2007.5.9 FJPPL Suekane 1

Nu_2-WP2:R&D of detectors for future high statistics, high precision experiment

(R&D for reactor anti-neutrino experiments)

F.Suekane, Tohoku Univ.D. Motta, CEA

2007.5.9 FJPPL Workshop

@ KEK

Presenters

In short: R&D for Reactor 13 experiments

Page 2: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 2

Contents of this report

•General description of the Project

• 2006 Activities in Japan

•2006 Activities in France

by F.Suekane

by D.Motta

Page 3: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 3

2006 FJPPL Members

5 from France 4 from Japan

Page 4: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 4

2006 Mission & Budget plan

Travel expense: 2x ( France <--> Japon )

Exchange Information ofKASKA and Double CHOOZ

Page 5: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 5

from 2007 Proposal

5 from France 4 from Japan

Page 6: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 6

2007 Proposal

Travel Expenses

Exchange information to proceed DC R&D

Page 7: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 7

KamLANDSolar experimens

SuperKamikandeK2K, MINOS

Purpose of the experiments

e

2 out of 3 Oscilltions have been confirmed.

Purpose: To find out the 3rd oscillation by Reactor

Page 8: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 8

Reactor Neutrino Oscillation

0

0.2

0.4

0.6

0.8

1

1.2

0.1 1 10 100 1000

L(km)

P(_e -->

_e )

13 Measurement by Reactor

sin2213=0.1

Normal Hierarchy

   Inverted Hierarchy

KamLAND

P ν e → ν e( ) =1− sin2 2θ13sin2 Δm132 L

4E

E=4MeV

Measure 13 at distance 1~2km from reactors

Page 9: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 9

Reactor 13 Experiment

Reactors

Near Detector(L<500m)

Far Detector(L~1km)

~1.5km

• Measure Disappearance at a distance 1~2km• Small Oscillation Amplitude => Precise measurement is necessary => 2 detectors to cancel systematics => Underground to reduce cosmic-ray backgrounds

Page 10: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 10

KASKA & DoubleChooz

Kashiwazaki-Kariwa Nuclear Power Station

Chooz Power Station

Early 2006

Page 11: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 11

R&Ds were going in parallel

Mass Measurement

KASKA DoubleChooz

Page 12: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 12

2006.9 KASKA Merged to DCHOOZ

KASKA R&D

Double Chooz R&D

Double Chooz Construction

Japan side France side

The FJPPL fund was used for mutual visits to discuss how to unify the two projects.

Merge 2006.9

Page 13: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 13

Page 14: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 14

Far detector only

Far & Near detectorstogether

08/2008 2009

sys=2.5%

sys=0.6%

Current limit

20122009 201220112010 2013 2014

Page 15: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 15

R&D in Japan before the Merge

KASKA Prototype

0.9m3

Gd-LS

0.05% Gd Liquid Scintillator (900L)

Lead Shields

Cosmic-ray anti-counters

Light shield

Paraffin Blocks

N2

to study Gd signalto study BKGto observe reactor

Page 16: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 16

å¥éqòFäi î[ óeäÌ

îRóøåä∑ã@ îRóøèoì¸ ã@

âÒì] ÉvÉâÉOãÏ ìÆëï íu

ìÒéüó‚ãpånÉiÉgÉäÉEÉÄ

éÂíÜä‘îMåä∑äÌ

àÍéüó‚ãpånÉiÉgÉäÉEÉÄ éÂèzä¬É|ÉìÉv

å¥éqòFåöâ∆

å¥éqòFït ëÆåöâ∆

å¥éqòFóeäÌ

òFêS

êßå‰ñ_ãÏìÆëïíu

Éj ÉÖÅ[ÉgÉäÉmåüèoäÌ

ÉgÉâÉì ÉXÉtÉ@Å[ÉçÅ[É^

Fast Reactor Pth=140MWFrequent ON/OFFL~25m~150 pen reaction/day

25m

KASKA Prototype@Joyo research reactor

KASKA prototype

Currently taking data

Page 17: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 17

PMT

TTS=2.5ns

Low BKG Glass

Hamamatsu 10"PMT

It is possible to make10"PMT glass as low BKG.

~400/detector13% coverage

1pe signals

Page 18: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 18

Gd-LS long term stability tests

(preliminary)

BC521 : Pseudocumen(PC) : Tetradecane(TD)

= A ‥ 20% : 20% : 60% B ‥ 30% : 10% : 60% C ‥ 20% : 10% : 70%

T=20deg

T=30deg

T=40deg

No aging at room temp. for 240days

KASKAcandidate

Page 19: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 19

Calibration:Wire manipulation

Mechanical Test Test at prototype (planning)

weight

hook hook

Source

(between PMTs)

Page 20: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 20

Designing WorkWith KEK Engineering Div.

Page 21: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 21

1/2 scale inner acrylic dorm.=90cm, t=1cm)

-> manufacturing method.-> Test of achievable precision

Page 22: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 22

Construction sequence

âFíàê ÉgÉâÉbÉJÅ[ê›íu PMTéxéùëï íuâ∫ïî ê›íu äOïî ÉAÉNÉäÉãóeäÌâ∫ïî ê›íu ì‡ ïî ÉAÉNÉäÉãóeäÌê›íu äOïî ÉAÉNÉäÉãóeäÌëgóß

ì‡ ïî ÉAÉNÉäÉãóeäÌÉ ÉÄÉjÅ[ãyÇ—PMTéÊÇËït ÇØ

äOïî ÉAÉNÉäÉãóeäÌÉ ÉÄÉjÅ[éÊÇËït ÇØ

PMTéÊÇËït ÇØÉ ÉÄÉjÅ[ÇÉXÉeÉìÉåÉXÉ ÉìÉNÇ…å≈íË

ìSÉVÅ[ÉãÉhÅAè„ïî âFíàê¸ÉgÉâÉbÉJÅ[ê›íu

Page 23: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 23

  LoI: hep-ex/0607013

~80 pages

Page 24: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 24

After the Merge to DCHOOZ

7m

HV

DividerMonitor

PMT(~800)

Tefloncable

Electro-nics

Front-EndElectronics

Take responsibility of PMT system

Page 25: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 25

Completed Low-BG Oil-Proof PMT design

Page 26: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 26

PMT testing box

Page 27: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 27

PMT Delivery Box

QuickTime˛ Ç∆TIFFÅiLZWÅj êLí£ÉvÉçÉOÉâÉÄ

ǙDZÇÃÉsÉNÉ`ÉÉÇ å©ÇÈÇΩÇflÇ…ÇÕïKóvÇ≈Ç∑ÅB

Ready to GO.

Page 28: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 28

2007 and Beyond2007 20092008 2011 2012 2013

1 2 3 4 5 6 7 8 9 O N D 1 2 3 4 5 6 7 8 9 O N D 1 2 3 4 5 6 7 8 9 O N D

FARInstallation

Activity in Japan

Activity in France

Receive, test

FAR data taking start

NEAR

NEAR data taking start

400PMTproduction

400PMTproduction

test test

Installationpreparation

Page 29: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 29

Next Speaker => Dario talks about

French Activities in 2006

Page 30: 2007.5.9FJPPL Suekane1 Nu_2-WP2: R&D of detectors for future high statistics, high precision experiment (R&D for reactor anti-neutrino experiments) F.Suekane,

2007.5.9 FJPPL Suekane 30

Summary

* Now Japan and France projects have unified as Double Chooz.

* Full proposal in 2006 (hep-ex/0606025)

* Material procurement underway

* 2007/08 is the DCHOOZ (Far det.) construction phase.

* The first data taking is expected to start in 2008 and the first result is expected to come out in 2010.