All dates are subject to change
CONFEDERATION LINE EAST SEGMENT Includes Blair, Cyrville, St-Laurent, Tremblay, Hurdman, and Lees stations, and Belfast Yard
Blair Station
Station construction including superstructure*
Building envelope work including roofing and siding
Mechanical and electrical works
Architectural finishes*
Permanent bus loop construction
Winter Spring Summer Fall Winter
The O-Train Confederation Line project is the first stage in Ottawa’s future light rail network. The 12.5 kilometre electric rail system will replace existing diesel powered buses, providing rapid transit between Blair Station in the east and Tunney’s Pasture Station in the west. The route includes 13 stations and a 2.5 kilometre tunnel that will alleviate congestion through the downtown core. This look-ahead outlines the construction activities through 2016.
Construction has been divided into three segments along the Light Rail Transit (LRT) alignment corridor:
• East Segment (includes Blair, Cyrville, St-Laurent, Tremblay, Hurdman, and Lees stations and the Belfast Yard Maintenance and Storage Facility)
• Central Segment (includes uOttawa, Rideau, Parliament, and Lyon stations and the 2.5 kilometre tunnel where, this year, work on the caverns, stations and running tunnel will continue)
• West Segment (includes Pimisi, Bayview and Tunney’s Pasture stations)
Construction on the Confederation Line began in 2013 and is on schedule. Works continue in all segments.
In 2016, a number of significant construction activities will occur:
•The Belfast Yard Maintenance and Storage Facility will be completed.
• The last section of running tunnel between Rideau and Parliament stations will be excavated.
• Construction of stations in the east segment and integrated stations in the central segment will continue. Station construction will begin in the west segment.
•Work on the guideway will continue across the O-Train Confederation Line alignment.
•Queen Street renewal works will begin.
1
2016 LOOK-AHEAD
Cyrville Station
Tremblay Station
St-Laurent Station
Station construction including superstructure
Building envelope work including roofing and siding
Architectural finishes
Mechanical and electrical works
Station construction including superstructure
Building envelope work including roofing and siding
Architectural finishes
Mechanical and electrical works
Station construction
Architectural finishes
Mechanical and electrical works
2
2016 LOOK-AHEAD
Winter Spring Summer Fall Winter
Winter Spring Summer Fall Winter
Winter Spring Summer Fall Winter
Belfast Yard Maintenance and Storage Facility and connector
Final site works and landscaping Winter Spring Summer Fall Winter
ottawa.ca/confederationline
All dates are subject to change
Lees Station
Guideway, trackwork and associated works
Mobilization including demolition of existing Transitway station
Station construction including superstructure
Architectural finishes
Mechanical and electrical works
2016 LOOK-AHEAD
Guideway work between Blair and St-Laurent stations including trackwork, overhead catenary system (OCS)* installation and landscaping
Work at the D-Ring road east at VIA Rail Station including deck, abutments, sidewalks and reinstatement Riverside Drive Bridge construction
Hurdman East Overpass construction
Hurdman Elevated Guideway construction
Traction Power Sub Station (TPSS)* installation
Rideau River Transitway Bridge rehabilitation
Guideway work between St-Laurent and Hurdman stations including trackwork, overhead catenary system installation and landscaping
Mann Avenue Bridge construction
Guideway work between Hurdman Station and East Portal including trackwork, overhead catenary system installation and landscaping
3All dates are subject to change
ottawa.ca/confederationline
Winter Spring Summer Fall Winter
Winter Spring Summer Fall Winter
Hurdman Station
Construction of elevated guideway*
Station construction including superstructure
Architectural finishes
Mechanical and electrical works
Permanent bus loop and Transitway platform construction
Construction of bus operator facility
Winter Spring Summer Fall Winter
Rideau Station
2016 LOOK-AHEAD
Station cavern final lining including rebar, arch and formwork
Station construction
East entrance construction
Mid entrance construction (elevators)
West entrance construction
Parliament Station
Station cavern final lining including rebar, arch and formwork
Station construction
Mechanical and electrical works
East entrance construction
Mid entrance construction
West entrance construction
4
All dates are subject to change
ottawa.ca/confederationline
Winter Spring Summer Fall Winter
Winter Spring Summer Fall Winter
CONFEDERATION LINE CENTRAL SEGMENT Includes uOttawa, Rideau, Parliament and Lyon stations, the 2.5 kilometre tunnel, as well as works from the East Portal, central shaft and West Portal
uOttawa Station
Mobilization including demolition of existing Transitway station
Station construction including superstructure
Mechanical and electrical works
Winter Spring Summer Fall Winter
Confederation Line Tunnel
2016 LOOK-AHEAD
Excavation of running tunnel from Parliament to Rideau stations
Final lining at east running tunnel
West Portal final construction
Trackwork installation in the tunnel
East Portal final construction
CONFEDERATION LINE WEST SEGMENT Includes Pimisi, Bayview and Tunney’s Pasture stations
Pimisi Station
Bayview Station
Mobilization including demolition of existing Transitway platforms
Station construction including superstructure
Architectural finishes
Mechanical and electrical works
Mobilization including demolition of existing Transitway platforms
Station construction including superstructure
Mechanical and electrical works
5All dates are subject to change
ottawa.ca/confederationline
Winter Spring Summer Fall Winter
Winter Spring Summer Fall Winter
Winter Spring Summer Fall Winter
Lyon Station
Station cavern final lining including rebar, arch and formwork
Station construction
Mechanical and electrical works
East entrance construction
West entrance construction
Winter Spring Summer Fall Winter
Tunney’s Pasture Station
Guideway, trackwork and associated works
2016 LOOK-AHEAD
Bus loop construction
Mobilization including demolition of existing Transitway platforms
Station construction including superstructure
Mechanical and electrical works
Rehabilitation of sidewalks
Combined sewage and storage tunnel (CSST) work adjacent to Booth Street Albert Street phase three works (Lorne, Perkins and Empress avenues)
Booth Street Bridge construction
Bayview Road Bridge construction
Traction Power Sub Station installation
Guideway work (Merton Street to Empress Avenue) including overhead catenary system installation and landscaping
Guideway work (Tunney’s Pasture Station to Merton Street) including overhead catenary system installation and landscaping
* Definitions:
Traction Power Sub Station (TPSS): TPSS structures are approximately four metres high by five metres wide by 15 metres long. TPSS structures convert electricity from local power sources to the voltage levels needed by the light rail vehicles.
Superstructure: Superstructure construction involves work to the aboveground structure.
Overhead Catenary System (OCS): OCS is a system of overhead wires used to supply electricity to light rail vehicles.
Guideway: The O-Train Confederation Line’s ‘guideway’ is the footprint along which the light rail vehicles will travel.
Architectural finishes: Architectural finishes involve doors, masonry, millwork and flooring.
6
All dates are subject to change
ottawa.ca/confederationline
Winter Spring Summer Fall Winter
Winter Spring Summer Fall Winter
2016 LOOK-AHEAD
7
All dates are subject to change
ottawa.ca/confederationline
CONFEDERATION LINE EAST SEGMENT
CONFEDERATION LINE WEST SEGMENT
CONFEDERATION LINE CENTRAL SEGMENT
2016 TRAFFIC DETOUR LOOK-AHEAD
Traffic detours are subject to change. For the most up to date information, please visit www.ottawa.ca/confederationline or follow @Ottawa_Traffic on Twitter. Please find below some of the traffic impacts:
•Traffic impacts for phase 1 (Blair Station to Hurdman Station) and phase 2 (Hurdman Station to Lees Station) Transitway service adjustments are ongoing.
•The 174 eastbound on-ramp closure from Highway 417 westbound continues until August 2018.
•Traffic impacts for the Transitway service adjustment from Lees Station to Laurier Station are expected to begin at the end of April.
•Rideau Street between Sussex Drive and Dalhousie Street remains closed to general traffic until March 2018.
•Lane closures on Queen Street are anticipated as a result of the Queen Street renewal works.
•Lane closures on Queen and O’Connor streets are expected for utilities and station work around Parliament Station.
•Booth Street remains closed from the Sir John A. Macdonald Parkway to Albert Street until fall 2016.
•Phase 1 of the Transitway service adjustments from Empress Avenue to Merton Street began on January 17, 2016
•Phase 2 of the Transitway service adjustments from Merton Street to Tunney’s Pasture Station are expected to begin at the end of June.
2016 LOOK-AHEAD
8
All dates are subject to change
ottawa.ca/confederationline
Station Start Completion
Blair July 2015 January 2017
Cyrville July 2015 February 2017
St-Laurent August 2015 February 2017
Tremblay August 2015 February 2017
Hurdman November 2015 August 2017
Lees April 2016 October 2017
uOttawa April 2016 October 2017
Rideau September 2016 June 2017
Parliament October 2016 October 2017
Lyon July 2016 July 2017
Pimisi January 2016 September 2017
Bayview April 2016 September 2017
Tunney’s Pasture June 2016 October 2017
In order to begin vehicle testing, the eastern stations of the O-Train Confederation Line are scheduled to be completed before most central or western stations. Please see the table below for a full list of stations and their estimated construction dates:
STATION CONSTRUCTION
Tunn
ey’s
Pastu
reBa
yview
Pimisi
Lyon
Parli
amen
t
Ridea
uuO
ttawa
Lees
Hurdm
an
Trembla
y
Belfast Yard
St-La
uren
t
Cyrv
ille
Blair
2016 LOOK-AHEAD
9ottawa.ca/confederationline
•Some disruption is unavoidable when building a project of this size and scope.
•Public access to residences will be maintained, although temporary inconveniences may occur when crews are working in the immediate area.
•Businesses in the construction area remain open and accessible and welcome your continued patronage.
•Cyclists are not permitted to ride through active construction areas; alternate routes will be provided and should be used for public and worker safety.
•All efforts will be made to ensure multi-use pathway access is maintained during construction if public and worker safety permits. Detours will be provided where closures are required for public safety.
•Businesses and residents may experience general disruption associated with truck traffic, noise from crews and heavy equipment, vibration, as well as impacts from excavation, elevated guideway work, station construction, and general construction activity.
•Crews will endeavour to minimize disruption to businesses and residents in the area, and we thank you for your understanding while we build.
•Throughout Confederation Line construction and operation, Rideau Transit Group (RTG) is adhering to noise and vibration standards defined in the Project Agreement.
•The public can access construction and traffic management information by visiting the City of Ottawa’s website, calling 3-1-1, following the City’s Ottawa Traffic Twitter feed @Ottawa_Traffic or signing up to receive regular updates at ottawa.ca/confederationline.
•The Confederation Line team wants to ensure everyone is safe and aware around Confederation Line construction sites. Please adhere to all safety signage and never enter a construction site.
CONSTRUCTION OF THE CONFEDERATION LINE