8/4/2019 2011 10 03 Student Forum
1/27
Georgetown University | New South Student Center
New South Student
CenterFeasibility StudyOctober 03, 2011
-
8/4/2019 2011 10 03 Student Forum
2/27
Georgetown University | New South Student Center
How will this study be used?
April 21, 2012 2
Feasibility Study Establish a conceptual program/space list
Overlay objectives from the Campus Plan
Overlay data from recent space reports
Test fit the program to the space
Envision the character & quality of space
Establish a conceptual cost
Produce fund-raising materials
Process 2004 Study 2010 Report on Student Space / 2010-2020 Master Plan Preliminary Building/Systems analysis Steering committee
Planning and Project Management/UFSH Student Programs Student Affairs Office of the Provost Center for Multicultural Equity and Access Auxiliary Services Office of Advancement Department of Performing Arts
Student forum(s)Leavey Center
CostProject Cost of approx. $15.5M.
-
8/4/2019 2011 10 03 Student Forum
3/27
Georgetown University | New South Student Center
Fundraising complete May/June 2012 9 months
Design Documentation May 2012 - February2013 9 months
OGB Review
Concept Review July 2012Permit Review January 2013
Permit (DCRA) December 2012 - March 2013 3 months
Bid April 2013 1 month
Construction May 2013-July 2014 14 months
Substantial Completion July 2014
Occupancy August 1, 2014
April 21, 2012 3
Schedule
-
8/4/2019 2011 10 03 Student Forum
4/27
Georgetown University | New South Student Center
Goals for the Building
April 21, 2012 4
Active in theSW Residential Precinct
To provide continuity throughoutthe building.
For the building to engage with the
surroundings, be a presence.Porous/access all around.
Accessibility 24/7
LEED
-
8/4/2019 2011 10 03 Student Forum
5/27
Georgetown University | New South Student Center
Goals for the Program
April 21, 2012 5
Enhance Student Community/Living Room of the campusOwnershipUndergraduates
Functional Student Space/Spirit of cura personalis
Variety of spaces Study Social Space/Lounge Dining Meeting
Preservinghighest quality ofspace and views for thoseareas most frequently occupiedby students.
-
8/4/2019 2011 10 03 Student Forum
6/27
Georgetown University | New South Student Center
Existing Conditions
April 21, 2012 6
-
8/4/2019 2011 10 03 Student Forum
7/27
Georgetown University | New South Student CenterApril 21, 2012 7
Existing Conditions
Getting to the skeletonmost of ground floorExcept existing residencehall lobby
1. Existing program:residence hall entrance,dance, lounge
2. Exterior repairsMinor repairs to exteriorfaade required.Roof replacement
3. Ground level
classrooms, dancestudios, lounge space
-
8/4/2019 2011 10 03 Student Forum
8/27
Georgetown University | New South Student Center
Demolition
April 21, 2012 8
-
8/4/2019 2011 10 03 Student Forum
9/27
Georgetown University | New South Student Center
Demolition
April 21, 2012 9
-
8/4/2019 2011 10 03 Student Forum
10/27
Georgetown University | New South Student Center
Scope
April 21, 2012 10
-
8/4/2019 2011 10 03 Student Forum
11/27
Georgetown University | New South Student CenterApril 21, 2012 11
Exterior Modification | Site
A. Courtyard - Approximate Area: 3,500 SF. Theexisting courtyard will be re-configured to allow for thenew student center entrance. Some re-grading will needto occur, but access to basement stairs and to theresidence hall lobby will remain as-is.The existing curb at Library Walk and sidewalk willremain. The new courtyard configuration will includesteps and an accessible ramp, planted areas,convenience exterior power receptacles, bike racks andexterior pole lights. Materials may be primarily cast-in-
place concrete with concrete pavers at the exterior diningarea.
A1. Approximate Location of new grease interceptorservicing kitchen.
A2. New building entry at courtyard requires bridgeover areaway.
B. Main Entry Area - New entrance at the intersection ofLibrary Walk & Tondorf will require a ramp and entrysteps to navigate the approximate five to six foot gradedifference. Materials may be primarily cast-in-place
concrete steps and pavement, as well as some low stoneor precast concrete site walls. An existing fire hydrantand light pole may need to be relocated.C. Loading Dock - Approximate Area: 600 SFRepairs and grading only as necessary to accommodatethe new loading dock function.D. Code/Safety repairs - Minor patch/repairs to existingconcrete sidewalk and steps as required.
-
8/4/2019 2011 10 03 Student Forum
12/27
Georgetown University | New South Student CenterApril 21, 2012 12
Exterior Modification | Building
Exterior building modifications will belimited, consisting primarily of work at thetwo new entrances (northwest &courtyard), minor repairs to existing brickwhere required, and may be generallydescribed as follows:
1. New/modified wall at student centerentrance area in courtyard, introducing
doors, windows and potentially newcladding at ground level.1a. Bridge in foreground providing
access to doors across existingareaway.
2. New/modified wall at new entrance area.3. Existing south-facing windows mayreceive solar screening device.4. Remove existing windows and portion ofbrick wall between. Replace with insulated
overhead rolling door with 2 coatfluoropolymer finish.5. The Ground Level roofing was replacedin 1993; however, a preliminary review ofexisting conditions suggests the roof is inpoor condition and in need of replacementagain. A probable cost of this replacementhas been incorporated into the conceptualcost analysis.
-
8/4/2019 2011 10 03 Student Forum
13/27
Georgetown University | New South Student Center
Space List
April 21, 2012 13
-
8/4/2019 2011 10 03 Student Forum
14/27
Georgetown University | New South Student Center
Plans
April 21, 2012 14
Lower Level
-
8/4/2019 2011 10 03 Student Forum
15/27
Georgetown University | New South Student Center
Plans
April 21, 2012 15
Ground Level
-
8/4/2019 2011 10 03 Student Forum
16/27
Georgetown University | New South Student CenterApril 21, 2012 16
Program Diagrams
-
8/4/2019 2011 10 03 Student Forum
17/27
Georgetown University | New South Student Center
Program Diagrams
April 21, 2012 17
-
8/4/2019 2011 10 03 Student Forum
18/27
Georgetown University | New South Student Center
Program Diagrams
April 21, 2012 18
-
8/4/2019 2011 10 03 Student Forum
19/27
Georgetown University | New South Student CenterApril 21, 2012 19
Program Diagrams
-
8/4/2019 2011 10 03 Student Forum
20/27
Georgetown University | New South Student CenterApril 21, 2012 20
Living Room
-
8/4/2019 2011 10 03 Student Forum
21/27
Georgetown University | New South Student CenterApril 21, 2012 21
Open Study | New Riverside Lounge
-
8/4/2019 2011 10 03 Student Forum
22/27
Georgetown University | New South Student Center
Food Venue | Dining Lounge & Bar
April 21, 2012 22
-
8/4/2019 2011 10 03 Student Forum
23/27
Georgetown University | New South Student Center
Lobby & Information Desk
April 21, 2012 23
-
8/4/2019 2011 10 03 Student Forum
24/27
Georgetown University | New South Student CenterApril 21, 2012 24
Social Room (Multipurpose)
-
8/4/2019 2011 10 03 Student Forum
25/27
Georgetown University | New South Student CenterApril 21, 2012 25
Social Room (Multipurpose)
The Social Room shall bedivisableinto two equalrooms by the use ofoperable partition(s).
Both spaces shall have
audio/visual equipment andindividual control of lighting.The operable partition(s)shall have the greatestacoustic separationachievable, so thatfunctions on both sidesmay occur simultaneously.
The space is intended to beflexible, accommodatingseveral different types ofevents and furnitureconfigurations. To the leftare four possible scenarios.
-
8/4/2019 2011 10 03 Student Forum
26/27
Georgetown University | New South Student CenterApril 21, 2012 26
Cost Analysis
-
8/4/2019 2011 10 03 Student Forum
27/27
Georgetown University | New South Student CenterApril 21, 2012 27
Enhancements
Green Roof$$$
Fireplaces $$First Floor (piano rooms, lobby, restrms)
$$$
First Floor Courtyard Renovation$$$
Skylight $Replace current space with Radio/TV
$$$