2011 Work Plan Parking Operations Maintenance and Development Branch Public Works Department March 2011

Transcript of 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by...

Page 1: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

2011 Work Plan

Parking Operations Maintenance and Development Branch

Public Works Department

March 2011

Page 2: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Contents

Introduction .................................................................................................................. 2

Background .................................................................................................................. 3

Municipal Parking Management Strategy .................................................................. 3

Service Excellence ....................................................................................................... 4

Review of 2010 Initiatives ............................................................................................ 6

2011 Priorities .............................................................................................................. 6

2011 Work Plan ............................................................................................................ 7

2011 At-A-Glance ....................................................................................................... 12

Parking Stakeholder Consultation Group ............................................................... 13

Budget Process .......................................................................................................... 13

Key Contact ................................................................................................................ 14

 

2011 Work Plan Parking Operations, Maintenance and Development

1

Page 3: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Introduction

  With the approval of the Municipal Parking Management Strategy by City Council in 2009 as well as the 2008 Audit of the Parking Function conducted by the Auditor General (and the corresponding follow‐up Audits in 2009 and 2010), the mandate, scope and purpose of the Municipal Parking Program has been crystallized,  leading  to  significant  change  for  the Parking Operations, Maintenance  and Development Branch.  The key factors driving this change were:  

• The Municipal Parking Management Strategy; 

• The establishment of a designated reserve fund for parking; and, 

• The  change  in  reporting  structure of  the Parking Operations, Maintenance  and Development Branch which now  reports directly as a  stand‐alone Branch  to  the General Manager of Public Works. 

 In approving the Municipal Parking Management Strategy, Ottawa City Council was clear  in  identifying parking  as  a  service  that  is  responsible  for  providing  and  maintaining  an  appropriate  supply  of affordable, secure, accessible, convenient and appealing public parking that supports  local businesses, institutions  and  tourism.    In  carrying  out  this  service,  the  Parking  Operations,  Maintenance  and Development Branch manages 4,260 on‐street and 2,731 off‐street paid parking spaces.  The off‐street spaces are located in five off‐street parking structures and 11 surface lots.  Since the approval of the Municipal Parking Management Strategy in 2009, this is the first annual work plan  to  be  submitted  to  Transportation  Committee  and  Council  for  approval.    It  presents  the  key initiatives that were undertaken in 2010 and identifies the priorities and initiatives that are planned for 2011.  Coinciding with this document, the Branch also provides a Financial Summary and Capital Program Plan which presents, in detail, the projected revenue and proposed operational expenses for 2011, as well as the planned spending from the Parking Reserve Fund to support the capital programs outlined herein.  The  Financial  Summary and Capital Program Plan also outlines  the  long‐term planning  that has been undertaken to ensure a viable parking reserve.    

2011 Work Plan Parking Operations, Maintenance and Development

2

Page 4: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Background

The  Parking Operations, Maintenance  and Development  Branch  is  comprised  of  three  units  (Parking Studies, Parking Operations, and Special Projects), and operates in alignment with the Municipal Parking Management Strategy.  This work plan document is one of the outcomes of the Strategy.  Along with the Annual Report, this document provides a clear window into the operation of the paid parking program and provides Council with a plan of what is proposed for the upcoming year.   The  following  Vision  Statement  has  been  developed  for  the  Parking  Operations, Maintenance  and Development Branch.       Municipal Parking Management Strategy

The Council‐approved Municipal Parking Management Strategy was the result of extensive consultation with the community and the various stakeholders related to parking services.  It was further coordinated with a number of other projects including the updating of the Transportation Master Plan, the review of Cash‐in‐Lieu  of  parking,  the  procurement  of  Pay  and  Display  technology  and  the  2008  Audit  of  the Parking Function.  The Municipal  Parking Management  Strategy  identifies  that  the  following  statement will  govern  the Municipal Parking Management Program’s policies and objectives and guide its actions:  

The Municipal  Parking Management  Program  values  efficiency,  transparency,  and  clarity. Stakeholders will be engaged through regular and timely communications and opportunities for consultation. 

 Further,  the  following  objectives  for  the Municipal  Parking Management  Program were  identified  to clarify  its purpose and serve as the basis for policy and performance appraisals and ultimately act as a glue that binds the entire organization together:  

1. Provide and maintain an appropriate supply of affordable, secure, accessible, convenient, and appealing public parking; 

2. Provide  and  promote  affordable  short‐term  parking  services,  and  fair  and  consistent enforcement services, that support local businesses, institutions, and tourism; 

We are recognized and respected as an innovative,

progressive leader in the provision of world-class parking services for our Nation’s Capital.

2011 Work Plan Parking Operations, Maintenance and Development

3

Page 5: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

3. Promote, establish, and maintain programs and facilities that encourage the use of alternative modes of  transportation  including public  transit,  car/van pooling,  taxis,  auto  sharing,  cycling, and walking; 

4. Support residential intensification and resolve parking problems within residential areas caused by significant traffic generators or conflicting uses of the roadway,  including  implementing on‐street permit parking programs  to  relieve area  residents and visitors  from parking  regulations directed at the non‐resident; and, 

5. Ensure  the  revenues  generated  by  the  Municipal  Parking  Program  are  sufficient  to  wholly recover all  related operating and  life‐cycle maintenance expenditures; contribute  to a  reserve fund to finance future parking system development, operation, and promotion; and then assist in the funding of related initiatives to encourage the use of alternative modes of transportation. 

This establishes the Municipal Parking Program as a service provider as opposed to a revenue generator and  clearly  lays  out  the  purpose  of  the  program.    In  addition,  the Municipal  Parking Management Strategy  provided  a  number  of  tools  and  requirements  to  direct  the  fulfillment  of  the  Strategy’s objectives.  These included:  

• Rate Setting Guidelines; 

• Terms of Reference for Local Area Parking Studies; 

• Terms of Reference for the Parking Stakeholder Consultation Group; 

• Establishment of a Parking Reserve Fund; and, 

• An Implementation Plan.  The Municipal Parking Management Strategy and  its corresponding objectives and tools help to clarify the purpose of  the Municipal Parking Management Program and how  it operates.    In addition  to  this, the  Parking Operations, Maintenance  and Development Branch  aligns with  City  of Ottawa  corporate standards  and  initiatives  that  address  such  things  as  financial  planning/reporting,  transportation planning, and service delivery.  One of the current key City‐wide  initiatives that has had a significant  influence  in the development of the Branch’s work plan is Service Excellence.   Service Excellence

Service Excellence  is a corporate  initiative which has the ultimate goal of creating positive experiences every time a service is provided to the public.  This outcome is interdependently influenced by three key drivers:  

• Employee Engagement; 

• Operational Performance; and, 

• Client Satisfaction.   

2011 Work Plan Parking Operations, Maintenance and Development

4

Page 6: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

In  early  2010,  along with  the  other  Branches  in  the  Public Works  Department,  Parking  Operations, Maintenance  and Development  embarked on  a process  to develop  a  Service  Excellence  Plan  for  the Branch.  In doing so, all Branch staff were engaged in identifying the various customers and clients that are served by the Branch.  As well opportunities, obstacles and tools to achieve Service Excellence were identified.  Resulting from this process, a three year Service Excellence Plan for the Branch was finalized in April 2010.   This  includes a  series of  initiatives  that will contribute  to  the goal of providing  service excellence to the City’s residents.  The initiatives that were identified in the Branch’s Service Excellence Plan are identified below. 

In order to achieve a sustained and effective approach to Service Excellence, it will be necessary for the Branch to review its plan on an on‐going basis and undertake the development of a new Plan for beyond 2012.   More detail  is provided  later  in  this document on  those  initiatives  that are  to be addressed  in 2011.  

Service Excellence Plan Initiatives 

• Develop/Implement Customer Engagement Plan 

• Clarify/Organize Procedures/Protocols  

• Clarify Mandates  • Develop/Implement IT Development Strategy  

• Develop/Implement Performance Measurement Framework  

• Develop Plan to Build Relationships/Partnerships  

• Realign Branch Functions  • Conduct/Implement Workplace Assessment  

• Develop Employee Engagement Plan   • Enhance Approach to Employee Recognition  

• Develop Business Continuity Plan   • Develop/Implement Parking Facilities Improvement Strategy  

• Create/Implement Data Management Strategy  

• Develop/Implement Sustainable Parking Plan  

• Develop and Initiate Business Cycle Process  

• Create an Annual Training/Development Plan  

2011 Work Plan Parking Operations, Maintenance and Development

5

Page 7: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Review of 2010 Initiatives 

In 2010, significant resources were allocated towards ensuring a successful  implementation of the Pay and Display  technology.    In  total, 675 Pay and Display machines were  installed between  June 3rd and October 29th, replacing 4,278 parking meters as well as existing Pay and Display machines in the ByWard Market and off‐street lots.  While the implementation of new parking technology represented the most visible initiative undertaken by  the parking program,  there were a number of other  important  initiatives  that were  completed  in 2010:     

• Completion of Branch Service Excellence Plan; 

• Interim Report for first Local Area Parking Studies (ByWard Market and Downtown Rideau); 

• Interim Report for the Rideau Area Transportation Network Study; 

• Follow‐up of the 2008 Audit of the Parking Function (report expected from the Auditor General 

in Fall 2011); 

• Finalization of the Branch’s organizational structure; 

• Development of a draft Performance Measurement Framework; and 

• Evaluations  in  the  Preston,  Vanier,  Chinatown  and  Ruskin  Street  areas  in  response  to stakeholder requests for parking policy changes.   

o Vanier ‐ Removal of 100 low utilization meters; and o Ruskin Street ‐ reduced on‐street paid parking hours (evening) 

 The work that was undertaken in 2010 towards the parking program will be presented in greater detail in the Annual Report that will be presented to Transportation Committee in Q2 2011.  2011 Priorities

In developing the work plan for the Parking Operations, Maintenance and Development Branch, a series of priorities have been established to assist in identifying projects and operational needs.  They include:  

• Continued implementation of the Municipal Parking Management Strategy; 

• Implementation of the Branch’s Service Excellence Plan; 

• Upgraded parking garage facilities; and, 

• Implementation of Pay‐by‐Cell. 

2011 Work Plan Parking Operations, Maintenance and Development

6

Page 8: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

2011 Work Plan

The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.   

Local Area Parking Study (LAPS) – ByWard Market   This represents a comprehensive review of parking conditions  in  the ByWard Market area and will result  in  recommendations on how  to best provide and manage parking.   This Local Area Parking Study was  started  in  2009  and  is  substantially  completed.    An  interim  report was  presented  to Transportation Committee in June 2010.  Objectives in 2011 

 Timeline 

• Conclude study and finalize recommendations Q1 – Q2 

• Prepare report and submit to Transportation Committee and Council    Local Area Parking Study (LAPS) – Downtown Rideau   This  represents  a  comprehensive  review  of  parking  conditions  in  the Downtown  Rideau  Business Improvement Area and will result in recommendations on how to best provide and manage parking.  This Local Area Parking Study was started in 2009 and is substantially completed.  An interim report was presented to Transportation Committee in June 2010.  Objectives in 2011 

 Timeline 

• Conclude study and finalize recommendations Q1 – Q2 

• Prepare report and submit to Transportation Committee and Council    Local Area Parking Study (LAPS) – Westboro   This represents a comprehensive review of parking conditions in the Westboro area and will result in recommendations  on  how  to  best  provide  and manage  parking.   Work  towards  this  Local  Area Parking Study was started in 2010.  This study will take into account the recommendations from the Transportation Management  Implementation  Study  report  that  was  tabled  at  Transportation  in February 2011 and pertains in part to parking on Richmond Road in Westboro.  Objectives in 2011 

 Timeline 

• Conduct stakeholder consultation 

Q1 – Q3 • Identify major issues • Undertake parking utilization surveys • Prepare report and submit to Transportation Committee and Council 

   

2011 Work Plan Parking Operations, Maintenance and Development

7

Page 9: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Local Area Parking Study (LAPS) – Glebe   This represents a review of parking conditions in the Glebe area and will result in recommendations on  how  to  best  provide  and manage  parking.    This  Local Area  Parking  Study was  deemed  to  be necessary resulting from a Council direction in September 2010 to consider a parking structure at an existing City‐owned surface lot.  Objectives in 2011 

 Timeline 

• Conduct stakeholder consultation Q1 – Q4 

(conclude in 2012) • Identify major issues • Undertake parking utilization surveys 

   Local Area Parking Study (LAPS) – Old Ottawa South   This  represents  a  review  of  parking  conditions  in  the  Old  Ottawa  South  area  and  will  result  in recommendations on how to best provide and manage parking.   This Local Area Parking Study was deemed to be necessary following a Council direction in January 2009 to evaluate parking conditions as a result of a commercial development in the area.  Objectives in 2011 

 Timeline 

• Conduct stakeholder consultation Q1 – Q4 

(conclude in 2012) • Identify major issues • Undertake parking utilization surveys (as required) 

   Rideau Area Network Transportation Study (RATNS)   This is a study of traffic operational issues and bus waiting areas in the area bounded by St. Patrick Street, King Edward Avenue, Laurier Avenue East and Sussex Drive.  It was directed by Transportation Committee  in November 2008 and staff have since embarked on a follow‐up to the original Rideau Area Transportation Network Study, which was carried out in the 1990’s.  This is a legacy project that staff  from  Parking Operations, Maintenance  and Development  are  coordinating  (with  input  from other staff on traffic and transit matters) due to alignment with the Local Area Parking Studies in the ByWard  Market  and  Downtown  Rideau.    In  June  2010,  an  interim  report  was  presented  to Transportation Committee on this study.  Objectives in 2011 

 Timeline 

• Complete analysis of alternative solutions to address issues Q1 – Q3 • Finalize recommendations 

• Prepare report and submit to Transportation Committee and Council    City‐Wide Utilization Study   In response to the 2008 Audit of the Parking Function, a comprehensive study of all on‐street paid parking  spaces was  completed.    This measured  both  average  paid  and  unpaid  utilization  and  is intended to be repeated every two years.  Objectives in 2011 

 Timeline 

• Finalize study methodology and confirm representative timing Q2 – Q3 • Conduct data collection 

• Finalize report    

2011 Work Plan Parking Operations, Maintenance and Development

8

Page 10: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Installation of New Off‐Street Garage Equipment   In  addition  to  the  provision  and  operation  of  Pay  and  Display machines,  the  Parking  Operation System Agreement that was finalized with Precise Parklink  included the provision and operation of new payment systems (including gates and Pay on Foot machines) for the three gate‐access facilities the City owns.   Objectives in 2011 

 Timeline 

• Confirm equipment specifications 

Q1 – Q2 • Develop and initiate communications strategy to ensure public 

awareness and education (as required) • Oversee installation and activation of machines 

   Parking Facilities Improvement Strategy   This  represents  a  commitment  to  upgrade  existing  parking  facilities  aimed  at  improving  the customer experience and fulfilling the Branch’s vision of providing world‐class parking services.  This will  include  the  implementation  of  recommendations  from  recent  internal  assessments  on accessibility and security.  Objectives in 2011 

 Timeline 

• Engage stakeholders and itemize findings of previous assessment Q1 – Q3 • Identify opportunities 

• Finalize strategy (including implementation plan)    Pay‐by‐Cell Procurement and Launch   A procurement process is currently underway for a Pay‐by‐Cell service that will allow residents to pay for parking via their mobile device.  Objectives in 2011 

 Timeline 

• Complete procurement and select successful proponent  

Q1 – Q3 • Develop and initiate communications strategy to ensure public 

awareness and education (as required) • Implement and launch Pay‐by‐Cell system 

 Customer Engagement Strategy   This  involves  the  design  and  development  of  a  strategy  that  will  establish  a  communications approach with  the  intent  to  raise  the  Branch  profile  through  increased  awareness  and  improved services.    Objectives in 2011 

 Timeline 

• Develop and finalize project scope Q3 – Q4 

(conclude in 2012) • Conduct marketing research and engage stakeholders • Establish feedback mechanism(s) 

   

2011 Work Plan Parking Operations, Maintenance and Development

9

Page 11: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Business Continuity Plan   Required  as  an  emergency management  tool  to  ensure the  appropriate  protocols  are  in  place  to mitigate  any  type  of  business  disruption.   This  involves  establishing  appropriate  issue  escalation processes and ensuring necessary support and cover‐off exists when any disruption occurs.  Objectives in 2011 

 Timeline 

• Undertake threat and impact analysis Q1 – Q2 • Identify and design solutions 

• Finalize and implement Plan    2010 Annual Report   As directed by the Municipal Parking Management Strategy, the Branch will bring forward an Annual Report each year.  The Annual Report will present a detailed review of the previous year’s initiatives, budget  and  changes  to  parking  policy  (rates,  hours,  et),  as  well  as  the  Branch’s  Performance Measurement Framework.  Objectives in 2011 

 Timeline 

• Develop framework for Annual Report and staff report Q1 – Q2 • Present to Parking Stakeholder Consultation Group 

• Present to Transportation Committee and Council    Tour Bus Strategy   The  Transportation  Master  Plan  directs  the  development  of  a  Tour  Bus  Parking  Strategy  in partnership with other  levels of government,  institutions,  tour operators, and  tourism authorities.  This would assist  in the management of city‐wide tour bus parking demand.   A Terms of Reference has been previously developed but requires updating.  Objectives in 2011 

 Timeline 

• Update the Terms of Reference through a new stakeholder group  Q4 (conclude in 2012)

   Implementation of Performance Measurement Framework   The Branch has developed a Performance Measurement Framework which  identifies objectives and specific measures that will be reported on regularly.  This will involve internal reporting on a monthly basis via a Balanced Scorecard and external reporting annually via the Annual Report.   Objectives in 2011 

 Timeline 

• Begin producing regular Balanced Scorecards for management review  Q1 – Q2 • Present Performance Measurement Framework to Transportation 

Committee as part of the 2010 Annual report and begin reporting on Key Business Indicators 

 

   

2011 Work Plan Parking Operations, Maintenance and Development

10

Page 12: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Sustainable Parking Plan   This  involves  the  development  of  a  plan  to  integrate  ‘green’  initiatives  into  the  parking  program where possible with respect to parking facilities and the Branch’s business processes.  This would also consider  incorporation  of  Transportation  Demand  Management  principles  towards  achieving strategic objectives of the Branch and the City.  Objectives in 2011 

 Timeline 

• Develop and finalize project scope  Q4 (conclude in 2012) • Conduct research on environmental best practises 

   2012 Work Plan Report   This will  be  the  second work  plan  submitted  to  Transportation  Committee  and  Council  and will outline planned initiatives for 2012.  Objectives in 2011 

 Timeline 

• Draft 2012 Work Plan and staff report Q3 – Q4 • Present to Parking Stakeholder Consultation Group for feedback 

• Present to Transportation Committee and Council for approval    

2011 Work Plan Parking Operations, Maintenance and Development

11

Page 13: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

 2011 At-A-Glance

Q1 Q2 Q3 Q4

   

LAPS Final Report – ByWard Market

LAPS Final Report – Downtown Rideau

Conduct LAPS ‐ Westboro 

Conduct LAPS ‐ Glebe 

Conduct LAPS – Old Ottawa South 

Rideau Area Transportation Network Study (RATNS) 

City‐Wide Utilization Study 

New Off‐Street Garage Equipment 

Parking Facilities Improvement Strategy 

Pay‐by‐Cell Procurement and Launch 

Customer Engagement Strategy Business Continuity  

Plan 

2010 Annual Report  Development 

2010 Annual Report Presentation

Tour Bus  Strategy 

Implementation of Performance Measurement Framework 

Sustainable  Parking Plan 

2012 Work Plan Development

2012 Work Plan Report 

RATNS Final Report 

LAPS Report ‐ Westboro 

Conclude LAPS – ByWard Market 

Conclude LAPS – Downtown Rideau 

2011 Work Plan Parking Operations, Maintenance and Development

12

Page 14: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

In  addition,  the  Parking  Operations, Maintenance  and  Development  Branch will  undertake work  on other  initiatives that are more  internally focussed.   These are  important for the Branch to be effective and to enhance service under Service Excellence.  In 2011, staff resources will also be directed towards:  

• Clarifying mandates with respect to aspects of the parking function, such as bicycle parking, parking at City‐owned facilities and residential parking permits; 

• Creation of a Data Management Strategy to assist in the organization of the extensive data and other information that is collected by the Branch and required in the course of the day‐to‐day operation;  

• Creating an Annual Staff Training and Development Plan; 

• Developing an Employee Engagement Plan; and, 

• Undertaking a process to clarify and organize all of the Branch’s procedures and protocols.   Parking Stakeholder Consultation Group

The  Municipal  Parking  Management  Strategy  identifies  the  requirement  for  a  Parking  Stakeholder Consultation Group to act as a channel between the City, stakeholders, and affected citizens and groups.  In doing so, the intent of the group is to provide advice and guidance on parking management policy and promote parking policies that support the needs of local businesses, residents, institutions and tourism.  Per  the  Terms  of  Reference  (which  were  approved  by  Council  as  part  of  the  Municipal  Parking Management Strategy), the General Manager of Public Works (or designate)  is to serve as the Chair of this group with 10 representatives from various defined stakeholder groups (including BIAs, Community Associations, the tourism industry, etc.).  Meetings are to be held on a quarterly basis with the term of the group to run concurrent with the term of Council.  To  date,  this  group  has  provided  valuable  feedback  on  a  number  of  initiatives.    At  a meeting  on December 1st, 2010, the framework for this work plan was presented and no specific recommendations for revision were received.  Budget Process

Many of the  initiatives and requirements  identified  in this document are dependent on capital and/or operating  funding  in  2011.    The  Parking  Operations,  Maintenance  and  Development  Branch  has developed  a  Capital  Program  Plan  that  identifies  short  and  long  term  capital  funding  requirements.  2011 capital and operating requirements are  identified via the Financial Summary and Capital Program Plan which is available along with this report.  The approval of the 2011 Budget is expected to occur in March 2011.  If there are reductions in what is approved relative to what has been requested, this would necessitate adjustments to the 2011 Work Plan.   

2011 Work Plan Parking Operations, Maintenance and Development

13

Page 15: 2011 Work Plan · 2011 Work Plan The following section includes the initiatives to be undertaken by the Parking Operations, Maintenance and Development Branch in 2011.

Key Contact

 Regarding any of  the  items  identified  in  this document, or any other  issues  related  to  the City’s paid parking  program,  please  contact  Doug  Robertson,  Manager,  Parking  Operations,  Maintenance  and Development at 613‐580‐2424 ext. 32574 or [email protected].  Additional  information  regarding  the  Municipal  Parking  Program  can  be  found  at www.ottawa.ca/parking.  

2011 Work Plan Parking Operations, Maintenance and Development

14