2016 3 ENG · 2018. 5. 31. · WWT without compromise since 1990. Title: 2016_3 ENG.cdr Author:...
1
Site Selection Construction Operation Management Old Landfill study • • • • • STRUCTURE STABILITY STUDY • • • • • Planning Design Operation Construction Management WASTE WATER TREATMENT LANDFILL ENGINEERING • • • Dam Investigation Dam Monitoring Dam Rehabilitation Contact Phone: Fax: E-mail: Internet: +49 (0) 36075 / 55000 +49 (0) 36075 / 439308 [email protected] www.sco-tech.com Address. SCO Engineering GmbH Auf der Heide 15 D-37351 Dingelstädt Federal Republic of Germany WWT without compromise since 1990
Transcript of 2016 3 ENG · 2018. 5. 31. · WWT without compromise since 1990. Title: 2016_3 ENG.cdr Author:...
Site Selection
Construction
Operation
Management
Old Landfill study
•
•
•
•
•
STRUCTURE STABILITY STUDY
•
•
•
•
•
Planning
Design
Operation
Construction
Management
WASTE WATER TREATMENT
LANDFILL ENGINEERING
•
•
•
Dam Investigation
Dam Monitoring
Dam Rehabilitation
Contact
Phone:
Fax:
E-mail:
Internet:
+49 (0) 36075 / 55000
+49 (0) 36075 / 439308
www.sco-tech.com
Address. SCO Engineering GmbH
Au f de r He ide 15
D-37351 Dingelstädt
Federal Republic of Germany
WWT without compromise
since 1990