2000 South BellSPRC Wrap-Up Meeting
April 2021
Project Page: https://projects.arlingtonva.us/projects/2001-clark-st/
TABLE OF CONTENTS1. Block Plan Updates 1:092. Program 1:503. Clark-Bell Realignment 5:454. Community Benefits Recap 9:12
BLOCK PLAN
Block Plan Scenario Updates
Current Block Plan Scenario Proposed Block Plan Scenario
Final Proposed Block Plan Scenario
Final Proposed Block Plan Scenario illustrates:
• 60’ of separation that will be maintained between 2001 S. Bell and the future Crystal Plaza Apartments redevelopment
• Pedestrian connection and its relationship to future open space (Park 8)
PROGRAM
Crystal City: Aerial Plan View
N
2000/2001 SITE
Existing Site
2000/2001 SITE
N
Aerial View Looking South
2000 S. Bell2001 S. Bell
N
Parking Entry Off Alley
RIC
HM
ON
D H
WY
Pedestrian Connection
Retail Elevator to Garage & Underground
Residential EntryLoading
Loading
Site Plan Retail Entry
2000 S. Bell2001 S. Bell
2000 S. BELL ZONING SUMMARYZONING C-O CRYSTAL CITY
2000 S. BellHEIGHT 250’*
RESIDENTIAL GFA 367,040UNIT COUNT 338RETAIL GFA 12,244
PARKING SPACES** 157
*Excludes mechanical penthouse per Arlington County regulations**Garage is singular plate connecting both towers, inclusive of 5 visitor spaces
2000 & 2001 S. BELL ZONING SUMMARY
ZONING C-O CRYSTAL CITY
VEHICULAR BIKEBUILDINGS 2000 & 2001 S. Bell
SPACES 247 332*UNIT COUNT 758 -
RATIO .325 -*Exceeding Arlington County’s Bicycle Parking Requirements
2000 S. Bell Ground Floor
13
Angled loading docks and distinct loading zone to eliminate conflicts with
transitway
N
Simplified build to line, maintaining consistent
façade along Rt. 1
Residential entry setback creates outdoor
space to relieve pressure on the
sidewalk
Shifted building 6.5’ north and added 4-floor cantilever
element to accommodate gentler curve of Clark-Bell
2000 S. Bell – Podium/Ground Floor Updates
14
2000 S. Bell – Tower Views
20th StBell StFrom Route 1 South From Route 1 North
CLARK-BELL REALIGNMENT
17
Clark-Bell Alignment
Sector Plan: Proposed Final ConditionExisting Conditions
Interim Conditions/Phasing Not Included in Sector Plan
Clark-Bell Alignment
18
Coordinated a revised interim condition based on updated guidance from DES to address major concerns such as:
• Right-of-way services
• Sidewalk dimensions
• Additional detail for turning & loading movements
• Additional information on Clark-Bell alignment throughout the block over time
2000 S. Bell
2001 S. Bell
Ultimate S. Bell Street Alignment
19
Sections of Clark-Bell delivered with 2000 & 2001 S. Bell and southern end of the block will function in both the interim condition and ultimate condition per the Crystal City Sector Plan
20
Streetscape Updates
5’ bike lanes with 2.5’ protection running N / S
along Clark-Bell
10’ dual direction bike lane
Clark-Bell Streetscape
Clark-Bell RoW Key Characteristics
Sector Plan 80’ • Single track, 6’ protected bike lane
Initial Proposal 72’ • Single track, 6’ protected bike lane
Final Proposal 76.5’ • Two separate single-direction, 5’ protected bike lanes
• 14’ sidewalks, 8’ clear sidewalk
Clark-Bell Streetscape
Initial Proposal Final Proposal
Crystal City Sector Plan
Connector Road Streetscape
Connector Road RoW Key Characteristics
Initial Proposal 35’ • Single track, 6’ protected bike lane
Final Proposal 38’ • Single, dual direction 10’ bike lane
Initial Proposal Final Proposal
COMMUNITY BENEFITS RECAP
2000 & 2001 S. Bell Specific Bonus Density & Community Benefits
25
Library Operations Support • Additional Funding for Library under 1901 S. Bell to be constructed per PDSP commitments:
$250K annually for 5 years; $1.25MOpen Space
• Design, construction, and easement for new pedestrian pathwayInfrastructure Improvements
• Realignment and easement dedication of Clark-Bell St.• Improvements to Rt.1 & 20th St. Intersection
Underground • Preservation and installation of improved underground connection
Sustainability • LEED Gold, Bird-Friendly Materials, Net-Zero Analysis & 12% over ASHRAE
Affordable Housing• Dedication of affordable units per Base Density requirements
Public Art • Doubling standard contribution to public fund: $150K Contribution
26
COMMUNITY BENEFITSOPEN SPACE
Pedestrian Pathway
27
Pedestrian Pathway Connection and Future Open Space #8
N
28
Ped Pathway and Open Space #8 Area Overlap ≈ 1,700 SF
N
29
COMMUNITY BENEFITSINFRASTRUCTURE IMPROVEMENTS
Clark-Bell St. Construction & Easement
30
Existing Conditions Sector Plan Phase to be delivered with 2000/2001
No interim conditions/phasing included in sector plan
Clark-Bell St. Construction & Easement
31
Rt 1 / 20th St. Intersection Improvements
32
Sector Plan
33
COMMUNITY BENEFITSUNDERGROUND PRESERVATION & ENHANCEMENT
N 34
Proposed Mid-path connection to open space
RIC
HM
ON
D
HW
Y
2001 S. Bell2000 S. Bell
Existing Route vs Proposed Connection
Crystal City Shops ExitExisting Underground Connection
Elevator connection between G1 & G2
Renderings
35
G1 Level
G2 Level
36
COMMUNITY BENEFITSSUSTAINABILITY
Current Commitments:- LEED Gold- Bird Glass per Arlington Standards- 12% Energy Reduction above ASHRAE 90.1-202- Carbon Neutral Study
37
2000 & 2001 S. Bell St. Sustainability MeasuresPDSP Standard
- LEED Silver
LEED Scorecard
Achieving LEED Gold
Benefits Recap
39
Library Operations Support • Additional Funding for Library under 1901 S. Bell to be constructed per PDSP
commitments: $250K annually for 5 years; $1.25MOpen Space
• Design & installation of new pedestrian pathwayInfrastructure Improvements
• Realignment and easement dedication of Clark-Bell St.• Improvements to Rt.1 & 20th St. Intersection
Underground • Preservation and installation of improved underground connection
Sustainability • LEED Gold, Bird-Friendly Materials, Net-Zero Analysis & 12% over ASHRAE
Affordable Housing• Dedication of affordable units per Base Density requirements
Public Art • Doubling standard contribution to public fund to $150K