2013 ECWRPC Work Program

120
East Central Wisconsin Regional Planning Commission 2013 WORK PROGRAM & BUDGET An Economic Development District and Metropolitan Planning Organization. Serving the Region Member Counties: Calumet, Menominee, Outagamie, Shawano, Waupaca, Waushara, and Winnebago MPOs: Fond du Lac, Fox Cities (Appleton), and Oshkosh

description

 

Transcript of 2013 ECWRPC Work Program

Page 1: 2013 ECWRPC Work Program

East Central Wisconsin Regional Planning Commission

2013 WORK PROGRAM & BUDGET

An Economic Development District and Metropolitan Planning Organization. Serving the Region

Member Counties: Calumet, Menominee, Outagamie, Shawano, Waupaca, Waushara, and Winnebago

MPOs: Fond du Lac, Fox Cities (Appleton), and Oshkosh

Page 2: 2013 ECWRPC Work Program

2013 WORK PROGRAM & BUDGET

Prepared for the

EAST CENTRAL WISCONSIN REGIONAL PLANNING COMMISSION

by

EAST CENTRAL PLANNING STAFF

January, 2013

The East Central Wisconsin Regional Planning Commission's CY 2013 planning program is supported by federal and state assistance. Specific funding for this report was provided by the Economic Development Administration, Environmental Protection Agency, the Federal Highway Administration, the Federal Transit Administration, the Wisconsin Department of Transportation and the Wisconsin Department of Natural Resources.

Page 3: 2013 ECWRPC Work Program

ABSTRACT TITLE: 2013 ANNUAL WORK PROGRAM & BUDGET AUTHOR: East Central Planning Staff SUBJECT: The ECWRPC work program with budget and staffing requirements; programming of all transportation

planning projects in the East Central Region; description of the multi-year framework within which the work program is to be accomplished.

DATE: January, 2013 PLANNING AGENCY: East Central Wisconsin Regional Planning Commission SOURCE OF COPIES: East Central Wisconsin Regional Planning Commission

400 Ahnaip Street, Suite 100 Menasha, WI 54952 www.eastcentralrpc.org

This document outlines the work efforts of the East Central Wisconsin Regional Planning Commission for the next year. The document also includes the transportation planning studies that will be undertaken in the East Central Region by the Wisconsin Department of Transportation, local communities, or consultants to them. The Annual Work Program provides the basis for setting the annual commission budget and dues levy and for adopting an annual staffing plan. The work program serves as the basis for funding assistance applications from various federal and state agencies. Funding shares are identified for individual work items taking into account assistance eligibility, sharing formulas and the total grant amount available. Through cooperative review by the FHWA, WisDOT and related state agencies, this work program is accepted by all participating agencies.

i

Page 4: 2013 ECWRPC Work Program

TABLE OF CONTENTS

I. Introduction & Prospectus Introduction & Prospectus ..................................................................................................... 1 Purpose of the Annual Work Program ..................................................................................... 2 Planning Program Overview ................................................................................................... 9 Summary of Cost Sharing ....................................................................................................... 9 II. Summary of Budget & Work Program Proposed 2012 Staffing Plan ................................................................................................. 11 2013 Salary Adjustments ...................................................................................................... 12 2013 Health Insurance Costs ................................................................................................ 12 Setting the 2013 Tax Levy .................................................................................................... 12 Revenue Assumptions .......................................................................................................... 15 Expenditures Summary......................................................................................................... 16 Summary of Work Element Allocations ................................................................................... 16 III. Work Program Descriptions 1100 Regional Comprehensive Plan ....................................................................................... 19 1200 Community Facilities .................................................................................................... 23 1300 Transportation ............................................................................................................ 27 1400 Agriculture, Open Space, Culture & Recreation ............................................................... 48 1500 Economic Development ................................................................................................ 54 1600 Environmental Management ......................................................................................... 60 1700 Land Use & Housing .................................................................................................... 66 2000 Local Assistance & Contract Services ............................................................................. 71 3000 Geographic Information Systems .................................................................................. 75 5000 Administration & Fringe Benefits ................................................................................... 77 6000 Overhead .................................................................................................................... 82 III. Appendices

Appendix A – Work Program & Budget Resolution Appendix B - ECWRPC By-Laws Provisions for Standing Committees

Appendix C - Membership Rosters of ECWRPC Advisory Committees Appendix D - Affirmative Action Resolution Appendix E - Cost Allocation Plan Appendix F - Long Range Transportation Plan Schedules Appendix G - Other Supporting Documents

Page 5: 2013 ECWRPC Work Program

Exhibits Exhibit 1 - Map of East Central Region ........................................................................................... 3 Exhibit 2 - Map of RPCs and MPOs ................................................................................................. 5 Exhibit 3 - Table of Organization (Commissioners) ........................................................................... 7 Exhibit 4 - Table of Organization (Staff) .......................................................................................... 8 Exhibit 5 - 2013 Health Insurance Costs ....................................................................................... 13 Exhibit 6 - Approved ECWRPC 2013 Levy & Rate History ................................................................ 14 Exhibit 7 - Projected Grant & Program Revenue ............................................................................. 15 Exhibit 8 - 2013 ECWRPC Budget Summary .................................................................................. 17 Exhibit 9 - 2013 ECWRPC Overhead Budget .................................................................................. 18

Page 6: 2013 ECWRPC Work Program

FOX CITIESMETROPOLITAN PLANNING

ORGANIZATIONPLANNING AREAS

Source: Calumet, Outagamie, and Winnebago Counties provided the 2007 centerline, municipality boundaries, hydrology, and railroad data. WisDOT and ECWRPC provided the 2000 metropolitan planning and adjusted urbanized areas.

Prepared ByEAST CENTRAL WISCONSIN

REGIONAL PLANNING COMMISSION-MARCH 2008

This data was created for use by the East Central Wisconsin Regional PlanningCommission Geographic Information System. Any other use/application of thisinformation is the responsibility of the user and such use/application is at theirown risk. East Central Wisconsin Regional Planning Commission disclaims allliability regarding fitness of the information for any use other than for EastCentral Wisconsin Regional Planning Commission business.

4

Map 1

R

CP

CW

E

STH

76

COUNTY RD G

WIOW

ASH

TRAIL

CTH S

CTH GG

CTH

T OAK S

T

CTH JJ TULL

AR R

D

S PAR

K AVE

RACI

NE R

D

COUNTY RD CB COLD

SPR

ING

RD

USH 41

N LAKE ST

BREEZEWOOD LN

E SHADY LN

9TH ST

TAYC

O ST

W BELL ST

AMERICAN DR

LAKE ST

JACO

BSEN

RD

CTH II

E WISCONSIN AVE

NORTH ST

CECIL

ST

KEYES ST

OAKRIDGE RD

NICOLET BLVD

3RD

ST

CTH

T

STH

76

USH 4

1

CTH II

USH 10

WIOWASH TRAIL

USH

41

BAYV

IEW

RD

CTH II

CTH E

USH 41

STH

47

STH 96

CTH O

CTH

N

CTH JJ

CTH OO

CTH BB

MEAD

E ST

CTH

CBCTH Z

CTH MM

CTH ZZ

CTH CA

CTH GV

CTH

CC

CTH CE

PROSPECT AV

STH 125

EVERGREEN DR

USH

441

10 ST

BLU

MND

DR

DREW

ST

SPENCER ST

WIS AV

CASA

LOMA

DR

CAPITOL DR

CTH AA

COLLEGE AV

KIMBERLY AVBADGER AV CTH

K

LAWE S

TST

H 96

PERK

INS

ST

CTH

HH

GILL

ETT S

T

3 ST

PROSPECT ST

CTH J

EMONS RD

MASO

N ST

FREMONT ST

MAYF

LOW

ER D

R

NEWBERRY ST

BUCH

ANAN

RD

THIRD ST

PERSHING ST

FREN

CH R

D

KENNEDY AV

SOUTH RIVER ST

PACIFIC STWALLACE ST

RIVERSIDE DR

LINWO

OD AV

GERT

RUDE

ST

APPLE

CREEK RD

JACKMAN STWEST

HILL

BLVD

CTH

U

CTH JJ

USH

441

USH 4

1

CTH A

CTH

EE

CAPITOL DR

CTH

J

MAYF

LOW

ER D

R

STH

55

STH 15

CTH CE

STH

76

CTH

A

USH 41

CTH

BB

USH 10

CTH KK

CTH B

STH 55

CTH

N

STH

57

STH 114

CTH

D

CTH

LP MANITOWOC RD

MILITARY R

D

CTH S

S ONE

IDA S

T

CTH EE

N MI

LITAR

Y RD

STAT

E PAR

K RD

E PLANK RD

MIDWAY RDUSH 441

E MIDWAY RD

S CARPENTER ST

STH

57

STH

55

W MAIN ST

STH 114

STH 114

Town of Vinland

Town ofClayton

Town ofNeenah

City ofMenasha

Town ofMenasha

Town ofGreenville

Town ofEllington

Town ofGrand Chute

Town ofCenter

Town of Freedom

City ofAppleton

Town ofVandenbroek

Town ofKaukauna

Town ofBuchanan

Village ofLittle Chute

Village ofKimberlyVillage of

Combined Locks

City ofKaukauna

LakeWinnebago

LittleLake

Buttedes

Morts

FoxRiv

er

City ofNeenah

OUTAGAMIE COUNTYWINNEBAGO COUNTY

OUTAGAMIE COUNTYCALUMET COUNTY

Town ofHarrison

Village ofSherwood

Town ofStockbridge

Town ofWoodville

Town ofChilton

Village ofHilbert

2000 METROPOLITAN PLANNING AREA

2000 ADJUSTED URBANIZED AREA

MUNICIPALITY BOUNDARIES

0 1 20.5Scale in Miles

Document Path: P:\13xx-Transportation Planning\2006\FXUpdatedLRPMaps\Projects\FX_PlanningArea.mxd

Page 7: 2013 ECWRPC Work Program

OSHKOSHMETROPOLITAN PLANNING

ORGANIZATIONPLANNING AREAS

Source: Winnebago County provided the 2007 centerline, municipality boundaries, hydrology, and railroad data. WisDOT and ECWRPC provided the 2000 metropolitan planning and adjusted urbanized areas.

Prepared ByEAST CENTRAL WISCONSIN

REGIONAL PLANNING COMMISSION-FEBRUARY

This data was created for use by the East Central Wisconsin Regional PlanningCommission Geographic Information System. Any other use/application of thisinformation is the responsibility of the user and such use/application is at theirown risk. East Central Wisconsin Regional Planning Commission disclaims allliability regarding fitness of the information for any use other than for EastCentral Wisconsin Regional Planning Commission business.

4

Map 2

R

CP

CW

E

STATE RD 91

STATE RD 44

CTH S

COUN

TY R

D A

COUNTY RD E

US H

WY 4

1 SOU

THBO

UND

JACK

SON

ST

S US HWY 45

COUNTY RD M

E RIVE

R DR

COUN

TY R

D Z

STAT

E RD 2

6

WITZEL AVE

E MAIN ST

STAT

E RD

175

OREG

ON ST

N MA

IN S

T

W 20TH AVE

ALGOMA BLVD

9TH ST RD

S MAIN ST

W 9TH AVE

BOWE

N ST

OHIO

ST

HIGH AVE

VINLA

ND S

T

S WAS

HBUR

N ST

FISK AVE

W COUNTY RD Y

COUN

TY R

D FF

HAZE

L ST

W SNELL RD

USH 41

OMRO RD

COUNTY RD N

W SOUTH PARK AVE

POBEREZNY RD

REIG

HMOO

R RD

CLAI

RVILL

E RD

CTH T

S KOE

LLER

ST

N SA

WYE

R ST

N KOELLER ST

FOND DU LAC RD

S OAKWOOD RD

E MURDOCK AVE

LEON

ARD

POIN

T RD

PEARL AVE

N CAMPBELL RD

E COUNTY RD Y

OSHK

OSH A

VE

CTH

T

STAT

E RD

116

BOWE

N ST

US H

WY 4

1 NOR

THBO

UND

COUN

TY R

D FF

S US HWY 45

COUNTY RD K

OREG

ON ST

STATE RD 21

LEONARD POINT RD

LakeWinnebago

Lake Butte

desMorts

City ofOshkosh

Village of Winneconne

Town of Winneconne

Town ofOshkosh

Town ofBlack Wolf

City ofOmro

Town ofUtica

Town ofNekimi

Town ofOmro

2000 ADJUSTED URBANIZED AREA

2000 METROPOLITAN PLANNING AREA

MUNICIPALITY BOUNDARIES

0 1 20.5Scale in Miles

Document Path: P:\13xx-Transportation Planning\2006\OSUpdatedLRPMaps\Projects\Oshkosh_PlanningArea.mxd

Page 8: 2013 ECWRPC Work Program

City ofFond du Lac

Town ofEldorado

Town ofFriendship

Town ofLamartine

Village ofNorth Fond du Lac

Village ofOakfield

Town ofOakfield

Town ofFond du Lac

Town ofByron

Town ofEden

Town ofOsceola

Town ofForest

Town ofEmpire

Town of Taycheedah

Town ofCalumet

Town ofMarshfield

Village ofMt. Calvary

Village ofEden

LakeWinnebago

USH 41

CTH F

STH 23

CTH

K

USH 45

CTH N

CTH H

CTH D

CTH

Y

CTH B

CTH T

PARK

USH 1

51

STH

175

CTH

UU

CTH I

PIONE

ER

9th

CTH Q

CTH OO

CTH OOO

CTH CCC

CTH

W

CTH V

KINKER

CTH TC

CTH QQ

ROLLING MEADOWS

FOREST

STH 149

NATIO

NAL

SEYM

OUR

HICK

ORY

4th

MINNESOTA

CTH

WW

PETE

RS

BROO

KE

MART

IN

MAIN

CTH AS

ARNDT

LUCO

HWY 151

USH 45-175

GOLF COURSE

CTH H

CTH Q

CTH K

CTH W

4th

CTH V

STH 23

HICKO

RY

USH 15

1

USH 45

CTH Q

CTH W

CTH T

STH 149

USH 45

STH 149

STH

175

CTH

W

USH 1

51

STH 149

CTH F

CTH Q

CTH B

USH 151

STH

175

USH 45

4th

CTH

Y

CTH B

CTH T CTH T

CTH

UU

USH

45

STH 23USH 15

1

STH

149

CTH D

CTH

Y

CTH

K

CTH

UU

CTH

V

CTH

Y

PIONEER

CTH

T

USH 151

CTH

W

USH 45

CTH W

FOND DU LACMETROPOLITAN PLANNING

ORGANIZATION PLANNING AREAS

Source: WisDOT and ECWRPC provided the 2000 MPO and adjusted urbanized areas. Fond du Lac County provided 2007

centerline, hydrology, and municipality boundaries.

Prepared ByEAST CENTRAL WISCONSIN

REGIONAL PLANNING COMMISSION-FEBRUARY 2008

This data was created for use by the East Central Wisconsin Regional PlanningCommission Geographic Information System. Any other use/application of thisinformation is the responsibility of the user and such use/application is at theirown risk. East Central Wisconsin Regional Planning Commission disclaims allliability regarding fitness of the information for any use other than for EastCentral Wisconsin Regional Planning Commission business.

4

Map 3

2 0 21Scale in Miles

R

CP

CW

E

2000 ADJUSTED URBANIZED AREA

2000 METROPOLITAN PLANNING AREA

MUNICIPALITY BOUNDARIES

Document Path: P:\13xx-Transportation Planning\2006\FDLUpdatedLRPMaps\Projects\FD_PlanningArea.mxd

Page 9: 2013 ECWRPC Work Program

FOND DU LAC AREA METROPOLITAN PLANNING ORGANIZATION (MPO)

POLICY BOARD

VOTING MEMBERS:

Allen Buechel, Chair – Fond du Lac County Wayne Rollin, Vice Chair – City of Fond du Lac

Joe Moore, – City of Fond du Lac Rick Gudex – City of Fond du Lac

Rob Vande Zande – City of Fond du Lac Jordan Skiff – City of Fond du Lac Tom Janke – Fond du Lac County

Chuck Hornung – Village of North Fond du Lac James Pierquet – Town of Empire (representing all towns)

Matt Halada – WisDOT, Northeast Region

NON-VOTING MEMBERS:

Sam Tobias (Alternate) – Fond du Lac County Jill Michaelson, (Alternate) – WisDOT, Northeast Region

Mary Robb – WisDOT, Central Office Alexis Kuklenski – FHWA Dwight McComb – FHWA

Nick Leonard, (Alternate) – Village of North Fond du Lac Walt Raith – East Central Wisconsin Regional Planning Commission

Page 10: 2013 ECWRPC Work Program

PART I – INTRODUCTION AND PROSPECTUS

Page 11: 2013 ECWRPC Work Program

1

INTRODUCTION & PROSPECTUS The Annual Work Program schedules the East Central Wisconsin Regional Planning Commission's work activities for the next year and discusses the general framework for planning. It contains three major sections: a prospectus which contains a general description of the agency's activities; a summary of the 2013 budget and work program elements, and; a specific annual work program which describes details of the work activity, budget and staffing requirements for 2013. The document describes the organizational arrangements, roles and responsibilities of the various agencies involved in the planning process and the decision making process used to prepare, implement and periodically reevaluate the policy and action recommendations. It describes the approach used in developing planning work programs and the management of the planning process. It also addresses the specific requirements of the various federal and state grant programs and outlines how they will be achieved through the scheduled work activities. The annual work program statement of work activities includes: (1) A brief description of the overall work activity objective; (2) A description of the technical procedures and activities involved in accomplishing the work; (3) The estimated cost and source of funds. (4) The manpower required and the planning organizations that will perform the work. East Central was created as a regional planning commission by Executive Order No. 41, issued by Governor Patrick J. Lucey and dated June 29, 1972. This action was taken following the submittal of petitions by the ten counties within the East Central region pursuant to SS. 66.945, the existing regional planning enabling statute. The East Central RPC was preceded by two areawide planning agencies: the Fox Valley Council of Governments (FVCOG) which was formed in 1956 and composed of fifteen governmental units in the Appleton-Neenah and Oshkosh urbanized areas; and the Northeastern Wisconsin Regional Planning Commission (NEWRPC), formed in 1962 and composed of nine counties encompassing the Wolf River Basin. With the issuance of HUD's APO and APJ certification requirements in July, 1970, these two agencies were dissolved and replaced by East Central, which was roughly aligned with proposed uniform state administrative districts. The three northernmost counties of NEWRPC were dropped from the region and Calumet, Fond du Lac, Green Lake and Marquette counties were added on the south. Calumet and Fond du Lac counties had ongoing county planning programs prior to their affiliation with East Central. The existence of different state agency configurations at the time various regional planning agencies were formed, coupled with the fact that the Governor did not adhere to the districting configuration when forming East Central, has resulted in the significant overlapping of jurisdictions. In the past, the East Central region coordinated its planning program through memoranda of agreement with up to three criminal justice planning regions (now a statewide function), two health planning districts (now defunct), three manpower planning districts (now four), two area agencies on aging (now one), two rural conservation and development districts, two community action programs (now three), one water quality management planning area (now defunct), the Wisconsin Rural Housing Cooperative and the State Clearinghouse. Additionally East Central coordinated with three district transportation offices (now two regional offices) and two district natural resource offices. There are varying degrees of formal planning at the local level. County planning is staffed in Calumet and Fond du Lac counties as previously mentioned, and in Green Lake, Shawano, Outagamie and Winnebago counties. The cities of Appleton, Fond du Lac, Kaukauna, Menasha, Neenah, and Oshkosh, and the towns of Menasha and Grand Chute have planning staff. Numerous other communities have contracted with consultants for the preparation of comprehensive development plans.

Page 12: 2013 ECWRPC Work Program

2

Basic rationale for the East Central Region as a geographic planning region is twofold. First, the Appleton-Oshkosh-Neenah MSA (metropolitan statistical area including Calumet, Outagamie and Winnebago counties) is a geographic unit that cannot be split. This area has mandatory planning requirements for various federal funding programs above and beyond those for other areas. Exhibits 1 and 2 contain a map of the East Central Region and the four counties containing urban planning areas. Fond du Lac County has been designated an urbanized area effective May 2002. The Metropolitan Planning Organization (MPO) designation was made by the Governor of Wisconsin in December, 2002. The Fox Cities, Oshkosh and Fond du Lac urban areas thus serve as the focus for regional planning in this four county area, along with the urban water quality focus of the Winnebago pool and the lower Fox River. To the west and north, Green Lake, Marquette, Waushara, Waupaca, Shawano and Menominee counties share a common rural character while having a general orientation to the urban counties as trade and employment centers. However, as one goes to the extremes of the rural counties, these ties fade, or are shifted outside the region. The basic orientation for planning in the East Central region recognizes both the diversity and commonality, and tailors program activities accordingly. However, the overall planning framework is consistent throughout the region. PURPOSE OF THE ANNUAL WORK PROGRAM Within the statutory provisions of SS. 66.0309 (previously SS. 66.945), East Central's stated purpose is the "function and duty of making (preparing) and adopting a master (comprehensive) plan for the physical development of the region." To carry out this responsibility the Commission retains staff and annually programs work activities and budgets. Staffing and budget are based on the work activities scheduled within the constraints of available revenue. This basic enabling statute is complemented by the new comprehensive planning law (Smart Growth) ss. 66.1001 that specifies the content of the regional comprehensive plan. The annual work program is a one year statement which itemizes work to be performed. For each program element (e.g. transportation work element), work objectives, work activities and methodology are listed, any previous work is identified, and products resulting from the proposed work and their anticipated impacts are identified. The funding for East Central or another agency's work is identified by source for 2013 and person-days of professional and technical support are also identified. If subcategories are included under a program element or a major work element, a summary of the funding source and person-days is given in table form. Each year, the previous work program and budget is evaluated and a new annual work program is drafted. Exhibits 3 and 4 contain information on the current structure of the Commission and staffing as they relate to the various work program elements.

Page 13: 2013 ECWRPC Work Program

Prepared April, 2012 By:

East Central Wisconsin Regional Planning Commission400 Ahnaip Street Suite 100 Menasha, Wisconsin 54952

This data was created for use by the East Central Wisconsin Regional Planning Commission Geographic Information System. Any other use/application of this information is the responsibility of the user and such use/application is at their own risk. East Central Wisconsin Regional Planning Commission disclaims all liability regarding fitness of the information for any use other than forEast Central Wisconsin Regional Planning Commission business.

Member County information provided by ECWRPC 2010.Base map data provided by the Regional counties andDNR Wiscland data.

Legend

Sources:

MEN OM IN EE

ONE ID A

LIN D

IO LA

EDEN

LEON

RO SE

ALTO

PELLA

HARRISO N

OM RO

OASIS

UTICA

DALE

RIPON

MAINE

BUFFAL O

UNION

BYRO N

CH ARLES-TOW N

GRANT

STOCK-BRID GE

CICERO

LESSOR

FO REST

ANIWA

SENECA

ALMO N

CALU MET

CEN TER

MO RRIS

BOV IN A

BROO KLYN

DAY TON

AUBURN

SENECABERLIN

OXFO RD

DUPO NT

MARION

MUKW A

POYG ANPOYSIPPI

HARRIS

AURORA

NEW TON

EMPIRE

HERMAN

WAUPUN

DAKO TA

GREEN LAKE

OSCEOLA

NEKIMI

CO LOM A

VIN LAND

CLAY TO N

LIB ERT Y

LEBAN ON

SHIELDS

MECAN

ASHFORD

FREEDO M

HELVET IA

OAKFIE LD

WARREN

CH ILT ON

BRILLION

WYO M IN G

ANG ELICA

BROT HERTO WN

MET OM EN

HARRISO N

SAXEVILLE

HAN CO CK RAN TO UL

ST. M ARIE

BARTELM E

HUT CH IN S

RICHFORD

BLACK WO LF

MAT TESO N

MARQU ETTE

LARRAB EE

HARTLAN D

RO YALT ON

DEERFIELD

RUSH FORD

MO NTEL LO

NAVARINO

ELDO RAD O

WESCOT T

FAIRBAN KS

WAUT OM A

SEYM OUR

WAUPACA

WO LF RIVER

PRINCET ON

LAMART IN E

GERMAIN IA

BEAR CREEK

ELLIN GT ON

NEPEUSKUN

RICHM ON D

RO SEND ALE

DOU GLAS MACKFORD

PACK WAUK EE

FRIEND -SHIP

DEER CREEK

PLAIN FIELD

BELLE PLAIN E

GREENVILLE

WASH IN GT ON

SPRING VALE

LIT TLE WO LF

WINCHEST ER

RED SPRING S

BLOO M-FIELD

WITTEN BERG

MARSHFIELD

KIN GST ON

WO OD -VILLE

WAUKECH ON

SPRING -FIELD

BLACK CREEK

WEST FIELD

TAYCH EEDAH

FARM IN GT ON

MAN CH ESTER

WINN ECO NN E

ST. LAW RENCE

MAPLE GROVE

CRYST AL LAKE

SCAN DINA VIA

GREEN VALLEY

SPRING -WAT ER

CALED ON IA

NEWHOL STEIN

MO UNTMO RRIS

FREM ON T

BIRN AMW O OD

Nee nah

OSBO RN

NESH KORO

GRAND CH UTE

HORT ON IA

MO UND VILLE

WEY AUWEG A

MAPLECREEK

BUCHAN AN

KAUK

AUNA

Appleton

ALGO MA

FO ND D U LAC

MEN ASHA

NEEN AH

Berlin

VAND ENB RO EK

Rip on

Shawa no

Omro

Iola

Kaukauna

Chi lton

Eland

Little Chute

Aniwa

Cli ntonvi lle

Ce cil

Bri llion

Seymour

Marion

NewLondon

Stockbridge

Sherw ood

Neshkoro

Markesa n

Kimberly

Hortonville

Montel lo

Bonduel

Mana wa

Re dgranit e

Shioct on

Birnamwood

Mat toon

Waut oma

Waupun

Kingst on

Prince ton

New H olstein

Winne conne

West fie ld

Bowle r

Oxford

Fremont

Hilbe rt

Gresham

Wil d Rose

Coloma

Plainfiel d

Lohrvi lle

Hancock

Wit tenberg

Emba rrass

Nichols

Oakfiel d

St.Cloud

Weyauw ega

Rosenda le

Berlin

NorthFond du La c

Combined Locks

Bea rCreek

BlackCreek

Kiel

OgdensburgSca ndinavia

Pott er

Fai rw ate r

Endeavor Eden

Marquet te Bra ndon

MountCa lva ry

Mena sha

Ca mpbe llsport

BigFal ls

OSH KOSH

Oshkosh

GreenLake

Fond du La c

Lake Winneb ago

Lake P oygan

Green Lake

Shawano Lake

Lake But te

Des M orts

LakePuckawa y

RushLake

Fox R iver

Whi t e Lake

Par tr i dge Lake

Lake M ari a

Long Lake

Lit t le LakeBut te Des Mo rt s

Sil ver Lake

Lit t le Green Lake

Irogam i Lake

Grand Lake

Bear Lake

LakeMon tel lo

Mason Lake

Fish Lake

Mul l et Lake

Lawrence Lake

Ci ncoe La ke

Mi l l Pond

Harr is Pond

Tutt l e Lake

Weyauw egaLake

Hi ll s L ake

Ket tl e M orai ne L ake

Par tr i dgeCrop Lake

Upper Red Lake

Crys tal L ake

Pear l Lake

Rat Ri ver

Plea san t Lake

Auburn Lake

Round Lake

LakeDeN eveu

Spr ing Lake

Big Tw in Lake

Whi t e Ri verFlo wage

Bla ck O tt er Lake

LakeMau the

Cur t is Lake

Bear C reek

Arrowhead Ri ver

Shioc Ri ver

Lucky La ke

Chai n ' O Lakes

Lit t le Twi n Lake

Flyn n Lake

Crooked Lake

Cedar Creek

Bla ck Creek

Emeral d Lake

Ja ckson Lake

Lake V irgi nia

Duck Creek

Ald er Creek

Lake Win neconne

Wau ka u C reek

Pum pkinseed Creek

But ler Lake

Fox R iver

Legend L akes

Lake Winneb ago

Lake P oygan

Green Lake

Shawano Lake

Lake But te

Des M orts

LakePuckawa y

RushLake

Fox R iver

Whi t e Lake

Par tr i dge Lake

Lake M ari a

Long Lake

Lit t le LakeBut te Des Mo rt s

Sil ver Lake

Lit t le Green Lake

Irogam i Lake

Grand Lake

Bear Lake

LakeMon tel lo

Mason Lake

Fish Lake

Mul l et Lake

Lawrence Lake

Ci ncoe La ke

Mi l l Pond

Harr is Pond

Tutt l e Lake

Weyauw egaLake

Hi ll s L ake

Ket tl e M orai ne L ake

Par tr i dgeCrop Lake

Upper Red Lake

Crys tal L ake

Pear l Lake

Rat Ri ver

Plea san t Lake

Auburn Lake

Round Lake

LakeDeN eveu

Spr ing Lake

Big Tw in Lake

Whi t e Ri verFlo wage

Bla ck O tt er Lake

LakeMau the

Cur t is Lake

Bear C reek

Arrowhead Ri ver

Shioc Ri ver

Lucky La ke

Chai n ' O Lakes

Lit t le Twi n Lake

Flyn n Lake

Crooked Lake

Cedar Creek

Bla ck Creek

Emeral d Lake

Ja ckson Lake

Lake V irgi nia

Duck Creek

Ald er Creek

Lake Win neconne

Wau ka u C reek

Pum pkinseed Creek

But ler Lake

Fox R iver

Legend L akes

Wol f R iver

Wol f R iver

Bay Lake RPC

SoutheasternRPC

No RPCDesignation

North Central RPC

Marathon

Oconto

Dodge

Portage

Adams

Langlade

Brown

Columbia

Manitowoc

Sheboygan

Washington

(with adjacent Regional Planning Commissions[RPCs] and Member

Counties 2012)

Exhibit 1East Central Region

Surrounding County

Member County \ Municipality 2012Non-Member County \ Municipality 2012

:10 0 105

Scale in Miles

Surrounding RPC

Page 14: 2013 ECWRPC Work Program

Source: Base data provided by the WIDNR, MPO & RPC data provided by the WisDOT.

Exhibit 2Wisconsin RPCs and MPOs

This data was created for use by the East Central Wisconsin Regional PlanningCommission Geographic Information System. Any other use/application of thisinformation is the responsibility of the user and such use/application is at theirown risk. East Central Wisconsin Regional Planning Commission disclaims allliability regarding fitness of the information for any use other than forEast Central Wisconsin Regional Planning Commission business.

KenoshaLafayette Rock WalworthGreen

Racine

Jefferson WaukeshaIowa

Milw

auke

e

Grant

Dane

Crawford

Richland Washington

OzaukeeDodgeSauk

ColumbiaVernon

SheboyganFond du

LacMarquette Green

Lake

LaCrosse

Monroe

Waushara

Adams

Juneau

Winnebago

Calumet Manitowoc

Outagamie

Jackson

Trempealeau

Buffalo Wood WaupacaPortage Brown

Pepin Kewaunee

EauClairePierce

ShawanoClark

Marathon

MenomineeDunn

St Croix Chippewa

Door

Taylor

Oconto

LangladeLincoln

RuskBarronPolk

Marinette

OneidaPrice

Florence

Forest

SawyerWashburnBurnett

Vilas

IronAshland

Douglas

Bayfield

SouthwesternWisconsin RPC

West CentralWisconsin RPC

Southeastern WisconsinRPC & MPO

NorthWestRPC

North CentralWisconsin RPC

MississippiRiver RPC

East CentralWisconsin RPC

CapitalRPC

Bay-Lake RPC

Fox CitiesMPO

BeloitDubuque

SuperiorMPO

Eau ClaireMPO

Fond du Lac MPO

Green BayMPO

Janesville

La CrosseMPO

Oshkosh MPOSheboygan

MPO

Madison AreaMPO

Wausau MPO

25 0 2512.5Miles

tn d:\AnnualReport08/mxds_data/StateMPRPCMap_Exhibit12.mxd

R

CP

CW

E

Metropolitan Planning Organizations

Prepared April, 2008 By:

East Central Wisconsin RegionalPlanning Commission400 Ahnaip Street, Suite 100Menasha, Wisconsin 54952

Page 15: 2013 ECWRPC Work Program

7

EXHIBIT 3

EAST CENTRAL WISCONSIN REGIONAL PLANNING COMMISSION (FOX CITIES AND OSHKOSH MPO POLICY BOARD)

2013 COMMISSION MEMBERS

Robert Hermes, Chair Donna Kalata, Vice-Chair

Eric Fowle, Secretary-Treasurer

CALUMET COUNTY WAUPACA COUNTY Bill Barribeau Dick Koeppen Patrick Laughrin Gary Barrington Merlin Gentz DuWayne Federwitz Brian Smith MENOMINEE COUNTY WAUSHARA COUNTY Elizabeth Moses Donna Kalata (Alt. Jeremy Johnson) Larry Timm Ruth Winter Neal Strehlow Robert Hermes OUTAGAMIE COUNTY WINNEBAGO COUNTY Thomas Nelson Mark Harris Judy Schuette (Peter Stueck, Alt) David Albrecht Paul Hirte Ernie Bellin Tim Hanna Burk Tower, (Mark Rohloff, Perm. Alt.) Carl Anthony Jim Erdman Kevin Sturn Ken Robl SHAWANO COUNTY Jerry Erdmann Ken Capelle

Marshal Giese

Page 16: 2013 ECWRPC Work Program

8

EXHIBIT 4

2013 East Central Staffing

Page 17: 2013 ECWRPC Work Program

9

PLANNING PROGRAM OVERVIEW East Central’s focus, in accordance with s.66.0309, s.66.1001 and s.16.965, Wis. Stats, is on comprehensive planning. Under the umbrella of comprehensive planning there are a number of distinct, but interrelated, planning programs. These are regional comprehensive planning, transportation planning, community facilities planning, economic development planning and open space and environmental management planning. All the programs are focused on comprehensive planning in that they emphasize land use interrelationships and take into account the environment, the economy and the community. Each of these program elements receives direction from the regional comprehensive plan (regional goals and objectives) and provides feedback to it (objectives, policies, standards and strategies). In addition to the comprehensive program elements, other planning programs address current (local) planning, information systems, and administration respectively. SUMMARY OF COST SHARING The East Central Wisconsin Regional Planning Commission receives funds to support the transportation planning program from FHWA, FTA and WisDOT; the economic development program from EDA; and, the sewer service area program and aquatic invasive species coordinator program from WDNR. The funds are allocated among each work element on the basis of the relative benefits to be derived by each funding agency's program, grant program eligibility requirements, and federal and state cost sharing formulas. The NR-135 Non-Metallic Mining Reclamation Program is funded 100 percent through fees derived from permitted mine sites and their operators.

Page 18: 2013 ECWRPC Work Program

PART II – 2013 WORK PROGRAM & BUDGET SUMMARY

Page 19: 2013 ECWRPC Work Program

11

SUMMARY OF BUDGET AND WORK PROGRAM This section outlines a summary of the work activity, budget and staffing requirements for 2013 which are reflected in Part III of this document. A description of the proposed staffing plan, salary adjustments, health insurance assumptions, setting the 2013 tax levy, and revenue/expenses are illustrated and discussed. Lastly, a summary of work plan elements and staffing are contained in this section. PROPOSED 2013 STAFFING PLAN The staffing plan for CY 2013 is proposed to include the following 22 full-time professional positions as follows: Planning Services (15): Executive Director (1) Assistant Director (1) Principal Planner (3) Associate Planner (4) Planning Specialist II (1) Planning Specialist I (0) Planner (5) Technical Services (4): IT Coordinator (1) GIS Coordinator (1) GIS Specialist II (1) GIS Specialist I (0) GIS Assistant (1) Administrative Services (3): Controller* (1) Financial Specialist (0) Administrative Coordinator (1) Administrative Assistant (1)

* Indicates part-time, permanent positions

Page 20: 2013 ECWRPC Work Program

12

2013 SALARY ADJUSTMENTS Salary adjustments made within the context of the Commission's personnel policies, whether for cost of living adjustments to the salary schedule or for considerations of meritorious performance, exclude the Executive Director. Any salary adjustment for the Executive Director must be made by the Steering Committee and the Commission directly. There is no discretion on the part of the Executive Director to apply a salary schedule cost of living adjustment to his own salary or to assign any part of any merit pot to his own salary. Typically the Commission has always referenced the national consumer price index rate when deliberating adjustments to the salary schedule. Within East Central's revised personnel policies, meritorious service can be rewarded by an increase within a position pay range and within the amount of money made available for such increases in the annual budget. A total of 2.43% ($24,899) of the total 2012 salaries was approved for use in 2013 salary adjustments. This includes a 1.5% cost-of-living adjustment component ($14,132), and a merit pot component of 0.93% ($10,766). Additionally, two planned staff promotions are considered as approved by the Steering Committee in late 2012 as well as the hiring of a new, entry-level GIS Assistant position. 2013 HEALTH INSURANCE COSTS Historically, health insurance rates have experienced significant annual increased. Due to this trend, and beginning in 2008, the Commission became be part of a ‘deductible-based’ program through the State’s insurance program which lowered its total premiums. The same program is available to staff for 2013 and for the last several years, the Commission has experienced relatively low annual increases. Given the make-up and distribution of health insurance amongst staff, and accounting for a new GIS Assistant position (see Exhibit 5), for 2013 the overall increase for providing this benefit $27,200 or 10.0% ($299,594 total). SETTING THE 2013 TAX LEVY The establishment of the Commission’s levy to its member counties and communities is set forth by state statute, which also limits the levy to an amount no more than 0.003% of the previous year’s equalized property valuation. The Commission has lowered the tax levy rate in each of last eleven consecutive years in order to deal with county-level concerns and budget issues. The 2013 levy rate was approved by the Commission in July, 2012 at 0.0016959% of equalized real property value minus tax increment district valuations. This formula which the levy is based upon currently utilizes the previous year’s (in this case, January 1, 2011) equalized value minus tax increment valuations as a base for establishing the dues assessment. This method provides a known assessment amount and is not be subject to an estimated change in valuation due to only estimates being provided at the time of the Commission’s budget adoption. Using this method, the January 1, 2013 levy amount was $692,821.78, a reduction of -0.73% from the 2012 levy. The levy rate, levy and breakdown by member unit of government are contained in Exhibit 6.

Page 21: 2013 ECWRPC Work Program

13

Exhibit 5: ECWRPC 2013 Health Insurance Costs

Rates per MONTH Participants Total Commission Costs (Annual) Family Single Family Single Family Single Total

Lowest Cost Plan:

Network $ 1,652.00 $662.70 11 4 $205,901.52 $ 30,029.76 $ 235,931.28 Employee Share $92.14 $ 37.08

Other Health Plans:

United Healthcare NE $ 1,809.70 $725.80 3 1 $56,154.96 $ 7,507.44 $ 63,662.40 Employee Share (per month) $ 249.84 $ 100.18

ADDED ONE FAMILY PLAN FOR NEW GIS ASSISTANT

Totals 14 5 $ 62,056.48 $37,537.20 $299,593.68

DIFFERENCE FROM 2012 $27,200.28 10.0%

Page 22: 2013 ECWRPC Work Program

14

Exhibit 6: Approved ECWRPC 2013 Levy & Rate History

2009 2010 2011 2012 PROPOSED 2013 %

INCREASE / $ INCREASE /

TAX LEVY TAX LEVY TAX LEVY TAX LEVY TAX LEVY DECREASE DECREASE

PARTICIPATING / RATE = (RATE = (RATE = (RATE = (RATE = 2012-2013 2012-2013

JURISDICTION 0.000020778 0.000019185 0.000018291 0.000016977 0.000016959

CALUMET CO. $62,217.99 $ 59,238.53 $ 57,486.44 $ 54,253.09 $55,860.82 2.96% $1,607.73 FOND DU LAC CO. (withdrew effective 1982) n/a n/a n/a n/a n/a n/a n/a

C. Fond du Lac $49,464.36 $47,429.27 $ 47,427.56 $ 45,367.69 $44,443.44 -2.04% $ (924.25)

V. Eden $884.80 $875.02 $ 826.73 $ 789.22 $777.73 -1.46% $ (11.49)

V. North FdL $3,789.54 $3,531.50 $3,357.74 $3,087.18 $ 3,031.38 -1.81% $ (55.80) V. Oakfield (withdrew effective 2012) $1,003.45 $908.36 $ 888.79 n/a n/a n/a n/a V. Rosendale (withdrew effective 2009) n/a n/a n/a n/a n/a n/a n/a T. Eden (withdrew effective 2008) n/a n/a n/a n/a n/a n/a n/a

T. Empire $ 5,448.31 $5,158.53 $5,153.26 $4,904.65 $ 4,862.15 -0.87% $ (42.50)

T. Fond du Lac $5,436.32 $5,429.02 $5,293.24 $4,784.35 $ 4,864.14 1.67% $79.79

T. Friendship $3,208.85 $2,998.77 $3,204.02 $2,796.85 $ 2,808.33 0.41% $11.48 T. Lamartine (withdrew effective 2009) n/a n/a n/a n/a n/a n/a n/a

T. Oakfield $1,033.35 $979.79 $ 981.44 $ 943.49 $914.64 -3.06% $ (28.85) T. Taycheedah (withdrawing effective Jan. 1, 2010) $8,591.15 n/a n/a n/a n/a n/a n/a

GREEN LAKE CO. n/a n/a n/a n/a n/a n/a n/a MARQUETTE CO. (withdrew effective 2002) n/a n/a n/a n/a n/a n/a n/a MENOMINEE CO. $5,912.63 $5,888.57 $ 5,808.99 $ 5,392.24 $ 5,397.07 0.09% $4.83

OUTAGAMIE CO. $ 249,128.81 $ 239,700.52 $234,274.91 $224,904.98 $221,707.63 -1.42% $ (3,197.34) SHAWANO CO. $58,113.47 $ 56,577.75 $ 53,811.62 $ 49,765.97 $50,154.47 0.78% $ 388.51

WAUPACA CO. $74,475.68 $ 71,769.25 $ 68,734.21 $ 64,108.67 $62,408.75 -2.65% $ (1,699.93)

WAUSHARA CO. $50,245.86 $ 50,243.69 $ 45,858.94 $ 42,600.12 $41,375.88 -2.87% $ (1,224.23)

WINNEBAGO CO. $ 225,267.95 $ 214,783.21 $205,680.09 $194,211.57 $194,215.35 0.00% $3.78

TOTALS (MEMBERS) $ 804,222.52 $ 765,511.80 $738,787.97 $697,910.07 $692,821.78 -0.73% $ (5,088.29) Notes: Beginning in 2005, the Commission changed its policy so that the current year's levy is based on the equalized value from 2 years prior to the budget year (i.e., the 2013 levy is determined

by the 2011 equalized value) The maximum RPC levy rate is established by Wis. State Statutes 66.0309 at .00003

Page 23: 2013 ECWRPC Work Program

15

REVENUE ASSUMPTIONS Besides the tax levy, the Commission receives revenues from a variety of other sources. These estimated revenues, along with the required local match (where applicable) is summarized on Exhibit 7. For 2013, each dollar used for match by the Commission leverages $7.79 of other funding. Exhibit 7: Projected 2013 Grant & Program Revenues (excludes levy and contracts)

Source Funding Entity/Program 2013 Estimated Award Amount

Required Local Share

%

Local Share Amount (from ECWRPC Levy)

Total Program Cost (min.)

Federal FHWA - PL (FC&Osh MPOs) $ 270,000 12.1% $ 40,913 $ 310,913

State WisDOT- PL (FC&Osh MPOs) $ 26,587 0% $ - $ 26,587

Federal FHWA - Discretionary (FC&Osh&FDL Modeling + CFIRE 5th Year) $ 182,374 20% $ 42,475 $ 224,849

Federal FHWA - PL (Fond du Lac MPO) $ 50,000 12% $ 7,478 $ 57,478

State WisDOT- PL (Fond du Lac MPO) $ 5,022 0% $ - $ 5,022

Federal FHWA - Regional Program $ 62,373 10% $ 7,797 $ 70,170

State WisDOT - Regional Program $ 7,797 0% $ - $ 7,797

Federal RSRTS - 2013/2014 (Year 1 of 2) $ 492,000 0% $ - $ 492,000

Federal RSRTS - 2012/2013 Carryover $ 125,636 0% $ - $ 125,636

State Wisconsin Transformation Grant $ 41,787 0% $ - $ 41,787

State MPO Bike/Ped Plans - WisDOT Transp. Enhancement Grant $ 77,553 20% $ 15,511 $ 93,064

Federal EDA - Economic Development Program Planning Grant (Year 2 of 3) $ 61,628 30% $ 26,412 $ 88,040

State WEDC - EMSI Implementation $ 22,222 0% $ 22,222 Federal EPA Lake Michigan Academy $ 7,500 0% $ 2,500 $ 10,000

State WDNR - NR-121 Sewer Service Area Planning Grant $ 35,000 50% $ 35,000 $ 70,000

State

WDNR - Aquatic Invasive Species Grant (L. Winnebago West Coordinator) - Yr. 3 of 3 $ 49,300 34% $ 16,667 $ 65,967

Totals $ 1,516,779 $ 194,753 $ 1,711,532

Page 24: 2013 ECWRPC Work Program

16

EXPENDITURES SUMMARY Estimated expenditures are illustrated on Exhibit 8 (Budget Summary) and Exhibit 9 (Overhead), and are based on estimates of salaries and indirect costs (benefits and overhead). SUMMARY OF WORK ELEMENT ALLOCATIONS A summary of the work elements and how dollars (staff time) allocations are made is illustrated in Section III. These relate closely to the costs shown in the Budget Summary (Exhibit 8). The allocations and funding amounts are subject to change throughout the course of the year as final projects and funding awards are made.

Page 25: 2013 ECWRPC Work Program

Exhibit 8: East Central Wisconsin RPC 2013 Budget Summary

Projected Operating Revenues PRELIM. 2013 2012 ADOPTED + or - ($) + or - (%)

Intergovernmental Grants 1,516,779$ 1,306,244$ 210,535$ 16.1%Federal Grants 1,251,511$ 1,078,432$ 173,079$ 16.0%State Grants 265,268$ 227,812$ 37,456$ 16.4%Other Grants -$ -$ -$ -

Intergovernmental Charges for Services 972,138$ 929,675$ 42,463$ 4.6%Local districts membership levy 692,822$ 697,910$ (5,088)$ -0.7%

Local district contracts (secured/expected) 122,677$ 102,405$ 20,272$ 19.8%

NR-135 program (Operator fees) 136,741$ 109,485$ 27,256$ 24.9%

NR-135 program (WDNR fees) 19,898$ 19,875$ 23$ 0.1%

Public Charges for Services 3,100$ 3,100$ -$ 0.0%

Product/Material Sales 1,000$ 1,000$ -$ 0.0%SSA Review Fees 1,500$ 1,500$ -$ 0.0%

Miscellaneous (interest earned, etc.) 600$ 600$ -$ 0.0%

Total Operating Revenues 2,492,017$ 2,239,019$ 252,998$ 11.3%

Projected Operating ExpensesSalaries and wages 1,126,570$ 1,054,566$ 72,004$ 6.8%

Staff 1,089,478$ 1,018,266$ 71,212$ 7.0%Paid Internships (3) 25,092$ 24,300$ 792$ 3.3%Commissioners (meeting payments) 12,000$ 12,000$ -$ 0.0%

Employee fringe benefits 493,851$ 447,286$ 46,566$ 10.4%Health Insurance 299,594$ 272,393$ 27,200$ 10.0%FICA, Wkmn's Comp, Life, WRS, Vac./Sick. etc. 194,258$ 174,892$ 19,365$ 11.1%

Direct grant expenses (contracts/programs) 396,289$ 392,200$ 4,089$ 1.0%Program Expenses (1100-2000 Elements, incl. NR-135) 175,000$ 175,000$ -$ 0.0%Pass-through Expense - NR-135 (WDNR Fees) 19,898$ 19,750$ 148$ 0.7%Pass-through Expense - HNTB CUBE Modeling Contract 25,000$ 35,000$ (10,000)$ -28.6%Pass-through Expense - Regional SRTS Service Contracts 158,891$ 154,937$ 3,954$ 2.6%Pass-through Expense - WGNHS Contract (final payment) 7,500$ Pass-through Expense - Winnebago County Rural Transp. Stakeholder Surveys 10,000$ -$ 10,000$ n/aPass-through Expense - WEDC EMSI Software 13,000$ -$ 13,000$ n/a

Overhead Expenses 282,984$ 290,505$ (7,521)$ -2.6%Meeting expenses & Staff Development 30,500$ 21,500$ 9,000$ 41.9%Supplies 14,300$ 15,300$ (1,000)$ -6.5%Office space and equipment-rent & copier increases 162,487$ 163,555$ (1,068)$ -0.7%Reference materials, subscriptions and dues 7,750$ 9,600$ (1,850)$ -19.3%Outside printing and publishing 12,400$ 27,000$ (14,600)$ -54.1%Postage (EC costs only) 5,000$ 8,500$ (3,500)$ -41.2%Staff expenses (EC costs only) 8,000$ 9,000$ (1,000)$ -11.1%Insurance, legal, audit 25,547$ 15,550$ 9,997$ 64.3%Capital Purchases 17,000$ 20,500$ (3,500)$ -17.1%

Total Operating Expenses 2,299,694$ 2,184,557$ 115,138$ 5.3%

Projected Surplus / (Deficit)* 192,323$ 54,462$ 137,861$ 253%

17

Page 26: 2013 ECWRPC Work Program

Exhibit 9 - ECWRPC 6000 Work Program Element: 2013 Overhead Budget

Work Program ESTIMATED AdoptedElement/Item Overhead Item 2013 BUDGET 2012 Budget

6100 Meeting Expenses 30,500$ 21,500$ 9,000$ 6101 Staff Development* 15,000$ 9,500$ 5,500$ 6102 Commissioner's Meeting Exp. (mileage only)** 9,500$ 9,000$ 500$ 6103 Mini-Conference(s) (incl. printing/postage) 4,500$ 1,500$ 3,000$ 6104 Annual Meeting 1,500$ 1,500$ -$

-$ 6200 Supplies 14,300$ 15,300$ (1,000)$ 6201 General Office & Copier Supplies 11,000$ 12,000$ (1,000)$ 6203 GIS Printing/Plotting/Graphics Supplies 2,200$ 2,200$ -$ 6204 Computer & IT Supplies (consumables) 1,100$ 1,100$ -$

6300 Office Space and Equipment 162,487$ 163,555$ (1,068)$ 6301 Office Rent 91,987$ 89,305$ 2,682$ 6302 Utilities & Security Monitoring 8,000$ 8,000$ -$ 6304 Office Cleaning 4,500$ 3,750$ 750$ 6310 Telephone/Internet 7,000$ 11,000$ (4,000)$ 6320 General Office Furniture/Equipment 1,500$ -$ 1,500$

6340 (1450 asset acct.) Computer Software Purchases 3,000$ 3,000$ -$ 6350 Copier / Postage Meter Rental (not incl. supplies) 18,000$ 20,000$ (2,000)$ 6390 Computer Equipment/Network Maintenance (harddrives, mice, etc.) 3,500$ 3,500$ -$ 6391 Computer Software Maintenance (incl. MAS90) 25,000$ 25,000$ -$

6400 Refer. Materials, Subscrip., Dues 7,750$ 9,600$ (1,850)$ 6401 Reference Materials & Books 500$ 350$ 150$ 6410 Subscriptions (Newspapers, Periodicals) 1,750$ 1,750$ -$ 6450 Professional Org. Memberships & Dues 5,500$ 7,500$ (2,000)$

6500 Printing and Publishing 12,400$ 12,000$ 400$ 6501 Newsletter (including printing/postage) 4,500$ 4,500$ -$ 6502 Annual Report (including printing/postage) 7,900$ 7,500$ 400$

6600 Postage 5,000$ 8,500$ (3,500)$

6700 Staff Expenses* 8,000$ 9,000$ (1,000)$ 6701 Agency Car Maintenance & Expenses 2,000$ 2,000$ -$ 6702 Employee Vehicle Mileage (not contract or program related) 4,500$ 4,500$ -$ 6703 Other Employee Expenses (not contract or program related) 1,500$ 2,500$ (1,000)$

6800 Insurance, Legal and Audit 25,547$ 15,550$ 9,997$ 6803 Insurance (not incl. WC and pub. off. bond) 4,667$ 3,000$ 1,667$ 6820 Legal Counsel / HR Services 3,500$ 3,500$ -$ 6830 Annual Audit 8,600$ 8,300$ 300$ 6840 Banking Fees 2,280$ 750$ 1,530$ 6850 Other Professional Services (i.e., marketing, etc.) 6,500$ -$ 6,500$

6900 Capital Purchases 17,000$ 17,000$ -$ 6902 (1410 asset acct.) Capital Purchases, Computers & Equipment 17,000$ 17,000$ -$

Automobile -$ -$ -$

GRAND TOTAL 282,984$ 272,005$ 10,979$ Direct Overhead Subtotal* 23,000$ 18,500$ 4,500$ Indirect Overhead Subtotal 250,484$ 244,505$ 5,979$ Commissioner’s Meeting Expense** 9,500$ 9,000$ 500$

* Direct Overhead Cost charged to all individual work elements

** Direct Overhead Cost charged to commission levy dollars only

Difference (2013-2012)

18

Page 27: 2013 ECWRPC Work Program

19

PART III – WORK PROGRAM DESCRIPTIONS

Page 28: 2013 ECWRPC Work Program

1100 PROGRAM ELEMENT: REGIONAL COMPREHENSIVE PLANNING PROGRAM

MAJOR WORK ELEMENTS:1105 - Technical Assistance (Comprehensive Planning)

ECWRPC: $ 75,185 Planning: 88 1120 – Regional Plan Implementation & Monitoring

GIS / IT: 24

PROGRAM TOTAL: $ 75,185 112

FUNDING SOURCES PERSON DAYS

ECWRPC: 25,934$ Planning: 33

GIS: 6

ELEMENT TOTAL: $ 25,934 39

FUNDING SOURCES PERSON DAYS

ECWRPC: 4,309$ Planning 5

Goal I-12.1Srategy I-12.1.1. GIS:

ITEM TOTAL: 4,309$ 5

1106 WORK ITEM: SHAWANO COUNTY ANNUAL COMPREHENSIVE PLAN REVIEW PROCESS (Carry over from 2012)

OBJECTIVE(S): To promote Comprehensive Planning within theregion and to further align local plans with the Regional Plan's vision.

This program is overseen by the Regional Comprehensive Plan Committee. It was created in 2002 to coincide with the initiation of the Commission’s Year 2030 Regional Comprehensive Plan development process. The Year 2030 Regional Comprehensive Plan provides the overall framework for guiding future growth and development in the region and follows the requirements of Wisconsin State Statutes 66.1001 (smart growth). The plan, adopted in April, 2008 now serves as a framework with which to address issues of regional concern and impact. The State Statutes outline the nine elements that are to be contained in the regional comprehensive plan. Of the nine elements, six may be defined as substantive and, for East Central’s purpose, and one has been further broken out into two separate elements (7 total): land use; transportation; community facilities; open space and recreation; economic development; housing; and agricultural, natural and cultural resources. The remaining three elements are process based: issues and opportunities; intergovernmental coordination; and plan monitoring and implementation. Responsibility for each element of the regional plan has been assigned to a specific standing committee.

TOTAL PERSON DAYS:

PROGRAM OBJECTIVE(S): To promote, build awareness, and coordinate the implementation of the Commission's Year 2030 Regional Comprehensive Plan (Wis. Stats. 66.1001) and locally adopted Comprehensive Plans.

ACTIVITY/METHODOLOGY: Staff will assist Shawano County in the review of its existing comprehensive plan document for items that need to be addressed or updated during this forthcoming process.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1105 MAJOR WORK ELEMENT: TECHNICAL ASSISTANCE (Comprehensive Planning)

1110 - Regional Plan Promotion, Coordination & Administration

The Year 2030 Regional Comprehensive Plan is available for review on the Commission's website - www.eastcentralrpc.org .

TOTAL FUNDING SOURCES:

ACTIVITY/METHODOLOGY: To solicit and pre-select projects on an annual basis using a consistent set of notification and evaluation procedures. Annual project solicitation requests are mailed out in August and the assessment/selection process is completed in December for the following year's projects.

19

Page 29: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

Planning 5

ECWRPC: 4,309$ GIS: -

ITEM TOTAL: 4,309$ 5

FUNDING SOURCES PERSON DAYS

Planning-

ECWRPC: 1,608$ GIS: 3

ITEM TOTAL: 1,608$ 3

OBJECTIVE(S): To promote Comprehensive Planning within theregion and to further align local plans with the Regional Plan's vision.

ACTIVITY/METHODOLOGY: Staff will review the City of New London (Outagamie and Waupaca Counties) zoning code and smart growth plan for consistency.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan.

FUNDING SOURCES PERSON DAYS

Planning 4ECWRPC: 4,426$

GIS: -

ITEM TOTAL: 4,426$ 4

OBJECTIVE(S): To promote Comprehensive Planning within theregion and to further align local plans with the Regional Plan's vision.

ACTIVITY/METHODOLOGY: Staff will assist Shawano County by providing a third party review of previous land use decisions conformance with the County's comprehensive plan.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan.

FUNDING SOURCES PERSON DAYS

Planning 8 ECWRPC: 6,587$

GIS: 3

ITEM TOTAL: 6,587$ 11

1109 WORK ITEM: CITY OF NEW LONDON CONSISTENCY REVIEW OF ZONING CODE AND SMART GROWTH PLAN

1110 WORK ITEM: SHAWANO COUNTY REVIEW LAND USE DECISIONS CONFORMANCE WITH COUNTY COMPREHENSIVE PLAN

1108 WORK ITEM: WAUSHARA COUNTY COMPREHENSIVE PLAN MAP AMENDMENTS (ongoing service since 2010)

OBJECTIVE(S): To promote Comprehensive Planning within theregion and to further align local plans with the Regional Plan's vision.

ACTIVITY/METHODOLOGY: Staff will update, as needed, and as resources allow for, Future Land Use Maps for Waushara County and its communities.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

OBJECTIVE(S): To promote Comprehensive Planning within theregion and to further align local plans with the Regional Plan's vision.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1107 WORK ITEM: TOWN OF GREENVILLE ANNUAL COMPREHENSIVE PLAN REVIEW PROCESS (Carry over from 2012)

ACTIVITY/METHODOLOGY: Staff will assist the Town of Greenville (Outagamie County) in the review of its existing comprehensive plan document for items that need to be addressed or updated during this forthcoming process.

20

Page 30: 2013 ECWRPC Work Program

OBJECTIVE(S): To promote Comprehensive Planning within theregion and to further align local plans with the Regional Plan's vision.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan.

FUNDING SOURCES PERSON DAYS

Planning 3 ECWRPC: 2,675$

GIS:

ITEM TOTAL: 2,675$ 3

OBJECTIVE(S): To promote Comprehensive Planning within theregion and to further align local plans with the Regional Plan's vision.

ACTIVITY/METHODOLOGY: Staff will assist Shawano County by providing updated demographic information for the county's comprehensive plan.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan.

FUNDING SOURCES PERSON DAYS

ECWRPC: 2,019$ Planning 5

GIS: -

ITEM TOTAL: 2,019$ 5

ACTIVITY/METHODOLOGY: Staff will assist Shawano County by developing and providing an educational session to the Planning/Zoning Committee on Section 236 of the Wisconsin Administrative Code (Land Divisions).

1112 WORK ITEM: SHAWANO COUNTY PLANNING/ZONING COMMITTEE EDUCATIONAL SESSION

1113 WORK ITEM: SHAWANO COUNTY DEMOGRAPHIC UPDATE FOR COMPREHENSIVE PLAN

21

Page 31: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC:24,562$

Planning: 20

Recommendation I-12.1.1.1 GIS/IT: 18

Recommendation I-12.6.2.3

3) Completion and promotion of a 'checklist' for use by local units of government to assess local plans in comparison to the regional plan.

Recommendation I-12.1.2.1

4) Continue the development of a GIS map which illustrates a composite of the locally adopted smart growth land use plan maps for the region.

Recommendation I-12.2.1.1

5) Review and update all 'Regionally Significant Features' maps for use by staff in promoting the regional plan.

Recommendation I-12.1.2.3

6) Conduct a review of progress on plan implementation and prioritize activities for 2013.

Recommendation I-12.2.2.1 / I-12.2.2.2 ELEMENT TOTAL: $ 24,562 38

FUNDING SOURCES PERSON DAYS

ECWRPC: 24,690$ Planning: 35

GIS: - Recommendation I-12.3.3.1

Recommendation I-12.4.1.1 / I-12.4.1.2

Recommendation I-12.5.1.1

Recommendation LU-4.2.1.1

ELEMENT TOTAL: $ 24,690

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

PROGRAM OBJECTIVE(S): To promote, build awareness, and coordinate the implementation of the Commission's Year 2030 Regional Comprehensive Plan (Wis. Stats. 66.1001).

1120 MAJOR WORK ELEMENT: REGIONAL PLAN IMPLEMENTATION & MONITORING

2) Partner with UW-Extension on the development of mini-conferences which incorporate regional plan goals and strategies.

1) Develop a standard set of indicators, data requirements, procedures and document format(s) for monitoring progress on regional plan implementation.

3) Develop the necessary procedures and protocols for future Comprehensive Plan updates and amendments.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1) Presentation of the plan to local groups, at public events, community and county level committee and board meetings

2) Development of an improved website page containing information about the Commission, its programs and tools for county and local units of government.

4) Work with data developed from 2011's internal assessment of the Regional Plan's Transportation Element utilizing the concepts of The Natural Step.

ACTIVITY/METHODOLOGY: Staff will facilitate the implementation and monitoring of the Regional Plan through the following activities:

1115 MAJOR WORK ELEMENT: REGIONAL PLAN PROMOTION, COORDINATION & ADMINISTRATION

OBJECTIVE(S): To monitor the development of the region and its conformance with the regional plan policies as well as to track progress of the Commission’s implementation of plan recommendations and tasks.

ACTIVITY/METHODOLOGY: Staff will facilitate an efficient and standardized approach to the promotion and implementation of the Regional Comprehensive Plan.

22

Page 32: 2013 ECWRPC Work Program

1200 PROGRAM ELEMENT: COMMUNITY FACILITIES

MAJOR WORK ELEMENTS: FUNDING SOURCES:

1205 – Community Facilities Committee Administration/Coordination

ECWRPC: 100,693$ Planning: 255

1210 – Technical Assistance (CF)

Other Sources: 2,000$ GIS: -

1220 – Regional Plan Implementation & Coordination (CF)

EPA-WDNR: 35,000$

1230 – Sewer Service Area Planning

CF -1: Waste - Garbage & Recycling CF-6: Education & LibrariesCF-2: Public & Private Wastewater Treatment CF-7: Health & ChildcareCF-3: Public & Private Water Supply CF-8: Local Parks & Recreational FacilitiesCF-4: Electric, Gas, and Telecommunications CF-9: Wind Energy

CF-5: Public SafetyPROGRAM TOTAL: 137,693$ 255

FUNDING SOURCES PERSON DAYS

ECWRPC: 13,117$ Planning: 23

GIS: -

ELEMENT TOTAL: 13,117$ 23

1205 MAJOR WORK ELEMENT: COMMUNITY FACILITIES COMMITTEE ADMINISTRATION/COORDINATION

OBJECTIVE(S): To support the Commission's designated Standing Committees.

ACTIVITY/METHODOLOGY: Staff will provide support activities for the periodic meetings of the Commission's Community Facilities Committee (CFC). This includes, but is not limited to the preparation of meeting agendas, materials, meeting scheduling, meeting attendance, development of written meeting summaries and other duties and follow-up activities assigned by the Committee.

REGIONAL PLAN RELATIONSHIP: The Community Facilities Committee oversees the Community Facilities Element of the Year 2030 Comprehensive Plan.

“Efficient, cost effective community facilities are provided, which enhance the quality of life and ensure prosperity and economic stability for all. The emphasis in service provision is on cooperative planning, fostering collaboration, enhancing partnerships, sharing resources and transcending boundaries, as appropriate. In 2030, there are regional opportunities for the sustainable and safe management of solid waste and recycling, collection, processing and disposal activities. A well managed and planned public and private water supply provides for the region’s citizens and industry. The region is served by a variety of well-functioning public and private wastewater treatment systems, which are capable of accommodating future growth, while limiting the inherent conflicts caused by both urban and rural development patterns. Adequate, cost effective, environmentally conscientious utility infrastructure exists to support industry and the general population. There are cost effective, efficient, quality emergency and non-emergency services to ensure public safety.

REGIONAL PLAN RELATIONSHIP:

The Year 2030 Regional Comprehensive Plan and the various Sewer Service Area Plans spell out more specific issue areas and policies which need to be addressed at a local or regional scale. Details of these issues can be found in one of the comprehensive plan's nine "Plan Guideline" fact sheets contained in Chapter 7:

The 1200 Community Facilities Program is directly related to Chapter 7 of the Year 2030 Regional Comprehensive Plan, and the NR-121 based Sewer Service Area (SSA) plans. The adopted vision for this element is as follows:

A variety of meaningful educational options and opportunities exist for all students. Children and adults in the region are provided with accessible educational, informational and recreational library services and materials in an economically efficient and timely manner. There is a collaborative regional forum to create and implement a strategic framework for the continuum of care for the health and well being of the residents of the region. Through cooperative efforts, park, open space, and recreational facilities and programs are protected and preserved and there are plans for new facilities. There are community facilities which meet the needs of various groups, including youth, elderly, and minorities, in a balanced and financially responsible manner.”

This program element implements the requirements of the “Smart Growth” planning legislation for the Community Facilities and Utilities plan element and incorporates the Commission’s ongoing NR-121 sewer service area (SSA) planning function. This function is derived from East Central being designated by the WDNR as the 208 Water Quality Management Planning Agency for the region and Its advisory capacity is established through a formal funding agreement with the WDNR. SSAs are the basis for promoting orderly growth and efficient development patterns based on the cost-effectiveness of providing public wastewater collection and treatment. This work program element is overseen by the Commission’s Community Facilities Committee (CFC) and consists of the following major work elements:

PERSON DAYS:

23

Page 33: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 8,866$ Planning: 12

GIS: -

ELEMENT TOTAL: 8,866$ 12

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

ECWRPC: 4,433$ Planning: 6

GIS: -

ITEM TOTAL: 4,433$ 6

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

ECWRPC: 4,433$ Planning: 6

GIS: -

ITEM TOTAL: 4,433$ 6

FUNDING SOURCES PERSON DAYS

ECWRPC: 16,533$ Planning: 26

GIS: -

ELEMENT TOTAL: 16,533$ 26

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1220 MAJOR WORK ELEMENT: REGIONAL PLAN IMPLEMENTATION & COORDINATION (C.F.)

1211 WORK ITEM: TOWN OF WINNECONNE HWYS 116 & 45 SEWER SERVICE ANALYSIS

OBJECTIVE(S): To communicate and coordinate various policies and recommendations contained within the Regional Comprehensive Plan's Community Facilities Element.

ACTIVITY/METHODOLOGY: Staff will actively participate in a variety of local, regional, and state level committee/partnership efforts in the interests of promoting and implementing the Year 2030 Regional Comprehensive Plan. Activities, projects, and programs will be initiated and worked on to implement the recommendations of the Year 2030 Regional Comprehensive Plan. These items are primarily funded by the Commission levy unless otherwise noted. ALSO PLEASE NOTE THAT WHILE THESE ARE IMPORTANT ACTIVITIES, THEY ARE DEEMED TO BE THE LOWEST PRIORITY FOR COMPLETION IN 2013 AS STAFF TIME IS ROUTINELY CONSUMED BY ACTIVITIES ASSOCIATED WITH OTHER PROGRAMS WHICH ARE TIED TO OUTSIDE FUNDING SOURCES. THEREFORE, SEVERAL OF THESE ACTIVITIES MAY CARRYOVER FOR MULTIPLE YEARS.

OBJECTIVE(S): To provide direct assistance to local units of government in addressing issues specific to community and public facilities (solid waste, recycling, public utility infrastructure – gas, electric, telecommunications, education, library, health and childcare, public safety, stormwater management, wastewater, recreation, cemeteries and public water supply).

OBJECTIVE(S): To implement the vision, goals, strategies and recommendations contained in the adopted Year 2030 Regional Comprehensive Plan's Community Facilities and Land Use elements.

ACTIVITY/METHODOLOGY: Staff will work with the Town of Winneconne to review development plans/potential for a quadrant of the WIS 45 & WIS 116 interchange as well as alternatives and issues associated with the provision of public sewer service.

1212 WORK ITEM: TOWN OF CLAYTON SERVICE PROVISON ANALYSIS

OBJECTIVE(S): To communicate and coordinate various policies and recommendations contained within the Regional Comprehensive Plan's Community Facilities Element.

ACTIVITY/METHODOLOGY: Staff will work with the Town of Clayton to assess and illustrate factors and issues associated with the future urbanization of its eastern corridor along USH 76.

1210 MAJOR WORK ELEMENT: TECHNICAL ASSISTANCE (CF)

ACTIVITY/METHODOLOGY: Provide information related to general community and public facilities planning, and more specific technical assistance with the planning and development of alternative energy sources and ordinances, recycling, public safety, elderly needs and public facility planning. These activities are derived from the annual project solicitation process.

24

Page 34: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

ECWRPC: 9,563$ Planning: 15 Recommendation NR-1.2.1.1

GIS: -

ITEM TOTAL: 9,563$ 15

FUNDING SOURCES PERSON DAYS

ECWRPC: 6,970$ Planning: 11

Recommendation CF-1.1.6, CF-1.1.6.4. GIS: -

ITEM TOTAL: 6,970$ 11

FUNDING SOURCES PERSON DAYS

ECWRPC: 62,177$ Planning: 194

Other Sources: 2,000$ Recommendation CF-2.1.1.1 EPA-WDNR: 35,000$ GIS: -

ELEMENT TOTAL: 99,177$ 194

FUNDING SOURCES PERSON DAYS

ECWRPC: 5,580$ Planning: 14

Recommendation CF-2.1.1.8Recommendation CF-2.1.1.2 EPA-WDNR: 2,000$ GIS: - Recommendation CF-2.1.1.4Recommendation CF-2.1.1.5

ITEM TOTAL: 7,580$ 14

ACTIVITY/METHODOLOGY: Staff will attend and participate in various meetings and workshops with the intent of promoting and implementing the Community Facilities recommendations contained in the Year 2030 Regional Comprehensive Plan. For this work element, these groups include, but are not limited to: ECOS and Association of Associated Recyclers of Wisconsin, and others.

1231 WORK ITEM: OVERALL PLAN PROMOTION, IMPLEMENTATION & PROGRAM ADMINISTRATION

1230 MAJOR WORK ELEMENT: SEWER SERVICE AREA PLANNING

PROGRAM OBJECTIVE(S): To coordinate the various functional area planning programs and activities related to the development and administration of NR-121 Sewer Service Area Plans.

1227 WORK ITEM: ENERGY/COMPOST & JOB PRODUCTION THROUGH FOOD WASTE

OBJECTIVE(S): To promote and coordinate regional plan recommendations and policies related to community facilities and public/private service provisions. To improve access to, and the effectiveness of, SSA planning concepts and information.

ACTIVITY/METHODOLOGY: Staff will facilitate meetings and planning work, maintain a contact list of interested stakeholders (municipalities, businesses, public sector, schools, non-profits, etc.), connect stakeholders and gather information as necessary to further the work of the task force. The task force is comprised of representatives from Outagamie and Waupaca counties, waste management providers, local school districts, municipalities, UW-Oshkosh, FVTC, local businesses, non-profits, CAP Services and others.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1221 WORK ITEM: REGIONAL PLAN COORDINATION (Community Facilities)

OBJECTIVE(S): To communicate and coordinate various policies and recommendations contained within the Regional Comprehensive Plan's Community Facilities Element.

ACTIVITY/METHODOLOGY: Staff will make presentations to local governments and community groups; attend meetings, conferences and workshops which involve or promote SSA plan concepts and issues; perform liaison and review activities with federal, state and local government agencies; and, will maintain and update its webpage and provide links to WDNR webpage’s.

ACTIVITY/METHODOLOGY: East Central will continue its planning and administrative responsibilities as the designated Planning Agency responsible for urban service area planning within the designated Fox Valley Water Quality Management Area and also for the remaining non-designated portion of the ten county region.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

OBJECTIVE(S): To support the diversion of food/organic waste, generated by businesses, schools, municipalities, nursing homes and other facilities in Oshkosh, Fox Cities and the surrounding areas, from area landfills to other applications/processes. These applications/processes could include anaerobic digestion at UW-Oshkosh, local and regional composting operations, and processes that reclaim pre-consumer food residuals for human and animal consumption.

25

Page 35: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 14,472$ Planning: 45

Recommendation CF-2.1.1.2 Review Fees per Res. 20-09 2,000$ Recommendation CF-2.1.1.3 EPA-WDNR: 5,000$ GIS: - Recommendation CF-2.1.1.4Recommendation CF-2.1.1.5

ITEM TOTAL: 21,472$ 45

FUNDING SOURCES PERSON DAYS

ECWRPC: 42,125$ Planning: 135

Recommendation 2.1.1.1 EPA-WDNR: 28,000$ GIS: -

ITEM TOTAL: 70,125$ 135

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

OBJECTIVE(S): To provide orderly and efficient growth patterns, minimize the cost of public facilities and services; minimize adverse environmental impacts of sewer development and to promote water quality enhancement and conservation in existing (SSA plan) communities of the region.

1232 WORK ITEM: CONTINUING MANAGEMENT FOR SEWER SERVICE AREA PLANNING (AMENDMENTS & CONFORMANCE REVIEWS)

1233 WORK ITEM: UPDATES OF THE SHERWOOD, FOND DU LAC AND BRILLION SEWER SERVICE AREA PLANS

ACTIVITY/METHODOLOGY: Completion of the Sherwood SSA Plan is expected to be completed in early 2013. Additionally, work will commence on the Fond du Lac and Brillion SSA Plan Update with an expected completion date for the Brillion plan in mid-2013 and the Fond du Lac plan late 2013. New boundaries will be delineated using accepted population and land use projection methodologies and discussions with affected units of government. The process shall be consistent with the guidelines contained in Wis. Admin. Code NR121 and with current regional land use policies. Staff will also maintain and update its website with SSA information for the public, which includes a variety of development related statistics.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

OBJECTIVE(S): To provide an on-going SSA plan implementation and review process (plan amendments) which provides for an effective means of accommodating unforeseen growth in a cost-effective and environmentally sound manner.

ACTIVITY/METHODOLOGY: Administrative responsibilities will follow adopted procedures and criteria for amending sewer service areas and for reviewing NR-110 Wastewater Facilities Plans, sewer extensions and laterals as specified in the WDNR contract. Provide sewer service area amendment recommendations and on-going implementation and management strategies through the advisory review of subdivision plats, comprehensive plans and other projects.

26

Page 36: 2013 ECWRPC Work Program

1300 PROGRAM ELEMENT: TRANSPORTATION

MAJOR WORK ELEMENTS: FUNDING SOURCES:

The Transportation Work Program contains the following Major Work Elements:1310 - Fox Cities and Oshkosh Urbanized AreasMPOs

ECWRPC: 108,924$ 9% Planning: 1,646

1320 - Short-Range Planning - Congestion Management Process (TMA)

FHWA-PL/SPR: 347,945$ 28% IT: 51

1330 - Regional Transportation PlanningWisDOT-PL/SPR: 36,048$ 3% GIS: 252

1340 - Fond du Lac Urbanized Area MPO T-1: Effects of Sprawl Development on Transportation FHWA/WisDOT-SRTS 457,696$ 37%

1380 Regional Safe Routes to School Program T-2: Transportation Funding and Priority Plans and Projects FHWA/FTA Disc: 169,899$ 14%

Special Studies/Carry Over T-3: Regional Connectivity WisDOT BPFP GRANT 62,042$ 5%

Fox Cities and Oshkosh Bicycle Plan T-4: Balance Between Transportation and the Environment Wisconsin Transformation: 41,787$ 3%

PL Discretionary Carry Over $35,000 T-5: Alternative Modes of Transportation and Mobility

PROGRAM TOTAL: 1,224,341$ 100% 1,949

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES:

ECWRPC: $ 54,383 16% Planning: 454 Recommendation T-1.1.2.1 FHWA-PL: $ 127,600 38% IT: 6 Recommendation T-1.1.5.1 WisDOT-PL: $ 12,600 4% GIS: 40 Recommendation T-1.1.6.1 FHWA/FTA-Disc: $ 140,331 42%

ELEMENT TOTAL: $ 334,914 500

The purpose of this program element is to coordinate, administer and promote federal, state, and regional transportation planning through the Commission's Metropolitan Planning Organization (MPO) designation for the three urbanized areas. NOTE: The Appleton MPO is now Designated as a Transportation Management Area (TMA) that includes the development of a Congestion Management Process (CMP) as part of the 2013 and 2014 Work Programs. In addition, the development and implementation of federal, state and regional highway system plans are coordinated, planned for, and implemented by the Commission in the rural portions of the region. Additional transportation modes are addressed through various programs including public transit, bicycle and pedestrian systems, passenger rail and freight, whether by highway or rail. Where appropriate and practical, specific recommendations from the Commission's Year 2030 Regional Comprehensive Plan are addressed, implemented and monitored to further progress on reaching the identified Economic Development vision established within the plan.

The 2013 Work Program's Transportation Element is funded partially by the Federal Highway Administration, Federal Transit Administration and the Wisconsin Department of Transportation (WisDOT) through an annual planning grant. This award has a matching funds requirement of 10% from the Commission unless otherwise noted. A summary of funding sources is provided in the table on the next page. The development of this work program element is coordinated with federal and state transportation and transit agencies through a cooperative process involving previously executed agreements (on Web Site www.eastcentralrpc.org).

REGIONAL PLAN RELATIONSHIP: PERSON DAYS:

The 1300 Transportation Program is directly related to Chapter 6 of the Year 2030 Regional Comprehensive Plan . The adopted Transportation vision is as follows:

NOTE: Program is Subject to Change Based on Final Regulations and Guidance Under MAP 21

“In 2030, the East Central region will have an efficient regional transportation network which provides options for the mobility needs of all people, goods, and services”.The Year 2030 Regional Comprehensive Plan spells out more specific issue areas which need to be addressed at a local or regional scale. Details of these issues can be found in one of the chapter's five "Plan Guideline" fact sheets:

1310 MAJOR WORK ELEMENT: FOX CITIES/OSHKOSH METROPOLITAN PLANNING ORGANIZATION

PROGRAM OBJECTIVE(S): East Central staffwill prepare and maintain the required plans,reports, studies, models, and data necessary forthe operation and management of the Fox Citiesand Oshkosh Metropolitan Planning Organization(MPO). NOTE: The 2013 Work Program is basedon the planning requirements of the Safe,Accountable, Flexible, and Efficient TransportationEquity Act-A Legacy for Users (SAFETEA-LU).Amendments are expected after details aredefined for Moving Ahead for Progress in the 21stCentury (MAP 21). Work program objectives andactivities are described in more detail within eachwork item below.

ACTIVITY/METHODOLOGY: In 2013 East Central will work with WisDOT,FHWA, local governments, advisory committees, other operating agencies andthe public to evaluate, monitor and implement the adopted Long-RangeTransportation / Land Use Plan (LRTP), for both the Fox Cities and OshkoshMetropolitan Planning Organization (MPO) areas. Staff will continue theprocess of developing a 2010 base year for the next major plan update slatedfor completion by 2015.The proposed schedule for the major LRTP updatesfollow. Staff will update the Public Participation Plan and continue to reviewcurrent trends, plans, studies and models as part of the major updates.

PERSON DAYS:

27

Page 37: 2013 ECWRPC Work Program

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 2,388 10.6% Planning: 23 Recommendation T-1.2.2.1 FHWA-PL: $ 18,000 80.0% IT: 6 Recommendation T-1.2.2.2 WisDOT-PL: $ 2,112 9.4% GIS: -

FHWA/FTA-Disc: $ - 0.0%Other/TBD $ - 0.0%

ITEM TOTAL: $ 22,500 29

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 15,433 12.3% Planning: 215

Recommendation T-2.3.1.1 FHWA-PL: $ 100,480 80.0%Recommendation T-2.3.3.1 WisDOT-PL: $ 9,687 7.7% GIS: - Recommendation T-3.4.1.1 FHWA/FTA-Disc: $ - 0.0%

Other/TBD $ - 0.0%

Environmental Justice (EJ) activities includesparticipation with a number of advocacy groupsincluding health and human services agencies,Goodwill Industries, Advocap and HispanicInteragency groups of the Fox Valley and Fond duLac. Outreach activities will continue to solicitcomments and participation from all sectors of thepopulation.

PREVIOUS WORK: Past activities under this work item include thedevelopment and adoption of the Long-Range Transportation Plans,attendance at local and regional meetings to facilitate plan recommendations.Staff attends various meetings with Hispanic Interagencies, AdvocacyCoalitions and other multi cultural groups to encourage participation in theplanning process. In 2012 East Central Co-hosted a Multi Cultural PlanningWorkshop to encourage and showcase integrating cultural diversity inplanning activities. In 2012 East Participated in a month long series ofDiversity Circle meetings encouraging cultural awareness in the planningprocess. ITEM TOTAL: $ 125,600 215

1311 WORK ITEM: PROGRAM SUPPORT AND ADMINISTRATION

OBJECTIVE(S): To develop, maintain, andadminister an annual transportation planning workprogram which meets federal and state planningrequirements. MPO Administration objectivesinclude work activities required to maintain andupdate the Unified Work Program, the annualTransportation Improvement Programs and theMPO Long Range Plans as prescribed by SAFETEA-LU and the current MAP 21. To maintain updatedcontact information, mailing list, website and otherinformation as a critical element in the PublicParticipation Plan.

ACTIVITY/METHODOLOGY: This element includes costs associated withthe administration and support of LRTP development and administration,including grant administration and reporting, meeting coordination, meetingnotice preparation and publication, preparation and distribution of meetingsummaries and supporting documents, travel, conference and trainingattendance, and website maintenance. PREVIOUS WORK: Past activitiesunder this work item include administration of previous year's transportationgrants and attendance at MPO related meetings and conferences such as theannual MPO Conference, Freight Rail Conference and various training andcapacity building workshops.

1312 WORK ITEM: FOX CITIES/OSHKOSH LONG-RANGE TRANSPORTATION/LAND USE PLAN (LRTP) MAJOR UPDATES

OBJECTIVE(S): To continually monitor, evaluateand update the Public Participation Plans (PPP)the adopted LRTPs and amendments for theurbanized areas based on SAFETEA-LU. Tomaintain and implement transportation plansbased on updates and changes to local plans andprograms and maintain valid, up to dateinformation that identifies future needs, currentpriorities and available resources. To work withWisDOT and local governments as part of planimplementation to determine the most effectivemix of modal choices and land developmentpractices. A primary objective is to include thecitizens of the MPO in the planning process as wellas consultation with various environmentalmanagement agencies and organizations. MPOstaff actively seeks and solicits input andcomments from local government, environmentaland regulatory agencies, and the public. In 2013staff will be working with the various stakeholdersas part of the major update process for the LongRange Transportation Land use Plans for both theFox Cities and Oshkosh Urbanized Areas.

ACTIVITY/METHODOLOGY: In 2013 staff will work with MPO communitiesand WisDOT to compile 2010 land use and socioeconomic data as the basisfor the next major plan update. 2010 land use will be prepared basedprimarily on aerial photography delivered and processed in 2011. Work willcontinue to compile and format 2010 Census data.In 2013 staff will finalize the Public Participation Plan that identifies methodsand activities designed solicit public involvement in the planning process.Work will continue to promote and implement the provisions of the U.S. DOTEnvironmental Justice directives to ensure that minority, low-income and allother segments of the population have the opportunity to be involved in theplanning process. The public will be asked to assist in developing a vision forNortheast Wisconsin to 2045, with the focus on multi modal transportationthat provides choices that considers sustainability and healthy lifestyles. EastCentral will continue to organize, coordinate, and administer a cooperativeeffort with multiple jurisdictions to secure, develop, and maintain currentaerial photography, GIS data, and mapping products for the rapidlydeveloping areas of the region which will support and assist in the analysis ofregional transportation plans and issues.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

28

Page 38: 2013 ECWRPC Work Program

Appleton (Fox Cities) MPO Long Range Plan Update 2012 -

2015

Sept

embe

r-11

Oct

ober

-11

Nov

embe

r-11

Dec

embe

r-11

Janu

ary-

12

Febr

uary

-12

Mar

ch-1

2

Apr

il-12

May

-12

June

-12

July

-12

Aug

ust-

12

Sept

embe

r-12

Oct

ober

-12

Nov

embe

r-12

Dec

embe

r-12

Janu

ary-

13

Febr

uary

-13

Mar

ch-1

3

Apr

il-13

May

-13

June

-13

July

-13

Aug

ust-

13

Sept

embe

r-13

Oct

ober

-13

Nov

embe

r-13

Dec

embe

r-13

Janu

ary-

14

Febr

uary

-14

Mar

ch-1

4

Apr

il-14

May

-14

June

-14

July

-14

Aug

ust-

14

Sept

embe

r-14

Oct

ober

-14

Nov

embe

r-14

Dec

embe

r-14

Janu

ary-

15

Febr

uary

-15

Mar

ch-1

5

Apr

il-15

May

-15

June

-15

July

-15

Aug

ust-

15

Sept

embe

r-15

Oct

ober

-15

Nov

embe

r-15

Dec

embe

r-15

Transportation Committee -Tuesday, October 4, 2011 1:30 pm - TIP amendments/adoption and LRTP update discussionCommission meeting/Policy Board - Friday, October 28, 2011 9:00 am - TIP amendments/adoption and LRP update discussionAnnual TIP development/adoption/submittalAnnual work program development and submittalPublic participation plan (PPP) developmentTechnical Advisory Committee - Wednesday, April 4, 2012 10:00 am - Review of draft PPP and 2012-2015 LRTP update scheduleCommission Transportation Committee - Tuesday, April 10, 2012 1:30 pm - Review of draft PPR and 2012-2015 LRTP update scheduleCommission meeting/Policy Board - Friday, April 27, 2012 9:00 am - Review of draft PPP and approval for public review/2012-2015 LRTP update scheduleLRTP timeline evaluation and revisionPublic participation plan release and 45 day comment periodCommission meeting/Policy Board - Friday, July 27, 2012 9:00 am - Adoption of PPPCensus defined Urbanized Area releasedSmoothing of Urbanized Area/identification of planning areaStaff review of goals and objectivesAnnual TIP development/adoption/submittalAnnual work program development and submittal

Technical Advisory Committee - Wednesday, October 3, 2012 10:00 am - Urbanized Area/Planning Area adoption and adoption of goals and objectives/TIP amendments and adoption

Commission Transportation Committee - Tuesday, October 9, 2012 1:30 pm - Urbanized Area/Planning Area adoption and adoption of goals and objectives/TIP amendments and adoption

Commission meeting/Policy Board - Friday, October 26, 2012 9:00 am - Urbanized Area/Planning Area adoption and adoption of goals and objectives/TIP amendments and adoption

LRTP timeline evaluation and revisionData collection and preparation: gap analysis, transportation and land use inventories, TAZ delineation, implementation status of adopted plan, performance indicators, scenarios, etc.

Technical Advisory Committee - Wednesday, January 9, 2013 10:00 am - Data review/LRTP update

Commission Transportation Committee - Tuesday, January 15, 2013 1:30 pm - Data review/LRTP updates

Commission meeting/Policy Board - Friday, January 25, 2013 9:00 am - Data review/LRTP updates

Existing needs/deficiencies analysis (projects to be modeled and not modeled)LRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, July 10, 2013 10:00 am - existing needs and deficiencies analysisCommission Transportation Committee - Tuesday, July 16, 2013 1:30 pm - existing needs and deficiencies analysisCommission meeting/Policy Board - Friday, July 26, 2013 9:00 am - existing needs and deficiencies analysisModeling: existing conditions/future scenarios/analysis and refinementTechnical Advisory Committee - Wednesday, October 2, 2013 10:00 am - TIP amendments and adoption/modeling updates and scenariosCommission Transportation Committee - Tuesday, October 8, 2013 1:30 pm - TIP amendments and adoption/modeling updates and scenariosCommission meeting/Policy Board - Friday, October 25, 2013 9:00 am - TIP amendments and adoption/modeling updates and scenariosAnnual TIP development/adoption/submittalAnnual work program development and submittalLRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, January 8, 2014 10:00 am - modeling updates and scenariosCommission Transportation Committee - Tuesday, January 14, 2014 1:30 pm - modeling updates and scenariosCommission meeting/Policy Board - Friday, January 31, 2014 9:00 am - modeling updates and scenariosFinancial Plan/Fiscal ConstraintTechnical Advisory Committee - Wednesday, April 2, 2014 10:00 am - financial plan and fiscal constraintCommission Transportation Committee - Tuesday, April 8, 2014 1:30 pm - financial plan and fiscal constraintCommission meeting/Policy Board - Friday, April 25, 2014 9:00 am - financial plan and fiscal constraintLRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, July 9, 2014 10:00 am - financial plan and fiscal constraintCommission Transportation Committee - Tuesday, July 15, 2014 1:30 pm - financial plan and fiscal constraintCommission meeting/Policy Board - Friday, July 25, 2014 9:00 am - financial plan and fiscal constraintPlan AlternativesTechnical Advisory Committee - Wednesday, October 8, 2014 10:00 am - TIP amendments and adoption/plan alternativesCommission Transportation Committee - Tuesday, October 14, 2014 1:30 pm - TIP amendments and adoption/plan alternativesCommission meeting/Policy Board - Friday, October 31, 2014 9:00 am - TIP amendments and adoption/plan alternativesAnnual TIP development/adoption/submittalAnnual work program development and submittalLRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, January 7, 2015 10:00 am - plan alternatives

Commission Transportation Committee - Tuesday, January 13, 2015 1:30 pm - plan alternatives

Commission meeting/Policy Board - Friday, January 30, 2015 9:00 am - plan alternativesConformity - interagency consultation, analysis, and determinationTechnical Advisory Committee - Wednesday, April 8, 2015 10:00 am - conformityCommission Transportation Committee - Tuesday, April 14, 2015 1:30 pm - conformityCommission meeting/Policy Board - Friday, April 24, 2015 9:00 am - conformityLRTP timeline evaluation and revisionFinal draft plan developmentTechnical Advisory Committee - Wednesday, July 8, 2015 10:00 am - review of draft plan

Commission Transportation Committee - Tuesday, July 14, 2015 1:30 pm - review of draft plan

Commission meeting/Policy Board - Friday, July 31, 2015 9:00 am - review of draft planPublic comment/public information meetingsTechnical Advisory Committee - Wednesday, October 7, 2015 10:00 am - review of draft plan

Commission Transportation Committee - Tuesday, October 13, 2015 1:30 pm - review of draft plan

Commission meeting/Policy Board - Friday, October 30, 2015 9:00 am - TIP amendments/LRTP adoptionAnnual TIP development/adoption/submittalAnnual work program development and submittalPlan production and distribution

To be determined based on the provisions included in the new federal transportation bill MAP-21 which was signed into law on July 6, 2012. Including TMA provisions for the Appleton (Fox Cities ) Urbanized Area which was designated as a TMA with a population of over 200,000 people with the processing of the 2010 U.S. Census.

29

Page 39: 2013 ECWRPC Work Program

Oshkosh MPO Long Range Plan Update 2012 -2015

Sept

embe

r-11

Oct

ober

-11

Nov

embe

r-11

Dec

embe

r-11

Janu

ary-

12

Febr

uary

-12

Mar

ch-1

2

Apr

il-12

May

-12

June

-12

July

-12

Aug

ust-

12

Sept

embe

r-12

Oct

ober

-12

Nov

embe

r-12

Dec

embe

r-12

Janu

ary-

13

Febr

uary

-13

Mar

ch-1

3

Apr

il-13

May

-13

June

-13

July

-13

Aug

ust-

13

Sept

embe

r-13

Oct

ober

-13

Nov

embe

r-13

Dec

embe

r-13

Janu

ary-

14

Febr

uary

-14

Mar

ch-1

4

Apr

il-14

May

-14

June

-14

July

-14

Aug

ust-

14

Sept

embe

r-14

Oct

ober

-14

Nov

embe

r-14

Dec

embe

r-14

Janu

ary-

15

Febr

uary

-15

Mar

ch-1

5

Apr

il-15

May

-15

June

-15

July

-15

Aug

ust-

15

Sept

embe

r-15

Oct

ober

-15

Nov

embe

r-15

Dec

embe

r-15

Transportation Committee -Tuesday, October 4, 2011 1:30 pm - TIP amendments/adoption and LRTP update discussionCommission meeting/Policy Board - Friday, October 28, 2011 9:00 am - TIP amendments/adoption and LRP update discussionAnnual TIP development/adoption/submittalAnnual work program development and submittalPublic participation plan (PPP) developmentTechnical Advisory Committee - Wednesday, April 4, 2012 10:00 am - Review of draft PPP and 2012-2015 LRTP update scheduleCommission Transportation Committee - Tuesday, April 10, 2012 1:30 pm - Review of draft PPR and 2012-2015 LRTP update scheduleCommission meeting/Policy Board - Friday, April 27, 2012 9:00 am - Review of draft PPP and approval for public review/2012-2015 LRTP update scheduleLRTP timeline evaluation and revisionPublic participation plan release and 45 day comment periodCommission meeting/Policy Board - Friday, July 27, 2012 9:00 am - Adoption of PPPCensus defined Urbanized Area releasedSmoothing of Urbanized Area/identification of planning areaStaff review of goals and objectivesAnnual TIP development/adoption/submittalAnnual work program development and submittal

Technical Advisory Committee - Wednesday, October 3, 2012 10:00 am - Urbanized Area/Planning Area adoption and adoption of goals and objectives/TIP amendments and adoption

Commission Transportation Committee - Tuesday, October 9, 2012 1:30 pm - Urbanized Area/Planning Area adoption and adoption of goals and objectives/TIP amendments and adoption

Commission meeting/Policy Board - Friday, October 26, 2012 9:00 am - Urbanized Area/Planning Area adoption and adoption of goals and objectives/TIP amendments and adoption

LRTP timeline evaluation and revisionData collection and preparation: gap analysis, transportation and land use inventories, TAZ delineation, implementation status of adopted plan, performance indicators, scenarios, etc.

Technical Advisory Committee - Wednesday, January 9, 2013 10:00 am - Data review/LRTP update

Commission Transportation Committee - Tuesday, January 15, 2013 1:30 pm - Data review/LRTP updates

Commission meeting/Policy Board - Friday, January 25, 2013 9:00 am - Data review/LRTP updates

Existing needs/deficiencies analysis (projects to be modeled and not modeled)LRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, July 10, 2013 10:00 am - existing needs and deficiencies analysisCommission Transportation Committee - Tuesday, July 16, 2013 1:30 pm - existing needs and deficiencies analysisCommission meeting/Policy Board - Friday, July 26, 2013 9:00 am - existing needs and deficiencies analysisModeling: existing conditions/future scenarios/analysis and refinementTechnical Advisory Committee - Wednesday, October 2, 2013 10:00 am - TIP amendments and adoption/modeling updates and scenariosCommission Transportation Committee - Tuesday, October 8, 2013 1:30 pm - TIP amendments and adoption/modeling updates and scenariosCommission meeting/Policy Board - Friday, October 25, 2013 9:00 am - TIP amendments and adoption/modeling updates and scenariosAnnual TIP development/adoption/submittalAnnual work program development and submittalLRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, January 8, 2014 10:00 am - modeling updates and scenariosCommission Transportation Committee - Tuesday, January 14, 2014 1:30 pm - modeling updates and scenariosCommission meeting/Policy Board - Friday, January 31, 2014 9:00 am - modeling updates and scenariosFinancial Plan/Fiscal ConstraintTechnical Advisory Committee - Wednesday, April 2, 2014 10:00 am - financial plan and fiscal constraintCommission Transportation Committee - Tuesday, April 8, 2014 1:30 pm - financial plan and fiscal constraintCommission meeting/Policy Board - Friday, April 25, 2014 9:00 am - financial plan and fiscal constraintLRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, July 9, 2014 10:00 am - financial plan and fiscal constraintCommission Transportation Committee - Tuesday, July 15, 2014 1:30 pm - financial plan and fiscal constraintCommission meeting/Policy Board - Friday, July 25, 2014 9:00 am - financial plan and fiscal constraintPlan AlternativesTechnical Advisory Committee - Wednesday, October 8, 2014 10:00 am - TIP amendments and adoption/plan alternativesCommission Transportation Committee - Tuesday, October 14, 2014 1:30 pm - TIP amendments and adoption/plan alternativesCommission meeting/Policy Board - Friday, October 31, 2014 9:00 am - TIP amendments and adoption/plan alternativesAnnual TIP development/adoption/submittalAnnual work program development and submittalLRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, January 7, 2015 10:00 am - plan alternatives

Commission Transportation Committee - Tuesday, January 13, 2015 1:30 pm - plan alternatives

Commission meeting/Policy Board - Friday, January 30, 2015 9:00 am - plan alternativesConformity - interagency consultation, analysis, and determinationTechnical Advisory Committee - Wednesday, April 8, 2015 10:00 am - conformityCommission Transportation Committee - Tuesday, April 14, 2015 1:30 pm - conformityCommission meeting/Policy Board - Friday, April 24, 2015 9:00 am - conformityLRTP timeline evaluation and revisionFinal draft plan developmentTechnical Advisory Committee - Wednesday, July 8, 2015 10:00 am - review of draft plan

Commission Transportation Committee - Tuesday, July 14, 2015 1:30 pm - review of draft plan

Commission meeting/Policy Board - Friday, July 31, 2015 9:00 am - review of draft planPublic comment/public information meetingsTechnical Advisory Committee - Wednesday, October 7, 2015 10:00 am - review of draft plan

Commission Transportation Committee - Tuesday, October 13, 2015 1:30 pm - review of draft plan

Commission meeting/Policy Board - Friday, October 30, 2015 9:00 am - TIP amendments/LRTP adoptionAnnual TIP development/adoption/submittalAnnual work program development and submittalPlan production and distribution

To be determined based on the provisions included in the new federal transportation bill MAP-21 which was signed into law on July 6, 2012.

30

Page 40: 2013 ECWRPC Work Program

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ 1,479 13.0% Planning: 25 FHWA-PL: $ 9,120 80.0%

Recommendation T-4.1.2.1 WisDOT-PL: $ 801 7.0% GIS: - Recommendation T-5.1.3.1 FHWA/FTA - Disc. $ - 0.0%Recommendation T-1.3.8.5 Other/TBD $ - 0.0%

ITEM TOTAL: $ 11,400 25

FUNDING SOURCES PERSON DAYS

ECWRPC: $ 24,000 14% Planning: 231

FHWA-PL: $ - 0%

Recommendation T-3.2.5.1WisDOT-PL: $ - 0% GIS: -

Recommendation T-3.2.6.1FHWA/FTA-Disc. 96,000$ 55%

Recommendation T-3.2.7.1 FHWA Dis. Carry Over $ 44,331 25%

ECWRPC Carry-Over $ 11,083 $ 0

PREVIOUS WORK: Staff worked to run, review, test and comment on the freight component of the Northeast Region Model in-house during 2011. East Central worked with UW-Madison CFIRE staff to prepare a peer review and report regarding the NE Region Truck Model that includes recommendations for future improvements. In 2011 staff worked with the WisDOT and their consultant to separate the single unit truck from the combination truck in the model assignment. This will allow for refined analysis of the heavy truck or semi traffic in the region that accounts for the majority of freight movements.

* Per the Commission's Competitive Bid Policy (Resolution 34-10), Section III ( C ), a contract expressly approved as a line item in the adopted Annual Work Program/Budget can be executed by the Executive Director, so long as proper procedures for soliciting bids is followed (see Section III ( C ) and Section V of the Competitive Bid Policy). IN THIS CASE, A $25,000 CONSULTANT CONTRACT IS EXPECTED WITH HNTB TO SUPPORT MODELING EFFORTS.

ITEM TOTAL: $ 175,414 231

1313 WORK ITEM: NORTHEAST REGION TRAVEL DEMAND MODEL IMPROVEMENT PROGRAM

OBJECTIVE(S): In 2012 East Central willcontinue working with WisDOT and otherstakeholders to improve the Northeast RegionTravel Demand Model. The Northeast RegionModel combined the Green Bay, Fox Valley andFond du Lac Travel Demand models and recentlycombine the Lake-shore counties from Door toSheboygan. Work will continue to improve thetransit and truck mode for the entire model. Theobjective is to collect and maintain socio-economicdata for use in the travel demand model andother MPO planning and implementation projects.In 2012 the work effort will include developing a2010 base year model that can be used as a toolfor the major plan update scenario testing inabout 2013.

ACTIVITY/METHODOLOGY: Modify, manipulate, and review socioeconomicdata based on aerial photography and land use data formatted to reflect theTransportation Analysis Zones (TAZ) developed for the Northeast RegionModel. Ongoing activities include updating and maintaining data for use intransportation modeling programs. Work will continue in 2012 to prepare theTAZ, census block and block group data for review by U.S. Census as part ofthe Census Transportation Planning Package (CTPP) development. Staff willcontinue to work through the Model User Group that includes WisDOT, BrownCounty Planning and Bay-Lake Regional Planning to improve modelingcapabilities statewide. PREVIOUS WORK: Past activities under this workitem include the review manipulation of various years of aerial photographyand TAZ demographic, land use and traffic data for use in daily modelingactivities and model development. Phase I of the Northeast Region Modelwas completed and operational in late 2008. In 2010 work continued on theNortheast Region Model adding Door, Kewaunee, Manitowoc and Sheboygancounties.

1314 WORK ITEM: FREIGHT MODEL IMPROVEMENT/MULTIMODAL FREIGHT PLANNING

OBJECTIVE(S): To enhance freight planningactivities based on priorities to prepare regional,state and national freight plans and programs.East Central will continue work with WisDOT toevaluate and improve the truck/freight mode splitcomponent in the Northeast Travel DemandModel. While the travel model estimates volumesof single unit and combination truck trips, freightinformation to verify and calibrate theassignments in the model are very sparse. Theproject objective would be working with WisDOTand other stakeholders including CFIRE, the Mid-America Freight Coalition to gather and organizefreight travel information and compare the data totravel model output.

ACTIVITY/METHODOLOGY: East Central will work closely with WisDOTand their consultants to consider methods and variables that can be used tocalibrate the freight component of the travel model. Travel modeldevelopment coordination will require constant communication with WisDOTUrban Planning, Forecasting and Regional staff, and MPO model user workgroups. In addition to further studies recommended in the LRTPs, the modelswill continue to be used for analysis and traffic forecast for WisDOT and localgovernments. Ongoing activities to compile, organize, and geo-referenceupdated aerial photography and GIS data with a regional coordinate system.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

31

Page 41: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: Theseactivities are specifically related to and/orimplement the followingstrategies/recommendations contained withinthe adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 31,874 15% Planning: 328 Recommendation T-2.2.4.1 FHWA-PL: $ 107,971 51%Recommendation T-2.2.2.1 WisDOT-PL: $ 10,630 5% GIS: 151 Recommendation T-2.2.5.1 FHWA/FTA-Disc: $ - 0%Recommendation T-2.3.1.1 Other/TBD $ 62,042 29%Recommendation T-2.7.3.1 $ -

ELEMENT TOTAL: $ 212,517 479

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 4,643 12% Planning: 43 Recommendation T-1.3.1.1 FHWA-PL: $ 30,531 80%Recommendation T-1.3.6.1 WisDOT-PL: $ 2,990 8% GIS: 15

FHWA/FTA-Disc: $ - 0%

Note-47% of $81,200=

Other/TBD $ - 0%

To work with local jurisdictions and WisDOT toinitiate planning activities to improve trafficoperations, safety and security. Work continues to integrate transportation planning with emergencymanagement and all hazards planning activities.

PREVIOUS WORK: Past activities under this work item include the provisionof assistance with pavement management using the PASER method and usingWISLR. In 2012 staff completed a sign inventory and replacement plan for theTown of Wolf in Winnebago County. In 2012 staff worked with WisDOT,Calumet County, Outagamie County, the towns of Harrison and Buchanan todevelop to complete a long term plan for the WIS 441 and CTH KK area andthe southeast portion of the Fox Cities. The WIS 441/CTH KK study willprovide alternatives considered in the LRTP update.

38,164.00

ITEM TOTAL: $ 38,164 58

1320 MAJOR WORK ELEMENT: SHORT-RANGE TRANSPORTATION SYSTEM MANAGEMENT (TSM) and CONGESTION MANAGEMENT PROCESS (CMP)

PROGRAM OBJECTIVE(S): Work with localgovernments to provide TransportationSystem Management (TSM) assistance,emphasizing a more efficient use of theexisting transportation system. Work withlocal governments and WisDOT to prepareand assist with studies needed to program,design and implement transportationimprovements that contributes to the widernational objectives of energy conservation,improved air quality; and increased socialand environmental considerations includingaccessibility to minorities, disadvantagedand handicapped groups.

ACTIVITY/METHODOLOGY: Staff activities include the assessment ofa wide range of transportation issues faced by local governments.Staff provides technical assistance through the TransportationSystem Management (TSM) program (Sub‑elements 1321, 1323,1325 and 1326). Short Range Transportation and OperationPlanning does not include the Transportation Improvement Program(TIP 1322) or Specialized Transit Planning (1324).

1321 WORK ITEM: SHORT‑RANGE STREET AND HIGHWAY PLANNING - Congestion Management Process (CMP)

OBJECTIVE(S): To maintain an ongoing programof traffic operations and highway improvementproject assistance that contributes to the safetyand improved operation of the street and highwaysystem in the Oshkosh and Fox Cities UrbanizedAreas. A primary objective will be to assistWisDOT by promoting and incorporating the goalsand objectives in the Wisconsin Strategic HighwaySafety Plan into the planning process. To providecontinuing assistance in implementing therecommendations developed in Oshkosh and FoxCities plans and TIPs. To assist in thedevelopment of a comprehensive pavementmanagement system, that includes all jurisdictionsin the urbanized areas. To work with localjurisdictions and WisDOT to collect local roadinformation for the urbanized areas for inclusion inWisDOT’s Wisconsin Information System for LocalRoads (WISLR).

ACTIVITY/METHODOLOGY: The Appleton MPO Area is designated as aTMA and staff will be working with WisDOT and FHWA to prepare aCongestion Management Process document that includes many of the ShortRange Planning Elements and system improvement activities. East Central willwork with WisDOT to develop performance measures that can be used toevaluate and plan for improvements to the system. Work will continue to offertechnical support to local governments in the collection of pavement ratingdata for inclusion in WisDOT’s WISLR system, and assist in training, asdeemed necessary. Staff will continue to assist communities with MUTCD signstandards and planning based on current requirements and guidance. Staffwill continue the evaluation of the functionally classified system and considerchanges based on evolving traffic patterns and land use. Work to developstrategies to measure and monitor traffic operations and level of servicebased on CMP performance measures. Technical assistance will continue tobe provided to WisDOT and local governments within the MPO as needed fortransportation studies and small scale projects including, but not limited totraffic forecast and model testing.

32

Page 42: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 5,320 12.1% Planning: 55 Recommendation T-1.3.1.1 FHWA-PL: $ 35,040 80.0%Recommendation T-1.3.4.1 WisDOT-PL: $ 3,440 7.9% GIS: 31

FHWA/FTA-Disc: $ - 0.0%Other/TBD $ - 0.0%

ITEM TOTAL: $ 43,800 86

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ - #DIV/0! Planning: 31 Recommendation T-2.2.5.1 FHWA-PL: $ - #DIV/0!

Recommendation T-2.3.1.1 WisDOT-PL: $ - #DIV/0! GIS: -

Recommendation T-2.2.4.1 FHWA/FTA-Disc: $ - #DIV/0!

Other/TBD $ - #DIV/0!

ITEM TOTAL: $ - 31

1322 WORK ITEM: TRANSPORTATION IMPROVEMENT PROGRAM (TIP), FOX CITIES AND OSHKOSH MPO's

OBJECTIVE(S): To prepare the annualTransportation Improvement Program (TIP) . Toprepare a transportation capital improvementprogram that identifies all projects using federalfunding and all other projects that significantlyimpact the operation of the transportation system.To actively solicit eligible candidate transportationprojects from local governments to prioritize andprepare a logical program to efficiently utilize STP-Urban funds and improve the traffic operations onthe system. A primary objective of the TIPprocess is to provide appropriate publicnotification of TIP requirements and the ability toidentify and comment on projects.

ACTIVITY/METHODOLOGY: In 2013 a separate TIP will be developed forthe Appleton TMA that will include additional information based on thedesignation requirements under MAP-21. 2012‑2016 TIPs will be preparedcontaining a four year programming element. In 2013 STP-Urban candidateprojects will be reviewed and selected for construction years 2014 and 2015.Requests will be made for submittal of a five-year Capital ImprovementProgram to demonstrate the community's fiscal commitment and financialcapacity to carry out projects submitted for federal funding. Highwayprojects eligible for funding will be evaluated and prioritized according toneed-related objective criteria. The projects are then reviewed and approvedby the MPO TACs and the Commission's Transportation Committee prior toconsideration by the full Commission and submittal to WisDOT, FHWA, andFTA. PREVIOUS WORK: Past activities under this work item include thedevelopment of the 2011 and 2012 TIPs, required plan amendments, andreporting activities.

1323 WORK ITEM: TRANSPORTATION ALTERNATIVES

OBJECTIVE(S): To encourage, promote, andaccommodate bicyclists and pedestrians as safeand efficient modes of transportation. To workcooperatively with WisDOT, MPO communities andthe various stakeholders to initiate and implementa Complete Streets program and other initiativesto promote physical activity and healthy lifestyles.To work cooperatively with stakeholders to link the various transportation modes and provide themost energy/cost effective means for thetransport of people, goods and services. In theOshkosh and Fox Cities Urbanized Areas work willcontinue to evaluate the movement and volume offreight. Staff will continue to promote theredevelopment of multimodal freight facilities toserve the area, primarily road to rail connections.Other efforts will include highway park and ridefacilities, air freight and passenger multimodallinkages or terminals.

ACTIVITY/METHODOLOGY: Provide technical assistance to communities,rail lines, trucking interest and other transportation providers, includingcoordinating and hosting meetings, preparing data, and providing informationto identify potential facilities and the potential reuse of corridors resultingfrom recommendations and implementation of additional modes. East Centralwill continue to maintain an ongoing inventory and analysis of existing bicycleroutes and usage, destinations, road conditions and other hazards, bicycleand pedestrian crash data. Staff will work with local governments tointegrate local bicycle, pedestrian and SRTS plans with MPO, regional andstate plans. PREVIOUS WORK: Past activities under this work item includeassisting communities in the development of funding applications for SRTSplanning, the development of bicycle and pedestrian plans, and thedevelopment of trail linkages.

33

Page 43: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 6,400 12% Planning: 52 Recommendation T-1.2.12.1 FHWA-PL: $ 42,400 80%Recommendation T-1.2.12.2 WisDOT-PL: $ 4,200 8% GIS: 50

FHWA/FTA-Disc: $ - 0%Other/TBD $ - 0%

ITEM TOTAL $ 53,000 102

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ - #DIV/0! Planning: 30 Recommendation T-1.1.6.1 FHWA-PL: $ - #DIV/0!Recommendation T-1.2.13.1 WisDOT-PL: $ - #DIV/0! GIS: - Recommendation T-3.1.1.1 FHWA/FTA-Disc: $ - #DIV/0!

Other/TBD $ - #DIV/0!

and structure rehabilitation projects associatedwith water-based, trail, or rail orientedtransportation modes. The urban portion of theFox River corridor is part of a larger effort toestablish the Fox-Wisconsin River NationalHeritage Area recognizing the importance of theriver in the past and future development of theregion.

PREVIOUS WORK: In 2009, the Commission prepared the NationalHeritage Area application which was accepted by the region's congressionaldelegation. Additional funding was leveraged and secured to initiate theupdate of the 1997 Fox-Wisconsin Heritage Parkway Plan and numerousmeetings were held with communities along the corridor to gather input andassess opportunities for trail linkages along the Upper and Lower Fox Rivercorridors. In 2010 legislation was introduced by the Wisconsin Delegation todesignate the Fox-Wisconsin Heritage Parkway as a historically significantnational Heritage Area.

ITEM TOTAL: $ - 30

1324 WORK ITEM: TRANSIT AND SPECIALIZED TRANSPORTATION DEVELOPMENT AND COORDINATION/SAFETY AND SECURITY

OBJECTIVE(S): To work with the urban transitsystems to develop transit operating and capitalimprovement programs which efficiently andeffectively serve the Fox Cities and OshkoshUrbanized Areas; to prepare, and assist in thepreparation of, service coordination studies andelderly and disabled transportation plans whichmeet federal transit accessibility regulations andpromote coordination between transit and otherfederal and state-funded specializedtransportation services; work closely with healthand human services (HSS) and other humanresource agencies to coordinate and preparestudies which contribute to transit efficiency andeffectiveness; and to provide assistance withimplementation activities.

ACTIVITY/METHODOLOGY: Staff will continue to coordinate existingtransportation programs and to assist in the application for special programfunding. Work will also continue on a regional approach to planning withtransit and transportation providers, public safety and health and humanservices agencies to better coordinate transportation services. Other emphasisfor 2011 include the prioritization and implementation of the TDPrecommendations and locally developed human service/public transportationcoordination plans. Further study would include working with the traveldemand model to test alternative transit routes and services.PREVIOUS WORK: The Commission completed the TDPs for Valley Transit,Oshkosh Transit and Fond du Lac Transit and continues work with the variousstakeholders to implement and evaluate plan recommendations. In 2012 staffworked with Oshkosh Transit and our consultant to test a number of transitalternatives using the Transit Model.

1325 WORK ITEM: TRANSPORTATION ALTERNATIVES (TA) ACTIVITIES IN THE FOX RIVER CORRIDOR

OBJECTIVE(S): To assist local communities andgovernment agencies to enhance multi-modaltransportation opportunities and connections thatimproves access to portions of the Upper Fox,Lake Winnebago, and Lower Fox Rive system.Another objective is to better coordinate thebridge operation and navigation schedules for theLake Winnebago and Lower Fox River corridorthroughout the Fox Cities and Oshkosh tominimize traffic delays during openings. Continueto prepare studies, site plans and participate inother planning activities upon request from FoxRiver/Lake Winnebago Pool communities forvarious land acquisition, historic preservation

ACTIVITY/METHODOLOGY: As part of a larger National Heritage Areadesignation (pending). planning project staff will continue to coordinate andassist with short and long term planning associated with developing a multimodal transportation corridor that includes navigation on the Fox River andLake Winnebago system within the MPO areas. The Fox-Wisconsin RiverHeritage Corridor Plan will include proposed bicycle and pedestrian facilitiesand connections to other systems along this important river corridor. The planwill include the annual cost attributed to the safe operation of the waterwayand provide a list and cost estimate for short/long term safety enhancements.Staff will work with WisDOT and communities on project development and theformulation of a list of stakeholders as initiatives are prioritized.

34

Page 44: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ - #DIV/0! Planning: 12 Recommendation T-5.2.3.1 FHWA-PL: $ - #DIV/0!Recommendation T-5.2.5.1 WisDOT-PL: $ - #DIV/0! GIS: - Recommendation T-4.4.2.1 FHWA/FTA-Disc: $ - #DIV/0!

Other/TBD $ - #DIV/0!

ITEM TOTAL: $ - 12

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to following recommendationscontained within the adopted Regional Plan:

FUNDING SOURCES: BPFP GRANT

PERSON DAYS:

ECWRPC : $ 15,511 20% Planning: 105 Recommendation T-5.5.1.1: FHWA-PL: $ - 0%

WisDOT-BPFP Grant: $ 62,042 80% GIS: 55 Recommendation T-5.5.1.2: FHWA/FTA-Disc: $ - 0%

0%

ITEM TOTAL: $ 77,553 160

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 7,797 10% Planning: 108

FHWA-SPR: $ 62,374 80%Recommendation T-1.2.1.1 WisDOT-SPR: $ 7,797 10% GIS: 14 Recommendation T-1.2.2.1 FHWA/FTA -Disc: $ - 0%

Other/TBD $ - 0%

ELEMENT TOTAL: $ 77,967 122

1326 WORK ITEM: TRANSPORTATION PLANNING PROMOTING SUSTAINABILITY, ENERGY CONSERVATION AND MINIMIZING AIR QUALITY IMPACTS

OBJECTIVE(S): To develop transportation plansand programs that promote sustainability concepts with a direct impact on reducing energyconsumption and the associated environmentalimpacts. Continue to monitor federal and stateenvironmental mitigation guidance, standards andregulations as they evolve. East Central willcontinue to promote and assist with land usepractices that are consistent with transportationefficiency objectives and air quality considerations.

ACTIVITY/METHODOLOGY: Work to implement recommendationsincluding the promotion of alternative fuels and energies, to reduce singleoccupant vehicle trips through programs for car pooling, van pooling, worktrip busing or other alternative modes including pedestrian and bicycle. Workwith local communities to promote and develop facilities for walking andbiking, including, but not limited to, the Safe Routes to School (SRTS)program. Many of these activities will be monitored and measured incollaboration with WisDOT using FHWA supported travel demand air qualityand system evaluation systems. PREVIOUS WORK: Past activities under thiswork item include participation in webinars showcasing recycling materials fortransportation projects. Attendance at WisDOT and WDNR meetingsconcerning air quality, the review of air quality regulatory proposals, and thecollection/generation of air quality data for use in examining transportationalternatives.

1328 WORK ITEM: FOX CITIES AND OSHKOSH BICYCLE AND PEDESTRIAN PLAN

OBJECTIVE(S): To work with the public, bicycleand pedestrian stakeholders and local officials toprepare a long range Bicycle and Pedestrian Planfor the Fox Cities and Oshkosh Urbanized Area. Anobjective is to identify and plan for criticalconnections between communities and establishedroutes or facilities. An objective is to work withhealthy lifestyle and sustainability advocates topromote transportation choices and benefits.

ACTIVITY/METHODOLOGY: Work with WisDOT, the Bicycle PedestrianPlan Advisory Committee and Sub-Committees to review, evaluate andincorporate existing facilities and plans in the Fox Cities and Oshkosh into thedocument and mapping. Staff has prepared a Public Participation Plan thatidentifies how all segments of the population will be notified about theplanning process. The study will include an analysis of existing conditionsincluding public perceptions and comments, as well as an evaluation ofsystem-wide accessibility and connections to transit and other modes.Project Administration and Reporting will be Managed by WisDOTNortheast Region based on an approved BPFP Municipal Agreement

1330 MAJOR WORK ELEMENT: REGIONAL MULTIMODAL TRANSPORTATION PLANNING

PROGRAM OBJECTIVE(S): To assistWisDOT, Counties, local jurisdictions andother operating agencies in providing a safeand efficient transportation system thatincludes all modes of travel. To work withWisDOT and local government and thepublic to promote and encourageimprovements based on the policies ofConnections 2030, the State Rail Plan andother transportation planning initiatives.

ACTIVITY/METHODOLOGY: Coordinate regional transportationplanning activities with WisDOT, local jurisdictions and the public. Topromote and assist WisDOT with rural transportation initiatives andprograms including WISLR, locally adopted specializedtransportation coordination plans and SRTS planning activities. Workwith WisDOT, local jurisdictions and freight stakeholders to evaluatethe freight system to better assess current and future needs.

REGIONAL PLAN RELATIONSHIP: Theseactivities are specifically related to and/orimplement the followingstrategies/recommendations contained withinthe adopted Regional Plan:

35

Page 45: 2013 ECWRPC Work Program

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 4,233 10% Planning: 60 Recommendation T-3.1.1.1 FHWA-SPR: $ 33,866 80%Recommendation T-3.4.3.1 WisDOT-SPR: $ 4,233 10% GIS: 5 Recommendation T-5.5.1.2 FHWA/FTA -Disc: 0%

Other/TBD 0%

ITEM TOTAL: $ 42,333 65

FUNDING SOURCES: PERSON DAYS:ECWRPC: $ 891 10% Planning: 12

FHWA-SPR: $ 7,126 80%

Recommendation T-3.4.1.1 WisDOT-SPR: $ 891 10% GIS: 4

Recommendation T-3.1.3.1

FHWA/FTA -Disc: 0%

Recommendation T-1.3.10.2 Other / TBD: 0%

A primary objective will be to assist WisDOT bypromoting and incorporating the goals andobjectives in the Wisconsin Strategic HighwaySafety Plan into the planning process.

Annually the Commission solicits Technical Assistance Projects from member communities that are prioritized and selected for any given year. Technical assistance projects for the upcoming year are selected and finalized in October.

PREVIOUS WORK: During 2012 the Commission assisted local jurisdictionswith various traffic studies, intersection design, and access control issues.

ITEM TOTAL: $ 8,908 16

1331 WORK ITEM: REGIONAL TRANSPORTATION STUDIES

OBJECTIVE(S): To assist counties andcommunities in the region address transportationneeds, problems or issues which are expressed bythe region's citizens and elected representativesand which promote state interests. To coordinatefully with WisDOT's initiatives includingConnections 2030 and the Wisconsin InformationSystem for Local Roads (WISLR). East Central willcontinue to work with the objective of promotingand developing best management practices usingWISLR. Continue to provide counties, communitiesand the public with studies and informationaddressing regional transportation system needsand opportunities.

ACTIVITY/METHODOLOGY: Efforts include the implementation of locallyadopted primary recommendations for the USH 10 corridor from the Fox Cities to Stevens Point, the USH 45 corridor from USH 10 to USH 8, the STH 21corridor from Oshkosh to Omro and beyond, , STH 15, STH 23, and STH 76.Ongoing corridor plan development will continue for STH 47 and theUSH 10/STH 114 corridors. East Central will continue to work with WisDOTand local communities to adequately plan for the long term preservation ofthese highway corridors as they relate to Connections 2030 and other WisDOT initiatives. PREVIOUS WORK: Past activities under this work item includethe development of corridor plans for USH 10, STH 23, STH 15, STH 21 andUSH 45 and work on the STH 47 and USH 10/114 corridor studies. Workedwith WisDOT and UW-Madison CFIRE as part of the Northeast WisconsinFreight Study that led to the addition of a Regional Freight Mobility Planningcomponent.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

1332 WORK ITEM: TECHNICAL ASSISTANCE

OBJECTIVE(S): To assist operating agencies andlocal governments in the development of solutionsto critical transportation problems. To assist withthe implementation of plans and programsdeveloped in accordance with East Central’sregional transportation policies. Provide technicalassistance to local governments requestingguidance in the analysis of transportation systemproblems including highway, transit, specializedtransit services, rail, air, bicycle and other modes.

ACTIVITY/METHODOLOGY: Technical assistance is provided to therequesting entities in response to issues which arise, in a fast informalmanner. Emphasis is placed on meeting the requirements for locally adoptedtransportation coordination plans for elderly and disabled populations. Otherregional work efforts include WISLR pavement management programs, raildevelopments and access control, and on state plans and programs such asthe Connections 2030, Transportation Economic Assistance (TEA), and ruralpublic transportation programs and initiatives. In 2013, the Commissionwill work with selected entities on various transportation issues aspart of the annual Technical Assistance program.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thef ll i i / d i i d

36

Page 46: 2013 ECWRPC Work Program

FUNDING SOURCES: PERSON DAYS:

ECWRPC: $ 2,673 10% Planning: 36 FHWA-SPR: $ 21,381 80%

WisDOT-SPR: $ 2,673 10% GIS: 5 Recommendation T-2.2.1.1 FHWA/FTA -Disc: 0%Recommendation T-2.2.5.1 Other/TBD: 0%

Recommendation T-2.3.3.1

ITEM TOTAL: $ 26,726 41

REGIONAL PLAN RELATIONSHIP: Theseactivities are specifically related to and/orimplement the followingstrategies/recommendations contained withinthe adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

Recommendation T-1.1.2.1ECWRPC $ 14,870 15% Planning: 129

Recommendation T-1.1.5.1 FHWA-PL: $ 50,000 50%Recommendation T-1.1.6.1 WisDOT-PL: $ 5,022 5% GIS: 47 Recommendation T-1.3.1.1 FHWA/FTA -Disc: $ 29,568 30%

Other / TBD: $ 5,568 6%

ELEMENT TOTAL: $ 99,460 176

1333 WORK ITEM: REGIONAL COMPREHENSIVE PLANNING

OBJECTIVE(S): East Central's RegionalComprehensive Plan was completed in 2008. Theprimary objective is to integrate state, regionaland local plans so that a consistent vision for thetransportation In system is identified. EastCentral will continue work with the variousjurisdictions as they prepare and implement theircomprehensive plans to ensure consistency withstate and regional plans. In 2013 staff will focuson regional freight planning and will be assistingmember counties and communities on identifyingways to improve the freight system.

ACTIVITY/METHODOLOGY: In 2013 work continues to prioritize andimplement recommendations and strategies identified in the RegionalComprehensive Plan. The issues pertaining to region-wide transportationinclude: regional trails, rural highway deficiencies and pavement ratings,intermodal facilities and their connections to broader markets, rural functionalclassification, rural transit (Locally Adopted Transportation Coordination Plans)programs, and other planning initiatives including rail, water, trucking, and airfreight transportation. In 2013 East Central will be working with freight railstakeholders to discuss issues and opportunities to improve rail service tocommunities and impacted businesses. Specifically East Central will beworking with Calumet County, WisDOT and other stakeholders to stabilize,reestablish and improve rail service in the County and region. PREVIOUS WORK: In 2008, the Commission completed the development and adoptionof its comprehensive plan. In 2012 staff worked with the various standingCommittees to monitor and discuss priority projects in the ComprehensivePlan. State and Federal level transportation plans were formally integratedinto this document and specific recommendations for transportation planningactivities and infrastructure improvements were stated. Work continues toincorporate recommendations into locally developed plans.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

1340 MAJOR WORK ELEMENT: FOND DU LAC METROPOLITAN PLANNING ORGANIZATION

PROGRAM OBJECTIVE(S): Through acontractual agreement for staffing with theCity of Fond du Lac, the Federal HighwayAdministration and the WisconsinDepartment of Transportation; East Centralstaff will prepare and maintain the requiredplans, reports, studies, models, and datanecessary for the development andmanagement of the Fond du LacMetropolitan Planning Organization (MPO).The objective is to meet all the planningrequirements associated with "MovingAhead for Progress in the 21st Century (MAP-21)" and the prior Safe, Accountable,Flexible, Efficient Transportation Equity Act;A Legacy for Users (SAFETEA-LU).

ACTIVITY/METHODOLOGY: Develop and maintain a Unified WorkProgram, a Public Participation Plan (PPP), a TransportationImprovement Program (TIP) and a Long-Range Transportation/LandUse Plan (LRTP) to serve as a guide for future transportation andland use development in the Fond du Lac Metropolitan PlanningOrganization (MPO) area. Work with FHWA/WisDOT and otherstakeholders to insure plans and programs meet federal, state andlocal planning requirements.

37

Page 47: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement the

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ 1,731 12.1% Planning: 18

Recommendation T-1.2.2.1FHWA-PL: $ 11,412 80.0%

Recommendation T-1.2.2.2WisDOT-PL: $ 1,122 7.9% GIS: -

FHWA/FTA -Disc: $ - 0.0%Other/TBD $ - 0.0%

ITEM TOTAL: $ 14,265 18

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ 2,981 12.1% Planning: 25 FHWA-PL: $ 19,724 80.0%

Recommendation T-2.3.1.1 WisDOT-PL: $ 1,950 7.9% GIS: 17 Recommendation T-2.3.3.1 FHWA/FTA -Disc: $ - 0.0%Recommendation T-3.1.1.1 Other / TBD $ - 0.0%

PREVIOUS WORK: Past activities under this work item include thedevelopment of a Public Participation Plan and adoption of LRTP that includedpublic information meetings and outreach to federal and state environmentalregulatory and protection agencies. Staff attends numerous local and regionalmeetings to monitor implementation and plan recommendations.

ITEM TOTAL: $ 24,655 42

1341 WORK ITEM: FOND DU LAC MPO PROGRAM SUPPORT AND ADMINISTRATION

OBJECTIVE(S): To develop, maintain, implementand administer an annual transportation planningwork program which meets federal and stateplanning requirements. To maintain updatedcontact information, mailing list, an MPO websiteand other information as a critical element in thepublic involvement process and plan.

ACTIVITY/METHODOLOGY: Activities include planning and technicalsupport of the Metropolitan Planning Organization, for grantadministration/reporting, meeting coordination, meeting notice preparationand publication, preparation and distribution of meeting summaries andsupporting documents, travel, conference and training attendance.PREVIOUS WORK: Past activities under this work item includeadministration of previous year's transportation grants and attendance atMPO related meetings and conferences such as the annual MPO Conference,Freight Rail Conference, etc. and various technical forums and workshops.

1342 WORK ITEM: FOND DU LAC MPO LONG-RANGE TRANSPORTATION PLAN IMPLEMENTATION AND MAJOR UPDATE

OBJECTIVE(S): In 2013 staff will work with theFond du Lac MPO to begin the major update tothe adopted in the LRTP. The MPO will continue tomonitor current socioeconomic trends and workto develop a 2010 base year in using census data,traffic counts and 2010 land use. The objective isto maintain long range transportation plans basedon updates and changes to local plans andprograms and maintain valid, up to dateinformation that identifies future needs, currentpriorities and available resources. Transportationmodes will be continually evaluated in the contextof land use development patterns as compared tothe preferred 2035 plan adopted by the Fond duLac MPO. Staff will work with WisDOT, localgovernments and other stakeholders as part ofplan implementation.

ACTIVITY/METHODOLOGY: In 2013 MPO staff will continue collecting2010 land use that will serve as the basis for the next major LRTP and usingthe 2010 census and WisDOT's large scale traffic counting program. Staff willmaintain a regular meeting schedule to reevaluate methods used to monitorand track the projects in the plan and discuss implementation status.Activities include improving internet access to the TIP,LRTP and status ofobligated and significant projects. Staff will continue to work with MPOcommunities as comprehensive plans are developed or updated to ensureconsistency with State and Regional programs and projects. Staff will developadditional strategies to avoid, minimize or mitigate environmental disruptionby land use and transportation projects based on 2010 plan consultation withenvironmental organizations and agencies. Staff will continue to promote andimplement the provisions of the U.S. DOT Environmental Justice in terms ofthe transportation system and impacts of projects to minority and low-incomepopulations. In 2013 staff use the Public Participation Plan as a guide to inviteall segments of the population to participate in the planning process. EJActivities includes the collection of 2010 socioeconomic data to locate andevaluate minority and disadvantaged populations relative to thetransportation system plans and projects.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

38

Page 48: 2013 ECWRPC Work Program

Fond du Lac MPO Long Range Plan Update 2012 - 2015

Sep

tem

ber

-11

Oct

ober

-11

Nov

emb

er-1

1

Dec

emb

er-1

1

Jan

uar

y-1

2

Feb

ruar

y-1

2

Mar

ch-1

2

Ap

ril-

12

May

-12

Jun

e-1

2

July

-12

Au

gu

st-1

2

Sep

tem

ber

-12

Oct

ober

-12

Nov

emb

er-1

2

Dec

emb

er-1

2

Jan

uar

y-1

3

Feb

ruar

y-1

3

Mar

ch-1

3

Ap

ril-

13

May

-13

Jun

e-1

3

July

-13

Au

gu

st-1

3

Sep

tem

ber

-13

Oct

ober

-13

Nov

emb

er-1

3

Dec

emb

er-1

3

Jan

uar

y-1

4

Feb

ruar

y-1

4

Mar

ch-1

4

Ap

ril-

14

May

-14

Jun

e-1

4

July

-14

Au

gu

st-1

4

Sep

tem

ber

-14

Oct

ober

-14

Nov

emb

er-1

4

Dec

emb

er-1

4

Jan

uar

y-1

5

Feb

ruar

y-1

5

Mar

ch-1

5

Ap

ril-

15

May

-15

Jun

e-1

5

July

-15

Au

gu

st-1

5

Sep

tem

ber

-15

Oct

ober

-15

Nov

emb

er-1

5

Dec

emb

er-1

5

Policy Board - Wednesday, October 12, 2011 10:00 am - TIP amendments/adoption, LRP update discussion, work program discussionAnnual TIP development/adoption/submittalAnnual work program development and submittalPolicy Board/TAC (if needed) - Wednesday, November 2, 2011 10:00 am - TIP amendments/adoption, LRP update discussion, work program discussionPublic participation plan (PPP) developmentPolicy Board/TAC - Wednesday, February 8, 2012 10:00 am - Review of draft PPP and 2012-2015 LRTP update schedule/TIP discussion

Policy Board - Wednesday, May 9, 2012 10:00 am - Final review of draft PPP and approval for public review/2012-2015 LRTP update schedule/planning activity update/membership update

LRTP timeline evaluation and revisionPublic participation plan release and 45 day comment period

TAC (if needed) - Wednesday, June 13, 2012 10;00 am - special studies/TIP candidate projects

Policy Board (if needed) - Wednesday, July 11, 2012 10:00 am - TIP/special studies/work program discussionCensus defined Urbanized Area releasedSmoothing of Urbanized Area/identification of planning areaStaff review of goals and objectivesAnnual TIP development/adoption/submittalAnnual work program development and submittalTechnical Advisory Committee - Wednesday, September 12, 2012 10:00 am - Urbanized Area/Planning Area adoption and adoption of goals and objectives/TIP amendments and adoptionPolicy Board - Wednesday, October 10, 2012 10:00 am - Urbanized Area/Planning Area adoption and adoption of goals and objectives/TIP amendments and adoptionPolicy Board/TAC - Wednesday, November 14, 2012 10:00 am -LRTP timeline evaluation and revision/study updates/2013 work programLRTP timeline evaluation and revisionData collection and preparation: gap analysis, transportation and land use inventories, TAZ delineation, implementation status of adopted plan, performance indicators, scenarios, etc.Policy Board/TAC - Wednesday, February 13, 2013 10:00 am - Data review/LRTP update/TIP discussionExisting needs/deficiencies analysis (projects to be modeled and not modeled)Policy Board - Wednesday, May 8, 2013 10:00 am - New MAP-21 planning provisions update/planning activity update/membership update/data review/existing needs/deficiencies analysis/LRTP evaluation and revisionLRTP timeline evaluation and revisionTechnical Advisory Committee - Wednesday, June 12, 2013 10:00 am - TIP candidate projects/LRTP updates/special studiesPolicy Board - Wednesday, July 10, 2013 10:00 am -TIP candidate projects/LRTP updates/special studiesModeling: existing conditions/future scenarios/analysis and refinementTAC - Wednesday, September 11, 2013 10:00 am - 2014 work program/TIP project review and discussion/modeling updatePolicy Board - Wednesday, October 9, 2013 10:00 am - TIP amendments and adoption/modeling updates and scenarios/2014 work programAnnual TIP development/adoption/submittalAnnual work program development and submittalLRTP timeline evaluation and revisionPolicy Board/TAC (if needed) - Wednesday, November 13, 2013 - 10:00 am - modeling update/2014 work programPolicy Board/TAC - Wednesday, February 12, 2014 10:00 am - TIP discussion/LRTP updates/modeling updates and scenariosFinancial Plan/Fiscal ConstraintPolicy Board - Wednesday, May 14, 2014 10:00 am - LRTP monitoring/planning activity update/ membership updateLRTP timeline evaluation and revisionTAC - Wednesday, June 11, 2014 10:00 am - financial plan and fiscal constraintPolicy Board - Wednesday, July 9, 2014 10:00 am - financial plan and fiscal constraintPlan AlternativesTechnical Advisory Committee - Wednesday, September 10, 2014 10:00 am - TIP amendments and adoption/plan alternativesPolicy Board - Wednesday, October 8, 2014 10:00 am - TIP amendments and adoption/plan alternativesAnnual TIP development/adoption/submittalAnnual work program development and submittalLRTP timeline evaluation and revisionPolicy Board/TAC (if needed) - Wednesday, November 12, 2014 10:00 am - plan alternativesConformity - interagency consultation, analysis, and determinationPolicy Board/TAC - Wednesday, February 11, 2015 10:00 am - conformityPolicy Board - Wednesday, May 13, 2015 10:00 am - conformityLRTP timeline evaluation and revisionFinal draft plan developmentTechnical Advisory Committee - Wednesday, June 10, 2015 10:00 am - review of draft planPolicy Board - Wednesday, July 8, 2015 10:00 am - review of draft planPublic comment/public information meetingsTechnical Advisory Committee - Wednesday, September 9, 2015 10:00 am - review of draft plan/public commentPolicy Board - Wednesday, October 14, 2015 10:00 am - TIP amendments/LRTP adoptionAnnual TIP development/adoption/submittalAnnual work program development and submittalPlan production and distribution

To be determined based on the provisions included in the new federal transportation bill MAP-21 which was signed into law on July 6, 2012.

39

Page 49: 2013 ECWRPC Work Program

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ 974 12.2% Planning: 14

FHWA-PL: $ 6,394 80.0%Recommendation T-2.2.5.1 WisDOT-PL: $ 625 7.8% GIS: - Recommendation T-2.3.1.1 FHWA/FTA -Disc: $ - 0.0%Recommendation T-2.4.1.1 Other/TBD: $ - 0.0%

ITEM TOTAL: $ 7,993 14

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ 715 11.8% Planning: 12

Recommendation T-1.3.1.1 FHWA-PL: $ 4,862 80.0%

Recommendation T-1.3.4.1 WisDOT-PL: $ 500 8.2% GIS: - FHWA/FTA -Disc: $ - 0.0%

Other/TBD: $ - 0.0%

ITEM TOTAL: $ 6,077 12

1343 WORK ITEM: FOND DU LAC MPO SHORT RANGE PLANNING AND MULTIMODAL COORDINATION/TRANSPORTATION ALTERNATIVES (TA)

OBJECTIVE(S): To encourage, promote, andaccommodate bicyclists and pedestrians as safeand efficient modes of transportation. A primaryobjective will be to assist WisDOT by promotingand incorporating the goals and objectives in theWisconsin Strategic Highway Safety Plan into theplanning process. To work cooperatively withstakeholders to link the various transportationmodes and provide the most energy/cost effectivemeans for the transport of people, goods andservices. In the Fond du Lac Urbanized Area workwill continue to evaluate the movement andvolume of freight. Staff will continue to promotethe redevelopment of multimodal freight facilitiesto serve the area, primarily road to railconnections. Other efforts will include highwaypark and ride facilities, air freight and passengermultimodal linkages or terminals. Work with localgovernments to integrate local bicycle andpedestrian plans with MPO, regional and stateplans. As part of SAFETEA-LU staff will beassisting WisDOT with the implementation of theSafe Routes to School program.

ACTIVITY/METHODOLOGY: Provide technical assistance to communities,rail lines, trucking interest and other transportation providers, includingcoordinating and hosting meetings, preparing data, and providing informationto identify potential facilities and the potential reuse of corridors resultingfrom recommendations and implementation of additional modes. East Centralwill continue to maintain an ongoing inventory and analysis of existing bicycleroutes and usage, destinations, road conditions and other hazards, bicycleand pedestrian crash data. Appropriate consideration will be given to theprovisions of the U.S. DOT Environmental Justice directives on the effects ofprojects on minority and low-income populations. Staff will work with localgovernments to integrate local bicycle, pedestrian and SRTS plans with MPO,regional and state plans. NOTE: Under MAP-21 multi modal provisions aregrouped into a single category of "Transportation Alternatives" (TA) that areincluded under this element. PREVIOUS WORK: Past activities haveincluded providing assistance in dealing with rail / street crossing issues,reviewing area development and park plans and pedestrian/bicycle mobilityissues.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

1344 WORK ITEM: FOND DU LAC MPO TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

OBJECTIVE(S): To prepare the annualTransportation Improvement Program (TIP) forthe Fond du Lac Urbanized Area. To prepare atransportation capital improvement program thatidentifies all projects using federal funding and allother projects that significantly impact theoperation of the transportation system. To activelysolicit eligible candidate transportation projectsfrom local governments to prioritize and prepare alogical program to efficiently utilize STP-Urbanfunds and improve the system in the short term.Provide appropriate public notification of TIPrequirements and the ability to identify andcomment on projects.

ACTIVITY/METHODOLOGY: A 2014-2018 TIP will be prepared containinga four year programming element. In 2013 STP-Urban candidate projectswill be reviewed and reaffirmed for construction years 2014 and 2016.Requests will be made for submittal of a five-year Capital ImprovementProgram to demonstrate the community's fiscal commitment and financialcapacity to carry out projects submitted for federal funding. Highwayprojects eligible for funding will be evaluated and prioritized according toneed-related objective criteria. The projects are then reviewed and approvedby the MPO Technical Advisory Committee prior to consideration/approval bythe Fond du Lac Policy Board and submittal to WisDOT, FHWA, and FTA.PREVIOUS WORK: Past activities under this work item include thedevelopment of the 2011 and 2012 TIPs, required plan amendments, andreporting activities.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

40

Page 50: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ 297 11.3% Planning: 4 Recommendation T-1.2.12.1 FHWA-PL: $ 2,110 80.0%Recommendation T-1.2.12.2 WisDOT-PL: $ 230 8.7% GIS: -

FHWA/FTA -Disc: $ - 0.0%Other/TBD: $ - 0.0%

ITEM TOTAL: $ 2,637 4

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ 780 11.3% Planning: 10 Recommendation T-4.1.2.1 FHWA-PL: $ 5,498 80.0%Recommendation T-5.1.3.1 WisDOT-PL: $ 595 8.7% GIS: - Recommendation T-1.3.8.5 FHWA/FTA -Disc: $ - 0.0%

Other/TBD: $ - 0.0%

ITEM TOTAL: $ 6,873 10

1345 WORK ITEM: FOND DU LAC TRANSIT AND SPECIALIZED TRANSPORTATION DEVELOPMENT AND COORDINATION

OBJECTIVE(S): To work with Fond du LacTransit and other transportation providers todevelop transit operating and capital improvementprograms which efficiently and effectively servethe Fond du Lac Urbanized Area; to prepare, andassist in the preparation of, service coordinationstudies and elderly and disabled transportationplans which meet federal transit accessibilityregulations and promote coordination betweentransit and other federal and state-fundedspecialized transportation services including thevarious health and human services agencies; toprepare other studies which contribute to transitefficiency and effectiveness; and to provideassistance with implementation activities. Work onissues of safety and security with regard to thetransit systems.

ACTIVITY/METHODOLOGY: Staff will continue to coordinate existingtransportation programs and will assist in the application for special programfunding. Work will also continue on a regional approach to implementation ofIntelligent Transportation Systems (ITS) planning with transit providers,public safety agencies, etc. in the region, including but not limited to theapplication of transit modeling components for system evaluation. Effortsincluding coordination between public works, public safety, and transit, as wellas between jurisdictions are underway and will continue through 2013. Staffwill also work with Fond du Lac Area Transit to implement recommendationsin their TDP. PREVIOUS WORK: Past activities under this work iteminclude the completion of the Fond du lac Area Transit TDP in 2009 andcontinued work with FDLAT, providing technical assistance as part of theannual TIP and reporting process.

1346 WORK ITEM: FOND DU LAC MPO TRAVEL MODEL IMPROVEMENT PROGRAM

OBJECTIVE(S): In 2013 staff will continueworking with WisDOT and their consultants toupdate the Northeast Region Travel DemandModel to a year 2010 base year that coincideswith the census. The Northeast Region Modelincludes Green Bay, the Fox Cities, Oshkosh andFond du Lac and work continues to improve thetransit and truck mode for the entire model. Theobjective is to collect and maintain socio-economicdata for use in the travel demand model andother MPO planning and implementation projects.The work effort will assist in the long range planscenario testing and provide a powerful tool forthe major plan update beginning in 2013.

ACTIVITY/METHODOLOGY: Modify, manipulate, and review socioeconomicdata based on aerial photography and land use data formatted to reflect theTransportation Analysis Zones (TAZ) developed for the Northeast RegionModel. Ongoing activities include updating and maintaining data for use intransportation modeling programs. Work will continue in 2013 to prepare theTAZ, census block and block group data for review by U.S. Census as part ofthe Census Transportation Planning Package (CTPP) development.PREVIOUS WORK: Past activities under this work item include the reviewmanipulation of various years of aerial photography and TAZ demographic,land use and traffic data for use in daily modeling activities and modeldevelopment. Phase I of the Northeast Region Model was completed andoperational in late 2008. In 2010 work continued on Phase II of the NortheastRegion Model that adds Door, Kewaunee, Manitowoc and Sheboygan countiesto the model. A recently completed version of the Northeast Region Modelwas finalized and approved by WisDOT in late 2011.

41

Page 51: 2013 ECWRPC Work Program

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ 6,000 16% Planning: 27 ECWRPC Carry Over $ 1,392 4%

Recommendation T-3.2.5.1 WisDOT-PL: $ - 0% GIS: 19 Recommendation T-3.2.6.1 FHWA/FTA - Disc: 24,000$ 65%Recommendation T-3.2.7.1 FHWA Dis Carry Over $ 5,568 15%

ITEM TOTAL: $ 36,960 46

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - Planning: 85 IT: -

Wisconsin Transformation: $ 41,787 GIS: -

ELEMENT TOTAL: $ 41,787 85

* Per the Commission's Competitive Bid Policy (Resolution 34-10), Section III ( C ), a contract expressly approved as a line item in the adopted Annual Work Program/Budget can be executed by the Executive Director, so long as proper procedures for soliciting bids is followed (see Section III ( C ) and Section V of the Competitive Bid Policy). IN THIS CASE, A $2,050 MARKETING CONTRACT IS EXPECTED.

1370 MAJOR WORK ELEMENT: WISCONSIN TRANSFORMATION GRANT

PROGRAM OBJECTIVE(S): To promote healthycommunity concepts that link directly totransportation and recreation.

ACTIVITY/METHODOLOGY: The Transform Wisconsin project seeks tobuild local capacity to promote healthy environments that help Shawano arearesidents make healthy choices and therefore prevent chronic diseases. Staffwill work to grow strong local coalitions that advance local policy andenvironmental change efforts to improve health. Local initiatives are rooted incommunity engagement and follow the project’s guiding principles, includingpopulation-wide environmental and system changes to increase access tohealthy environments, with specific attention paid to groups experiencinghealth inequities. The grant is funded across three periods: an initial “start-up” period (2 months), followed by Year 1 (12 months) and Year 2 (12months). 2013 work will focus on Year 1 and will complete objectivesidentified in the Year 1 contract.

1347 WORK ITEM: FREIGHT MODEL IMPROVEMENT /FREIGHT PLANNING

OBJECTIVE(S): East Central will continue workwith WisDOT to evaluate and improve thetruck/freight mode split component in the travelmodel. While the travel model estimates volumesof single unit and combination truck trips, freightinformation to verify and calibrate theassignments in the model are very sparse. Theproject objective would be working with WisDOT,CFIRE, a Freight Advisory Committee and otherstakeholders to gather and organize freight travelinformation and compare the data to travel modeloutput. .East Central will continue to organize,coordinate, and administer a cooperative effortwith multiple jurisdictions to secure, develop, andmaintain current aerial photography, GIS data,and mapping products for the rapidly developingareas of the region which will support and assist inthe analysis of local or regional transportationissues.

ACTIVITY/METHODOLOGY: East Central will work closely with WisDOTstaff and their consultants to develop advanced techniques that can be usedto improve the freight component of the travel model. Travel modeldevelopment coordination will require constant communication with WisDOTUrban Planning, Forecasting and Regional staff, and MPO model user workgroups. In addition to further studies recommended in the LRTPs, the modelswill continue to be used for analysis and traffic forecast for WisDOT and localgovernments.

PREVIOUS WORK Work continues through Model User Groups with variousstakeholders including WisDOT, Brown County Planning and Bay LakeRegional Planning to improve modeling capabilities statewide. Other activitiesunder this work item included freight stakeholder meetings and forums torequest participation from the freight community. Staff worked with the UWMadison Researchers to conduct a formal peer review of the truck model andto prepare informational materials and develop establishment surveys thatcan be used to better understand the movement of freight in the region.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

42

Page 52: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: Theseactivities are specifically related to and/orimplement the followingstrategies/recommendations contained withinthe adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: 537 Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: 45

FHWA/WisDOT-SRTS: $ 332,061 100% GIS: - Recommendation T-5.5.11.1 FHWA/FTA -Disc: $ - 0%

SRTS Carry Over from 2012: $ 125,635 126%

ELEMENT TOTAL: $ 457,696 582

2013 FUNDS TO BE CARRIED OVER TO 2014 $ 153,769

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: 385

Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: 45

Recommendation T-5.5.11.1 WisDOT-SRTS: $ 85,678 100% GIS: - FHWA/FTA -Disc: $ - 0%SRTS Carry Over $ 125,635 0%

ELEMENT TOTAL: $ 211,313 430

1381 WORK ITEM: REGIONAL SAFE ROUTES TO SCHOOL AND LOCAL PLAN DEVELOPMENT/IMPLEMENTATION

OBJECTIVE(S): To work with regionalstakeholders and WisDOT in the develop of aRegional SRTS Program. Staff will provideguidance, resources, and empower local SRTSprograms to implement education,encouragement, enforcement, and evaluationprograms.

ACTIVITY/METHODOLOGY: Coordinate and develop a Regional SafeRoutes to School Program that includes the following activities: coordinateand develop a Regional Safe Routes to School Baseline Plan and StrategicPlan, local SRTS Action Plans, Regional SRTS Website, Regional SRTSElectronic Newsletter, host SRTS workshops, and develop a mediacampaign/outreach for SRTS Programs. Ongoing programs for 2013 includeEnforcement for SRTS Training Course and a Youth Engagement Program forMiddle Schools. Additional costs for materials, printing, conference attendanceand miscellaneous meeting and travel expenses are included in this category.PREVIOUS WORK: Staff hosted three Regional Stakeholder meetings, sixRegional SRTS Advisory Committee meetings, worked with local schooldistricts with developing local SRTS task forces, gathering parent and studentsurveys, and conducting bike and walk audits. Staff also assisted localcommunities and school districts with SRTS Events including InternationalWalk to School Day and Bike Safety Month.

1380 MAJOR WORK ELEMENT: REGIONAL SAFE ROUTES TO SCHOOL COORDINATOR PROGRAM

PROGRAM OBJECTIVE(S): This is a newprogram, initiated in August, 2009 andallows staff to work with WisDOT, localmunicipalities (including law enforcement,health professionals, planners, etc.), schooldistricts, health professionals, bicycleadvocates, local businesses and non-profitagencies on the development of a RegionalSRTS Program. All communities within theEast Central Region will be invited toparticipate in the SRTS Program. Staff willcoordinate and develop a Regional SRTSBaseline Report and Strategic Plan, website,and electronic newsletter. Staff will workwith local SRTS program to assist in thedevelopment of a SRTS program, assist inthe development of a SRTS plan, and assistwith the implementation ofrecommendations made in the SRTS Plan.Staff will also provide resources, incentives,and assist with activities related toInternational Walk to School Day (October)and Bike Safety Month (May).

ACTIVITY/METHODOLOGY: Coordinate and develop a Regional SafeRoutes to School Program that includes the following activities:coordinate and develop a Regional Safe Routes to School BaselineReport and Strategic Plan and, Regional SRTS Website, RegionalSRTS Electronic Newsletter, host SRTS workshops, and develop amedia campaign/outreach for SRTS Programs. Staff will work withlocal communities and school districts to start a SRTS program,develop a SRTS Plan, and to assist in the implementation activitiesidentified in their SRTS Plan. Staff will also assist with activities forInternational Walk to School Day, Bike Safety Day, Walking SchoolBus Program.

43

Page 53: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: 30 Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: -

WisDOT-SRTS: $ 10,000 100% GIS: - Recommendation T-5.5.1.1 FHWA/FTA -Disc: $ - 0%

SRTS Carry Over $ 16,553 0%

ITEM TOTAL: $ 26,553 30

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: 113 Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: -

WisDOT-SRTS: $ 87,000 100% GIS: - Recommendation T-5.5.11.1 FHWA/FTA -Disc: $ - 0%

SRTS Carry Over $ 21,022 0%

ITEM TOTAL: $ 108,022 113

1382 WORK ITEM: WORKSHOPS

OBJECTIVE(S):The regional program started inOctober 2009 with 41 schools in 9 school districtsand now include over 120 schools in 26 schooldistricts. With the program's growth the 10counties covered by the East Central RPC nowmake up approximately 35% of the communitiesthat have ongoing SRTS Programs in Wisconsin.The regional program has allowed schools to come on board as they become interested and beginplanning and move quickly to implementationwithout waiting for the next program cycle. With57 school districts in the 10 county area continualoutreach continues to be an important part of theregional program.

ACTIVITY/METHODOLOGY: Staff will work to expand the Regional SRTSProgram by continuing to do outreach to local SRTS coalitions throughworkshops. Workshops could include but are not limited to the followingpotential speakers: Madison Police Department Cycle Train Program;Enforcement for SRTS Course, School Siting, Person Safety, Teens Go GreenProgram. PREVIOUS WORK: Staff hosted three Regional Stakeholdermeetings, six Regional SRTS Advisory Committee meetings, worked with localschool districts with developing local SRTS task forces, gathering parent andstudent surveys, and conducting bike and walk audits. Staff also had aworkshop with the PedNet Coalition on their Walking School Bus program

1383 WORK ITEM: REGIONAL SAFE ROUTES TO SCHOOL EVENTS

OBJECTIVE(S): To work with local communitiesand school districts to provide incentives and staffassistance for walking and biking events.

ACTIVITY/METHODOLOGY: Staff will work with local communities andschool districts to assist with their parent pledge program and registrationactivities, walk to school day event, bike safety day activities, Fire Up YourFeet Program, Frequent Walker Program, Walking School Bus Program/CycleTrain, Bike Fleets, and a Summer Bicycling Program and their bike rodeo andtheir walking school bus programs. PREVIOUS WORK: Staff worked withcommunities and schools for their parent pledge and registration dayactivities, International Walk to School Day event, bike safety day activities,bike rodeos and their walking school bus programs.

* Per the Commission's Competitive Bid Policy (Resolution 34-10), Section III ( C ), a contract expressly approved as a line item in the adopted Annual Work Program/Budget can be executed by the Executive Director, so long as proper procedures for soliciting bids is followed (see Section III ( C ) and Section V of the Competitive Bid Policy). IN THIS CASE, A $55,000 IN PROGRAM INCENTIVES ARE EXPECTED.

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

44

Page 54: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: - Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: -

WisDOT-SRTS: $ 25,000 100% GIS: - Recommendation T-5.5.11.1 FHWA/FTA -Disc: $ - 0%

SRTS Carry Over $ - 0%

ITEM TOTAL: $ 25,000 -

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: 9 Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: -

WisDOT-SRTS: $ 15,000 100% GIS: - Recommendation T-5.5.11.1 FHWA/FTA -Disc: $ - 0%

SRTS Carry Over $ - 0%

ITEM TOTAL: $ 15,000 9

1384 WORK ITEM: MEDIA CAMPAIGN OUTREACH

OBJECTIVE(S): To continue to develop a moremedia focused campaign which would includebranded materials, assistance with increasedmedia coverage and PSA use, and development ofa social media campaign.

ACTIVITY/METHODOLOGY: Staff will work with local communities andschool districts and the consultant to get more of the local SRTS stories in themedia (i.e. in the newspaper and the tv). Development of Public ServiceAnnouncements for the Regional SRTS Program. PREVIOUS WORK: Staff has worked with their consultant to develop social media sites for the regionalprogram. Staff and their consultant have also worked with the media to getlocal stories in the newspapers, especially for events such as walk to schoolday and bike safety day.

1385 WORK ITEM: EVIDENCE BASED PRACTICES AND RESEARCH

ACTIVITY/METHODOLOGY: Staff will develop evaluation and research ofSRTS programs within the East Central Region. PREVIOUS WORK: Staff has developed a Performance Analysis Tool to evaluate how schools are doingwith SRTS.

* Per the Commission's Competitive Bid Policy (Resolution 34-10), Section III ( C ), a contract expressly approved as a line item in the adopted Annual Work Program/Budget can be executed by the Executive Director, so long as proper procedures for soliciting bids is followed (see Section III ( C ) and Section V of the Competitive Bid Policy). IN THIS CASE, A $10,000 RESEARCH CONTRACT IS EXPECTED.

* Per the Commission's Competitive Bid Policy (Resolution 34-10), Section III ( C ), a contract expressly approved as a line item in the adopted Annual Work Program/Budget can be executed by the Executive Director, so long as proper procedures for soliciting bids is followed (see Section III ( C ) and Section V of the Competitive Bid Policy). IN THIS CASE, A $25,000 MARKETING EXPENSE IS EXPECTED.

OBJECTIVE(S): To work with schools and localSRTS task forces to develop an evaluation andresearch program for the Regional SRTS program.

45

Page 55: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: - Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: -

WisDOT-SRTS: $ 42,391 100% GIS: - Recommendation T-5.5.11.1 FHWA/FTA -Disc: $ - 0%

SRTS Carry over $ 16,500 0%

ITEM TOTAL: $ 58,891 -

Consultant Contract $ 58,891

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: - Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: -

WisDOT-SRTS: $ - 100% GIS: - Recommendation T-5.5.11.1 FHWA/FTA -Disc: $ - 0%

SRTS Carry Over $ 2,917 0%

ITEM TOTAL: $ 2,917 -

1388 WORK ITEM: UNUSUALLY HAZARDOUS BUSING SITUATIONS

OBJECTIVE(S): To work with school districts andlocal law enforcement in developing a bettermethodology for delineating unusually hazardousbusing situations.

ACTIVITY/METHODOLOGY: Staff will work with school districts and locallaw enforcement to assist them with their unusually hazardous busingsituations and work with them to resolve these as well. PREVIOUS WORK:Staff previously worked with WE BIKE, etc., LLC to take a look at the currentprocess and criteria for unusually hazardous busing situations for Wisconsin.Staff and the consultant also looked at examples across the country that havedealt with unusually hazardous busing situations.

* Per the Commission's Competitive Bid Policy (Resolution 34-10), Section III ( C ), a contract expressly approved as a line item in the adopted Annual Work Program/Budget can be executed by the Executive Director, so long as proper procedures for soliciting bids is followed (see Section III ( C ) and Section V of the Competitive Bid Policy). IN THIS CASE, A $58,891 CONTRACT IS IN PLACE WITH TOOLE DESIGN GROUP.

1386 WORK ITEM: YOUTH ENGAGEMENT PROGRAM

OBJECTIVE(S): To work with middle schoolstudents and empower them to create activitiesfor sustainable transportation, lower air pollutionand increase physical activity.

ACTIVITY/METHODOLOGY: There are approximately 27 middle schools(and potentially 7 elementary schools with 5th and 6th grades) that would beparticipating in the Youth Engagement program. The Youth Engagementprogram is a leadership program that empowers youth to create activities forsustainable transportation, lower air pollution and increase physical activity.Training and supporting groups of students leaders in an authenticcollaboration model with student leaders helps to ensure that strategies andactivities are "cool-proofed" and fun. PREVIOUS WORK: Staff has put willbegin implementing this program with middle schools across the region in theFall of 2012-2013.

46

Page 56: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activitiesare specifically related to and/or implement thefollowing strategies/recommendations containedwithin the adopted Regional Plan:

FUNDING SOURCES: PERSON DAYS:

ECWRPC $ - 0% Planning: - Recommendation T-5.5.1.1 FHWA-PL: $ - 0% IT: -

WisDOT-SRTS: $ 10,000 100% GIS: - Recommendation T-5.5.11.1 FHWA/FTA -Disc: $ - 0%

SRTS Carry Over $ - 0%

ITEM TOTAL: $ 10,000 -

1389 WORK ITEM: SRTS NATIONAL CONFERENCE STIPENDS

OBJECTIVE(S): To provide travel stipends forparents, school officials, municipal representatives,advocates, and other to attend the SRTS NationalConference.

ACTIVITY/METHODOLOGY: Staff will work with local communities andschool districts within the rural counties to develop or expand their SRTSProgram. Staff will also provide resources, incentives, and assist with activitiesfor International Walk to School Day and Bike to School. Resources for theschool districts and the communities will also be available through EastCentral staff, the East Central Regional SRTS Website, electronic newsletter,and SRTS Workshops. Community and school districts representatives will alsobe asked to participate in the Regional SRTS Planning process. PREVIOUS WORK: Staff sent 10 SRTS local leaders to the 3rd National Safe Routes toSchool Conference. The SRTS local leaders that attended came back with arenewed energy, new ideas for their local program, and were inspired.

47

Page 57: 2013 ECWRPC Work Program

MAJOR WORK ELEMENTS: REGIONAL PLAN RELATIONSHIP:

1405 - Open Space & Environmental Management Committee Administration/Coordination

1410 - Technical Assistance

ECWRPC: $141,840 Planning: 236

1430 - Regional Plan Implementation & Coordination

GIS: 20

1440 - Fox-Wisconsin Heritage ParkwayAG-1: Preservation and Protection of Agricultural lands CR-1: Preservation of Indigenous and Ethnic Cultural HeritageAG-2: Development of Sustainable Farming Opportunities CR-2: Access to Cultural Resource Protection ToolsAG-3: Government Support Mechanisms for Agriculture CR-3: Cultural Resource Educational OpportunitiesAG-4: Importance of Education in Agriculture’s Future CR-4: Communication and InteractionNR-5: Regional Open Space and Recreation CR-5: Historic Building and Archaeological Site Inventories

PROGRAM TOTAL: $141,840 256

FUNDING SOURCES PERSON DAYS

ECWRPC: 8,664$ Planning: 8

GIS: 7

ELEMENT TOTAL: 8,664$ 15

FUNDING SOURCES PERSON DAYS

ECWRPC:91,332$

Planning:19

GIS: 121 Strategy CF-8.3.2

ELEMENT TOTAL: 91,332$ 140

1405 MAJOR WORK ELEMENT: OPEN SPACE/ENVIRONMENTAL MANAGEMENT COMMITTEE ADMINISTRATION/COORDINATION

OBJECTIVE(S): To support the Commission's designated Standing Committees.

1400 PROGRAM ELEMENT: AGRICULTURE, OPEN SPACE, CULTURE & RECREATION

The Agriculture, Open Space, Culture & Recreation work program element encompasses planning activities associated with meeting the open space and recreational needs of the region as a whole, as well as plans for individual governmental jurisdictions as identified in the Year 2030 Regional Comprehensive Plan . Funding for the Open Space & Recreation Element is derived mainly from the Commission’s tax levy, as many recreational issues are regional in nature. The Commission has long supported local assistance in this area and it is expected that the need will continue. Due its close relationship with the future economic development of the region, particularly the Fox Cities, Oshkosh, and Fond du Lac urbanized areas. The major program categories are listed below and reiterated in the work program activity table on the following pages. The work plan elements are designed to serve the short and long term open space and recreational needs of a growing and diverse population and include:

TOTAL FUNDING SOURCES: TOTAL PERSON DAYS:

“In 2030, agriculture is an important feature of the economy and lifestyle of the East Central region. Development pressures have been diverted away from prime farmland and ample, un-fragmented agricultural districts exist. Farming is practiced on the most productive soils. A variety of farm types and sizes are operating successfully. The region’s farming community supplies both local and global markets. Citizens, local officials, and farmers are aware of and continuously address interrelated economic and land use issues. The viable and stable farm economy, in terms of farm income and prosperity, reflects concerted efforts by the private and public sectors to balance free market forces and government programs for land conservation”.

ACTIVITY/METHODOLOGY: Staff acts as a resource to provideinformation and technical design assistance to localcommunities in the following areas: county/local park facilityplanning and concept design; recreational needs oropportunities studies; design assistance with innovativesubdivisions and conservation subdivisions.

OBJECTIVE(S): Provide direct assistance to local units ofgovernment in addressing issues specific to recreation, openspace, trail development, and the promotion of theconservation subdivision planning concept,

The 1400 Program is directly related to Chapters 8, 9 and 10 of the Year 2030 Regional Comprehensive Plan, The adopted vision for these elements are as follows:

ACTIVITY/METHODOLOGY: Staff will provide support activities for the periodic meetings of the Commission's Open Space & Environment Committee. This includes, but is not limited to the preparation of meeting agendas, materials, meeting scheduling, meeting attendance, development of written meeting summaries and other duties and follow-up activities assigned by the Committee.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies or recommendations contained within the adopted Regional Plan:

1410 MAJOR WORK ELEMENT: TECHNICAL ASSISTANCE (AG/OP/CUL/REC)

“In the year 2030, the region is recognized as a leader in the state for preservation of its cultural resources. It provides public access to resource protection tools and the political advocacy necessary to ensure protection for, and appreciation of, our diverse ethnic heritage, both historic and prehistoric.”

The Year 2030 Regional Comprehensive Plan spells out more specific issue areas which need to be addressed at a local or regional scale. Details of these issues can be found in Chapters 8, 9, and 10 in the form of twelve separate "Plan Guideline" fact sheets:

48

Page 58: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 2,675$ Planning: 3

GIS: - Strategy CF-8.3.2

ITEM TOTAL: 2,675$ 3

FUNDING SOURCES PERSON DAYS

ECWRPC: 4,409$ Planning: 5

GIS: - Strategy CF-8.3.2

ITEM TOTAL: 4,409$ 5

FUNDING SOURCES PERSON DAYS

ECWRPC: 5,781$ Planning: 10

GIS: - Strategy CF-8.3.2

ITEM TOTAL: 5,781$ 10

FUNDING SOURCES PERSON DAYS

ECWRPC: 2,725$ Planning: 3

GIS: - Recommendation CF-8.3.2.2

ITEM TOTAL:

2,725$ 3

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

ACTIVITY/METHODOLOGY: Staff will assist the City of Fond duLac in the development of a concept plan for existing open spacelocated behind the Fond du Lac Children's Museum which will allow fora connection to Lakeside Park.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

ACTIVITY/METHODOLOGY: Staff will provide limited assistance in the development of maps and recommendations for the development of a local trail network which better connects the Village of Bonduel (Shawano County) to the Mountain-Bay Trail.

1415 WORK ITEM: TRAIL PLANNING - VILLAGE OF BONDUEL (continued from 2009)

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1412 WORK ITEM: CITY OF FOND DU LAC CHILDREN'S MUSEUM GREENSPACE DESIGN

OBJECTIVE(S): To assist communities and counties in meeting theirneeds for the development of site-specific park and recreation facilityplans or master plans.

OBJECTIVE(S): To assist communities and counties in meeting theirneeds for the development of site-specific park and recreation facilityplans or master plans.

1411 WORK ITEM: PARK SITE PLANNING - TOWN OF BELLE PLAINE (continued from 2008)

1413 WORK ITEM: CALUMET COUNTY 441 AREA REGIONAL PARK FACILITY SITING (continued from 2012)

OBJECTIVE(S): To assist communities and counties in meeting theirneeds for the development of site-specific park and recreation facilityplans or master plans.

ACTIVITY/METHODOLOGY: Staff will assist the Calumet Countyin the development of an analysis and alternatives for the creation of aregional park facility in the southeast 441 area of the Fox Cities.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

OBJECTIVE(S): To provide limited assistance to complete or substantially progress a local-level project.

ACTIVITY/METHODOLOGY: Specifically, staff will assist the Town of Belle Plaine (Shawano County) in the development of a park siteplan for the former Steig Property, a 10 acre property located onRound Lake.

49

Page 59: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC:2,991$

Planning:5

Recommendation CF-8.3.2.2 GIS: -

ITEM TOTAL: 2,991$

TOTAL:

5

FUNDING SOURCES PERSON DAYS

ECWRPC: 8,722$ Planning: 15

Recommendation CF-8.3.2.2 GIS: -

ITEM TOTAL: 8,722$

TOTAL:

15

FUNDING SOURCES PERSON DAYS

ECWRPC: 7,077$ Planning: 12

Recommendation CF-8.3.2.2 GIS: -

ITEM TOTAL: 7,077$ TOTAL: 12

FUNDING SOURCES PERSON DAYS

ECWRPC: 7,077$ Planning: 12

Recommendation CF-8.3.2.2 GIS: -

ITEM TOTAL: 7,077$ TOTAL: 12

1421 WORK ITEM: PARK AND OPEN SPACE PLAN UPDATE - WINNEBAGO COUNTY (carryover from 2012)

OBJECTIVE(S): To assist communities and counties in meetingeligibility requirements for participation in matching funding programsfor park acquisition and development available through the Departmentof Natural Resources' Stewardship Program. To work with interestedcounties and individual municipalities to prepare and updatecomprehensive recreation and open space plans. It is common for onecounty plan and one or two community plans to be completed in atypical year.

1418 WORK ITEM: PARK AND OPEN SPACE PLAN UPDATE - CITY OF CLINTONVILLE (carryover from 2012)

ACTIVITY/METHODOLOGY: Staff will assist the City of Clintonville (Waupaca County) in preparing and updatingcomprehensive recreation and open space plans. The City will providean updated inventory of existing facilities and other information neededto prepare such plans. Meetings with staff will determine local needsand priorities. Analyses of demographic information, existing facilities,needs, and project lists for use in priority setting will be prepared bystaff. Upon adoption, East Central will be responsible for final planpreparation, mapping, and printing. This project should be completedin spring of 2013.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

OBJECTIVE(S): To assist communities and counties in meetingeligibility requirements for participation in matching FUNDINGprograms for park acquisition and development available through theDepartment of Natural Resources' Stewardship Program. To work withinterested counties and individual municipalities to prepare and updatecomprehensive recreation and open space plans. It is common for onecounty plan and one or two community plans to be completed in atypical year.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

ACTIVITY/METHODOLOGY: Staff will assist Winnebago County in preparing and updating comprehensive recreation and open spaceplans. The County will provide an updated inventory of existingfacilities and other information needed to prepare such plans. Meetingswith staff will determine local needs and priorities. Analyses ofdemographic information, existing facilities, needs, and project lists foruse in priority setting will be prepared by staff. Upon adoption, EastCentral will be responsible for final plan preparation, mapping, andprinting.

1422 WORK ITEM: PARK AND OPEN SPACE PLAN UPDATE - TOWN OF GRAND CHUTE

OBJECTIVE(S): To assist communities and counties in meetingeligibility requirements for participation in matching FUNDINGprograms for park acquisition and development available through theDepartment of Natural Resources' Stewardship Program. To work withinterested counties and individual municipalities to prepare and updatecomprehensive recreation and open space plans. It is common for onecounty plan and one or two community plans to be completed in atypical year.

ACTIVITY/METHODOLOGY: Staff will assist the Town of GrandChute (Outagamie County) in preparing and updatingcomprehensive recreation and open space plans. The County willprovide an updated inventory of existing facilities and other information needed to prepare such plans. Meetings with staff will determine localneeds and priorities. Analyses of demographic information, existingfacilities, needs, and project lists for use in priority setting will beprepared by staff. Upon adoption, East Central will be responsible forfinal plan preparation, mapping, and printing.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1423 WORK ITEM: PARK AND OPEN SPACE PLAN UPDATE - CITY OF NEENAH

OBJECTIVE(S): To assist communities and counties in meetingeligibility requirements for participation in matching FUNDINGprograms for park acquisition and development available through theDepartment of Natural Resources' Stewardship Program. To work withinterested counties and individual municipalities to prepare and updatecomprehensive recreation and open space plans. It is common for onecounty plan and one or two community plans to be completed in atypical year.

ACTIVITY/METHODOLOGY: Staff will assist the City of NeenahWinnebago County) in preparing and updating comprehensiverecreation and open space plans. The County will provide an updatedinventory of existing facilities and other information needed to preparesuch plans. Meetings with staff will determine local needs andpriorities. Analyses of demographic information, existing facilities,needs, and project lists for use in priority setting will be prepared bystaff. Upon adoption, East Central will be responsible for final planpreparation, mapping, and printing.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

50

Page 60: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 7,327$ Planning: 12

Recommendation CF-8.3.2.2 GIS: -

ITEM TOTAL: 7,327$ TOTAL: 12

FUNDING SOURCES PERSON DAYS

ECWRPC: 14,503$ Planning: 25

Recommendation CF-8.3.2.2 GIS: -

ITEM TOTAL: 14,503$ TOTAL: 25

FUNDING SOURCES PERSON DAYS

ECWRPC: 5,731$ Planning: 10

Recommendation CF-8.3.2.2 GIS: -

ITEM TOTAL: 5,731$ TOTAL: 10

FUNDING SOURCES PERSON DAYS

ECWRPC: 5,831$ Planning: 10

Recommendation CF-8.3.2.2 GIS: -

ITEM TOTAL: 5,831$ TOTAL: 10

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1424 WORK ITEM: PARK AND OPEN SPACE PLAN UPDATE - CITY OF SHAWANO

OBJECTIVE(S): To assist communities and counties in meetingeligibility requirements for participation in matching FUNDINGprograms for park acquisition and development available through theDepartment of Natural Resources' Stewardship Program. To work withinterested counties and individual municipalities to prepare and updatecomprehensive recreation and open space plans. It is common for onecounty plan and one or two community plans to be completed in atypical year.

ACTIVITY/METHODOLOGY: Staff will assist the City of Shawano(Shawano County) in preparing and updating comprehensiverecreation and open space plans. The County will provide an updatedinventory of existing facilities and other information needed to preparesuch plans. Meetings with staff will determine local needs andpriorities. Analyses of demographic information, existing facilities,needs, and project lists for use in priority setting will be prepared bystaff. Upon adoption, East Central will be responsible for final planpreparation, mapping, and printing.

1425 WORK ITEM: PARK AND OPEN SPACE PLAN UPDATE - SHAWANO COUNTY

OBJECTIVE(S): To assist communities and counties in meetingeligibility requirements for participation in matching FUNDINGprograms for park acquisition and development available through theDepartment of Natural Resources' Stewardship Program. To work withinterested counties and individual municipalities to prepare and updatecomprehensive recreation and open space plans. It is common for onecounty plan and one or two community plans to be completed in atypical year.

ACTIVITY/METHODOLOGY: Staff will assist Shawano County in preparing and updating comprehensive recreation and open spaceplans. The County will provide an updated inventory of existingfacilities and other information needed to prepare such plans. Meetingswith staff will determine local needs and priorities. Analyses ofdemographic information, existing facilities, needs, and project lists foruse in priority setting will be prepared by staff. Upon adoption, EastCentral will be responsible for final plan preparation, mapping, andprinting.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

ACTIVITY/METHODOLOGY: Staff will assist the Village ofBonduel (Shawano County) in preparing a draft site park plan andanalysis by providing mapping, and planning graphics.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1426 WORK ITEM: PARK SITE PLANNING / ANALYSIS VILLAGE OF BONDUEL

OBJECTIVE(S): To assist communities and counties in meetingeligibility requirements for participation in matching FUNDINGprograms for park acquisition and development available through theDepartment of Natural Resources' Stewardship Program. To work withinterested counties and individual municipalities to prepare and updatecomprehensive recreation and open space plans. It is common for onecounty plan and one or two community plans to be completed in atypical year.

1427 WORK ITEM: PARK SITE NEEDS ASSESMENT STUDY - JEFFERSON PARK, CITY OF MENASHA

OBJECTIVE(S): To assist communities and counties in meetingeligibility requirements for participation in matching FUNDINGprograms for park acquisition and development available through theDepartment of Natural Resources' Stewardship Program. To work withinterested counties and individual municipalities to prepare and updatecomprehensive recreation and open space plans. It is common for onecounty plan and one or two community plans to be completed in atypical year.

ACTIVITY/METHODOLOGY: Staff will assist the City of Menasha(Winnebago County) in preparing a draft site master park plan andanalysis by providing mapping, and planning graphics for JeffersonPark. Specifically the removal of the Army Reserve buildings on the 2.5acre plat of land.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

51

Page 61: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 5,781$ Planning: 10

GIS: - Strategy CF-8.3.2

ITEM TOTAL: 5,781$ 10

FUNDING SOURCES PERSON DAYS

ECWRPC: 10,702$ Planning: 8

GIS: 15

ITEM TOTAL: 10,702$ 23

FUNDING SOURCES PERSON DAYS

ECWRPC: 15,285$ Planning: 29

GIS: -

ELEMENT TOTAL: 15,285$ 29

FUNDING SOURCES PERSON DAYS

ECWRPC: 12,073$ Planning: 22

Recommendation NR-1.2.1.1 GIS: -

ITEM TOTAL: 12,073$ 22

ACTIVITY/METHODOLOGY: Staff will actively participate in a variety of local, regional, and state level committee/partnership efforts in the interests of promoting and implementing the Year 2030 Regional Comprehensive Plan. Activities, projects, and programs will be initiated and worked on to implement the recommendations of the Year 2030 Regional Comprehensive Plan. These items are primarily funded by the Commission levy unless otherwise noted. ALSO PLEASE NOTE THAT WHILE THESE ARE IMPORTANT ACTIVITIES, THEY ARE DEEMED TO BE THE LOWEST PRIORITY FOR COMPLETION IN 2013 AS STAFF TIME IS ROUTINELY CONSUMED BY ACTIVITIES ASSOCIATED WITH OTHER PROGRAMS WHICH ARE TIED TO OUTSIDE FUNDING SOURCES. THEREFORE, SEVERAL OF THESE ACTIVITIES MAY CARRYOVER FOR MULTIPLE YEARS.

1429 WORK ITEM: WAUSHARA COUNTY FARMLAND PRESERVATION PLAN UPDATE

OBJECTIVE(S): To assist communities and counties in meeting theirneeds for the development of site-specific park and recreation facilityplans or master plans.

ACTIVITY/METHODOLOGY: Staff will assist Waushara County in itsupdate of its Farmland Preservation Plan by providing GIS mappingdata and services as well as socio-economic data as needed.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

ACTIVITY/METHODOLOGY: Staff will attend and participate in various meetings and workshops with the intent of promoting and implementing the Year 2030 Regional Comprehensive Plan. This may include working with groups such as the Friends of the Fox, Fox Cities Greenways, and others. Staff will also continue to assist the National Park Service with Ice Age Trail related implementation activities.

1430 MAJOR WORK ELEMENT: REGIONAL PLAN COORDINATION & IMPLEMENTATION

1431 WORK ITEM: REGIONAL PLAN COORDINATION (AG/OPEN/CUL/REC)

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

OBJECTIVE(S): To communicate and coordinate various policies and recommendations contained within the Regional Comprehensive Plan's Agriculture, Open Space, Cultural Resources, and Recreation Elements.

OBJECTIVE(S): To implement the vision, goals, strategies and recommendations contained in the adopted Year 2030 Regional Comprehensive Plan's Agriculture, Open Space, Cultural Resources, and Recreation element.

1428 WORK ITEM: INTERURBAN TRAIL PLAN (FOX RIVER/SOLOMON TRAIL CONNECTION)

OBJECTIVE(S): To assist communities and counties in meeting theirneeds for the development of site-specific park and recreation facilityplans or master plans.

ACTIVITY/METHODOLOGY: Staff will assist Calumet County in the development of an analysis and concept plan for local trailconnections between the Solomon Trail, Fox River Trail and otherfeatures within the County.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

52

Page 62: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 3,212$ Planning: 7

Goal CF-8.1 GIS: - Recommendation CF-8.1.2.1Strategy CF-8.1.3Goal CF-8.2Goal CF-8.4 ITEM TOTAL: 3,212$ 7 Goal CF-8.5

FUNDING SOURCES PERSON DAYS

ECWRPC: 26,558$ Planning: 52

GIS: 5

Strategy CF-8.6.2

ITEM TOTAL: 26,558$ 57

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

Recommendation ED-4.1.2.1 ECWRPC: 19,853$ Planning: 37 Strategy CF-8.6.2Goal NR-4.5 GIS: 5 Goal NR-4.8Goal NR-5.1Goal NR-5.2Goal NR-5.3Goal NR-5.4 ITEM TOTAL: 19,853$ 42

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

ECWRPC: 6,705$ Planning: 15 Recommendation ED-4.1.2.1Strategy CF-8.6.2 GIS: - Goal NR-4.5Goal NR-4.8Goal NR-5.1Goal NR-5.2Goal NR-5.3 ITEM TOTAL: 6,705$ 15 Goal NR-5.4

OBJECTIVE(S): To work with the CHIP/ReThink committee to provide Winnebago County with information and inventories that encourages the use of recreational opportunities within Winnebago County.

ACTIVITY/METHODOLOGY: Staff will continue to serve on and work with the Winnebago County CHIP/ReThink Committee to promote recreational opportunities and to encourage residents and visitors to use the facilities as part of a healthy lifestyle. The Committee will also continue to develop a comprehensive plan assessment system that will identify missed opportunities in a community that would foster a healthier community.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1440 MAJOR WORK ELEMENT: FOX-WISCONSIN HERITAGE PARKWAY (ongoing since 2009)

1443 WORK ITEM: FWHP BOARD INVOLVEMENT

OBJECTIVE(S): To provide local units of government, residents, businesses, and organizations with information that can aid in the local and regional planning, promotion, and geotourism development along the FWHP.

ACTIVITY/METHODOLOGY: Staff will serve as Board member for the non-profit FWHP Board. As a Board member of the FWHP, staff will play a lead role in planning for and providing support to conservation and economic development activities along the FWHP. Regular meetings, project coordination and minor expense/material costs are expected in 2013.

1442 WORK ITEM: ACTION PLAN IMPLEMENTATION & TECHNICAL ASSISTANCE

OBJECTIVE(S): To provide local units of government, residents, businesses, and organizations with information that can aid in the local and regional planning, promotion, and geotourism development along the FWHP.

ACTIVITY/METHODOLOGY: Staff will provide assistance to select communities within the Upper and Lower Fox River portion of the Heritage Parkway to better align local plans, or implement planning for the development of opportunity sites identified n the FWHP Action Plan. Public presentations will also be given to town, village, city and county entities to further inform them of the FWHP project. Additional time will be used to assist in seeking grants for the FWHP, some of which may result in additional contract work for the Commission.

OBJECTIVE(S): To develop an updated 'framework plan' for the development of the Fox Wisconsin Heritage Parkway Plan for use by communities, economic development and tourism entities, as well as the state and federal governments.

ACTIVITY/METHODOLOGY: Staff will work with a variety of partners to implement the Fox-Wisconsin Heritage Parkway Concept which was initiated in 1997. Under the funding arrangement, the Commission continues a 1-1/2 year effort to prepare an updated parkway plan, actively implement plan recommendations applicable to the communities of the Upper and Lower Fox Rivers and foster 'National Heritage Area' designation through the National Park Service. Additional work will include board representation on the FWHP Non-profit Board

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1432 WORK ITEM: WINNEBAGO COUNTY CHIP/RETHINK PROGRAM INVOLVEMENT

53

Page 63: 2013 ECWRPC Work Program

1500 PROGRAM: ECONOMIC DEVELOPMENT

SUMMARY OF ACTIVITIES: REGIONAL PLAN RELATIONSHIP: FUNDING SOURCES PERSON DAYS

The Work Program contains the following elements and work items: ECWRPC: 81,355$ PLANNING: 235

1505: Program Administration & Support WEDC 22,222$ GIS: 117

1510: Regional Plan & CEDS Implementation & Monitoring EDA: 64,425$

1520: Economic Development Technical Assistance ADMIN: 5

1540: Comprehensive Economic Development Strategy (CEDS)

ED-1: The Changing Regional Economy

ED-2: Workforce and the Regional Economy

ED-3: Economic Impacts of Community Development

ED-4: Economic Impacts of Recreational and Natural Resources

ED-5: Buying Food Locally PROGRAM TOTAL: $ 168,002 357

FUNDING SOURCES PERSON DAYS

ECWRPC 7,123$ Planning 30

EDA 7,123$ GIS - Recommendation ED-1.1.1.1Recommendation ED-1.1.1.2CEDS Principle 1-Activity C

ELEMENT TOTAL: 14,246$ 30

Note: 2012-2014 EDA Planning Grant provides a total of $184,884, or $61,614 per year. Local matching funds at the 30% rate equates to a minimum of $26,425 per year.

The primary focus of this program element is to coordinate and promote the federal Economic Development Administration's (EDA's) programs with public and private stakeholders throughout the region in a manner which is consistent with EDA's identified mission. East Central also coordinates and communicates with State of Wisconsin economic development agencies and programs, including the Department of Commerce, thereby furthering economic sustainability through focused efforts. Where appropriate and practical, specific recommendations from the Commission's Year 2030 Regional Comprehensive Plan, 2008 Comprehensive Economic Development Strategy (CEDS 5-year update) and subsequent CEDS annual reports, are addressed, implemented and monitored to further progress on reaching the identified Economic Development vision established within the plan. This program is funded partially by the Economic Development Administration (EDA) through a 3-year planning grant award that began in 2012. This award has a matching funds requirement of 50% unless otherwise noted. As this is a three year program, many of the individual activities have notations as to the timeframe in which they are expected to occur. For the purposes of this document however, only a single year's worth of EDA funding is illustrated and it is assumed that the same amounts will be available for each of the three years. Staff allocations to projects are expected to remain similar, the latter years' activities will be subject to review and updating during the Commission's annual work program process.

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

ACTIVITY/METHODOLOGY: Staff will continue to serve as a liaison with the region’s EDR, serve as active members of the Northeast Wisconsin Regional Economic Partnership Technology Zone (NEWREP), Fox Cities Economic Development Partnership, and other County, local and regional-level economic development groups/committees. Staff will attend workshops and conferences as deemed necessary to promote regional economic development activities and to foster new projects as required. Staff will improve internal and external communication with the public through media press releases and the Commission's website, newsletter and mini-conferences. Staff will prepare and submit applications and grant reporting documents as required for EDA planning grant administration.

1505 MAJOR WORK ELEMENT: PROGRAM ADMINISTRATION & SUPPORT (2012-2014)

The 1500 Economic Development Program is directly related to Chapter 4 of the Year 2030 Regional Comprehensive Plan , the 2008 Comprehensive Economic Development Strategy (CEDS) (5-year update) and subsequent CEDS Annual Reports . The adopted economic development vision, for both plans, is as follows:

“The East Central Region has diversified employment opportunities including well paid knowledge based jobs. The regional economy benefits from advances in research and technology and supports entrepreneurialism and local business ownership. The region conducts collaborative economic development efforts across jurisdictional boundaries of governments, educational institutions, and other economic development entities. The preservation of natural resource amenities supports tourism opportunities, assists in attracting an educated workforce and enhances the quality of place for residents in the region.”

The Year 2030 Regional Comprehensive Plan, 2008 CEDS ( 5-year update), and subsequent CEDS annual reports spell out more specific issue areas which need to be addressed at a local or regional scale. Details of these issues can be found in Chapter 6, "Action Plan" of the 2008 CEDS, Chapter 3 of the CEDS Annual Reports, or one of the comprehensive plan's five "Plan Guideline" fact sheets contained in Chapter 5:

OBJECTIVE(S): To participate in, coordinate, and share information regarding various local and regional efforts so as to provide a presence for the Economic Development Administration. To develop and administer aspects of the planning grant funds received from EDA.

54

Page 64: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC 20,991$ Planning 50

WEDC 22,222$ GIS 22

Recommendation ED-1.1.2.1 EDA 15,056$ ADMIN: 5 Recommendation ED-1.1.2.2Recommendation ED-1.1.2.3Recommendation ED-1.1.2.4CEDS Principle 1-Activities A & B

ELEMENT TOTAL: 58,269$ 105

ECWRPC 1,151$ Planning 10

Recommendation ED-1.3.1.3 EDA 2,686$ GIS - Recommendation ED-1.3.2.1Recommendation ED-5.1.2.1.4Recommendation ED-5.1.3.1.3CEDS Principal 5 - Activity ACEDS Principle 7-ACTIVITY BCEDS Principal 7 - Activity C

ITEM TOTAL: 3,838$ 10

ECWRPC 2,802$ Planning 16

Recommendation ED-1.2.2.1 EDA 4,000$ GIS - Recommendation ED-1.3.4.1CEDS Principal 1 - Activity C ADMIN 5

ITEM TOTAL: 6,802$ 16

ECWRPC 2,000$ Planning 15

Recommendation ED-1.2.2.1 EDA 4,200$ GISRecommendation ED-1.3.4.1Recommendation ED-5.1.2.1.4Recommendation ED-5.1.3.1.3 - CEDS Principle 1-ACTIVITIES C, E & F ITEM TOTAL: 6,200$ 15 CEDS Principle 7-ACTIVITY C

1513 WORK ITEM: IGNITE FOX CITIES / FOX CITIES CHAMBER OF COMMERCE SUPPORT ACTIVITIES

OBJECTIVE(S): To support the economic development efforts of the Fox Cities Chamber of Commerce. To provide oversight, review, and coordination activities to the Chamber which support its Ignite Fox Cities initiative. These activities will directly or indirectly serve to implement the vision, goals, strategies and recommendations contained in the adopted Year 2030 Regional Comprehensive Plan and 2012 Comprehensive Economic Development Strategy (CEDS).

ACTIVITY/METHODOLOGY: Staff will attend meetings, provide marketing data or GIS services to promote and implement the Fox Cities Chambers' regional goals.

ACTIVITY/METHODOLOGY: Research and utilize Facebook, twitter, LinkedIn and or other social media tools. Once fully implemented, utilization of these tools will become a regular function of the Economic Development Staff's responsibilities, much like updating the website and/or utilizing email is currently. Inventory existing grant and loan program websites and economic development organizations, many of which are already listed within the CEDS. In addition, research additional funding sources not already inventoried in the CEDS. Lastly, as part of the commission's State Data Center Affiliation, put links to various data sources.

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

OBJECTIVE(S): Utilize readily available social media tools to market the commission's EDA program, coordinate economic development initiatives and organizations, and promote the availability of socioeconomic data and economic research and studies. Restructure the Commission's economic development website to maintain up-to-date information on grants, loans, and other funding sources, as well as links to economic development organizations and pertinent socioeconomic data sources. Focus on resources for 1) communities & 2) businesses.

OBJECTIVE(S): To provide oversight, review, and coordination activities which directly or indirectly serve to implement the vision, goals, strategies and recommendations contained in the adopted Year 2030 Regional Comprehensive Plan, the 2008 Comprehensive Economic Development Strategy (CEDS 5-year update) and subsequent CEDS Annual Reports.

OBJECTIVE(S): To support the efforts of the Northeast Wisconsin Regional Economic Partnership (NEWREP), a non-profit regional collaborative effort.

1511 WORK ITEM: DEVELOP & UTILIZE SOCIAL MEDIA TO IMPROVE MARKETING OF ECONOMIC DEVELOPMENT PROGRAM AND ENHANCE ECONOMIC DEVELOPMENT WEBSITE

1512 WORK ITEM: NEWREP COORDINATION AND ADMINISTRATION

FUNDING SOURCES

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

FUNDING SOURCES

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

ACTIVITY/METHODOLOGY: As a non-dues paying member of NEWREP, provide "in-kind" match through the provision of support services, project services and administration of NEWREP's finances.

PERSON DAYS

1510 MAJOR WORK ELEMENT: REGIONAL PLAN & CEDS IMPLEMENTATION & MONITORING (2012-2014)

ACTIVITY/METHODOLOGY: Staff will periodically attend meetings and review draft federal, state, or local rules, regulations, or plans so as to achieve consistency with the Regional Plan, particularly the Economic Development component. Staff will coordinate or attend as necessary, meetings and workshops related to reviewing or resolving, multi-jurisdictional issues, or promoting/implementing regional goals.

PERSON DAYS

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

FUNDING SOURCES PERSON DAYS

55

Page 65: 2013 ECWRPC Work Program

ECWRPC 13,250$ Planning 28

EDA -$ GIS

-

ITEM TOTAL: 13,250$ 28

ECWRPC 1,787$ Planning 15

Recommendation ED-5.1.2.1.4 EDA 4,170$ GISRecommendation ED-5.1.3.1.3CEDS Principle 7-ACTIVITY B

- ITEM TOTAL: 5,957$ 15

ECWRPC -$ Planning 4

Recommendation ED-1.2.1.4 WEDC 22,222$ GIS 17 Recommendation ED-1.2.2.1Recommendation ED-1.3.1.3

CEDS Principle 1- C - CEDS Principle 1- E ITEM TOTAL: 22,222$ 21

FUNDING SOURCES PERSON DAYS

ECWRPC 36,964$ Planning 78

EDA 23,624$ GIS 60

Recommendation ED-5.1.1.2

CEDS Principle 1-Activity F

ELEMENT TOTAL: 60,588$ 138

1514 WORK ITEM: GLOBAL TRADE STRATEGY IMPLEMENTATION

OBJECTIVE(S): Staff will implement the goals and objectives identified above by being part of the Global New North Taskforce and Stakeholder Committees. These committees leverage knowledge from multiple public and private sector entities and are critical for increasing exports in the East Central region.

ACTIVITY/METHODOLOGY: Global New North work will implement goals and objectives identified in the “Northeast Wisconsin Global Trade Strategy” report developed by East Central staff in 2012 as an EDA funded project. Major goal areas include 1) Increase capacity of economic development professionals to better assist companies seeking to expand into global markets. 2) Develop a strategy framework to identify, prioritize and engage companies that could benefit from services aimed at encouraging global trade. 3) Track, document and publicize impact of the global trade outreach initiative. 4) Create a clearinghouse of data driven, internal market opportunity analysis for Wisconsin industries, products and businesses. 5) Actively promote infrastructure and policy initiatives at the local and state level that would benefit global trade in Northeast Wisconsin.

1515 WORK ITEM: YET TO BE IDENTIFIED IMPLEMENTATION AND MONITORING ACTIVITIES

OBJECTIVE(S): To provide oversight, review, and coordination activities which directly or indirectly serve to implement the vision, goals, strategies and recommendations contained in the adopted Year 2030 Regional Comprehensive Plan and 2012 Comprehensive Economic Development Strategy (CEDS).

ACTIVITY/METHODOLOGY: Staff will periodically attend meetings and review draft federal, state, or local rules, regulations, or plans so as to achieve consistency with the Regional Plan, particularly the Economic Development component. Staff will coordinate or attend as necessary, meetings and workshops related to reviewing or resolving, multi-jurisdictional issues, or promoting/implementing regional goals.

NOTE: $13,000 is a pass through to EMSI for annual software cost.

1520 MAJOR WORK ELEMENT: ECONOMIC DEVELOPMENT TECHNICAL ASSISTANCE (2013)

OBJECTIVE(S): To assist regional, county, and local economic development efforts and activities. To promote the use of applicable EDA programs and funding sources as necessary.

ACTIVITY/METHODOLOGY: Staff will provide assistance to communities, organizations, and other regional, county, and local economic development entities in order to foster economic development projects. Activities may include the coordination of, or attendance, at meetings; provision of socioeconomic data and information to communities; assistance with grant applications, and coordination of projects with respect to potential EDA funding.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

OBJECTIVE(S): To utilize the EMSI Analyst program as an economic development tool by providing economic data to requesting economic development entities or municipalities in the East Central Region.

ACTIVITY/METHODOLOGY: Research successful projects created by other users. Apply this knowledge to fulfill local requests for data and information. Promote EMSI Analyst via ECWRPC newsletters, website, and social media.

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

FUNDING SOURCES

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

FUNDING SOURCES PERSON DAYS

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

FUNDING SOURCES PERSON DAYS

PERSON DAYS

1516 WORK ITEM: WEDC PARTNERSHIP AGREEMENT/EMSI ANALYST PROGRAM

56

Page 66: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC 1,298$ Planning -

EDA -$ GIS 3

Recommendation ED-5.1.1.2Recommendation ED-5.3.1.1CEDS Principle 1-Activity F

ITEM TOTAL: 1,298$ 3

OBJECTIVE(S): Utilize ESRI Business Analyst as an Economic Development tool.

ACTIVITY/METHODOLOGY: Research successful projects created by other users. Apply this knowledge to create templates for potential ECWRPC regional level projects and to fulfill local requests for data and information. Promote ESRI Business Analyst via ECWRPC newsletters, website, and social media.

FUNDING SOURCES PERSON DAYS

ECWRPC 7,073$ Planning 2

EDA -$ GIS 14 Recommendation ED-1.3.1.3Recommendation ED-1.3.2.1Recommendation ED-3.1.1.1CEDS Principle 1- E

ITEM TOTAL: 7,073$ 16

FUNDING SOURCES PERSON DAYS

ECWRPC 2,665$ Planning 6

EDA 1,000$ GIS 2

Recommendation ED-1.3.1.2CEDS Principle 1-Activities E & FCEDS Principle 7-Activity C

ITEM TOTAL: 3,665$ 8

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

ACTIVITY/METHODOLOGY: Work with the City of Brillion (Calumet County) staff to provide an update of key 2010 census data as identified by village staff for use in a socio-economic data analysis.

OBJECTIVE(S): To assist the City of Brillion with obtaining Census data and completing a socio-economic data analysis.

1525 WORK ITEM: CITY OF BRILLION SOCIO-ECONOMIC DATA ANALYSIS

OBJECTIVE(S): To provide limited assistance to complete or substantially progress a local-level or regional economic development project.

ACTIVITY/METHODOLOGY: Work with Glacierland RC&D and other individuals/entities to annually update the Northeast Wisconsin Farm Fresh Atlas mapping and graphics. This highly colorful brochure/map was developed to further promote the numerous existing local agricultural enterprises of Northeastern Wisconsin.

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

1524 WORK ITEM: ESRI BUSINESS ANALYST SERVICES (ongoing since 2012)

1521 WORK ITEM: MAINTAIN/UPDATE THE "FARM FRESH ATLAS" MAP (ongoing since 2008)

57

Page 67: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC 4,830$ Planning 6

EDA 1,000$ GIS 7

Recommendation ED-1.3.1.2CEDS Principle 1-Activities E & FCEDS Principle 7-Activity C

ITEM TOTAL: 5,830$ 13

FUNDING SOURCES PERSON DAYS

ECWRPC 2,528$ Planning -

EDA 1,000$ GIS 7

Recommendation ED-1.3.1.2CEDS Principle 1-Activities E & FCEDS Principle 7-Activity C

ITEM TOTAL: 3,528$ 7

FUNDING SOURCES PERSON DAYS

ECWRPC 2,128$ Planning 6

EDA 1,000$ GIS -

Recommendation ED-3.4.1.2CEDS Principle 1-Activities E & FCEDS Principle 7-Activity C

ITEM TOTAL: 3,128$ 6

FUNDING SOURCES PERSON DAYS

ECWRPC 3,145$ Planning 2

EDA 1,000$ GIS 7

Recommendation ED-1.3.1.2CEDS Principle 1-Activities E & FCEDS Principle 7-Activity C

ITEM TOTAL: 4,145$ 9

1528 WORK ITEM: VILLAGE OF BLACK CREEK MAIN STREET REVITALIZATION & REDEVELOMPENT

1530 WORK ITEM: CITY OF BRILLION MARKETING ANALYSIS

OBJECTIVE(S): To assist the City of Brillion with obtaining Census data and completing a marketing analysis study.

ACTIVITY/METHODOLOGY: Work with the City of Brillion (Calumet County) staff to provide an update of key 2010 census data for use in a marketing analysis study.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

OBJECTIVE(S): To assist the Village of Black Creek in the development of an Economic Development Profile including GIS elements for marketing and promotion efforts.

ACTIVITY/METHODOLOGY: Work with Village of Black Creek (Outagamie County) staff to provide an update of key 2010 census data as identified by village staff for use in the Economic Development Profile.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

1526 WORK ITEM: MENOMINEE COUNTY ECONOMIC DEVELOPMENT PROMOTION ASSISTANCE

OBJECTIVE(S): To assist Menominee County in the development of economic development promotion materials.

1527 WORK ITEM: VILLAGE OF BLACK CREEK ECONOMIC DEVELOPMENT PROFILE/GIS ELEMENTS

OBJECTIVE(S): To assist the Village of Black Creek in revitalizing their downtown and encouraging economic development.

ACTIVITY/METHODOLOGY: Work with Village of Black Creek (Outagamie County) staff to revitalize the Main Street and encourage development. In particular, special attention will be given to blighted storefronts, vacant parcels, and other impediments to downtown revitalization.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

ACTIVITY/METHODOLOGY: Work with Menominee staff to provide an update of key 2010 census data for use in economic development promotional materials.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

58

Page 68: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC 13,297$ Planning 56

EDA 18,624$ GIS 20

Recommendation ED-1.1.1.2Recommendation ED-2.2.1.1CEDS Principle 1-Activities C, E & FCEDS Principle 7-Activity B & C

ITEM TOTAL: 31,921$ 76

FUNDING SOURCES PERSON DAYS

ECWRPC 16,278$ Planning 54

EDA 18,622$ GIS 30 Recommendation ED-1.1.2.1Recommendation ED-1.1.2.2Recommendation ED-1.1.2.3Recommendation ED-1.1.2.4Recommendation ED-1.1.3.1 ITEM TOTAL: 34,900$ 84 CEDS Principle 1-Activity B

ACTIVITY/METHODOLOGY: Staff will provide assistance to communities, organizations, and other regional, county, and local economic development entities in order to foster economic development projects. Activities may include the coordination of, or attendance, at meetings; provision of data and information to communities; participation in public presentations and workshops, assistance with grant applications, and coordination of projects with respect to potential EDA funding.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

OBJECTIVE(S): Per the requirements of the EDA grant, annually update the CEDS to maintain the region’s eligibility as an Economic Development District for East Central Wisconsin and to provide socio-economic information to communities, organizations, and the private sector.

ACTIVITY/METHODOLOGY: Staff will compile the 2013 CEDS Report for the Commission's and EDA's consideration. The CEDS contains socio-economic data, a description of Commission projects and work efforts, and the results of the annually distributed regional project inventory questionnaire. The plan is developed with the assistance and guidance of the CEDS Strategy Committee (See Appendix B for current membership). Once approved and published, the 2013 CEDS Update will be distributed throughout the region.

REGIONAL PLAN/CEDS RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan and/or CEDS document:

1532 WORK ITEM: YET TO BE IDENTIFIED TECHNICAL ASSISTANCE PROJECTS (2013)

OBJECTIVE(S): To assist regional, county, and local economic development efforts and activities. To promote the use of applicable EDA programs and funding sources as necessary.

1540 MAJOR WORK ELEMENT: COMPREHENSIVE ECONOMIC DEVELOPMENT STRATEGY (CEDS) (2012-2014)

59

Page 69: 2013 ECWRPC Work Program

1600 PROGRAM ELEMENT: ENVIRONMENTAL MANAGEMENT

MAJOR WORK ELEMENTS: REGIONAL PLAN RELATIONSHIP:

1605 – Technical Assistance (ENV) ECWRPC: 154,203$ Planning: 478

1610 – Regional Plan Implementation & Coordination (ENV)

1620 - Mineral Resource Planning & Management (including NR-135)

WDNR: 49,300$ GIS: 54

1630 - Niagara Escarpment Management

NR-135 Operator Fees: 136,741$ Admin: 7

NR-1: Geologic Resources and Non-Metallic Mining1640 - Regional Aquatic Invasive Species Coordinator NR-2: Groundwater and Water Supply

NR-3: Water Quality, Flooding and Watershed ManagementNR-4: Wildlife Habitat, Forests, and Ecological ResourcesLU-2: Community & Regional Character

PROGRAM TOTAL: 340,244$ 539

FUNDING SOURCES PERSON DAYS

ECWRPC: 10,417$ Planning: 15

GIS: -

ELEMENT TOTAL: 10,417$ 15

FUNDING SOURCES PERSON DAYS

ECWRPC 7,044$ Planning: 2

Recommendation NR-3.1.4.1 GIS: 2 Recommendation NR-3.1.4.2

ITEM TOTAL: 7,044$ 4

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

ACTIVITY/METHODOLOGY: Staff will assist Waushara County in the mapping and analysis of 31 watersheds to assist in future planning activities. Several watersheds will be developed initially to better gauge the scope of the project first.

1606 WORK ITEM: WAUSHARA COUNTY WATERSHED MAPPING

OBJECTIVE(S): Provide direct assistance to local units of government in addressing issues specific to environmental management.

"The region is comprised of well-defined urban and rural spaces which improve the individual's perception of 'sense of place', while communities within the region have maintained their individual character and identity. Within the region, surface water resources are planned for in a watershed-based manner that embraces and encourages the use of ‘green infrastructure’ concepts. The proactive protection of natural features not only contributes to water quality, but also to the long term sustainability and economic benefit of the region”.

The Year 2030 Regional Comprehensive Plan spells out more specific issue areas which need to be addressed at a local or regional scale. Details of these issues can be found in one of the comprehensive plan's five separate "Plan Guideline" fact sheets contained in Chapters 9 and 11:

1605 MAJOR WORK ELEMENT: TECHNICAL ASSISTANCE (ENVIRONMENTAL)

OBJECTIVE(S): Provide direct assistance to local units of government in addressing issues specific to environmental management.

ACTIVITY/METHODOLOGY: Provide short-term expertise and assistance to local communities on general environmental planning issues through specialized projects on more specific topics such as environmental corridors, non-metallic mining, wetlands, floodplains, etc.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to implementing the overall vision of the Regional Comprehensive Plan by affecting change at the local level.

The major goals of this functional planning element are to ensure that the region’s natural resources and unique environmental features are identified and managed as an integral part of planning and development throughout the region. These features need to be considered so that valuable resources and their ecological services contribute to, or enhance the economic life of the region. The Year 2030 Regional Comprehensive Plan guides planning activities under the element. Funding for the Environmental Management is derived mainly from the Commission’s tax levy, as many environmental and natural resource issues are regional in nature. The Commission has long supported local assistance in this area and it is expected that the need will continue as the region continues to develop and grow, thereby impacting these resources. The various elements and activities included in this section are:

TOTAL FUNDING SOURCES: TOTAL PERSON DAYS:The 1600 Environmental Management Program is directly related to Chapters 9 and 11 of the Year 2030 Regional Comprehensive Plan, The adopted vision for this element is as follows:

“In 2030, the importance of natural resources, including their link to the regional economy, quality of life, and cost effective service provision is recognized. Natural resource planning is sustainable, consistent and coordinated in order to protect and build a strong sense of ecological place. The Winnebago Pool Lakes and the Fox/Wolf River systems are recognized as the backbone of the region's ecological resources. Geologic resources that are significant from an aesthetic, scientific, cultural, historic, educational, or commercial extraction purpose, have been identified, inventoried, preserved and protected to meet the development and societal needs of the region. The region has proactively addressed public access, recreation, open space, and trail facilities in order to meet the needs of its citizens; enhance the quality of life and environment; realize tax savings and other economic benefits; and to maintain and improve the region's tourism economy"

60

Page 70: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC 3,374$ Planning: 2

Goal NR-2.5 GIS: 2 Recommendation NR-2.5.1.1Strategy NR-2.5.2Recommendation NR-2.5.2.3

ITEM TOTAL: 3,374$ 4

FUNDING SOURCES PERSON DAYS

ECWRPC: 52,711$ Planning: 31

GIS: -

ELEMENT TOTAL: 52,711$ 31

FUNDING SOURCES PERSON DAYS

ECWRPC: 10,419$ Planning: 17 Goal I-12.2

GIS: -

ITEM TOTAL: 10,419$ 17

1607 WORK ITEM: TOWN OF MATTESON (WAUPACA COUNTY) WELL WATER TESTING INFORMATIONAL PROGRAM

OBJECTIVE(S): Provide direct assistance to local units of government in addressing issues specific to environmental management.

ACTIVITY/METHODOLOGY: Staff will assist the Town of Matteson (Waupaca County) in providing information at a public forum regarding well water testing programs and benefits.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1610 MAJOR WORK ELEMENT: REGIONAL PLAN COORDINATION AND IMPLEMENTATION (ENV)

OBJECTIVE(S): To implement the vision, goals, strategies and recommendations contained in the adopted Year 2030 Regional Comprehensive Plan's Agriculture, Natural Resources, and Recreation elements.

ACTIVITY/METHODOLOGY: Staff will actively participate in a variety of local, regional, and state level committee/partnership efforts in the interests of promoting and implementing the Year 2030 Regional Comprehensive Plan. Activities, projects, and programs will be initiated and worked on to implement the recommendations of the Year 2030 Regional Comprehensive Plan. These items are primarily funded by the Commission levy unless otherwise noted. ALSO PLEASE NOTE THAT WHILE THESE ARE IMPORTANT ACTIVITIES, THEY ARE DEEMED TO BE THE LOWEST PRIORITY FOR COMPLETION IN 2012 AS STAFF TIME IS ROUTINELY CONSUMED BY ACTIVITIES ASSOCIATED WITH OTHER PROGRAMS WHICH ARE TIED TO OUTSIDE FUNDING SOURCES. THEREFORE, SEVERAL OF THESE ACTIVITIES MAY CARRYOVER FOR MULTIPLE YEARS.

1611 WORK ITEM: REGIONAL PLAN COORDINATION (ENV.)

OBJECTIVE(S): To communicate and coordinate various policies and recommendations contained within the Regional Comprehensive Plan's Natural Resources Element.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations

ACTIVITY/METHODOLOGY: Staff will attend and participate in various meetings and workshops with the intent of promoting and implementing the Year 2030 Regional Comprehensive Plan. For this work element, these groups include, but are not limited to: Wisconsin Geologic and Natural History Survey, Winnebago Lakes Council, North East Wisconsin Wilderness Alliance, Lower Fox River Partnership (WDNR), among others.

61

Page 71: 2013 ECWRPC Work Program

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

Recommendation NR-2.3.1.1 ECWRPC: 15,667$ Planning: 14

GIS: -

ITEM TOTAL: 15,667$ 14

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

Goal NR-4.1 ECWRPC: 26,626$ Planning: 52 Strategy NR-4.1.1Recommendation NR-4.1.1.1 GIS: -

ITEM TOTAL: 26,626$ 52

ACTIVITY/METHODOLOGY: The Commission will begin identifying and mapping on its GIS system, a full regional coverage of all defined Environmentally Sensitive Area (ESA) components as prescribed by existing NR-121 Sewer Service Area Plan Policies.

1613 WORK ITEM: REGIONAL AQUIFER RECHARGE MAPPING (continued from 2009)

OBJECTIVE(S): To provide local units of government with information that can aid in the development of policies and regulations which preserve and protect the region's groundwater supplies.

ACTIVITY/METHODOLOGY: In 2010, the Commission received $12,000 in ARRA (stimulus) funds to prepare GIS data for use in mapping groundwater recharge areas within its member counties. Furthermore, an additional $10,000 was received from the Lake Michigan Academy, part of the Great Lakes Restoration Initiative towards this project. An additional $20,000 commitment of County levy funds were made in 2010 and a 2011 to facilitate this project. In summary, the Wisconsin Geologic & Natural History Survey (WGNHS) was contracted with to conduct groundwater recharge modeling for all of the region's counties. Phase i included Calumet, Outagamie and Winnebago Counties and was completed in late 2011. Phase II of this project will be initiated and completed in 2012 and includes recharge mapping for Menominee, Shawano, Waupaca, and Waushara Counties.

1614 WORK ITEM: REGIONAL ENVIRONMENTALLY SENSITIVE AREA (ESA) MAPPING

OBJECTIVE(S): To provide local units of government with information that can aid in the development of policies and regulations which preserve and protect the region's surface waters, stormwater management capacity, and wildlife habitat

62

Page 72: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 25,409$ Planning: 227

2012 Operator Fees 136,741$

GIS: 4

ELEMENT TOTAL: 162,150$ 231

FUNDING SOURCES PERSON DAYS

ECWRPC: -$ Planning: 178

2012 Operator Fees 136,741$

GIS: 4

ELEMENT TOTAL: 136,741$ 182

FUNDING SOURCES PERSON DAYS

ECWRPC: 15,501$ Planning: 30

GIS: - Recommendation NR-1.3.2.4

ITEM TOTAL: 15,501$ 30

1621 WORK ITEM: NR-135 REGIONAL NON-METALLIC MINING RECLAMATION PROGRAM ADMINISTRATION

OBJECTIVE(S): Administer five separate county-adopted ordinances relating to the reclamation of existing and future non-metallic mining sites as required under Wisconsin Administrative Code, NR-135. This work element is part of an ongoing formal intergovernmental agreement established in 2001 between East Central and Calumet, Outagamie, Winnebago, Waupaca, and Shawano counties involving the oversight and administration of the non-metallic mining reclamation program per the provisions of NR-135 and county adopted Non-Metallic Mining Reclamation ordinances.

ACTIVITY/METHODOLOGY: Staff reviews and issues reclamation permits and monitors them for compliance; develops program information, tracking reports and maintains financial procedures, and; provides education to existing site owners/operators. Staff also works with the counties and communities to review and suggest changes to zoning and conditional use provisions regarding operations. Site inspections are routinely conducted and reports and permits updated as necessary. The annual 'per unreclaimed acre' permit fee is established at $30.00 per acre for 2011 (as applied to 3,711 acres across 214 permitted sites).

$19,878 is a pass-through to expense to WDNR for their annual fees.

1622 WORK ITEM: ABANDONED MINES INVENTORY AND ASSESSMENT (continued from 2008)

OBJECTIVE(S): To address environmental and land use issues such as potential threats for groundwater contamination, safety, and rural aesthetics. In some cases, these sites may provide additional needed mineral resources for use in development and construction. This work item builds off of issues identified by counties related to the implementation of the NR-135 Non-Metallic Mining Reclamation Program (see work item #1620) regarding abandoned mine sites.

ACTIVITY/METHODOLOGY: Staff will utilize the NR-135 program database and information from non-program counties to inventory and evaluate existing inactive non-metallic mine sites. The sites would be mapped and certain characteristics identified so as to better prioritize sites and methods for potential restoration. An assessment of current state laws and programs related to inactive mines would be conducted and information pertaining to methods or examples of program development, funding, and implementation would be generated. No significant progress occurred on this project in past years due to other priority commitments which arose in the NR-135 program.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1620 MAJOR WORK ELEMENT: MINERAL RESOURCE PLANNING AND MANAGEMENT

OBJECTIVE(S): Staff will conduct work in the following three areas in order to implement specific programs, regional plan recommendations, and requested technical assistance as it pertains to non-metallic mining and mine reclamation.

ACTIVITY/METHODOLOGY: Staff reviews and issues reclamation permits and monitors them for compliance; develops program information, tracking reports and maintains financial procedures, and; provides education to existing site owners/operators. Staff also works with the counties and communities to review and suggest changes to zoning and conditional use provisions regarding operations. Site inspections are routinely conducted and reports and permits updated as necessary. The annual 'per unreclaimed acre' permit fee is established at $30.00 per acre for 2012 (as applied to 3,711 acres across 214 permitted sites).

63

Page 73: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC 9,909$ Planning: 19

GIS: -

ITEM TOTAL: 9,909$ 19

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

Recommendation NR-1.1.1.1 ECWRPC: 33,474$ Planning: 20 Recommendation NR-1.1.2.2Recommendation T-2.2.1.1 (6) National Park Service In-Kind Only GIS: 35

ITEM TOTAL: 33,474$ 55

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

ECWRPC: 13,743$ Planning: 10 Recommendation NR-1.1.1.1Recommendation NR-1.1.2.2 GIS: 10 Recommendation T-2.2.1.1 (6)

ITEM TOTAL: 13,743$ 20

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

ECWRPC: 19,731$ Planning: 10 Recommendation NR-1.1.1.1

Recommendation T-5.5.2.1 (6)National Park Service & Others

In-Kind GIS: 25

ITEM TOTAL: 19,731$ 35

1631 WORK ITEM: NIAGARA ESCARPMENT RESOURCE NETWORK PARTICIPATION

OBJECTIVE(S): To provide local units of government, residents, businesses, and organizations with information that can aid in the local and regional planning, promotion, and geotourism development along Wisconsin's Niagara Escarpment corridor.

ACTIVITY/METHODOLOGY: The Executive Director will continue to serve as a Co-Chair of the non-profit Niagara Escarpment Resource Network (NERN) which was made a formal program of the Lakeshore Natural Resource Partnership (LNRP) in 2010. NERN was a coalition-based regional forum 'founded' by the Commission in 2000. East Central now serves as a Board member of the LNRP and continues to play a lead role in planning for and providing support to conservation and economic development activities along the Niagara Escarpment Corridor. Regular meetings, project coordination and minor expense/material costs are expected in 2012. A majority of work on this item is done on the employee's own time, however; a connection of this effort to the agency is beneficial for various reasons.

1632 WORK ITEM: NIAGARA ESCARPMENT GREENWAY PLAN

OBJECTIVE(S): To provide local units of government with information that can aid in the local planning and development of an end-to-end hiking trail along the Niagara Escarpment Corridor.

ACTIVITY/METHODOLOGY: Staff will continue work with National Park Service and Bay-Lake RPC staff to complete a conceptual 'greenway' plan for the Niagara Escarpment corridor which will focus on identifying broad trail route alternatives for future consideration by counties and local communities. This project was initiated in late 2010.

1623 WORK ITEM: TECHNICAL ASSISTANCE TO WINNEBAGO COUNTY FOR EXTRACTION ORDINANCE INSPECTIONS (ongoing since 2011)

OBJECTIVE(S): Provide direct assistance to local units of government in addressing issues specific to environmental management.

ACTIVITY/METHODOLOGY: Staff will assist Winnebago County in the monitoring and enforcement of its current zoning ordinance provisions for extraction (mine) sites. Site inspections and evaluations will be conducted as needed on existing permitted sites. Written information and recommendations, if required, will be provided to County Zoning staff and additional support will be provided within the range costs illustrated. These inspections will conducted at the same time as traditional NR-135 program inspections, thereby increasing efficiencies and directly reducing workload for the County's Planning and Zoning Department staff.

1630 WORK ITEM: NIAGARA ESCARPMENT MANAGEMENT (ongoing since 2001)

OBJECTIVE(S): To continue a leadership role in building awareness for, and protecting the Niagara Escarpment as a feature of international geologic significance.

ACTIVITY/METHODOLOGY: Attend meetings and develop/implement projects associated with the protection, conservation and management of the Niagara Escarpment.

64

Page 74: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

WDNR 49,300$ Planning: 143

Goal NR-4.6: Create and promote more comprehensive efforts on controlling exotic and invasive species

ECWRPC: 32,191$ GIS: 5

Admin: 7

ELEMENT TOTAL: 81,491$ 155

1640 MAJOR WORK ELEMENT: WEST WINNEBAGO REGIONAL AQUATIC INVASIVE SPECIES COORDINATOR POSITION (Year 3 of 3)

OBJECTIVE(S): Protect the Lake Winnebago System from the invasion or expansion of new or existing aquatic invasive species.

ACTIVITY/METHODOLOGY: Implement the third and final year of a three year program (2011-13) grant from the Wisconsin Dept. of Natural Resources which was received in 2010. East Central will act as a regional Aquatic Invasive Species Coordinator (AISC) for two thirds of Lake Winnebago and the associated Winnebago Pool Lakes system. AISC will provide a regional approach to educate, monitor and control the spread of aquatic invasive species to and from the Winnebago Pool Lakes. The AISC will cover areas along the west, south, and southeast shoreline of Lake Winnebago; Little Lake Butte des Morts, Lake Butte des Morts, Lake Winneconne, and Lake Poygan. The AISC will also cover areas upstream along the Wolf River to Partridge Lake; the Fox River to the City of Omro; and, down the Lower Fox River to the Rapid Croche Lock/Dam. Educational outreach efforts will be extended to include Rush Lake (Winnebago County) and will cover the Wolf River Wildlife Area, Lower Wolf River Bottomlands Natural Resources Area, the Poygan Marsh, and the Eldorado Wildlife Area.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies and recommendations contained within the adopted Regional Plan:

(Note: Only 2013 Costs are illustrated. Three year award totaled $147,900 with a required local match of $50,000 over three year period)

65

Page 75: 2013 ECWRPC Work Program

1700 PROGRAM ELEMENT: LAND USE & HOUSING

MAJOR WORK ELEMENTS: REGIONAL PLAN RELATIONSHIP: TOTAL FUNDING SOURCES:

1705 – Technical Assistance

1720 - Regional Plan Implementation & Coordination

ECWRPC: 42,412$ Planning: 51

GIS: 25

H-1: Affordable Housing LU-1 Land Consumption & Development Choices

H-2: Housing Choice LU-2: Regional & Community Character

H-3: Housing Preservation LU-3: Balancing Community Interests & Property Rights

H-4: Coordination & Cooperation LU-4: Regional & Local Sustainability PROGRAM TOTAL: 42,412$ 76

FUNDING SOURCES PERSON DAYS

ECWRPC: 25,484$ Planning: 27

GIS: 25

ELEMENT TOTAL: 25,484$ 52

FUNDING SOURCES PERSON DAYS

ECWRPC: 3,915$ Planning: 3

GIS: -

Goal I-12.2Stragey I-12.2.1

ITEM TOTAL: 3,915$ 3

TOTAL PERSON DAYS:

The 1700 Land Use & Housing Program is directly related to Chapters 7 and 11 of the Year 2030 Regional Comprehensive Plan . The adopted visions for these element are as follows:

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

Housing: "In 2030 in the East Central Wisconsin region, a dynamic housing market fosters community and neighborhood cohesion. Varied types of quality housing are integrated with community facilities and various transportation alternatives. This housing market meets the needs of urban and rural households of all types, ages, income, cultures and mobility status."

Land Use: “In 2030 in the East Central Wisconsin region, efficient regional land use patterns foster healthy communities, individual community identity, and respect the natural environment.”

OBJECTIVE(S): To assist communities and counties in identifying housing needs within their communities. To help identify and support coordinated efforts to maximize resources to meet housing needs in the most efficient way possible in order to promote the quality of life and housing stock within the region.

ACTIVITY/METHODOLOGY: Staff will provide limited assistance in the development or delivery of land use and housing related data, prepare short studies, or become involved in a local project upon request.

This program element addresses the requirements of the Year 2030 Regional Comprehensive Plan's Land Use and Housing elements. It incorporates the Commission’s ongoing efforts to help address regional land use and housing issues which has a strong relationship with the regional economic development strategy for the region. Access to an adequate supply of decent, safe, affordable housing promotes economic development by contributing to the region’s quality of life through providing an adequate supply of workforce housing and providing choice for households of all types, income, age, cultures and mobility status. The integration of other land uses as they relate to housing is imperative as the Regional Plan calls for an improved mix of land uses so as to improve walkability and decrease energy usage. This element relates closely to the Commission’s Economic Development (1500) Element and, as such, some of the Technical Assistance related to housing may be deemed as being eligible for partial EDA funding. The following two work elements exist under this section:

The Year 2030 Regional Comprehensive Plan spells out more specific issue areas and policies which need to be addressed at a local or regional scale. Details of these issues can be found in one of the comprehensive plan's eight "Plan Guideline" fact sheets contained in Chapters 7 and 11:

1705 MAJOR WORK ELEMENT: TECHNICAL ASSISTANCE (Land Use & Housing)

ACTIVITY/METHODOLOGY: Staff will attend regular meetings of the Waushara County Land Use Committee in an advisory to assist its members in reviewing decisions and issues related to county-wide and local-level comprehensive plan implementation, monitoring, and updating.

1706 WORK ITEM: WAUSHARA COUNTY LAND USE COMMITTEE PARTICIPATION (ongoing service since 2010)

OBJECTIVE(S): To provide limited assistance to complete orsubstantially progress a local-level project.

66

Page 76: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 3,385$ Planning: 3

GIS: 4

Goal I-12.2Strategy I-12.2.1

ITEM TOTAL: 3,385$ 7

FUNDING SOURCES PERSON DAYS

ECWRPC: 3,385$ Planning: 3

GIS: 4

Goal I-12.2Strategy I-12.2.1

ITEM TOTAL: 3,385$ 7

FUNDING SOURCES PERSON DAYS

ECWRPC: 3,204$ Planning: 5

GIS: -

Goal LU-4.3Strategy LU-4.3.1Strategy LU-4.3.2 ITEM TOTAL: 3,204$ 5

FUNDING SOURCES PERSON DAYS

ECWRPC: 4,559$ Planning: 5

GIS: - Recommendation AG-1.2.4.1Recommendation AG-2.1.1.1 ITEM TOTAL: 4,559$ 5

ACTIVITY/METHODOLOGY: Staff will assist Waupaca County in an update of existing zoning ordinances to ensure compliance with ATCP Livestock Siting Standards.

OBJECTIVE(S): To provide limited assistance to complete or substantially progress a local-level project.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1712 WORK ITEM: WAUPACA COUNTY - ATCP 51 LIVESTOCK SITING ORDINANCE (continuation from 2011)

1711 WORK ITEM: TOWN OF MENASHA - SUSTAINABILITY ZONING OVERLAY (carry over from 2012)

OBJECTIVE(S): To provide limited assistance to complete orsubstantially progress a local-level project.

1708 WORK ITEM: CITY OF WAUPACA - ZONING MAP EDITING TO REMOVE SPLIT PARCELS (carry over from 2012)

OBJECTIVE(S): To provide limited assistance to complete orsubstantially progress a local-level project.

ACTIVITY/METHODOLOGY: Staff will work with the City of Waupaca (Waupaca County) to edit its zoning map to remove parcels that have more than one zoning category.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1707 WORK ITEM: CITY OF WAUPACA - LAND USE PLAN MAP SIMPLIFICATION (carry over from 2012)

OBJECTIVE(S): To provide limited assistance to complete orsubstantially progress a local-level project.

ACTIVITY/METHODOLOGY: Staff will assist the City of Waupaca (Waupaca County) in the modification of its existing Future Land Use Map to simplify the land use designations, thereby giving the City more flexibility in making decisions that would not necessarily require the plan to be amended.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

ACTIVITY/METHODOLOGY: Staff will assist the Town of Menasha (Winnebago County) in the development of an overlay zoning category that would require/consider elements of green design.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

67

Page 77: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 1,122$ Planning: -

GIS: 2

Goal I-12.2Strategy I-12.2.1

ITEM TOTAL: 1,122$ 2

OBJECTIVE(S): To provide limited assistance to amend future town land use maps previously developed by the Commission.

ACTIVITY/METHODOLOGY: Staff will assist Waushara County in amending future land use maps on an as needed basis.

FUNDING SOURCES PERSON DAYS

ECWRPC: 1,997$ Planning: -

Goal I-12.1 GIS: 5 Stratgey I-12.1.1

ITEM TOTAL: 1,997$ 5

OBJECTIVE(S): To assist the City of Brillion in obtaining U.S. Census data and completing a housing analysis.

ACTIVITY/METHODOLOGY: Staff will work with the City of Brillion (Calumet County) staff to provide an update of key 2010 Census data to be used to complete a housing analysis.

FUNDING SOURCES PERSON DAYS

ECWRPC: 2,269$ Planning: 5

Strategy H-1.1.7 GIS: - Recommendation H-1.1.7.1

ITEM TOTAL: 2,269$ 5

FUNDING SOURCES PERSON DAYS

ECWRPC: 2,780$ Planning: -

GIS: 5

Goal I-12.6Strategy I-12.6.2

ITEM TOTAL: 2,780$ 5

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies / recommendations contained within the adopted Regional Plan.

OBJECTIVE(S): To provide limited assistance to complete orsubstantially progress a local-level project.

ACTIVITY/METHODOLOGY: Staff will work with City of Berlin (Waushara County) staff to provide limited on-site training on ArcMap, focusing particularly on analysis capabilities.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

1713 WORK ITEM: VILLAGE OF COMBINED LOCKS ZONING MAP DEVELOPMENT/UPDATE (ongoing since 2000)

OBJECTIVE(S): To provide limited assistance to complete orsubstantially progress a local-level project.

1715 WORK ITEM: CITY OF BRILLION HOUSING ANALYSIS

1714 WORK ITEM: WAUSHARA COUNTY - ADMENDMENTS TO FUTURE TOWN LAND USE MAPS (ongoing service since 2010)

1716 WORK ITEM: CITY OF BERLIN ON-SITE GIS TRAINING & CAPACITY BUILDING (carryover from 2012)

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan.

ACTIVITY/METHODOLOGY: Staff will work with the V illage of Combined Locks (Outagamie County) to develop and updated zoning map to reflect its comprehensive plan goals and to accompany its current zoning ordinance as a regulatory method for controlling land use.

68

Page 78: 2013 ECWRPC Work Program

OBJECTIVE(S): To provide assistance to complete an inventory ofpedestrian/bike facilities in the Village of Combined Locks.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies / recommendations contained within the adopted Regional Plan.

FUNDING SOURCES PERSON DAYS

ECWRPC: 1,847$ Planning: -

Recommendation T-1.2.3.1 GIS: 5

ITEM TOTAL: 1,847$ 5

OBJECTIVE(S): To provide assistance to the Village of Redgranite toupdate its current zoning map.

ACTIVITY/METHODOLOGY: Staff will work with the Village of Redgranite (Waushara County) to update its current zoning map.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies / recommendations contained within the adopted Regional Plan.

FUNDING SOURCES PERSON DAYS

ECWRPC: 1,847$ Planning: -

Goal I-12.2 GIS: 5

Strategy I-12.2.1

ITEM TOTAL: 1,847$ 5

FUNDING SOURCES PERSON DAYS

ECWRPC: 16,927$ Planning: 24

GIS: -

ELEMENT TOTAL: 16,927$ 24

1717 WORK ITEM: VILLAGE OF COMBINED LOCKS PEDESTRIAN/BIKE FACILITY INVENTORY

1718 WORK ITEM: VILLAGE OF REDGRANITE ZONING MAP UPDATE

1720 MAJOR WORK ELEMENT: REGIONAL PLAN IMPLEMENTATION & COORDINATION (Land Use & Housing)

ACTIVITY/METHODOLOGY: Staff will actively participate in a variety of local, regional, and state level committee/partnership efforts in the interests of promoting and implementing the Year 2030 Regional Comprehensive Plan. Activities, projects, and programs will be initiated and worked on to implement the recommendations of the Year 2030 Regional Comprehensive Plan. These items are primarily funded by the Commission levy unless otherwise noted. ALSO PLEASE NOTE THAT WHILE THESE ARE IMPORTANT ACTIVITIES, THEY ARE DEEMED TO BE THE LOWEST PRIORITY FOR COMPLETION IN 2012 AS STAFF TIME IS ROUTINELY CONSUMED BY ACTIVITIES ASSOCIATED WITH OTHER PROGRAMS WHICH ARE TIED TO OUTSIDE FUNDING SOURCES. THEREFORE, SEVERAL OF THESE ACTIVITIES MAY CARRYOVER FOR MULTIPLE YEARS.

ACTIVITY/METHODOLOGY: Staff will assist the Village of Combined Locks (Outagamie County) in developing an inventory of existing pedestrian and biking facilities.

OBJECTIVE(S): To implement the vision, goals, strategies and recommendations contained in the adopted Year 2030 Regional Comprehensive Plan's Land Use and Housing Elements.

69

Page 79: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYSECWRPC: 5,037$ Planning: 10

GIS: -

Recommendation H-1.2.1.1Recommendation H-1.4.3.1

ITEM TOTAL: 5,037$ 10

FUNDING SOURCES PERSON DAYSECWRPC: 11,890$ Planning: 16

GIS: -

Recommendation LU-1.5.1.2Recommendation LU-1.5.1.3Recommendation LU-2.1.3.4

ITEM TOTAL: 11,890$ 16

OBJECTIVE(S): To communicate and coordinate various policies and recommendations contained within the Regional Comprehensive Plan's Land Use and Housing Elements.

ACTIVITY/METHODOLOGY: Staff will work key partners as identified in the Commission's previously submitted HUD Sustainable Communities Regional Planning Grant (which was not funded) to move forward on one or more individual subcomponents of the overall project proposal. This will include work on the development of a regular planner's symposium to discuss planning issues and opportunities associated with the integration of modern planning concepts into local ordinances and development regulations. Periodic learning sessions and 1/2 day workshops for elected officials, along with printed materials and reports and program grant applications will be the likely outcomes of this effort. Examples of concepts to be considered include, but are not limited to: Healthy Communities, Active Communities, Walkable Communities and Livable Communities.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

OBJECTIVE(S): To communicate and coordinate various policies and recommendations contained within the Regional Comprehensive Plan's Land Use and Housing Elements.

ACTIVITY/METHODOLOGY: Staff will attend and participate in various meetings and workshops with the intent of promoting and implementing the Year 2030 Regional Comprehensive Plan. For this work element, these groups include, but are not limited to: Fox Cities Housing Coalition and the Winnebagoland Housing Coalition.

1721 WORK ITEM: REGIONAL PLAN COORDINATION (HSNG. & LAND USE)

1722 WORK ITEM: LIVABLE COMMUNITIES INITIATIVE

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

70

Page 80: 2013 ECWRPC Work Program

2000 PROGRAM ELEMENT: LOCAL ASSISTANCE & CONTRACT SERVICES

MAJOR WORK ELEMENTS: TOTAL PROGRAM FUNDING:

2100 - Technical AssistanceECWRPC: $ 68,141 Planning: 254

2300 - Contract ServicesVARIOUS SOURCES: $ 130,177

GIS: 66

PROGRAM TOTAL $ 198,318 320

FUNDING SOURCES PERSON DAYS

ECWRPC: 62,421$ Planning: 81

GIS: 20

ELEMENT TOTAL: 62,421$ 101

FUNDING SOURCES PERSON DAYS

ECWRPC: 5,720$ Planning: 163

COMMITTED FROM GIS: 56 VARIOUS ENTITIES: 130,177$

ELEMENT TOTAL: 135,897$ 219

2300 MAJOR WORK ELEMENT: CONTRACT SERVICES

ACTIVITY/METHODOLOGY: Staff will work on the following specific contract planning projects during the 2012 calendar year.

The objective of this program is to provide planning and development assistance services, under contract, to local units of government in the region in a manner that promotes, encourages and implements more orderly and efficient growth and development methods through an organized, efficient, and publicly accessible planning process. A secondary objective is to improve decision‑making capabilities to address regional and community growth and development issues. If a technical assistance request is likely to expand beyond the typical three days allotted, or requires substantial effort, then the local community contracts with East Central and bears the entire cost of the project.

Technical assistance projects for 2012 are noted mainly in the 2100 element, however; other projects may be listed in the individual 1100-1700 work program elements for community facilities, transportation, economic development, open space, environmental management, and housing. Contracts for planning assistance are negotiated between East Central and the member community or county, based on a scope of services outlining the work effort and methodologies to be used in the project. Contracts are then approved by the appropriate Committee and the full Commission, or solely by the Steering Committee.

2100 MAJOR WORK ELEMENT: TECHNICAL ASSISTANCE

TOTAL PERSON DAYS:

ACTIVITY/METHODOLOGY: Provide immediate general services and responses to inquires, problems or concerns regarding planning related matters that are received during 2013. This time is allocated beyond that for other approved technical assistance projects.

OBJECTIVE(S): To provide longer-term, more in-depth administrative and planning services to local counties, communities, and organizations on specific planning projects.

OBJECTIVE(S): To provide limited assistance to complete or substantially progress a local-level project.

71

Page 81: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: -$ Planning: 6

City of Oshkosh 4,000$ GIS: -

ITEM TOTAL: 4,000$ 6

FUNDING SOURCES PERSON DAYS

ECWRPC: -$ Planning: 9

Outagamie County: 5,597$ GIS: -

ITEM TOTAL: 5,597$ 9

FUNDING SOURCES PERSON DAYS

ECWRPC: 2,500$ Planning: 16

Lake Michigan Academy 7,500$ GIS: -

ITEM TOTAL: 10,000$ 16

OBJECTIVE(S): To provide longer-term, more in-depth administrative and planning services to local counties, communities, and organizations on specific planning projects.

OBJECTIVE(S): To provide longer-term, more in-depth administrative and planning services to local counties, communities, and organizations on specific planning projects.

ACTIVITY/METHODOLOGY: Staff will provide the City of Oshkosh (Winnebago County) with grant administration services for previously awarded Wisconsin Dept. of Commerce CDGB grant for stormwater infrastructure in 2010.

OBJECTIVE(S): To provide longer-term, more in-depth administrative and planning services to local counties, communities, and organizations on specific planning projects.

ACTIVITY/METHODOLOGY: Staff continues to provide assistance to the EPA's Lake Michigan Academy by accepting periodic funding awards for localized projects that fit in with the Great Lakes. For 2013 staff will facilitate the enhancement of an ongoing project, or they will identify and select a new project which generally fits with the regional comprehensive plan's goals.

ACTIVITY/METHODOLOGY: Staff will provide administrative oversight of Outagamie County's 85.21 Specialized Transportation Program. This program provides coordination for elderly and disabled transportation activities which are derived from federal transit plans and accessibility regulations. Staff will work with county-level health and human service agencies as needed for this program.

2382 WORK ITEM: CITY OF OSHKOSH CDBG GRANT ADMINISTRATION (carry over from 2012)

2385 OUTAGAMIE COUNTY 85.21 SPECIALIZED TRANSPORTATION PROGRAM ADMINISTRATION (ongoing contract since 2006)

2386 WORK ITEM: LAKE MICHIGAN ACADEMY ACTIVITIES

72

Page 82: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: -$ Planning: 5

Menominee Tribe 2,700$ GIS: -

ITEM TOTAL: 2,700$ 5

FUNDING SOURCES PERSON DAYS

ECWRPC: 1,220$ Planning: 24

City of Waupaca 11,017$ GIS: -

ITEM TOTAL: 12,237$ 24

OBJECTIVE(S): To address service gaps and barriers and improved specialized transportation services throughout Winnebago County.

ACTIVITY/METHODOLOGY: Staff will provide recommendations to address service gaps and barriers and improved specialized transportation services throughout Winnebago County. The final recommendations will be presented at a County Specialized Transportation Summit.

FUNDING SOURCES PERSON DAYS

ECWRPC: -$ Planning: 50 WisDOT 54,000$ Winnebago County 16,000$ GIS: 41

ITEM TOTAL: 70,000$ 91

OBJECTIVE(S): To provide longer-term, more in-depth administrative and planning services to local counties, communities, and organizations on specific planning projects.

2387 WORK ITEM: MENOMINEE TRIBE LONG-RANGE TRANSPORTATION AND LAND USE PLAN (carryover from 2012)

2388 CITY OF WAUPACA STAFFING ASSISTANCE

OBJECTIVE(S): To provide longer-term, more in-depth administrative and planning services to local counties, communities, and organizations on specific planning projects.

ACTIVITY/METHODOLOGY: Staff will provide the City of Waupaca (Waupaca County) with professional planning staff assistance on a one day per week basis. Services include the provision of Plan Commission staff support, development of planning reports and implementation of other projects as deemed necessary by the City .

ACTIVITY/METHODOLOGY: Staff will develop two separate planning reports for the Menominee Tribe: A federally mandated Long-Range Transportation Plan and a Land Use Plan.

2391 WORK ITEM: WINNEBAGO COUNTY SPECIALIZED TRANSPORTATION STUDY

73

Page 83: 2013 ECWRPC Work Program

OBJECTIVE(S): To provide longer term, more in-depth administrative and planning services to local counties, communities, and organizations on specific planning projects.

ACTIVITY/METHODOLOGY: Staff will implement an onboard transit survey to examine transit trip patterns and transit user socioeconomic characteristics to better plan future routes. Staff will also develop an informational brochure (not currently available) to outline service information such as routes, times, fares, etc.

FUNDING SOURCES PERSON DAYS

ECWRPC: -$ Planning: 10

Menominee Tribe 6,363$ GIS: -

ITEM TOTAL: 6,363$ 10

FUNDING SOURCES PERSON DAYS

ECWRPC: 2,000$ Planning: 32

Village of Hortonville 23,000$ GIS: 15

ITEM TOTAL: 25,000$ 47

2392 WORK ITEM: MENOMINEE TRIBE TRANSIT SURVEY & BROCHURE

OBJECTIVE(S): To provide longer-term, more in-depth administrative and planning services to local counties, communities, and organizations on specific planning projects.

ACTIVITY/METHODOLOGY: Staff will develop an update of the Village's current Comprehensive Plan so that it meets the State's "smart growth' requirements spelled out in Wis. Stats. 66.1001.

2393 - WORK ITEM: VILLAGE OF HORTONVILLE COMPREHENSIVE PLAN UPDATE

74

Page 84: 2013 ECWRPC Work Program

3000 PROGRAM ELEMENT: GEOGRAPHIC INFORMATION SYSTEMS

REGIONAL PLAN RELATIONSHIP: TOTAL FUNDING SOURCES TOTAL PERSON DAYS:

3005 – Technical Assistance (GIS)ECWRPC: 21,951$ PLANNING: 8

3020 – Information Processing and Data CenterGIS: 112

3030 - Regional Land Information System (RLIS)

PROGRAM TOTAL 21,951$ TOTAL: 120

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies / recommendations contained within the adopted Regional Plan:

FUNDING SOURCES PERSON DAYS

ECWRPC: 1,992$ PLANNING: 8

GIS: -

ELEMENT TOTAL: 1,992$ TOTAL: 8

FUNDING SOURCES PERSON DAYS

ECWRPC: 1,992$ Planning: 8

GIS: -

ITEM TOTAL: 1,992$ 8

ACTIVITY/METHODOLOGY: Staff will attend regular meetings of various County Land Information Councils to share information, report on Commission and local level GIS projects, and to assist where necessary in coordinating the county's needs with respect to GIS data development and maintenance. Currently, the GIS Coordinator sits on the following Committees: Shawano, Waupaca, and Waushara,(3)(Advisory -Ad Hoc), Calumet and Winnebago (2)(Voting-Appointed). Voted as Vice-Chair to the State Council - WIGICC Wisconsin Geographic Information Coordination Council.

The Geographic Information System (GIS) element is designed to support all elements of the agency's planning program as well as coordination, promotion and participation of GIS activities within the state and region. The majority of GIS staff time, other than coordination, is scheduled into the various work efforts of the Commission's listed programs and activities. The following major work elements are contained in this section:

MAJOR WORK ELEMENTS:

3008 WORK ITEM: COUNTY / STATE LAND INFORMATION COUNCILS PARTICIPATION (ongoing since 2011)

OBJECTIVE(S): To provide limited assistance to complete orsubstantially progress a local-level project. Assigned to councils per2009 Wisconsin ACT 316 to act as an Ad Hoc or other voting member.

The 3000 Program is directly related to Chapter 12 of the Year 2030 Regional Comprehensive Plan . The main goal relating to this element is as follows:

GOAL I-12.6: Retain a leading role in the development and distribution of Geographic Information Systems (GIS) mapping data.

3005 MAJOR WORK ELEMENT: TECHNICAL ASSISTANCE (GIS)

OBJECTIVE(S): To assist member counties and communities in the collection, maintenance and development of GIS data and map compilations which improve their ability to make land use related decisions and implement programs.

ACTIVITY/METHODOLOGY: Staff will assist communities that request technical assistance during the annual project solicitation process.

75

Page 85: 2013 ECWRPC Work Program

PERSON DAYSFUNDING SOURCES

PLANNING:

Recommendation I-12.6.1.4 ECWRPC: 9,229$ GIS: 52 Recommendation I-12.6.1.5

ELEMENT TOTAL: 9,229$ TOTAL: 52

PERSON DAYSFUNDING SOURCES PLANNING: -

ECWRPC: 10,730$ GIS: 60

Recommendation I-12.6.1.2

ELEMENT TOTAL: 10,730$ TOTAL: 60

3020 MAJOR WORK ELEMENT: INFORMATION PROCESSING AND DATA CENTER

ACTIVITY/METHODOLOGY: Staff will continue to develop themes for the Regional Land Information System by processing and archiving files into a consistent format by building the system with data created by the GIS Staff. The work activities of this element involve using the GIS system to produce map products to support Commission activities. It includes processing data from cooperators such as the counties and other governmental agencies.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted

OBJECTIVE(S): To collect, maintain, develop and process data and information and to present this information in appropriate formats to support planning and operational functions of the Commission or to respond to requests from sources outside the Commission.

ACTIVITY/METHODOLOGY: Staff will collect and process information for use in maps, charts, tables, or reports, which satisfy Commission program needs and outside requests. Staff will provide information aerial photos or maps on requests. Staff will provide information, aerial photos or maps on request from communities, counties or outside sources. The information used is compiled from data received in printed publications, computer files, the internet, or as the result of internal studies.

REGIONAL PLAN RELATIONSHIP: These activities are specifically related to and/or implement the following strategies/recommendations contained within the adopted Regional Plan:

3030 MAJOR WORK ELEMENT: REGIONAL LAND INFORMATION SYSTEM (RLIS)

OBJECTIVE(S): To continue to develop and maintain a Regional Land Information System. This program includes use of East Central’s Geographic Information System for the development and production of consistent regional-level maps and analyses for use in local and regional planning activities.

76

Page 86: 2013 ECWRPC Work Program

5000 PROGRAM ELEMENT: ADMINISTRATION & FRINGE BENEFITS

5100 – General AdministrationTOTAL FUNDING SOURCES:

5200 – Staff Development5900 – Fringe Benefits ECWRPC: 322,288$

Planning: 409

GIS/IT: 355

Administrative: 778

PROGRAM TOTAL: 322,288$ 1,541

FUNDING SOURCES PERSON DAYS

ECWRPC: 168,992$ Planning: 70

GIS/IT: 185

Administrative: 608

ELEMENT TOTAL: 168,992$ 863

The administration program activities are carried out on a continuing basis in support of the Commission’s overall 2010 Planning Work Program. These include commissioners' activities, general administration, program review (work plan), public information, planning library, and staff development, administrative services, and fringe benefits. The categories of the Administration element include:

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

TOTAL PERSON DAYS:

The entire 5000 program category is treated as indirect costs within the context of the agency's cost allocation plan. Details of budget allocations for various administrative and overhead costs are listed in the 6000 Program Element.

5100 MAJOR WORK ELEMENT: GENERAL ADMINISTRATION

PROGRAM OBJECTIVE(S): To maintain efficient administration and operation of the agency. To maintain effective communication with the Commission and its committees.

ACTIVITY/METHODOLOGY: Includes the preparation of applications for funding assistance and requisition, progress, completion and annual reports related thereto; consideration of personnel matters

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

77

Page 87: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYSPlanning: 70

ECWRPC: 22,326$ GIS/IT: -

Administrative:

ITEM TOTAL: 22,326$ 70

FUNDING SOURCES PERSON DAYSPlanning: -

ECWRPC: 14,330$ GIS/IT: 70

ITEM TOTAL: 14,330$ 70

FUNDING SOURCES PERSON DAYSECWRPC: 30,340$ Planning: -

GIS/IT: -

Administrative: 181

ITEM TOTAL: 30,340$ 181

5130 WORK ITEM: FINANCIAL MANAGEMENT AND ACCOUNTING SERVICES

PROGRAM OBJECTIVE(S): To provide financial management support for Commission activities and programs.

ACTIVITY/METHODOLOGY: Staff will maintain accurate accounting for all Commission finances in conformance with generally accepted accounting procedures and with specific requirements of various federal or state grants. The annual audit process is contracted out and costs are contained in the 6000 Overhead Element.

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

5120 WORK ITEM: GIS MANAGEMENT

PROGRAM OBJECTIVE(S): To provide agency-wide management of the GIS department and staff in support of Commission programs and needs.

ACTIVITY/METHODOLOGY: Includes the preparation and monitoring of all Commission GIS projects; annual planning of the work program, budget and staffing plan; staff oversight and annual performance evaluations; preparation of work proposals and grant applications; graphic design preparation/review of Commission documents; preparation for and attendance at Commission and GIS related meetings.

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

5110 WORK ITEM: AGENCY MANAGEMENT

PROGRAM OBJECTIVE(S): To maintain efficient administration and operation of the agency and its staff.

ACTIVITY/METHODOLOGY: Includes the preparation and monitoring of the annual planning work program, budget and staffing plan in compliance with all federal or state grant requirements; staff oversight and annual performance evaluations; preparation of work proposals and grant application; preparation/review of Commission documents; preparation for and attendance at Commission related meetings, including AWRPC.

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

78

Page 88: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYSECWRPC: 33,239$ Planning: 165

GIS/IT: -

ITEM TOTAL: 33,239$ 165

FUNDING SOURCES PERSON DAYSPlanning: -

ECWRPC: 68,756$ GIS/IT: -

Administrative: 427

ITEM TOTAL: 68,756$ 427

FUNDING SOURCES PERSON DAYSPlanning: -

ECWRPC: 15,000$ GIS/IT: -

Administrative: -

ELEMENT TOTAL: 15,000$ -

5150 WORK ITEM: ADMINISTRATIVE SERVICES

5140 WORK ITEM: INFORMATION TECHNOLOGY MANAGEMENT

ACTIVITY/METHODOLOGY: Staff will provide administrative services such as reception, secretarial, and document production in support of Commission activities.

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

5200 MAJOR WORK ELEMENT: STAFF DEVELOPMENT

PROGRAM OBJECTIVE(S): To provide opportunities for staff members to attend conferences and short courses in furtherance of their professional and technical capabilities which can assist furthering the vision set forth in the regional comprehensive plan. To provide work opportunities to students with a planning concentration giving them exposure to "real world" problems and their feasible solutions.

ACTIVITY/METHODOLOGY: Includes attendance at conferences, training workshops and short courses. Attendance by designated staff personnel at conferences of APA, the American Planning Association, including the Wisconsin Chapter (WAPA). Training of staff in Microsoft Office computer applications. Participation by staff members in various UW Extension short courses or other training seminars and conferences sponsored by WDOD, WDNR, WDOT, EPA, FHWA or other entities as appropriate.

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

PROGRAM OBJECTIVE(S): To provide support for Commission activities.

PROGRAM OBJECTIVE(S): To provide technical support and Information Systems direction for the Commission's planning program work activities. Includes the maintenance and enhancement of computer hardware and software and technical support.

ACTIVITY/METHODOLOGY: Staff will be responsible for purchasing/configuration of GIS computers, update network infrastructure and disaster recovery plans, performing general research, management and support of current network and computer equipment, IP telephony, software, and supplies; monitoring server logs and support a routine program for workstation and server backup procedures including offsite storage and rotation; document contacts, procedures, and general network information; research new technologies and recommend implementation methods ;train and assist all staff; maintain and update the IT Plan; update, maintain, and upgrade the Commission's website.

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

79

Page 89: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYS

ECWRPC: 138,296$

ELEMENT TOTAL: 138,296$ 678

FUNDING SOURCES PERSON DAYSPlanning: -

ECWRPC: 880$ GIS/IT: -

Administrative: -

ITEM TOTAL: 880$ -

FUNDING SOURCES PERSON DAYSPlanning: -

ECWRPC: 1,020$ GIS/IT: -

Administrative: -

ITEM TOTAL: 1,020$ -

5904 BENEFIT ITEM: FLEXIBLE SPENDING ACCOUNT

5900 MAJOR WORK ELEMENT: FRINGE BENEFITS

PROGRAM OBJECTIVE(S): To provide pre-tax income savings to employees while offering increased flexibility for meeting medical costs.

ACTIVITY/METHODOLOGY: The Commission enrolled in an FSA administered through AFLAC beginning January, 2009.

5905 BENEFIT ITEM: CELL PHONE ALLOWANCE

PROGRAM OBJECTIVE(S): To provide and monitor indirect costs attributable to all direct salaries program costs regardless of funding source for days related to vacation, holiday and sick leave, and costs associated with various employee benefits.

ACTIVITY/METHODOLOGY: Monthly tracking and analysis of days associated with fringe benefits.

This is an indirect cost attributable to all direct salaries program costs regardless of funding source.

PROGRAM OBJECTIVE(S): To provide reimbursement for business use of personal cell-phones for key agency management positions.

ACTIVITY/METHODOLOGY: The Commission will reimburse the Executive Director and Assistant Director on a per month for business use of personal cell-phones with proper documentation.

80

Page 90: 2013 ECWRPC Work Program

FUNDING SOURCES PERSON DAYSPlanning: -

ECWRPC: 920$ GIS/IT: -

Administrative: -

ITEM TOTAL: 920$ -

PROGRAM OBJECTIVE(S): To provide confidential employee assistance in both personal and agency matters.

ACTIVITY/METHODOLOGY: The Commission pays for and provides referral to the Employee Assistance Program (EAP). This program can be used either by the Commission to resolve personnel issues or by the employee and their family in a confidential manner at no cost to the employee.

5906 BENEFIT ITEM: EMPLOYEE ASSISTANCE PROGRAM

81

Page 91: 2013 ECWRPC Work Program

6000 PROGRAM ELEMENT: OVERHEAD

FUNDING SOURCES: PERSON DAYS:

ECWRPC: 282,984$ Planning: -

GIS/IT: -

PROGRAM TOTAL: 282,984$

The overhead costs for Commission's daily operations throughout the year are estimated and shown on the subsequent budget table. These items include various expenses which are, for the most part considered when calculating the Commission's indirect salary rate.

82

Page 92: 2013 ECWRPC Work Program

APPENDIX A

RESOLUTION ADOPTING WORK PROGRAM & BUDGET

Page 93: 2013 ECWRPC Work Program
Page 94: 2013 ECWRPC Work Program

APPENDIX B

ECWRPC BY-LAWS PROVISIONS FOR STANDING COMMITTEES

Page 95: 2013 ECWRPC Work Program

ARTICLE VI - MANAGEMENT Section 1. EXECUTIVE COMMITTEE: The Executive Committee shall be comprised of the entire Commission membership as set forth in Article IV, Section 1 and 2 hereof.

Section 2. STANDING COMMITTEES: Appointments to standing committees shall be made by the Chairman at its Annual Meeting. Such appointments shall include designation of the committee chairman and vice-chairman and such appointments shall be subject to confirmation by the Commission.

There shall be Standing Committees and sub-committees including but not limited to the following:

A. Steering Committee: The Steering Committee shall be composed of seven (7)

members who serve as their respective county board chair or their designee. The Chair and Vice Chair positions for the Committee shall be the same as the current Commission Chair and Vice-Chair positions. The Secretary-Treasurer of the Commission shall be the secretary of the Steering Committee and shall attend all meetings of the Committee, keep a record of the proceedings and perform such other duties as may be designated to him by the Committee. The Secretary-Treasurer shall be an ex-officio member of this Committee without voting privileges. The duties of the Committee shall include:

1. Insure proper coordination and cooperation among the planning committees of

the Commission and their respective citizens' or technical advisory committees. 2. Act in emergency situations with the full power and authority of the Commission

taking appropriate action until action is taken at the next Commission meeting, subject only to the limitation of $15,000 for any expenditure resulting from such action. Refer to Article V, Section 5 regarding additional Chairman authorities for the timely approval of County levy commitments for state and federal funding opportunities.

3. Keep the Commission advised of pending legislation affecting the Commission, its

policies and its programs. 4. Prepare and submit at the quarterly July meeting an annual work program based

on statements of work program activities presented to it by the planning committees and including budget and staffing recommendations.

5. Recommend entering into contracts with member governmental units for the

provision of staff planning services.

6. Recommend the employment of auditors to audit the books of the Commission.

7. Direct the payment of any bills, claims or expenses incurred on behalf of and approved by the Commission.

Page 96: 2013 ECWRPC Work Program

8. Recommend the appointment of employees necessary to administer and carry

out the functions of the Commission. 9. Recommend the salaries and wages of all employees of the Commission.

10. Recommend a per diem compensation, mileage and other expenses to be paid members of the Commission.

11. Direct and monitor the current planning, information system and administration

program elements. B. Planning Committees: The various planning committees shall be composed of five

(5) or six (6) members. The general functions of the committees include: 1. Elect a Committee Chair and Vice-Chair as their first order of business at the first

regular Committee meeting following the Annual Meeting. The Steering Committee Chair and Vice Chair shall be the same as the current Commission Chair and Vice-Chair.

2. Provide orientation information for new Planning Committee members at the first

meeting following the Annual Meeting. 3. Prepare the annual work program statement of activities for their respective

program element(s).

4. Review detailed study designs for major work elements. 5. Monitor progress on work activities, review staff drafts of analytical reports and

alternative plan and program proposals. 6. Report, advise and recommend on activities for their respective program

element(s) including their responsibilities for elements of the regional comprehensive plan to the full Commission for action.

7. Review specific project proposals for conformance with adopted plans and policies.

8. Coordinate activities with those of other committees when necessary and desirable.

9. Maintain liaison with appropriate citizen and technical advisory committees. Planning committees and their specific duties follow:

1. Regional Comprehensive Planning Committee: This committee directs

and monitors the regional comprehensive plan and oversees other matters of regional impact. The committee is also responsible for intergovernmental coordination and serves as the Regional Clearinghouse Review Sub-Committee which administers the review process according to procedures outlined in the

Page 97: 2013 ECWRPC Work Program

Clearinghouse Review Manual. The committee shall consist of five (5) or six (6) members dependent upon annual committee assignments.

2. Economic Development Committee: This Committee directs and monitors

the economic development and housing program element and maintains liaison with respective technical advisory committees, including the Comprehensive Economic Development Strategy (CEDS) Committee. The CEDS Committee composition and operational structure is managed through the guidelines adopted by the Commission in Resolution No. 29-09. The committee shall consist of five (5) or six (6) members dependent upon annual committee assignments.

3. Transportation Committee: This committee directs and monitors the

transportation program element and maintains liaison with the Transportation Policy Advisory Committees and the Transportation Technical Advisory Committee. The committee shall consist of five (5) or six (6) members dependent upon annual committee assignments.

4. Open Space and Environmental Management Committee - This

committee directs and monitors the open space and environmental management program element and maintains liaison with the Open Space Technical Advisory Committee and the Environmental Management Technical Advisory Committee. The committee shall consist of five (5) or six (6) members dependent upon annual committee assignments.

5. Community Facilities Committee – This committee directs and monitors

the community facilities program element. The committee has responsibility to act on-behalf of the Commission for sewer service area amendments and reviews. The committee maintains liaison with the Sewer Service Area Technical Advisory Committee. The committee shall consist of five (5) or six (6) members dependent upon annual committee assignments.

Page 98: 2013 ECWRPC Work Program

APPENDIX C

POLICY AND TECHNICAL ADVISORY COMMITTEES

Page 99: 2013 ECWRPC Work Program

FOX CITIES TRANSPORTATION POLICY ADVISORY COMMITTEE POOL

County Officials Bill Barribeau, Calumet County Board Chairman Tom Nelson, Outagamie County Executive Mark Harris, Winnebago County Executive City Mayors Tim Hanna, Appleton Gene Rosin, Kaukauna Don Merkes, Menasha George Scherck, Neenah Village Presidents John Neumeier, Combined Locks Chuck Kuen, Kimberly Mike Vanden Berg, Little Chute Town Board Chairmen Mark McAndrews, Buchanan David Schowalter, Grand Chute Randy Leiker, Greenville John Slotten, Harrison Dale Youngquist, Menasha Bob Schmeichel, Neenah Brad Rettler, Vandenbroek Federal Officials Dwight McComb, Planning & Program Development Engineer Alexis Kuklenski, FHWA Community Planner Marisol Simon, Region Director, FTA Christopher Bertch, AICP, FTA State Officials Will Dorsey, Director, WisDOT Northeast Region Sandra Beaupre, Bureau of System Planning, WisDOT Madison Other Chuck Rundquist, Chairman, Fox Cities Transit Commission

Page 100: 2013 ECWRPC Work Program

OSHKOSH TRANSPORTATION POLICY ADVISORY COMMITTEE POOL County Officials Mark Harris, Winnebago County Executive City Mayors Burk Tower, City of Oshkosh Town Board Chairmen Tim Blake, Town of Algoma Frank Frassetto, Town of Black Wolf Glen Barthels, Town of Nekimi Jim Erdman, Town of Oshkosh Federal Officials Dwight McComb, Planning & Program Development Engineer Alexis Kuklenski, FHWA Community Planner Marisol Simon, Region Director, FTA Christopher Bertch, AICP, FTA State Officials Will Dorsey, Director, WisDOT Northeast Region

Sandra Beaupre, Director Bureau of System Planning, Madison Other Mark Rohloff, City Manager, Oshkosh,

Permanent ECWRPC Commissioner Alternate for Oshkosh Mayor

Page 101: 2013 ECWRPC Work Program

TRANSPORTATION TECHNICAL ADVISORY COMMITTEE POOL County Highway Commissioners Mike Ottery, Calumet Ton Janke, Fond du Lac Robert Podgorski, Green Lake Brendon Rhinehart, Marquette Al Geurts, Outagamie Grant Bystol, Shawano Dean Steingraber, Waupaca Tom Dahlke, Waushara Ernest Winters, Winnebago Ben M. Warrington, Menominee Public Works Director/Engineers Paula Van de Hey, City of Appleton Jordan Skiff, City of Fond du Lac Roy Van Gheem, Village of Little Chute John Sundelius, City of Kaukauna Mark Radtke, City of Menasha Gerry Kaiser, City of Neenah David Patek, City of Oshkosh Dave Vander Velden, Village of Kimberly Tom Marquardt, Town of Grand Chute Planners Wayne Rollin, City of Fond du Lac Bob Buckingham, Town of Grand Chute Robert Jakel, City of Kaukauna Greg Keil, City of Menasha George Dearborn, Town of Menasha Chris Haese, City of Neenah Darryn Burich, City of Oshkosh Julie Schmelzer, Calumet County Mike Hendrick, Outagamie County Jerry Bougie, Winnebago County

Airport Managers Martin Lenss, Outagamie County Peter Moll, Wittman Field State Officials Will Dorsey, Director, WisDOT, Northeast Region Sandra Beaupre, Director, Bureau of Planning, Madison Steve Coons, WisDOT Planning Federal Officials Dwight McComb, Planning &

Program Development Engineer Alexis Kuklenski, FHWA Community Planner Marisol Simon, FTA Region 5 Christopher Bertch, AICP, FTA MPO Transit Operators Chris Strong, Oshkosh Transit Deborah Wetter, Valley Transit Lynn M. Gilles, Fond du Lac Transit

Page 102: 2013 ECWRPC Work Program

FOND DU LAC MPO TECHNICAL ADVISORY COMMITTEE

Members: Alexis Kuklenski ............................................................................................................ FHWA Curt Holman ...................................................................................Canadian National Railroad Derek Weyer ................................................................................... WisDOT, Northeast Region Jerry Guelig ............................................................................................ Town of Taycheedah Jordan Skiff ............................................................................................... City of Fond du Lac Harold Manske ........................................................................................ Town of Fond du Lac Charles McCourt ......................................................................................... Town of Friendship Lynn Gilles ..................................................................................... City of Fond du Lac, FDLAT Mary Robb ................................................................................................... WisDOT, Madison Lee F. Perrizo ................................................................................. Fond du Lac County Airport Wayne Rollin .............................................................................................. City of Fond du Lac Sam Tobias ............................................................................................... Fond du Lac County Chuck Hornung ............................................................................ Village of North Fond du Lac Norbert C. Kolell .............................................................................................. Town of Empire Tom Janke .................................................................................. Fond du Lac County Highway James Pierquet ............................................................................................... Town of Empire Walt Raith ................................................................................................................ ECWRPC

Page 103: 2013 ECWRPC Work Program

ECONOMIC DEVELOPMENT ADVISORY COMMITTEE Dave Theil, Executive Director, Waupaca County Economic Development Corporation Mike Hendrick, Director, Outagamie County Planning Department Steve Sengstock, Executive Director, Shawano County Economic Progress Inc. Bill Wheeler, Executive Director, Tri-County Regional Economic Development Corporation Amy Pietsch, Director, FVTC Venture Center Jerry Murphy, Executive Director, New North, Inc Matthew Rehbein, City of Appleton Community Development Tim Hanna, Mayor, City of Appleton Ron Corn, Administrative Coordinator, Menominee County Jim Resick, CNRED, Outagamie County UW-Extension Jay Moynihan, CNRED, Shawano County UW-Extension Steve R. Jenkins, President, Fond du Lac County Economic Development Corporation Bobbi Miller, Business Services Manager, Fox Valley Workforce Development Board Lew Boyd , Project Manager, Menominee Nation Office of Economic Development Rob Kleman, Executive Director, Oshkosh Area Economic Development Corporation Christine Schaefer, Executive Vice President, Valley Homebuilders Associate (VHBA) Jeff Hunter, Senior Vice President-Planning & Marketing, Theda Care Jeff Sachse, Regional Economist, Department of Workforce Development, OEA Jerry Bougie, Planning Director, Winnebago County Planning Dept Larry Burkhardt, Executive Vice President/Chief Economic Development Officer, Fox Cities Chamber of Commerce & Industry Josh Dukelow , Fox Cities Chamber of Commerce & Industry Lynne Wichmann, Independent Living Coordinator, Waushara County Economic Development Corporation Elizabeth Hartman, President & CEO, CHAMCO Meridith Jaeger, Director, AeroInnovate Carol Karls, Manager/ Business & Community Development, Wisconsin Public Service Melissa Hunt, RAM, WEDC Naletta Burr, CAM, WEDC Linda Bartelt, Executive Director, NEWERA John Winkler, SBDC Business Councelor, Wisconsin Small Business Development Center Network (SBDC) John Casper, President/CEO, Oshkosh Chamber of Commerce Dena Mooney, Calumet County Planner, Calumet County Kim Biederman, Community Development Director, City of Omro George Dearborn, Director of Community Development, Town of Menasha Lori Gosz, City Administrator, City of Brillion Allen Davis, Community Development Director, City of Oshkosh Kevin Vonck, Special Projects Coordinator, Town of Grand Chute Robert Jakel, Director, City of Kaukauna April Mielke, Director of Community Development , City of Neenah Greg Keil, Director, City of Menasha Henry Veleker, Administrator/Clerk, City of Waupaca Angela Gorall, Administrator/Clerk, Town of Buchanan Alan Shute, Land Development Director, Green Lake County Thomas Onofrey, Administrator, Marquette County Jean Gliniecki, Zoning Administrator, Waupaca County Will Dippiesse, Vice President, First Business Bank Northeast Dale Walker, Director of Business and Industry Services, Fox Valley Technical College

Page 104: 2013 ECWRPC Work Program

APPENDIX D

RESOLUTION ADOPTING AFFIRMATIVE ACTION PLAN  

Page 105: 2013 ECWRPC Work Program
Page 106: 2013 ECWRPC Work Program
Page 107: 2013 ECWRPC Work Program
Page 108: 2013 ECWRPC Work Program

APPENDIX E

COST ALLOCATION PLAN

Page 109: 2013 ECWRPC Work Program

 

 

  East Central Wisconsin Regional Planning Commission

Cost Allocation Plan

2012

Page 110: 2013 ECWRPC Work Program

East Central Wisconsin Regional Planning Commission

1

Purpose The purpose of this cost allocation plan is to summarize the methods and procedures that this organization will use to allocate costs to various programs, grants, contracts and agreements. OMB Circular A-122, “Cost Principles for Non-Profit Organizations,” establishes the principles for determining costs of grants, contracts and other agreements with the Federal Government. East Central’s Cost Allocation Plan is based on the Direct Allocation method described in OMB Circular A-122. The Direct Allocation Method treats all costs as direct costs except general administration and general expenses. Direct costs are those that can be identified specifically with a particular final cost objective. Indirect costs are those that have been incurred for common or joint objectives and cannot be readily identified with a particular final cost objective. Only costs that are allowable, in accordance with the cost principles, will be allocated to benefiting programs by East Central. Methodology This proposal is based on East Central’s actual costs reconcilable to the audited financial statements for its calendar year ending December 31, 2009. The general approach of East Central in allocating costs to particular grants and contracts is as follows:

A. All allowable direct costs are charged directly to programs, grants, activity, etc. B. Allowable fringe benefits including FICA, Unemployment Insurance, Worker’s

Compensation, health insurance, life & disability, and other fringe benefits are pooled and allocated to programs, grants, etc. using direct labor as the base.

C. All other allowable general and administrative costs (including vacation, holiday, and

sick pay) are pooled and allocated to programs, grants, etc. using direct labor as a base.

Note--Actual costs from the prior calendar year are used for the indirect rate calculation on a provisional basis. Upon completion of the annual single audit (typically early second quarter), a final rate for the current year is determined. Current year’s costs to programs, grants, etc. are then utilized to calculate the final rate.

Page 111: 2013 ECWRPC Work Program

East Central Wisconsin Regional Planning Commission

2

Allocation of Costs The following information summarizes the procedures that have been used by East Central:

A. Compensation for Personal Services - Documented with timesheets showing time distribution for all employees and allocated based on time spent on each program or grant. Salaries and wages are charged directly to the program for which work has been done. NOTE-Paid interns or summer help labor figures are not burdened with any indirect labor.

B. Insurance - Insurance needed for a particular program is charged directly to the

program requiring the coverage. Other insurance coverage that benefits all programs is allocated to the “overhead” category.

C. Professional Services Costs (such as consultants) -Costs that benefit all programs

are charged directly to the program requiring the service. D. Audit Costs –Annual audit fees will be allocated to the “overhead” category.

E. Postage - Allocated based on usage. Postage expenses are charged directly to

programs to the extent possible. Costs that benefit all programs will be allocated to the overhead category.

F. Printing – Allocated based on usage. Copier expenses are charged directly to

programs to the extent possible. Costs that benefit all programs will be allocated to the overhead category.

G. Program Supplies - Expenses are charged directly to programs to the extent

possible. Costs that benefit all programs will be allocated to the overhead H. Equipment/Depreciation – East Central depreciates equipment when the initial

acquisition cost exceeds $1,000. Items below $1,000 are reflected in the supplies category and expensed in the current year. Costs that benefit all programs will be allocated to the overhead category.

I. Training/Conferences/Seminars –Costs that benefit one program will be charged

directly to the program. Costs that benefit all programs will be allocated to the overhead category.

J. Travel Costs - All travel costs (local and out-of-town) are charged directly to the

program for which the travel was incurred. Travel costs that benefit all programs will be allocated to the overhead category.

K. Vehicle Costs (Vehicle lease payments, vehicle maintenance costs associated with

leased vehicles, gas, repairs, insurance) - Allocated to the program benefiting from

Page 112: 2013 ECWRPC Work Program

East Central Wisconsin Regional Planning Commission

3the vehicle costs, using the federal mileage reimbursement rate. Vehicle costs that benefit all programs will be allocated to the overhead category.

L. Facilities Expenses (includes Rent, Utilities, Maintenance) - Facilities costs related to

general and administrative activities are allocated to the overhead category. M. Other costs (including membership dues, licenses, fees, etc.) – Expenses are

charged directly to programs that benefit from the service. Expenses that benefit all programs will be allocated to the overhead category.

N. Unallowable Costs – Costs that are unallowable in accordance with OMB Circular A-

122 including alcoholic beverages, bad debts, contributions, entertainment, fines & penalties are not included in the calculation of the indirect rate.

   

Page 113: 2013 ECWRPC Work Program

East Central Wisconsin Regional Planning Commission

4Indirect Salary Narrative

Executive Director charges for time spent on support to the Commissioners, financial review, personnel matters, and project management. Assistant Director charges for time spent on support to the Commissioners, financial review, personnel matters, and project management. Controller charges for time spent on financial management, procurement, employee benefit administration, and contract administration. GIS Coordinator charges for time spent on coordination of regional GIS projects, data collection/manipulation, and archive administration. IT Coordinator charges for time spent on support of the network and staff, procurement, and web maintenance. Administrative Staff charges for time spent on support of staff, preparation of materials for the Commissioners, and report preparation and production.

Page 114: 2013 ECWRPC Work Program

East Central Wisconsin Regional Planning Commission

5Exhibit 1: Table of Organization

Executive Division

Eric W. Fowle, AICP

Executive Director

Walt Raith, Assistant Director

MPO Director & Title VI Coordinator

Administrative Division

Vicky Johnson

Administrative Coordinator

Edalia Haney

Administrative Assistant

Angela Cottrell

Controller

Technical Services Division

GIS Program IT Program

Trish Nau Tim Badtke

GIS Coordinator IT Coordinator

Mike Zuege

GIS Specialist II

Adam Pfefferle

GIS Specialist I

Mike Patza

SRTS/GIS Assistant

Planning Services Division

Transportation Sewer Service Community Area Planning

Jason Kakatsch Joe Huffman Kathy Thunes, P.E.

Principal Planner Planner Principal Planner

Dave Moesch Todd Verboomen Tom Baron

Associate Planner Planner Planner

Melissa Kramer-Badtke Nick Musson

Safe Routes to School (SRTS) Planner

Economic Dev. NR-135 Mine Reclamation

Kara Homan Scott Konkle

Principal Planner Planning Specialist II

Page 115: 2013 ECWRPC Work Program

East Central Wisconsin Regional Planning Commission

6Exhibit 2: Certificate of Indirect Costs

This is to certify that I have reviewed the cost allocation plan submitted herewith and to the best of my 

knowledge and believe that: 

 

(1) the information contained in the Plan for the calendar year ending December 31, 2010 was 

prepared in accordance with 2 CFR Part 230 (formerly OMB Circular A‐122), and 

(2) the costs have been accorded consistent treatment in accordance with generally accepted 

accounting principles, and 

(3) an adequate accounting and statistical system exists to support claims that will be made 

under the Plan.  The system  prevents costs from being allocated to Federal programs as indirect 

costs that have already been charged to such programs as direct costs, and 

(4) the information provided in support of the Cost Allocation Plan is accurate, and 

(5) consistent treatment was accorded to similar costs for all project categories regardless of the 

source of funds, and 

(5) all federally unallowable costs have been excluded from allocations. 

 

I declare that the foregoing is true and correct. 

 

Organization:        _______________________________ 

Signature:        _______________________________ 

Name of Official (printed):    _______________________________ 

Title:          _______________________________ 

Date of Execution:      _______________________________ 

(Signed by the official having the authority to negotiate cost allocation plans for the organization, or by a 

higher level official.) 

Page 116: 2013 ECWRPC Work Program

APPENDIX F

LONG RANGE TRANSPORTATIN PLAN SCHEDULES  

Page 117: 2013 ECWRPC Work Program

Fox Cities (Appleton) and Oshkosh Metropolitan Planning Organization 2013 Meeting ScheduleMPO Standing Transportation Committee (TC), MPO Technical Advisory Committee (TAC)ECWRPC, Fox Cities (Appleton) and Oshkosh MPO Policy Board (PB)

Fox Cities and Oshkosh Bicycle and Pedestrian Plan (BP)Long Range Transportation Plan (LRTP) Implementation - Special StudiesPublic Participation Plan (PPP) Evaluation/MonitoringAnnual Transportation Improvement Program (TIP)2011 Unified Transportation Work Program (WP)* Special meetings of the TAC will be held as needed to address transportation issuesDate Time Tentative Primary Meeting Subjects CommitteeTuesday, January 8th 1:30 P.M. LRTP Update/BP Update/TIP/2013 WP Amendment TC

Friday, January 25th 10:00 A.M. Staff and TC Committee Reports/BP/WP/TIP Action/LRTP PB

Tuesday, January 29th 9:00 A.M. Wisconsin MPOs Quarterly Directors Meeting MPO Staff

Wednesday, April 3rd 10:00 A.M. Review and discussion LRTP update /BP Update/TIP TAC

Tuesday, April 9th 1:30 P.M. LRTP update /BP Update/TIP TC

Tuesday, April 23th 9:00 A.M. Wisconsin MPOs Quarterly Directors Meeting MPO Staff

Friday, April 26th 10:00 A.M. Staff and TC Committee Reports/BP/WP/TIP Action/LRTP PB

TBD TBD WisDOT/FHWA/MPO WP Mid-Year Review meeting Staff

Open Date * TBD If Needed TAC

Tuesday, July 16th 1:30 P.M. LRTP status update/TIP/work program/BP Status TC

Tuesday, July 23rd 9:00 A.M. Wisconsin MPOs Quarterly Directors Meeting MPO Staff

Friday, July 26th 10:00 A.M. Staff and TC Committee Reports/BP/WP/TIP Action/LRTP PB

TBD All Day MPO/WisDOT/FHWA Conference Staff

Tuesday, October 8th 10:00 A.M. Review and discussion LRTP update /BP Update/TIP TAC

Tuesday, October 15th 1:30 P.M. 2014 WP/LRTP Update/BP/TIP TC

Tuesday, October 22nd 10:00 A.M. Wisconsin MPOs Quarterly Directors Meeting MPO Staff

Friday, October 26th 10:00 A.M. 2014 WP Action/LRTP Update/BP/TIP PB

Last Updated 11-26-12

Page 118: 2013 ECWRPC Work Program

Fond du Lac Metropolitan Planning Organization (MPO) 2013 Meeting ScheduleMPO Policy Board (PB) and MPO Technical Advisory Committee (TAC)

ACRONYMS

Long Range Transportation Plan (LRTP)Transportation Improvement Program (TIP) Public Participation Plan (PPP)Transit Development Plan (TDP)Unified Transportation Work Program (WP)*Special meetings of the TAC and PB can be held as needed to address transportation issues

Date Time Tentative Primary Meeting Subjects Committee

Tuesday, January 29th 9:00 A.M. Wisconsin MPOs Quarterly Directors Meeting MPO Staff

Wednesday, February 13th 10:00 A.M. Review PPP and 2013-2015 LRTP update schedule/TIP PB/TAC

Tuesday, April 23rd 9:00 A.M. Wisconsin MPOs Quarterly Directors Meeting MPO Staff

Wednesday, May 8th 10:00 A.M. Review and discussion of LRTP update status/public review PB2013 - 2015 LRTP update schedule/planning activity update/membership update

TBD TBD WisDOT/FHWA/MPO WP Review Meeting MPO Staff

Wednesday, June 12th 10:00 A.M. LRTP Land Use/TIP Candidate Project listing review TAC

Wednesday, July 10th 10:00 A.M. TIP/LRTP/Special Studies /2014 WP Review Discussion PB

Tuesday, July 23rd 9:00 A.M. Wisconsin MPOs Quarterly Directors Meeting MPO Staff

TBD All Day MPO/WisDOT/FHWA Conference Staff

Wednesday, September 11th 10:00 A.M. 2014 WP/ LRTP Update/TIP Project Review Discussion TAC

Wednesday, October 9th 10:00 A.M. 2014 WP, TIP Project Review Discussion PBLRTP Update and Discussion

Tuesday, October 22nd TBD Wisconsin MPOs Quarterly Directors Meeting MPO Staff

Wednesday, November 13th 10:00 A.M. LRTP timeline evaluation/study updates/2014 WP PB/TACLast Updated 11-26-12

Page 119: 2013 ECWRPC Work Program

APPENDIX G

OTHER SUPPORTING DOCUMENTS

Page 120: 2013 ECWRPC Work Program

Other Supporting Documents at http://www.eastcentralrpc.org/planning/transportation.htm Public Participation Plans, Appleton MPO, Oshkosh MPO, Fond du Lac MPO Title VI Agreement, East Central Wisconsin Regional Planning Commission Cooperative Planning Agreements, Valley Transit (Appleton MPO), Oshkosh Transit (Oshkosh MPO), Fond du Lac Transit (FDL MPO) http://www.fcompo.org http://www.eastcentralrpc.org/FondduLacMPO/index.html Documents are also available by contacting staff at 920-751-4770 or E-mail request to: E-Mail: [email protected]