2 Purchasing
Transcript of 2 Purchasing
-
8/3/2019 2 Purchasing
1/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 1
LABSMODULE:PURCHASINGSAPUsername _______________________________ Name _______________________________
1.CreateRawMaterialMenu LogisticsMaterialsManagementMaterialMasterMaterialCreate
(Special)RawMaterial
Trans.codeGBI
company
(retail
industry
sector
and
company
code
US##)
needs
to
produce
bicycles
to
fulfillcustomersdemands.Theyhavealreadychecked their inventory inplant DL##andtheystillneedotherrawmaterialnamely###bicyclelamp(LAMP###).Creatingspecialforthisrawmaterial,GBIspersonnelneedstoinsertBasicData1,Purchasing,
GeneralPlantData/Storage1,Accounting1andCosting1.
ThisrawmaterialhasBaseUnitofMeasureequalwithEA(Each)andincludedinBIKESmaterialgroup. Inaddition,purchasinggroupN##willhandletheprocurementofthisrawmaterial. Inordertodeterminewhichgeneralledgeraccountswillbeaffectedbytransactioninvolvingthis
material,the
valuation class of this material is 3000 We would like also to tell the system to
adjustthevalueofinventoryheldbythecompanyaspriceschangebysettingthepricecontroltoVandmovingpriceequalto1.75.Eachtimethismaterialispurchased,thecurrentpurchaseprice isusedtoupdatethevalueof
thecompanysinventoryofthismaterialusingamovingaverageformula.MakesurethatWithQty Structure and Material Origin are checked. The Qty (quantity) Structure setting tells thesystem that cost estimating will be done within a Bill of Material Structure (for discrete
manufacturing)orarecipe(processmanufacturing). TheMaterialOriginsettingtellsthesystem
torecordthematerialnumberwhenupdatingcosts involvingthismaterial,allowing formore
detailedcost
analysis.
YourRawMaterialNumber:______________________
-
8/3/2019 2 Purchasing
2/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 2
2.CreateNewVendorMenu LogisticsMaterialsManagementPurchasingMasterDataVendor
CentralCreate
Trans.codeNext,thecompanyneedstoentertheinformationforthevendorwhowillbeprovidingthisnew
rawmaterial.GBIwillcreatetheVendorcentrally,whichmeansthatwewillbeenteringboth
purchasing organization (US##) and accountingrelated data i.e. account group KRED in thistransaction.Theaccountgroupdefineswhichdataisrequired/possibleforthevendorandhow
thevendornumberwillbeassigned.
Thevendorsnameis###PortageMaterial(ArbocrestStreetNo.10postalcode49024PortageUS,regionMI)andhasjurisdictioncodeMI0000000.Thisvendorhasbeenassignedto300###reconciliation account and E1 for the cash management group. The reconciliation account istheoverall general ledgeraccount that is updated whenever anaccounting entry is made for
this vendor. Whenever an invoice is received from this vendor account 300100, which is the
accountspayablereconciliationaccount,willbeincreasedbytheamountoftheinvoiceaswell
as the sub ledgeraccount for this vendor. The reconciliation account allows the company to
easilykeeptrackofitstotalaccountspayable.Paymentterm0001isPaymentimmediatelyDuenet,whichmeansthatforthisvendor,therearenoearlypaymentdiscounts(like2%10,net30),the entire amount is due when the invoice is received. Then item Chk double inv. means incheckingforduplicateinvoices,thesystemcomparesthefollowingcharacteristicsbydefault:
Vendor Currency Companycode Grossamountoftheinvoice Referencedocumentnumber Invoicedocumentdate
Thisitemhelpsprevententeringaninvoicetwicesothatyoudontpayabilltwice.GBIandthis
vendorhavealreadyagreedtouseUSDcurrencyforalltransactionsand0001forthetermsofpayment(thesecondtimethishasbeenentered).
YourVendorNumber:______________________
3.CreatePurchaseOrderMenu LogisticsMaterialsManagementPurchasingPurchaseOrder
CreateVendor/SupplyingPlantKnown
Trans.code
-
8/3/2019 2 Purchasing
3/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 3
Withamaterialandvendordefined inthesystem,wecannowcreateapurchaseorder. This
purchaseordercontains:
Material:LAMP###
POquantity:100Deliv.Date: adatetwoweeksinthefutureNetPrice:1.75Currency:USDPlant:DL##InfoUpdateisNOTselected
PurchasingGroup: N##After saving the data and you will get the system message issued, click the save button. This
warningshownbecause inthissystem,wehavenotconfiguredanoutputdestination(printer,
fax,EDI,internet,etc.)forthepurchaseorderasthisisavirtualcompany.
InfoUpdate tells the SAP system that it should create a purchasing info record automatically
when this order is saved. The purchasing info record contains information about the
relationshipbetweenavendorandacustomer.Thepurchasinginforecordisausefultool,and
therereallyisntareasonwewouldntwanttocreateone,butasatest,wewillfirstseewhat
happenstothepurchasingprocesswhenwedonotcreateapurchasinginforecord.
YourPurchaseOrderNumber:______________________
4.Check
for
Purchasing
Info
Record
Next,wewillconfirmthatthesystemdidnotcreateapurchasinginforecordwasNOTcreated
whenwesavedthepurchaseorder. TheonlywaytoseeifsomethingdoesnotexistintheSAP
systemistotryandseeifitistherebysearching. Tolookforapurchasinginforecord,follow
themenupath:
Menu LogisticsMaterialsManagementPurchasingMasterDataInfoRecordDisplay
Trans.codeSearch
for
your
vendor (###PortageMaterial),entermaterialLAMP###,US##forPurchasing
Org,andDL## for Plantshouldbeenteredasdefaultvalues fromtheParameter IDs.Clickontheentericon( ). Confirmthatyourentriesarecorrect,andthenclickontheexiticon( )to
returntotheSAPEasyAccessscreen.
-
8/3/2019 2 Purchasing
4/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 4
5.ReceiveGoodsintoInventoryNext,wewillreceivethegoodsfromthepurchaseorderintoinventory. Todothis,followthe
menupath:
Menu LogisticsMaterialsManagementInventoryManagementGoodsMovementGoodsReceiptForPurchaseOrderGRforPurchase
Order(MIGO)
Trans.code
MakesuretousethePurchasingDocumentsforMaterialtab,thenenterLAMP###forMaterialandDL##forplantandclickontheenter. ClickontheWheretabtotellthesystemwhereweare putting the receipt (storage location RM## (Raw materials)). Makesure that Item OK isselected,meaningthat100lampswereintheshipmentandpassedinspection,thenclickonthe
save icon ( ). You should get a message like the following:
________________________________
Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
6.VerifyGoodsReceiptNext, we will verify that the goods receipt is now in the system by looking at the
Stock/RequirementsList. Todothis,followthemenupath:
Click on the search icon to fithe purchase order number
-
8/3/2019 2 Purchasing
5/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 5
Menu LogisticsProductionMRPEvaluationsStock/RequirementsListTrans.codeMake sure material LAMP### and plant DL## are entered, then click enter. Make sure yourmaterialandplantareproperlyspecifiedon the Individualaccess tab, thenclickon theenter
icon( ).Verify100lampsinstock.Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
7.CheckG/LAccountBalanceNotonlyshouldthelampsshowupinthematerialsmanagementarea,butitshouldalsoshow
uponthegeneralledgeraccounts. Toverifythis,followthemenupath:
Menu AccountingFinancialAccountingGeneralLedgerInformationSystemGeneralLedgerReports(New)LineItemsG/LAccount
Statements
Trans.codeEnter US## for Company code, the current year for fiscal year, the date you started thisexerciseasthePostingdate.Makesuretheselections:
G/LaccountlineitemsAssetlineitemsMateriallineitemsStandarddocuments
arechecked.Thenclickontheexecuteicon( ). ThiswillproducethefollowingreportonG/L
account 200####, InventoryRaw Material. The 100 units purchased have created a debit of
$175.00.TheG/Laccountreflectsthevalueoftherawmaterialsreceived. Clickontheexiticon
( )toreturntotheSAPEasyAccessscreen.
Note: You may have additional entries if you have performed other purchasing transactions
beforeworkingonthisexercise.
8.CreateaSecondPurchaseOrderWewillnowcreateasecondpurchaseordertodemonstratehowSAP:
Helpsmanagepurchasedmaterialprices AdjustsG/LrecordswithMovingAveragePrices
-
8/3/2019 2 Purchasing
6/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 6
CanautomaticallycreateapurchasinginforecordTocreateanotherpurchaseorder,wewillagainfollowthemenupath:
Menu LogisticsMaterialsManagementPurchasingPurchaseOrderCreateVendor/SupplyingPlantKnown
SAP tries to make data input easier by remembering the last configuration of a screen and
previousvaluesforfieldentries. Thistime,wedonthavetoclearouttheEnjoySAPwindowor
expandtheitemoverviewarea. Inaddition,wecanusethebackspacekeyonthevendorfield
to find the vendor number for ### Portage Materials and purchasing group North America(N##). Clicking on the enter icon ( ) calls up data about ### Portage Materials. Enter thematerial number (LAMP###),aquantity of 100anddelivery date a date twoweeks into thefuture,andANEWNETPRICEOF1.80.MakesurethatInfoUpdateisselectedthistime,sothatapurchasinginforecordwillbecreatedautomaticallywhenthisorderissaved.Clickonthesave
icon( )tosavethepurchaseorder. Youwillgetthefollowingmessage:
ClickontheSaveoptiontosavethepurchaseorder. Clickontheexiticon( )toreturntothe
SAP
Easy
Access
screen.
YoursecondPurchaseOrderNumber:______________________
9.CheckforPurchasingInfoRecordNext, we will confirm that the system created a purchasing info record when we saved the
secondpurchaseorder. Tolookforthenewpurchasinginforecord,followthemenupath:
Menu LogisticsMaterialsManagementPurchasingMasterDataInfoRecordDisplay
Searchforyourvendor(###PortageMaterial),entermaterialLAMP###,US##forPurchasingOrg,andDL## for Plantshouldbeenteredasdefaultvalues fromtheParameter IDs.Clickontheentericon( ).
Thepurchasing inforecordhasbeencreated,but littledatahasbeenmaintained.Clickonthe
Purch.org.data1icon.Nopricingorplanneddeliveryleadtimedatahasbeenmaintained.The
standardquantitywas taken from thepurchaseorder thatcreated the info record.While the
Click on Save
-
8/3/2019 2 Purchasing
7/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 7
purchasinginforecordhasnowbeencreated,there isvery littleusefuldatamaintainedatthis
point. Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
10.ReceiveGoodsintoInventoryNext,wewillreceivethegoodsfromthepurchaseorderintoinventoryandexaminetheimpact
thenewpricehasonthevalueofourinventory. Toreceivethepurchaseorderintoinventory,
followthemenupath:
Menu LogisticsMaterialsManagementInventoryManagementGoodsMovementGoodsReceiptForPurchaseOrderGRforPurchase
Order(MIGO)
MakesuretousethePurchasingDocumentsforMaterialtab,thenenterLAMP###forMaterialandDL## for plantandclickon theenter. Perform thesearchasshownabove,and theSAPsystemshouldfindyourpurchaseorder:
Click on the search icon to fithe purchase order number
-
8/3/2019 2 Purchasing
8/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 8
Doubleclickonthecorrectpurchaseordernumbertoselectit,thenclickontheentericon( )
to
pull
up
the
data
from
the
purchase
order.
Click
on
the
Where
tab
to
tell
the
system
where
weareputtingthereceipt(storagelocationRAWMATERIALS(RM00)). MakesurethatItemOKisselected,meaningthat100lampswereintheshipmentandpassedinspection,thenclickon
the save icon ( ). You should get a message like the following:
_________________________________
Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
11.CheckInventoryintheMaterialMasterThefirstplacewecanviewtheimpactoftwogoodsreceiptsformaterialpurchasedatdifferent
prices is in thematerialmasterrecord. Toviewthematerialmaster record, followthemenu
path:
Menu LogisticsMaterialsManagementMaterialMasterMaterialDisplayDisplayCurrent
Trans.codeEnteryourmaterialnumberLAMP###.Clickontheentericon( ),whichwillproducethefollowingpopupwindowtoselectmaterialmasterviews:Accounting1view,thenclick
on
the
enter
icon.
Enter
DL##forPlant,thenclickontheentericon.
Purchase order numbers are sequential.The most current purchase order will havethe highest document number.Double-click to select the correct purchaseorder
-
8/3/2019 2 Purchasing
9/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 9
Weprocessedtwoordersforthelampwithdifferentprices:
Quantity UnitPrice Total
Order1 100 $1.75 $175.00
Order2 100 $1.80 $180.00
200 $355.00
Sothe
average
price
for
alamp
is
currently:
unitper$1.775units200
$355.00PriceAverage
Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
The moving average price is $1.78 (actually $1.775,as we will see soon), there are 200 units in stock andthe total value of this inventory is $355.00
-
8/3/2019 2 Purchasing
10/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 10
12.PerformGoodsIssueNext,wewillwithdraw100lampsfrominventorybyperformingagoodsissuetoacostcenter.
Todothis,followthemenupath:
Menu LogisticsMaterialsManagementInventoryManagementGoodsMovement
Goods
Issue
Trans.code
EnterMovementtype201(ConsumptionforCostCenterfromWarehouse),whichmeansthatthecostforthismaterialwithdrawalwillbeabsorbedbyacostcenter. Becausethecontrolling
module,whichmanagesmanagerialandcostaccounting,hasbeenimplementedinthissystem,
anytransactioninvolvingacostorexpensemusthavesomeobjecttoabsorbthecost. Thiscan
beacostcenter,whichrepresentsanoverheadcostobject,oraproductionorsalesorder,ora
project,amongothers. Afterspecifyingthemovementtype201,whichtellsthesystemwewill
beprovidingacostcenter,enterPlantDL##andStorageLocationRM##(rawmaterials),thenclick
on
the
enter
icon
( ).
EntercostcenterNAPR1000(productioncost),MaterialLAMP###andquantity100,thenclick
onthesaveicon( ). Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
ToseehowmuchtheSAPsystemchargedthecostcenterforthe100lamps,followthemenu
path:
Menu AccountingControllingCostCenterAccountingInformationSystemReportsforCostCenterAccountingLineItemsCostCenters:ActualLine
Items
Trans.codeEntercostcenterNAPR1000,thenclickontheentericon( ).Executingthecostcenterreport
willproducethefollowingresults:100unitswerechargedtothecostcenteratacostof$177.50.
Usetheexiticon( )toreturntotheSAPEasyAccessscreen.
13.RecheckG/LAccountBalanceWecanreviewthecostsforthesetransactionsusingtheG/LAccountStatement,whichwehave
seenbefore. Todothis,followthemenupath:
Menu AccountingFinancialAccountingGeneralLedgerInformationSystemGeneralLedgerReports(New)LineItemsG/LAccountStatements
Enter US## for company code, the current year for fiscal year, the date you started thisexerciseasthePostingdate.Makesuretheselections:
-
8/3/2019 2 Purchasing
11/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 11
G/LaccountlineitemsAssetlineitemsMateriallineitemsStandarddocuments
arechecked.
Then
click
on
the
execute
icon
( ).
This report shows the impact of the two purchases and one material withdrawal. The table
belowmoreclearlyillustrateshowthemovingaveragepriceworks:
Quantity UnitPrice Trans.Total Total
Order1 100 $1.75 $175.00
Order2 100 $1.80 $180.00
200 $355.00
Withdrawal1 100 $1.775 $177.50
100
$177.50
Afterthetwopurchases,GBIcompanyhas200lamps,forwhichitpaidatotalof$355.00,oran
average of $1.775 per lamp, which is the moving average price. The 100 lamps that are
withdrawnarecostedatthemovingaverageprice,sothattheremaininginventoryof100lamps
isvaluedat$177.50,or$1.775perlampthemovingaverageprice.
Onemorepurchasewillfurther illustratetwoconceptstheroleofthepurchasing inforecord
andhowmovingaveragepriceswork.
Usetheexiticon( )toreturntotheSAPEasyAccessscreen.
14.CreateaThirdPurchaseOrderWewillnowcreateathirdpurchaseorder. Thistime,thepurchasinginforecordexistsandwill
help usdetermine pricing. To create the third purchase order, we will again follow the menu
path:
Menu LogisticsMaterialsManagementPurchasingPurchaseOrderCreateVendor/SupplyingPlantKnown
Again use the backspace key on the vendor field to find the vendor number for ### PortageMaterials.
Clicking
on
the
enter
icon
( )
to
call
up
data
about
###
Portage
Materials.
Vendor
nameandcurrencyarepulledupfromthevendormaster.Similarly,wecanusethebackspace
keytocallupthematerialnumberfor lamps,LAMP###.Enterthematerialnumber,quantity(100)anddeliverydateisadatetwoweeksintothefuture.Thistime,LEAVETHEPRICEBLANK.Clickingontheentericon( )willagaincallupdataaboutthelamp(materialLAMP###)from
thedatabase. Itwillagainopenthe itemdetailsectionofthescreen,butthistime,adefault
price will be entered automatically because the R/3 system set the default price using the
previouspurchaseorder.
-
8/3/2019 2 Purchasing
12/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 12
Because the purchasing info record exists, the SAP system looked at the previous purchase
orderto findapriceforthe lamps. Ifapricehasbeenset inthepurchasing inforecord,that
pricewouldhavebeenused. Clickonthesave icon( )tosavethepurchaseorder. Youwill
getthefollowingmessage:
ClickontheSaveoptiontosavethepurchaseorder. Usetheexiticon( )toreturntotheSAP
EasyAccess
screen.
YourthirdPurchaseOrderNumber:______________________
15.CreateaThirdGoodsReceiptWewillagainreceivegoodsfromthepurchaseorderintoinventoryandexaminetheimpactthe
new price has on the value of our inventory. To receive the purchase order into inventory,
followthemenupath:
Menu LogisticsMaterialsManagementInventoryManagementGoodsMovementGoodsReceiptForPurchaseOrderGRforPurchaseOrder(MIGO)
MakesuretousethePurchasingDocumentsforMaterialtab,thenenterLAMP###forMaterialandDL## for plantandclickon theenter. Perform thesearchasshownabove,and theSAPsystemshouldfindyourpurchaseorder:
Double-click on the purchase order withthe highest purchase order number
-
8/3/2019 2 Purchasing
13/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 13
Doubleclickonthecorrectpurchaseordernumbertoselectit,thenclickontheentericon( )
topullupthedatafromthepurchaseorder:
Clickon the Where tab to tell thesystemwhereweareputting the receipt (storage locationrawmaterials (RM##)). Makesurethat ItemOK isselected,meaningthat100 lampswere intheshipmentandpassedinspection,thenclickonthesaveicon( ). Youshouldgetamessage
likethefollowing:___________________________________
Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
16.CheckInventoryintheMaterialMasterWecanagainchecktheimpactofthenewgoodsreceiptsinthematerialmasterrecord. To
viewthe
material
master
record,
follow
the
menu
path:
Menu LogisticsMaterialsManagementMaterialMasterMaterialDisplayDisplayCurrent
Enter your material number LAMP###. Click on the enter icon ( ), which will produce thefollowingpopupwindowtoselectmaterialmasterviews:Accounting1view,thenclickontheentericon.EnterDL##forPlant,thenclickontheentericon.
Click on the Where tab andenter 100 for storage locationMake sure Item OK is selected,then click on the Save (post) icon
-
8/3/2019 2 Purchasing
14/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 14
Themovingaveragepricehasagainchangedbecauseofthenewmaterialreceipt. Theanalysis
isasfollows:
Order1 100 $1.75 $175.00
Order2
100 $1.80
$180.00200 $355.00
Withdrawal1 100 $1.775 $177.50
100 $177.50
Order3 100 $1.80 $180.00
200 $357.50
The moving average price is now $1.79 (actually$1.7875, and there are 200 units in stock for a totalvalue of this inventory is $357.50
-
8/3/2019 2 Purchasing
15/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 15
Sotheaveragepriceforalampiscurrently:
unitper$1.7875units200
$357.50PriceAverage
Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
17.CreateCondition(Price)inPurchasingInfoRecordThepurchasinginforecordprovidestheabilitytomanagepricesandmaintainbettercontrols
andrecords. Tousethepurchasinginforecordtomanagepurchaseditemprices,acondition
recordhastobeentered. Todothis,followthemenupath:
Menu LogisticsMaterialsManagementPurchasingMasterDataInfoRecordChange
Trans.codeThis informationshouldbeenteredautomaticallyifnot,search for thevendorandmaterial,
andentertheappropriatePurchasingOrg.andPlant.Makesuretheappropriatedataisentered,
thenclickontheenter icon( ). ClickontheConditions tabtoenterthematerial LAMP###price.
Enter 1.85 for the price
-
8/3/2019 2 Purchasing
16/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 16
TheSAPsystemwillusetodaysdateasthedefaultstartdate,andwillalsoenterthecurrency
andunitofmeasurefromthevendorandmaterialmasters. Enter1.85forthematerialprice,
thenclickonthesave icon ( ) tosavethenewmaterialprice. Clickontheexit icon ( ) to
returntotheSAPEasyAccessscreen.
18.CreateaFourthPurchaseOrderWe will now create a fourth purchase order. This time, the pricing condition exists in the
purchasing inforecordandwillbeusedbytheSAPsystemtodeterminepricing.Tocreatethe
fourthpurchaseorder,wewillagainfollowthemenupath:
Menu LogisticsMaterialsManagementPurchasingPurchaseOrderCreateVendor/SupplyingPlantKnown
Againuse
the
backspace
key
on
the
vendor
field
to
find
the
vendor
number
for
### Portage
Materials. Clickingontheentericon( )tocallupdataabout##PortageMaterials.Similarly,wecan use the backspacekey tocallup thematerialnumber for lamp, LAMP###. Enter the
materialnumber,quantity (100) anddeliverydate is a date two weeks into the future. Thistime,LEAVETHEPRICEBLANK.Clickingontheentericon( )willagaincallupdataaboutthelamp (material LAMP##) from the database. It will again open the item detail section of the
screen,butthistime,adefaultpricewillbeenteredautomaticallybecausetheR/3systemset
thedefaultpriceusingthepreviouspurchaseorder.
Becauseacondition(price)nowexists inthepurchasing inforecord,theSAPsystemusesthat
price($1.85)insteadofthepricefromthepreviouspurchaseorder($1.80)tofindapriceforthe
lamps. Click on the save icon ( ) to save the purchase order. You will get the following
message:
The R/3 system set the default price usingthe purchasing info record price of $1.85
-
8/3/2019 2 Purchasing
17/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 17
ClickontheSaveoptiontosavethepurchaseorder. Usetheexiticon( )toreturntotheSAP
EasyAccessscreen.
YourFourthPurchaseOrderNumber:_______________________
19.CreateaFifthPurchaseOrderandOverridetheDefaultPriceWewillnowcreatea fifthpurchaseorderandwillobserve the impactofmanuallyoverriding
theprice. Tocreatethefifthpurchaseorder,wewillagainfollowthemenupath:
Menu LogisticsMaterialsManagementPurchasingPurchaseOrderCreateVendor/SupplyingPlantKnown
Again use the backspace key on the vendor field to find the vendor number for ### PortageMaterials. Enter thematerialnumber (LAMP###),quantity (100) anddelivery date is a datetwoweeksintothefuture. Thistime,LEAVETHEPRICEBLANK.Clickingontheentericon( )will again call up data about the lamp from the database. It will again open the item detail
section of the screen, and again a default price will be entered automatically from thepurchasinginforecord. Thistime,wewillmanuallyoverridethedefaultprice:
Replace the default price of 1.85 per unitwith a price of 1.90 per unit
-
8/3/2019 2 Purchasing
18/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 18
TheSAPsystementeredadefaultpriceof1.85,butthepricingprocedurewillallowthistobe
overridden. Notethatthesystemcanbeconfiguredsothatamanualoverride isnotpossible.
Enterapriceof1.90,thenclickonthesave icon( )tosavethepurchaseorder. Youwillget
thefollowing
message:
Clickon
the
Save
option
to
save
the
purchase
order.
Use
the
exit
icon
( )
to
return
to
the
SAP
EasyAccessscreen.
YourFifthPurchaseOrderNumber:_______________________
20.ReviewCondition(Price)inPurchasingInfoRecordWeshouldreviewthepurchasinginforecordtoseeifthepricethatwasmanuallyenteredinthe
last step had an impact on the condition in the purchasing info record. We can do this by
reviewingthepurchasinginforecordineitherdisplayorchangemode. Ifwemakenochanges,
thenthere
is
no
difference
in
which
approach
we
use.
Entering
the
review
in
change
mode
has
theadvantageofallowingustoeasilycorrectanyerrors.
Toreviewthepurchasinginforecordinchangemode,followthemenupath:
Menu LogisticsMaterialsManagementPurchasingMasterDataInfoRecordDisplay
Again, this information should be entered automaticallyif not, search for the vendor and
material,andentertheappropriatePurchasingOrg.andPlant.ClickontheConditionstab,and
thistimeanewwindowwillpopup:
-
8/3/2019 2 Purchasing
19/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 19
Doubleclickingonthefirst(andonly)entrywillbringupthepricingcondition:
Notethatthepriceisstill1.85. Themanualoverridechangedthepurchaseorder,buthadnot
impact on the pricing condition. If another purchase order is created for the lamp, the SAP
Price is still 1.85
Double-click on thefirst line to review thepricing condition
-
8/3/2019 2 Purchasing
20/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 20
systemwilluse1.85 for thedefaultprice, not the1.90manuallyentered in the lastpurchase
order.
Clickontheexiticon( )toreturntotheSAPEasyAccessscreen. Toseehowthepurchasing
inforecordcanbeusedtomanagepricechanges,reentertheChangeInfoRecordtransaction.
Clickon
the
enter
icon
( ),
then
click
on
the
Conditions
icon
to
get
back
to
the
following
pop
upwindow:
Toenterapricechange,clickontheNewvalidityperiodicon( ). ThiswillbringuptheCreate
GrossPriceConditionscreen:
Click on New validity period
-
8/3/2019 2 Purchasing
21/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 21
EnterthefirstdayofthenextmonthfortheValidondate,sothatthenewpricewilltakeeffectonthefirstofthenextmonth. Enter1.90fortheprice,thenclickonthesaveicon( )tosave
thepricechange. Thiswilltakeyoubacktothe initialChange InfoRecordscreenandclickon
theentericon( ),thenclickontheConditionsicontogettheValidityPeriodspopupwindow:
Enter the first date of the next month forthe Valid on date, then enter 1.90 forthe new price and click on the save icon
-
8/3/2019 2 Purchasing
22/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 22
Notethatbyusingconditionsinthepurchasinginforecord,itismucheasiertoreviewpricingas
wellasmanagepricechanges. Clickonthecancelicon( ),thenontheexiticon( )toreturn
totheSAPEasyAccessscreen.
21.CreateaFourthGoodsReceiptforTwoPurchaseOrdersFinally,wewillreceivethelasttwopurchaseorderstoreviewthemovingaveragepriceonelast
time. Wecanusethesameprocessasbefore,followingthemenupath:
Menu LogisticsMaterialsManagementInventoryManagementGoodsMovementGoodsReceiptForPurchaseOrderGRforPurchase
Order(MIGO)
Doubleclickonthefourthpurchaseordernumbertoselectit,thenclickontheentericon( )
topullupthedatafromthepurchaseorder,thenclickonthesearchicon( )tosearchforthe
lastpurchase
order
number.
Again,
double
click
on
the
fifth
purchase
order
number
to
select
it,
thenclickontheentericon( )topullupthedatafromthispurchaseorder.
-
8/3/2019 2 Purchasing
23/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 23
Closetheitemdetailportionofthescreentomakeprocessingeasier:
ClickonOKforbothitems,enterstoragelocationrawmaterialsforbothitems,thenclickonthe
Save (post) icon ( ). You should get a message like the following:
_______________________________
Close the item detail portion of thescreen to make processing easier
Click on OK for both items,enter storage location 100 forboth items, then click on theSave (post) icon
-
8/3/2019 2 Purchasing
24/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 24
Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
21.VerifyMovingAveragePricesFor
one
final
time,
we
will
verify
the
moving
average
prices
in
the
SAP
R/3
system.
The
relevant
transactionsthatwehaveprocessedsofararesummarizedinthefollowingtable:
Transaction Units UnitCostOrder1 100 $1.75
Order2 100 $1.80
Withdrawal1 100 $1.775
Order3 100 $1.80
Order3 100 $1.85
Order4 100 $1.90
Giventhisinformation,whatshouldthemovingaveragepricebe?___________________
OnewaytocheckistolookonemoretimeattheMaterialMaster. Onemenupathtogettothe
materialmasteris:
Menu LogisticsMaterialsManagementMaterialMasterMaterialDisplayDisplayCurrent
Select the Accounting 1 view for material LAMP### in Plant DL##. This screen shows the
standardprice tobe$1.83. This isobviouslya roundedvalue. An interestingquestion is the
internal accuracy of this price. In other words, does SAP use the rounded figure in cost
calculations,ordoesitmaintainamoreaccuratefigureinternally?
______________________________________________________________________________
______________________________________________________________________________
Aninterestingwaytotestthisistocreateonemoregoodsissuetoacostcenterforlamps,and
thencheckthecostchargedtothecostcenter. Toissuelampstoacostcenter,followthemenu
path:
Menu LogisticsMaterialsManagementInventoryManagementGoodsMovementGoodsIssue
Enter Movement type 201 (Consumption for Cost Center from Warehouse), Plant DL## and
StorageLocationrawmaterials,thenclickontheentericon( ).EntercostcenterNAPR1000,MaterialLAMP###andquantity100,thenclickonthesave icon
( ).
To
review
the
costs
associated
with
this
goods
issue,
run
the
cost
center
report
by
followingthemenupath:
Menu AccountingControllingCostCenterAccountingInformationSystemReportsforCostCenterAccountingLineItemsCostCenters:ActualLine
Items
Enter NAPR1000 in the cost center, then click on the execute icon. Executing the cost centerreportwillproducethefollowingresults:
-
8/3/2019 2 Purchasing
25/26
SCMGenap2010/2011
FacultyofComputerScienceUniversityofIndonesia 25
Although SAP only maintains two decimal places for the moving average price, in actual cost
calculations,it
uses
the
total
value
of
the
stock
($732.50)
divided
by
the
total
stock
(400
units)
toobtainamoreaccuratecostforthegoodsissue($183.13)thanwouldhavebeenobtainedby
usingthemovingaverageprice($183.00).
Note also that by using the moving average price to value goods issues, the moving average
pricedoesnotchangewhengoodsareissued. Theyonlychangewhengoodsarereceivedand
there isapricedifferencebetweenthepriceofthenewgoodsbeingreceivedandthemoving
averageprice.Clickontheexiticon( )toreturntotheSAPEasyAccessscreen.
22.PrintResultTo
verify
that
you
have
completed
this
exercise,
we
will
report
the
quantity
and
value
of
materialLAMP###instock. Todothis,followthemenupath:Menu LogisticsMaterialsManagementValuationBalanceSheetValuation
ResultsBalanceSheetValueperAccount
TransCode
Enteryourcompanycodeandmaterial,thenclickontheexecuteicon( ). Thiswillproduce
thefollowingreport:
Note the cost of 183.13
-
8/3/2019 2 Purchasing
26/26
/
Ifyouhave300unitsinstockwithavalueof$549.37,congratulations.
There should be 300 units instock with a value of $549.37