2012 Cost Table Corrections - IN.gov · 2012 Cost Table Corrections. ... – Rigid steel frame ......
Transcript of 2012 Cost Table Corrections - IN.gov · 2012 Cost Table Corrections. ... – Rigid steel frame ......
1
2012 Cost Table Corrections
Department of Local Government Finance
David SchwabSenior Statistician/Application Systems Analyst
Terry KneeField Supervisor
January 18 ‐ 20, 2012
2
Agenda
Overview
2012 Cost Table Corrections
2012 Ratio Study Guidance
2012 Ratio Study Format
3
Overview
4
Overview
New cost tables published Sept. 2, 2011
Available at DLGF websitehttp://www.in.gov/dlgf/2444.htm
New tables updated:– Residential, Commercial, and Industrial cost schedules
– Location Cost Multipliers
– Depreciation base year
Set to March 1, 2012
Depreciation schedules not updated
5
Overview
Reasons for update– Changes in construction costs
Overall increase
Relative cost of some items changed:
– Basements more expensive than upper stories
– Brick increased more than frame
– Changes in buyer preferencesLarger homes
“Big‐box” stores
– Changes in builder markup (profit)
6
2012 Reassessment
Must use updated cost schedules
May use own depreciation schedules
May use own Location Cost Modifier– Must be developed from local cost data
– May not be from cost service (i.e. Marshall and Swift)
– Requires Department approval
7
2012 Cost Table Corrections
8
2012 Cost Table Corrections
Residential Corrections– Schedule A: Dwelling Base Prices
Base values: 4,250; 4,500; and 4,750 sq. ft.
Commercial/Industrial Corrections– Schedule A.2: GCI Base Prices
Base values for:
– Light Utility/Storage
– Heavy Utility/Storage
– Light Warehouse
Wall Type 3 rate for first floor (all use types)
9
2012 Cost Table Corrections
Commercial/Industrial Corrections– Schedule A.4: GCK Base Rates
Base rates: Light metal/wood siding pole frame
Modifiers:
– Rigid steel frame
– Concrete floor deduction
Typographical ErrorsAttached canopy base rates omitted (pg. 43)
Schedule A.3: GCR Base Prices: incorrect first floor wall height for Apartment
10
Residential Corrections
Schedule A: Dwelling Base Rates– Affects
4,250; 4,500; and 4,750 sq. ft. base rate
All columns
– CauseWrong interpolation between 4,000 and 5,000 sq. ft. base rates
– CorrectionUsed correct interpolation
11
Residential Corrections
Schedule A Correction (First Three Columns Only)
First FloorArea 1 ‐ 5 + 6 ‐ 8
4250 2039 30 22184500 2050 30 22304750 2060 30 2241
4250 2071 31 22534500 2179 32 23694750 2287 33 2484
Incorrect
Correct
12
Commercial/Industrial Corrections
Schedule A.2: GCI Base Rates– Affects
Light Utility/Storage, Heavy Utility/Storage, and Light Warehouse base rates
First floor; all wall types, all PAR values
– CauseWrong wall height was used in initial calculations
– CorrectionRecalculated using correct wall height
13
Commercial/Industrial CorrectionsSchedule A.2 Correction (Light Utility/Storage, First Floor, PAR 1‐3 Only)
PARWall Type 1 2 3
1 22.23 26.14 31.092 23.56 28.88 35.423 21.68 25.01 29.31
1 22.66 26.86 32.132 24.00 25.59 36.453 22.11 25.73 30.35
Incorrect
Correct
14
Commercial/Industrial Corrections
Schedule A.2: Wall Type 3 Base Rate– Affects
First floor; all use types
– CauseCalculation error
– CorrectionRecalculated using correct process
15
Commercial/Industrial CorrectionsSchedule A.2 Correction (Wall Type 3, First Floor: Selected Use Types)
Use Type Wood JstRein Conc FP Steel
Light Utility/Storage 13.08 15.27 16.25Heavy Manufacturing 13.44 15.90 16.49
Industrial Office 12.52 14.61 15.57
Light Utility/Storage 10.26 11.81 12.92Heavy Manufacturing 10.26 11.81 12.92
Industrial Office 9.75 11.21 12.29
Incorrect
Correct
16
Commercial/Industrial Corrections
Schedule A.4: GCK Base Rates– Affects
Light metal/wood siding pole frame base rates
Steel frame and concrete floor modifiers
– CauseCalculation error
– CorrectionRecalculated using correct process
17
Commercial/Industrial CorrectionsSchedule A.4 Correction (PAR 1‐3 Only)
PAR1 2 3
Light Metal/Wood Siding Pole Frame 11.17 11.81 12.36Rigid Steel Frame Construction ‐3.25 ‐2.45 ‐1.30
Concrete Floor 4.75 4.75 4.75
Light Metal/Wood Siding Pole Frame 9.56 10.27 10.98Rigid Steel Frame Construction ‐0.33 ‐0.29 ‐0.25
Concrete Floor 3.14 3.22 3.46
Incorrect
Correct
18
Typographical Corrections
Special Use Commercial Property– Attached canopy base rates missing
– Values per square foot:Steel frame $20.75
Wood frame $9.00
Schedule A.3: GCR Base Prices– Apartment first‐floor height listed as 10’
– Changed to 9’ per guidelines
19
2012 Ratio Study Guidance
20
General Guidance
Must have approved ratio study
Should submit by May 1, 2012
Must be data compliant.– Sales Disclosure
– Real Property
21
General Guidance
2012 ratio study based on:– Updated land values
– Updated cost schedulesDepreciation base year: 2012
Updated LCM
– Changes in parcel characteristics
May adjust further (“trending”), but not necessary if standards met
22
General Guidance
Assessment Date: March 1, 2012
Valuation Date: March 1, 2012
Inspection Period: July 1, 2010 – March 1, 2012
Confirm inspections prior to July 1, 2010 with:
– Property visit
– Permit review (and visit if necessary)
– Oblique photography (i.e. Pictometry)
23
Ratio Study Review Standards
Standards outlined in IAAO 2007 Standard on Ratio Studies
No changes in median, COD, or PRD for 2012
Changes for 2012
– Sales window
– Multiple sales years
– Sales chasing
24
Sales Window
March 2, 2010 – March 1, 2012.
Two years of sales– Not usual 14‐month window
Older sales usable if time‐adjusted– Up to 5 years
Townships may have different sales windows– Time adjustments must use all comparable sales, even those not in ratio study
25
Multiple Sales Years
Ratio Study:
– Adams Twp. 50 current sales
– Boone Twp. 5 current & 10 older sales
Boone Time Adjustment:
– Adams Twp. 50 older sales
– Boone Twp. 10 older sales
60 sales total
TownshipAdams Boone
Current Sales 50 5Older Sales 50 10Total Sales 100 15
26
Sales Chasing
Appendix D of 2007 IAAO Standard lists oversight methods:– Average value changes
– Average value per unit changes
– Follow‐up ratio study
– Automated valuation model
Department mostly uses average value change (Mann‐Whitney test)
27
Sales Chasing
Mann‐Whitney test unreliable during reassessment
Mann‐Whitney test not used for 2012 review.
Other Appendix D methods used at Department’s discretion
28
2012 Ratio Study Format
29
Ratio Study Format
New 2012 ratio study format
Reasons:– Process study in SPSS
– Reconcile sales faster
Study still submitted in Excel
SPSS NOT needed to do formatting
30
General Formatting
MS Excel compatible spreadsheet
Seven Familiar tabs– Study Sections (6 tabs)
– Summary tab
Two New tabs– Formatted: SPSS readable data
– MultiParcelSales: Sales reconciliation
31
Formatted Tab
Field Name Format Example
ParcelNumber Text 01‐00‐00‐000‐000.000‐001Township Text AdamsNeighborhood Text 1000PropertyClass Text 510TaxingDistrict Text 1 SaleDate Date 1/1/2012StudySalePrice Number 100,000 CurrentLandAV Number 20,000 CurrentImpAV Number 80,000 CurrentTotalAV Number 100,000
Familiar Fields
32
Formatted Tab (New Fields)
Stratification Fields– StudySection
– Grouping
Sales Reconciliation Fields– SDFID
– MultiParcel
33
Formatted Tab (New Fields)
Field Name Format Example
SDFID Text C01‐2012‐000001MultiParcel Text YStudySection Text ResImpGrouping Text CombinedResVav
New Fields
34
Formatted Tab (Stratification)
Two New Fields– StudySection: where sale is used
ResImp ResVac
ComImp ComVac
IndImp IndVac
– Grouping: which townships are combined
Unique name:– AdamsBoone
– CombinedResVac
Enter “None” if not combined
35
Formatted Tab (SDFID)
SDFID (Sales Disclosure Form ID)
Unique ID for each sales disclosure
Example: C01‐2012‐000001– C01: County number
– 2012: Sales year
– 000001: ID number
Assigned by– Online Sales Disclosure Application
– Vendor
36
Formatted Tab (SDFID)
Sales Data files list all SDFIDs
Sales Data and Ratio Study can differ– Validity
– Property class
Parcels can sell multiple times
SDFID can match Sales Data to Ratio Study every time
37
Formatted Tab (SDFID)
Approved Sales Data file sent with approval.
Reconciliation report for ratio study– Lists sales needing
– Parcel‐level data, not aggregate
– Back to 2010 if data available
– Summary data for 2009 and older sales.
Manual reconciliation for sales without SDFID
38
Multi‐Parcel Sales
New field: “MultiParcel”
New tab: MultiParcelSales
Field only used on Formatted tab.
New format only used on Formatted tab.
39
Multi‐Parcel Sales (Formatted Tab)
Include primary or first parcel number.
Mark new “MultiParcel” field “Y”
Include parcel characteristics– Property class, neighborhood, etc.
Include total sales price.
Include sum for all parcels in sale:– Land AV
– Improvement AV
– Total AV
40
Multi‐Parcel Sales (Formatted Tab)
Sale DataParcel Number Property Class Current Total AV
000.000‐001 510 119,000
000.001‐001 500 21,000
Formatted TabParcel
NumberMulti
ParcelProperty
ClassStudySale
PriceCurrent TotalAV
000.000-001 Y 510 135,000 140,000
Sale Price135,000
41
Multi‐Parcel Sales (MultiParcelSales Tab)
Sale DataParcel Number Property Class Current Total AV
000.000‐001 510 119,000
000.001‐001 500 21,000
MultiParcelSales TabParcel Number Primary Property Class StudySale Price
Current TotalAV
000.000‐001 Y 510 135,000 119,000000.001‐001 N 500 135,000 21,000
Sale Price135,000
42
Questions?
43
Contact The Department
• David Schwab
• Telephone: 317.234.5861
• E‐mail: [email protected]
• Terry Knee
• Telephone: 317.519.1809
• E‐mail: [email protected]
• Web site: www.in.gov/dlgf
• “Contact Us”: www.in.gov/dlgf/2338.htm
• Fax: 317.232.8779
Summary of Corrections to 2012 Cost Schedules
Appendix C: Residential and Agricultural Cost Schedules
Schedule A: Dwelling Base Prices (Note: Only header row and corrected rows are shown.)
Initial Release (July 1, 2011)
Dwelling Base Prices (in hundreds of dollars)
100 to 1475
First Floor Half Upper Story (+/- 1) Full Upper Story Unfin Attic Unfin
Bsmt
Area 1 - 5 + 6 - 8 1 - 5 + 6 - 8 1 - 5 6 - 8 1 - 5 + 6 - 8 Attic Fin Bsmt Crawl Fin
4250 2039 30 2218 800 2 816 140 228 1080 32 1272 169 315 679 131 892
4500 2050 30 2230 804 2 820 141 229 1086 32 1279 170 317 682 131 898
4750 2060 30 2241 809 2 825 142 230 1092 32 1286 171 319 686 132 903
Corrected Release
Dwelling Base Prices (in hundreds of dollars)
100 to 1475
First Floor Half Upper Story (+/- 1) Full Upper Story Unfin Attic Unfin
Bsmt
Area 1 - 5 + 6 - 8 1 - 5 + 6 - 8 1 - 5 6 - 8 1 - 5 + 6 - 8 Attic Fin Bsmt Crawl Fin
4250 2071 31 2253 814 2 830 143 232 1098 33 1293 172 321 690 133 908
4500 2179 32 2369 859 2 876 149 242 1154 35 1357 182 340 724 139 959
4750 2287 33 2484 904 2 923 154 250 1210 36 1422 191 359 758 144 1010
Appendix G: Commercial and Industrial Cost Schedules
Schedule A.2: GCI Base Price (Note: Only header row and first floor values shown. Changes are highlighted.)
Initial Release (September 2, 2011)
SCHEDULE A.2
GCI Base Prices
2 1 3 4
Fire Resistant Wood Rein F P
Floor Fin Use Flr Wall Jst Conc Steel
Level Type Type Hgt Type 1 2 3 4 5 6 7 8 9 10 +1 (-) (+) (+)
First UF Light Utility/Storage 14' 1 22.23 26.14 31.09 36.19 40.74 45.66 51.10 58.19 63.48 69.80 6.49 10.26 11.81 12.92
2 23.56 28.88 35.42 42.19 48.43 55.12 62.49 71.91 79.08 87.55 8.50 10.26 11.81 12.92
3 21.68 25.01 29.31 33.72 37.61 41.80 46.44 52.52 56.99 62.37 5.60 13.08 15.27 16.25
Heavy Utility/Storage 14' 1 26.79 30.87 36.14 41.52 46.27 51.37 57.05 64.47 69.95 76.50 6.62 10.31 11.52 13.32
2 28.13 33.61 40.47 47.52 53.96 60.84 68.44 78.19 85.55 94.24 8.63 10.31 11.52 13.32
3 26.24 29.74 34.36 39.04 43.14 47.51 52.39 58.79 63.46 69.06 5.73 13.88 15.90 17.54
Light Warehouse 18' 1 24.59 28.57 33.65 38.86 43.48 48.46 53.99 61.21 66.56 72.95 6.52 11.30 13.03 14.19
2 26.42 32.30 39.57 47.07 54.00 61.41 69.57 79.97 87.90 97.23 9.27 11.30 13.03 14.19
3 23.89 27.13 31.38 35.71 39.49 43.54 48.04 53.99 58.32 63.52 5.40 14.19 16.58 17.62
Mini Warehouse 12' 1 14.94 18.43 22.68 27.15 31.18 35.57 40.42 46.70 51.46 57.16 5.78 9.30 10.93 11.48
2 16.03 20.66 26.22 32.04 37.46 43.29 49.71 57.90 64.18 71.64 7.42 9.30 10.93 11.48
3 14.47 17.46 21.15 25.01 28.48 32.24 36.40 41.80 45.85 50.73 5.00 12.87 15.30 15.70
Commercial 14' 1 29.81 34.18 39.86 45.63 50.73 56.19 62.28 70.21 76.06 83.04 6.98 10.26 11.81 12.92
Garage 2 31.14 36.91 44.19 51.63 58.42 65.66 73.67 83.93 91.66 100.79 8.99 10.26 11.81 12.92
3 29.26 33.05 38.08 43.16 47.60 52.34 57.61 64.54 69.58 75.61 6.09 13.08 15.27 16.25
Hanger 20' 1 32.00 37.23 43.92 50.74 56.87 63.42 70.68 80.06 87.05 95.34 8.20 11.81 13.63 14.83
2 34.07 41.47 50.64 60.05 68.81 78.11 88.36 101.35 111.26 122.88 11.32 11.81 13.63 14.83
3 31.22 35.63 41.41 47.25 52.45 57.96 64.09 72.06 77.93 84.91 6.98 14.75 17.24 18.30
Truck Terminal 14' 1 25.55 30.19 35.56 41.06 45.94 51.43 57.63 64.80 70.64 77.65 7.10 10.26 11.81 12.92
Warehouse 2 26.88 32.92 39.88 47.06 53.63 60.90 69.02 78.52 86.24 95.40 9.11 10.26 11.81 12.92
3 24.99 29.06 33.78 38.58 42.81 47.58 52.96 59.12 64.16 70.22 6.21 13.08 15.27 16.25
SF Loft Warehouse 14' 1 20.51 24.74 29.98 35.41 40.34 45.65 51.52 59.10 64.81 71.62 6.99 10.26 11.81 12.92
2 21.84 27.47 34.31 41.41 48.03 55.11 62.91 72.81 80.41 89.37 9.00 10.26 11.81 12.92
Light Manufacturing 14' 1 32.33 36.84 42.76 48.76 54.03 59.67 65.96 74.17 80.20 87.39 6.99 10.26 11.81 12.92
2 33.66 39.58 47.09 54.75 61.72 69.14 77.35 87.89 95.80 105.13 9.00 10.26 11.81 12.92
3 31.78 35.71 40.98 46.28 50.90 55.81 61.29 68.49 73.72 79.96 6.10 13.08 15.27 16.25
Heavy Manufacturing 14' 1 34.10 38.95 45.29 51.71 57.38 63.43 70.18 78.96 85.43 93.11 7.43 10.31 11.52 13.32
2 35.44 41.68 49.62 57.70 65.07 72.90 81.57 92.68 101.03 110.86 9.44 10.31 11.52 13.32
3 33.55 37.82 43.51 49.23 54.25 59.58 65.52 73.28 78.94 85.68 6.54 13.44 15.90 16.49
Loft Manufacturing 12' 1 25.92 30.00 35.24 40.60 45.35 50.46 56.13 63.54 69.03 75.58 6.64 9.75 11.21 12.29
2 27.01 32.23 38.77 45.50 51.62 58.18 65.43 74.74 81.75 90.06 8.28 9.75 11.21 12.29
Mill Manufacturing 40' 1 66.80 76.12 82.72 86.39 93.00 104.62 117.44 133.69 146.01 160.43 13.62 17.43 19.02 22.97
2 73.68 85.82 97.25 106.28 121.31 139.46 159.36 184.18 203.42 225.74 21.02 17.43 19.02 22.97
3 65.14 69.51 75.45 80.10 85.19 94.99 105.83 119.66 130.03 142.19 11.51 22.75 25.55 29.27
Small Shop 14' 1 27.40 31.80 37.43 43.20 48.32 53.83 59.94 67.89 73.79 80.82 7.08 10.26 11.81 12.92
2 28.74 34.53 41.76 49.19 56.01 63.29 71.33 81.61 89.39 98.57 9.08 10.26 11.81 12.92
3 26.85 30.67 35.66 40.72 45.19 49.97 55.28 62.21 67.31 73.39 6.19 13.08 15.27 16.25
Power Generating 30' 1 72.18 78.89 83.92 89.67 97.34 103.13 112.82 123.09 133.89 146.57 11.84 12.61 13.31 17.08
Plant 2 78.93 91.69 97.98 103.72 115.32 127.62 140.14 160.95 176.94 195.55 17.39 12.61 13.31 17.08
FO Truck Terminal 9' 1 27.75 31.43 36.28 41.22 45.47 50.07 55.21 61.99 66.94 72.87 5.76 8.98 10.30 11.34
Bunk Room 2 29.27 34.55 41.22 48.05 54.25 60.87 68.20 77.63 84.71 93.08 8.04 8.98 10.30 11.34
3 27.57 31.07 35.71 40.41 44.45 48.81 53.69 60.16 64.84 70.48 5.48 11.69 13.63 14.55
FD Industrial Office 12' 1 50.74 55.73 62.73 69.62 75.46 81.65 88.62 97.86 104.42 112.23 7.13 9.75 11.21 12.29
2 51.83 57.96 66.26 74.52 81.74 89.38 97.92 109.06 117.15 126.71 8.77 9.75 11.21 12.29
3 50.26 54.75 61.19 67.49 72.77 78.33 84.60 92.96 98.81 105.79 6.35 12.52 14.61 15.57
Research/Devel. 12' 1 61.77 66.63 70.74 73.83 79.78 86.07 93.17 102.61 109.27 117.19 7.18 9.75 11.21 12.29
2 62.48 68.61 74.49 78.72 86.05 93.79 102.47 113.81 122.00 131.67 8.82 9.75 11.21 12.29
3 55.30 59.96 65.22 71.69 77.08 82.75 89.15 97.71 103.66 110.76 6.40 12.52 14.61 15.57
Corrected Release
SCHEDULE A.2
GCI Base Prices
2 1 3 4
Fire Resistant Wood Rein F P
Floor Fin Use Flr Wall Jst Conc Steel
Level Type Type Hgt Type 1 2 3 4 5 6 7 8 9 10 +1 (-) (+) (+)
First UF Light Utility/Storage 14' 1 22.66 26.86 32.13 37.56 42.45 47.71 53.54 61.10 66.76 73.51 6.89 10.26 11.81 12.92
2 24.00 29.59 36.45 43.56 50.14 57.18 64.93 74.82 82.35 91.25 8.90 10.26 11.81 12.92
3 22.11 25.73 30.35 35.09 39.32 43.86 48.88 55.42 60.27 66.07 6.01 10.26 11.81 12.92
Heavy Utility/Storage 14' 1 27.23 31.59 37.17 42.89 47.97 53.43 59.49 67.38 73.23 80.20 7.03 10.31 11.52 13.32
2 28.56 34.32 41.50 48.89 55.66 62.89 70.88 81.09 88.82 97.95 9.03 10.31 11.52 13.32
3 26.68 30.45 35.40 40.41 44.84 49.57 54.83 61.70 66.74 72.77 6.13 10.31 11.52 13.32
Light Warehouse 18' 1 25.89 30.70 36.75 42.97 48.60 54.63 61.31 69.92 76.39 84.07 7.73 11.30 13.03 14.19
2 27.72 34.44 42.67 51.17 59.12 67.58 76.89 88.69 97.72 108.34 10.48 11.30 13.03 14.19
3 25.19 29.26 34.48 39.82 44.60 49.71 55.36 62.70 68.14 74.64 6.61 11.30 13.03 14.19
Mini Warehouse 12' 1 14.94 18.43 22.68 27.15 31.18 35.57 40.42 46.70 51.46 57.16 5.78 9.30 10.93 11.48
2 16.03 20.66 26.22 32.04 37.46 43.29 49.71 57.90 64.18 71.64 7.42 9.30 10.93 11.48
3 14.47 17.46 21.15 25.01 28.48 32.24 36.40 41.80 45.85 50.73 5.00 9.30 10.93 11.48
Commercial 14' 1 29.81 34.18 39.86 45.63 50.73 56.19 62.28 70.21 76.06 83.04 6.98 10.26 11.81 12.92
Garage 2 31.14 36.91 44.19 51.63 58.42 65.66 73.67 83.93 91.66 100.79 8.99 10.26 11.81 12.92
3 29.26 33.05 38.08 43.16 47.60 52.34 57.61 64.54 69.58 75.61 6.09 10.26 11.81 12.92
Hanger 20' 1 32.00 37.23 43.92 50.74 56.87 63.42 70.68 80.06 87.05 95.34 8.20 11.81 13.63 14.83
2 34.07 41.47 50.64 60.05 68.81 78.11 88.36 101.35 111.26 122.88 11.32 11.81 13.63 14.83
3 31.22 35.63 41.41 47.25 52.45 57.96 64.09 72.06 77.93 84.91 6.98 11.81 13.63 14.83
Truck Terminal 14' 1 25.55 30.19 35.56 41.06 45.94 51.43 57.63 64.80 70.64 77.65 7.10 10.26 11.81 12.92
Warehouse 2 26.88 32.92 39.88 47.06 53.63 60.90 69.02 78.52 86.24 95.40 9.11 10.26 11.81 12.92
3 24.99 29.06 33.78 38.58 42.81 47.58 52.96 59.12 64.16 70.22 6.21 10.26 11.81 12.92
SF Loft Warehouse 14' 1 20.51 24.74 29.98 35.41 40.34 45.65 51.52 59.10 64.81 71.62 6.99 10.26 11.81 12.92
2 21.84 27.47 34.31 41.41 48.03 55.11 62.91 72.81 80.41 89.37 9.00 10.26 11.81 12.92
Light Manufacturing 14' 1 32.33 36.84 42.76 48.76 54.03 59.67 65.96 74.17 80.20 87.39 6.99 10.26 11.81 12.92
2 33.66 39.58 47.09 54.75 61.72 69.14 77.35 87.89 95.80 105.13 9.00 10.26 11.81 12.92
3 31.78 35.71 40.98 46.28 50.90 55.81 61.29 68.49 73.72 79.96 6.10 10.26 11.81 12.92
Heavy Manufacturing 14' 1 34.10 38.95 45.29 51.71 57.38 63.43 70.18 78.96 85.43 93.11 7.43 10.31 11.52 13.32
2 35.44 41.68 49.62 57.70 65.07 72.90 81.57 92.68 101.03 110.86 9.44 10.31 11.52 13.32
3 33.55 37.82 43.51 49.23 54.25 59.58 65.52 73.28 78.94 85.68 6.54 10.31 11.52 13.32
Loft Manufacturing 12' 1 25.92 30.00 35.24 40.60 45.35 50.46 56.13 63.54 69.03 75.58 6.64 9.75 11.21 12.29
2 27.01 32.23 38.77 45.50 51.62 58.18 65.43 74.74 81.75 90.06 8.28 9.75 11.21 12.29
Mill Manufacturing 40' 1 66.80 76.12 82.72 86.39 93.00 104.62 117.44 133.69 146.01 160.43 13.62 17.43 19.02 22.97
2 73.68 85.82 97.25 106.28 121.31 139.46 159.36 184.18 203.42 225.74 21.02 17.43 19.02 22.97
3 65.14 69.51 75.45 80.10 85.19 94.99 105.83 119.66 130.03 142.19 11.51 17.43 19.02 22.97
Small Shop 14' 1 27.40 31.80 37.43 43.20 48.32 53.83 59.94 67.89 73.79 80.82 7.08 10.26 11.81 12.92
2 28.74 34.53 41.76 49.19 56.01 63.29 71.33 81.61 89.39 98.57 9.08 10.26 11.81 12.92
3 26.85 30.67 35.66 40.72 45.19 49.97 55.28 62.21 67.31 73.39 6.19 10.26 11.81 12.92
Power Generating 30' 1 72.18 78.89 83.92 89.67 97.34 103.13 112.82 123.09 133.89 146.57 11.84 12.61 13.31 17.08
Plant 2 78.93 91.69 97.98 103.72 115.32 127.62 140.14 160.95 176.94 195.55 17.39 12.61 13.31 17.08
FO Truck Terminal 9' 1 27.75 31.43 36.28 41.22 45.47 50.07 55.21 61.99 66.94 72.87 5.76 8.98 10.30 11.34
Bunk Room 2 29.27 34.55 41.22 48.05 54.25 60.87 68.20 77.63 84.71 93.08 8.04 8.98 10.30 11.34
3 27.57 31.07 35.71 40.41 44.45 48.81 53.69 60.16 64.84 70.48 5.48 8.98 10.30 11.34
FD Industrial Office 12' 1 50.74 55.73 62.73 69.62 75.46 81.65 88.62 97.86 104.42 112.23 7.13 9.75 11.21 12.29
2 51.83 57.96 66.26 74.52 81.74 89.38 97.92 109.06 117.15 126.71 8.77 9.75 11.21 12.29
3 50.26 54.75 61.19 67.49 72.77 78.33 84.60 92.96 98.81 105.79 6.35 9.75 11.21 12.29
Research/Devel. 12' 1 61.77 66.63 70.74 73.83 79.78 86.07 93.17 102.61 109.27 117.19 7.18 9.75 11.21 12.29
2 62.48 68.61 74.49 78.72 86.05 93.79 102.47 113.81 122.00 131.67 8.82 9.75 11.21 12.29
3 55.30 59.96 65.22 71.69 77.08 82.75 89.15 97.71 103.66 110.76 6.40 9.75 11.21 12.29
Schedule A.4: GCK Base Price (Note: Changes are highlighted.)
Initial Release (September 2, 2011)
SCHEDULE A.4
GCK Base Rates
Light pre-engineered steel and pole framed buildings (used for C/I occupancies)
Per square foot, average quality, 12' eaves height
Perimeter/Area Ratio
1 2 3 4 5 6 7 8 9 10 +1
Light metal/wood siding, pole frame 11.17 11.81 12.36 12.57 13.36 13.91 14.59 15.13 16.02 16.52 1.06
Add per P/A ratio:
Exterior sheathing 0.17 0.29 0.44 0.49 0.64 0.77 0.92 1.05 1.23 1.29 0.10
Insulation 0.11 0.18 0.27 0.31 0.40 0.48 0.57 0.65 0.76 0.80 0.07
Steel girts and purlins 0.60 0.66 0.72 0.78 0.84 0.90 0.96 1.02 1.08 1.14 0.12
Aluminum siding and roofing 2.31 2.52 2.77 2.86 3.12 3.34 3.62 3.84 4.15 4.26 0.18
Interior liner (1) 0.36 0.61 0.92 1.03 1.34 1.60 1.93 2.19 2.56 2.68 0.22
Heavy gauge siding and roofing (2) 0.63 0.69 0.76 0.79 0.86 0.92 1.00 1.06 1.14 1.17 0.05
Plastic panel siding 0.29 0.49 0.73 0.81 1.06 1.26 1.52 1.73 2.03 2.12 0.18
Sandwich paneling 6.77 7.38 8.14 8.41 9.17 9.82 10.62 11.28 12.19 12.49 0.55
Interior finish (3)
Unfinished occupancies (UF) 4.79 4.79 4.79 4.79 4.79 4.79 4.79 4.79 4.79 4.79
Semi-finished occupancies (SF) 12.85 12.85 12.85 12.85 12.85 12.85 12.85 12.85 12.85 12.85
Finished open occupancies (FO) 19.29 19.72 20.14 20.56 20.98 21.41 21.84 22.29 22.68 23.10 0.50
Finished divided occupancies (FD) 30.39 30.82 31.24 31.66 32.08 32.51 32.94 33.39 33.78 34.20 0.50
Add per square foot of floor area for frame variations:
Steel post and beam 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
Rigid steel frame construction -3.25 -2.45 -1.30 -0.48 -0.41 -0.32 -0.22 -0.10 0.05 0.25
Deduct per square foot of floor area for absence:
Concrete floor 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75
Corrected Release
SCHEDULE A.4
GCK Base Rates
Light pre-engineered steel and pole framed buildings (used for C/I occupancies)
Per square foot, average quality, 12' eaves height
Perimeter/Area Ratio
1 2 3 4 5 6 7 8 9 10 +1
Light metal/wood siding, pole frame 9.56 10.27 10.98 11.69 12.40 13.11 13.82 14.53 15.24 15.95 1.22
Add per P/A ratio:
Exterior sheathing 0.17 0.29 0.44 0.49 0.64 0.77 0.92 1.05 1.23 1.29 0.10
Insulation 0.11 0.18 0.27 0.31 0.40 0.48 0.57 0.65 0.76 0.80 0.07
Steel girts and purlins 0.60 0.66 0.72 0.78 0.84 0.90 0.96 1.02 1.08 1.14 0.12
Aluminum siding and roofing 2.31 2.52 2.77 2.86 3.12 3.34 3.62 3.84 4.15 4.26 0.18
Interior liner (1) 0.36 0.61 0.92 1.03 1.34 1.60 1.93 2.19 2.56 2.68 0.22
Heavy gauge siding and roofing (2) 0.63 0.69 0.76 0.79 0.86 0.92 1.00 1.06 1.14 1.17 0.05
Plastic panel siding 0.29 0.49 0.73 0.81 1.06 1.26 1.52 1.73 2.03 2.12 0.18
Sandwich paneling 6.77 7.38 8.14 8.41 9.17 9.82 10.62 11.28 12.19 12.49 0.55
Interior finish (3)
Unfinished occupancies (UF) 4.79 4.79 4.79 4.79 4.79 4.79 4.79 4.79 4.79 4.79
Semi-finished occupancies (SF) 12.85 12.85 12.85 12.85 12.85 12.85 12.85 12.85 12.85 12.85
Finished open occupancies (FO) 19.29 19.72 20.14 20.56 20.98 21.41 21.84 22.29 22.68 23.10 0.50
Finished divided occupancies (FD) 30.39 30.82 31.24 31.66 32.08 32.51 32.94 33.39 33.78 34.20 0.50
Add per square foot of floor area for frame variations:
Steel post and beam 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
Rigid steel frame construction -0.33 -0.29 -0.25 -0.21 -0.18 -0.14 -0.10 -0.06 -0.02 0.02
Deduct per square foot of floor area for absence:
Concrete floor 3.14 3.22 3.46 3.70 3.79 3.90 4.06 4.10 4.14 4.18