2009 IBC Seismic for Abu Dhabi

11
Copyright© 1994~2010 Forum Engineers. All rights reserved. SEISMIC DESIGN BASE SHEAR 1 Occupancy Category = I. Substantial Hazard to Human Life If F III ─► = 1.25 (2009 IBC Table 1604.5) = 1.15 = 58 g% ─► = 1.540 = 18 g% ─► = 3.260 Site Class = E ─► Soft soil profile = E (ASCE 7-05 Table 20.3-1) = 89.3 g% ─► = 0.595 (MCE Spectral Response Acceleration @ 0.2-second Period) 3 = C = 58.7 g% ─► = 0.391 (MCE Spectral Response Acceleration @ 1-second Period) 4 = D = C Base Shear per Eq. (12.8-2) Diaphragm Type of the Structure: = 1.400 S1 < 0.75g + Rigid Diaphragm ─ ─ ─► SDC determined by Ss only (Section Ta < 0.8 Ts T < Ts Basic Resisting System = Cantilevered Column System ─ ─ ─► onse Modification Coefficient = 2 1/2 Lateral Resisting Elements = Special reinforced concrete moment frames System Overstrength Factor = 1 1/4 flection Amplification Factor = 2 1/2 CnSpncremes = ### CnSpncremes = 0.9 0 = 0.66 = 4 = 0.16 Structure Height Limit (m) = 10.7 = 0.23 = 1.47 = 0.23 Equivalent Lateral Force Procedure is permitted! < 3.5Ts ASCE 7-05 Equation (12.8-2) = = 0.298 ASCE 7-05 Equation (12.8-3) = SD1 / T / ( R / I ) W = 0.861 ASCE 7-05 Equation (12.8-5) = = 0.033 (12.8-2) need not exceed (12.8-3) and shall not be less than (12.8-5) ─► SEISMIC BASE SHEAR (LRFD) = 0.298 ASCE 7-05 Section 2.4.1 ─► SEISMIC BASE SHEAR (ASD) = 0.208 How to Enter Data (Emirate of Abu Dhabi Building Code & ASCE 7-05 ) - in Metric System Ver Seismic Importance Factor, IE Wind Importance Factor, IW Mapped S.R.A. = Ss Site Coefficient, Fa Mapped S.R.A. = S1 Site Coefficient, Fv SMS = Fa Ss 2/3 times S MS = SDS Seismic Design Category per S DS SM1 = Fv S1 2/3 times S M1 = SD1 Seismic Design Category per S D1 Seismic Design Category E 7-05 Table 12.8-1) Coefficient, Cu (ASCE 7-05 Table 12.8-2) Numerical Coefficient, Ct (ASCE 7-05 Table 12.8-2) Numerical Coefficient, x Period at Transition Point, Ts Structure Height, hn (m) Approximate Fundamental Period, Ta per Limit of Calculated Period, Tmax Calculated Period, Tcal Period to be used in calculations, T (ASCE 7-05 Table 12.6-1) T SDS / ( R / I ) W 0.044 SDS I W 0.01 W Developed by: Forum E

description

calculation.

Transcript of 2009 IBC Seismic for Abu Dhabi

Page 1: 2009 IBC Seismic for Abu Dhabi

Copyright© 1994~2010 Forum Engineers. All rights reserved.

SEISMIC DESIGN BASE SHEAR 4/17/2023

Occupancy Category = III. Substantial Hazard to Human Life If Fail III ─► = 1.25

(2009 IBC Table 1604.5) = 1.15

= 58 g% ─► = 1.540

= 18 g% ─► = 3.260

Site Class = E ─► Soft soil profile = E(ASCE 7-05 Table 20.3-1)

= 89.3 g% ─► = 0.595 g

(MCE Spectral Response Acceleration @ 0.2-second Period) 3 = C

= 58.7 g% ─► = 0.391 g

(MCE Spectral Response Acceleration @ 1-second Period) 4 = D= C

Base Shear per Eq. (12.8-2) Diaphragm Type of the Structure: = 1.400

S1 < 0.75g+

Rigid Diaphragm─ ─ ─► SDC determined by Ss only (Section 1613.5.6.1)

Ta < 0.8 Ts T < Ts

Basic Resisting System = Cantilevered Column System─ ─ ─►

Response Modification Coefficient = 2 1/2 …….. R

Lateral Resisting Elements = Special reinforced concrete moment frames System Overstrength Factor = 1 1/4 ……..

Deflection Amplification Factor = 2 1/2 ……..

CnSpncremes = 0.0466CnSpncremes = 0.9

0 = 0.66

= 4 = 0.16Structure Height Limit (m) = 10.7 = 0.23

= 1.47 Second(s)

= 0.23

Equivalent Lateral Force Procedure is permitted! < 3.5Ts = (2.30)

ASCE 7-05 Equation (12.8-2) = = 0.298 WASCE 7-05 Equation (12.8-3) = SD1 / T / ( R / I ) W = 0.861 W

ASCE 7-05 Equation (12.8-5) = = 0.033 W

(12.8-2) need not exceed (12.8-3) and shall not be less than (12.8-5) ─► SEISMIC BASE SHEAR (LRFD) = 0.298 W

ASCE 7-05 Section 2.4.1 ─► SEISMIC BASE SHEAR (ASD) = 0.208 W

How to Enter Data

(Emirate of Abu Dhabi Building Code & ASCE 7-05) - in Metric System

Version: 3A

Seismic Importance Factor, IE

Wind Importance Factor, IW

Mapped S.R.A. = Ss Site Coefficient, Fa

Mapped S.R.A. = S1 Site Coefficient, Fv

SMS = Fa Ss 2/3 times S MS = SDS

Seismic Design Category per S DS

SM1 = Fv S1 2/3 times S M1 = SD1

Seismic Design Category per S D1

Seismic Design Category

(ASCE 7-05 Table 12.8-1) Coefficient, Cu

Ωo

Cd

(ASCE 7-05 Table 12.8-2) Numerical Coefficient, Ct(ASCE 7-05 Table 12.8-2) Numerical Coefficient, x

Period at Transition Point, Ts

Structure Height, hn (m) Approximate Fundamental Period, TaUpper Limit of Calculated Period, Tmax

Calculated Period, Tcal

Period to be used in calculations, T

(ASCE 7-05 Table 12.6-1) T

SDS / ( R / I ) W

0.044 SDS I W ≥ 0.01 W

(Eh)

(0.7 Eh)

Developed by:Developed by:

Forum EngineersForum Engineers

E1
!!! WARNING !!! Make sure macros are enabled; otherwise, this spreadsheet won't work correctly. <Tab> key After typed in a number or selected an item from the drop-down menu, press the <Tab> key to jump to the next input cell. Color Convention ► Input Data ► Linked or calculated Values ► Reference ► Final Values or Warning Messages
G29
Tcal shall not exceed Tmax. It is permitted to use the approximate fundamental period, Ta, as Tcal. T = Min (Tmax, Tcal)
G30
T = Min (Tmax, Tcal) T must be smaller than Ts in order to use Ss only to determine the Seismic Design Category.
Page 2: 2009 IBC Seismic for Abu Dhabi

Copyright© 1994~2010 Forum Engineers. All rights reserved.

Second(s)

(Eh)

(0.7 Eh)

Forum EngineersForum Engineers

Page 3: 2009 IBC Seismic for Abu Dhabi
Page 4: 2009 IBC Seismic for Abu Dhabi
Page 5: 2009 IBC Seismic for Abu Dhabi
Page 6: 2009 IBC Seismic for Abu Dhabi
Page 7: 2009 IBC Seismic for Abu Dhabi
Page 8: 2009 IBC Seismic for Abu Dhabi
Page 9: 2009 IBC Seismic for Abu Dhabi
Page 10: 2009 IBC Seismic for Abu Dhabi
Page 11: 2009 IBC Seismic for Abu Dhabi