2014 Annual Overlay Resurfacing Program Project Overview: ES0495 The 2014 Annual Overlay Program aims to maintain existing streets to protect the initial investment in the street and to ensure an adequate, quality driving surface for mobility and public safety. Work includes pavement repair, leveling of the pavement surface, and resurfacing with hot mix asphalt. Locations include portions of Hawthorn Road and14th Street, Kellogg Road and Electric Avenue north of Birch Street, and the intersection of James and Illinois streets. Shared lane markings and porous concrete will be added to Hawthorn Street. Over 2000 linear feet of new sidewalk and ADA improvements are included. The 2014 funding includes about $1,500,000 from the Transportation Benefit District as well as street and stormwater funds. Status March 2015 Accomplishments: Project complete. Next Milestone: Affected Neighborhoods Edgemoor, South Hill, Fairhaven, Meridian, Silver Beach, and Whatcom Falls Project Manager Freeman Anthony, P.E. Project Engineer Phone: (360) 7787924 Email Public Works Project Details Status Construction Contract Awarded 7/21/14 Contract Amount $1,428,935.94

Transcript of 2014 Annual Overlay Resurfacing Program - COB Home Works/2014 Annual... · 2014 Annual Overlay...

2014 Annual Overlay Resurfacing Program 

Project Overview: ES­0495

The 2014 Annual Overlay Program aims to maintain existingstreets to protect the initial investmentin the street and to ensure anadequate, quality driving surface formobility and public safety. Workincludes pavement repair, leveling ofthe pavement surface, andresurfacing with hot mix asphalt.Locations include portions ofHawthorn Road and14th Street,Kellogg Road and Electric Avenuenorth of Birch Street, and the intersection of James and Illinois

streets.  Shared lane markings and porous concrete will be added to Hawthorn Street. Over 2000linear feet of new sidewalk and ADA improvements are included.

The 2014 funding includes about $1,500,000 from the Transportation Benefit District as well asstreet and stormwater funds.

Status ­ March 2015Accomplishments:  Project complete.

Next Milestone: 

Affected NeighborhoodsEdgemoor, South Hill, Fairhaven, Meridian, Silver Beach, and Whatcom Falls

Project ManagerFreeman Anthony, P.E.Project EngineerPhone: (360) 778­7924Email Public Works

Project DetailsStatus ­ ConstructionContract Awarded ­   7/21/14Contract Amount ­  $1,428,935.94