2012 09 24 IV Geothermie Indonesien Harsoprayitno

download 2012 09 24 IV Geothermie Indonesien Harsoprayitno

of 37

Transcript of 2012 09 24 IV Geothermie Indonesien Harsoprayitno

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    1/37

    Ministry of Energy and Mineral Resources

    Directorate General of New Renewable Energy and Energy Conservation

    MINISTRY OF ENERGY AND MINERAL RESOURCES

    REPUBLIC OF INDONESIA

    Geothermal Development in Indonesia

    Presented at:

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    2/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    Geothermal Energy Potent ia ls in Indonesia Worksho p

    Berlin German, September 20th 2012

    OUTLINE

    I. Introduction

    II. Energi Condition 2010

    III. Share of the National Energy ConsumptionIV. Share of the National Energy Supply

    DGNREEC-MEMR-2012

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    3/37

    - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    V. Energy Policy Direction

    VI. Power Plant Installed Capacity

    VII. Electricity Demand Projection

    VIII. Geothermal Potential in Indonesia

    IX. Geothermal Policies

    X. Geothermal Activities

    XI. Invesment Opportunities

    INTRODUCTION

    Indonesia has an abundance potentials in geothermal energymore than 29 GWe which are distributed in 285 locations alongthe country. Unfortunately, less than 5% of the potentials have been utilized.

    Average growth of energy consumption is 8,5% per year. Up to now, energy nationaldemand is still fulfiledl by fossil fuels.

    Presidential Decree No. 5 / 2006 on National Energy Policy (KEN) has been targettedthat by 2025, the electricity from geothermal power plant will be reached up to 9,500MW or equivalent to 5% of national energy consumption.

    DGNREEC-MEMR-2012

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    4/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    To support the utilization of geothermal energy, the GoI have been issued TheFasttrack Program Phase II in order to accelerate a 10.000 MW electricity development

    from geothermal power plant (4,925 MW) The program needs more than US$ 14,000 million of investment. In order to support the

    program, the GoI has been issued some policies and regulations to overcome barriersin geothermal development.

    GoI has also launched Energy Vision 25/25 to support the program. The vision has atarget that by 2025 the energy utilization based on new and renewable energy willreach be reached to 25% of total national mixed energy. Whereas, The target of

    geothermal utilization itself is 5.7% of equivalent to 12,000 MW.

    ENERGY CONDITION 2010

    1. Limited access to (modern) energy :

    National a. Electrification ratio in 2010 is 67,2% (32,8% Primary Energy Mix

    DGNREEC

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    5/37

    - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    2010 household with no access to electricity);

    10666 MMillion BOE on BOE b. Development of energy infrastr

    rural/isolated areas and borderline islands has no access to

    electricity);

    2. Average growth of energy consumption is 7% per year, with no

    sufficient energy supply;

    3. Dependency to fossil energy is still high, with limited reserves;

    4. New renewable energy utilization and energy conservation

    implementation is not optimum;

    5. Related environmental issues :

    a. Climate change mitigation;

    b. Carbon emission trading;

    c. National commitment to reduce 26% of carbon

    Energy Elasticity= 1,60 emission by 2020;

    Share if Non Fossil Energy < 5% 6. Funding for energy sector development is still limited.

    DGNREEC - MEMR - 2012

    NRE5%

    Coal

    24%Gas2%

    Oil47%

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    6/37

    - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    SHARE OF THE NATIONAL ENERGY CONSUMPTION

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    7/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    PER SECTOR (19902010)

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    8/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    SHARE OF THE NATIONAL ENERGY SUPPLY

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    9/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    PER SECTOR (19902010)

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    10/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    POWER PLANT INSTALLED CAPACITY

    2010

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    11/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    Source : Center for Data and Informatioan Energy and Mineral Resources

    Hydro Coal GasCombined

    CycleGeothermal Diesel

    Combined

    OilGasWind Total

    3,709.57 12,290.50 3,460.38 7,879.16 1,890 4,342.76 38.84 0.60 32,871.97

    MW

    8

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    12/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    ELECTRICITY DEMAND

    PROJECTION

    TWh = Tera Watt hour

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    13/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    Sourc e : Geological Survey, MEMR(2011)

    Note:

    P

    RESOURCES (MWe) % RESERVE(MWe) %

    Speculative Hypothet ical Possib le Probable Proven

    8.231 4.964 45.17% 12.909 823 2.288 54.83%

    13.195 16.020

    29.215

    9

    Already Developed

    Ready to Developad

    GEOTHERMAL POTENTIAL MAP

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    14/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    reliminary Survey

    Detail Survey

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    15/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    INSTALLED GEOTHERMAL POWER PLANT CAPACITY

    Name of InstalledGeothermal Working

    NoNo. License Holder Developer Geothermal CapacityArea/ Location

    Power Plant (MW)

    Sibayak Sinabung, PT. Pertamina Geothermal PT. Pertamina Geothermal1 Sibayak 12

    North Sumatera Energy (PGE) Energy (PGE)

    Cibeureum Parabakti, PT. Pertamina Geothermal JOC - Chevron Geothermal2 Salak 377

    West Java Energy (PGE) Salak, Ltd (CGS)

    PangaPangalenganengan, PTPT. Pertamina Geothermal JOC - Star Energy GeothermalWayang 3 227

    West Java Energy (PGE) Wayang Windu, Ltd (SEGWWL) Windu

    Kamojang Darajat, PT. Pertamina Geothermal PT. Pertamina Geothermal4 Kamojang 200

    West Java Energy (PGE) Energy (PGE)

    Kamojang Darajat, PT. Pertamina Geothermal JOC - Chevron Geothermal5 Darajat 270

    West Java Energy (PGE) Indonesia, Ltd (CGI)

    DaDataran Tinggi Dienga an T ngg D eng, PTPT. Pertamina Geothermal

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    16/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    6 PT. Geo Dipa Energi(GDE) Dieng 60

    Central Java Energy (PGE)

    Lahendong Tompaso, PT. Pertamina Geothermal PT. Pertamina Geothermal7 Lahendong 80

    North Sulawesi Energy (PGE) Energy (PGE)

    1.226

    JOC :Joint Operation Contract

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    17/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    18/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    GOVERNMENT POLICIES TO SCALE UP GEOTHERMAL

    DEVELOPMENT IN INDONESIA

    The Government of Indonesia (GoI) intends to accelerate and speed up the development ofgeothermal. In order to do so, the government intends to enhance the investment climatefor both existing developers as well as new entrants to the geothermal sector in Indonesia.

    1.Law No. 27/2003 on Geothermal and Government Regulations No. 59/2007 on Geothermal

    Business Activities jo Government Regulations No. 70/2010 are the basis of geothermaldevelopment Indonesia

    2.Presidential Regulation No. 04/2010 jo Ministerial Regulation No. 01/2012 as revised ofMinisterial Regulation No. 15/2010 (2nd Stage of 10,000 MW Fast Track Program) in orderto speed up the development of geothermal power.

    3.Pricing Policy

    GoI have issued Ministerial Regulation No. 22/2012 on Assignment to PT PLN (Persero) to

    Purchase Electricity from Geothermal Power Plant and Geothermal Power PurchaseBenchmark Price by PT PLN (Persero) which covers Feed in TariffMechanism (FIT). This

    regulation obligates PT PLN (Persero) to buy electricity refers to location and availabletransmission of the Plant.

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    19/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    4. Access to Potential Geothermal Resources for Investors, Government offers aPreliminary Survey Assignment to third party (investor) which provides Right to Match.

    GOVERNMENT POLICIES TO SCALE UP GEOTHERMALDEVELOPMENT IN INDONESIA (contd)

    5. Fiscal incentivesFiscal incentives for geothermal development (based on Government Regulation No.

    62/2008 jo No. 1/2007; MR of MoF No. 177/PMK.011/2007; and MR of MoF No.

    22/PMK.011/2011) :- 30% of corporate income tax;- 10% of added-value tax paid by the GoI;- Custom duties exemption for geothermal developer;- 25% per year depreciation for 8 years with double declining balance method; and -

    Investment tax credit 5% per year for 6 years.

    6. Related to Forestry Issues, currently MEMR and Ministry of Forest have signed theMoU regarding the acceleration of geothermal utilization permit within production forest,protected forest, and conservation forest.

    7. Presidential Decree that guarantees support for investment in GeothermalInfrastructure Project (PR No. 13/2010 jo PR No.67/2005 and PR 78/2010) and Ministrial

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    20/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    of Finance Regulation No. 139/2011 (PMK No. 139/2011) which guarantee the businessfeasibility of PT PLN for developing electricity from renewable energy, coal, and gasthrough cooperation with Independent Power Producers.

    FEED-IN TARIFF IMPLEMENTATION

    The FiT scheme for geothermal in Indonesia is divided into 6 areas and notdepended on the capacities.

    Thus all electricity generated from geothermal power plant will be bought using thisscheme.

    The advantages of FiT scheme for geothermal are providing economical price fordeveloper and accelerating geothermal development.

    For the FiT scheme if the project can not perform in regard to

    time and capacity. The electricity price from the project will befollowed the electricity price at that time

    Feed-in Tariff are applied for all geothermal business scheme:

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    21/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    - Existing GWA for Contract extension, unit expansion and alreadysigned PPA as long as both parties agree to renegotiate

    - New GWA for IUP holder after the MR issued and IUP holder

    will negotiate PPA as long as both parties agree to renegotiate

    STRATEGICAL TARGET FOR GEOTHERMAL

    DEVELOPMENT 2010 - 2014

    Presidential Regulation No. 04/2010 on Assignment to PT. PLN to AcceleratePower Plant Development Using Renewable Energy, Coal and Gas

    MEMR Regulation No. 01/2012 as revised of Ministerial Regulation No. 15/2010 onProjects List of Power Plant Accelerated Development using Renewable Energy,

    Coal and Gas as well as Related Transmission

    Target for Geothermal Power Plant Development on Crash Program 10.000

    MW Phase II

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    22/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    - Development for Production on Existing Field : 465 MW -Development for not yet in production on Existing Field : 1535

    MW- New Development Geothermal Working Area : 2925 MW

    Total of Geothermal Development 4925 MW

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    23/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    INVESTMENT OPPORTUNITIES

    1. Geothermal developer

    -Foreign ownership in Geothermal Business is allowed up to 95 %;

    -Up to year 2025, Indonesia will develop total 9,500 MW base on geothermal roadmap. Unfortunately, only 1,226 MW installed in 2012.

    2. Services Company

    Exploration, Drilling, Construction,

    3. Manufacturing

    Piping, Turbin, Instrumentation,

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    24/37

    - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    4. Financial

    30 % capital, 70 % loan

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    25/37

    - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    Geothermal Power Plant Projects in Fast Track Phase II

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    26/37

    - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    Geothermal Power Plant Projects in Fast Track Phase II

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    27/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    28/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    DANKE

    DGNREEC-MEMR-2012 21

    TERIMA KASIH

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    29/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    attachment

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    30/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    Implementation of Geothermal Policies

    President Decree No 45/1991, No49/1991, and No 23/1992

    Business structure based on JOC and

    ESC

    34% of Net Operating Income (NOI),that had included all kinds of taxes andretribution, except personal tax.

    Project Management : Under Pertamina

    (JOC) and PLN (ESC)

    Project Type:

    Mi i t f E d Mi l R

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    31/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    Existing GWA

    Law No. 27/2003

    Business structure in the form of Permit:Geothermal Business PermitEnterprise Permit for Electricity

    ObObligation to pay for taga on o pa o axes and royaltye and o a

    Project Management t : U Undder P Permit Hit Holdlder

    Project Type:Total (Integrated) Project

    lly plan operation

    Geothermal Activities in Indonesia

    Total (Integrattedd) ProjectPartial Project

    Ministry of Energy and Mineral Resources

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    32/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    Ministry of Energy and Mineral Resources

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    33/37

    DGNREEC - MEMR - 2012

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    Ministry of Energy and Mineral Resources

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    34/37

    Ministry of Energy and Mineral ResourcesDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    Ministry of Energy and Mineral Resources

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    35/37

    y gyDirectorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    GEOTHERMAL FEED-IN TARIFF MECHANISM

    (Based On MinistrialRegulation of MEMR No. 22 / 2012)

    In FIT mechanism, the Government set the price of electricity fromgeothermal power plant. The price is final and can not be negotiated. Themechanism is determined base on:1. Energy resources avaibility; 2.

    Environment support;3. Economical aspects.

    Ministry of Energy and Mineral Resources

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    36/37

    Directorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    The mechanism is expected to reduce the main obstacle in geothermaldevelopment related to price uncertainty that usually requires a long time

    for negotiation.

    Ministry of Energy and Mineral ResourcesDi G l f N R bl E d E C i

  • 7/27/2019 2012 09 24 IV Geothermie Indonesien Harsoprayitno

    37/37

    Directorate General of New Renewable Energy and Energy Conservation

    DGNREEC-MEMR-2012

    GEOTHERMAL FEED-IN TARIFF

    AreaNo

    Price)(cent US$/kWh

    High VoltageMedium Voltage

    1 11,5Sumatera 10

    2 JAMALIJava BaliandMadura 1211 5( , ) ,

    3 SouthernSulawesi

    Sulawesi)(SouthSulawesi,WestSulawesi,andSoutheast12 13,5

    SulawesiNorthern 5,14134

    (NorthSulawesi,CentralSulawesi,andGorontalo

    5 Tenggara, 15TenggaraNusaEastandWestNusa 16,5