2015 03 12 W1412 Confirmation Statical Calculation V1

1
Page 1 / 1 Ha Long Sun Company Guest House of Quang Ninh Province No. 227, Nguyen Van Cu Street, Hong Ha Ward Ha Long City Quang Ninh Province Vietnam Vienna, 12 th March 2015 FEA/nw 230-ATW Ha Long Bay / Vietnam Statical calculations of station and tower foundations - Confirmation Dear Sir or Madam, BauCon ZT GmbH as a Civil Engineering office in Austria has received the contract from Garaventa AG to perform the statical calculations of all towers and stations foundations and concrete structures of Ha Long Aerial Tramway. We have already performed such design works for the projects Kitzbühel, Sölden, Ischgl (all in Austria), Koblenz (Germany), Peak to Peak (Canada), Espui (Spain), Psekhako, Rosa Khutor 1 and 2 (all in Russia, Sochi), Lushan (China), Grindelwald, Kleines Matterhorn (Swiss, predesign) and Lagos (Nigeria, predesign). As the designers we are responsible for the correct design of all the concrete structures which are needed to support the steel structures of the cable car delivered by Garaventa AG. This includes of course, that all different possible load cases and all possible and reasonable load case combinations are considered and calculated. Therefore we can assure and guarantee that all load effects onto the concrete structures of this ropeway at Ha Long, such as loads from the steel structures, ropes, embedded parts, etc. and also from earth pressure, wind, water, snow, ice and earthquake loads are considered and calculated. And so the concrete structures of this ropeway at Ha Long are stable structures. _________________________________ Dipl.-Ing. Dr. techn. Hans-Georg Leitner CEO of BauCon ZT GmbH

description

material for design of cable car

Transcript of 2015 03 12 W1412 Confirmation Statical Calculation V1

Page 1: 2015 03 12 W1412 Confirmation Statical Calculation V1

 

Page 1 / 1

Ha Long Sun Company Guest House of Quang Ninh Province No. 227, Nguyen Van Cu Street, Hong Ha Ward Ha Long City Quang Ninh Province Vietnam

Vienna, 12th March 2015 FEA/nw

230-ATW Ha Long Bay / Vietnam Statical calculations of station and tower foundations - Confirmation Dear Sir or Madam, BauCon ZT GmbH as a Civil Engineering office in Austria has received the contract from Garaventa AG to perform the statical calculations of all towers and stations foundations and concrete structures of Ha Long Aerial Tramway. We have already performed such design works for the projects Kitzbühel, Sölden, Ischgl (all in Austria), Koblenz (Germany), Peak to Peak (Canada), Espui (Spain), Psekhako, Rosa Khutor 1 and 2 (all in Russia, Sochi), Lushan (China), Grindelwald, Kleines Matterhorn (Swiss, predesign) and Lagos (Nigeria, predesign). As the designers we are responsible for the correct design of all the concrete structures which are needed to support the steel structures of the cable car delivered by Garaventa AG. This includes of course, that all different possible load cases and all possible and reasonable load case combinations are considered and calculated. Therefore we can assure and guarantee that all load effects onto the concrete structures of this ropeway at Ha Long, such as loads from the steel structures, ropes, embedded parts, etc. and also from earth pressure, wind, water, snow, ice and earthquake loads are considered and calculated. And so the concrete structures of this ropeway at Ha Long are stable structures. _________________________________ Dipl.-Ing. Dr. techn. Hans-Georg Leitner CEO of BauCon ZT GmbH