2013-14 Construction Engineering Solicitation -...

26
2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST REGION – LOCAL PROGRAM CONSULTANT PACKAGE NW 60L Project I.D. #1 8997-00-30 Highway/Street: West Avenue, City of Rice Lake Termini/Location: Augusta Street – Knapp Street County: Barron Length: 0.51 Miles Project Type: Reconstruction Urban and/or Rural: Urban Traffic Control: Closed to through traffic Letting Date: January 14, 2014 Field Rate Accounting Required: No Anticipated Construction Cost: $1,000,000-$1,999,999 Major Items of Work: Grading, Concrete Paving, Curb and Gutter, Incidental Items Complexity Level: Medium Restrictions: None Construction Leader Required: Yes Construction Support Staff Required: Yes Anticipated Number of Support Staff: 1 Required Certification: See above major items of work for required certification. Duties: All duties required for construction engineering / management Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548- 8649. NW Region Local Program, 14 Packages

Transcript of 2013-14 Construction Engineering Solicitation -...

Page 1: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT

NORTHWEST REGION – LOCAL PROGRAM

CONSULTANT PACKAGE NW 60L

Project I.D. #1 8997-00-30Highway/Street: West Avenue, City of Rice LakeTermini/Location: Augusta Street – Knapp StreetCounty: BarronLength: 0.51 MilesProject Type: ReconstructionUrban and/or Rural: UrbanTraffic Control: Closed to through traffic

Letting Date: January 14, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $1,000,000-$1,999,999

Major Items of Work: Grading, Concrete Paving, Curb and Gutter, Incidental ItemsComplexity Level: MediumRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 2: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 61L

Project I.D. #1 8953-00-70Highway/Street: CTH SS, Rice Lake - HaugenTermini/Location: Haugen Avenue/Lindy Street – CTH BCounty: BarronLength: 3.15 MilesProject Type: LFA Pavement Replacement, Incidental ItemsUrban and/or Rural: RuralTraffic Control:

Letting Date: April 25, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $500,000-$999,999

Project I.D. #2 8997-00-22Highway/Street: Wisconsin Avenue, City of Rice LakeTermini/Location: Allen Street IntersectionCounty: BarronLength: N/AProject Type: Intersection Reconstruction with RoundaboutUrban and/or Rural: UrbanTraffic Control:

Letting Date: May 13, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $500,000-$999,999

Major Items of Work: Concrete and Asphalt Paving, Grading, Incidental ItemsComplexity Level: MediumRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 3: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 62L

Project I.D. #1 7235-01-70Highway/Street: North Washington Street, City of MondoviTermini/Location: Peeso Creek Bridge, B-06-0192County: BuffaloLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: February 11, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $250,000-$499,999

Project I.D. #2 7160-01-71Highway/Street: CTH FTermini/Location: Branch Little Bear Creek Bridge, CTH K – CTH JJCounty: BuffaloLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Temporary Bypass

Letting Date: May 13, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $500,000-$749,999

Major Items of Work: Bridge B-06-0186, B-06-0192 and ApproachesComplexity Level: LowRestrictions: North Washington Street – All work that has the potential to adversely

affect the water quality of the stream must be completed between May 1 and October 1. CTH F – None.

Construction Leader Required: YesConstruction Support Staff Required: NoAnticipated Number of Support Staff: 0

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 4: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 63L

Project I.D. #1 7864-08-75 Highway/Street: CTH J, CTH X – CTH KTermini/Location: CTH J/50th Avenue IntersectionCounty: ChippewaLength: .34 MilesProject Type: LFA Reconstruction, RoundaboutUrban and/or Rural: Urban/RuralTraffic Control: None

Letting Date: June 25, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $500,000-$999,999

Project I.D. #2 7865-03-75 Highway/Street: CTH T, STH 29 – CTH STermini/Location: CTH N IntersectionCounty: ChippewaLength: .36 MilesProject Type: LFA ReconstructionUrban and/or Rural: RuralTraffic Control: None

Letting Date: April 25, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $250,000-$499,999

Major Items of Work: Grading, Asphalt Paving, Storm Sewer, Incidental ItemsComplexity Level: MediumRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 5: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 64L

Project I.D. #1 7849-03-71Highway/Street: CTH H, STH 73 – CTH KTermini/Location: Cawley Creek Bridge B-10-0222County: ClarkLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: May 13, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $500,000-$999,999

Project I.D. #2 8881-01-71Highway/Street: CTH D, STH 29 – North County LineTermini/Location: Center Road – County Line RoadCounty: ClarkLength: 3.0 MilesProject Type: LFA Pavement ReplacementUrban and/or Rural: RuralTraffic Control: Constructed under traffic.

Letting Date: May 25, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $250,000-$499,999

Major Items of Work: Bridge B-10-0222 and ApproachesComplexity Level: LowRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: NoAnticipated Number of Support Staff: 0

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 6: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 65L

Project I.D. #1 8396-00-72Highway/Street: Smith Bridge Road, Town of WascottTermini/Location: Minong Flowage Bridge B-16-0135County: DouglasLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: May 13, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $500,000-$999,999

Major Items of Work: B-16-0135 and ApproachesComplexity Level: MediumAssociated Contracts: NoneRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 7: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

NW Region Local Program, 14 Packages

Page 8: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 66L

Project I.D. #1 7828-03-70Highway/Street: CTH D, CTH V – USH 53Termini/Location: Beaver Creek Bridge B-18-0222County: Eau ClaireLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: March 11, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $250,000-$499,999

Project I.D. #2 7830-00-70Highway/Street: CTH V, CTH VV – CTH OTermini/Location: Beargrass Creek Bridge B-18-0221County: Eau ClaireLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: March 11, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $100,000-$249,999

Project I.D. #3 7830-03-70Highway/Street: CTH HH, Town of Pleasant ValleyTermini/Location: Pine Creek Bridge & Approaches B-18-0950County: Eau ClaireLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: March 11, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $250,000-$499,999

Project I.D. #4 7995-02-34Highway/Street: Madison Avenue, City of Eau ClaireTermini/Location: Farwell Street IntersectionCounty: Eau ClaireLength: N/AProject Type: LFA Electrical WorkUrban and/or Rural: UrbanTraffic Control: Constructed under traffic

Letting Date: May 25, 2014

NW Region Local Program, 14 Packages

Page 9: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

Field Rate Accounting Required: NoAnticipated Construction Cost: $0-$99,999

Major Items of Work: B-18-0221, B-18-0222, B-18-0950 and Approaches, Traffic signal modifications

Complexity Level: LowRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 10: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 67L

Project I.D. #1 7260-00-70Highway/Street: Cut Off Road, Town of MelroseTermini/Location: Bridge over Douglas Creek B-27-0159County: JacksonLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: May 13, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $100,000-$249,999

Project I.D. #2 7705-00-70Highway/Street: CTH A, Osseo – Black River FallsTermini/Location: STH 95 – Charcoal RoadCounty: JacksonLength: 5.1 MilesProject Type: ReconditionUrban and/or Rural: RuralTraffic Control: Closed with detour

Letting Date: May 13, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $2,000,000-$2,999,999

Major Items of Work: B-27-0159 and Approaches, Grading, Base Course, Paving, and Incidental Construction

Complexity Level: MediumRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 11: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 68L

Project I.D. #1 8787-00-70Highway/Street: CTH A, USH 8 – STH 27Termini/Location: Thornapple River Bridge B-54-0114County: RuskLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: May 13, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $250,000-$499,999

Project I.D. #2 8456-00-70Highway/Street: Townline Road, Town of RadissonTermini/Location: Kenyon Creek Bridge B-57-0084County: SawyerLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: June 10, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $100,000-$249,999

Major Items of Work: B-54-0114, B-57-0084 and ApproachesComplexity Level: LowRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: NoAnticipated Number of Support Staff: 0

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 12: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 69L

Project I.D. #1 8448-00-71Highway/Street: CTH GG, Loretta – North County LineTermini/Location: Brunet River Bridge B-57-0083County: SawyerLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: March 11, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $250,000-$499,999

Project I.D. #2 8451-00-70Highway/Street: CTH CC, CTH B – CTH HTermini/Location: Chippewa Flowage Bridge, B-57-0082County: Sawyer Length: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Temporary Bypass

Letting Date: March 11, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $750,000-$999,999

Major Items of Work: B-57-0082, B-57-0083 and ApproachesComplexity Level: MediumRestrictions: CTH CC – There are existing swallows nests on the bridge. The bridge

should be removed or netted prior to May 1 or after August 30.

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649..

NW Region Local Program, 14 Packages

Page 13: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 70L

Project I.D. #1 1540-00-72Highway/Street: North Main Street, City of River FallsTermini/Location: Union Street IntersectionCounty: St. CroixLength: N/AProject Type: ElectricalUrban and/or Rural: UrbanTraffic Control: Constructed under traffic

Letting Date: May 13, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $0-$99,999

Project I.D. #2 7919-05-76Highway/Street: CTH TTermini/Location: CTH M – CTH NCounty: St. CroixLength: 2.0Project Type: LFA Pavement ReplacementUrban and/or Rural: RuralTraffic Control: Constructed under traffic

Letting Date: April 25, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $500,000-$999,999

Major Items of Work: Electrical work, Pavement replacement, and Incidental ItemsComplexity Level: LowRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 14: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 71L

Project I.D. #1 8866-00-70Highway/Street: CTH M, North County Line – STH 65Termini/Location: Apple River Bridge B-55-0268County: St. CroixLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: UrbanTraffic Control: Closed

Letting Date: April 8, 2014

Field Rate Accounting Required: NoAnticipated Construction Cost: $500,000-$999,999

Major Items of Work: B-55-0268 and ApproachesComplexity Level: MediumRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 15: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

NW Region Local Program, 14 Packages

Page 16: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 72L

Project I.D. #1 8944-00-75Highway/Street: Trout Brook Road, Town of HudsonTermini/Location: Willow River Bridge B-55-0267County: St. CroixLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: December 10, 2013

Field Rate Accounting Required: NoAnticipated Construction Cost: $250,000-$499,999

Project I.D. #2 8947-00-70Highway/Street: 90th Avenue, Town of BaldwinTermini/Location: Trib to Carr Creek Bridge B-55-0269 County: St. CroixLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: December 10, 2013

Field Rate Accounting Required: NoAnticipated Construction Cost: $100,000-$249,999

Major Items of Work: B-55-0267, B-55-0269 and ApproachesComplexity Level: LowRestrictions: None

Construction Leader Required: YesConstruction Support Staff Required: NoAnticipated Number of Support Staff: 0

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages

Page 17: 2013-14 Construction Engineering Solicitation - …wisconsindot.gov/.../slicitations/13con/nwlpack13.docx · Web view2013 - 2014 CONSTRUCTION ENGINEERING SERVICES FOR WISDOT NORTHWEST

CONSULTANT PACKAGE NW 73L

Project I.D. #1 8899-01-73Highway/Street: Town of Westboro, Business Highway 13Termini/Location: Silver Creek Bridge B-60-0127County: TaylorLength: N/AProject Type: Bridge ReplacementUrban and/or Rural: RuralTraffic Control: Closed

Letting Date: December 10, 2013

Field Rate Accounting Required: NoAnticipated Construction Cost: $1,000,000-$1,999,999

Major Items of Work: B-60-0921 and ApproachesComplexity Level: MediumRestrictions: Business Highway 13 – All work that has the potential to adversely affect

the water quality of the stream must be completed between June 15 and April 15. There are existing swallows nests on the bridge. The bridge should be removed or netted prior to May 1 or after August 30. Final paving of approaches in 2015.

Construction Leader Required: YesConstruction Support Staff Required: YesAnticipated Number of Support Staff: 1

Required Certification: See above major items of work for required certification.Duties: All duties required for construction engineering / management

Check the ‘2013-14 WisDOT Construction: Statewide Project List’ to see DBE participation goals

For more information, contact: Sandra Villiesse, Contract Specialist, (262) 548-8649.

NW Region Local Program, 14 Packages