    Senator Murray 2011 project earmarks submitted to AppropriationsCommittee

    20th Street SE Corridor ImprovementsRecipient: Snohomish CountyAmount: $4,000,000

    24th Avenue South Improvement ProjectRecipient: City of Des MoinesAmount: $2,840,000

    39th Avenue SE Extension ProjectRecipient: City of PuyallupAmount: $1,500,000

    70th Avenue East and Valley Avenue East Corridor ProjectRecipient: City of FifeAmount: $1,610,000

    116th Avenue Non-Motorized Facilities, Phase 2Recipient: City of KirklandAmount: $1,627,000

    179th/147th Intersection ImprovementsRecipient: City of Monroe

    Amount: $535,000

    192nd Avenue Corridor Extension ProjectRecipient: City of Bonney LakeAmount: $11,300,000

    Anderson Laventure Extension ProjectRecipient: City of Mount VernonAmount: $7,000,000

    Aurora RapidRideRecipient: King CountyAmount: $2,000,000

    Ballard/Uptown RapidRideRecipient: King CountyAmount: $5,000,000

  • 8/9/2019 2011 Murray Submits to Committee

    2/21

    2

    Barker Road/BNSF Grade SeparationRecipient: City of Spokane ValleyAmount: $3,650,000

    Bellingham Waterfront ProjectRecipient: City of BellinghamAmount: $2,000,000

    Ben Franklin Transit Vehicle Fleet Expansion and Modernization ProjectRecipient: Ben Franklin Transit (Ben Franklin Public Transportation Benefit Area)Amount: $5,200,000

    Berrydale Overcrossing Bridge ReplacementRecipient: King County

    Amount: $2,000,000

    Big Pasco Industrial Center Intermodal Project, Phase 5Recipient: Port of PascoAmount: $1,400,000

    BNSF Skagit River Bridge Replacement Cost-Benefit AnalysisRecipient: City of BurlingtonAmount: $120,000

    Bottleneck Relief Project, Phase 1Recipient: City of WoodinvilleAmount: $5,000,000

    Bowers Road Extension EastRecipient: Kittitas County Public Works DepartmentAmount: $1,448,000

    Bowers Field Industrial Park Road Improvement Project,

    Recipient: Kittitas CountyAmount: $1,900,000

    Bremerton Terminal Safety Improvements,Recipient: Washington State Department of TransportationAmount: $1,220,000

    C-TRAN Transit Bus Replacement,

  • 8/9/2019 2011 Murray Submits to Committee

    3/21

    3

    Recipient: C-TRAN (Clark County Public Transportation Benefit Area Authority)Amount: $3,000,000

    Centennial Trail Expansion,Recipient: Snohomish CountyAmount: $1,777,000

    Central Avenue Corridor Improvement Project,Recipient: City of BellinghamAmount: $2,000,000Location: Bellingham, WA

    Chelatchie Prairie Railroad Rehabilitation Project,Recipient: Clark CountyAmount: $4,000,000Location: Clark County, WA

    Chico Creek Restoration Project,Recipient: Kitsap County Public WorksAmount: $1,500,000Location: Bremerton, WA

    City of Longview Hybrid Transit Buses,Recipient: City of LongviewAmount: $1,000,000

    Clodfelter/Locust Grove Road Project,Recipient: Benton CountyAmount: $1,500,000

    Community Transit Hybrid Bus ReplacementRecipient: Snohomish County Transportation Benefit Area (Community Transit)Amount: $10,000,000

    Community Transit Operating AssistanceRecipient: Snohomish County Transportation Benefit Area (Community Transit)Amount: $11,000,000

    Cushman Trail Project, Phase 3,Recipient: Pierce County Parks and RecreationAmount: $2,000,000

  • 8/9/2019 2011 Murray Submits to Committee

    4/21

    4

    Foster Creek BridgeRecipient: Douglas County Transportation and Land ServicesAmount: $3,799,000

    Downtown Revitalization Project(streetscape),

    Recipient: City of LongviewAmount: $1,200,000

    Downtown Streetscape Improvements,Recipient: City of TacomaAmount: $4,000,000

    Division Street Gateway/Corridor Improvement, Phase 2,Recipient: City of SpokaneAmount: $2,000,000

    East Foster Wells Road, Phase 2,Recipient: Franklin CountyAmount: $1,014,000

    East Historic Business District Revitalization,Recipient: City of Port TownsendAmount: $1,600,000

    East Marginal Way: Argo Yard Truck Roadway Project,Recipient: Port of Seattle and the Freight Mobility Strategic Investment BoardAmount: $1,350,000

    Eastside BNSF Trail, Segments C and D,Recipient: City of WoodinvilleAmount: $5,000,000

    Electric Bus and Rapid Charging SystemRecipient: King CountyAmount: $5,000,000

    Elwha Valley Road,Recipient: Lower Elwha Klallam TribeAmount: $1,400,000

    Everett Transit Hybrid Bus and Paratransit Vehicle Procurement,

  • 8/9/2019 2011 Murray Submits to Committee

    5/21

    5

    Recipient: City of Everett, Everett TransitAmount: $1,200,000

    Ferry Terminals and Environmental and Safety Improvements,

    Recipient: Washington State Department of TransportationAmount: $2,330,000

    Fleshman Way/State Route 129 Interchange Improvements Project,Recipient: Asotin CountyAmount: $10,000,000

    Fort Road Reconstruction Project, Phase 2,Recipient: Yakima County (Toppenish)Amount: $2,000,000

    Foss Waterway Seaport Safety Improvements to Tacoma's Balfour Dock Building,Recipient: Foss Waterway SeaportAmount: $1,000,000

    Fourth Plain Bus Rapid Transit,Recipient: C-TRAN (Clark County Public Transportation Benefit Area Authority)Amount: $3,000,000

    Fryelands/Main Street RoundaboutRecipient: City of MonroeAmount: $1,750,000

    Grace Avenue Realignment,Recipient: City of Battle GroundAmount: $1,200,000

    Grant Transit Authority Bus Replacement,

    Recipient: Grant Transit AuthorityAmount: $259,200

    Grant Transit Authority Operations and Maintenance Base,Recipient: Grant Transit AuthorityAmount: $1,000,000

    Grays Harbor Transit Authority Vehicle Replacement,

  • 8/9/2019 2011 Murray Submits to Committee

    6/21

    6

    Recipient: Grays Harbor Transit AuthorityAmount: $1,740,000

    Harris Avenue Shipyard Pier Project,

    Recipient: Port of BellinghamAmount: $1,375,000

    Highway 516 Improvements from Jenkins Creek to 185th Avenue SE,Recipient: City of CovingtonAmount: $2,500,000

    Howard Hanson Dam UAS Preparedness Initiative,Recipient: King County Sheriff s OfficeAmount: $1,750,000

    Howard Street Improvement and Economic Development Project,Recipient: City of Port TownsendAmount: $2,600,000

    Icicle Station, Phase 2,Recipient: City of LeavenworthAmount: $900,000

    Improvements to Relieve Traffic Congestion on Miller Street,Recipient: Central Washington Hospital through the City of WenatcheeAmount: $1,157,000

    Infrastructure Construction at Cascades Business Park,Recipient: Port of Skamania CountyAmount: $1,912,000

    Integrated Ignition Interlock Program,Recipient: The American Association of Motor Vehicle Administrators (AAMVA)Amount: $400,000

    Intercity Transit Hybrid Buses Project,Recipient: Intercity TransitAmount: $3,240,000

    Intercity Transit Maintenance and Operations Facility Expansion Project,

  • 8/9/2019 2011 Murray Submits to Committee

    7/21

    7

    Recipient: Intercity TransitAmount: $4,000,000

    Interstate 5 Capacity and Safety Improvements, Chehalis to Centralia,Recipient: Washington State Department of Transportation

    Amount: $1,500,000

    Interstate 5 Columbia River Crossing Project,Recipient: Washington State Department of TransportationAmount: $2,000,000

    Interstate 5 Columbia River Crossing Project,Recipient: Washington State Department of TransportationAmount: $40,000,000

    Interstate 5/Everett to Marysville Enhanced Traveler and Safety Communications,Recipient: Washington State Department of TransportationAmount: $1,200,000

    Interstate 5 Mobility Strategy Grand Mound to State Route 512,Recipient: Thurston Regional Planning CouncilAmount: $2,700,000

    Interstate 5/Old Jackson Connector Trail,

    Recipient: Washington State Department of TransportationAmount: $650,000

    Interstate 5 Port of Tacoma Road Interchange Improvements,Recipient: City of FifeAmount: $4,700,000

    Interstate 5 South Everett Interchange Improvements,Recipient: City of EverettAmount: $800,000

    Interstate 5/State Route 501 Ridgefield Interchange Replacement Project,Recipient: City of Ridgefield, WashingtonAmount: $1,500,000

    Interstate 5/Thorne Lane Capacity and Safety Improvements,Recipient: Washington State Department of Transportation

  • 8/9/2019 2011 Murray Submits to Committee

    8/21

    8

    Amount: $1,500,000

    Interstate 5 West Coast Green Highway Electrification Demonstration Project,Recipient: Washington State Department of TransportationAmount: $650,000

    Interstate 82/South Union Gap Interchange Improvements,Recipient: City of Union GapAmount: $1,700,000

    Interstate 82/State Route 97 Freight Express Route WARecipient: Yakima CountyAmount: $500,000

    Interstate 90 Snoqualmie Pass Safety and Capacity Improvements,Recipient: Washington State Department of TransportationAmount: $1,500,000

    Island Transit Vehicle Replacement,Recipient: Island TransitAmount: $825,500

    Japanese Gulch Creek Fish Passage Restoration Project,Recipient: City of MukilteoAmount: $800,000

    Jefferson Transit Vehicle Replacement,Recipient: Jefferson TransitAmount: $412,000

    Juniper Dunes Wilderness Access, Phase 1,Recipient: Franklin CountyAmount: $700,000

    Kalama VFW Project,Recipient: Kalama Veterans of Foreign Wars and Ladies Auxiliary #10435Amount: $300,000

    Keller Ferry Replacement,Recipient: Confederated Tribes of the Colville ReservationAmount: $14,000,000

  • 8/9/2019 2011 Murray Submits to Committee

    9/21

    9

    Keller Ferry Replacement,Recipient: Washington State Department of TransportationAmount: $2,000,000

    Kelsey Street/Blueberry to US Highway 2 Intersection Improvements

    Recipient: City of MonroeAmount: $1,300,000

    Kettle River RoadRecipient: Ferry County Public WorksAmount: $3,417,000

    King County International Airport Taxiway Alpha,Recipient: King CountyAmount: $5,000,000

    King Street Station Restoration,Recipient: City of SeattleAmount: $850,000

    Lakewood Triangle Access/156th Street Overcrossing,Recipient: City of MarysvilleAmount: $2,000,000Location: Marysville, WA

    Lauridsen Boulevard Bridge Replacement,Recipient: City of Port AngelesAmount: $4,000,000

    Lewis Street Overpass Project, Phase 4,Recipient: City of PascoAmount: $4,000,000

    Link Transit Vehicle Replacement,Recipient: Chelan-Douglas Public Transportation Benefit Area (Link Transit)Amount: $1,200,000

    Lummi Nation Transportation Safety Improvements,Recipient: Lummi NationAmount: $16,000,000

  • 8/9/2019 2011 Murray Submits to Committee

    10/21

    10

    Lynch Road/US Highway 101 Interchange (Simmons Road) Safety Improvements,Recipient: City of Shelton and Mason CountyAmount: $5,200,000

    Lynch Road/US Highway 101 Interchange (Simmons Road) Safety Improvements,Recipient: Squaxin Island Tribe

    Amount: $5,200,000

    M Street SE Grade Separation Project WARecipient: City of AuburnAmount: $2,800,000

    Makah Office of Marine Affairs,Recipient: Makah Tribal CouncilAmount: $458,000

    Maritime Access and Education at Lake Union,Recipient: The Center for Wooden BoatsAmount: $1,000,000

    Mason Transit Community Center,Recipient: Mason County Transportation AuthorityAmount: $4,100,000

    Moses Lake Rail Corridor Relocation and Rail-to-Trail Project,Recipient: City of Moses LakeAmount: $3,000,000

    Mount Vernon Downtown Riverfront Revitalization Project,Recipient: City of Mount VernonAmount: $1,000,000

    Mountlake Terrace Safe Routes to School Project,Recipient: City of Mountlake TerraceAmount: $750,000

    Multi-Purpose Social Services Facilities Expansion,Recipient: Jewish Family ServiceAmount: $1,000,000

    Naches-Tieton Grade Road Reconstruction Project,Recipient: Yakima CountyAmount: $6,000,000

  • 8/9/2019 2011 Murray Submits to Committee

    11/21

    11

    NE 3rd/4th Street Corridor Improvements Project,Recipient: City of RentonAmount: $2,000,000

    NE 4th Street Extension,

    Recipient: City of BellevueAmount: $2,000,000

    NE 120th Street Roadway Extension,Recipient: City of KirklandAmount: $6,219,000

    NE 137th Avenue Improvement Project,Recipient: City of VancouverAmount: $1,500,000

    Newport Way Maple Street to Sunset Way Improvements,Recipient: City of IssaquahAmount: $2,000,000

    Northern Columbia Basin Railroad ProjectRecipient: Port of Moses Lake, Grant County International AirportAmount: $10,000,000

    Oil Spill Response Fleet Upgrade and Shipboard Firefighter Training,Recipient: The Maritime Fire and Safety Association (MFSA)Amount: $471,000

    Battle Ground Economic Revitalization, (e.g., streetscape)Recipient: City of Battle GroundAmount: $250,000

    Olympic Discovery Trail,Recipient: City of Port AngelesAmount: $750,000

    Olympic Discovery Trail,Recipient: Clallam CountyAmount: $1,499,000

    On Board Closed-Circuit Television (Transit),

  • 8/9/2019 2011 Murray Submits to Committee

    12/21

    12

    Recipient: King CountyAmount: $1,000,000

    Pacific Northwest Legislative Transportation Institute,Recipient: Pacific NorthWest Economic Region (PNWER)Amount: $500,000

    Pacific Transit Vehicle Replacement,Recipient: Pacific Transit SystemAmount: $336,000

    Pedestrian Bridge, Carty Unit, Ridgefield National Wildlife Refuge,Recipient: Ridgefield National Wildlife ServiceAmount: $1,800,000

    Pierce County 9th Street East Safety Improvements Project,Recipient: Pierce CountyAmount: $700,000

    Pierce County South Puget Sound Economic Development Project, Phase 2,Recipient: Pierce County Office of the ExecutiveAmount: $3,500,000

    Pierce Transit Vehicle Replacement,Recipient: Pierce County Public Transportation Benefit Area Corporation (Pierce Transit)

    Amount: $1,440,000

    Piert Road Extension,Recipient: Benton CountyAmount: $1,491,000

    Poplar Way Extension Bridge,Recipient: City of LynnwoodAmount: $1,000,000

    Port Angeles Downtown Waterfront Development,Recipient: City of Port AngelesAmount: $2,020,000

    Port Angeles Ferry Terminal Improvement Project,Recipient: Port of Port AngelesAmount: $4,000,000

  • 8/9/2019 2011 Murray Submits to Committee

    13/21

    13

    Port of Grays Harbor Marine Terminal Rail System, Phase 1,Recipient: Port of Grays HarborAmount: $3,300,000

    Port of Vancouver Freight Access Project,

    Recipient: Port of VancouverAmount: $5,000,000

    Puget Sound and Pacific Railroad Wishkah River Railroad Bridge Repairs,Recipient: Port of Grays HarborAmount: $800,000

    Puget South Regional Council Sustainable Transportation and Growth Modeling Demonstration Project,Recipient: Puget Sound Regional CouncilAmount: $1,225,000

    Pullman Airport Road Realignment and Reconstruction,Recipient: Whitman County and Pullman, WAAmount: $33,300,000

    Puyallup River Rail Bridge Improvement Project,Recipient: Tacoma Public Utilities, Tacoma RailAmount: $2,070,000

    Qwuloolt Trail Access Project,Recipient: City of MarysvilleAmount: $750,000

    Red Mountain InterchangeRecipient: Benton CountyAmount: $5,000,000

    Regionwide Vanpool Expansion,Recipient: Washington State Department of TransportationAmount: $1,000,000

    Replace Automatic Bus Wash and Water Reclamation Systems,Recipient: Clallam Transit SystemAmount: $160,000

    Replacement of Worker/Driver fleet,

  • 8/9/2019 2011 Murray Submits to Committee

    14/21

    14

    Recipient: Kitsap TransitAmount: $4,012,000

    Roosevelt Extension at Urban Ave to Cameron Way,Recipient: City of Mount VernonAmount: $1,137,000

    Russell Road Culvert Replacement Project,Recipient: City of ForksAmount: $500,000

    Salmon Creek Interchange Project,Recipient: Clark County and Washington State Department of TransportationAmount: $3,000,000

    Sammamish Bridge and Road (State Route 202) Project,Recipient: City of WoodinvilleAmount: $3,500,000

    SEAPORT: South Terminal Wharf Strengthening,Recipient: Port of EverettAmount: $3,200,000

    Seattle Port Townsend Passenger Only Ferry,Recipient: Port of Port Townsend

    Amount: $1,000,000

    Shelton Arterial Streets Rehabilitation Projects,Recipient: City of SheltonAmount: $15,000,000

    Skagit Transit Vehicle Replacement,Recipient: Skagit TransitAmount: $675,000

    Sound Transit Alternatives Analysis for High Capacity Transit from Northgate to Lynnwood,Recipient: Sound TransitAmount: $1,600,000

    Sound Transit Link Light Rail Airport to South 200th in the City of SeaTac,Recipient: Sound TransitAmount: $3,000,000

  • 8/9/2019 2011 Murray Submits to Committee

    15/21

    15

    Sound Transit Tacoma High Capacity Transit Alternatives Analysis,Recipient: Sound TransitAmount: $720,000

    Sound Transit Vehicle Upgrades,

    Recipient: Sound TransitAmount: $2,000,000

    South 154th Street Improvements, Phase 2,Recipient: City of SeaTacAmount: $1,000,000

    South Kitsap Industrial Area (SKIA) Cross Connector,Recipient: Port of BremertonAmount: $4,500,000

    South Park Bridge Replacement,Recipient: King CountyAmount: $5,000,000

    South Whidbey Harbor Expansion ProjectRecipient: Port District of South Whidbey IslandAmount: $1,000,000

    Southridge Transportation Improvements,Recipient: City of KennewickAmount: $460,000

    Spokane Masonic Center Preservation and Restoration Project (sidewalks)Recipient: Masonic Temple Association of SpokaneAmount: $500,000

    Spokane Public Market/Pacific Bridge Gateway Development,Recipient: Spokane Economic Development AllianceAmount: $250,000

    University District Revitalization and Economic Development Project,Recipient: City of SpokaneAmount: $5,300,000

    Spokane Transit Authority Paratransit Vehicles,

  • 8/9/2019 2011 Murray Submits to Committee

    16/21

    16

    Recipient: Spokane Transit AuthorityAmount: $2,036,000

    State Avenue NE 116th Street NE to 136th Street NE,Recipient: City of MarysvilleAmount: $2,000,000

    State Route 14 Camas/Washougal Safety Improvements, Phase 2,Recipient: City of WashougalAmount: $3,000,000

    State Route 14 Gorge Safety Improvements,Recipient: Washington State Department of TransportationAmount: $2,000,000

    State Route 20 Corridor Freight Mobility and Revitalization Project,Recipient: City of Sedro WoolleyAmount: $500,000

    State Route 28/Rock Island Passing Lane Safety Improvement,Recipient: Washington State Department of TransportationAmount: $1,000,000

    State Route 35 Columbia River Crossing,Recipient: Southwest Washington Regional Transportation Council (RTC)

    Amount: $1,000,000

    State Route 99 Improvement Project,Recipient: City of ShorelineAmount: $5,000,000

    State Route 112/Pysht River Environmental Mitigation,Recipient: Washington State Department of TransportationAmount: $500,000

    State Route 167 Tacoma to Puyallup New Freeway,Recipient: Washington State Department of TransportationAmount: $2,000,000

    State Route 169 Safety and Freight Mobility Improvement Project,Recipient: City of Maple ValleyAmount: $2,000,000

  • 8/9/2019 2011 Murray Submits to Committee

    17/21

    17

    State Route 202 Pedestrian and Bicycle Safety Improvements,Recipient: Washington State Department of TransportationAmount: $1,000,000

    State Route 240/Duportail Street Intersection Improvements,

    Recipient: City of RichlandAmount: $2,200,000

    State Route 303 Vicinity Pedestrian and School Zone Safety Improvements,Recipient: Washington State Department of TransportationAmount: $240,000

    State Route 410/Old Sumner Buckley Highway Intersection Improvement Project,Recipient: City of Bonney LakeAmount: $3,396,000

    State Route 510 Yelm Loop,Recipient: Washington State Department of TransportationAmount: $1,500,000

    State Route 518 and Des Moines Memorial Drive Interchange,Recipient: City of BurienAmount: $750,000

    State Route 520 Montlake NewMobility Hub,Recipient: Washington State Department of TransportationAmount: $950,000

    State Route 522 and 61st Avenue NE Improvements,Recipient: City of KenmoreAmount: $ 2,843,000

    State Route 522 Paradise Lake Road Safety and Capacity Improvements,Recipient: Washington State Department of TransportationAmount: $2,000,000

    Sustainable Transportation Hubs,Recipient: King CountyAmount: $5,000,000

    SW 27th Street/Strander Connection Project,

  • 8/9/2019 2011 Murray Submits to Committee

    18/21

    18

    Recipient: City of RentonAmount: $2,000,000

    Tacoma Intermodal Transit Center and Parking Facility,Recipient: City of TacomaAmount: $1,000,000

    Tacoma Public Waterfront Promenade Project,Recipient: City of Tacoma, Pierce County and Pt. RustonAmount: $4,000,000

    Tacoma Rail Locomotive Repower Project,Recipient: Tacoma Public Utilities, Tacoma RailAmount: $2,000,000

    Terrace Heights and Yakima Gateway Corridor Redevelopment ProjectRecipient: Yakima County and City of YakimaAmount: $2,000,000

    Tjerne Place Chain Lake Road to Wood Creek Road ExtensionRecipient: City of MonroeAmount: $1,000,000

    Transportation Vehicles for El Centro de la Raza Child and Youth Education Activities and HomeboundSenior Program Hot Meal Delivery,

    Recipient: El Centro de la RazaAmount: $150,000

    Travis Road,Recipient: Benton CountyAmount: $1,800,000

    Triangle Project - State Route 161/SW 356th Street Left Turn Lane,Recipient: City of Federal WayAmount: $2,700,000

    Tukwila Transit Center,Recipient: City of Tukwila$1,500,00

    Twin Transit Vehicle Replacement,Recipient: Twin Transit

  • 8/9/2019 2011 Murray Submits to Committee

    19/21

    19

    Amount: $878,400

    University Place Pedestrian Overpass, Phase 2,Recipient: City of SpokaneAmount: $2,000,000

    US Highway 2 and Sultan Basin Road Realignment, Phase 3Recipient: City of SultanAmount: $2,015, 500

    US Highway 2/Cascade Avenue Interchange,Recipient: Wenatchee Valley Transportation CouncilAmount: $2,000,000

    US Highway 2/Cascade Avenue Interchange,Recipient: Washington State Department of TransportationAmount: $2,000,000

    US Highway 2/Stevens Pass Traveler Safety Communications Enhancement,Recipient: Washington State Department of TransportationAmount: $1,280,000

    US Highway 12 Burbank to Walla Walla, Phase 7A,Recipient: Port of Walla WallaAmount: $3,000,000

    US Highway 12 Burbank to Walla Walla,Recipient: Washington State Department of TransportationAmount: $2,000,000

    US Highway 12 Mossyrock Roundabout,Recipient: Lewis CountyAmount: $1,500,000

    US Highway 101 Corridor Improvement Project,Recipient: Skokomish Indian TribeAmount: $1,500,000

    US Highway 101 Regional Circulation Project Siting Analysis,Recipient: Grays Harbor Council of GovernmentsAmount: $325,000

  • 8/9/2019 2011 Murray Submits to Committee

    20/21

    20

    US Highway 195/Cheney-Spokane Road Interchange,Recipient: Washington State Department of TransportationAmount: $2,000,000

    US Highway 395 North Spokane Corridor Project,Recipient: Washington State Department of Transportation

    Amount: $2,000,000

    Wahkiakum FerryRecipient: Wahkiakum CountyAmount: $4,015,000

    Waterfront Redevelopment Access Project,Recipient: City of VancouverAmount: $2,000,000

    West Coast Corridor Coalition,Recipient: West Coast Corridor CoalitionAmount: $250,000

    West Main Realignment Project,Recipient: City of KelsoAmount: $3,000,000

    West Seattle RapidRide,

    Recipient: King CountyAmount: $21,300,000

    Westside Connector Alignment Study,Recipient: Yakima Valley Conference of GovernmentsAmount: $280,000

    Whatcom Transportation Authority Fleet Replacement Project,Recipient: Whatcom Transportation AuthorityAmount: $3,680,000

    Whidbey Island Main Operations, Maintenance, and Administration Facility,Recipient: Island TransitAmount: $10,752,000

    William O. Douglas Trail,Recipient: City of Yakima

  • 8/9/2019 2011 Murray Submits to Committee

    21/21