Transcript of 2012.0853C
-
7/30/2019 2012.0853C
1/31
-
7/30/2019 2012.0853C
2/31
-
7/30/2019 2012.0853C
3/31
-
7/30/2019 2012.0853C
4/31
-
7/30/2019 2012.0853C
5/31
Subject to: (Select only if applicable)
Inclusionary Housing (Sec. 315)
Jobs Housing Linkage Program (Sec. 313)
Downtown Park Fee (Sec. 139)
First Source Hiring (Admin. Code)
Child Care Requirement (Sec. 314)
Other
Draft Planning Commission MotionHEARING DATE, NOVEMBER 15, 2012
Date: November8,2012
CaseNo.: 2012.0853CV
ProjectAddress: 1984GREATHIGHWAY
Zoning: RH2(Residential,Twofamily)District
40XHeightandBulkDistrict
Block/Lot: 2086/011
ProjectSponsor: MaggiePoon
1028BalboaAvenue
SanFrancisco,CA 94118
StaffContact: AdrianC.Putra(415)5759079
d i t @ f
-
7/30/2019 2012.0853C
6/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
On November 15, 2012, the Commission conducted a duly noticed public hearing at a regularly
scheduledmeetingonConditionalUseApplicationNo.2012.0853CV.
TheProjectisexemptfromtheCaliforniaEnvironmentalQualityAct(CEQA)asaClass1categorical
exemptionunderCEQA.
TheCommissionhasheardandconsidered the testimonypresentedto itat thepublichearingandhas
furtherconsideredwrittenmaterialsandoraltestimonypresentedonbehalfoftheapplicant,Department
staff,andotherinterestedparties.
MOVED, that the Commission hereby authorizes theConditionalUse requested inApplicationNo.
2012.0853CV,subjecttotheconditionscontainedinEXHIBITAofthismotion,basedonthefollowing
findings:
FINDINGS
Having reviewed thematerials identified in thepreambleabove, andhavingheard all testimonyand
arguments,thisCommissionfinds,concludes,anddeterminesasfollows:
1. TheaboverecitalsareaccurateandconstitutefindingsofthisCommission.
2 Site De i tio a d P e e t U e The oje t ite at 1984 G eat Hi h ay i a th ou h lot
-
7/30/2019 2012.0853C
7/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
4. ProjectDescription. Theproject sponsor seeksaConditionalUseAuthorization,pursuant to
PlanningCodeSections209.3(f)and303forachangeofusetoestablishachildcarefacility(d.b.a.GrowingTreeChildCare)providinglessthan24hourcarefor15ormorechildrenattheproject
site. Theproposedchildcarefacilitywouldoccupytheexistingtwostorybuildinganddoesnot
involveanyexterioralterations. Theprojectsitealsohasapproximately1,300squarefeetofopen
spaceat the frontof the lotwhichwillbeutilizedasasupervisedplayarea forchildren. The
proposed facilitywould operateMonday through Friday from 7:30AM to 5:30 PM, serving
childrenup to five years old, andwillbe operatedby a staff of sixtoeight employees. The
projectsponsorexpectstheproposedfacilitytoprovidecareforupto60childrenthroughoutthe
day.Aspartoftheoperationofthechildcarefacility,theprojectsponsorintendstoapplyfora
passenger loading and unloading white zone curb along GreatHighway, at the front the
subjectproperty. Theproject sponsorwillalsobe required toobtainaState issued license to
operatetheproposedchildcare facilityandadheretotheChildCareCenterGeneralLicensing
RequirementsoftheStateofCalifornia.
5. PublicComment. Todate theDepartmenthasreceived twowrittencorrespondencesandone
phone call from neighbors citing concernswith onstreet parkingdemands, traffic, and noise
generatedbytheproject.
6. Planning Code Compliance: The Commission finds that the Project is consistentwith the
relevantprovisionsofthePlanningCodeinthefollowingmanner:
A Institutions Child Care Facility Planning Code Section 209 3(f) requires Conditional Use
-
7/30/2019 2012.0853C
8/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
7. PlanningCodeSection303establishescriteria for thePlanningCommission toconsiderwhen
reviewingapplicationsforConditionalUseapproval. Onbalance,theprojectdoescomplywith
saidcriteriainthat:
A. The proposed new uses andbuilding, at the size and intensity contemplated and at the
proposedlocation,willprovideadevelopmentthatisnecessaryordesirable,andcompatible
with,theneighborhoodorthecommunity.
Theproject iscompatiblewith thesurroundingneighborhoodas theproposedchildcarefacilitywill
notphysically expandoralter thesubjectbuildingpreviouslyoccupiedbyachurch. Therefore, the
projectwillnotcreateanyphysicalimpactsuponlight,airormidblockopenspace. Additionally,the
useisdesirableasitwillprovideavitalservicefortheresidentsoftheneighborhood.
B. Theproposedprojectwillnotbedetrimental to thehealth, safety, convenienceorgeneral
welfareofpersonsresidingorworking in thevicinity. Therearenofeaturesoftheproject
thatcouldbedetrimental to thehealth,safetyorconvenienceof thoseresidingorworking
thearea,
in
that:
i. Natureofproposedsite,includingitssizeandshape,andtheproposedsize,shapeand
arrangementofstructures;
Theprojectisnotdetrimentaltotheareasinceitdoesnotinvolveanyphysicalexpansiontothe
-
7/30/2019 2012.0853C
9/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
C. That theuseasproposedwillcomplywith theapplicableprovisionsof thePlanningCode
andwillnotadverselyaffecttheGeneralPlan.
Theproject complies with all relevant requirements and standards of the Planning Code and is
consistentwithobjectivesandpoliciesoftheGeneralPlanasdetailedbelow.
8. General Plan Compliance. The Project is consistentwith theObjectives and Policies of the
GeneralPlaninthat:
COMMERCE AND INDUSTRY ELEMENT
ObjectivesandPolicies
OBJECTIVE1:
MANAGE ECONOMICGROWTHANDCHANGE TO ENSURE ENHANCEMENTOF THE
TOTALCITYLIVINGANDWORKINGENVIRONMENT.
Policy1.1:
Encourage development which provides substantial netbenefits and minimizes undesirable
consequences. Discourage development that has substantial undesirable consequences that
cannotbemitigated.
-
7/30/2019 2012.0853C
10/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
Policy3.1:
Promote the attraction, retention and expansion of commercial and industrial firms whichprovideemploymentimprovementopportunitiesforunskilledandsemiskilledworkers.
TheprojectwillprovideadditionalemploymentopportunitiesforSanFranciscoresidents.
GOVERNMENT, HEALTH AND EDUCATION SERVICES
ObjectivesandPolicies
OBJECTIVE7:
ENHANCESANFRANCISCOSPOSITIONASANATIONALANDREGINALCENTERFOR
GOVERNMENT,HEALTH,ANDEDUCATIONALSERVICES.
Policy7.2:
Encouragetheextensionofneededhealthandeducationalservices,butmanageexpansionto
avoid
or
minimize
disruption
of
adjacent
residential
areas.
TheproposedchildcarecenterwillprovideeducationalservicesforthechildrenofSanFranciscoresidents.
Nophysicalexpansionisproposedtotheexistingchurchgroundsandamajorityoftheproposedchildcare
facilitysactivitieswilltakeplaceindoors,hencetheadjacentresidentialuseswillnotbedisrupted.
-
7/30/2019 2012.0853C
11/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
Due to thenature of theproject there arenoanticipated adverse effectsuponMUNI serviceoron
neighborhoodparking.
E. Thatadiverseeconomicbasebemaintainedbyprotectingourindustrialandservicesectors
fromdisplacementduetocommercialofficedevelopment,andthatfutureopportunitiesfor
residentemploymentandownershipinthesesectorsbeenhanced.
Approval of thisprojectwillnotadverselyaffectany industrialor service sectorjobs rather itwill
createnewservicesectoremploymentopportunitiesforworkersofthatsector.
F. ThattheCityachievethegreatestpossiblepreparednesstoprotectagainstinjuryandlossof
lifeinanearthquake.
Theprojectwillnot impact thesubjectpropertysability towithstandanearthquakeandall tenant
improvementsshallmeetthestructuralandseismicsafetyrequirementsoftheCityBuildingCode.
G. Thatlandmarksandhistoricbuildingsbepreserved.
Nolandmarksorhistoricbuildingswillbeadverselyaffectedbytheproject.
H. That our parks and open space and their access to sunlight andvistasbeprotected from
development
-
7/30/2019 2012.0853C
12/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
DECISION
Thatbasedupon theRecord, the submissionsby theApplicant, the staffof theDepartmentandother
interestedparties,theoraltestimonypresentedtothisCommissionatthepublichearings,andallother
written materials submitted by all parties, the Commission hereby APPROVES Conditional Use
ApplicationNo.2012.0853CVsubjecttothefollowingconditionsattachedheretoasEXHIBITAwhich
isincorporatedhereinbyreferenceasthoughfullysetforth.
APPEALAND
EFFECTIVE
DATE
OF
MOTION:
Any
aggrieved
person
may
appeal
this
Conditional
UseAuthorizationtotheBoardofSupervisorswithinthirty(30)daysafterthedateofthisMotionNo.
XXXXX.TheeffectivedateofthisMotionshallbethedateofthisMotionifnotappealed(afterthe30
dayperiodhasexpired)OR thedateof thedecisionof theBoardofSupervisors ifappealed to the
BoardofSupervisors. Forfurther information,pleasecontact theBoardofSupervisorsat (415)554
5184,CityHall,Room244,1Dr.CarltonB.GoodlettPlace,SanFrancisco,CA,94012.
IherebycertifythatthePlanningCommissionADOPTEDtheforegoingMotiononNovember15,2012.
JonasP.Ionin
ActingCommissionSecretary
-
7/30/2019 2012.0853C
13/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
EXHIBIT AAUTHORIZATIONThisauthorizationisforaconditionalusetoallowachangeofusefromachurchtoachildcarefacility
for15ormorechildren(d.b.a.GrowingTreeChildCare)locatedat1984GreatHighway,Block2086,and
Lot 011pursuant toPlanningCodeSections 209.3(f) and 303 andwithin anRH2Districtand a 40X
HeightandBulkDistrict;ingeneralconformancewithplans,datedJuly5,2012,andstampedEXHIBIT
BincludedinthedocketforCaseNo.2012.0853CVandsubjecttoconditionsofapprovalreviewedand
approvedbytheCommissiononNovember15,2012underMotionNoXXXXXX. Thisauthorizationandthe conditions contained herein run with the property and not with a particular Project Sponsor,
business,oroperator.
RECORDATION OF CONDITIONS OF APPROVAL
Prior to the issuance of the building permit or commencement of use for the Project the Zoning
AdministratorshallapproveandordertherecordationofaNoticeintheOfficialRecordsoftheRecorder
ofthe
City
and
County
of
San
Francisco
for
the
subject
property.
This
Notice
shall
state
that
the
project
is
subject to the conditions of approval contained herein and reviewed and approvedby the Planning
CommissiononNovember15,2012underMotionNoXXXXXX.
PRINTING OF CONDITIONS OF APPROVAL ON PLANS
The conditions of appro al under the Exhibit A of this Planning CommissionMotion No XXXXXX shall
-
7/30/2019 2012.0853C
14/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
Conditions of Approval, Compliance, Monitoring, and Reporting
PERFORMANCE
1. ValidityandExpiration. Theauthorizationandrightvestedbyvirtueofthisactionisvalidforthree
years from the effectivedateof theMotion. Abuildingpermit from theDepartmentofBuilding
Inspection to construct the project and/or commence the approved use must be issued as this
Conditional Use authorization is only an approval of the proposed project and conveys no
independent right to construct the project or to commence the approved use. The PlanningCommissionmay, inapublichearing,consider therevocationof theapprovalsgranted ifasiteor
buildingpermithasnotbeenobtainedwithinthree(3)yearsofthedateoftheMotionapprovingthe
Project. Once a siteorbuildingpermithasbeen issued, constructionmust commencewithin the
timeframe required by the Department of Building Inspection and be continued diligently to
completion. TheCommissionmayalsoconsiderrevoking theapprovals ifapermit for theProject
hasbeenissuedbutisallowedtoexpireandmorethanthree(3)yearshavepassedsincetheMotion
wasapproved.
Forinformation
about
compliance,
contact
Code
Enforcement,
Planning
Department
at
415
575
6863,
www.sfplanning.org.
2. ExtensionThisauthorizationmaybeextendedat thediscretionof theZoningAdministratoronly
where failure to issue apermitby theDepartment ofBuilding Inspection to perform said tenant
-
7/30/2019 2012.0853C
15/31
Draft Motion No.Hearing Date: November 15, 2012
CASE No. 2012.0853CV1984 Great Highway
OPERATION
5. CommunityLiaison. Priortoissuanceofabuildingpermittoconstructtheprojectandimplement
the approved use, theProject Sponsor shall appoint a community liaison officer todealwith the
issuesofconcerntoownersandoccupantsofnearbyproperties. TheProjectSponsorshallprovide
theZoningAdministratorwithwrittennoticeofthename,businessaddress,andtelephonenumber
ofthecommunityliaison. Shouldthecontactinformationchange,theZoningAdministratorshallbe
madeawareofsuchchange. ThecommunityliaisonshallreporttotheZoningAdministratorwhat
issues,if
any,
are
of
concern
to
the
community
and
what
issues
have
not
been
resolved
by
the
Project
Sponsor.
Forinformationaboutcompliance,contactCodeEnforcement,PlanningDepartmentat4155756863,
www.sfplanning.org
6. SidewalkMaintenance.TheProjectSponsorshallmaintainthemainentrancetothebuildingandall
sidewalks abutting the subject property in a clean and sanitary condition in compliancewith the
DepartmentofPublicWorksStreetsandSidewalkMaintenanceStandards.
Forinformation
about
compliance,
contact
Bureau
of
Street
Use
and
Mapping,
Department
of
Public
Works,
4156952017,http://sfdpw.org/
-
7/30/2019 2012.0853C
16/31
Parcel Map
-
7/30/2019 2012.0853C
17/31
Sanborn Map
-
7/30/2019 2012.0853C
18/31
Aerial Photo
view looking North
SUBJECT PROPERTY
-
7/30/2019 2012.0853C
19/31
Aerial Photo
view looking West
-
7/30/2019 2012.0853C
20/31
Aerial Photo
view looking East
-
7/30/2019 2012.0853C
21/31
Aerial Photo
view looking South
SUBJECT PROPERTY
-
7/30/2019 2012.0853C
22/31
Zoning Map
-
7/30/2019 2012.0853C
23/31
Site Photo - Subject PropertyView from Great Highway
-
7/30/2019 2012.0853C
24/31
Site Photo - Subject Property
View from 48th
Avenue
-
7/30/2019 2012.0853C
25/31
-
7/30/2019 2012.0853C
26/31
-
7/30/2019 2012.0853C
27/31
-
7/30/2019 2012.0853C
28/31
-
7/30/2019 2012.0853C
29/31
-
7/30/2019 2012.0853C
30/31
-
7/30/2019 2012.0853C
31/31