All dates are subject to change CONFEDERATION LINE EAST SEGMENT Includes Blair, Cyrville, St-Laurent, Tremblay, Hurdman, and Lees stations, and Belfast Yard Blair Station Station construction including superstructure* Building envelope work including roofing and siding Mechanical and electrical works Architectural finishes* Permanent bus loop construction Winter Spring Summer Fall Winter The O-Train Confederation Line project is the first stage in Ottawa’s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit between Blair Station in the east and Tunney’s Pasture Station in the west. The route includes 13 stations and a 2.5 kilometre tunnel that will alleviate congestion through the downtown core. This look-ahead outlines the construction activities through 2016. Construction has been divided into three segments along the Light Rail Transit (LRT) alignment corridor: • East Segment (includes Blair, Cyrville, St-Laurent, Tremblay, Hurdman, and Lees stations and the Belfast Yard Maintenance and Storage Facility) • Central Segment (includes uOttawa, Rideau, Parliament, and Lyon stations and the 2.5 kilometre tunnel where, this year, work on the caverns, stations and running tunnel will continue) • West Segment (includes Pimisi, Bayview and Tunney’s Pasture stations) Construction on the Confederation Line began in 2013 and is on schedule. Works continue in all segments. In 2016, a number of significant construction activities will occur: The Belfast Yard Maintenance and Storage Facility will be completed. The last section of running tunnel between Rideau and Parliament stations will be excavated. Construction of stations in the east segment and integrated stations in the central segment will continue. Station construction will begin in the west segment. Work on the guideway will continue across the O-Train Confederation Line alignment. Queen Street renewal works will begin. 1 2016 LOOK-AHEAD

Transcript of 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from...

Page 1: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

All dates are subject to change

CONFEDERATION LINE EAST SEGMENT Includes Blair, Cyrville, St-Laurent, Tremblay, Hurdman, and Lees stations, and Belfast Yard

Blair Station

Station construction including superstructure*

Building envelope work including roofing and siding

Mechanical and electrical works

Architectural finishes*

Permanent bus loop construction

Winter Spring Summer Fall Winter

The O-Train Confederation Line project is the first stage in Ottawa’s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit between Blair Station in the east and Tunney’s Pasture Station in the west. The route includes 13 stations and a 2.5 kilometre tunnel that will alleviate congestion through the downtown core. This look-ahead outlines the construction activities through 2016.

Construction has been divided into three segments along the Light Rail Transit (LRT) alignment corridor:

• East Segment (includes Blair, Cyrville, St-Laurent, Tremblay, Hurdman, and Lees stations and the Belfast Yard Maintenance and Storage Facility)

• Central Segment (includes uOttawa, Rideau, Parliament, and Lyon stations and the 2.5 kilometre tunnel where, this year, work on the caverns, stations and running tunnel will continue)

• West Segment (includes Pimisi, Bayview and Tunney’s Pasture stations)

Construction on the Confederation Line began in 2013 and is on schedule. Works continue in all segments.

In 2016, a number of significant construction activities will occur:

•The Belfast Yard Maintenance and Storage Facility will be completed.

• The last section of running tunnel between Rideau and Parliament stations will be excavated.

• Construction of stations in the east segment and integrated stations in the central segment will continue. Station construction will begin in the west segment.

•Work on the guideway will continue across the O-Train Confederation Line alignment.

•Queen Street renewal works will begin.

1

2016 LOOK-AHEAD

Page 2: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

Cyrville Station

Tremblay Station

St-Laurent Station

Station construction including superstructure

Building envelope work including roofing and siding

Architectural finishes

Mechanical and electrical works

Station construction including superstructure

Building envelope work including roofing and siding

Architectural finishes

Mechanical and electrical works

Station construction

Architectural finishes

Mechanical and electrical works

2

2016 LOOK-AHEAD

Winter Spring Summer Fall Winter

Winter Spring Summer Fall Winter

Winter Spring Summer Fall Winter

Belfast Yard Maintenance and Storage Facility and connector

Final site works and landscaping Winter Spring Summer Fall Winter

ottawa.ca/confederationline

All dates are subject to change

Page 3: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

Lees Station

Guideway, trackwork and associated works

Mobilization including demolition of existing Transitway station

Station construction including superstructure

Architectural finishes

Mechanical and electrical works

2016 LOOK-AHEAD

Guideway work between Blair and St-Laurent stations including trackwork, overhead catenary system (OCS)* installation and landscaping

Work at the D-Ring road east at VIA Rail Station including deck, abutments, sidewalks and reinstatement Riverside Drive Bridge construction

Hurdman East Overpass construction

Hurdman Elevated Guideway construction

Traction Power Sub Station (TPSS)* installation

Rideau River Transitway Bridge rehabilitation

Guideway work between St-Laurent and Hurdman stations including trackwork, overhead catenary system installation and landscaping

Mann Avenue Bridge construction

Guideway work between Hurdman Station and East Portal including trackwork, overhead catenary system installation and landscaping

3All dates are subject to change

ottawa.ca/confederationline

Winter Spring Summer Fall Winter

Winter Spring Summer Fall Winter

Hurdman Station

Construction of elevated guideway*

Station construction including superstructure

Architectural finishes

Mechanical and electrical works

Permanent bus loop and Transitway platform construction

Construction of bus operator facility

Winter Spring Summer Fall Winter

Page 4: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

Rideau Station

2016 LOOK-AHEAD

Station cavern final lining including rebar, arch and formwork

Station construction

East entrance construction

Mid entrance construction (elevators)

West entrance construction

Parliament Station

Station cavern final lining including rebar, arch and formwork

Station construction

Mechanical and electrical works

East entrance construction

Mid entrance construction

West entrance construction

4

All dates are subject to change

ottawa.ca/confederationline

Winter Spring Summer Fall Winter

Winter Spring Summer Fall Winter

CONFEDERATION LINE CENTRAL SEGMENT Includes uOttawa, Rideau, Parliament and Lyon stations, the 2.5 kilometre tunnel, as well as works from the East Portal, central shaft and West Portal

uOttawa Station

Mobilization including demolition of existing Transitway station

Station construction including superstructure

Mechanical and electrical works

Winter Spring Summer Fall Winter

Page 5: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

Confederation Line Tunnel

2016 LOOK-AHEAD

Excavation of running tunnel from Parliament to Rideau stations

Final lining at east running tunnel

West Portal final construction

Trackwork installation in the tunnel

East Portal final construction

CONFEDERATION LINE WEST SEGMENT Includes Pimisi, Bayview and Tunney’s Pasture stations

Pimisi Station

Bayview Station

Mobilization including demolition of existing Transitway platforms

Station construction including superstructure

Architectural finishes

Mechanical and electrical works

Mobilization including demolition of existing Transitway platforms

Station construction including superstructure

Mechanical and electrical works

5All dates are subject to change

ottawa.ca/confederationline

Winter Spring Summer Fall Winter

Winter Spring Summer Fall Winter

Winter Spring Summer Fall Winter

Lyon Station

Station cavern final lining including rebar, arch and formwork

Station construction

Mechanical and electrical works

East entrance construction

West entrance construction

Winter Spring Summer Fall Winter

Page 6: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

Tunney’s Pasture Station

Guideway, trackwork and associated works

2016 LOOK-AHEAD

Bus loop construction

Mobilization including demolition of existing Transitway platforms

Station construction including superstructure

Mechanical and electrical works

Rehabilitation of sidewalks

Combined sewage and storage tunnel (CSST) work adjacent to Booth Street Albert Street phase three works (Lorne, Perkins and Empress avenues)

Booth Street Bridge construction

Bayview Road Bridge construction

Traction Power Sub Station installation

Guideway work (Merton Street to Empress Avenue) including overhead catenary system installation and landscaping

Guideway work (Tunney’s Pasture Station to Merton Street) including overhead catenary system installation and landscaping

* Definitions:

Traction Power Sub Station (TPSS): TPSS structures are approximately four metres high by five metres wide by 15 metres long. TPSS structures convert electricity from local power sources to the voltage levels needed by the light rail vehicles.

Superstructure: Superstructure construction involves work to the aboveground structure.

Overhead Catenary System (OCS): OCS is a system of overhead wires used to supply electricity to light rail vehicles.

Guideway: The O-Train Confederation Line’s ‘guideway’ is the footprint along which the light rail vehicles will travel.

Architectural finishes: Architectural finishes involve doors, masonry, millwork and flooring.

6

All dates are subject to change

ottawa.ca/confederationline

Winter Spring Summer Fall Winter

Winter Spring Summer Fall Winter

Page 7: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

2016 LOOK-AHEAD

7

All dates are subject to change

ottawa.ca/confederationline

CONFEDERATION LINE EAST SEGMENT

CONFEDERATION LINE WEST SEGMENT

CONFEDERATION LINE CENTRAL SEGMENT

2016 TRAFFIC DETOUR LOOK-AHEAD

Traffic detours are subject to change. For the most up to date information, please visit www.ottawa.ca/confederationline or follow @Ottawa_Traffic on Twitter. Please find below some of the traffic impacts:

•Traffic impacts for phase 1 (Blair Station to Hurdman Station) and phase 2 (Hurdman Station to Lees Station) Transitway service adjustments are ongoing.

•The 174 eastbound on-ramp closure from Highway 417 westbound continues until August 2018.

•Traffic impacts for the Transitway service adjustment from Lees Station to Laurier Station are expected to begin at the end of April.

•Rideau Street between Sussex Drive and Dalhousie Street remains closed to general traffic until March 2018.

•Lane closures on Queen Street are anticipated as a result of the Queen Street renewal works.

•Lane closures on Queen and O’Connor streets are expected for utilities and station work around Parliament Station.

•Booth Street remains closed from the Sir John A. Macdonald Parkway to Albert Street until fall 2016.

•Phase 1 of the Transitway service adjustments from Empress Avenue to Merton Street began on January 17, 2016

•Phase 2 of the Transitway service adjustments from Merton Street to Tunney’s Pasture Station are expected to begin at the end of June.

Page 8: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

2016 LOOK-AHEAD

8

All dates are subject to change

ottawa.ca/confederationline

Station Start Completion

Blair July 2015 January 2017

Cyrville July 2015 February 2017

St-Laurent August 2015 February 2017

Tremblay August 2015 February 2017

Hurdman November 2015 August 2017

Lees April 2016 October 2017

uOttawa April 2016 October 2017

Rideau September 2016 June 2017

Parliament October 2016 October 2017

Lyon July 2016 July 2017

Pimisi January 2016 September 2017

Bayview April 2016 September 2017

Tunney’s Pasture June 2016 October 2017

In order to begin vehicle testing, the eastern stations of the O-Train Confederation Line are scheduled to be completed before most central or western stations. Please see the table below for a full list of stations and their estimated construction dates:

STATION CONSTRUCTION

Tunn

ey’s

Pastu

reBa

yview

Pimisi

Lyon

Parli

amen

t

Ridea

uuO

ttawa

Lees

Hurdm

an

Trembla

y

Belfast Yard

St-La

uren

t

Cyrv

ille

Blair

Page 9: 2016 LOOK-AHEAD - ligneconfederationline.ca · 2016 LOOK-AHEAD Excavation of running tunnel from Parliament to Rideau ... 2016 LOOK-AHEAD Bus loop construction ... 2016 LOOK-AHEAD

2016 LOOK-AHEAD

9ottawa.ca/confederationline

•Some disruption is unavoidable when building a project of this size and scope.

•Public access to residences will be maintained, although temporary inconveniences may occur when crews are working in the immediate area.

•Businesses in the construction area remain open and accessible and welcome your continued patronage.

•Cyclists are not permitted to ride through active construction areas; alternate routes will be provided and should be used for public and worker safety.

•All efforts will be made to ensure multi-use pathway access is maintained during construction if public and worker safety permits. Detours will be provided where closures are required for public safety.

•Businesses and residents may experience general disruption associated with truck traffic, noise from crews and heavy equipment, vibration, as well as impacts from excavation, elevated guideway work, station construction, and general construction activity.

•Crews will endeavour to minimize disruption to businesses and residents in the area, and we thank you for your understanding while we build.

•Throughout Confederation Line construction and operation, Rideau Transit Group (RTG) is adhering to noise and vibration standards defined in the Project Agreement.

•The public can access construction and traffic management information by visiting the City of Ottawa’s website, calling 3-1-1, following the City’s Ottawa Traffic Twitter feed @Ottawa_Traffic or signing up to receive regular updates at ottawa.ca/confederationline.

•The Confederation Line team wants to ensure everyone is safe and aware around Confederation Line construction sites. Please adhere to all safety signage and never enter a construction site.

CONSTRUCTION OF THE CONFEDERATION LINE