2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 1
Status of Activities and Plans for the GOES-R Core Ground System
Satya Kalluri Ph.D.GOES-R Program OfficeCode 416, Building 6, Room C200NASA Goddard Space Flight CenterGreenbelt, MD [email protected] http://www.goes-r.gov/
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 2
GOES-R Operational System Configuration
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 3
New Antennas Are Being Built to Receive Increased Volume of Data From GOES-R
WCDAS Facility Upgrades and new 16.4m Antennas
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 4
NSOF Facility and Antenna Upgrades
NSOF Antenna Upgrade
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 5
RBU Facility Upgrades and new 16.4m Antennas
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014
GSP Top-Level ScheduleFY13 FY14 FY15 FY16
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Current Milestone Deliverable Integration / Test GSP Slack ConstructionPlanned Available Date
Fiscal YearTask #
GOES-R Program Milestones1
GOES-R Ground Segment
DOST
2
GSP SI&T
Core Ground Segment3
RMM Upgrade (RMMU)
Enterprise Infrastructure (EI)
Initial Product Sets (IPS)
MM Flight Ready (MMFR)
Final Product Sets (FPS)
Antenna System4
ESPDS / PDA5
Facility Upgrades - NSOF & WCDAS
8
IT Security A & A11
4/14
MOR
5/14
SIR
6/14
ETE1
9/14
ETE2
12/14
ETE3
4/15
FOR
6/15
ETE4
8/15
ETE5
9/15
ORR
10/15
MRRLPD10/15
Form DOST 8/13 2/14
GSIR
6/15
Pre-DOT
7/15
DOT-1DOT-29/15
5/15
GSIT1
6/15
GSIT2
8/15
GSIT3
7/13
RelMM
RMMU4/14
9/14
EI
11/14
IPS
3/15
HarrisMMFR
4/15
MMFR & FPS Need
9/16
PLU
2/14
Builds Complete
FT & PSR 2/14
PAD4/14
7/14
EB 4.0
1/15
EB 5.0
6/13
BuildsComplete
12/13
FT & PSR
PAD 8/14
11/13
BuildsComplete
5/14
FT & PSR
PAD 10/14
6/14
Builds Complete
9/14
FT & PSR
PAD 3/15
6/14
Builds Complete
9/14
FT & PSR
PAD 3/15
9/13
Phase 1FAT
Phase 2 SIT05/14
Phase 1PAD 5/14
8/14
Phase 2 PAD 7/14
3/15
Phase 3 SIT
Phase 3PAD 5/15
1/14
Inc 1 ORR
5/14
Inc 2 TRR
10/14
5/13
NSOFRMM InstallReadiness
11/13
WCDAS EI Install
Readiness
1/14
NSOFEI Install
Readiness
WCDASConstruction
Comp 2/14
6/14
NSOF Building/ Facility Comp
8/13
RMM Update
12/14
Final A&A
7/15
SARComplete
9/15
ATOGranted
Notes:
CA: Contract Award CDR: Critical Design Review DOT: Data Operational Testing ETE: End to End Test MOR: Mission Operations Review ORR: Operational Readiness Review PDR: Preliminary Design Review PSR: Pre-Ship Review SIR: Systems Integration Review TRR: Test Readiness Review
Critical Path
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 7
Core GS Accomplishments
GRB simulators
Release Mission Management at NSOF
SatSim at NSOF SARSAT RF Compat Testing
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 8
ABI L2+ Algorithm Implementation Overview
1. Increment Integration: Each L2+ algorithm is implemented separately following descriptions provided in the ATBDs – Software Item Qualification Test (SIQT) is the test event where individual algorithm
requirements are verified2. Build Integration: L2+ algorithms that pass SIQT are integrated in precedence
– Software Build tests (ABIL2, R2ALG) verify that the data can be processed in precedence
• Products are created in NetCDF consistent with product definitions that are documented in the Product Definition and Users’ Guide (PUG)
• Metadata consistent with GOES-R Metadata Model3. Release Integration: Multiple Ground System elements (Mission Management, Product
Generation, Product Distribution and Enterprise Management) are integrated during different Releases.– Releases are deployed at site (NSOF, WCDAS, RBU), verified and handed over to NOAA– Initial Product Set Release includes Cloud & Moisture Imagery product generation and
distribution to AWIPS– Final Product Set Release includes remaining L2+ products (Clouds, Aerosols, Winds,
Radiation, Land, etc.) and distribution to PDA
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 9
ABI Algorithm Implementation Status
• ABI Product Generation Algorithms are implemented in a phased manner1. Develop L0→L1b →GRB (completed)2. Develop L0→L1b →GRB →CMI (In work)3. Develop L2+ Science software (completed for all algorithms)4. Operationalize L2+ algorithms – Process in precedence to
meet latency and refresh; create end products to send to externals (PDA, AWIPS)
a) Completed CMI, Air Quality, Soundings, Cloudsb) Hydrology, Aviation, Winds, Land, Ocean and Radiation
Products to be completed in 3/20145. End to End Capabilities to ingest L0 data from Mission
Management to process higher L2+ products (In work)
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 10
ABI Product Generation Schedule
• ABI L2+ Products will be in 3 releases:– Initial Product Set Release (9/2014)
• L0→L1b →GRB →CMI (KPP)– Sectorized KPPs to AWIPS– Product Performance and Product Monitoring – End-to-End MM Hardware integration– EM Ground Control
– Final Product Set (3/2015)• All L2+ Products Available at PDA• GRB for all non-ABI instruments
– Post Launch Update (7/2016)• Alternate Scenes and Timelines
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014
Product Capability Progression
Software Baseline (Clear Case)
L0 ABI
L1b ABI
L2+ CMIProduct Performance ABIProduct Monitoring ABI
IPS Interim Release
COSI 1.5 (RHEL 6.4)
L0 non-ABI
L1b non-ABI & Qbst / CDRL 80 RevC
L2+ Product Set #1 & #2
Product Performance non-ABIProduct Monitoring non-ABI
FPS Interim Release
COSI 1.5 (RHEL 6.4)
L1b SEISS/MAG & ALTSTProduct Performance ALST
Product Monitoring ALTST
PLU Interim Release
COSI 1.5 (RHEL 6.5)
Product Capability CIsL0 – Level 0 ProcessingL1b – Level 1b ProcessingL2+ - Level 2+ ProcessingPP – Product PerformancePM – Product MonitoringPD – Product DistributionSM – Service ManagementPGIM – PG Infrastructure Mgmt
PRDINCNMFR
CNMNUOPMGS
ABIEEABIL2
ABIL2R2ALG
SEISSSUVI
EXEUVMAGGLM
ABIEEUNABID
SSMPALTST
Product Distribution ABI
Product Distribution non-ABI
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 12
Product Capabilities Schedule
IPS Interim Release• L0 / L1b ABI• L2+ CMI• Prod Perf & Prod Mon for ABI & L2
FPS Interim Release• L0 / L1b non-ABI• L1b ABI Q Boost & CDRL 80 Rev C• L2+ Product Set #1 & #2• Prod Perf & Prod Mon
PLU Interim Release• SEISS/MAG Proc in Storage• Alt Scenes & Timelines
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 13
Technical Challenges
• Science data provided by AWG with 100% ATBDs was meant to test correct implementation of science– Only CMI data is realistic representation of ABI– Test data for all other products came from SEVIRI/MODIS/GOES-12
• Adequate for science testing one algorithm at a time. – Very good results achieved during science software development (see following
slides for examples)
• Not representative of ABI– Harris has been using WRF simulated data (Triplet) provided by AWG
for testing product precedence• AWG has been helping validate the products• Initial results look promising• There are some known artifacts/issues with metadata, data quality –
Harris has opened Problem Tracking Reports (PTRs) to fix them; ongoing process
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 14
Test Output from Integrated System (1 of 2)
Volcanic Ash (height)CMI Band 2 Aerosol Optical Depth
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 15
Test Output from Integrated System (2 of 2)
Total Precipitable WaterCloud Top Pressure Cloud Top Temperature
2013 GOES-R AWG 2nd Validation Workshop 9 - 10 January 2014 16
Summary
• Significant progress has been made in implementing ABI product generation capabilities in the ground segment
• All the science software development is completed for ABI L2+ products
• Integration of full product generation capabilities is on track