2011 03 25 Eslabon Peru Mining Country, Final Ld

27
Project Eslabon Peru, Mining Country Project Eslabon 1

description

Final presentation of Eslabon Mining Project-Minera Peru - Peru a power house in mining

Transcript of 2011 03 25 Eslabon Peru Mining Country, Final Ld

Page 1: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project EslabonPeru, Mining Country

Project Eslabon 1

Page 2: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Table of Content

Peru – Mining Industry Overview 3

Project Eslabon 10

Contact Information 27

Project Eslabon 2

Page 3: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon

Peru – Mining Industry Overview

3

Page 4: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Peru – Mining Industry Overview

Peru In Worldwide Production Rankings

• #1 – Silver• #2 – Copper & Zinc• #3 – Tin• #4 – Lead• #6 – Gold

FURTHER, PERU is • 3rd destination in the world for

Exploration Investment and 1st destination in Latin America.

• one of the fastest growing mining economies in the world.

• Peru has only 0.69% of the country area in production, creating a vast opportunity to capitalize on, given cause of mineralization in Peru and existing worldwide status.

Project Eslabon 4

Page 5: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Peru – Mining Industry Overview

Cause of Peru’s Mineralization

The Andes is a young, substantially non-eroded mountain range that crosses the Peruvian territory. Along its length, 03 frames of mountain range (Cordillera Negra, Cordillera Blanca and Cordillera Central), with key mineralization dominating across 03 knots, Vilcanota Knot on south, Pasco Knot on Center and Mollepata Knot in the North. Such knots were caused by strong orogenic movements favorable for mineralization.

It is not ”IF” there is mineral across these western parts of Peru… it is HOW MUCH and how accessible is the mineral?

Our focus is accessible, high grade, operating properties.

The Eslabon Project is one of such properties.

Project Eslabon 5

Page 6: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Peru – Mining Industry Overview

Cause of Peru’s Mineralization (Continued)

The presence of different intrusive pulses (batholiths) in conjunction with the presence of different types of rocks, gave rise to the various mineral deposits in Peru.

Project Eslabon 6

Page 7: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Peru – Mining Industry Overview

Cause of Peru’s Mineralization (Continued)

The key mineralization belts along western parts of Peru - recognizing key areas of gold, copper and polymetallic.

The Eslabon Project resides in the Central Peru Polymetaliic Skarn & Replacement Belt.

Project Eslabon 7

Page 8: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Peru – Mining Industry Overview

Existing Worldclass Projects

Yanacocha – Newmount +60 Million Oz of Gold

Lagunas Norte – Barrick +12 Million Oz of Gold

Pierina – Barrick

+10 Million Oz of Gold

Project Eslabon 8

Page 9: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Peru – Mining Industry Overview

Existing Worldclass Projects (Continued)

Antamina– BHP Billiton / Xstrata

745 Mt @ 1.06% Cu 0.671% Zn

Cerro de Pasco – VOLCAN

+120 Mt @ 7.2% Zn, 2.3% Pb

Cuajone – Southern Peru

+4,294 Mt @ 0.44% Cu, 0.021% Mo

Project Eslabon 9

Page 10: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon

Project Eslabon

10

Page 11: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon

Project Eslabon 11

Page 12: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Ancash, Peru

Project Eslabon 12

Page 13: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Geological Formation

Project Eslabon

229400

229400 229800

229800

88

94

00

08

89

44

00

88

94

00

0

229000

229000

B R E C C I A P O R T U G U E S A

INTRUSIVECALIPUY GROUPBRECCIA PIPEVEINFAULT

300 450 600

COMPAÑIA MINERA PARAC SAC

FIG.ArchivoNAS

0300

SCALE

150

1:250

PSAD56 18S

Job No.

Job No.

W. LOPEZ

Referencia:

ESLABON

MARZO 2010

N. LAREDO

Obtenido del plano geológico de S. Cayo 1995

Geología

Plano N°Prospecto

Fecha

Datum

Revisado PLANO GEOLOGICO SUPERFICIAL

PARAC

PROSPECTO ESLABON

13

Page 14: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Portuguesa Breccia Pipe

Project Eslabon 14

Page 15: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Breccia Pipe Structure

Project Eslabon 15

Page 16: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Cause of Mineralization

Project Eslabon 16

Page 17: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Ximena Vien

Project Eslabon

• Camp

• Ximena Vein

17

Page 18: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Reserves, Resources

Project Eslabon

4600

4500

4550

4650

NV-4730

4700

NV-4730

4500

4550

4600

4650

4700

S E C T I O N P A - 2

RECURSO MEDIDORECURSO INDICADORECURSO INFERIDO

18

Page 19: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Reserves, Resources

Project Eslabon

- Reserve, resource per tonne calculations reduced for a potential risk adjustment : Measured Reserves – 15%, Indicated Reserves – 25%, Inferred Resources – 50%

- The RED line highlights that the total calculations consider only 1st 200 meters of depth from operating mine.

19

Page 20: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon

Reserve, Resource Calculations

The total calculated reserves stand at :

Measured Reserves - 150,952 MT Indicated Reserves – 463,713 MT Indicated Resources –571,758 MTTOTAL 1,186,423 MT

The economic value of the initially determined and future potential of the reserves and resources can easily reach hundreds of millions dollars at today’s prices.

20

Project Eslabon – Reserves, Resources

Page 21: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Brecchia Pipe Reserves

Project Eslabon

Reserve Calculation (Continued)

The Portuguese Breccia Pipe is the main part of Eslabon in the current state of the project.

The Brecchia Pipe geological model determines:

- width, approximates 110 x 50 meters

- depth, recognizing only the first 200 meters

The total reserves of Portugese Breccia Piple is 970,000 metrics tons, which is 82% of the total reserves we have estimated.

The other part of reserves is Ximena Vien, which holds 295,000 metric tons.

21

Brechia Pipe

129,240

387,720

452,340

969,300

 

Measured Proven

Indicated

Inferred Potential

TOTAL

Page 22: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Silver Reserves

Project Eslabon

Average Grade control:Silver: 13.2 oz / tonLead: 9.6%

Projected Mine Life:10.8 years: assuming a production

level of 350 tons/day and no new reserve is found.

SILVER Reserves:

Measured silver reserve 1,390,125 oz.

At market value of $30/oz, the value approximates $41.7 million.

Total silver resources 10,900,000 oz.

At market value averaging of $23.22/ oz, the value approximates $253.8 million

22

$ / Oz # OZ Ag Venta VALUE

Reserves Measured $30.00 1,390,125 $ 41,703,746

Reserves Indicated $25.00 4,270,349 $ 106,758,734

Reserves Inferred $20.00 5,265,336 $ 105,306,720

Reserves TOTAL Ag # Oz 10,925,810 $ 253,769,200

Page 23: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Lead Reserves

Project Eslabon

LEAD Reserves, Resources:

Measured Lead Reserves: 23.6 million pounds, or 10,726

tons. At average value of US $1.10 per lb,

the total value is at $26 million.

Total Lead Reserves, Resources 158.8 million pounds, or 72,200

tons.At average value of US0.95 per lb, the

total value approximates $150.8million

** All data is estimated using an average net metallurgical recovery rate of 70%.

23

Reserves Measured

Reserves Indicated

Reserves Inferred

Reserves TOTAL

$ / Lb POUNDS PbSALES VALUE

$ 1.10 23,641,788 $ 26,005,967

$ 1.00 66,023,300 $ 66,023,300

$ 0.85 69,195,657 $ 58,816,308

Pb # Ib 158,860,745 $150,845,575

Page 24: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – Community Relations

Project Eslabon 24

Community Relations:

A key part of mining in Peru is maintaining good relations with the community.

The company has signed a 5 year community agreement for the use of land, water at the mine. We have also been granted the right to build a roads and install a plant, if we deem appropriate.

In December 2010, the company sponsored a Christmas party for the children. Noted beside, are company representatives and community women providing hot chocolate and gifts to the children.

Page 25: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon – In Conclusion

Project Eslabon

Eslabon Existing and Upside Potential:

Due to the nature and scope of the mineralization, we believe the existing and future potential of Project Eslabon can be substantially higher than indicated and, at today’s prices, can reach into the hundreds of millions of dollars.

If you share our view, and are interested to learn more…. and, share the view of many in the market… that metal prices will continue to be strong and continue their positive upward trend for the foreseeable future… do contact us, now.

We have participation arrangements for you to profit with us!

25

Page 26: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Project Eslabon

Contact Information

26

Page 27: 2011 03 25   Eslabon   Peru Mining Country, Final Ld

Contact Information

Project Eslabon

WE WELCOME YOU TO BENEFIT & PARTICIPATE WITH US!

There exists a vast opportunity to capitalize on right now, given Peru’s existing worldwide mining status, the Eslabon Project, other mines we have contracted and have under evaluation.

Join with us. There are 2 ways to participate. Contact us to find out how!

Thank you!

For More Information, Contact Us:

Tel: US Voip : 1-518-312-4243 (rings in Lima, Peru)

Email: [email protected]

27