2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the...

16
2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R Program Office Code 416, Building 6, Room C200 NASA Goddard Space Flight Center Greenbelt, MD 20771 [email protected] http://www.goes-r.gov/

Transcript of 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the...

Page 1: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 1

Status of Activities and Plans for the GOES-R Core Ground System

Satya Kalluri Ph.D.GOES-R Program OfficeCode 416, Building 6, Room C200NASA Goddard Space Flight CenterGreenbelt, MD [email protected] http://www.goes-r.gov/

Page 2: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 2

GOES-R Operational System Configuration

Page 3: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 3

New Antennas Are Being Built to Receive Increased Volume of Data From GOES-R

WCDAS Facility Upgrades and new 16.4m Antennas

Page 4: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 4

NSOF Facility and Antenna Upgrades

NSOF Antenna Upgrade

Page 5: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 5

RBU Facility Upgrades and new 16.4m Antennas

Page 6: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014

GSP Top-Level ScheduleFY13 FY14 FY15 FY16

Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Current Milestone Deliverable Integration / Test GSP Slack ConstructionPlanned Available Date

Fiscal YearTask #

GOES-R Program Milestones1

GOES-R Ground Segment

DOST

2

GSP SI&T

Core Ground Segment3

RMM Upgrade (RMMU)

Enterprise Infrastructure (EI)

Initial Product Sets (IPS)

MM Flight Ready (MMFR)

Final Product Sets (FPS)

Antenna System4

ESPDS / PDA5

Facility Upgrades - NSOF & WCDAS

8

IT Security A & A11

4/14

MOR

5/14

SIR

6/14

ETE1

9/14

ETE2

12/14

ETE3

4/15

FOR

6/15

ETE4

8/15

ETE5

9/15

ORR

10/15

MRRLPD10/15

Form DOST 8/13 2/14

GSIR

6/15

Pre-DOT

7/15

DOT-1DOT-29/15

5/15

GSIT1

6/15

GSIT2

8/15

GSIT3

7/13

RelMM

RMMU4/14

9/14

EI

11/14

IPS

3/15

HarrisMMFR

4/15

MMFR & FPS Need

9/16

PLU

2/14

Builds Complete

FT & PSR 2/14

PAD4/14

7/14

EB 4.0

1/15

EB 5.0

6/13

BuildsComplete

12/13

FT & PSR

PAD 8/14

11/13

BuildsComplete

5/14

FT & PSR

PAD 10/14

6/14

Builds Complete

9/14

FT & PSR

PAD 3/15

6/14

Builds Complete

9/14

FT & PSR

PAD 3/15

9/13

Phase 1FAT

Phase 2 SIT05/14

Phase 1PAD 5/14

8/14

Phase 2 PAD 7/14

3/15

Phase 3 SIT

Phase 3PAD 5/15

1/14

Inc 1 ORR

5/14

Inc 2 TRR

10/14

5/13

NSOFRMM InstallReadiness

11/13

WCDAS EI Install

Readiness

1/14

NSOFEI Install

Readiness

WCDASConstruction

Comp 2/14

6/14

NSOF Building/ Facility Comp

8/13

RMM Update

12/14

Final A&A

7/15

SARComplete

9/15

ATOGranted

Notes:

CA: Contract Award CDR: Critical Design Review DOT: Data Operational Testing ETE: End to End Test MOR: Mission Operations Review ORR: Operational Readiness Review PDR: Preliminary Design Review PSR: Pre-Ship Review SIR: Systems Integration Review TRR: Test Readiness Review

Critical Path

Page 7: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 7

Core GS Accomplishments

GRB simulators

Release Mission Management at NSOF

SatSim at NSOF SARSAT RF Compat Testing

Page 8: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 8

ABI L2+ Algorithm Implementation Overview

1. Increment Integration: Each L2+ algorithm is implemented separately following descriptions provided in the ATBDs – Software Item Qualification Test (SIQT) is the test event where individual algorithm

requirements are verified2. Build Integration: L2+ algorithms that pass SIQT are integrated in precedence

– Software Build tests (ABIL2, R2ALG) verify that the data can be processed in precedence

• Products are created in NetCDF consistent with product definitions that are documented in the Product Definition and Users’ Guide (PUG)

• Metadata consistent with GOES-R Metadata Model3. Release Integration: Multiple Ground System elements (Mission Management, Product

Generation, Product Distribution and Enterprise Management) are integrated during different Releases.– Releases are deployed at site (NSOF, WCDAS, RBU), verified and handed over to NOAA– Initial Product Set Release includes Cloud & Moisture Imagery product generation and

distribution to AWIPS– Final Product Set Release includes remaining L2+ products (Clouds, Aerosols, Winds,

Radiation, Land, etc.) and distribution to PDA

Page 9: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 9

ABI Algorithm Implementation Status

• ABI Product Generation Algorithms are implemented in a phased manner1. Develop L0→L1b →GRB (completed)2. Develop L0→L1b →GRB →CMI (In work)3. Develop L2+ Science software (completed for all algorithms)4. Operationalize L2+ algorithms – Process in precedence to

meet latency and refresh; create end products to send to externals (PDA, AWIPS)

a) Completed CMI, Air Quality, Soundings, Cloudsb) Hydrology, Aviation, Winds, Land, Ocean and Radiation

Products to be completed in 3/20145. End to End Capabilities to ingest L0 data from Mission

Management to process higher L2+ products (In work)

Page 10: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 10

ABI Product Generation Schedule

• ABI L2+ Products will be in 3 releases:– Initial Product Set Release (9/2014)

• L0→L1b →GRB →CMI (KPP)– Sectorized KPPs to AWIPS– Product Performance and Product Monitoring – End-to-End MM Hardware integration– EM Ground Control

– Final Product Set (3/2015)• All L2+ Products Available at PDA• GRB for all non-ABI instruments

– Post Launch Update (7/2016)• Alternate Scenes and Timelines

Page 11: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014

Product Capability Progression

Software Baseline (Clear Case)

L0 ABI

L1b ABI

L2+ CMIProduct Performance ABIProduct Monitoring ABI

IPS Interim Release

COSI 1.5 (RHEL 6.4)

L0 non-ABI

L1b non-ABI & Qbst / CDRL 80 RevC

L2+ Product Set #1 & #2

Product Performance non-ABIProduct Monitoring non-ABI

FPS Interim Release

COSI 1.5 (RHEL 6.4)

L1b SEISS/MAG & ALTSTProduct Performance ALST

Product Monitoring ALTST

PLU Interim Release

COSI 1.5 (RHEL 6.5)

Product Capability CIsL0 – Level 0 ProcessingL1b – Level 1b ProcessingL2+ - Level 2+ ProcessingPP – Product PerformancePM – Product MonitoringPD – Product DistributionSM – Service ManagementPGIM – PG Infrastructure Mgmt

PRDINCNMFR

CNMNUOPMGS

ABIEEABIL2

ABIL2R2ALG

SEISSSUVI

EXEUVMAGGLM

ABIEEUNABID

SSMPALTST

Product Distribution ABI

Product Distribution non-ABI

Page 12: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 12

Product Capabilities Schedule

IPS Interim Release• L0 / L1b ABI• L2+ CMI• Prod Perf & Prod Mon for ABI & L2

FPS Interim Release• L0 / L1b non-ABI• L1b ABI Q Boost & CDRL 80 Rev C• L2+ Product Set #1 & #2• Prod Perf & Prod Mon

PLU Interim Release• SEISS/MAG Proc in Storage• Alt Scenes & Timelines

Page 13: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 13

Technical Challenges

• Science data provided by AWG with 100% ATBDs was meant to test correct implementation of science– Only CMI data is realistic representation of ABI– Test data for all other products came from SEVIRI/MODIS/GOES-12

• Adequate for science testing one algorithm at a time. – Very good results achieved during science software development (see following

slides for examples)

• Not representative of ABI– Harris has been using WRF simulated data (Triplet) provided by AWG

for testing product precedence• AWG has been helping validate the products• Initial results look promising• There are some known artifacts/issues with metadata, data quality –

Harris has opened Problem Tracking Reports (PTRs) to fix them; ongoing process

Page 14: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 14

Test Output from Integrated System (1 of 2)

Volcanic Ash (height)CMI Band 2 Aerosol Optical Depth

Page 15: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 15

Test Output from Integrated System (2 of 2)

Total Precipitable WaterCloud Top Pressure Cloud Top Temperature

Page 16: 2013 GOES-R AWG 2 nd Validation Workshop 9 - 10 January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.

2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 16

Summary

• Significant progress has been made in implementing ABI product generation capabilities in the ground segment

• All the science software development is completed for ABI L2+ products

• Integration of full product generation capabilities is on track