2014 Fall Conference Welding Inspections-Items to Consider

Transcript of 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or...

Page 1: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

2014 Fall Conference

Welding Inspections-Items to Consider

Page 2: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Agenda

• Review

• Department of Transportation • Part 192 Transportation of Natural and Other Gas by Pipeline

• Subpart E – Welding of Steel in Pipelines • 192.225 Welding Procedures

• 192.241 Inspection and test of Welds

• 192.243 Nondestructive Testing

• 192.245 Repair or removal of defects

• State Requirements • New Hampshire

• 500 Rules

• Massachusetts • 220 CMR

• Maine • 65-407 PUC Chapter 420

Page 3: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Agenda

• Welding Procedures • Procedure Qualification Reports (PQR’s)

• API 1104 20th Edition • Welding Procedure, PQR’s earlier edition API 1104

• Procedure Application

• In-Service Welding

• Welding Documents (Projects) • NDT Reports

• Weld Maps

• Information (welder, repairs, procedure)

• Welding Documents (Welder) • Welder Qualifications (OQ’s)

• Single Qualification

• Multiple Qualification

• Re-Qualification (X-Rays)

Page 4: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

DOT Part 192

• DOT Part 192 • Subpart E Welding of Steel in Pipelines • 192.225 Welding Procedures

(a) Welding Must be performed by a qualified welder in accordance with welding Procedures qualified under section 5 of API 1104 (incorporated by reference, see 192.7) 192.7 / B. American Petroleum Institute (API)

(b) Each welding procedure must be recorded in detail, including the results of the qualifying tests. This record must be retained and followed whenever the procedure is used.

Test Welds to Qualify Welding Procedures shall be determined by destructive testing.

Page 5: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

DOT Part 192

• 192.241 Inspection and Test of Welds (a) Visual inspection of welding must be conducted by an

individual qualified by appropriate training and experience to ensure that: 1) The welding is performed in accordance with the welding

procedure; and 2) The weld is acceptable under paragraph (c) of this section.

(c) The acceptability of a weld that is non-destructively tested or visually inspected is determined according to the standards in Section 9 of API 1104

• 192.143 Nondestructive Testing • Must be performed by any process, other than trepanning,

that will clearly indicate defects that may affect the integrity of the weld

• 192.245 Repair or removal of defects • Defect removed down to sound metal • After repair inspected to ensure its acceptability • Repair in a previously repaired area must have a separate

procedure

Page 6: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

State Requirements

• New Hampshire • 500 Rules

• Utility shall ensure & document welders are qualified • Welder qualified by destructive testing with-in preceding 63 months at least 5 years • Engaged in welding with that process with-in the preceding 6 months

• All welds are visually inspected by qualified welding inspector in accordance with API 1104 section 8.3

• Projects operating greater than 60 pounds require 10% NDT of projects that consist of at least 10 welds ; or

• NDT field test on at least one weld for projects that include 5 to 9 welds • Any weld failure will require no less than 50% of all welds any additional failure will

require 100% NDT

• Massachusetts • 220 CMR

• Visually inspections of welds shall be performed by qualified welding inspector • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline tie-in welds shall be NDT

• Maine • 65-407 PUC Chapter 420

• 192 provisions

Page 7: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Procedures

• Procedure Qualification Reports (PQR’s)

• Procedure Application

• API 1104 20th Edition • Procedures qualified under an earlier edition

• Review essential variables

• Appendix B In-Service Welding • Primary concerns

• Burning through • Hydrogen cracking

Page 8: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• Nondestructive Testing (NDT) Reports • Projects

• Report review • Customer • Procedure • Code • Welder • Location (job) • Date • Pass / Fail • Weld #’s • Repairs • Material • Signed

Page 9: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• Weld Maps • Weld Locations

• Weld #’s

• Weld Repair #’s

• Size

Page 10: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• Information • Welding Inspector

• Oversees NDT company / Welders / Weld Map

• Responsibilities

• Welder • Certifications

• OQ’s

• Weld Numbers • Do not duplicate for project

• Repairs

• Procedure • Welder Certification

• Might not be your procedure, review

• Company Procedure

• Welder requires copy and understands

Page 11: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• GPS • Project Information

Page 12: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• GPS • Feature

Page 13: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• GPS • Data Dictionary

Page 14: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• GPS • Data Dictionary

Page 15: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• GPS • Main line Valve

Page 16: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Projects

• GPS • Coupling

Page 17: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Welder

• Certifications • Single Qualification

• Size limitations

• Girth / Fillet

• Multiple Qualification • Greater than or equal to 12.750”

• Girth

• Fillet

• Qualified

• All positions

• Wall thickness (procedure limitations)

• Joint designs

• Fittings

• All pipe diameters

• Completed together • Girth weld / Fillet

• Witnessed

• OQ’s

Page 18: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Welder

• Re-Qualification (x-Ray) • Required

• Location

• Company

• Date

• Code / Edition

• Welder

• Name / Stamp

• Stamp on multiple

• Process

• Procedure

• Electrode

• SMAW

• Accepted Welds

• Company performing Inspection

Page 19: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Welder

To work for multiple companies you need to know what procedure, O&M

Our O&M states MUGP-1, welder certifications were done with the NGA procedures can he weld you.

Two things have to happen:

1) Need to see if welder essential variables were met a) change from one welding process to a different welding process

b) Change in the combination of welding process

c) Change in the direction of welding uphill to vertical downhill

d) Filler-metal classification group 1&2 to group 3

2) You have to follow their welding procedures, in this case will be MGUP-1

Page 20: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Welding Documents Welder

Page 21: 2014 Fall Conference - Northeast · PDF file•Procedure Qualification ... • Record or each NDT or visual inspection for life of pipeline • 6”greater shall be NDT • All pipeline

Questions