2016 CA BUILDING CODE UPDATES€¦ · 2016 CA BUILDING CODE UPDATES. 2.24.2017. AGENDA – 2016...
Transcript of 2016 CA BUILDING CODE UPDATES€¦ · 2016 CA BUILDING CODE UPDATES. 2.24.2017. AGENDA – 2016...
Jeff Brink, DCI Engineers
Paul McGrath, MEYERS+ ENGINEERS
2016 CA BUILDING CODE UPDATES2.24.2017
AGENDA – 2016 CALIFORNIA BUILDING CODE UPDATESI . S T R U C T U R A L C B C U P D AT E S
- A L L O W A B L E B U I L D I N G H E I G H T S + A R E A S
- F I R E W A L L S
- W O O D F R A M E D B U I L D I N G S
- C R O S S L A M I N A T E D T I M B E R
- B A L C O N I E S + D E C K S
- 2 0 1 9 C B C – W H A T T O E X P E C T
I I . M E P M U LT I F A M I LY S F C O D E C H A N G E S
- S O L A R R E A D Y B U I L D I N G S
- F A L L P R O T E C T I O N G U A R D S
- F I L T R A T I O N
- I N D E P E N D E N T E X H A U S T S Y S T E M S
- W I N D O W + D O O R S W I T C H E S
- C O M M I S S I O N I N G
- E V C H A R G I N G S T A T I O N S + S F G B O
- I N S U L A T I O N
- S T O R M W A T E R C O N T R O L P L A N + R E C Y C L E D W A T E R
- T 2 4 E N V E L O P E C R I T E R I A
2016 vs 2013 – ALLOWABLE BUILDING HEIGHTS + AREAS
2016 vs 2013 – ALLOWABLE BUILDING HEIGHTS + AREAS
2016 CBC – FIRE WALLS
2013 CBC – WOOD FRAMED BUILDINGS
2016 CBC – WOOD FRAMED BUILDINGS
2013 vs 2016 CBC – WOOD FRAMED BUILDING
2013 CBC
2016 CBC
2016 CBC – WOOD FRAMED BUILDINGS
2016 CBC – CROSS LAMINATED TIMBER | SECTION 202
2016 CBC – BALCONIES + DECKS
American Society of Civil Engineers
(ASCE 2010) International Building Code(IBC 2015)
National Earthquake Hazards Reduction Program
(NEHRP 2009)
California Building Code (CBC 2016)
2019 CALIFORNIA BUILDING CODE – WHAT TO EXPECT
MEP MULTIFAMILY SF CODE CHANGES12.24.2017
NATURALLY-VENTILATED PARKING - CODE
SOLAR READY BUILDINGS – TITLE 24
SOLAR READY BUILDINGS – SF BETTER ROOFS ORD.
FALL PROTECTION GUARDS- OSHA
FALL PROTECTION GUARDS- CBC
FILTRATION – ARTICLE 38: MERV-13
INDEPENDENT EXHAUST SYSTEMS – CMC
∑
KITCHEN EXHAUST – SF: DUCTED KITCHEN HOODS
EXHAUST OPENINGS – WIRE MESH SCREEN: CMC
EXHAUST TERMINATIONS – CMC
COMMISSIONING –TITLE 24
• Cx Required if >3 Stories
EV CHARGING STATIONS –CALGREEN
• 4-10% of Spots EV-Charging ‘Ready’
EV CHARGING STATIONS –CALGREEN
• 4-10% of Spots EV-Charging ‘Ready’• 10 yrs: 50%?
or
SFGBO – LEED?
WALL INSULATION – WOOD-FRAME: T24 >3 STORIESPrescriptive Requirements• 2013: R22 Batt + 1” Continuous• 2016: R22 Batt + 1” Continuous
Minimum Requirements• 2013: R11 Batt + No Continuous• 2016: R19 Batt + No Continuous
WALL INSULATION – METAL-FRAME: T24 >3 STORIESPrescriptive Requirements• 2013: R19 Batt + 1” Continuous• 2016: R19 Batt + 2” Continuous
Minimum Requirements• 2013: R19 Batt + 1” Continuous• 2016: R19 Batt + ½” Continuous
• Sites >5000 SF: Reduce Runoff
STORMWATER CONTROL PLAN – SFPUC
• Dual-plumb if >40,000 SF and in Purple Zone
RECYCLED WATER – SFPUC: DUAL-PLUMBING
• Applies to Entire SF if >250,000 SF• On-Site Rain/Foundation/Gray Water
Treatment • Use for 100% of Toilet Flushing/ Irrigation
RECYCLED WATER – SFPUC: TREATMENT
Units Capex Opex100-400 $165,000 $40,000400-900 $195,000 $50,000900-2000 $235,000 $55,000