2016 Auckland Infrastructure conference

19
DEALING WITH CONGESTION PRESENTED BY URIE BEZUIDENHOUT PHD CANDIDATE

Transcript of 2016 Auckland Infrastructure conference

Page 1: 2016 Auckland Infrastructure conference

DEALING WITH CONGESTION

PRESENTED BY URIE BEZUIDENHOUT

PHD CANDIDATE

Page 2: 2016 Auckland Infrastructure conference

WHERE DID IT COME FROM?

Page 3: 2016 Auckland Infrastructure conference

SOMEWHERE, SOMETHING WENT TERRIBLY WRONG

Page 4: 2016 Auckland Infrastructure conference

THE 9 - 5 DILEMMA

Page 5: 2016 Auckland Infrastructure conference

COMPRESSED LIVING AND TIME

Page 6: 2016 Auckland Infrastructure conference

UNDERSTANDING CONGESTION

CausesScheduled living

+Individual’s free will

=Non-autonomous

movement

ToolsSignal systems

(Management)

Public Transport(Mass transit)

Monetary penalties(Tolls and fees)

Page 7: 2016 Auckland Infrastructure conference

RESEARCH ON VEHICLE CONGESTION

Driver behaviour

Non-autonomous more autonomous

Coerce not penalise

Page 8: 2016 Auckland Infrastructure conference

DRIVER BEHAVIOUR

• Competing signage

• Short block lengths

• Visually complex

• Queues

• Pedestrians and cyclists

Page 9: 2016 Auckland Infrastructure conference

TRAJECTORY PLOTS

Page 10: 2016 Auckland Infrastructure conference

ADDED INTELLIGENCE1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70

0

5

10

15

20

25

Q-Prediction

ObservedRefine predict

Cycle no. x Intersection

Vehi

cles

(no.

)

Page 11: 2016 Auckland Infrastructure conference

SYNCHRONISATION

 

Queued @ Red 

Detector Zone 

Free flow Platoon

QueuedPlatoon

Page 12: 2016 Auckland Infrastructure conference

FIXATION

Page 13: 2016 Auckland Infrastructure conference

GAZE HEATMAP

Page 14: 2016 Auckland Infrastructure conference

POINTS OF INTEREST

Page 15: 2016 Auckland Infrastructure conference
Page 16: 2016 Auckland Infrastructure conference

COERCING (CALIBRATING) DRIVERS

• Use queues to discourage movements• Flush out queues before arrival• Greenwave along alternative route• 4 - 6 weeks to get measurable benefits

Page 17: 2016 Auckland Infrastructure conference

OPERA ALGORITHM – Auckland CBD

Page 18: 2016 Auckland Infrastructure conference

RESULTS – NETWORK WIDE

Short term (Medium term)• Cyclical queues - 8%

(-28%)• Overcapacity queues - 4%

(-31%)• Stop-start queues - 39%

(-59%)• Travel time reduction - 5%

(-20%)

Page 19: 2016 Auckland Infrastructure conference

OPERA OPTIMISING BENEFITS

-20 % travel time

$ 400 Savings/person/year

$0.25 billion /yearTravel time savings for Auckland

500,000 trips in peak hr

11 min trip in peak hr