2015 Federal Transportation Improvement Program Imperial County - 100% Prior Local Highway, State Highway, Transit Including Amendments 1 - 7 (In $000`s) ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment IMP070923 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0 Description: PTC 1,267 Agency BRAWLEY Paving of 9th Street between Malan Street and Wildcat Drive Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 Total CMAQ 118 1,008 1,126 1,126 1,126 AGENCY 14 127 141 141 141 IMP070923 Total 132 1,135 1,267 1,267 1,267 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment IMP071202 Imperial SSAB 6TDL04 NCR25 L EXEMPT - 93.126 0 Description: PTC 1,310 Agency BRAWLEY IN BRAWLEY AT CATTLE CALL PARK. FROM WILLARD AVENUE, AROUND PARK, ENDING AT WILLARD AVENUE. BICYCLE AND PEDESTRIAN IMPROVEMENTS AND LANDSCAPING Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 Total ARRA - TRANSPORTATION ENHANCEMENT 152 152 152 152 AGENCY 39 94 133 133 133 STP ENHANCE-RIP TEA 300 725 1,025 1,025 1,025 IMP071202 Total 339 971 1,310 1,310 1,310 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment IMP080903 Imperial SSAB IMP080903 NCR31 L EXEMPT - 93.126 0 Description: PTC 226 Agency BRAWLEY Asphalt Rehabilitation of River Dr. Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 Total STP LOCAL 200 200 200 200 CITY FUNDS 26 26 26 26 IMP080903 Total 226 226 226 226 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment IMP120201 Imperial SSAB 6OM0701 VEN03 L EXEMPT - 93.126 0 Description: PTC 314 Agency BRAWLEY Purchase New CNG Street Sweeper Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 Total CMAQ 278 278 278 278 AGENCY 36 36 36 36 IMP120201 Total 314 314 314 314 Print Date: 6/2/2015 4:08:53 PM Page: 1 of 13 NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Transcript of 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST...

Page 1: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP070923 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0

Description: PTC 1,267 Agency BRAWLEY

Paving of 9th Street between Malan Street and Wildcat Drive

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 118 1,008 1,126 1,126 1,126AGENCY 14 127 141 141 141IMP070923 Total 132 1,135 1,267 1,267 1,267

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP071202 Imperial SSAB 6TDL04 NCR25 L EXEMPT - 93.126 0

Description: PTC 1,310 Agency BRAWLEY

IN BRAWLEY AT CATTLE CALL PARK. FROM WILLARD AVENUE, AROUND PARK, ENDING AT WILLARD AVENUE. BICYCLE AND PEDESTRIAN IMPROVEMENTS AND LANDSCAPING

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalARRA - TRANSPORTATION ENHANCEMENT

152 152 152 152

AGENCY 39 94 133 133 133STP ENHANCE-RIP TEA 300 725 1,025 1,025 1,025IMP071202 Total 339 971 1,310 1,310 1,310

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP080903 Imperial SSAB IMP080903 NCR31 L EXEMPT - 93.126 0

Description: PTC 226 Agency BRAWLEY

Asphalt Rehabilitation of River Dr.

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 200 200 200 200CITY FUNDS 26 26 26 26IMP080903 Total 226 226 226 226

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120201 Imperial SSAB 6OM0701 VEN03 L EXEMPT - 93.126 0

Description: PTC 314 Agency BRAWLEY

Purchase New CNG Street Sweeper

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 278 278 278 278AGENCY 36 36 36 36IMP120201 Total 314 314 314 314

Print Date: 6/2/2015 4:08:53 PM Page: 1 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 2: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120602 Imperial SSAB 7120001 NCR31 L EXEMPT - 93.126 0

Description: PTC 489 Agency BRAWLEY

W. A Street Rehabiitation Project- Asphault rehab/overlay and bicycle lane striping.

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 433 433 433 433AGENCY 56 56 56 56IMP120602 Total 489 489 489 489

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120615 Imperial SSAB 6TDL04 VEN03 L EXEMPT - 93.126 4

Description: PTC 330 Agency BRAWLEY

New CNG street sweeper

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 292 292 292 292AGENCY 38 38 38 38IMP120615 Total 330 330 330 330

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP080904 Imperial SSAB IMP080904 STUDY L EXEMPT - 93.126 0

Description: PTC 226 Agency CALEXICO

Seismic Bridge Evaluation Study

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 200 200 200 200CITY FUNDS 26 26 26 26IMP080904 Total 226 226 226 226

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120202 Imperial SSAB 6OM0701 VEN03 L EXEMPT - 93.126 0

Description: PTC 314 Agency CALEXICO

Purchase New CNG Street Sweeper

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 278 278 278 278AGENCY 36 36 36 36IMP120202 Total 314 314 314 314

Print Date: 6/2/2015 4:08:54 PM Page: 2 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 3: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120603 Imperial SSAB 7120001 NCR31 L EXEMPT - 93.126 0

Description: PTC 838 Agency CALEXICO

Cole Road Rehabilitation Project between State Highway 111 and M.L. King Avenue

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 742 742 742 742AGENCY 96 96 96 96IMP120603 Total 838 838 838 838

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120617 Imperial SSAB 6TDL04 VEN03 L EXEMPT - 93.126 4

Description: PTC 295 Agency CALEXICO

New CNG street sweeper

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 261 261 261 261AGENCY 34 34 34 34IMP120617 Total 295 295 295 295

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP080901 Imperial SSAB IMP080901 NCR29 L EXEMPT - 93.126 0

Description: PTC 551 Agency CALIPATRIA

HIghway 111 East Sidewalks Improvements Project. Sidewalk improvements of rehabilitation and reconstruction, including installation of sidewalks, ADA curb returns, and culvert boxes along east Hwy 111/Sorenson Ave. between Delta and Date StreetsFund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 158 158 158 158STP LOCAL 331 331 331 331CITY FUNDS 62 62 62 62IMP080901 Total 551 551 551 551

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP1301001 Imperial SSAB 7120001 NCR31 L EXEMPT - 93.126 0

Description: PTC 712 Agency CALIPATRIA

North International Avenue from Delta Street to Main Street street improvement of rehabilitation and reconstruction of eroded roadway, including installation of base material, new asphalt pavement sidewalks, ADA curb returns, and culvert boxes.Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 625 625 625 625AGENCY 87 87 87 87IMP1301001 Total 712 712 712 712

Print Date: 6/2/2015 4:08:54 PM Page: 3 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 4: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120611 Imperial SSAB 7120001 NCNH2 L EXEMPT - 93.126 0

Description: PTC 870 Agency CALTRANS

Upgrade Existing 4-Way Stop Control with Traffic Signal at S.R. 86 and South Center Street

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 456 456 456 456AGENCY 109 21 243 373 373 373CITY FUNDS 41 41 41 41IMP120611 Total 150 21 699 870 870 870

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP020802 Imperial SSAB 6OM0701 PLN40 L EXEMPT - 93.126 0

Description: PTC 120 Agency EL CENTRO

PRELIMINARY DESIGN OF TRAFFIC BRIDGE ON 8TH STREET OVER I-8

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 106 106 106 106CITY FUNDS 14 14 14 14IMP020802 Total 120 120 120 120

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP070910 Imperial SSAB 6TDL04 NCR26 L EXEMPT - 93.126 0

Description: PTC 11 Agency EL CENTRO

Installation of Bicycle Racks at Various locations

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 10 10 10 10AGENCY 1 1 1 1IMP070910 Total 11 11 11 11

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP071203 Imperial SSAB 6OM0701 NCN46 L EXEMPT - 93.126 0

Description: PTC 723 Agency EL CENTRO

I-8 ENTRANCE AND EXIT RAMPS AT SR86. LANDSCAPING BEAUTIFICATION

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalAGENCY 12 71 83 83 83STP ENHANCE-RIP TEA 89 551 640 640 640IMP071203 Total 101 622 723 723 723

Print Date: 6/2/2015 4:08:54 PM Page: 4 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 5: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP080905 Imperial SSAB IMP080905 NCR31 L EXEMPT - 93.126 0

Description: PTC 761 Agency EL CENTRO

Imperial Avenue Overlay with Curb/Gutter/Sidewalk.

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 674 674 674 674CITY FUNDS 87 87 87 87IMP080905 Total 761 761 761 761

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120205 Imperial SSAB 6OM0701 NCR25 L EXEMPT - 93.126 0

Description: PTC 140 Agency EL CENTRO

Bucklin Park - Parking lot and pedestrian/bike path pavement project (asphalt concrete paving)

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 124 124 124 124LOCAL TRANS FUNDS 16 16 16 16IMP120205 Total 140 140 140 140

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120206 Imperial SSAB 6OM0701 TRR07 L EXEMPT - 93.126 0

Description: PTC 174 Agency EL CENTRO

Diesel Vehicle Retrofits

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 154 154 154 154LOCAL TRANS FUNDS 20 20 20 20IMP120206 Total 174 174 174 174

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120605 Imperial SSAB 7120001 NCR31 L EXEMPT - 93.126 0

Description: PTC 644 Agency EL CENTRO

Adams Avenue Street Improvements project from La Brucherie Avenue to Lotus Drain- General recondidtioning of pavement, curb, gutter, and sidewalk.

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 570 570 570 570AGENCY 74 74 74 74IMP120605 Total 644 644 644 644

Print Date: 6/2/2015 4:08:54 PM Page: 5 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 6: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP080906 Imperial SSAB IMP080906 NCR31 L EXEMPT - 93.126 0

Description: PTC 339 Agency HOLTVILLE

State Route 115 and 5th Street Improvement

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 300 300 300 300CITY FUNDS 39 39 39 39IMP080906 Total 339 339 339 339

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP090501 Imperial SSAB 6OM0701 NCR36 L EXEMPT - 93.126 0

Description: PTC 1,000 Agency HOLTVILLE

Improve Bridge 58-7 on SR115 that crosses the Alamo River in Holtville and also Project Design and Environmental Analysis of a new bridge over the same river

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalDEMO-SAFETEA-LU 100 700 800 800 800CITY FUNDS 25 175 200 200 200IMP090501 Total 125 875 1,000 1,000 1,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP100901 Imperial SSAB 6TDL04 NCN25 L EXEMPT - 93.126 0

Description: PTC 489 Agency HOLTVILLE

Alamo River Recreational Trail, Phase I

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalRECREATIONAL TRAILS 430 430 430 430REDEVELOPMENT FUNDS 53 6 59 59 59IMP100901 Total 53 436 489 489 489

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120207 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0

Description: PTC 183 Agency HOLTVILLE

9th Street improvements between Slayton Road and Beale Avenue (installation of fill pavement, curb, gutter, and sidewalk).

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 162 162 162 162LOCAL TRANS FUNDS 21 21 21 21IMP120207 Total 183 183 183 183

Print Date: 6/2/2015 4:08:54 PM Page: 6 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 7: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120607 Imperial SSAB 7120001 NCR31 L EXEMPT - 93.126 0

Description: PTC 512 Agency HOLTVILLE

Ninth Street Rehabilitation Project between Cedar Avenue and Palm Avenue - Road overlay, curb, gutter, and sidewalks

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 228 225 453 453 453AGENCY 30 29 59 59 59IMP120607 Total 258 254 512 512 512

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120622 Imperial SSAB 6TDL04 NCN27 L EXEMPT - 93.126 0

Description: PTC 794 Agency HOLTVILLE

Fourth Street Pedestrian Improvements (new sidewalk, curb, and gutter) between Cedar and Walnut Avenue

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 49 66 587 702 702 702AGENCY 7 9 76 92 92 92IMP120622 Total 56 75 663 794 794 794

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP070928 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0

Description: PTC 957 Agency IMPERIAL CITY

Paving of .75 mile section of dirt road on P Street

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 230 230 230 230STP LOCAL 618 618 618 618CITY FUNDS 109 109 109 109IMP070928 Total 957 957 957 957

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120208 Imperial SSAB 6OM0701 VEN03 L EXEMPT - 93.126 0

Description: PTC 314 Agency IMPERIAL CITY

Purchase of new CNG Street Sweeper

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 278 278 278 278AGENCY 36 36 36 36IMP120208 Total 314 314 314 314

Print Date: 6/2/2015 4:08:54 PM Page: 7 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 8: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120609 Imperial SSAB 7120001 NCR31 L EXEMPT - 93.126 0

Description: PTC 827 Agency IMPERIAL CITY

Aten Blvd. Phase III - Rehabilitation and Reconstruction from Cross Avenue to Dogwood Road; roadway rehab, reconstruction of intersection, and striping and signing.

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 732 732 732 732AGENCY 95 95 95 95IMP120609 Total 827 827 827 827

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120621 Imperial SSAB 6TDL04 FUL52 L EXEMPT - 93.126 0

Description: PTC 68 Agency IMPERIAL CITY

Construction of slow fill CNG station

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 60 60 60 60AGENCY 8 8 8 8IMP120621 Total 68 68 68 68

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120628 Imperial SSAB 7120001 NCNH2 L EXEMPT - 93.126 0

Description: PTC 501 Agency IMPERIAL CITY

Aten Blvd. & Dogwood Rd. Intersection Traffic Flow Improvements (signalization)

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 338 338 338 338STP LOCAL 105 105 105 105AGENCY 58 58 58 58IMP120628 Total 501 501 501 501

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP050508 Imperial SSAB IMP050508 NCR31 L EXEMPT - 93.126 0

Description: PTC 1,519 Agency IMPERIAL COUNTY

Evan Hewes Highway Resurfacing Improvements from Silsbee Road to Austin Road

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 88 912 1,000 1,000 1,000COUNTY 12 507 519 519 519IMP050508 Total 100 1,419 1,519 1,519 1,519

Print Date: 6/2/2015 4:08:54 PM Page: 8 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 9: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP050903 Imperial SSAB 6OM0701 NCR28 L EXEMPT - 93.126 0

Description: PTC 377 Agency IMPERIAL COUNTY

In Imperial; reconstruction of passenger loading areas and road access improvements to the EXPO

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalDEMO-SAFETEA-LU 302 302 302 302AGENCY 45 30 75 75 75IMP050903 Total 45 332 377 377 377

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP070601 Imperial SSAB 6OM0701 NCN95 L EXEMPT - 93.127 0

Description: PTC 992 Agency IMPERIAL COUNTY

Near Westmorland - Forrester Rd. Intersection at Cady Rd.: new turning lanes and traffic channelization at nonsignalized intersection

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalHIGH RISK RURAL ROAD PROGRAM

81 812 893 893 893

COUNTY 9 90 99 99 99IMP070601 Total 90 902 992 992 992

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120209 Imperial SSAB 6OM0701 VEN03 L EXEMPT - 93.126 0

Description: PTC 314 Agency IMPERIAL COUNTY

Purchase New CNG Street Sweeper

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 278 278 278 278LOCAL TRANS FUNDS 36 36 36 36IMP120209 Total 314 314 314 314

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120623 Imperial SSAB 6TDL04 FUL52 L EXEMPT - 93.126 4

Description: PTC 141 Agency IMPERIAL COUNTY

Purchase and construction of 2 slow fill CNG fueling stations

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 124 124 124 124AGENCY 17 17 17 17IMP120623 Total 141 141 141 141

Print Date: 6/2/2015 4:08:54 PM Page: 9 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 10: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP100602 Imperial SSAB 6OM0701 VEN03 L EXEMPT - 93.126 0

Description: PTC 79 Agency IMPERIAL COUNTY TRANSPORTATION COMMISSION (ICTC)

Two Hybrid Vehicles

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 70 70 70 70AGENCY 9 9 9 9IMP100602 Total 79 79 79 79

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP1305001 Imperial SSAB RRC0702 NCN31 L EXEMPT - 93.126 0

Description: PTC 895 Agency VARIOUS AGENCIES

Eliminate hazards at railroad grade crossing at intersection of Main Street and UPRR in the City of El Centro

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP RAILROAD LOCAL 895 895 895 895IMP1305001 Total 895 895 895 895

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP051101 Imperial SSAB IMP051101 NCR31 L EXEMPT - 93.126 0

Description: PTC 800 Agency WESTMORLAND

In Westmorland- South Center Street; Roadway surface improvements, street lighting and storm drain improvements from Baughman Rd. to SR 78/86

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalDEMO-SAFETEA-LU 108 532 640 640 640CITY FUNDS 27 133 160 160 160IMP051101 Total 135 665 800 800 800

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendmentimp080907 Imperial SSAB 6OM0701 NCR31 L EXEMPT - 93.126 0

Description: PTC 339 Agency WESTMORLAND

North Center Street Pavement Rehabilitation

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP LOCAL 34 266 300 300 300CITY FUNDS 5 34 39 39 39imp080907 Total 39 300 339 339 339

Print Date: 6/2/2015 4:08:54 PM Page: 10 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 11: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP120626 Imperial SSAB 6TDL04 VEN03 L EXEMPT - 93.126 4

Description: PTC 303 Agency WESTMORLAND

New CNG street sweeper

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalCMAQ 268 268 268 268AGENCY 35 35 35 35IMP120626 Total 303 303 303 303

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP1307001 Imperial SSAB IMP0021 NCN46 78 7.2 15.7 S EXEMPT - 93.126 0

Description: PTC 1,741 Agency CALTRANS

Brawley Bypass Landscape Mitigation (in and near Brawley-on Rt 78 from Rt 86 to east of Best Rd and on Old Rt 111 at Rt 78/111 Seperation. Required Landscape Mitigation).

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalDEMO-SAFETEA-LU 1,741 1,741 1,741 1,741IMP1307001 Total 1,741 1,741 1,741 1,741

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment0505 Imperial SSAB 0505 NCN25 186 .05 .4 S EXEMPT - 93.126 0

Description: PTC 3,170 Agency CALTRANS

Andrade International Border Crossing In Andrade, at the Andrade International Port of Entry. Construct bicycle and pedestrian facilites

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSTP ENHANCE-IIP TEA 1,214 2 1,954 3,170 3,170 3,1700505 Total 1,214 2 1,954 3,170 3,170 3,170

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP050904 Imperial SSAB 6OM0701 NCN84 999 1 S EXEMPT - 93.126 0

Description: PTC 445 Agency CALIF DEPARTMENT OF PARKS & RECREATION

near Westmorland; aqusition of 4,000 undevloped acres adjacent to SR-86 for environmental mitigation

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalDEMO-SAFETEA-LU 445 445 445 445IMP050904 Total 445 445 445 445

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMP0523a Imperial SSAB 6M04018 CAN76 999 S NON-EXEMPT 1

Description: PTC 27,499 Agency CALTRANS

In El Centro on Dogwood Rd. Reconstruct and Widen Bridge from 2 to 4 lanes; with 2 turn lanes (Demo ID 409 - HPP 950)

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalDEMO-SAFETEA-LU 1,700 1,700 1,700 1,700DEVELOPER FEES 4,500 4,500 4,500 4,500

Print Date: 6/2/2015 4:08:54 PM Page: 11 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 12: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

STIP ADVANCE CON-RIP 4,600 16,699 21,299 21,299 21,299IMP0523a Total 4,600 4,500 18,399 27,499 27,499 27,499

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMPL512 Imperial SSAB REG0701 SHP04 999 S EXEMPT - 93.126 0

Description: PTC 1,300 Agency CALTRANS

Grouped projects for safety improvements, shoulder improvements, pavement resurfacing and/or rehabilitation - Minor Program. Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and 3 categories.Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalSHOPP ADVANCE CONSTRUCTION (AC) - CT MINOR

1,262 1,262 1,262 1,262

IMPL512 Total 1,262 1,262 1,262 1,262

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentIMPL508 Imperial SSAB 6OM0701 NCN46 999 .01 S EXEMPT - 93.126 0

Description: PTC 985 Agency VARIOUS AGENCIES

Grouped projects for plantings, landscaping, etc. (Projects are consistent with 40 CFR Part 93.126, exempt tables 2 and table 3 categories - plantings, landscaping, etc.)

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalAGENCY 113 113 113 113STP ENHANCE-RIP TEA 872 872 872 872IMPL508 Total 985 985 985 985

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentIMP090106 Imperial SSAB 6TDL04 TRNH6 T EXEMPT - 93.127 0

Description: PTC 1,850 Agency BRAWLEY

Transit Transfer Terminal in the City of Brawley

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalFTA 5309(c) BUS 300 300 300 300ARRA - FTA 5311 183 156 468 807 807 807LOCAL TRANS FUNDS 232 232 232 232PUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.

511 511 511 511

IMP090106 Total 183 156 1,511 1,850 1,850 1,850

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentIMP051104 Imperial SSAB IMP051104 TRNH6 T EXEMPT - 93.127 0

Description: PTC 4,906 Agency IMPERIAL COUNTY

In El Centro; regional public bus transfer terminal and passenger waiting area including a 24 foot high clock tower and other beautification at 7th and State Streets, with misc other bus stop improvements on fixed route systemFund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalFTA 5307 UZA FORMULAR 203 2,744 2,947 2,947 2,947

Print Date: 6/2/2015 4:08:54 PM Page: 12 of 13

NOTE: These projects may still require state or federal action other than funding & they are included in the 100% Prior Years listing of the 2015 FTIP for this purpose

Page 13: 2015 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/A15-01-7 Prior LST Project_Listing_IMP.pdf2015 Federal Transportation Improvement Program ... North International

2015 Federal Transportation Improvement Program

Imperial County - 100% PriorLocal Highway, State Highway, Transit

Including Amendments 1 - 7(In $000`s)

ARRA - FTA 5307 63 1,159 1,222 1,222 1,222LOCAL TRANS FUNDS 51 686 737 737 737IMP051104 Total 317 4,589 4,906 4,906 4,906

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentIMP070929 Imperial SSAB 6OM0701 TRRH6 T EXEMPT - 93.127 0

Description: PTC 2,086 Agency IMPERIAL COUNTY

Upgrades and Improvements to Existing Bus Transfer Terminal at Imperial Valley College

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalPUBLIC TRANS MODERINAZATION IMP AND SERV. ENHANCEMENT ACCT.

211 1,875 2,086 2,086 2,086

IMP070929 Total 211 1,875 2,086 2,086 2,086

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentIMP100603 Imperial SSAB 6OM0701 PAR16 T EXEMPT - 93.126 0

Description: PTC 143 Agency VARIOUS AGENCIES

Replace two large bus type III for ARC Paratransit Services

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalFTA 5310 ELD AND DISABI 127 127 127 127AGENCY 16 16 16 16IMP100603 Total 143 143 143 143

ProjectID County Air Basin Model RTP ID Program System Conformity Category AmendmentIMP110902 Imperial SSAB 6OM0701 PAR16 T EXEMPT - 93.126 0

Description: PTC 315 Agency VARIOUS AGENCIES

3 replacement larger buses in 10/11

Fund ENG R/W CON Total Prior 2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020 TotalFTA 5310 ELD AND DISABI 315 315 315 315IMP110902 Total 315 315 315 315

Grand Total 8,236 5,457 52,767 66,460 66,460 66,460

Print Date: 6/2/2015 4:08:54 PM Page: 13 of 13