TIP Annual Element (Bike & Ped) for October 1, 2011 through September 30, 2012
COUNTY
PLAN/
ACTL
03/08/2012
PEDESTRIAN BRIDGE/RT 33 11/3/2011 0.114WW1CONSTRUCTION ACTL551243 ON ERI
GRAYCLIFF PUBLIC ACCESS
ENHANCEMENT
3/21/2012 0.008C24DETAILED DESIGN PLND575745 OFF ERI
TOWN OF EVANS MULTI-USE PATHWAY
PHASE II
4/17/2012 0.028AA1CONST. INSP. PLND575749 OFF ERI
BNMC PHASE 2 STREETSCAPE
IMPROVEMENTS
3/17/2012 2.396C32CONSTRUCTION PLND575759 OFF ERI
3/17/2012 0.222C25CONSTRUCTION PLNDOFF ERI
3/17/2012 0.176C32CONST. INSP. PLNDOFF ERI
S PARK AVE & LAKE AVE STREETSCAPE 6/7/2012 0.034C32CONST. INSP. PLND575769 OFF ERI
6/7/2012 0.258C32CONSTRUCTION PLNDOFF ERI
ECC TRANSPORTATION IMPROVEMENTS 4/2/2012 0.086C33CONST. INSP. PLND575775 OFF ERI
4/2/2012 0.642C33CONSTRUCTION PLNDOFF ERI
NIAGARA GORGE BICYCLE/PED TRAIL 10/13/2011 0.008C32ROW INCI. ACTL575779 OFF NIA
2/29/2012 0.008C32ROW ACQU. PLNDOFF NIA
Unmatched Total 3.980