    Subject to: (Select only if applicable)

    Inclusionary Housing (Sec. 315)

    Jobs Housing Linkage Program (Sec. 313)

    Downtown Park Fee (Sec. 139)

    First Source Hiring (Admin. Code)

    Child Care Requirement (Sec. 314)

    Other

    Draft Planning Commission MotionHEARING DATE, NOVEMBER 15, 2012

    Date: November8,2012

    CaseNo.: 2012.0853CV

    ProjectAddress: 1984GREATHIGHWAY

    Zoning: RH2(Residential,Twofamily)District

    40XHeightandBulkDistrict

    Block/Lot: 2086/011

    ProjectSponsor: MaggiePoon

    1028BalboaAvenue

    SanFrancisco,CA 94118

    StaffContact: AdrianC.Putra(415)5759079

    d i t @ f

  • 7/30/2019 2012.0853C

    6/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    On November 15, 2012, the Commission conducted a duly noticed public hearing at a regularly

    scheduledmeetingonConditionalUseApplicationNo.2012.0853CV.

    TheProjectisexemptfromtheCaliforniaEnvironmentalQualityAct(CEQA)asaClass1categorical

    exemptionunderCEQA.

    TheCommissionhasheardandconsidered the testimonypresentedto itat thepublichearingandhas

    furtherconsideredwrittenmaterialsandoraltestimonypresentedonbehalfoftheapplicant,Department

    staff,andotherinterestedparties.

    MOVED, that the Commission hereby authorizes theConditionalUse requested inApplicationNo.

    2012.0853CV,subjecttotheconditionscontainedinEXHIBITAofthismotion,basedonthefollowing

    findings:

    FINDINGS

    Having reviewed thematerials identified in thepreambleabove, andhavingheard all testimonyand

    arguments,thisCommissionfinds,concludes,anddeterminesasfollows:

    1. TheaboverecitalsareaccurateandconstitutefindingsofthisCommission.

    2 Site De i tio a d P e e t U e The oje t ite at 1984 G eat Hi h ay i a th ou h lot

  • 7/30/2019 2012.0853C

    7/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    4. ProjectDescription. Theproject sponsor seeksaConditionalUseAuthorization,pursuant to

    PlanningCodeSections209.3(f)and303forachangeofusetoestablishachildcarefacility(d.b.a.GrowingTreeChildCare)providinglessthan24hourcarefor15ormorechildrenattheproject

    site. Theproposedchildcarefacilitywouldoccupytheexistingtwostorybuildinganddoesnot

    involveanyexterioralterations. Theprojectsitealsohasapproximately1,300squarefeetofopen

    spaceat the frontof the lotwhichwillbeutilizedasasupervisedplayarea forchildren. The

    proposed facilitywould operateMonday through Friday from 7:30AM to 5:30 PM, serving

    childrenup to five years old, andwillbe operatedby a staff of sixtoeight employees. The

    projectsponsorexpectstheproposedfacilitytoprovidecareforupto60childrenthroughoutthe

    day.Aspartoftheoperationofthechildcarefacility,theprojectsponsorintendstoapplyfora

    passenger loading and unloading white zone curb along GreatHighway, at the front the

    subjectproperty. Theproject sponsorwillalsobe required toobtainaState issued license to

    operatetheproposedchildcare facilityandadheretotheChildCareCenterGeneralLicensing

    RequirementsoftheStateofCalifornia.

    5. PublicComment. Todate theDepartmenthasreceived twowrittencorrespondencesandone

    phone call from neighbors citing concernswith onstreet parkingdemands, traffic, and noise

    generatedbytheproject.

    6. Planning Code Compliance: The Commission finds that the Project is consistentwith the

    relevantprovisionsofthePlanningCodeinthefollowingmanner:

    A Institutions Child Care Facility Planning Code Section 209 3(f) requires Conditional Use

  • 7/30/2019 2012.0853C

    8/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    7. PlanningCodeSection303establishescriteria for thePlanningCommission toconsiderwhen

    reviewingapplicationsforConditionalUseapproval. Onbalance,theprojectdoescomplywith

    saidcriteriainthat:

    A. The proposed new uses andbuilding, at the size and intensity contemplated and at the

    proposedlocation,willprovideadevelopmentthatisnecessaryordesirable,andcompatible

    with,theneighborhoodorthecommunity.

    Theproject iscompatiblewith thesurroundingneighborhoodas theproposedchildcarefacilitywill

    notphysically expandoralter thesubjectbuildingpreviouslyoccupiedbyachurch. Therefore, the

    projectwillnotcreateanyphysicalimpactsuponlight,airormidblockopenspace. Additionally,the

    useisdesirableasitwillprovideavitalservicefortheresidentsoftheneighborhood.

    B. Theproposedprojectwillnotbedetrimental to thehealth, safety, convenienceorgeneral

    welfareofpersonsresidingorworking in thevicinity. Therearenofeaturesoftheproject

    thatcouldbedetrimental to thehealth,safetyorconvenienceof thoseresidingorworking

    thearea,

    in

    that:

    i. Natureofproposedsite,includingitssizeandshape,andtheproposedsize,shapeand

    arrangementofstructures;

    Theprojectisnotdetrimentaltotheareasinceitdoesnotinvolveanyphysicalexpansiontothe

  • 7/30/2019 2012.0853C

    9/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    C. That theuseasproposedwillcomplywith theapplicableprovisionsof thePlanningCode

    andwillnotadverselyaffecttheGeneralPlan.

    Theproject complies with all relevant requirements and standards of the Planning Code and is

    consistentwithobjectivesandpoliciesoftheGeneralPlanasdetailedbelow.

    8. General Plan Compliance. The Project is consistentwith theObjectives and Policies of the

    GeneralPlaninthat:

    COMMERCE AND INDUSTRY ELEMENT

    ObjectivesandPolicies

    OBJECTIVE1:

    MANAGE ECONOMICGROWTHANDCHANGE TO ENSURE ENHANCEMENTOF THE

    TOTALCITYLIVINGANDWORKINGENVIRONMENT.

    Policy1.1:

    Encourage development which provides substantial netbenefits and minimizes undesirable

    consequences. Discourage development that has substantial undesirable consequences that

    cannotbemitigated.

  • 7/30/2019 2012.0853C

    10/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    Policy3.1:

    Promote the attraction, retention and expansion of commercial and industrial firms whichprovideemploymentimprovementopportunitiesforunskilledandsemiskilledworkers.

    TheprojectwillprovideadditionalemploymentopportunitiesforSanFranciscoresidents.

    GOVERNMENT, HEALTH AND EDUCATION SERVICES

    ObjectivesandPolicies

    OBJECTIVE7:

    ENHANCESANFRANCISCOSPOSITIONASANATIONALANDREGINALCENTERFOR

    GOVERNMENT,HEALTH,ANDEDUCATIONALSERVICES.

    Policy7.2:

    Encouragetheextensionofneededhealthandeducationalservices,butmanageexpansionto

    avoid

    or

    minimize

    disruption

    of

    adjacent

    residential

    areas.

    TheproposedchildcarecenterwillprovideeducationalservicesforthechildrenofSanFranciscoresidents.

    Nophysicalexpansionisproposedtotheexistingchurchgroundsandamajorityoftheproposedchildcare

    facilitysactivitieswilltakeplaceindoors,hencetheadjacentresidentialuseswillnotbedisrupted.

  • 7/30/2019 2012.0853C

    11/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    Due to thenature of theproject there arenoanticipated adverse effectsuponMUNI serviceoron

    neighborhoodparking.

    E. Thatadiverseeconomicbasebemaintainedbyprotectingourindustrialandservicesectors

    fromdisplacementduetocommercialofficedevelopment,andthatfutureopportunitiesfor

    residentemploymentandownershipinthesesectorsbeenhanced.

    Approval of thisprojectwillnotadverselyaffectany industrialor service sectorjobs rather itwill

    createnewservicesectoremploymentopportunitiesforworkersofthatsector.

    F. ThattheCityachievethegreatestpossiblepreparednesstoprotectagainstinjuryandlossof

    lifeinanearthquake.

    Theprojectwillnot impact thesubjectpropertysability towithstandanearthquakeandall tenant

    improvementsshallmeetthestructuralandseismicsafetyrequirementsoftheCityBuildingCode.

    G. Thatlandmarksandhistoricbuildingsbepreserved.

    Nolandmarksorhistoricbuildingswillbeadverselyaffectedbytheproject.

    H. That our parks and open space and their access to sunlight andvistasbeprotected from

    development

  • 7/30/2019 2012.0853C

    12/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    DECISION

    Thatbasedupon theRecord, the submissionsby theApplicant, the staffof theDepartmentandother

    interestedparties,theoraltestimonypresentedtothisCommissionatthepublichearings,andallother

    written materials submitted by all parties, the Commission hereby APPROVES Conditional Use

    ApplicationNo.2012.0853CVsubjecttothefollowingconditionsattachedheretoasEXHIBITAwhich

    isincorporatedhereinbyreferenceasthoughfullysetforth.

    APPEALAND

    EFFECTIVE

    DATE

    OF

    MOTION:

    Any

    aggrieved

    person

    may

    appeal

    this

    Conditional

    UseAuthorizationtotheBoardofSupervisorswithinthirty(30)daysafterthedateofthisMotionNo.

    XXXXX.TheeffectivedateofthisMotionshallbethedateofthisMotionifnotappealed(afterthe30

    dayperiodhasexpired)OR thedateof thedecisionof theBoardofSupervisors ifappealed to the

    BoardofSupervisors. Forfurther information,pleasecontact theBoardofSupervisorsat (415)554

    5184,CityHall,Room244,1Dr.CarltonB.GoodlettPlace,SanFrancisco,CA,94012.

    IherebycertifythatthePlanningCommissionADOPTEDtheforegoingMotiononNovember15,2012.

    JonasP.Ionin

    ActingCommissionSecretary

  • 7/30/2019 2012.0853C

    13/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    EXHIBIT AAUTHORIZATIONThisauthorizationisforaconditionalusetoallowachangeofusefromachurchtoachildcarefacility

    for15ormorechildren(d.b.a.GrowingTreeChildCare)locatedat1984GreatHighway,Block2086,and

    Lot 011pursuant toPlanningCodeSections 209.3(f) and 303 andwithin anRH2Districtand a 40X

    HeightandBulkDistrict;ingeneralconformancewithplans,datedJuly5,2012,andstampedEXHIBIT

    BincludedinthedocketforCaseNo.2012.0853CVandsubjecttoconditionsofapprovalreviewedand

    approvedbytheCommissiononNovember15,2012underMotionNoXXXXXX. Thisauthorizationandthe conditions contained herein run with the property and not with a particular Project Sponsor,

    business,oroperator.

    RECORDATION OF CONDITIONS OF APPROVAL

    Prior to the issuance of the building permit or commencement of use for the Project the Zoning

    AdministratorshallapproveandordertherecordationofaNoticeintheOfficialRecordsoftheRecorder

    ofthe

    City

    and

    County

    of

    San

    Francisco

    for

    the

    subject

    property.

    This

    Notice

    shall

    state

    that

    the

    project

    is

    subject to the conditions of approval contained herein and reviewed and approvedby the Planning

    CommissiononNovember15,2012underMotionNoXXXXXX.

    PRINTING OF CONDITIONS OF APPROVAL ON PLANS

    The conditions of appro al under the Exhibit A of this Planning CommissionMotion No XXXXXX shall

  • 7/30/2019 2012.0853C

    14/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    Conditions of Approval, Compliance, Monitoring, and Reporting

    PERFORMANCE

    1. ValidityandExpiration. Theauthorizationandrightvestedbyvirtueofthisactionisvalidforthree

    years from the effectivedateof theMotion. Abuildingpermit from theDepartmentofBuilding

    Inspection to construct the project and/or commence the approved use must be issued as this

    Conditional Use authorization is only an approval of the proposed project and conveys no

    independent right to construct the project or to commence the approved use. The PlanningCommissionmay, inapublichearing,consider therevocationof theapprovalsgranted ifasiteor

    buildingpermithasnotbeenobtainedwithinthree(3)yearsofthedateoftheMotionapprovingthe

    Project. Once a siteorbuildingpermithasbeen issued, constructionmust commencewithin the

    timeframe required by the Department of Building Inspection and be continued diligently to

    completion. TheCommissionmayalsoconsiderrevoking theapprovals ifapermit for theProject

    hasbeenissuedbutisallowedtoexpireandmorethanthree(3)yearshavepassedsincetheMotion

    wasapproved.

    Forinformation

    about

    compliance,

    contact

    Code

    Enforcement,

    Planning

    Department

    at

    415

    575

    6863,

    www.sfplanning.org.

    2. ExtensionThisauthorizationmaybeextendedat thediscretionof theZoningAdministratoronly

    where failure to issue apermitby theDepartment ofBuilding Inspection to perform said tenant

  • 7/30/2019 2012.0853C

    15/31

    Draft Motion No.Hearing Date: November 15, 2012

    CASE No. 2012.0853CV1984 Great Highway

    OPERATION

    5. CommunityLiaison. Priortoissuanceofabuildingpermittoconstructtheprojectandimplement

    the approved use, theProject Sponsor shall appoint a community liaison officer todealwith the

    issuesofconcerntoownersandoccupantsofnearbyproperties. TheProjectSponsorshallprovide

    theZoningAdministratorwithwrittennoticeofthename,businessaddress,andtelephonenumber

    ofthecommunityliaison. Shouldthecontactinformationchange,theZoningAdministratorshallbe

    madeawareofsuchchange. ThecommunityliaisonshallreporttotheZoningAdministratorwhat

    issues,if

    any,

    are

    of

    concern

    to

    the

    community

    and

    what

    issues

    have

    not

    been

    resolved

    by

    the

    Project

    Sponsor.

    Forinformationaboutcompliance,contactCodeEnforcement,PlanningDepartmentat4155756863,

    www.sfplanning.org

    6. SidewalkMaintenance.TheProjectSponsorshallmaintainthemainentrancetothebuildingandall

    sidewalks abutting the subject property in a clean and sanitary condition in compliancewith the

    DepartmentofPublicWorksStreetsandSidewalkMaintenanceStandards.

    Forinformation

    about

    compliance,

    contact

    Bureau

    of

    Street

    Use

    and

    Mapping,

    Department

    of

    Public

    Works,

    4156952017,http://sfdpw.org/

  • 7/30/2019 2012.0853C

    16/31

    Parcel Map

  • 7/30/2019 2012.0853C

    17/31

    Sanborn Map

  • 7/30/2019 2012.0853C

    18/31

    Aerial Photo

    view looking North

    SUBJECT PROPERTY

  • 7/30/2019 2012.0853C

    19/31

    Aerial Photo

    view looking West

  • 7/30/2019 2012.0853C

    20/31

    Aerial Photo

    view looking East

  • 7/30/2019 2012.0853C

    21/31

    Aerial Photo

    view looking South

    SUBJECT PROPERTY

  • 7/30/2019 2012.0853C

    22/31

    Zoning Map

  • 7/30/2019 2012.0853C

    23/31

    Site Photo - Subject PropertyView from Great Highway

  • 7/30/2019 2012.0853C

    24/31

    Site Photo - Subject Property

    View from 48th

    Avenue

  • 7/30/2019 2012.0853C

    25/31

  • 7/30/2019 2012.0853C

    26/31

  • 7/30/2019 2012.0853C

    27/31

  • 7/30/2019 2012.0853C

    28/31

  • 7/30/2019 2012.0853C

    29/31

  • 7/30/2019 2012.0853C

    30/31

  • 7/30/2019 2012.0853C

    31/31