Date: 13 September 2013By: Executive Mayor Cllr MD Magabe
BACKGROUND
2
•The presentation will outlines the budget allocation
amount and the cash flow projections.
•The municipality has appointed the “Term Contractors”
to short circuit the procurement process.
•The amount of R2.4 m was transferred to the
municipality at the end of August 2013.
BACKGROUND Cont.…
3
•The MWIG funds will be allocated to Municipalities for
only three financial years, starting from 2013/14
•SDM has the MWIG allocation of R29.2m for 2013/14,
which will be utilised to eradicated the O&M
backlogs(Hotspot areas with challenges of functionality)
•The allocation for outer years; R 86.5m and R 150.5m
respectively will be focusing on the Hotspot areas with
challenges of infrastructure and sources as well as
extensions.
4
ELIAS MOTSOALEDI REGION
VILLAGEPROJECT DESCRIPTION
ALLOCATED FUNDS CASH FLOW PROJECTIONS
JULY 13 AUG 13
SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Walkraal A Connecting ± 1400m line from Whalkraal (RDP) steel tank to cater Kgobokwane. R 100 000 100 000
Kuilsrivier (Stompo)
Connecting rising main from new equipped borehole and electric connection. R 700 000 100 000 250 000 200 000 100 000
Dennilton S/Holdings
Apply for electric connection R 60 000 60 000
Zondagsfontein A (Mpheleng)
Repair of pump and motor at booster pump station next to the steel tank. R 357 000 357 000
5
ELIAS MOTSOALEDI REGION
VILLAGEPROJECT DESCRIPTION
ALLOCATED FUNDS CASH FLOW PROJECTIONS
JULY 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14Uitspanning B Repair of boreholes.
Replace stolen transformer and submersible pump.
R 70 000 70 000Elandsdoorn B • Connection of electric
connection and the repair of the rising main.
• Repair pump at Kwarrilaagte pump station.
• Investigating the possibility of connection pipe to Malaeneg reservoir. R 620 000 120 000 250 000 250 000
Kwarrielaagte • Placement of stolen transformer and repair of non-operational pump at Waterkloof pump station.
• Connecting rising main from new equipped borehole and electric connection.
• Replace the burned control box R 400 000 400 000
6
ELIAS MOTSOALEDI REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Monsterlus Town (MONSTERLUS TOWNSHIP)
• Repair of Meters and pipe leaks.
• Refurbishment of WTW Hlogotlou plant. R 1 280 000 280 000 400 000 300 000 300 000
Nkosini • Cleaning up the siltation in the raw water dam and repair of two raw water pumps.
• Repair pump in the pump stations.
• Connect one pump from the pump station to pump to Nkosini Distribution reservior,
R 690 000 690 000Sehlakwane Equipping of newly drilled
borehole and connect to existing infrastructure. R 145 000 145 000
Tafelkop (TAFELKOP VILLAGE )
• Release pumps from service provider and upgrading of transformer at Motetema and Tafelkop to cater two pumpstations.
• Refurbishment of broken boreholes,
R 210 000 210 000
7
ELIAS MOTSOALEDI REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTIONS
JUL 13
AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
JeLe • Complete RBWS project,
• Verify infrastructure requirements, procure, design and construct extensions R 170 000 170 000
Lukau • Plan, design and construct extensions;
• Water Resources Development
R 75 000
75 000
Motetema and Tafelkop
Groblersdal/ Lukau Refurbishment of pump stations
R 4 251 000
2 200 000 2 000 051Sterkfontein Rehabilitate or drill test and
equip new borehole. R 150 000
150 000
TOTAL AMOUNT
R 9 278 000 2 410 000 3 025 051 2 592 000 750 000 400 000
8
FETAKGOMO REGION
VILLAGEPROJECT DESCRIPTION
ALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13
AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Ga-mmela
• Current project in progress,
• Verify BWS infrastructure requirements and extension requirements,
• Optimise Local water resources use,
R 71 000
71 000
Ga-Maesela
• Implement WC and WDM,
• install elevated storage. R 100 000 100 000
Ga-Nkwana
• Rehabilitate and equip borehole.
• Replace two uPVC storage Tanks. R 20 000 20 000
MohlaletsiRemove and Replace pipes R 50 000 50 000
9
FETAKGOMO REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Tshibeng
• Implement WC/ WDM. Community awareness campaign.
• Repair leaking pipes. Electrify borehole. R 5 500 5 500
Tsibeng B
• Refurbish pump mains.• Replace pumps. R 24 500 24 500
Mphanama
• Complete connection to Nkadimeng RWS,
• Procure and install electrical submersible pump complete with motor , two 10kl jojo tanks and control box. Electrify borehole.
• Replace booster pumps. R 105 000 105 000
TOTAL AMOUNT R 376 000 0 276 000 100 000 0 0
10
EPHRAIM MOGALE REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Makhutso Investigate Challenges and repair pump station.
R 450 000 450 000Phetwane (Flag Boshielo RWTW)
Implement WCDM
R 1 100 000 450 000 250 000 400 000Frischgewaagd • Installation of the electric
connection. ; • Investigate RWS
connection,• Investigate challenges,
design, procure and construct. R 320 000 320 000
Mathukhuthela Implement WCDM
R 400 000 100 000 250 000 50 000ELANDSKRAAL Sealing of the leaking
Reservoir. R 400 000 400 000Hinlopen (MORARELA )
Refurbishment and Extension of reticulation network infrastructure R 220 000 220 000
TOTAL AMOUNTR 2 890 000 0 100 000 2 090 000 300 000 400 000
11
TUBATSE REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Phiring
• Equip two boreholes and rehabilitation of booster pumps,
• Verify, procure, design and construct. R 500 000.00 250 0 00 250 000
Leboeng
• Verify, procure, design and construct
• Install package plant.• Equip borehole and
connect to line. R 593 280.00 120 000 300 000 173 280
Ga-Masha Repair of burst bulk pipeline. R 15 000.00 15 000
Ga-Malekana Replace foot mounted motor R 19 165.00 19 165
KalkfonteinAddress refurbishment and O&M requirements, R 80 000.00 80 000
Mapodile
• Address refurbishment and O&M requirements,
• Procure, site, drill, test and equip borehole R 82 149.00 82 149
12
TUBATSE REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Ga-Phasha
• Address refurbishment and O&M requirements,
• Procure, design and construct extensions,
• Implement WCDM and cost recovery,
• Drill and equip new borehole R 90 000.00 90 000
Tokagomo ext
• Equip of two boreholes and rehabilitation of booster pumps,
50 000
50 000Mampuru [MAMPURU(MOSHATE)] Replace of rising main R 60 000.00 60 000Ga-Mamphahlane
Replace submersible pump and motor. R 12 000.00 12 000
Motlolo
Verify, procure and replace stolen diesel engine R 56 000.00 56 000
13
TUBATSE REGION
VILLAGEPROJECT DESCRIPTION
ALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
SekitiReplace Stolen diesel engine R 98 000.00 98 000
SwaleReplace stolen submersible pump. R 12 000.00 12 000
Magakala Replace diesel engine R 98 000.00 98 000
Ga-MashabelaReplace generator with a higher rating one. R 107 001.00 107 001
Ga-MashishiReplace diesel engine
98 00098 000
Seuwe Replacement of submersible pump. R 12 000.00 12 000
DITHABANENG
• Repair pump at Kwarrilaagte pump station.
• Investigating the possibility of connection pipe to Malaeneg Reservoir R 50 000.00 50 000
Moshira Replace monostroom pump R 25 000.00 25 000
14
TUBATSE REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13
AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Botshabelo Replace diesel engine, R 80 000.00 80 000
ShakungReplace monostroom pump X2 R 50 000.00 50 000
Sekopung Replace burnt element R 26 535.00 26 535
Ga-PodileReplace of Stolen diesel engine R 78 000.00 78 000
Ga-Khowane
Reinstate electricity,R 30 000.00 30 000
Sehlaku
• Verify extension and resources requirements,
• Procure, design and construct. R 57 474.00 57 474
Mashibishane
• Verify extension and resources requirements,
• Procure, design and construct. R 50 000.00 50 000
15
TUBATSE REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Thabaneng
• Verify extension and resources requirements,
• Procure, design and construct. R 50 000.00 50 000
PulasengRemove and replace fallen pipes R 45 000.00 45 000
Matimatsatsi
• Verify extension and resources requirements,
• Procure, design and construct. R 216 000.00 216 000
Alverton
One borehole to be tested, equiped and connected to the exisisting pipe line and the other one to be electrified R 370 000.00 370 000
Thusanang Replace Stolen diesel engine R 150 000.00 150 000
Ga-Motodi
• Replace Stolen diesel engine
• Borehole to be electrified. R 200 000.00 100 000 100 000
16
TUBATSE REGION
VILLAGEPROJECT DESCRIPTION
ALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13
AUG 13
SEPT 13 OCT 13 NOV 13
DEC 13 JAN 14 FEB 13
MAR 13
Praktiseer
Overall of hydrostat pump and purchase of new standby pump.
R 230 805.00 230 805
Makofane
• Drilling, testing and equipping of boreholes
• installation of 200kl steel tank and extension of reticulation pipeline.
R 3 326 557.00 526 557 800 000
300 000
300 000
900 000
700 000
Leolo
Verify infrastructure requirements, procure, design and construct.
R 204 990.00 204 990
TaungReplace broken Monostroom.
R 20 000.00 20 000
Sehlabeng
Verify infrastructure requirements, procure, design and construct.
R 164 491.00
164 491
TOTAL AMOUNTR 7 563 447.00
3180002068212 2433464 637771 300000 900000 700000
17
MAKHUDUTHAMAGA REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Kotupu Repair broken bulk pipeline and installation of air valve.
R 200 000200 000
Riverside • Refurbishment of Vergelegen WTW and Complete and commission Nebo RWS augmentation,
• Implement of WC/WDM
R 890 000
200 000 500 000 190 00Ga-Moloi • Verify extension needs,
procure, plan, design and construct
• Refurbishment of Vergelegen WTW and Complete and commission Nebo RWS augmentation,
• Implement of WC/WDM
R 200 000
200 000Jane Furse • Verify extension needs,
procure, plan, design and construct.
• Refurbishment of Vergelegen WTW and Complete and commission Nebo RWS augmentation,
• Implement of WC/WDM
R 140 000
140 000
18
MAKHUDUTHAMAGA REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Madibaneng • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 130 940
130 000Sebitsane • Address refurbishment of
BWS components,• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 20 000
20 000Malegale • Address refurbishment of
BWS components,• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 101 168
101 168
19
MAKHUDUTHAMAGA REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Maseleseleng • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 33 254 33 254
Tsatane Ext 1 • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 82 939 82 939
Tsatane • Address refurbishment of BWS components,
• Address O&M backlog,Verify extension requirements, design and construct,
• WCDM
R 81 290 R81 290
20
MAKHUDUTHAMAGA REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Ga-Mokadi • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 32 422 32 422
Ramphelane • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 207 084 R207 084
Ga-Maila Mapitsane
• Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 56 283 R56 283
21
MAKHUDUTHAMAGA REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Marulaneng • Address refurbishment of BWS components,
• Address O&M backlog• Verify extension
requirements, design and construct,
• WCDM
R 93 704 93 704
Manganeng • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 104 461 R104 461
Modiketsi • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 193 824 R193 824
22
MAKHUDUTHAMAGA REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Disesane • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 40 654 40 654
Masite • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 78 810 78 810
Molapong • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 41 530 R41 530
23
MAKHUDUTHAMAGA REGION
VILLAGE PROJECT DESCRIPTIONALLOCATED FUNDS CASH FLOW PROJECTIONS
JUL 13 AUG 13 SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14
Ga-Magolego • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 33 239 33 239
Ga-Mohlala • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 52 123 52 123
Sebetole • Address refurbishment of BWS components,
• Address O&M backlog,• Verify extension
requirements, design and construct,
• WCDM
R 20 000 20 000
24
MAKHUDUTHAMAGA REGION
VILLAGEPROJECT DESCRIPTION
ALLOCATED FUNDS CASH FLOW PROJECTION
JUL 13
AUG 13
SEPT 13 OCT 13 NOV 13 DEC 13 JAN 14 FEB 14 MAR 14
Thoto Design, procure and construct 5km pipeline
R 5 666 552
500 000 1600 000 400 000 400 0001 666 552
1 100 000
Molebeledi Drilling or rehabilitate, testing and equipping of new borehole
R 120 000
120 000Ga-Marishane Sealing of
leaking concrete reservoir.
R 320 000
220 000 100 000Maseshegwane Replace burnt
element R 25 000
25 000
Ga-Mogashoa Manamane
Procure and repair the broken pump.
R 34 000
34 000
TOTAL AMOUNT R 9 092 553 2007772 3134013 500000 400000 1666552 1100000