2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD...

10
2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices

Transcript of 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD...

Page 1: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

2015 T&D Discussion TopicURD Inspection and Maintenance

Practices

June 4, 2015

Webinar #3 – URD Equipment Inspection and Maintenance Practices

Page 2: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

2

Discussion Topic Webinars – URD Inspection and Maintenance Practices

Webinar #1URD Standards and Maintenance IssuesMay 21, 2015

Webinar #2URD Cable Management PracticesMay 28, 2015

Webinar #3URD Equipment I&M PracticesJune 4, 2015

• URD design and construction standards –current and historical

• Reliability trends • Problematic

equipment

• URD primary riser I&M• URD switchgear/junction

box I&M• URD transformer I&M • URD secondary

equipment I&M

• Trends in cable failure rates

• Cable rehabilitation policies

• Cable treatment programs

• Cable replacement programs

Asset Manager URD Standards

Engineer Distribution Reliability

Data Expert

Asset Manager URD Cable Mgmt

Program Manager Field Supervisor/

Manager

Asset Manager URD I&M Program

Manager(s) Field Supervisor/

Manager

Issues to be discussed:

Expected company participants*:

Page 3: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

3

Background

◼ URD equipment may either be installed above grade, on foundation pads, or below grade in an enclosure or vault.

◼ One concern about URD equipment, whether it is installed above or below grade, is that it is more accessible to the public than overhead equipment. This public safety concern has lead utilities to:

1. Install locking mechanisms (often dual locks) on URD equipment cabinets

2. Perform periodic external inspections to ensure that the locks are still in place and that the exterior cabinets have not been damaged or deteriorated to the point where live parts are exposed.

3. Some utilities are also now using test equipment to periodically verify that no contact voltage is present on the equipment cabinets

◼ The scope, extent and frequency of internal inspections of URD equipment vary across utilities. The primary purpose of today’s webinar is to develop a better understanding of the differences within our T&D community and what factors influenced our companies to adopt the practices that they have.

◼ We also want to learn how companies are evaluating the effectiveness of their URD equipment I&M programs from a cost versus benefit or cost versus reliability perspective

Page 4: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

4

Webinar #3 Discussion Guide -- URD Equipment Inspection and Maintenance Practices

1. Please describe your current I&M program for URD primary risers:

a. Program scope• All risers or focused on specific circuits, installation types and/or vintages?• Any specific regulatory requirements?

b. Inspection cycle

c. Technology used in inspection process (e.g., infrared cameras, contact voltage meters, etc.)

d. Source and qualifications of inspection personnel

e. Inspections targeted at what specific subcomponents and what types of defects/deterioration? (provide 1QC a copy of your I&M form or checklist, if possible)

f. Maintenance tasks typically performed at time of inspection

g. Follow-up maintenance/repair tasks typically scheduled based on inspection results

h. Program effectiveness measures

Page 5: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

5

Webinar #3 Discussion Guide -- URD Equipment Inspection and Maintenance Practices (Continued)

2. Please describe your current I&M program for URD switchgear and primary junction boxes:

a. Program scope• All switchgear or focused on specific circuits, equipment types and/or vintages?• Any specific regulatory requirements?

b. Inspection cycle

c. Technology used in inspection process (e.g., infrared cameras, contact voltage meters, etc.)

d. Source and qualifications of inspection personnel

e. Inspections targeted at what specific subcomponents and what types of defects/deterioration? (provide 1QC a copy of your I&M form or checklist, if possible)

f. Maintenance tasks typically performed at time of inspection

g. Follow-up maintenance/repair tasks typically scheduled based on inspection results

h. Program effectiveness measures

Page 6: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

6

Webinar #3 Discussion Guide -- URD Equipment Inspection and Maintenance Practices (Continued)

3. Please describe your current I&M program for URD transformers:

a. Program scope• All transformers or focused on specific circuits, customers equipment types and/or vintages?• Any specific regulatory requirements?

b. Inspection cycle

c. Technology used in inspection process (e.g., infrared cameras, contact voltage meters, etc.)

d. Source and qualifications of inspection personnel

e. Inspections targeted at what specific subcomponents and what types of defects/deterioration? (provide 1QC a copy of your I&M form or checklist, if possible)

f. Maintenance tasks typically performed at time of inspection

g. Follow-up maintenance/repair tasks typically scheduled based on inspection results

h. Program effectiveness measures

Page 7: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

7

Webinar #3 Discussion Guide -- URD Equipment Inspection and Maintenance Practices (Continued)

4. Please describe your current I&M program for URD secondary equipment (enclosures/pedestals, service wire and connections):

a. Program scope• All equipment or focused on specific equipment types, applications and/or vintages?• Any specific regulatory requirements?

b. Inspection cycle

c. Technology used in inspection process (e.g., infrared cameras, contact voltage meters, etc.)

d. Source and qualifications of inspection personnel

e. Inspections targeted at what specific subcomponents and what types of defects/deterioration? (provide 1QC a copy of your I&M form or checklist, if possible)

f. Maintenance tasks typically performed at time of inspection

g. Follow-up maintenance/repair tasks typically scheduled based on inspection results

h. Program effectiveness measures

Page 8: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

Discussion Topic Deliverables

8

◼ Recordings and summaries of all webinar discussions

◼ Insights Conference -- 1QC presentation of webinar results and key insights learned through the discussions

◼ Insights Conference -- Company presentations with specific practice examples

1. Are there any specific topics/subtopics that we should ask companies to discuss?

2. Are there any companies that will volunteer today to make a presentation?

Page 9: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

Possible Topics for Company Presentations

9

1. Why or how have some companies achieved successful outcomes with direct buried construction over the long term and others have not? (panel discussion)

2. What data collection and analysis tools/systems are being used to optimize and support the processes (for both cable management and equipment inspection, maintenance and replacement)?

3. How are companies scheduling and coordinating the system isolation, diagnostic testing, cable treatment, cable replacement and equipment inspection and maintenance/replacement work to maximize efficiency and minimize customer inconvenience?

4. What are the plusses and minuses of the IMCORP versus CableWISE diagnostic testing techniques, and what specific results and benefits have companies achieved through such testing?

Page 10: 2015 T&D Discussion Topic URD Inspection and Maintenance Practices June 4, 2015 Webinar #3 – URD Equipment Inspection and Maintenance Practices.

10

Corporate Offices

400 Continental Blvd. Suite 600El Segundo, CA 90245(310) 426-2790

New York | Maryland | Texas | Wyoming | Wisconsin

First Quartile Consulting is a utility-focused consultancy providing a full range of consulting services including continuous process improvement, change management, benchmarking and more. You can count on a proven process that assesses and optimizes your resources, processes, leadership management and technology to align your business needs with your customer’s needs.

Visit us at www.1stquartileconsulting.com | Follow our updates on LinkedIn

About 1QC

Satellite Offices

Debi [email protected]

David [email protected]

Dave [email protected]

Dave [email protected]

Your Team

Ken Buckstaff [email protected]

Thank You for your Participation