    AT&T NETWORK 

    20 sites IPPM active

    Prepared by: LIYANLONG ate: !"#"20$!

    Revie%ed by: ate:

    Apprved by: ate: "

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    2/16

    Implementation Solution for Change

    'ONTENT

    1 Description of Change 4

    1.1 Description of Sites.................................................................................................4

    1.2 Purpose....................................................................................................................4

    1.3 Description of Change and Change Influence........................................................4

    1.4 License should be apply before a wee..................................................................!

    1." #ersion infor$ation................................................................................................!

    1.! I$pact on the Syste$ During the %d&ust$ent........................................................!

    1.' ()uip$ent *unning Chec.....................................................................................!

    2 Preparations for Change '

    2.1 During ++,++ -th to 23,++ -th Sep we need to as custo$er stop any operation

    with this two */Cs.....................................................................................................................'

    2.2 Change Period.........................................................................................................'

    2.3 Co$position of Change 0ea$ and *esponsibility of 0ea$ e$bers...................'

    2.2.1 Change Team of Huawei Company..............................................................................7 

    2.2.2 Huawei On-site Monitoring Team................................................................................7 

    2.2.3 Huawei Support & Guarantee Team............................................................................7 

    2.4 Change *iss and Counter$easures.......................................................................-

    2." Chec efore Change.............................................................................................-

    3 Procedure 11

    3.1 peration Steps for Change..................................................................................11

    3.2 ac up.................................................................................................................12

    3.3 Change Period.......................................................................................................1"

    3.4 Change step and operation....................................................................................1"

    4 #erifying the operation 1'

    4.1 Chec the */C C/ script hae already configured successfully..................1'

    4.2 Chec %lar$s after ad&ust$ent and ensure no related alar$s to this actiity......1-

    4.3 onitor 5PIs........................................................................................................1-

    " *ollbac 16

    ".1 *ollbac *esponsibility........................................................................................16

    ".2 erall Description of rollbac............................................................................16

    ".3 *ollbac Procedure...............................................................................................16

    ".4 Definition of change failure..................................................................................2+

    Technical support website:http://support.huawei.com

    Page 2 of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    3/16

    Implementation Solution for Change

    "." Infor$ation Collection efore rollbac...............................................................2+

    ".! Change bac steps.................................................................................................2+

    ".' 0ests after Change bac........................................................................................22

    ".'.1 %fter roll bac chec */C and /D( cells status nor$al or not...................22

    ".'.2 Chec if any new alar$s co$e out.......................................................................24

    ".'.3 Chec the serice on site for */C users runs well..............................................24

    ".'.4 onitor 5PIs........................................................................................................24

    ".- Change bac *is analysis...................................................................................24

    ! *esources 2"

    Technical support website:http://support.huawei.com

    Page 3 of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    4/16

    Implementation Solution for Change

    $ escripti( ) '*a(+e

    1.1Description of Sites

    e!ico cit" 2# sites nee$ acti%e IPP to chec& the transmission;

    1.2 Purpose

     'cti%ate IPP of 2# sites to chec& the transmission.

    1.3 Description of Change and Change Influence

    This acti%ation of IPP is to chec& the transmission (ualit" between )*C an$ *+,-

    0hen acti%e we will use the information of +S 

    , so if the +S configuration on the T

    is $ifferent with )*C*+,- 

    , there will has alarms 

    , an$ we nee$ tr" to fi! it

    together with transmission team.

    1.4 5icense .

    This operation not relate$ to license.

    1. 7ersion information

    Current #ersion,

    */C, #6++*+1!C++SPC!!+

     /D(, #1++*++6C++SPC23+

    72+++, #2++*+14C++SPC22+

    0he current ersion supports to i$ple$ent these ad&ust$ents.

    1.! I$pact on the Syste$ during the %d&ust$ent

    *o affect for the ser%ice.

    1.' ()uip$ent *unning Chec

    efore operation8 ma&e sure no T problems of this site,an$ all cells are normal.

    Technical support website:http://support.huawei.com

    Page 4 of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    5/16

    Implementation Solution for Change

    2 Preparati(s )r '*a(+e

    2.1 During ++,++ !th to +",++ !th %pr. we need to as custo$er stop any operation

    with this */C and sites.

    2.2 Change Period

      de_B_M2000 Tracker

    Date

    8ID96+21:+!3+:0ulancingo:II 8ID96+21 ++,++;+",++ %pr '

    8ID96+26:+!33::0ulancingo   ++,++;+",++ %pr '

    C*629+++!%:++66:C%(:0ulancingo   ++,++;+",++ %pr '

    C*629

    ++"4%:+3!4:Calle:Sinaloa:0ulancingo:I 

    ++,++;+",++ %pr '

    C*629++12%:+141:(letra:0ulancingo   ++,++;+",++ %pr '

    8ID96++6:+!31:0ulancingo   ++,++;+",++ %pr '

    2.3 Co$position of Change 0ea$ and *esponsibility of 0ea$ e$bers

    -Wireless Team 'cti%it" e!ecution

    -RF Team: Performance anal"sis

    2.2.1 Change 0ea$ of 8uawei Co$pany

     /a$e *esponsibility 0elephone /o.

    Technical support website:http://support.huawei.com

    Page of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    6/16

    Implementation Solution for Change

    raulio >ireless Depart$ent 9#49#99

    2.2.2 8uawei n9site onitoring 0ea$

     /a$e *esponsibility 0elephone /o.

    5uis -$win >ireless Depart$ent 1##9#;41

    *? Depart$ent

    2.2.3 8uawei Support @

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    7/16

    Implementation Solution for Change

     'CT IPP on

    )*C*+,- si$e

    +pen =2###,run

    comman$

    8an$ cop" the script into

    this. then run the

    comman$.

    raulio

    -nri(ue

    12:##

    Chec& the alarms Chec& the alarmsraulio

    -nri(ue

    1:##

    4Chec& the IPP >PI Chec& the >PI of IPP

    raulio

    -nri(ue

    2:##

    )ollbac& ?if change

    operation failure @

     'cti%e the bac&up CA<

    Aile an$ connect the

    original ))= an$

    antennas bac&.

    raulio

    -nri(ue

    before

    4:3#

    3.2 ac& up Query Alarms

    btain the current alar$ list and sae. In the ain 0opology clic right button

    on the */C select Euery %lar$F(ent and then choose %lar$ List.

    Backup license;

    RNC CFGMML and backup files

    7se 2+++ bacup function to select related */C and bacup.

    Technical support website:http://support.huawei.com

    Page 9 of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    8/16

    Implementation Solution for Change

    %nd eport the configuration open target */C L0 run co$$and ,(AP C?

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    9/16

    Implementation Solution for Change

    acup C?

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    10/16

    Implementation Solution for Change

    3.3 Change Perio$

    The change perio$ is from ##:## to 1:##.

    3.4 Change step an$ operation

    A. Open the LMT of related RNC:Select the target )*C an$ clic& right button on mouse8 then select the aintenance Client8

    "ou will open the 5T .

    B. Run the ACT IM s!ripts on RNC:

    Technical support website:http://support.huawei.com

    Page 1# of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    11/16

    Implementation Solution for Change

    ACT IPPM.txt

    C. Run the A"" IM#$##ION s!ripts on NO"$B:

    ADD

    IPPMSESSION.txt

    Technical support website:http://support.huawei.com

    Page 11 of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    12/16

    Implementation Solution for Change

    # .eri)yi(+ t*e perati(

    4.1 Chec& the )*C +C* script ha%e alrea$" configure$ successfull". 

    =se the comman$s to chec& the configurations are all normal:

    )*C si$e:

    =se comman$:,SP IPP to chec& if the IPP status is =P or not;

    *+,- si$e:

    =se comman$ ,SP IPPS-SSI+* to chec& the IPP status is =P or not;

    4.2 Chec& 'larms after a$Bustment an$ ensure no relate$ alarms to this acti%it".

    4.3 onitor >PIs

    GIf the %erification results are normal8 the operation is successful.

    If a fault occurs $uring the %erification an$ cannot be rectifie$8 perform the rollbac&.

    Technical support website:http://support.huawei.com

    Page 12 of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    13/16

    Implementation Solution for Change

    / Rbac1

    .1)ollbac& )esponsibilit"

     /a$e *esponsibility 0elephone /o.

    raulio -nri(ue >ireless Depart$ent 9#49#99

    *? Depart$ent

    .2 +%erall ,escription of rollbac&

    Change bac& the +C* 'cti%ation on )*C

    .3 )ollbac& Proce$ure

    * Change Step +peration Implementat

    ion Person

    Time

    1

    1

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    14/16

    Implementation Solution for Change

    A. Open the LMT for related RNC:Select the target )*C an$ clic& right button on mouse8 then select the aintenance Client8

    "ou will open the 5T.

    B. Fall%a!& RNC IM:

    DEA IPPM.txt

    C. Fall%a!& NO"$B IM

    RMV

    IPPMSESSION.txt

    .9 Tests after Change bac&

    .9.1 'fter roll bac&8 chec& whether the )*C an$ *+,- cellsE status are normal or not.

    =se the comman$s to chec& the configuration are all normal:

    )*C si$e:

    =se comman$:,SP IPP to chec& if the IPP status is =P or not;

    *+,- si$e:

    Technical support website:http://support.huawei.com

    Page 14 of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    15/16

    Implementation Solution for Change

    =se comman$ ,SP IPPS-SSI+* to chec& the IPP status is =P or not;

    .9.2 Chec& if an" new alarms come out.

    .9.3 Chec& the ser%ice on site for )*C users runs well

    .9.4 onitor >PIs

    .; Change bac& )is& anal"sis

    There is no ris& when we roll bac& because it was wor&ing well on the e(uipment before.

    Technical support website:http://support.huawei.com

    Page 1 of 16

  • 8/17/2019 20 Sites IPPM Active Apr6 to Apr7

    16/16

    Implementation Solution for Change

    ! Res-rces

    2### 'CC+=*TS

    Technical support website:http://support.huawei.com

    Page 16 of 16