to 0.5 mile west ofShasta County line. Perform storm watermitigation improvements at 16 locations to meetStatewide NPDES permit mandate goals.

3637

1H700$3,200

$345

Subtotal: $3,545

2021-22$860

$1,200$380

$1,100

$3,540Total Project Cost: $7,085

02160000493/28/20222/25/20229/8/2020PA&ED:

RTL:R/W Cert:

8/30/2022Begin Con:

02-Trinity-299 18-1920-2120-2121-22

201.335108 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

64.7/71.7

Con Sup:

Storm Water Mitigation

Const:R/W:

BRIDGE PRESERVATIONNear Trinity Center, from north of PreacherMeadows Road to north of El Dorado Way.Replace Swift Creek Bridge No. 05-0059.3485

4F220$8,627

$820

Subtotal: $9,447

2019-20$930

$1,680$100

$2,090

$4,800Total Project Cost: $14,247

02120000735/21/20204/16/20201/17/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

02-Trinity-3 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

58.7/61.9

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In Trinity County, at Dobbins Gulch Bridge No.05-0042 (PM 0.6), Stuart Fork Bridge No. 05-0055 (PM 43.9), and Mule Creek Bridge No. 05-0056 (PM 48.5); also, on Route 299 at GrassValley Creek Bridge No. 05-0013 (PM 65.5). Repair unsound concrete, replace bearings andjoint seals, repair bridge decks, and install barrierand approach slabs.

3633

1H500$6,300

$206

Subtotal: $6,506

2021-22$900

$1,030$230

$2,060

$4,220Total Project Cost: $10,726

02160000452/22/20221/21/20227/2/2020PA&ED:

RTL:R/W Cert:

8/9/2022Begin Con:

02-Trinity-3 Prior20-2120-2121-22

201.1194 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

In Trinity County, on Routes 299 and 36 and inSiskiyou County on Route 96 at various locations.Bridge preventative maintenance at 9 bridges.3516

4F600$6,771

$22

Subtotal: $6,793

2019-20$950

$1,400$150

$1,910

$4,410Total Project Cost: $11,203

02130000129/13/20199/6/2019

9/28/2018PA&ED:

RTL:R/W Cert:

2/14/2020Begin Con:

02-Trinity-299 Prior18-1918-1919-20

201.1199 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 263 of 284

DRAFT

12-06

-17

Page 268: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Trinity($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONNear Burnt Ranch, from 0.4 mile east ofHennessey Road to 0.3 mile west of Burnt RanchRoad. Install rockfall drapery system. 3579

0H410$2,079

$0

Subtotal: $2,079

2019-20$200$470$50

$500

$1,220Total Project Cost: $3,299

021500001910/11/2019

9/4/20197/24/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Trinity-299 Prior18-1918-1919-20

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

10.9/11.2

Con Sup:

Roadway Protective Betterments

Const:R/W:

Near Junction City, at west of Canyon CreekBridge. Install rockfall drapery system

3592

0H690$2,495

$15

Subtotal: $2,510

2019-20$330$580$200$630

$1,740Total Project Cost: $4,250

021500005510/11/2019

9/4/20197/24/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Trinity-299 Prior18-1918-1919-20

201.1507 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

43.1/43.3

Con Sup:

Roadway Protective Betterments

Const:R/W:

Near Trinity Center, from 0.9 miles south ofTrinity River Bridge to Siskiyou County line atvarious locations. Drainage system restoration.3586

0H540$3,443

$365

Subtotal: $3,808

2019-20$1,390

$850$1,450$1,580

$5,270Total Project Cost: $9,078

021500004910/10/2019

9/3/20199/1/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Trinity-3 Prior18-1918-1919-20

201.15135 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

30.0/T85.0

Con Sup:

Drainage System Restoration

Const:R/W:

Near Salyer, at various locations from 0.1 milewest of White House Gulch Road to 0.4 mile westof Slattery Pond Road. Rehabilitate culverts.3668

2H810$5,390

$311

Subtotal: $5,701

2021-22$930$980$330$990

$3,230Total Project Cost: $8,931

02170000128/19/20217/19/20216/3/2020PA&ED:

RTL:R/W Cert:

12/14/2021Begin Con:

02-Trinity-299 Prior20-2120-2121-22

201.15118 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.6/45.2

Con Sup:

Drainage System Restoration

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 264 of 284

DRAFT

12-06

-17

Page 269: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Trinity($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyTrinity

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,222$51,117

R/W:

Subtotal: $53,339

Const:$8,695

$12,145$3,300

$15,445

$39,585

Total (Capital + Support): $92,924

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 265 of 284

DRAFT

12-06

-17

Page 270: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tulare($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Porterville, from west of Route 65 to S.Plano Road. Landscape Mitigation.

3032A

0S311$400

Subtotal: $400

2018-19 $330

$490

$820Total Project Cost: $1,220

061800008811/2/201810/2/20187/19/2016PA&ED:

RTL:R/W Cert:

5/3/2019Begin Con:

06-Tulare-19018-19

18-19

201.0100 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R15.1/16.9

Con Sup:

Safety Improvements

Const:R/W:

In and near Porterville, from 0.4 mile north ofAvenue 136 to 0.2 mile north of Linda VistaAvenue; also on Route 190 from 0.2 mile west ofthe Route 65/190 Separation to Blue HeronParkway. Construct MVPs, gore paving, drainageimprovements, new fencing and relocation ofpullboxes and controller cabinets.

6813

0U730$4,400

$13

Subtotal: $4,413

2020-21$610$940$18

$710

$2,278Total Project Cost: $6,691

06160000287/15/20207/1/2020

7/15/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

06-Tulare-65 18-1919-2019-2020-21

201.23529 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

17.5/22.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Near Tipton, at the Philip S. Raine SafetyRoadside Rest Area. Upgrade water, sewer andirrigation facilities.6885

0U770$8,000

$50

Subtotal: $8,050

2021-22$550

$1,750$12

$2,250

$4,562Total Project Cost: $12,612

06160000358/4/20212/2/2021

7/18/2019PA&ED:

RTL:R/W Cert:

1/3/2022Begin Con:

06-Tulare-99 18-1919-2019-2021-22

201.2352 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

22.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Tulare, from north of Bardsley Avenue to northof Prosperity Avenue. Roadside safetyimprovements.6700

0R170$2,700

Subtotal: $2,700

2018-19$255$624$24

$430

$1,333Total Project Cost: $4,033

06140000513/1/20192/1/2019

8/25/2017PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

06-Tulare-99 PriorPriorPrior18-19

201.23526 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.9/31.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 266 of 284

DRAFT

12-06

-17

Page 271: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tulare($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Kingsburg, from 0.2 mile south to 0.4 milenorth of Avenue 384 Overcrossing at the C. H.Warlow Safety Roadside Rest Area. Upgrade water and wastewater systems to comply withFederal and State statutes and regulatoryrequirements.

6882

0V760$4,241

$170

Subtotal: $4,411

2021-22$869

$1,666$36

$1,705

$4,276Total Project Cost: $8,687

06160002203/25/20223/21/20221/2/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

06-Tulare-99 18-1919-2019-2021-22

201.2351 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

51.6/52.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

BRIDGE PRESERVATIONIn Tipton, at Avenue 152 Overcrossing No. 46-019. Replace bridge.

6679

0Q910$7,521

$343

Subtotal: $7,864

2019-20$453

$1,730$54

$1,354

$3,591Total Project Cost: $11,455

06140000053/2/20202/3/20202/1/2018PA&ED:

RTL:R/W Cert:

8/3/2020Begin Con:

06-Tulare-99 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

19.4

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Woodlake, at Yokohl Creek Bridge No. 46-0011 (PM 1.39); also at Kaweah River BridgeNo. 46-0073 (PM 4.19). Replace bridges toupgrade to current standards, facilitate bike laneshoulders, and upgrade guard railing.

6787

0U280$12,100

$395

Subtotal: $12,495

2020-21$1,325$2,260

$645$1,940

$6,170Total Project Cost: $18,665

06150002934/26/20214/15/2021

12/13/2019PA&ED:

RTL:R/W Cert:

10/5/2021Begin Con:

06-Tulare-245 Prior19-2019-2020-21

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

1.4

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In and near Pixley, at Avenue 48 Overcrossing(OC) No. 46-0165 (PM 6.2), Davis Avenue OCNo. 46-0172 (PM 12.6), and Avenue 100 OC No.46-0173 (PM 12.8). Upgrade bridge railing tocurrent standards and install approach railings.

6788

0U270$2,120

$108

Subtotal: $2,228

2020-21$740

$1,122$30

$1,048

$2,940Total Project Cost: $5,168

06150002952/1/2021

1/15/202111/20/2019PA&ED:

RTL:R/W Cert:

10/15/2021Begin Con:

06-Tulare-99 18-1919-2019-2020-21

201.1121493 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 267 of 284

DRAFT

12-06

-17

Page 272: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tulare($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Kingsburg, on Route 201 at Sand Creek andFriant-Kern Canal Bridge; also on Route 216 atKaweah River Bridge. Bridge rail replacement.6521

0H200$9,371

$450

Subtotal: $9,821

2018-19$1,728$3,900

$617$2,357

$8,602Total Project Cost: $18,423

06120001576/22/20176/21/20174/20/2015PA&ED:

RTL:R/W Cert:

1/21/2019Begin Con:

06-Tulare-201 PriorPriorPrior18-19

201.1121188 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

ROADWAY PRESERVATIONIn Tulare, Fresno and Madera Counties, on Route99 at various locations. Upgrade existing pumpsand control systems at 11 pumping plants.6795

0U230$5,140

$65

Subtotal: $5,205

2019-20$650

$2,060$620

$2,230

$5,560Total Project Cost: $10,765

061500029711/20/201911/8/20197/13/2018PA&ED:

RTL:R/W Cert:

5/11/2020Begin Con:

06-Tulare-99 Prior18-1918-1919-20

201.15111 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

Const:R/W:

Between Springville and Camp Nelson, from eastof Balch Park Road to west of Wishon Drive.Replace deteriorated culverts and upgradeexisting Guardrail.

6286

0H140$2,850

$246

Subtotal: $3,096

2019-20$800$950$210$800

$2,760Total Project Cost: $5,856

06160001943/15/20203/1/2020

11/17/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

06-Tulare-190 PriorPriorPrior19-20

201.1517 Drainage system(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

34.7/39.7

Con Sup:

Drainage System Restoration

Const:R/W:

CountyTulare

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,840$58,843

R/W:

Subtotal: $60,683

Const:$7,980

$17,332$2,266

$15,314

$42,892

Total (Capital + Support): $103,575

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 268 of 284

DRAFT

12-06

-17

Page 273: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tuolumne($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONAt various locations, from Sonora to Dardanelle;also, on Route 49 in Sonora (PM 17.4 to 17.6)and in Stanislaus County on Route 108 in andnear Riverbank (PM 28.5 to 33.4). Upgradeguardrail to make standard.

3234

1C400$3,087

$173

Subtotal: $3,260

2021-22$634$972$11

$554

$2,171Total Project Cost: $5,431

101700002511/30/202110/18/202111/2/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

10-Tuolumne-108 18-1920-2120-2121-22

201.01531 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

L1.3/53.3

Con Sup:

Collision Severity Reduction

Const:R/W:

ROADWAY PRESERVATIONNear Long Barn, from 0.1 mile east of the eastjunction of Long Barn Road to 2.3 miles east ofCow Creek Road. Pavement rehabilitation.0157

46210$17,970

$88

Subtotal: $18,058

2020-21$687

$1,152$8

$2,092

$3,939Total Project Cost: $21,997

10130002661/1/2021

12/1/202010/1/2019PA&ED:

RTL:R/W Cert:

7/15/2021Begin Con:

10-Tuolumne-108 Prior19-2019-2020-21

201.12151.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R18.9/38.8

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Buck Meadows, from Elder Lane toYosemite National Park boundary. Pavementrehabilitation.0335

0E960$20,520

$6

Subtotal: $20,526

2018-19$931

$1,070$55

$2,793

$4,849Total Project Cost: $25,375

101300025412/7/201811/7/20183/3/2018PA&ED:

RTL:R/W Cert:

7/10/2019Begin Con:

10-Tuolumne-120 PriorPriorPrior18-19

201.1212 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

32.7/R56.5

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Near Strawberry, from east of Old StrawberryRoad to west of Beardsley Road. Rockfallmitigation at 4 locations.3137

0Y800$2,628

$43

Subtotal: $2,671

2018-19$750$625$75

$560

$2,010Total Project Cost: $4,681

10150000071/15/2019

12/31/201811/1/2017PA&ED:

RTL:R/W Cert:

8/30/2019Begin Con:

10-Tuolumne-108 PriorPriorPrior18-19

201.1504 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

32.3/34.6

Con Sup:

Roadway Protective Betterments

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 269 of 284

DRAFT

12-06

-17

Page 274: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Tuolumne($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Haden Flat, from east of Cherry Lake Roadto west of Packard Canyon Road. Stabilize slopeerosion at two locations.3136

0Y790$1,874

$12

Subtotal: $1,886

2018-19$650$493$48

$363

$1,554Total Project Cost: $3,440

10150000061/15/201912/1/20189/1/2017PA&ED:

RTL:R/W Cert:

6/26/2019Begin Con:

10-Tuolumne-120 PriorPriorPrior18-19

201.1502 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

48.8/R50.5

Con Sup:

Roadway Protective Betterments

Const:R/W:

CountyTuolumne

PA&ED:PS&E:

R/W Sup:Con Sup:

$322$46,079

R/W:

Subtotal: $46,401

Const:$3,652$4,312

$197$6,362

$14,523

Total (Capital + Support): $60,924

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 270 of 284

DRAFT

12-06

-17

Page 275: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Ventura($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONIn Ventura County, south of Point Mugu StatePark (PM 4.0) and Sycamore Canyon Road (PM4.2). Construct secant walls at two locations as apermanent slope restoration solution to stabilize the slope and prevent continued erosion. Twoprevious Director Orders: 07-4X370 and 07 -4X760 were executed to remove slide materialand repair embankment, roadway and drainagesystems.

4930

31820$27,179

$766

Subtotal: $27,945

2019-20$1,200$1,900

$100$2,600

$5,800Total Project Cost: $33,745

071500028612/16/2019

9/3/20199/28/2018PA&ED:

RTL:R/W Cert:

7/16/2020Begin Con:

07-Ventura-1 Prior18-1918-1919-20

201.1312 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.0/4.2

Con Sup:

Permanent Restoration

Const:R/W:

Near Point Mugu State Park, at Big SycamoreCreek No. 52-0011. Shoreline embankmentrestoration by replacing Rock Slope Protection(RSP), constructing seawalls and secant retainingwall, and upgrade guardrail.

5181

33350$11,099

$442

Subtotal: $11,541

2021-22$2,300$3,240$1,000$3,880

$10,420Total Project Cost: $21,961

07160003128/2/20217/1/20217/1/2019PA&ED:

RTL:R/W Cert:

3/2/2022Begin Con:

07-Ventura-1 Prior19-2019-2021-22

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.5/4.6

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONNear Ojai, north of North Fork Matilija CreekBridge No. 52-450. Widen the roadway by fourfeet, upgrade rock block barrier, and place HighFriction Surface Treatment (HFST).

5145

33230$3,080

$64

Subtotal: $3,144

2021-22$660

$1,460$40

$1,550

$3,710Total Project Cost: $6,854

071600025712/15/202111/15/20213/30/2021PA&ED:

RTL:R/W Cert:

7/10/2022Begin Con:

07-Ventura-33 18-1920-2120-2121-22

201.01529 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

18.9/19.1

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near various cities, at various locations,from 0.2 mile south of Lakeview Canyon Road toHobson Road Undercrossing. Upgradeguardrails, end treatments, and bridgeconnections, and add vegetation control underguardrails. Remove and replace dikes.

5231

33900$6,470

$80

Subtotal: $6,550

2021-22$950

$2,800$35

$2,000

$5,785Total Project Cost: $12,335

071700010810/4/20218/23/20219/30/2019PA&ED:

RTL:R/W Cert:

5/5/2022Begin Con:

07-Ventura-101 18-1919-2021-2221-22

201.015345 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/R38.9

Con Sup:

Collision Severity Reduction

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 271 of 284

DRAFT

12-06

-17

Page 276: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Ventura($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near various cities, at various locations,from 0.2 mile north of Westlake Boulevard to0.3mile north of Hobson Road. Upgrade guardrails,end treatments, and bridge connections, and addvegetation control under guardrails. Remove andreplace dikes.

5082

33110$9,776

$29

Subtotal: $9,805

2021-22$392

$1,733$20

$1,750

$3,895Total Project Cost: $13,700

071600022510/4/20218/23/20219/30/2019PA&ED:

RTL:R/W Cert:

5/5/2020Begin Con:

07-Ventura-101 18-1918-1919-2021-22

201.01593 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.9/R39.2

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Thousand Oaks, from Los AngelesCounty line to 0.3 mile north of CamarilloSprings Road. Construct access trails and MVPs,relocate irrigation facilities, install access gates,railings and breakaway post sleeves, pave gore, narrow and slope areas.

5030

32560$4,915

$20

Subtotal: $4,935

2020-21$514

$1,523$46

$2,117

$4,200Total Project Cost: $9,135

071600008612/1/202010/1/202010/1/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

07-Ventura-101 18-1919-2020-2120-21

201.23594 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/11.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

In Simi Valley, from First Street to YosemiteStreet. Construct maintenance vehicle pulloutsand access roads, pave gore areas, install smartirrigation controllers and access gates. Plantvines at bridge wingwalls.

4894

31650$3,250

$10

Subtotal: $3,260

2018-19$677

$1,369$39

$1,292

$3,377Total Project Cost: $6,637

07150002102/1/2019

11/15/20186/26/2017PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

07-Ventura-118 PriorPriorPrior18-19

201.235100 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R24.1/R29.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

MANDATESIn Ventura County, at various locations; also onRoute 101 (PM 22.0/43.6), Route 34 (PM4.3/17.7) and Route 150 (PM 2.5/34.4).Construct and install stormwater treatment BMPsincluding biofiltration swales, gross solid removaldevices and Austin Vault Sand Filters.

5012

32270$10,340

$126

Subtotal: $10,466

2021-22$2,500$2,650

$40$3,750

$8,940Total Project Cost: $19,406

071600006712/15/202111/1/20217/2/2020PA&ED:

RTL:R/W Cert:

7/5/2022Begin Con:

07-Ventura-1 18-1920-2118-1921-22

201.33590.61 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/28.5

Con Sup:

Storm Water Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 272 of 284

DRAFT

12-06

-17

Page 277: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Ventura($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In the city of Ventura, from south of SeawardAvenue to Ventura River. Stabilize soil anderosion control.4813

31130$1,823

$20

Subtotal: $1,843

2018-19$95

$1,196$24

$959

$2,274Total Project Cost: $4,117

071500000912/14/201810/5/20186/9/2017PA&ED:

RTL:R/W Cert:

6/19/2019Begin Con:

07-Ventura-101 PriorPriorPrior18-19

201.33522.5 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

27.5/31.0

Con Sup:

Storm Water Mitigation

Const:R/W:

Near the city of Ventura, from County Drive toSanta Clara River. Construct stormwatertreatment BMP infiltration basin.5204

33600$6,011

$10

Subtotal: $6,021

2021-22$950

$1,961$44

$1,680

$4,635Total Project Cost: $10,656

07160003759/15/20217/15/2021

12/30/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

07-Ventura-118 18-1919-2019-2021-22

201.33542.01 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.2/1.8

Con Sup:

Storm Water Mitigation

Const:R/W:

In Santa Paula, from Peck Road to Santa PaulaCreek. Stabilize soil and install irrigation system.

4815

31150$2,431

$30

Subtotal: $2,461

2018-19$130$916$102

$1,379

$2,527Total Project Cost: $4,988

071500001211/30/201810/1/20186/28/2017PA&ED:

RTL:R/W Cert:

7/8/2019Begin Con:

07-Ventura-126 PriorPriorPrior18-19

201.33522.5 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R10.2/R12.7

Con Sup:

Storm Water Mitigation

Const:R/W:

Near Ventura and Ojai, from north of SycamoreDrive to Fairview Road. Construct and upgradecurb ramps, sidewalks and driveways to meetcurrent ADA standards.

5010

32320$6,481$4,141

Subtotal: $10,622

2021-22$980

$4,620$1,100$3,798

$10,498Total Project Cost: $21,120

071600006212/15/202111/1/20219/3/2019PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

07-Ventura-33 18-1918-1919-2021-22

201.36164 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

6.5/12.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 273 of 284

DRAFT

12-06

-17

Page 278: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Ventura($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near Ventura and Moorpark, from NorthRoute 126 Junction to 0.3 mile west of PrincetonAvenue. Reconstruct curb ramps, construct newsidewalks, install accessible pedestrian signalsand upgrade thermoplastic pavement markingcrosswalks.

5233

33920$3,944$2,941

Subtotal: $6,885

2021-22$1,000$2,000$1,624$1,500

$6,124Total Project Cost: $13,009

07170001193/15/20223/1/2022

3/15/2020PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

07-Ventura-118 18-1919-2019-2021-22

201.36193 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.5/T18.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

In and near cities of Ojal and Santa Paula, fromRoute 33 to Route 126. Construct and upgradecurb ramps and sidewalks to comply with ADAstandards.

4746

30670$4,549

$556

Subtotal: $5,105

2019-20$908

$1,000$100

$1,000

$3,008Total Project Cost: $8,113

07140001793/30/20205/1/20197/2/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

07-Ventura-150 Prior18-1918-1919-20

201.361134 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.6/34.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONNear the city of Ventura, at Ventura OverheadNo. 52-0040. Replace corroded steel spans ofbridge and upgrade bridge railing to currentstandards.

4972

31960$3,565

$983

Subtotal: $4,548

2021-22$1,200$2,500

$540$1,650

$5,890Total Project Cost: $10,438

071600002512/15/202111/15/202112/14/2018PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

07-Ventura-1 Prior18-1918-1921-22

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

21.5

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Oak View, at San Antonio Creek Bridge No.52-0065. Scour mitigation and bridge railupgrade.4496

29130$2,460$2,750

Subtotal: $5,210

2018-19$1,640$1,112

$600$1,460

$4,812Total Project Cost: $10,022

07120000831/25/20191/4/2019

6/30/2017PA&ED:

RTL:R/W Cert:

9/6/2019Begin Con:

07-Ventura-33 PriorPriorPrior18-19

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.6

Con Sup:

Bridge Scour Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 274 of 284

DRAFT

12-06

-17

Page 279: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Ventura($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Sea Cliff, at Willow Creek Bridge No. 52-003; also in Ojai, on Route 33 at North ForkMatilija Bridges No. 52-0044 (PM 15.8) and No.52-0173 (PM16.1). Upgrade bridge railings tomeet current standards.

4601

29650$2,657

$818

Subtotal: $3,475

2020-21$958

$2,300$465

$2,000

$5,723Total Project Cost: $9,198

07130000991/23/20201/3/2020

11/5/2018PA&ED:

RTL:R/W Cert:

7/8/2020Begin Con:

07-Ventura-1 Prior20-2120-2120-21

201.112724 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

28.2

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Ojai, at North Fork Matilija Creek No. 52-0173. Paint steel portion of bridge and replacemissing rivets of bottom flanges for preventativemaintenance to preserve and extend the life ofbridge.

5008

32300$660$30

Subtotal: $690

2021-22$320$850$50

$620

$1,840Total Project Cost: $2,530

071600006010/31/2021

9/1/202112/15/2018PA&ED:

RTL:R/W Cert:

6/2/2022Begin Con:

07-Ventura-33 Prior18-1918-1921-22

201.1191 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.1

Con Sup:

Bridge Preventative Maintenance

Const:R/W:

ROADWAY PRESERVATIONIn the city of Ventura, from North 101 Junction -Solimar Undercrossing to Hobson County ParkRoad. Cold plane and overlay pavement, upgradeguardrail/end treatment, install traffic signs andcrosswalks.

5018

32390$10,200

$14

Subtotal: $10,214

2021-22$625

$1,850$60

$3,350

$5,885Total Project Cost: $16,099

071600007212/15/202111/1/20217/15/2020PA&ED:

RTL:R/W Cert:

8/5/2022Begin Con:

07-Ventura-1 19-2020-2120-2121-22

201.12111.7 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

21.3/27.1

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

In and near Ojai, Mira Monte and Meiners Oaks,from Burham Road to Gorham Road; also onRoute 33 from 33/150 Junction to Meiners Road.Cold plane and overlay pavement, upgradeguardrail and signs.

5014

32370$5,588

$221

Subtotal: $5,809

2020-21$600

$1,500$250

$1,700

$4,050Total Project Cost: $9,859

071600006910/5/20208/5/20209/3/2019PA&ED:

RTL:R/W Cert:

4/8/2021Begin Con:

07-Ventura-150 18-1919-2019-2020-21

201.12115.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R13.3/19.0

Con Sup:

Pavement Rehabilitation (CAPM)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 275 of 284

DRAFT

12-06

-17

Page 280: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Ventura($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

In and near cities of Thousand Oaks andMoorpark, from Route 101 to Route 118.Rehabilitate pavement.4688

30250$92,445

$860

Subtotal: $93,305

2018-19$1,300$7,500

$100$17,000

$25,900Total Project Cost: $119,205

07130004796/14/20195/15/20199/29/2017PA&ED:

RTL:R/W Cert:

7/9/2020Begin Con:

07-Ventura-23 PriorPriorPrior18-19

201.12257 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R3.3/R11.5

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

Near Sea Cliff, from Padre Juan Canyon RoadOvercrossing to Punta Gorda PedestrianUndercrossing. Rehabilitate roadway.4687

30240$19,270

$70

Subtotal: $19,340

2019-20$100

$1,700$200

$2,100

$4,100Total Project Cost: $23,440

07130004882/14/20202/11/20199/21/2018PA&ED:

RTL:R/W Cert:

8/28/2020Begin Con:

07-Ventura-101 Prior18-1918-1919-20

201.12221.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R36.7/R40.3

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

MOBILITYIn Thousand Oaks and Camarillo, from WendyDrive to Pleasant Valle Road, at the northboundand southbound Commercial VehicleEnforcement Facilities. Replace concrete slabsand repair and replace asphalt concrete.

5081

33100$2,006

$8

Subtotal: $2,014

2020-21$0

$1,550$20

$850

$2,420Total Project Cost: $4,434

07160002208/10/20206/15/20206/29/2016PA&ED:

RTL:R/W Cert:

3/10/2021Begin Con:

07-Ventura-10118-1918-1920-21

201.3212 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

9.0/9.2

Con Sup:

Weigh Stations

Const:R/W:

In and near Moorepark, at the eastbound andwestbound Commercial Vehicle EnforcementFacilities. Construct new modular office facilityand install overhead truck scale on/off messagesigns.

5255

34160$1,150

$44

Subtotal: $1,194

2021-22$300$800$16

$400

$1,516Total Project Cost: $2,710

071700019410/15/2021

8/1/20218/18/2019PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

07-Ventura-118 18-1919-2019-2021-22

201.3212 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

13.3/15.6

Con Sup:

Weigh Stations

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 276 of 284

DRAFT

12-06

-17

Page 281: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Ventura($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyVentura

PA&ED:PS&E:

R/W Sup:Con Sup:

$15,033$241,349

R/W:

Subtotal: $256,382

Const:$20,299$50,030$6,615

$60,385

$137,329

Total (Capital + Support): $393,711

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 277 of 284

DRAFT

12-06

-17

Page 282: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Yolo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear West Sacramento, from 3.7 miles north ofClarksburg Road to Levee Access Road.Permanent restoration of damaged pavement andsupporting levee embankment.

9058

2H460$51,950$7,200

Subtotal: $59,150

2019-20$2,080$1,930

$990$5,890

$10,890Total Project Cost: $70,040

03170001141/1/2020

12/1/20198/15/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

03-Yolo-84 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.3/15.7

Con Sup:

Permanent Restoration

Const:R/W:

COLLISION REDUCTIONNear Cadenasso, from 0.4 mile west of CountyRoad 79 to 0.4 mile east of County Road 79; alsofrom Esparto to 0.2 mile west of Route 505.Shoulder widening, curve correction, left-turnchannelization, signalization and two-way left- turn lanes.

8655A

0C472$19,390$7,989

Subtotal: $27,379

2018-19 $2,570$2,500$4,850

$9,920Total Project Cost: $37,299

031400027212/15/201712/12/20176/24/2015PA&ED:

RTL:R/W Cert:

3/26/2018Begin Con:

03-Yolo-16PriorPrior18-19

201.010330 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.5/31.6

Con Sup:

Safety Improvements

Const:R/W:

Near Capay, from Capay Canal Bridge to CountyRoad 85; also, in Esparto from Orleans Street toCounty Road 21A (PM 27.5/28.3). Improvepedestrian safety and operations for bicycles andmotorists.

8663

4F170$1,492

$408

Subtotal: $1,900

2018-19$380$490$140$390

$1,400Total Project Cost: $3,300

031400006312/1/2018

11/15/201812/1/2017PA&ED:

RTL:R/W Cert:

6/1/2019Begin Con:

03-Yolo-16 PriorPriorPrior18-19

201.01529 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

25.2/28.3

Con Sup:

Collision Severity Reduction

Const:R/W:

In and near Woodland, from the SacramentoCounty line to Colusa County line. Improvements to reduce maintenance workerexposure.

8572

4F830$1,940

$10

Subtotal: $1,950

2018-19$240$400$20

$420

$1,080Total Project Cost: $3,030

031400030011/1/20189/1/2018

10/10/2017PA&ED:

RTL:R/W Cert:

5/15/2019Begin Con:

03-Yolo-5 PriorPriorPrior18-19

201.23532 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.4/R28.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 278 of 284

DRAFT

12-06

-17

Page 283: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Yolo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MANDATESIn and near Woodland, from County Road 102 toCounty Road 13 at various locations; also, in thecity of Sacramento, from Seamas Avenue toRichards Boulevard (PM 19.3/24.7) at variouslocations. Upgrade ADA facilities.

5833

3F140$690

Subtotal: $690

2018-19$110$140$30

$170

$450Total Project Cost: $1,140

03120000728/15/20188/1/2018

12/1/2017PA&ED:

RTL:R/W Cert:

1/3/2019Begin Con:

03-Yolo-5 PriorPriorPrior18-19

201.36154 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.5/R17.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

BRIDGE PRESERVATIONIn West Sacramento, at the Sacramento RiverBridge and Overhead No. 22-0026L/R.Rehabilitate bridge.8901

0F250$32,760

$482

Subtotal: $33,242

2019-20$990

$1,550$75

$3,640

$6,255Total Project Cost: $39,497

03000000754/1/20203/1/20209/1/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

03-Yolo-80 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R11.3

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Winters, at Putah Creek Bridge No. 22-0072L/R, from Solano County line to 0.4 milesouth of Route 128; also in Solano County from0.3 mile south to the Yolo County line (PM R10.3to R10.6). Seismic retrofit of two parallelbridges.

9504

2H450$13,960

$215

Subtotal: $14,175

2021-22$941

$1,755$371

$2,662

$5,729Total Project Cost: $19,904

03170001133/15/20223/1/20222/1/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

03-Yolo-505 18-1919-2019-2021-22

201.1132 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.0/0.2

Con Sup:

Bridge Seismic Restoration

Const:R/W:

Near Woodland, at County Road 96 Overcrossing(OC) No. 22-0155 (PM R14.27), County Road 95OC No. 22-0156 (PM R15.85), and Zamora OCNo. 22-0157 (PM R17.62); also in Colusa Countyin and near Williams at E Street OC No. 15-0067(PM R17.98) and Lurline Avenue OC No. 15-0075 (PM R22.74). Establish standard verticalclearance.

ACCELERATED BRIDGE (PA&ED Only)

5869

3H391$15,700

$620

Subtotal: $16,320

2019-20$1,700$1,570

$430$2,470

$6,170Total Project Cost: $22,490

03170003494/15/20204/1/20202/1/2019PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

03-Yolo-5 Prior19-2019-2019-20

201.3225 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 279 of 284

DRAFT

12-06

-17

Page 284: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Yolo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Woodland, at Wye Line Road Overcrossing(OC) No. 22-0158 (PM 4.49), County Road 6 OCNo. 22-0138 (PM R25.57), County Line Road OCNo. 22-0139 (R28.92). Establish standardvertical clearance.

ACCELERATED BRIDGE (PA&ED Only)

8563

0F760$11,032

$655

Subtotal: $11,687

2020-21$744

$1,885$98

$3,901

$6,628Total Project Cost: $18,315

03170000314/1/20213/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

10/1/2021Begin Con:

03-Yolo-5 Prior20-2120-2120-21

201.3223 Bridge(s)Performance Measure

Program Code

PA&ED:* PS&E:

* R/W Sup:

Carryover

4.4/R28.9

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

* Const:* R/W:

MOBILITYIn various counties, on various routes at variouslocations. Repair and install permanentAutomatic Vehicle Classification (AVC) truckdata collection stations.

8571

0H410$9,400

$80

Subtotal: $9,480

2018-19$1,000$1,000

$190$1,900

$4,090Total Project Cost: $13,570

031500016510/1/20189/1/20181/1/2018PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

03-Yolo-5 PriorPriorPrior18-19

201.31569 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

Const:R/W:

CountyYolo

PA&ED:PS&E:

R/W Sup:Con Sup:

$17,659$158,314

R/W:

Subtotal: $175,973

Const:$8,185

$13,290$4,844

$26,293

$52,612

Total (Capital + Support): $228,585

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 280 of 284

DRAFT

12-06

-17

Page 285: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Yuba($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Marysville, from Laurellen Road to SouthHoncut Creek Bridge. Widen shoulders andimprove clear recovery zone.9819

4F380$70,735$9,858

Subtotal: $80,593

2019-20$3,906$4,884$6,227$6,094

$21,111Total Project Cost: $101,704

03140001535/20/20205/5/20203/1/2018PA&ED:

RTL:R/W Cert:

11/20/2020Begin Con:

03-Yuba-70 PriorPriorPrior19-20

201.01080 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.2/25.8

Con Sup:

Safety Improvements

Const:R/W:

Near Smartsville, from the Yuba River Bridge toeast of Smartsville Road. Realign and widen roadway.9590

3F510$48,500$2,750

Subtotal: $51,250

2018-19$4,700$3,500$1,000$6,871

$16,071Total Project Cost: $67,321

03130000205/1/2019

4/16/20199/1/2017PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

03-Yuba-20 PriorPriorPrior18-19

201.01520 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R18.0/20.3

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Linda and Marysville, from 0.3 mile southof Feather River Boulevard to Yuba River Bridge.Install concrete median barrier. 9821

0H510$5,200

$10

Subtotal: $5,210

2018-19$350$500$40

$590

$1,480Total Project Cost: $6,690

031500020110/15/20189/15/20188/27/2017PA&ED:

RTL:R/W Cert:

4/1/2019Begin Con:

03-Yuba-70 PriorPriorPrior18-19

201.0153 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R11.0/13.6

Con Sup:

Collision Severity Reduction

Const:R/W:

BRIDGE PRESERVATIONIn Marysville, at the Feather River Bridge No. 18-009. Scour mitigation and retrofit piers.

8140

3F560$26,441$1,887

Subtotal: $28,328

2020-21$1,240$2,700

$200$4,100

$8,240Total Project Cost: $36,568

03130000334/1/20213/1/20212/1/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

03-Yuba-20 Prior20-2120-2120-21

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.1

Con Sup:

Bridge Scour Mitigation

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 281 of 284

DRAFT

12-06

-17

Page 286: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Yuba($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Marysville, from 0.1 mile north of BinneyJunction Underpass to 0.3 mile north of LaurellenRoad, at Simmerly Slough Bridge No. 16-0019.Replace bridge.

9812

1E060$68,500$3,800

Subtotal: $72,300

2018-19$1,600$3,050

$750$5,200

$10,600Total Project Cost: $82,900

03120000686/1/20195/1/2019

6/21/2017PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

03-Yuba-70 PriorPriorPrior18-19

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

15.5/16.5

Con Sup:

Bridge Scour Mitigation

Const:R/W:

ROADWAY PRESERVATIONNear Marysville, from 0.1 mile east of Loma RicaRoad to 0.2 mile west of Spring Valley Road.Rehabilitate roadway.9587

2F320$10,700$1,400

Subtotal: $12,100

2018-19$1,160$1,610

$950$1,600

$5,320Total Project Cost: $17,420

03000205943/15/20183/1/2018

6/13/2016PA&ED:

RTL:R/W Cert:

1/2/2019Begin Con:

03-Yuba-20 18-19PriorPrior18-19

201.1204.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

8.0/10.2

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

Near Marysville, from Marysville Road to YubaRiver (Parks Bar) bridge. Rehabilitate roadway.

9579

0A570$38,100$6,800

Subtotal: $44,900

2018-19$3,700$2,210$2,300$6,900

$15,110Total Project Cost: $60,010

03000205934/15/20194/1/20198/1/2017PA&ED:

RTL:R/W Cert:

12/29/2019Begin Con:

03-Yuba-20 PriorPriorPrior18-19

201.1209.9 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.3/R17.6

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

In and near Marysville, from 14th Street toCemetery Road. Roadway rehabilitation.

9820

0H160$85,000$5,000

Subtotal: $90,000

2020-21$3,000$3,500$2,500$5,500

$14,500Total Project Cost: $104,500

031500008210/2/20209/18/20201/2/2019PA&ED:

RTL:R/W Cert:

3/26/2021Begin Con:

03-Yuba-70 Prior18-1918-1920-21

201.1205 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

14.9/15.6

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 282 of 284

DRAFT

12-06

-17

Page 287: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Yuba($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

CountyYuba

PA&ED:PS&E:

R/W Sup:Con Sup:

$31,505$353,176

R/W:

Subtotal: $384,681

Const:$19,656$21,954$13,967$36,855

$92,432

Total (Capital + Support): $477,113

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 283 of 284

DRAFT

12-06

-17

Page 288: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Project List

Support

Yuba($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 284 of 284

DRAFT

12-06

-17

Page 289: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Long Lead Project List

Page 290: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Del Norte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Crescent City, at Last Chance Grade, fromWilson Creek Bridge to 3.8 miles north of WilsonCreek Bridge. Permanent roadway restorationand realignment. PA&ED and R/W funds arerequested for geotechnical evaluation of thecurrent seven alternatives and for theenvironmental clearance needed to performgeotechnical work.

1112

0F280 $75

Subtotal: $75

2030-31$5,000

$5,000Total Project Cost: $5,075

01150000999/2/20307/1/2030

2/16/2026PA&ED:

RTL:R/W Cert:

10/14/2031Begin Con:

01-Del Norte-101 Prior25-2625-2630-31

201.1311 Location(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

Long Lead

12.0/15.5

Con Sup:

Permanent Restoration

* R/W, * PA&ED phase(s) are authorized

Const:* R/W:

Approximate project estimates: PA&ED $52,600,000, R/W $89,600,000,Con $1,610,000,000.

CountyDel Norte

PA&ED:PS&E:

R/W Sup:Con Sup:

$75R/W:

Subtotal: $75

Const:$5,000

$5,000

Total (Capital + Support): $5,075

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 1 of 18

DRAFT

12-06

-17

Page 291: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Humboldt($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Hoopa, at Trinity River Bridge No. 04-0137.Upgrade bridge rails, widen for pedestrian access,and strengthen for truck permit load capacity.2432

0F600$29,764$1,576

Subtotal: $31,340

2022/23$2,621$2,895$1,138$3,287

$9,941Total Project Cost: $41,281

01160000292/1/2023

12/27/202212/27/2021PA&ED:

RTL:R/W Cert:

9/1/2023Begin Con:

01-Humboldt-96 18-1921-2221-2222-23

201.1121328 Linear FeetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

12.3

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

Near Weitchpec, at Klamath River Bridge No. 04-0144. Seismically retrofit bridge, upgrade bridgerails, and provide shoulders and pedestrianaccess.

2423

0F350$34,640

$138

Subtotal: $34,778

2022/23$2,434$2,648

$342$6,931

$12,355Total Project Cost: $47,133

01150001148/23/20227/7/2022

4/25/2020PA&ED:

RTL:R/W Cert:

1/12/2023Begin Con:

01-Humboldt-96 18-1919-2019-2022-23

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

22.9

Con Sup:

Bridge Seismic Restoration

Const:R/W:

In Rio Dell, at Eel River Bridge No. 04-0016R.Seismic retrofit.

2301B

0A111$26,813

$44

Subtotal: $26,857

2022-23$5,433$5,113

$216$4,632

$15,394Total Project Cost: $42,251

01160001488/1/20228/1/20225/1/2021PA&ED:

RTL:R/W Cert:

1/1/2023Begin Con:

01-Humboldt-101 Prior20-2120-2122-23

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

M53.9

Con Sup:

Bridge Seismic Restoration

Const:R/W:

CountyHumboldt

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,758$91,217

R/W:

Subtotal: $92,975

Const:$10,488$10,656$1,696

$14,850

$37,690

Total (Capital + Support): $130,665

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 2 of 18

DRAFT

12-06

-17

Page 292: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Inyo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MANDATESNear Bishop, from North See Vee Lane to NorthBarlow Lane. Upgrade ADA curb ramps,driveways, and pedestrian push buttons, refreshstriping, relocate signals, and construct newpedestrian and bicycle facilities.

2641

36680$9,901$6,378

Subtotal: $16,279

2023/24$1,530$3,340$1,670$2,190

$8,730Total Project Cost: $25,009

091600002111/20/202310/2/202310/1/2020PA&ED:

RTL:R/W Cert:

6/19/2024Begin Con:

09-Inyo-395 18-1920-2120-2123-24

201.36115 ADA Unit(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

117.3/117.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

Const:R/W:

CountyInyo

PA&ED:PS&E:

R/W Sup:Con Sup:

$6,378$9,901

R/W:

Subtotal: $16,279

Const:$1,530$3,340$1,670$2,190

$8,730

Total (Capital + Support): $25,009

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 3 of 18

DRAFT

12-06

-17

Page 293: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONNear Bakersfield, from 0.1 miles east of AsheRoad to Route 99 Separation. Rehabilitateroadway including reconstruction of travel laneswith Jointed Plain Concrete Pavement (JPCP),widen intersections and shoulders to meet currentstandards, add bicycle lanes, median lane toaccommodate two-way turning, install drainage inlets and stormwater basin, sidewalks andupgrade ADA ramps to current standards.

6805

0V610$26,500$14,200

Subtotal: $40,700

2023-24$3,200$2,500$6,300$4,600

$16,600Total Project Cost: $57,300

061600022210/2/20239/1/20239/1/2020PA&ED:

RTL:R/W Cert:

3/1/2024Begin Con:

06-Kern-119 Prior20-2120-2123-24

201.12010.0 Lane Mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

28.2/31.3

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

CountyKern

PA&ED:PS&E:

R/W Sup:Con Sup:

$14,200$26,500

R/W:

Subtotal: $40,700

Const:$3,200$2,500$6,300$4,600

$16,600

Total (Capital + Support): $57,300

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 4 of 18

DRAFT

12-06

-17

Page 294: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Mendocino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Hopland, from 0.1 mile south to 0.3 milenorth of Russian River Bridge No. 10-0082 (PM9.24). Bridge seismic and rail upgrade and widenfor standard shoulders with partial or complete structure replacement.

4526

0A130$44,499

$600

Subtotal: $45,099

2022/23$1,176$1,953

$165$9,351

$12,645Total Project Cost: $57,744

01160000012/1/2023

1/15/202310/1/2021PA&ED:

RTL:R/W Cert:

8/1/2023Begin Con:

01-Mendocino-101 18-1921-2221-2222-23

201.1131 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

9.2/9.9

Con Sup:

Bridge Seismic Restoration

Const:R/W:

CountyMendocino

PA&ED:PS&E:

R/W Sup:Con Sup:

$600$44,499

R/W:

Subtotal: $45,099

Const:$1,176$1,953

$165$9,351

$12,645

Total (Capital + Support): $57,744

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 5 of 18

DRAFT

12-06

-17

Page 295: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Mono($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Bridgeport, from north of Route 270Junction to Green Creek Road. Widen shouldersto eight feet, install rumble strips, improve sightdistance, and upgrade signing and striping tocurrent standards.

2639

36940$7,623

$471

Subtotal: $8,094

2023/24$1,300$1,240

$590$2,330

$5,460Total Project Cost: $13,554

09170000147/14/20234/18/20234/1/2021PA&ED:

RTL:R/W Cert:

1/23/2024Begin Con:

09-Mono-395 18-1920-2120-2123-24

201.01554 Collisions ReducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

69.9/71.9

Con Sup:

Collision Severity Reduction

Const:R/W:

Near Bridgeport, from Burcham Flat Road to 0.3mile south of Route 395/108 Junction. Widenshoulders, install rumble strips, and correctsuperelevation at three curves.

2460

36800$12,567$1,855

Subtotal: $14,422

2022/23$1,395$1,764

$395$2,084

$5,638Total Project Cost: $20,060

09170000116/8/20236/8/20236/1/2021PA&ED:

RTL:R/W Cert:

12/14/2023Begin Con:

09-Mono-395 18-1920-2120-2122-23

201.01555 Collisions ReducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

91.6/93.4

Con Sup:

Collision Severity Reduction

Const:R/W:

CountyMono

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,326$20,190

R/W:

Subtotal: $22,516

Const:$2,695$3,004

$985$4,414

$11,098

Total (Capital + Support): $33,614

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 6 of 18

DRAFT

12-06

-17

Page 296: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Monterey($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Lucia from 0.1 mile south to 0.2 mile northof Limekiln Creek Bridge No. 44-0058. Replacebridge.2524

1F510$64,644

$704

Subtotal: $65,348

2024-25$3,500

$0$416

$13,865

$17,781Total Project Cost: $83,129

05140000044/3/20253/5/2025

12/2/2021PA&ED:

RTL:R/W Cert:

Begin Con:

05-Monterey-1 Prior21-2221-2224-25

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

20.9/21.3

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Carmel-by-the-Sea, at the Garrapata CreekBridge No. 44-0018. Replace bridge railing tomeet current traffic safety standards.2696

1H800$3,000

$5

Subtotal: $3,005

2022/23$1,600$1,900

$130$1,300

$4,930Total Project Cost: $7,935

05160001632/14/2023

10/21/20224/2/2021PA&ED:

RTL:R/W Cert:

Begin Con:

05-Monterey-1 18-1920-2120-2122-23

201.112603 Linear FeetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

63.0

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

ROADWAY PRESERVATIONNear Lucia, north of Mill Creek Bridge. Stabilizehighway segment caused by erosion.

3030

0P300$9,402

$100

Subtotal: $9,502

2024/25$2,376$2,748

$185$4,400

$9,709Total Project Cost: $19,211

05160000471/2/2025

12/1/20249/1/2021PA&ED:

RTL:R/W Cert:

6/1/2025Begin Con:

05-Monterey-1 18-1921-2221-2224-25

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

18.5/18.7

Con Sup:

Roadway Protective Betterments

Const:R/W:

CountyMonterey

PA&ED:PS&E:

R/W Sup:Con Sup:

$809$77,046

R/W:

Subtotal: $77,855

Const:$7,476$4,648

$731$19,565

$32,420

Total (Capital + Support): $110,275

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 7 of 18

DRAFT

12-06

-17

Page 297: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONIn St. Helena, at Sulphur Creek Bridge No. 21-0016 and York Creek Bridge No. 21-0017.Upgrade bridge rails.1462K

2K150$4,188

$748

Subtotal: $4,936

2022/23$1,040

$800$500$800

$3,140Total Project Cost: $8,076

04160003754/3/20231/3/20233/1/2021PA&ED:

RTL:R/W Cert:

10/2/2023Begin Con:

04-Napa-29 18-1920-2120-2122-23

201.112328 Linear FeetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

28.4/29.3

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

CountyNapa

PA&ED:PS&E:

R/W Sup:Con Sup:

$748$4,188

R/W:

Subtotal: $4,936

Const:$1,040

$800$500$800

$3,140

Total (Capital + Support): $8,076

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 8 of 18

DRAFT

12-06

-17

Page 298: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Sacramento($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONIn the city of Sacramento, at the West EndViaduct No. 24-0069L/R. Improve to standardtruck capacity.5863

1H610$120,000

$900

Subtotal: $120,900

2021/22$5,700$5,800

$400$24,000

$35,900Total Project Cost: $156,800

03160001905/11/20223/11/20224/2/2020PA&ED:

RTL:R/W Cert:

8/24/2022Begin Con:

03-Sacramento-5 18-1919-2019-2021-22

201.3222 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

23.6/24.3

Con Sup:

Trans Permit Requirements for Bridges

Const:R/W:

CountySacramento

PA&ED:PS&E:

R/W Sup:Con Sup:

$900$120,000

R/W:

Subtotal: $120,900

Const:$5,700$5,800

$400$24,000

$35,900

Total (Capital + Support): $156,800

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 9 of 18

DRAFT

12-06

-17

Page 299: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

San Bernardino($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Needles, from Park Moabi Road to TopockRoad at the Colorado River Bridge No. 54-0415.Bridge rehabilitation and/or replacement. Caltrans will be the lead agency and will sharehalf of all costs with ADOT as indicated via asigned Letter of Intent.

3001S

0R380$28,800

$169

Subtotal: $28,969

2023-24$2,650$3,759

$431$8,332

$15,172Total Project Cost: $44,141

08120000678/15/20232/1/20232/1/2021PA&ED:

RTL:R/W Cert:

4/15/2024Begin Con:

08-San Bernardino-40 Prior20-2120-2123-24

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

153.9/154.7

Con Sup:

Const:R/W:

CountySan Bernardino

PA&ED:PS&E:

R/W Sup:Con Sup:

$169$28,800

R/W:

Subtotal: $28,969

Const:$2,650$3,759

$431$8,332

$15,172

Total (Capital + Support): $44,141

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 10 of 18

DRAFT

12-06

-17

Page 300: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

San Diego($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONIn the city of San Diego and Coronado from SanDiego-Coronado Bay Bridge to the Route 75/5Connector Overcrossing. Bridge rehabilitation.1065

40940

Subtotal: $0

TBD$2,593

$2,593Total Project Cost: $2,593

1112000071TBDTBD

6/29/2018PA&ED:

RTL:R/W Cert:

TBDBegin Con:

11-San Diego-75 Prior18-1918-19TBD

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

R20.5/R22.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

In the city of San Diego, at various locations fromQuince Street Overcrossing Bridge No. 57-0216Kto Washington Street Overcrossing Bridge No. 57-0220. Replace bridge rail within CabrilloFreeway Historic District.

1276

43013$9,473

$256

Subtotal: $9,729

2024/25$4,740$2,409

$212$3,633

$10,994Total Project Cost: $20,723

11170001713/7/2025

1/16/20257/29/2022PA&ED:

RTL:R/W Cert:

7/11/2025Begin Con:

11-San Diego-163 18-1922-2322-2324-25

201.1121959 Linear FeetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

1.6/2.8

Con Sup:

Bridge Rail Replacement and Upgrade

Const:R/W:

CountySan Diego

PA&ED:PS&E:

R/W Sup:Con Sup:

$256$9,473

R/W:

Subtotal: $9,729

Const:$7,333$2,409

$212$3,633

$13,587

Total (Capital + Support): $23,316

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 11 of 18

DRAFT

12-06

-17

Page 301: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

San Joaquin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONIn Stockton, at the Stockton Channel ViaductBridge No. 29-0176L/R. Bridge rehabilitation toaddress structural and load carrying capacitydeficiencies.

3133

0X460$815,000

$0

Subtotal: $815,000

TBD$4,169

$4,169Total Project Cost: $819,169

10120002599/30/2024

10/30/2020PA&ED:

RTL:R/W Cert:

5/30/2025Begin Con:

10-San Joaquin-5 Prior20-2120-21TBD

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

26.5

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

CountySan Joaquin

PA&ED:PS&E:

R/W Sup:Con Sup:

$0$815,000

R/W:

Subtotal: $815,000

Const:$4,169

$4,169

Total (Capital + Support): $819,169

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 12 of 18

DRAFT

12-06

-17

Page 302: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

San Luis Obispo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONNear Guadalupe, at the Santa Maria River BridgeNo. 49-0042; also in Santa Barbara County (PM50.3/50.6). The bridge is scour critical and needs to be replaced. The existing bridge will be usedfor traffic handling during construction and thendemolished. The highway will need to berealigned as a result of the new bridge location.The new bridge will provide standard lane andshoulder widths and include a protected walkway.

2650

1H440$28,461

$530

Subtotal: $28,991

2022-23$2,294$4,290

$455$9,660

$16,699Total Project Cost: $45,690

051600007410/1/20229/1/20223/1/2020PA&ED:

RTL:R/W Cert:

Begin Con:

05-San Luis Obispo-1 Prior19-2019-2022-23

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

0.0/0.3

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

CountySan Luis Obispo

PA&ED:PS&E:

R/W Sup:Con Sup:

$530$28,461

R/W:

Subtotal: $28,991

Const:$2,294$4,290

$455$9,660

$16,699

Total (Capital + Support): $45,690

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 13 of 18

DRAFT

12-06

-17

Page 303: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

San Mateo($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MANDATESIn Burlingame, Hillsborough, and Millbrae, fromBarroilhet Avenue to Millbrae Avenue. Upgradecurb ramps and sidewalks to ADA standards. 0730D

1G900$9,120

$844

Subtotal: $9,964

2022-23$3,320$1,200

$700$1,000

$6,220Total Project Cost: $16,184

04000206192/1/20232/1/20238/1/2020PA&ED:

RTL:R/W Cert:

9/1/2023Begin Con:

04-San Mateo-82 Prior20-2120-2122-23

201.378385 ADA Unit(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

12.9/15.9

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

Const:R/W:

ROADWAY PRESERVATIONIn the cities of San Mateo and Burlingame, fromEast Santa Inez Avenue to Murchison Drive.Rehabilitate roadway, improve drainage, andupgrade existing curb ramps and sidewalks toADA standards.

1496J

0K810$86,061$2,215

Subtotal: $88,276

2023-24$8,181$8,181$4,091

$12,270

$32,723Total Project Cost: $120,999

04160001422/1/2024

11/1/202311/1/2021PA&ED:

RTL:R/W Cert:

8/1/2024Begin Con:

04-San Mateo-82 Prior21-2221-2223-24

201.12015.2 Lane Mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

12.3/15.8

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

CountySan Mateo

PA&ED:PS&E:

R/W Sup:Con Sup:

$3,059$95,181

R/W:

Subtotal: $98,240

Const:$11,501$9,381$4,791

$13,270

$38,943

Total (Capital + Support): $137,183

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 14 of 18

DRAFT

12-06

-17

Page 304: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Santa Barbara($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

COLLISION REDUCTIONNear Santa Maria, from 0.2 mile north of Route135 Junction to Route 166 Junction. Widenshoulders, install rumble strips, upgradeguardrails and relocate objects from within theclear recovery zone.

2667

1H610$15,401$4,053

Subtotal: $19,454

2023/24$1,736$1,942$1,237$4,379

$9,294Total Project Cost: $28,748

05160000977/14/20237/14/20234/13/2021PA&ED:

RTL:R/W Cert:

2/22/2024Begin Con:

05-Santa Barbara-1 18-1920-2120-2123-24

201.015103 Collisions ReducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

R35.0/49.2

Con Sup:

Collision Severity Reduction

Const:R/W:

BRIDGE PRESERVATIONNear Goleta, at Refugio Road Undercrossing No.51-0215L/R. Replace bridges.

2448

1C950$34,640

$20

Subtotal: $34,660

2022-23$2,200

$0$100

$0

$2,300Total Project Cost: $36,960

05130000182/21/2023

12/21/20224/3/2020PA&ED:

RTL:R/W Cert:

Begin Con:

05-Santa Barbara-101 Prior19-2019-2022-23

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

R36.6

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

CountySanta Barbara

PA&ED:PS&E:

R/W Sup:Con Sup:

$4,073$50,041

R/W:

Subtotal: $54,114

Const:$3,936$1,942$1,337$4,379

$11,594

Total (Capital + Support): $65,708

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 15 of 18

DRAFT

12-06

-17

Page 305: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Shasta($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn and near the town of Shasta, from west ofCrystal Creek Road to Trinity Alley. Roadwayrehabilitation.3680

3H310$69,236$6,269

Subtotal: $75,505

2024-25$4,130$5,110

$490$6,820

$16,550Total Project Cost: $92,055

02170000837/22/20246/21/20245/2/2022PA&ED:

RTL:R/W Cert:

3/4/2025Begin Con:

02-Shasta-299 Prior21-2221-2224-25

201.12014.4 Lane Mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

R7.6/18.3

Con Sup:

Roadway Rehabilitation (3R)

Const:R/W:

CountyShasta

PA&ED:PS&E:

R/W Sup:Con Sup:

$6,269$69,236

R/W:

Subtotal: $75,505

Const:$4,130$5,110

$490$6,820

$16,550

Total (Capital + Support): $92,055

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 16 of 18

DRAFT

12-06

-17

Page 306: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Siskiyou($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATION Near Somes Bar, from 0.6 mile east to 1.3 mileseast of Irving Creek Bridge at Stanshaw Creek(PM R8.2); also, from 1.6 miles east of IrvingCreek Bridge to 1.6 miles west of Ti CreekBridge at Sandy Bar Creek (PM 9.1). Replacedeteriorated large-diameter culverts with natural-bottom structures, reduce fish passage barriers,and adjust new approaches.

3622

1H780$16,830

$37

Subtotal: $16,867

2023/24$1,910$2,730

$170$4,660

$9,470Total Project Cost: $26,337

02160000352/20/20241/19/202410/1/2021PA&ED:

RTL:R/W Cert:

8/27/2024Begin Con:

02-Siskiyou-96 18-1921-2221-2223-24

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

R7.9/R9.4

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Happy Camp, from 0.9 mile west to 0.4 milewest of Gordons Ferry Road at Cade Creek (PM43.4 to 43.8); also, near Seiad Valley atPortuguese Creek (PM 57.0). Replacedeteriorated large-diameter culverts with natural-bottom structures, reduce fish passage barriers,and adjust new approaches.

3620

1H590$6,760

$48

Subtotal: $6,808

2023/24$1,720$2,740

$160$2,840

$7,460Total Project Cost: $14,268

02160000251/29/2024

12/29/20239/7/2021PA&ED:

RTL:R/W Cert:

7/2/2024Begin Con:

02-Siskiyou-96 18-1921-2221-2223-24

201.1102 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

43.4/57.0

Con Sup:

Bridge Major Rehabilitation

Const:R/W:

Near Horse Creek, at Horse Creek Bridge No. 02-0117, from 0.4 mile west of Klamath RiverBridge to 2.0 miles west of Kohl Creek. Replacebridge on new alignment to correct scour criticalconditions, improve safety, and reduce operational deficiencies.

3629

1H360$19,760

$993

Subtotal: $20,753

2023/24$2,640$2,810

$830$4,300

$10,580Total Project Cost: $31,333

021600004010/1/20233/1/20239/1/2021PA&ED:

RTL:R/W Cert:

4/27/2024Begin Con:

02-Siskiyou-96 18-1921-2221-2223-24

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Long Lead

76.8/78.0

Con Sup:

Bridge Scour Mitigation

Const:R/W:

CountySiskiyou

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,078$43,350

R/W:

Subtotal: $44,428

Const:$6,270$8,280$1,160

$11,800

$27,510

Total (Capital + Support): $71,938

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 17 of 18

DRAFT

12-06

-17

Page 307: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

Post Mile

Location/DescriptionPPNO EA

Program Year Capital

V3.0 2018 SHOPP Long Lead Project List

Support

Siskiyou($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 18 of 18

DRAFT

12-06

-17

Page 308: 2018 DRAFT SHOPP - Caltrans 2018_shopp...SHOPP is fiscally constrained, meaning that it cannot program more projects than available funding. The accompanying Draft 2018 SHOPP Project

California Department of Transportation1120 N Street Sacramento, CA 95814 www.dot.ca.gov