2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

75
2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010

description

UTILITY

Transcript of 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Page 1: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

2010-2011

DRAFT BUDGETPRESENTATION

CITY COUNCIL WORKSHOPAUGUST 10, 2010

Page 2: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

GENERAL FUND

ADDITIONAL DISCUSSIONAND QUESTIONS

Page 3: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

UTILITY

Page 4: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

UTILITY BUDGET

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $40,988,051 $32,090,445 $30,844,855 $31,345,250

EXPENDITURES $35,094,151 $32,090,445 $30,844,855 $31,345,250

’10 Budget vs ’11 Budget - Or +

TOTAL -$745K

PERSONNEL 113.2

Employee changes -2.0, -$360K

Other major changes

Page 5: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

CUSTOMER SERVICE

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $1,135,115 $1,166,196 $1,140,804 $1,094,576

’10 Budget vs ’11 Budget - Or +

TOTAL -$72K

Other major changes Capital: Automate posting payments $15K

Page 6: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

UTILITY ADMINISTRATION

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $1,302,988 $1,290,555 $1,291,703 $1,204,686

’10 Budget vs ’11 Budget - Or +

TOTAL -$86K

Other major changes

Page 7: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

UTILITY MAINTENANCE

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $730,641 $657,846 $671,740 $598, 781

’10 Budget vs ’11 Budget - Or +

TOTAL -$59K

Other major changes

Page 8: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

WASTEWATER COLLECTION

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $2,401,258 $2,561,010 $2,437,034 $2,319,639

’10 Budget vs ’11 Budget - Or +

TOTAL -$241K

Other major changes

Capital summary Meters: $ 5,000 Pumps: $24,000 Total: $29,000

Page 9: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

WASTEWATER TREATMENT

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $1,881,268 $1,814,948 $1,722,739 $1,819,722

’10 Budget vs ’11 Budget - Or +

TOTAL +$5K

Other major changes

Page 10: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

WATER PLANT #1

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $1,857,114 $1,980,448 $1,807,263 $1,836,723

’10 Budget vs ’11 Budget - Or +

TOTAL -$144

Other major changes

Page 11: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

WATER PLANT #2

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $1,454,783 $1,579,729 $1,309,600 $1,419,383

’10 Budget vs ’11 Budget - Or +

TOTAL -$160K

Other major changes

Page 12: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

WATER PLANT #3

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $883,270 $1,038,708 $1,055,509 $1,064,998

’10 Budget vs ’11 Budget - Or +

TOTAL +$26K

Other major changes

Page 13: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

WATER QUALITY

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $459,566 $451,569 $443,399 $426,963

’10 Budget vs ’11 Budget - Or +

TOTAL -$25K

Other major changes

Page 14: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

WATER DISTRIBUTION

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $3,595,264 $3,124,215 $3,140,637 $2,968,066

’10 Budget vs ’11 Budget - Or +

TOTAL -$156K

Capital summary Meters: $495,785

Page 15: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

UTILITY NON-DEPARTMENTAL

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

EXPENDITURES $19,392,884 $16,425,221 $15,824,427 $16,591,713

’10 Budget vs ’11 Budget - Or +

TOTAL +$166K

Other major changes

Page 16: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

STORMWATER

Page 17: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

STORMWATER BUDGET

Capital Land for access: $15K Field Automation Equipment: $7,500

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $5,404,875 $10,247,400 $11,833,700 $7,378,200

EXPENDITURES $4,079,982 $10,247,400 $11,833,700 $7,378,200

’10 Budget vs ’11 Budget - Or +

TOTAL -$2.9 million

Other major changes Established pipe & ditch crewsReduced contract services

Page 18: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

STORMWATER MANAGEMENT

FUND  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $7,790,946 $8,875,981 $9,032,995 $9,126,809 $9,131,923

TOTALEXPENDITURES $7,107,365 $8,170,786 $8,371,086 $8,599,086 $8,836,286

Page 19: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

STORMWATER UTILITY CAPITAL PROJECTS FUND

  FY 11 FY12 FY 13 FY 14 FY 15

Swale Rehabilitation Program $865,000 $882,300 $899,900 $917,900 $4,501,400

Valley Gutter Improvements $75,000 $76,500 $78,800 $79,600 $81,200

Pipe Replacement $1,361,611 $1,388,800 $1,416,600 $1,444,900 $1,473,800

Control Structure Rehab $492,600 $506,000 $517,000 $528,000 $539,000

Page 20: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

INFORMATION TECHNOLOGY &

COMMUNICATIONS

Page 21: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

INFORMATION TECHNOLOGY & COMMUNICATIONS FUND

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $2,531,702 $3,281,781 $2,810,927

EXPENDITURES $2,531,702 $3,281,781 $2,810,927

’10 Budget vs ’11 Budget - Or +

TOTAL +$279K

PERSONNEL 12.5

Employee changes -2.0, -$175K

Other major changes Added capital & contingency to FY10: $888KOperations support down $40K

CapitalNetwork equipment: $40KSecurity camera/access control: $60,000Fiber Cable: $215,200

Page 22: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

BUILDING PERMITS & INSPECTIONS

Page 23: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

BUILDING PERMITS

& INSPECTIONS

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $1,548,947 $1,714,913 $1,512,072

EXPENDITURES $1,548,947 $1,714,913 $1,512,072

’10 Budget vs ’11 Budget - Or +

TOTAL -$37K

PERSONNEL 15.4

Employee changes -2.6, -$78K

Other major changes Added 2 construction inspectors, supported by site permit fees

Page 24: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

GOLF COURSE

Page 25: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

GOLF COURSE BUDGET

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $97,704 $2,866,230 $2,510,400 $1,492,200

EXPENDITURES $4,584,218 $2,866,230 $2,510,400 $1,492,200

Page 26: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

TENNIS

Page 27: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

TENNIS BUDGET

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $236,084 $286,719 $281,800 $304,208

EXPENDITURES $242,969 $286,719 $281,800 $304,208

’10 Budget vs ’11 Budget - Or +

TOTAL +$18K

PERSONNEL 0

Employee changes -4

Other major changes Contract with Kemper

Page 28: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

SOLID WASTE

Page 29: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

SOLID WASTE BUDGET

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $7,479,229 $7,658,400 $7,724,600 $7,745,800

EXPENDITURES $6,948,593 $7,658,400 $7,724,600 $7,745,800

’10 Budget vs ’11 Budget - Or +

TOTAL +$87K

Other major changes

Page 30: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

MISCELLANEOUS FUNDS

Page 31: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

CDBG FUND

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES

EXPENDITURES $3,201

Page 32: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

POLICE EDUCATION FUND

 

Actual FY 09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $9,388 $76,500 $49,000 $55,400

EXPENDITURES $24,000 $76,500 $49,000 $55,400

Page 33: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

POLICE AUTOMATION FUND

 

Actual FY 09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $37,068 $261,800 $244,600 $270,100

EXPENDITURES $261,800 $244,600 $270,100

Page 34: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

DISASTER RESERVE FUND

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $802,600 $2,222,300 $2,168,900 $2,200,900

EXPENDITURES $755,379 $2,222,300 $2,168,900 $2,200,900

Page 35: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

RECYCLING FUND

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $69,051 $272,200 $118,900 $306,900

EXPENDITURES $63,164 $272,200 $118,900 $306,900

Page 36: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

NEIGHBORHOOD

STABILIZATION FUND

 

Actual FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $5,856 $2,131,900 $2,290,500

EXPENDITURES $5,856 $2,131,900 $2,290,500

Page 37: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

StaffingEnterprise Fund 2006-07 2009-10

2010-11

1-YrChange

4-YrTotal

Change

FTE FTE FTE FTE FTE

UTILITY 112 115.2 113.2 -2 +1.2

FLEET 5 3 3 0 -2

STORMWATER 20 29.55 35.55 +6 +15.55

TENNIS 0 4 0 -4 0

INFORMATIONTECHNOLOGY 13.5 14.5 12.5 -2 -1

BUILDING PERMITS & INSPECTIONS

31.5 18 15.4 -2.6 -16.1

SOLID WASTE 2 0 0 0 -2

ENTERPRISE FUND 184 184.25 179.65 -4.6 -4.35

Page 38: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

CAPITAL FUNDS

Page 39: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

$-

$10,000,000.00

$20,000,000.00

$30,000,000.00

$40,000,000.00

$50,000,000.00

$60,000,000.00

$70,000,000.00

$80,000,000.00

$90,000,000.00

$100,000,000.00

FY2005/2006 APPLY FY2006/2007 APPLY FY2007/2008 APPLY FY2008/2009 APPLY FY2009/2010 APPLY

Grants Applications By Category

Environmental Fire Housing & Community Development Information Technology Parks & Recreation Stormwater Transportation Utility

Page 40: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

$-

$1,000,000.00

$2,000,000.00

$3,000,000.00

$4,000,000.00

$5,000,000.00

$6,000,000.00

$7,000,000.00

$8,000,000.00

$9,000,000.00

FY2005/2006 AWARD FY2006/2007 AWARD FY2007/2008 AWARD FY2008/2009 AWARD FY2009/2010 AWARD

Awarded Grants By Category

Environmental Fire Housing & Community Development Information Technology Parks & Recreation Stormwater Transportation Utility

Page 41: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

PARK IMPACT FEE FUND

Page 42: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

PARK IMPACT FEE FUND

  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $ 766,918 $997,118 $1,377,918 $1,782,518 $691,818

TOTALEXPENDITURES $137,000 $1,500,000 $500,000

Page 43: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Park Impact Fee Fund

  FY 11 FY12 FY 13 FY 14 FY 15

Trails

Graham Swamp Trail $137,000 $1,500,000 $500,000

Page 44: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

FIRE IMPACT FEE FUND

Page 45: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

FIRE IMPACT FEE FUND

  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $144,293 $222,693 $304,593 $389,793 $478,793

TOTALEXPENDITURES $150,000

Page 46: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Fire Impact Fee Fund

  FY 11 FY12 FY 13 FY 14 FY 15

Fire Station # 26 – Seminole Woods $150,000

Page 47: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

TRANSPORTATION IMPACT FEE

FUND

Page 48: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

TRANSPORTATION IMPACT FEE FUND

  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE

FUNDS$6,804,100 $8,394,300 $6,427,800 $1,979,700 $2,080,100

TOTALEXPENDITURES $4,950,000 $7,000,000 $5,800,000 $1,400,000 $1,400,000

• Revenues are lower than current project commitments by $4mil

Page 49: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Transportation Impact Fee

Fund  FY 11 FY12 FY 13 FY 14 FY 15

Belle Terre Parkway 4 Laning $2,500,000

Palm Harbor Extension $250,000 $250,000

Palm Coast Parkway 6 Laning $1,500,000 $5,000,000 $4,000,000

Old Kings Rd. Extension $280,000 $750,000 $750,000

North Pine Lakes Parkway Improvement

North Old Kings Road 4 Laning $420,000 $1,000,000

Belle Terre Parkway-Palm Coast Parkway to

Pine Lakes Parkway$150,000 $500,000 $500,000

Page 50: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

STREETS IMPROVEMENT

FUND

Page 51: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

STREETS IMPROVEMENT FUND

  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $6,733,652 $6,109,152 $6,936,452 $9,095,052 $11,680,952

TOTALEXPENDITURES $6,463,900 $5,130,900 $3,930,400 $3,637,100 $3,640,300

• Added North Pine Lakes Parkway from Impact Fee Fund• ½ cent sales tax expires after FY2012, budget FY13-FY15 reflects renewal by voters

Page 52: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Streets Improvement Fund

  FY 11 FY12 FY 13 FY 14 FY 15

Street Paving and Resurfacing $4,338,900

$4,555,900

$2,535,400

$2,662,100

$2,795,300

Royal Palms Parkway Shoulders

Intersection/Turn Lane Improvements $350,000 $400,000

Signage Upgrades Complete

Traffic Signals $470,000 $270,000

Guardrail Safety Improvements $250,000 $200,000 $200,000 $200,000 $200,000

Pavement Marking $75,000 $75,000 $75,000 $75,000 $75,000

North Pine Lakes Parkway Improvements

$1,500,000

Whiteview Parkway Shoulders

Page 53: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

CAPITAL PROJECTS FUND

Page 54: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

CAPITAL PROJECTS FUND

  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $11,648,429 $12,891,929 $1,925,829 $1,977,329 $1,445,929

TOTALEXPENDITURES $10,683,500 $12,795,100 $1,660,000 $1,700,000 $1,010,000

Page 55: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Capital Projects Fund - 1 of 2

  FY 11 FY12 FY 13 FY 14 FY 15

Fire Station #22 Replacement $200,000 $1,000,000 $1,200,000

Industrial Park

Bridge Rehabilitation $910,000 $810,000

Holland Park Renovation $112,500

Indian Trails Sports Complex $330,000

Sidewalks and Bike Paths $5,798,900 $3,455,100

Community Development Software $70,000

Page 56: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Capital Projects Fund - 2 of 2

  FY 11 FY12 FY 13 FY 14 FY 15

800 Mhz System Improvements $300,000 $300,000 $300,000 $300,000

Parkway Beautification $200,000 $40,000 $360,000 $200,000 $200,000

Gateway Corridor Beautification $1,472,100

Longs Landing $215,000

Park Renovation $75,000

City Hall $1,200,000 $8,800,000

General City Project Planning

Page 57: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

SR 100 CRAFUND

Page 58: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

SR 100 CRA FUND

  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $3,265,490 $11,962,421 $4,212,083 $2,316,759 $2,249,483

TOTALEXPENDITURES $2,329,369 $9,054,938 $3,255,824 $1,506,276 $1,506,294

Page 59: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

SR100 CRA Fund

  FY 11 FY12 FY 13 FY 14 FY 15

Bulldog Drive $400,000 $2,200,000 $1,800,000

Midway $1,000,000

Whispering Pines

Central Park $150,000

Page 60: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

MISCELLANEOUS FUNDS

Page 61: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

OLD KINGS ROAD SPECIAL ASSESSMENT

FUND  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $50,000,000 $4,500,000 $4,500,000 $4,500,000

TOTALEXPENDITURES $50,000,000 $4,500,000 $4,500,000 $4,500,000

Page 62: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

DEVELOPMENT SPECIAL PROJECTS FUND

  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $1,164,905 $1,187,905 $1,210,905 $1,234,905 $1,258,905

TOTALEXPENDITURES

Page 63: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

UTILITY CAPITAL PROJECTS

FUND

Page 64: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

UTILITY CAPITAL PROJECTS FUND

  FY 11 FY12 FY 13 FY 14 FY 15

TOTALAVAILABLE FUNDS $24,911,434 $28,081,334 $24,033,334 $7,771,134 $7,847,334

TOTALEXPENDITURES $23,576,000 $26,344,000 $20,861,000 $4,734,000 $7,204,000

Page 65: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Utility Capital Projects Fund - 1 of 2

  FY 11 FY12 FY 13 FY 14 FY 15

Wellfield & Wells $4,840,000 $800,000 $827,000 $1,050,000 $1,300,000

Water Mains $1,250,000 $1,250,000 $2,000,000

Distribution System Improvement $200,000 $200,000 $200,000 $200,000 $200,000

Water Treatment Plant #1 $25,000 $250,000 $250,000

Water Treatment Plant #2 $3,405,000 $3,000,000

Water Treatment Plant #3 $250,000 $500,000Utility Land Acquisition $250,000 $250,000 $250,000 $250,000 $250,000

General Plant R&R Water $500,000 $250,000 $250,000 $250,000 $250,000

Misc Utility Services $71,000 $129,000 $149,000 $179,000 $149,000

Wastewater Treatment Plant #1 $2,930,000 $3,200,000 $500,000

Wastewater Treatment Plant #3 $500,000

Page 66: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Utility Capital Projects Fund - 2 of 2

  FY 11 FY12 FY 13 FY 14 FY 15 Lift Stations & Pump Stations $1,555,000 $1,805,000 $805,000 $455,000 $455,000

Force Mains $2,000,000 $1,250,000

Reclaimed Water $400,000 $1,000,000 $3,600,000

PEP System $600,000 $600,000 $600,000 $600,000 $600,000

Wastewater Treatment Plant #2 $1,300,000 $11,360,000 $9,180,000

General Plant R&R Wastewater $500,000 $250,000 $500,000 $250,000 $500,000

Beachside Sewer System $2,500,000 $1,000,000

Coquina Coast Sea Water Desalination $1,250,000 $1,000,000 $1,000,000 $1,000,000 $2,000,000

Page 67: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

FLEET MANAGEMENTFUND

Page 68: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

FLEET MANAGEMENT

 Actual

FY09

BudgetFY 10

Estimated FY 10

Proposed FY 11

REVENUES $3,640,319 $5,864,400 $4,457,077 $3,673,297

EXPENDITURES $2,851,112 $5,864,400 $4,457,077 $3,673,297

Page 69: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

FLEET CAPITAL FUND

Page 70: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

FLEET MANAGEMENT FUND

  FY 11 FY 12 FY13 FY 14 FY 15

TOTALAVAILABLE FUNDS $4,784,884 $5,862,771 $4,707,026 $5,212,513 $6,578,389

TOTALEXPENDITURES $2,575,255 $5,036,830 $3,417,200 $2,619,100 $2,292,700

Page 71: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Fleet Management Fund - 1 of 2

  FY 11 FY 12 FY13 FY 14 FY 15FLEET: . Community Relations $15,200 Financial Services $21,200 Planning $42,100 Code Enforcement $213,530 $13,600 Fire $19,700 $438,600 $135,400 $28,000 Streets $207,080 $771,100 $538,700 $59,700 $117,000 Facilities Maintenance $25,600 Engineering $162,600 $13,600 Parks/Facilities $62,100 $54,730 $26,700 $33,300

Utility Administration $107,900 $22,000 Utility

Maintenance $190,500 $73,350 $34,500

Wastewater Collection $17,590 $412,500 $623,300 $203,000 $63,800

Page 72: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Fleet Management Fund - 2 of 2

  FY 11 FY 12 FY13 FY 14 FY 15

FLEET (continued): . Wastewater Treatment $63,500 $75,900 Water Plant #1 $75,800 Water Plant #2 $29,900 Water Plant #3 $13,300 Water Quality $80,100 Water Distribution $79,000 $228,970 $99,900 $206,300

Stormwater Management $401,400 $93,200 $48,900 $137,500

Building Permits & Inspections $89,900 $13,600

Golf Course $49,600 $49,400

Information Technology & Communications $16,400 $20,000

Fleet Management $97,600

Page 73: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

ITEMIZED VEHICLESVehicle Cost

Passenger Van – Fire $19,700Pickups (Crew Cab & 4x4) (2-Streets/1-Utility) $52,770Dump Truck – Stormwater $110,00030 Ton Trailer – Stormwater $30,000Bush Hog – Stormwater $15,400Utility F-350 – Stormwater $35,000Utility Body F-550 – Stormwater $35,000Mini-Excavator – Stormwater $70,000Mowers – Streets (5) $158,100Multi-Terrain Loader – Utility $79,000Skid Loader – Streets $26,400Skid Steer – Stormwater $91,000Spray Rig – Parks $24,000Top Dresser – Parks $15,500Trailer – Stormwater $15,000Utility Body – Streets $10,000

Page 74: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

PassengerVehicles

SpecialtyVehicles

Off-RoadEquipment Total

General Fund 83 23 43 149

Utility Fund 66 12 7 85

Stormwater Management Fund 10 5 10 25

Building Permits & Inspections Fund 8 0 0 8

Golf Course Fund 0 0 13 13

Information Technology & Communications Fund 2 0 0 2

Fleet Management Fund 3 0 0 3

172 40 73 285

ITEMIZED VEHICLES

Page 75: 2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

• Tue - Sept 8 Public Hearing to tentatively 5:05 P.M. adopt Millage Rate and

Budget.

• Tue - Sept 21 Public Hearing to adopt final 5:05 P.M. Millage Rate Resolution and

Budget Resolution.

ADOPTION OF BUDGET