2016 3 ENG · 2018. 5. 31. · WWT without compromise since 1990. Title: 2016_3 ENG.cdr Author:...

1
Site Selection Construction Operation Management Old Landfill study STRUCTURE STABILITY STUDY Planning Design Operation Construction Management WASTE WATER TREATMENT LANDFILL ENGINEERING Dam Investigation Dam Monitoring Dam Rehabilitation Contact Phone: Fax: E-mail: Internet: +49 (0) 36075 / 55000 +49 (0) 36075 / 439308 [email protected] www.sco-tech.com Address. SCO Engineering GmbH Auf der Heide 15 D-37351 Dingelstädt Federal Republic of Germany WWT without compromise since 1990

Transcript of 2016 3 ENG · 2018. 5. 31. · WWT without compromise since 1990. Title: 2016_3 ENG.cdr Author:...

Page 1: 2016 3 ENG · 2018. 5. 31. · WWT without compromise since 1990. Title: 2016_3 ENG.cdr Author: Administrator Created Date: 3/8/2016 12:05:20 PM ...

Site Selection

Construction

Operation

Management

Old Landfill study

STRUCTURE STABILITY STUDY

Planning

Design

Operation

Construction

Management

WASTE WATER TREATMENT

LANDFILL ENGINEERING

Dam Investigation

Dam Monitoring

Dam Rehabilitation

Contact

Phone:

Fax:

E-mail:

Internet:

+49 (0) 36075 / 55000

+49 (0) 36075 / 439308

[email protected]

www.sco-tech.com

Address. SCO Engineering GmbH

Au f de r He ide 15

D-37351 Dingelstädt

Federal Republic of Germany

WWT without compromise

since 1990