2012 Mechanical Design Details

download 2012 Mechanical Design Details

of 25

Transcript of 2012 Mechanical Design Details

  • 8/12/2019 2012 Mechanical Design Details

    1/25

    STANDARD DESIGN DETAILS

    Division 23 - MECHANICAL

    Release 2.0April 2012

    Released by:Cleveland ClinicFacilities and Construction9500 Euclid Ave.Cleveland OH 44195

    All information within this Document is considered CONFIDENTIAL and PROPRIETARY. Byreceipt and use of this Document, the recipient agrees not to divulge any of the information hereinand attached hereto to persons other than those within the recipients organization that havespecific need to know for the purposes of reviewing and referencing this information. Recipientalso agrees not to use this information in any manner detrimental to the interests of ClevelandClinic.

  • 8/12/2019 2012 Mechanical Design Details

    2/25

    Cleveland Clinic

    Standard Design Details

    Copyright 2012

    By the Cleveland Clinic

    These Specifications, or parts thereof, may not be reproduced in any form without

    the permission of the Cleveland Clinic.

  • 8/12/2019 2012 Mechanical Design Details

    3/25

    Cleveland Clinic

    Cleveland Clinic Standard Design Details: Division 23 - Mechanical

    The following pages contain standard details for the design and construction of new and

    renovated facilities at all domestic Cleveland Clinic locations. They shall be used by A/E

    firms in the preparation of drawings and specifications for construction of facilities.

    The general purpose of each Detail is to provide the preferred method for installation of

    construction materials and equipment at Cleveland Clinic facilities regarding Codes and

    FM Global compliance, execution and uniformity.

    These Details are to be used as a part of Mechanical Bid and Construction documents.

    They are intended to be used to address system design aspects of equipment and materials

    that Cleveland Clinic desires to standardize among facilities, and identify prohibited

    materials and construction practices.

    The use of these Details is mandatory for all design or maintenance projects. Deviations

    are discouraged. If project conditions arise which require a deviation, it shall be

    thoroughly documented by the user and submitted to Cleveland Clinic for review and

    approval using the Design Standards Revision Request document. Additionally, all

    Cleveland Clinic staff, architects, engineers, and contractors are encouraged to participatein the ongoing development of these guidelines by communicating any suggestions by

    use of the Revision Request document.

    The Detail Drawings are in AutoCad format and categorized by system.

    *****

  • 8/12/2019 2012 Mechanical Design Details

    4/25

    Cleveland ClinicSTANDARD DESIGN DETAILS: DIVISION 23 - MECHANICAL

    I. NOTES

    a. NOTES DETAILS FILE NOTES

    b. NOMENCLATURE EQUIPMENT TAG W/ ID. NOMENCLATURE

    II. MECHANICAL DETAILS

    a. M-001 COOLING COIL CONDENSATE TRAP WITH POSITIVE

    PRESSUREb. M-002 COOLING COIL CONDENSATE TRAP WITH NEGATIVE

    PRESSURE

    c. M-003 CHILLED WATER COIL PIPING DETAIL, 2-WAY VALVE

    d. M-004 AIR SEPARATOR EXPANSION TANKS AND MAKE-UP WATERPIPING SCHEMATIC

    e.

    M-005 END SUCTION PUMP DETAILf. M-006 RADIANT PANEL COIL PIPING DETAILg. M-007 MULTIPLE COIL PIPING DETAIL

    h. M-008 HORIZONTAL FIRE DAMPER DETAIL

    i. M-009 VERTICAL FIRE DAMPER DETAILj. M-010 FIRE DAMPER (3 HR. RATED)

    k.j.M-0101COMBINATION FIRE-SMOKE DAMPER (PACKAGED UNITS)

    l.k.M-0112TYPICAL DIFFUSER DETAIL

    m.l. M-0123LINEAR DIFFUSER DETAILn.m. M-0134DUCTWORK BRANCH CONNECTIONS DETAILS

    o.n.M-0145PIPE GUIDE FOR INSULATED PIPE DETAIL

    p.o.M-0156RIGID INSULATION HANGER DETAILq.p.M-0167INSULATED PIPE ON CLEVIS HANGER

    r.q.M-0178TYPICAL AIR HANDLING UNIT DIAGRAM

    s.r.M-0189COOLING PLANT CONTROL DIAGRAMt.s.M-01920TYPICAL VARIABLE FREQUENCY DRIVE CONTROL

    SAFETIES WIRING DIAGRAM - SERIES

    **End of List**

  • 8/12/2019 2012 Mechanical Design Details

    5/25

  • 8/12/2019 2012 Mechanical Design Details

    6/25

  • 8/12/2019 2012 Mechanical Design Details

    7/25

  • 8/12/2019 2012 Mechanical Design Details

    8/25

  • 8/12/2019 2012 Mechanical Design Details

    9/25

  • 8/12/2019 2012 Mechanical Design Details

    10/25

  • 8/12/2019 2012 Mechanical Design Details

    11/25

  • 8/12/2019 2012 Mechanical Design Details

    12/25

  • 8/12/2019 2012 Mechanical Design Details

    13/25

  • 8/12/2019 2012 Mechanical Design Details

    14/25

  • 8/12/2019 2012 Mechanical Design Details

    15/25

  • 8/12/2019 2012 Mechanical Design Details

    16/25

  • 8/12/2019 2012 Mechanical Design Details

    17/25

  • 8/12/2019 2012 Mechanical Design Details

    18/25

  • 8/12/2019 2012 Mechanical Design Details

    19/25

  • 8/12/2019 2012 Mechanical Design Details

    20/25

  • 8/12/2019 2012 Mechanical Design Details

    21/25

  • 8/12/2019 2012 Mechanical Design Details

    22/25

  • 8/12/2019 2012 Mechanical Design Details

    23/25

  • 8/12/2019 2012 Mechanical Design Details

    24/25

  • 8/12/2019 2012 Mechanical Design Details

    25/25