2015 Renovation Proposal - Gethsemane United Methodist Church

18
01 2015 RENOVATION PROPOSAL

Transcript of 2015 Renovation Proposal - Gethsemane United Methodist Church

Page 1: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

2015 RENOVATION PROPOSAL

Page 2: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

Page 3: 2015 Renovation Proposal - Gethsemane United Methodist Church

New Addition

✤ Relocation of the administrative office to the entrance of the church. This will provide a safer work environment by knowing who is entering and leaving the church. This will also be more welcoming to members and guests entering the church

✤ Pastor’s office will be moved to the new addition with an attached conference room. This will provide a better work space for our Pastor while also offering better access to the sanctuary.

✤ This addition will also free up more classroom space and allow us to move the choir room to the current pastor’s office area.

Page 4: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

Page 5: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

Page 6: 2015 Renovation Proposal - Gethsemane United Methodist Church

Sanctuary improvements

✤ We will begin with insulating the concrete block walls and ceiling. This insulation will provide a much more energy efficient church. We have been working with Focus on Energy to apply for available grants to help offset costs

✤ New front wall and stained glass window. The window is the one part of the project that changes both the interior and exterior of the church. This window will set our church apart from others in the area.

✤ A new color scheme and lighting in the sanctuary will provide a more modern feel and welcoming atmosphere.

✤ Audio and visual equipment will be added in the sanctuary to provide access to use the church in new ways. This will also assist those who may have difficulty reading hymns and other messages.

Page 7: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

Page 8: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

Page 9: 2015 Renovation Proposal - Gethsemane United Methodist Church

Narthex

✤ In the Narthex we will begin with installing a beautiful stained glass window which will allow for a much brighter space within the church

✤ We will also be adding a new drop ceiling with improved lighting

✤ Updating the fireplace and color scheme create a welcoming environment upon entering the church

Page 10: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

Page 11: 2015 Renovation Proposal - Gethsemane United Methodist Church

Upper Fellowship Hall

✤ The upper fellowship hall will be changed to create a larger area for those using the church. Removing the current choir room and storage closets will remove the bottle neck created during our fellowship after service.

✤ A serving station/coffee bar will be added in the south side of the room. This will move traffic flow away from the Narthex and into the room during times the room is in use. This serving area will have a refrigerator, sink, and dishwasher

✤ Our goal is to create a space that can be used for post-service fellowship as well as other events. This space will be able to host almost every event we have at the church, this will allow for an easier time for those that have trouble negotiating the stairs.

Page 12: 2015 Renovation Proposal - Gethsemane United Methodist Church

Downstairs

✤ The lower fellowship hall will be changed to provide a dedicated entrance, removing the current set up of multiple doors. This will allow for the addition of another classroom/meeting space in the area currently used by the Sunday school program. A drop ceiling will be installed throughout the downstairs to encase the asbestos based pipes in the ceiling.

✤ In the hallway and classroom area the piping will be boxed in with drywall and painted

✤ The entire downstairs area will receive updated paint and lighting to flow with the changes that are being made in the rest of the church

Page 13: 2015 Renovation Proposal - Gethsemane United Methodist Church

Fire Sprinkler System

✤ We felt it was important to add a fire sprinkler system to the entire church for a number of reasons.

✤ We have been grandfathered in with the current fire code.

✤ By adding a sprinkler system to the church we were able to remove the current fire doors installed and open up areas like the upper fellowship hall.

✤ Our church was restricted from offering programs like daycare and senior activities because we did not have fire suppression.

✤ We can expect better insurance rates in the future due to the addition of the sprinkler system

✤ It was the right thing to do for to safety of our members and guests.

Page 14: 2015 Renovation Proposal - Gethsemane United Methodist Church

The process

✤ The planning for this renovation has been taking place for a number of years. As we would address one area of concern another area would arise. In the end the decision was made to do a complete renovation that would set our church up for success for years to come.

✤ During this process it was discussed many times that it would be much easier to sell the existing church and land and relocate to build a new church from scratch. Our group felt it was very important to preserve the legacy that was established by those who came before us and that this church was worth renovating.

✤ We tried our best to take into account the needs of everyone in the church. One area that we had a number of discussions was the addition of an elevator. The elevator would not fit within our current floor plan without major adjustments being made. In the end we felt it was better to update the upper fellowship hall to accommodate more functions without the need to go between the two areas.

✤ Ultimately we feel we have come up with a plan that will serve our church, our mission, and our community for the next 25-30 years getting us to our 200th anniversary in the Pewaukee area.

Page 15: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

Project Breakdown✤ Total project cost 1,150,000.00

✤ Conference requires 1/3 in cash, 1/3 in pledges, and up to 1/3 in a loan

✤ Cash of $383,000 we currently have

✤ Pledge of $383,000 over a 3 year period

✤ Mortgage of $383,000 through the United Methodist Foundation

✤ Mortgage amount would be higher at first until all the pledges come in over the 3 year time frame

✤ The final mortgage payment would be around $2,300 per month based on a current rate of 4% fixed for 5 years on a 20 year amortization. This is about $1,300 higher than our previous mortgage payment, but is affordable based on our current financial trends

Page 16: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

History of prior building projects✤ In 2007 we completed a renovation project

valued at $465,000✤ We received $225,000 in cash and pledges

from 2007-2009✤ The starting mortgage loan balance of

$240,000 was fully paid within 8 years✤ We are currently debt free and financially

healthy

Page 17: 2015 Renovation Proposal - Gethsemane United Methodist Church

Project Breakdown

✤ Sanctuary front wall replacement including stained glass window $285,000

✤ Drive way and parking lot replacement including new exterior lighting $155,000

✤ Sprinkler system installation $160,000

✤ New addition with offices $150,000

✤ Audio visual equipment $25,000

✤ Infrastructure updates, maintenance, and repairs $345,000

Page 18: 2015 Renovation Proposal - Gethsemane United Methodist Church

01

Considerations when asked to make your pledge

✤ We are off to a very strong start with our current cash position. Much better than when we started the previous project

✤ We are asking for a three year pledge commitment but our preference is to receive as much as possible earlier in the process, in order to minimize the initial loan amount

✤ Building project pledges are over and above normal annual pledges. We still need to be able to pay the normal monthly bills

✤ Each member should prayerfully consider how much they can give

✤ To put what is needed into perspective we need 100 members to pledge $4,000 each over a three year period