2014 GreenTRIP Application to Alberta Transportation

27
October 2, 2014 CRP 2014 GreenTRIP Application to Alberta Transportation(Draft)

description

Calgary Regional Partnership 2014 GreenTrip Application to Alberta Transportation

Transcript of 2014 GreenTRIP Application to Alberta Transportation

Page 1: 2014 GreenTRIP Application to Alberta Transportation

October 2, 2014

CRP 2014 GreenTRIP Application to Alberta Transportation(Draft)

Page 2: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  $2 billion Program introduced in June 2010 by Alberta Transportation

•  Invest in world class transit capital projects-up to 2/3 of total

capital cost to: –  Increase transit ridership and mode share –  Reduce traffic congestion and greenhouse gas emissions –  Provide greater accessibility for all trips

–  Projects should advance Provincial Building Alberta Plan, Land Use Framework and Climate Change Strategy, and assist in providing strong economic foundation

Program Purpose and Objectives

Page 3: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  Transit Capital Projects started after 2012

•  Design and construction of bus, BRT, commuter rail and LRT systems

•  Purchase of buses and LRT vehicles and key equipment components such as real time displays, fareboxes etc., traction power-vehicles can be for replacement or new service

•  Design and construction of bus/LRT storage/maintenance facilities, including land

•  Purchase of shelters, ITS, fareboxes and other transit equipment

•  Design and construction of park and ride and transit exchange facilities

•  Design and construction of commuter rail systems

•  Complete Applications Due before End of November, 2104

Eligible Projects under GreenTRIP Program

Page 4: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  City of Airdrie-$2.8 million to date on 3 articulated vehicles, maintenance facilities and equipment

•  City of Calgary-$473.0 million in GreenTRIP funding –  Predesign of SE LRT -$8.0 million –  LRT vehicles-$133.3 million – West LRT-$331.7 million –  Received $140.0 million to date as projects have progressed

•  BVRTSC- vehicles for start-up of Banff-Canmore service-$0.9 million-$0.45 million for each for Canmore and Banff

Green TRIP Projects in CRP-First Round-$483.1 million-approved by CRP-September,2010

Page 5: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  Cochrane-$6.14 million –  4 Double Decker buses-$2.4 million –  $3.2 million for bus exchange –  4 smaller shuttles for local services-$0.425 million –  $115,000 for design work for maintenance/storage facility –  None of this has been spent –  Rules:

•  There are no funding agreements in place for any of these projects

•  The GreenTRIP funding commitment to the Town continues until the Town indicates it will not proceed with the projects or the department withdraws the approval, potentially with the support/agreement of the CRP

•  If the projects are not to proceed, then the $6.1M funding commitment would be available to the CRP as part of their $800M allotment.

•  Other projects requested which did not proceed:

–  Okotoks-land in central area for hub for services- $1.5 million

Green TRIP Projects in CRP-First Round-$483.1 million-approved by CRP-September,2010

Page 6: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  Brief project description and timing •  Estimated capital cost and source(s)of municipal share •  Estimated Greenhouse Gas Emissions savings •  Supporting documentation of benefits-ridership, mode

share and relationship to other projects •  Estimated annual operating/maintenance and capital

costs and how funded- property taxes, fares, other grants etc.

•  Projected cash flow for each year •  How progress and benefits are to be reported to AT

each year-in simple terms-ridership etc. • Must have endorsement from municipal council and

CRP

GreenTRIP Funding Application Requirements

Page 7: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  Conducted many transit feasibility studies

•  Developed regional branding strategy

•  Provided planning assistance for Airdrie and BVRTSC

•  Developed marketing strategies Banff-Canmore service

•  Investigated governance, service and funding

•  Provided municipal TOD toolkits

•  Approved CM Plan

How CRP Has Assisted Transit since Green Trip Announced

Page 8: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  Attended national transit forums-CUTA

•  Held regional transit forums and workshops on best practices and hosted regional trip to Metro Vancouver

•  Prepared briefs to province on GreenTRIP, high speed rail bus regulations and other areas

•  Investigated commuter rail and economic development potential

How CRP Has Assisted Transit since Green Trip Announced

Page 9: 2014 GreenTRIP Application to Alberta Transportation

Client logo

Projects Completed and Requesting Funding (already spent 2012-2014 from GreenTRIP)

•  Bus Technology-$10,665

•  ICE Fleet Expansion-$6,600

•  Local Fleet Expansion-$2,950

•  Real Time Passenger Information Technology-$14,000 •  South Transit Terminal-$2,334,370

•  TOTAL-$2,368,585

Proposed 2014 Projects –City of Airdrie

Page 10: 2014 GreenTRIP Application to Alberta Transportation

Client logo

New Projects Requesting GreenTRIP funding-$25.5-2015 to 2019 Highest Priority

–  Transit Maintenance/Storage Facility-$11.9 –  New Fleet for Regional ICE Services-$4.4 –  New Fleet for Local Services-$1.5 Total -$17.8

Medium Priority –  South Transit Terminal-Phase 2-$1.0 –  Transit Zone improvements-$1.0 –  Transit Technology -$0.3 Total $2.3

Lowest Priority –  North Transit Terminal-$5.4

Proposed 2014 Projects–City of Airdrie (millions)

Page 11: 2014 GreenTRIP Application to Alberta Transportation

Client logo

• Greenhouse Gas Emissions Reductions in Airdrie

Benefits of GreenTRIP Requests

Overall GHG Emissions Impact – Regional ICE service (t CO2 eq.)

2016 2017 2018 2019 2020 Total

Tons of GHG avoided by modal shift 95 493 981 1 424 1 889 4 882

Tons of GHG produced by new buses 84 235 289 344 344 1 296

Tons of GHG produced/year -11 -258 -692 -1 080 -1 545 - 3 586

Page 12: 2014 GreenTRIP Application to Alberta Transportation

Client logo

Proposed 2014 Projects –BVRTSC Estimates on costs

Project Priority and Year Total Cost GreenTRIP Amount Purchase Nine 30 foot bio-diesel buses for introducing Parks Canada Lake Louise/Moraine Lake transit service that will operate all year round in 2016-2017 (includes 2 spares)

High-2016/2017 $2.25 million $1.485 million

Purchase four 30 foot diesel buses for introducing local transit service in Town of Canmore in 2016-2017 (includes one spare)

High-2016/2017 $1.0 million $0.67 million

2 Cutaways-2012 Initial purchase replacement if grant is still good to spend in 2019-2020

High-2019/2020 $0.5 million $0.34million

Purchase thirteen electronic validating Farelogistics/ Trapeze fareboxes to be part of the existing thirteen bus fleet configuration

Medium-2017 $0.35 million $0.23 million

Purchase NextBus/Cubic real time schedule hardware equipment to be part of the existing thirteen bus fleet configuration

Medium-2017 $0.20 million $0.13 million

Purchase Two Biodiesel Cummins replacement engines for lifecycle replacement of the 2012 40 ft. diesel buses

Medium-2017 $0.060 million $0.40

Buy four Hybrid bus Cummins diesel engines – lifecycle replacement Medium $0.120 million $0.80

Purchase four Nova 40ft Hybrid bus battery pack replacement for 2012 40 foot hybrid bus fleet

Medium-2017 $0.080 million

Purchase land, design and build bus storage/maintenance facility with ability to do repairs on buses and two wash bays, two hoists, mechanics and drivers offices lounge and administrative offices-store and maintain 40 foot buses and small buses-minimum of 12 and more for expansion

Low-2016/2017 $6.0 million $4.0 million

Purchase land, design and build multi-bus regional/local service transfer station – transfer hub in town of Banff – large covered passenger shelter with benches with AC power

Low–land-2016; design-2017; build-2018

$1.0 million $0.67 million

TOTAL COST $11.5 million $7.7 million

Page 13: 2014 GreenTRIP Application to Alberta Transportation

Client logo

• Greenhouse Gas Emissions Reductions in Airdrie

Benefits of GreenTRIP Requests

2016 2017 2018 2019 2020 Total

Tons of GHG generated by modal shift 0 23 32 77 86 217

Tons of GHG produced by new bus service 0 18 36 72 72 199

Tons of GHG produced/year 0 -5 4 -4 -14 -18

Overall GHG Emissions Impact – Local Service (t CO2 eq.)

Page 14: 2014 GreenTRIP Application to Alberta Transportation

Client logo

• Greenhouse Gas Emissions Reductions in BCRTSC

Benefits of GreenTRIP Requests

Overall GHG Emissions Impact – New Canmore Local Service (t CO2 eq.)

Year 1 Year 2 Year 3 Total

Tons of GHG avoided by modal shift 230 314 387 930

Tons of GHG produced by new buses 244 244 244 733

Tons of GHG produced/year 14 -69 -142 -197

Page 15: 2014 GreenTRIP Application to Alberta Transportation

Client logo

• Greenhouse Gas Emissions Reductions in BCRTSC

Benefits of GreenTRIP Requests

Overall GHG Emissions Impact – New Lake Louise Transit Service (t CO2 eq.)

Overall GHG Emissions Impact – New Moraine Lake Transit Service (t CO2 eq.)

Year 1 Year 2 Year 3 Total

Tons of GHG avoided by modal shift 167 192 243 602

Tons of GHG produced by new buses 158 158 158 473

Tons of GHG produced/year -10 -35 -85 -129

Year 1 Year 2 Year 3 Total

Tons of GHG avoided by modal shift 293 351 424 1 068

Tons of GHG produced by new buses 414 414 414 1 242

Tons of GHG produced/year 121 63 -11 173

Page 16: 2014 GreenTRIP Application to Alberta Transportation

Client logo

Proposed 2014 Projects –City of Calgary

$276 million plus in total for capital projects(GreenTRIP funding will be a portion)

•  North and South Crosstown BRT Projects

•  Southwest Transitway

•  17th Avenue SE Transitway

•  West LRT Land

•  LRT Traction Upgrades

•  Will need to set priority

Page 17: 2014 GreenTRIP Application to Alberta Transportation

Client logo

Rapid Transit Corridors

•  North Crosstown BRT •  South Crosstown BRT •  Southwest Transitway •  17 Avenue SE

Transitway

Additional Projects •  West LRT land purchase

•  LRT traction power upgrades

City of Calgary-Green TRIP Projects

Page 18: 2014 GreenTRIP Application to Alberta Transportation

Client logo

Additional Projects

•  Reduces travel time, improve reliability for transit customers

•  Addresses CTrain crowding by offering an east-west alternative

•  Connects northeast and north-central communities with major destinations (U of C, SAIT, hospitals)

•  Responds to managed supply of paid parking at post-secondary institutions and hospitals and increases transit demand

North Crosstown BRT -capital cost: $50 million

Page 19: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  Reduces travel time for transit customers in south Calgary with east-west rapid transit connection

•  Addresses CTrain crowding by offering an east-west alternative

•  Responds to development pressures-Mount Royal University, Quarry Park, Westbrook

•  Serves Rockyview General Hospital

South Crosstown BRT-capital cost: $20 million-

Page 20: 2014 GreenTRIP Application to Alberta Transportation

Client logo

Southwest Transitway-capital cost: $40 million

•  Provides alternative to crowded South LRT line for customers travelling downtown

•  Serves development pressures around Mount Royal University

•  Serves Rockyview General Hospital

•  Recognizes transitway phases already implemented on Crowchild Trail SW

•  Responds to managed supply of paid parking at post-secondary institution & hospitals and increases transit demand

Page 21: 2014 GreenTRIP Application to Alberta Transportation

Client logo

17 Avenue SE Transitway-capital cost: $98 million

•  Supports regional transit initiatives east of Calgary

•  Improves streetscape and facilitates redevelopment

•  Has strong business and community support

•  Aligns with major road reconstruction required this decade

•  Can be built in phases

•  Recognizes functional plan complete

Page 22: 2014 GreenTRIP Application to Alberta Transportation

Client logo

LRT Traction Power Upgrades-capital cost: $68 million

•  Improves reliability and capacity on the CTrain network

•  Upgrades are required to be able to provide four-car train service

•  Upgrades LRT which provides connections to regional public transit services

•  Supports redevelopment in Centre City (Brookfield Place, Telus Sky) and transit-oriented developments (Brentwood, Sunnyside, Westbrook)

Page 23: 2014 GreenTRIP Application to Alberta Transportation

Client logo

West LRT Land Purchase-capital cost: confidential

•  Provides rapid, reliable transit service for customers in the West LRT service area

•  Recognizes ridership in West LRT service area has increased 11% since opening day

•  Provides funding required to settle outstanding claims

Page 24: 2014 GreenTRIP Application to Alberta Transportation

Client logo

• Greenhouse Gas Emissions Reductions in Calgary

•  To be calculated

Benefits of GreenTRIP Requests

Page 25: 2014 GreenTRIP Application to Alberta Transportation

Client logo

•  Increased ridership and transit mode share in Calgary, BVRTSC and Airdrie-Access, local and regional routes

• Greenhouse gas emissions reductions – Calgary – Airdrie – CRTSC – Enhanced accessibility for all trips

–  Increased economic development and employment mobility

Benefits of GreenTRIP Requests

Page 26: 2014 GreenTRIP Application to Alberta Transportation

Client logo

Recommendations

Total Of Transit Capital Project Requests for GreenTRIP Calgary -$276.0 plus million plus-share of this amount Airdrie- $27.9 million-request BVRTSC- Approximately $11.5 million-request TOTAL=$250.0 million plus confidential cost for Calgary WEST LRT land

Page 27: 2014 GreenTRIP Application to Alberta Transportation

Client logo

Questions?