9/5/2013 6:17 AM ApprovedRisk Assessment Implementation Sheet Work NameProcess Name:) T o t a l T o t a l The next year consideration ESTOQUE Coi l movimentation TM operating to close to the lifted coil coul d damage other equipments, hurt others or himself Heavy Obj Procedure / Isol ation / Daily KYM, PPE use / Crane checklist 12 5 8 25 Aa Set safety distance for TM / walk always behind lifted coil 12 5 8 25 Aa Yearly review PACKING PACKING During the movimentation of Forklift from piler to packing area, FL Operator could drop steel sheets, caught other TM. Caught Fence / Procedure / FL Operator Training / Daily KYM / FL Checklist / Medicaal check 12 5 8 25 Aa Paint FL movimentation area on the ground / TL Presence / Orientation 12 5 8 25 Aa Under study PACKING FL In "Packing waiting area" TM help FL Operator to leave the sheets putting wood on the floor . During this process, TM can get caught by FL or sheets Caught Daily KYM / PPE / Team work / STOP,CALL,WAIT 12 5 8 25 Aa Ergonomy training / operational procedure / leader for this operation 12 5 8 25 Aa Studying to eliminate this kind of activities PILER Scrapping top sheet after check T/M standing between pallet and fork lift while removing sheets from piler. Caught 12 5 8 25 Aa 3r WI - Standing Location Foot Prints 12 5 4 21 Aa 1/19/2012 OnGoing Yearly Review 4th 2011-5th-91 Packing Level of traffic and no desi gnated foot travel area for TM going from operation to drive side, Investigate potential no walk zone between BL- 1 stacker and pack area Vehicle None 12 5 8 25 Aa Investigate potential no walk zone between BL-1 stacker and pack area 12 5 8 25 Aa 5th The work place *1 Risk Factor Accident Type4.Risk Valuation Work Process NO 1.Work Name Mac hineryEquipment2.Danger or Harm and a possible accident ( As a process to an accident, to state Because of A(or Due to A), do ___B, then, causes X (or Y Happens)3.Existing Counter- measures for an Accident A responsibel person of No., and the execution date A responsible person of No. and the execution date 8.Remarks 5.Countermeasures to decrease risk 7.Countermeasures A responsible person of No. 7.8 and the execution date 6.Assumption Risk for the countermeasures List 1 / 11 169825337.xlsx.ms_office

Transcript of 2013 Ttsb - Risk Assessment

Page 1: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 1/11

Risk Assessment Implementation Sheet (Work Name・Process Name:)

*①

*②

*③

T

ot

a

l

*④

ESTOQUE Coil movimentation TM operating to close to the lifted coil could damageother equipments, hurt others or himself 

Heavy Obj Procedure / Isolation /Daily KYM, PPE use /Crane checklist

12 5 8 25 Aa

Set safety distance for TM / always behind lifted coil

PACKING PACKING During the movimentation of Forklift from piler topacking area, FL Operator could drop steel sheets,caught other TM.

Caught Fence / Procedure /FL Operator Training /Daily KYM / FLChecklist / Medicaalcheck

12 5 8 25 Aa

Paint FL movimentation area ground / TL Presence / Orie

PACKING FL In "Packing waiting area" TM help FL Operator to leavethe sheets putting wood on the floor . During thisprocess, TM can get caught by FL or sheets

Caught Daily KYM / PPE /Team work /STOP,CALL,WAIT

12 5 8 25 Aa

Ergonomy training / operationprocedure / leader for this op

PILER Scrapping top

sheet after

check

T/M standing between pallet and fork lift

while removing sheets from piler.

Caught

12 5 8 25 Aa

3r WI - Standing Location

Prints

The work place *1

RiskFactor

【AccidentType】

4.Risk Valuation

Work ・Process

NO

1.WorkName (Machinery・Equipment)

2.Danger or Harm and a possible accident ( As aprocess to an accident, to state 「Because of A(or Due

to A), do ___B, then, causes X (or Y Happens)」

3.Existing Counter-measures for an

Accident

A responsibel person of No.1.2.3.4, and the execution date A responsible person of No. 5.6 and the exe

5.Countermeasures to decre

Page 2: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 2/11

2011-5th-77 Stacking Racks Stack height on KDB racks have no maximum

stack height for non shelf storage.

Fall None

12 5 8 25 Aa

Floor layout being mo

establish safety stand

RECEBIMENTO

Coil Receiveingand Inspection

Checking the coil over ehe truck, TM could fall in to theground.

Fall Daily KYM, SafetyStandard, PPE,Procedure (neveralone), TL presence,Periodical medicalcheck

12 5 4 21 Aa

Operational discipline / Limplementation

RECEBIMENTO

Coil truckunloading

During coil truck unloading, TM can "presume"that tongis in the center of the coil and start to hoist but, if it isnot correctly positioned, the coil could fall and hurtsomeone.

Heavy Obj Daily KYM / SafetyStandard, Procedure /Crane daily checklist /TLpresence,orientation

12 5 4 21 Aa

Periodical training / TL pDiscipline

DESCOBINADOR Uncoiler -Loading coil to

coil cart

Coil excessive swing not stopped beforeloading into cart, possible cart, material or

crane equipment damage.

Fly-coming Standardprocedure / Fence

12 5 4 21 Aa

Periodical training / TL pDiscipline

Page 3: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 3/11

PACKING PACKING During REWORK activity, TM have to handle sheets andcan get cut or caught

Cut Daily KYM / PPE /Team work /

STOP,CALL,WAIT 6 5 4 15 Bb

Ergonomy trainingprocedure / leade

RECEBIMENTO

Coil Receiveing Coil truck receiveing area is also TTSB facilities accessfor pedestrian. Does not exists man machine separation

Vehicle Daily KYM, SafetyStandard, Sinalization

6 5 8 19 Ab

Add speed sign / Pedestrian / DriveOperational discip

PACKING PACKING Packing TM could cut himself during packing operation Cut Daily KYM / PPE /Procedure /

6 5 8 19 Ab

Periodical trainingDiscipline

BL1 BL1 During BL1 cutting process, sometime, few sheets aredefective, so TM have to move with bare hands. He cancut himself or others.

Cut Daily KYM / PPE /Team work /STOP,CALL,WAIT

6 5 8 19 Ab

Ergonomy trainingprocedure / leade

Page 4: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 4/11

28. MATERIALSTORAGE

BL WHINVENTORYSTORAGE

DUE TO CLOSE PLACEMENT OF BLANK MATERIALTO EACH OTHER, THE POTENTIAL FOR FORKLIFTTO TIP OVER STACKED BLANK DUE TO THE BLINDSPOT AT THE END OF FORKS

Heavy Obj FORKLIFT OPS - CBTFORKLIFT

2 5 8 15 Bc

PUT BARRIERS IN PLACE STOPS) TO PREVENT FORFORKLIFT TIPPING STACK

Page 5: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 5/11

Page 6: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 6/11

Risk Assessment Result List

<Ⅰ:Risk Valuation Points by risk factor>Points(α) Number(β) α×β Number(β) α×β Number(β) α×β

12 0 0 0 0

6 0 0 0 0

2 0 0 0 0

5 0 0 0 0

4 0 0 0 0

3 0 0 0 0

8 0 0 0 0

4 0 0 0 0

1 0 0 0 0

Total Points⇒ 0 0 0

<Ⅱ:Risk Factor①>

Caught Heavy Obj Vehicle Fall Electric High Temp Stumbling Fly-coming Cut Explosion Noise Dust Chemicals

Present

AfterMeasuresDiffer-ence 0 0 0 0 0 0 0 0 0 0 0 0 0

Present

After

MeasuresDiffer-ence 0 0 0 0 0 0 0 0 0 0 0 0 0

Present

AfterMeasuresDiffer-ence 0 0 0 0 0 0 0 0 0 0 0 0 0

※1:Hazard except the above(Cutting in the press product etc.), to be evaluated in terms of the Accident Degree.

Hazards (In terms o

③Efficiency Partly depending on man

Little Efficiency No safety measures

Hazards (In terms of Safety)

Much Efficiency No depending on man

After CountermeasuresPresent Difference

Frequency

Risk Factor

Fatal Accident(a)

Accident with work suspension(b)

Accident without work suspension(c)

Little Frequency

Much Frequency

① 

Accident withoutwork suspension

days

Grave Accident

Accident with work

suspension days

Accident Degree

Risk Valuation(Risk Factor Total

) 

① Degree of

Accident

+ 

② Work Frequency

+ 

③ Level of

Measures

Page 7: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 7/11

Differ-ence 0 0 0 0 0 0 0 0 0 0 0 0

Present

AfterMeaures

Differ-ence 0 0 0 0 0 0 0 0 0 0 0 0

Present

AfterMeauresDiffer-ence 0 0 0 0 0 0 0 0 0 0 0 0

<Ⅳ:Number by display>

Display Aa Ab Ba Bb Bc Cc

Present

After Measures

Difference 0 0 0 0 0 0

Middle Efficiency③

 

Much Efficiency

Page 8: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 8/11

Risk Assessment Total Result List

<Ⅰ:Risk Valuation Points by risk factor>Points(α) Number(β) α×β Number(β) α×β Number(β) α×β

12 0 0 0 0

6 0 0 0 0

2 0 0 0 0

5 0 0 0 0

4 0 0 0 0

3 0 0 0 0

8 0 0 0 0

4 0 0 0 0

1 0 0 0 0

Total Points⇒ 0 0 0

<Ⅱ:Risk Factor①>

Caught Heavy Obj Vehicle Fall Electric High Temp Stumbling Fly-coming Cut Explosion Noise Dust Chemicals

Present

AfterMeasuresDiffer-ence 0 0 0 0 0 0 0 0 0 0 0 0 0

Present

AfterMeasuresDiffer-ence 0 0 0 0 0 0 0 0 0 0 0 0 0

Present

AfterMeasuresDiffer-ence 0 0 0 0 0 0 0 0 0 0 0 0 0

※1:Hazard except the above(Cutting in the press product etc.), to be evaluated in terms of the Accident Degree.

① 

Accident withoutwork suspension

days

Grave Accident

Accident with worksuspension days

Accident Degree

③Efficiency Partly depending on man

Little Efficiency No safety measures

Accident without work suspension(c)

Little Frequency

After CountermeasuresPresent Difference

Frequency

Risk Factor

Fatal Accident(a)

Accident with work suspension(b)

Much Frequency

Much Efficiency No depending on man

Hazards (In terms oazards (In terms of Safety)

Risk Valuation(Risk Factor Total

) 

① Degree of

Accident

+ 

② Work Frequency+ 

③ Level of

Measures

Page 9: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 9/11

Differ-ence 0 0 0 0 0 0 0 0 0 0 0 0

Present

AfterMeaures

Differ-ence 0 0 0 0 0 0 0 0 0 0 0 0

Present

AfterMeaures

Differ-ence 0 0 0 0 0 0 0 0 0 0 0 0

<Ⅳ:Number by display>

Display Aa Ab Ba Bb Bc Cc

Present

After Measures

Difference 0 0 0 0 0 0

Middle Efficiency

 

Much Efficiency

Page 10: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 10/11

Hazard Risk Quotation・Valuation Standard List (TTC G

Point

12

6

2

5 Frequen4 Sometim

3 Rare:Few times a8 No doubt of an occ

4 A possible occurre

1 No possibility :Dif

(a)12

Whole body・

Upper-body・

Head

Whole body・Upper-

body・Head(Handing of 

100kgor more)

Fork Lift (Anyspeed)・

IndustrialVehicles etc.

(more than10km/h at the

maximum speed)

Height2m or More

Electricity-active nearby

work for voltageof more than

120V

Whole body(more than

50%)

WholeBody・

Upper-Body・Head

WholeBody・

UpperBody・Hea

(b)6

A part of body(Hand・Arm・Le

gtip of a

finger、tiptoe)

Whole body・Upper-

body・Head(Handing of 

100kgor more)

IndustrialVehicles・

ExaminationVehicles etc(Less than

10km/h at themaximum speed)

-

Electricity-active nearby

work for voltageof more than25V to lessthan 120V

A part of body(more than 20%

less than50%)

Hand・Arm・Leg Hand・Arm・L

Caught

Hazard (in terms of Safety)

③Level of

MeasuresEfficiency Partly depending on man

Little Efficiency No safety measures

①Degree of

Accident

②Work

frequency

Much Frequency

The m

Fatal Accident of

R

i

s

k

 

F

a

c

t

o

r

 

Fall Electric Stumbling Fly-comiHigh TempVehicleDegree ofAccident Heavy Obj

To receive

Much Efficiency No depending on man

Risk Factor

Fatal Accident(a)

Accident with work suspension(b)

Accident without work suspension(c)

Little Frequency

Frequency

Risk Valuation(Risk Factor Total) 

① Degree of Accident

+ 

② Work Frequency+ 

③ Level of Measures 

Page 11: 2013 Ttsb - Risk Assessment

7/30/2019 2013 Ttsb - Risk Assessment

http://slidepdf.com/reader/full/2013-ttsb-risk-assessment 11/11

 

Work Name

Current Situation Improvement Measures

(Hazard-Risk) Safety (Protective measure)   Safety Points BookNoWho Type、Sketch、Description Protection   Protection Manual No 

_____B, then, causes X(or Y happens)」

Caught Heavy Obj Vehicle Fall Electric

Stumbling Fly-coming Explosion

Noise Dust Laser Heavy Labour

② ③  

Hazard Note: The sign of 「○」 to be applied to the corresponding place on the site.

Entry DD/MM/YY

① Degree of Accident ② Work Efficiency ③ Level of Measure

*To state 「Because of A(or Due to A), do

Chemicals Hypoxia

High Tmp

Cut

 

Risk Assessment Entry Sheet on Site 

Process  FacilitiesNo.  No. 

Points

1262

R i s k F a c t o r

Grave Accident(a)

W/ work suspention days

W/O work suspention days

Points

543

Much Frequency

Frequency

Little Frequency

R i s k F a c t o r

Points

841

R i s k F a c t o r

Little Efficiency

Efficiency

Much Efficiency

Valuation Points Rank Contents of the risk

Degree of Accident : a

Degree of Accident : b

  Degree of Accident : a

B Degree of Accident : b

Degree of Accident : c

6~9

pointsC Degree of Accident : c Cc

10~18

points

Rank Indicaiton

Aa

Ab

Ba

Bb

Bc

A19~25

points