Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation Town of Branford Orchard House 421 Shore Drive Branford, CT 06405 The Town of Branford is requesting 2 proposals : 1) for the design/build of a steam boiler replacement with an Building Energy Management System, 2) for the design/build of a steam boiler replacement. Information packets are available from the Purchasing Department, 1019 Main Street, Branford, CT. A mandatory pre-proposal meeting of the project will be held at the Orchard House on _September ___, 16th ___, 2009, at 10:00 AM. Proposals will be received until 3:00 PM., ___October_, _8th ____, 2009 to the Purchasing Department, 1019 Main Street, Branford, CT. No proposals will be accepted after that time and date. Proposals will be opened publicly at 3:30 PM on _October ___, __8th ___, 2009. Nancy Porto Purchasing Agent

Transcript of 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for...

Page 1: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Legal Notice Request for Proposals

Design/Build Steam Boiler Replacement

Energy Management System Installation Town of Branford

Orchard House 421 Shore Drive

Branford, CT 06405

The Town of Branford is requesting 2 proposals: 1) for the design/build of a steam boiler replacement with an Building Energy Management System, 2) for the design/build of a steam boiler replacement. Information packets are available from the Purchasing Department, 1019 Main Street, Branford, CT. A mandatory pre-proposal meeting of the project will be held at the Orchard House on _September___, 16th___, 2009, at 10:00 AM. Proposals will be received until 3:00 PM., ___October_, _8th____, 2009 to the Purchasing Department, 1019 Main Street, Branford, CT. No proposals will be accepted after that time and date. Proposals will be opened publicly at 3:30 PM on _October___, __8th___, 2009. Nancy Porto Purchasing Agent

Page 2: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

TOWN OF BRANFORD OFFICE OF THE TREASUER

1019 Main Street Post Office Box 150 (203) 488-8394 Branford, CT 06405 FAX: 315-3736

General Requirements for Bidding and

Instructions to Bidders

NOTICE

Information provided in these specifications is CONFIDENTIAL and is to be used only for the purpose of preparing a proposal. It is further expected that each bidder will read these specifications with care, for failure to meet every one or a combination of specified conditions may invalidate the proposal. The Town reserves the right to reject any or all bids or any portion thereof and to accept the bid deemed to be in the best interest of the Town of Branford. Bidders are requested to submit quotations on the basis of these specifications. Alternate quotations will receive consideration providing such alternatives are clearly explained. The information contained herein is believed to be accurate and is based upon the latest available information but is not to be considered in any way as a warranty. Revised 5/09 Standard Form

1

Page 3: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

SECTION I - General Terms and Conditions

A. Compliance with Laws

The bidder shall at all times observe and comply with all laws, ordinances and regulations of the federal, state and local governments, which may in any way affect the preparation or the performance of the contract.

B. Timetable

Price quoted must be valid for _90__(Ninety)_ days. Delivery and installation completion dates must be included in the bid proposal.

C. Consideration of Proposals

The Board of Selectmen, or a majority of them, reserve the right to select or reject alternate proposals; to waive informality in proposals; and to reject any and all bids, or accept such bid as shall in its judgement be to the best interest of the Town of Branford.

D. Bid Bond *See Bid Proposal Sheet

1. A certified check or bank draft made payable to the “Treasurer, Town of Branford”, or a satisfactory bid executed by the bidder and a surety company in an amount no less that five percent (5%) of the base bid, may be required with each proposal.

2. Checks or drafts will be returned to unsuccessful bidders within ten

(10) business days of the bid opening.

E. Performance Bond *See Bid Proposal Sheet

Successful bidders may be required to furnish a Performance and Payment Bond in the amount of 100% of the contract sum.

F. Protection of Work and Property

Successful bidders shall be responsible for protection of their equipment and materials against theft, damage or deterioration on the site.

2

Page 4: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

G. Competency of Bidders

1. Bidders shall have had proven experience in the field of work.

2. Bidders shall submit with their bid a listing of recent work

performed within the State of Connecticut of the size equal to or greater than the work being bid.

H. Alternates

1. Any alternates to specified materials or workmanship must be separately listed and described in detail.

2. Alternates will be considered in awarding the contract only if they

provide, as a minimum requirement, all features contained in the specifications.

3. The Town of Branford reserves the sole right to determine through

its agents the equality of alternate products and/or installation procedures.

I. Bid Requirements

1. Each bidder shall return two (2) copies of the proposal sheet entitled “Bid Proposal”.

2. Each bid proposal must be signed by an authorized agent of the

bidder.

3. Successful bidders must obtain any required governmental approvals.

J. Specifications – General

The contract shall include all labor and materials, tools and equipment and services required for proper performance of the work as specified hereinafter and as may be required for proper completion of the work in accordance with the highest standards of the trades involved.

3

Page 5: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

K. Examination of Site

Prior to submission of the bid, contractor shall visit the site, consult with the supervisor, and become thoroughly familiar with all conditions under which the work will be installed. The contractor will be responsible for any assumptions made regarding the site for the work to be performed.

4

Page 6: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

SECTION II - Insurance Requirements

The contractor, following award of the contract, may be required to furnish to the Town of Branford a Certificate of Insurance for the following coverage:

1. Comprehensive General Liability

2. Property Liability Insurance

3. Automobile Liability **

4. Workmen’s Compensation and Employees Liability**

5. Professional Liability

In addition to the coverage delineated above, Builders Risk Insurance may be required for construction contracts. The limits of insurance unless otherwise specified shall be a follows:

A. General Liability

Combined single limit of $1,000,000; Bodily Injury $500,000 per occurrence; Property Damage $500,000 per occurrence. The insurance carried by the bidder shall include the following coverage: 1. Comprehensive Form

2. Premises Operations

3. Products Completed Operations

4. Contractual – Hold Harmless Requirements**

5. Independent Contractors

6. Broad Form Property Damage

7. Personal Injury

B. Hold Harmless Requirements

The contractor shall, at all times, indemnify and save harmless the Town of Branford, its officers, agents, and servants on account of any and all claims, damages, losses, litigation expense, counsel fees and compensation

5

Page 7: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

arising out of injuries (including death) sustained by or alleged to have been sustained by the public, any or all persons affected by the contractor’s work, or by the contractor, any subcontractor, material, men or anyone directly or indirectly employed by them or any one of them while engaged in the performance of this contract. The Town of Branford shall be named as an additional insured on said policy of public liability insurance to cover all claims against the Town arising out of said contract.

C. Automobile Liability

Combined single limit of $1,000,000; Bodily Injury $500,000 per person/accident; Property Damage $500,000 per accident.

Comprehensive automobile policy to cover all automobile or vehicles owned, hired or owned by contractor’s employees and used on business.

D. Workers’ Compensation

The contractor must have workers’ compensation and liability insurance as provided by Connecticut and federal law with statutory limits of $100,000 per accident, $100,000 disease each employee and $500,000 disease policy limit

The contract shall procure and pay for the insurance coverage described above with the minimum limits of liability as stated. The Certification of Insurance shall certify that said coverage shall be in effect for the term of the contract.

The Town of Branford shall be named as an additional insured on the General Liability Insurance Policy. All policies shall provide for sixty (60) days written notice prior to cancellation, substantial change or non-renewal.

The contractor must be in compliance with the State of Connecticut Public Act Section 86-87, “An Act Concerning Workers’ Compensation Insurance Requirements For Contractors, On Public Works Projects and State Licenses”.

6

Page 8: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

TOWN OF BRANFORD Proposals for

Steam Boiler Replacement With an

Building Energy Management System We have visited the site and examined all conditions affecting the work. We hereby propose to furnish all labor and materials required by the contract documents as follows: Total Proposed Price: __________________________________________ Company Name: __________________________________________ Company Address: __________________________________________ __________________________________________ ___________________________________ ______________________________ Signature of Authorized Representative Date ___________________________________ Title List all incentive programs available: References: Bid Bond Required YES ______% NO X Bid Bond Enclosed (if required) YES NO Performance Bond Required YES ______% NO X

7

Page 9: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

8

TOWN OF BRANFORD Proposals for

Steam Boiler Replacement Minus the Building Energy Management System

We have visited the site and examined all conditions affecting the work. We hereby propose to furnish all labor and materials required by the contract documents as follows: Total Proposed Price: __________________________________________ Company Name: __________________________________________ Company Address: __________________________________________ __________________________________________ ___________________________________ ______________________________ Signature of Authorized Representative Date ___________________________________ Title List all incentive programs available: References: Bid Bond Required YES ______% NO X Bid Bond Enclosed (if required) YES NO Performance Bond Required YES ______% NO X

Page 10: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

TOWN OF BRANFORD

Department of General Government Buildings 1019 Main Street

P.O. BOX 150, BRANFORD, CT 06405

Otto Berger Lead Tradesman

Tel: 203-315-3365Fax: 203-315-5278

[email protected]

Request for Proposal

Steam Boiler Replacement With an

Building Energy Management System

INTRODUCTION 1.1 PURPOSE: The Town of Branford is inviting qualified firms to submit proposals for design-build for the existing Steam Boiler replacement with a Building Energy Management System at the Orchard House, where Energy Efficiency is a goal. 1.2 LOCATION: Orchard House 421 Shore Drive Branford, CT 06405 1.3 Propsals The town is requesting two proposals 1) Proposal of complete project. 2) Proposal of boiler replacements, minus the energy management system. 1.4 SCOPE OF SERVICES: The selected submitting firm will be responsible for design and construction of the new steam boilers to replace the existing steam boiler that will include:

1. Preparation of design plans meeting the building code for submission to and approval by the Building Official of the Town of Branford.

2. The Town, waves building permit fee for this project except for the education fee, which will be paid by the contractor.

3. Documentation of assumptions made and/or calculations made in determining the heat loss calculation required to size and capacity of proposed equipment.

Page 11: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

4. Contractor shall obtain all proper building permits required to perform this project prior to start of the project.

5. Demo the existing HB Smith Steam Boiler and associated piping. 6. It will be the responsibility of the contractor to remove all asbestos

encountered during the project in accordance with all local, state and federal laws and requirements. It will be the responsibility of the contractor to identify and notify on a timely basis, any existing conditions that might contain asbestos in order to coordinate its removal expediently. Notify the Department of Health should asbestos be found.

7. Install new concrete pads for the boilers as required. 8. Contractor shall be responsible to calculate the consumption of the gas usage

of the building to properly size the gas pipe to the new steam boilers and heat exchanger.

9. Contractor will provide all rigging necessary to remove existing Steam Boilers of site and existing pipes of site. Existing Hot water boiler shall be salvaged intact and be removed from boiler room and onto a town vehicle.

10. Contractor will provide all rigging for installation of new steam boilers. 11. Install two new smaller cast iron Steam Boilers, and piping to create a

replacement. (New boilers use dual fuel (Gas/Oil Combination). 12. Properly size the existing chimney for the two new steam boiler according to

manufacturer specifications. Install new sleeves in the existing chimney if necessary. Inspect existing chimney as to the condition.

13. Contractor shall assemble one new steam boiler on the existing concrete pad, and the other on the existing concrete pad.

14. During the heating season, a new concrete pad is to be poured for assembly of new steam in order to keep the heating system operational, if heat is required. New concrete pad is to be installed by the contractor.

15. Contractor shall install new stainless steel breech system. 16. Contractor shall provide and install all new gas piping and gas vent piping

(Black Iron Pipe Installed Only) from Gas Meter to the new steam boilers. 17. Contractor shall complete all supply, return; water feed and condensate return

piping. 18. Install a Steam to Hot Water Heat Exchanger, which will replace the existing

small Hot Water Boiler located behind the existing steam boiler. 19. Contractor shall provide and install all new operating controls and safety

controls. 20. Install three new DDC zone valves off the main header. 21. Install new damper actuated combustion air dampers. 22. Install and pipe dual fuel (Oil/Gas Combination) burners (piping for gas,

Utility requirement for 1 year). Include with future pipe for oil. 23. Install a complete boiler room Energy Management Control System. Energy

management Control System should be expandable to control zones in building for heating and cooling and lighting.

24. Insulate new piping, label, install new gauges, and sensors as required. 25. The contractor shall provide a complete start-up and check for proper

operation of all aspects of the new installation(s). 26. Contractor shall perform an efficiency rating test and submit a copy to the

town.

Page 12: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

27. The contractor will submit four (4) copies of maintenance manuals which will include all equipment installed for this project, as-built, sequence of operations and certificates of warranty.

28. Contractor shall provide a walk-though of the system at which time they will deliver four (4) copies of drawing with all the proper literature such as maintenance literature to the Town of Branford.

29. Contractor is responsible for their inspection from the Building Inspector. 30. Contractor shall provide a one-year warranty for parts and labor on their

system installed upon acceptance by the Town of Branford.

31. Attached to the proposal request is information of existing equipment in the building. (It is the contractor’s responsibility to acquire all proper information related for this project).

32. Attached with the proposal request is the asbestos report that the town has acquired for your use.

33. The contractor shall advice the Town on any energy efficiency rebates available for this project and complete all necessary paperwork for such rebates.

Sequence of Operation: Bring boilers on based on outside air temperature and control steam pressure to maintain a pressure difference between the supply and return main. Modulate boilers in lead/lag, zone control valves to modulate with temperature and time of day schedule, occupied/unoccupied. 1.5 MANDATORY SITE INSPECTION: There is a mandatory site inspection for all interested in submitting a proposal at the Orchard House, 421 Shore Drive, Branford, Ct, at 10:00 AM on September , 16th , 2009. A responsible representative of your company must attend this meeting to become familiar with the setting of this project. The contractor will be responsible for any assumptions made regarding the site for the work to be performed. GENERAL INFORMATION 2.1 CLIENT Town of Branford 2.2 CONTACT PERSON: Otto Berger, Lead Tradesman, General Government Buildings, is the designated contact person for this RFP. Any questions concerning this RFP shall be directed in writing to Otto Berger no less than seven days prior to the submission deadline. A written response will be faxed no less than three days prior to the submission deadline to all firms who have picked up an information packet from the Purchasing Agent and who have attended the mandatory pre-proposal meeting. The contact information for Otto Berger is:

Page 13: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Mailing address: General Government Buildings P.O. Box 150

Branford, CT 06405 Fax: (203) 315-5278 E-mail: oberger@branford-ct,.gov 2.2 AVAILABLE INFORMATION: Included with each information packet are copies of the proposed Steam Boiler Replacement plans for the Orchard House Building. They are not as-built plans and should be only used for reference in light of this fact. SUBMISSION OF PROPOSALS All proposals shall be delivered to the Purchasing Agent, 1019 Main Street, Branford, CT 06405. All proposals must be received by 3:00 PM., _October_, _8th_, 2009, and they will be opened publicly at 3:30 PM that same day. 3.1 PROPOSAL REQUIREMENTS: All proposals shall address all the requirements outlined in the scope of services and include the following:

• A completed proposal sheet (2 copies, see attached) shall be submitted. • Design plans and/or sketches with appropriate labels and a comprehensive

description of the proposal. • Manufacturer specifications and warranties for the equipment and units being

proposed and a full description of materials, including. • The contact name and applicable licenses of the persons involved in the project. • The name of the principal contact person for the project including address, phone

number and fax number. • A list of sub-contractors to be used for the project including their respective

licenses • A schedule, including estimated start and completion dates, demonstrating that

the work can be done as soon as possible after the acceptance of the proposal. • All requirements as defined in the “General Requirements for Bidders” included

in this RFP package (see attached) • Proposals shall include a listing of recent work performed within the State of

Connecticut of the size equal to or greater than the work being proposed • Proposal shall include all incentives and rebates for the Town.

SUBMISSION OF PROPOSALS 3.2 RFP REVIEW CRITERIA:

Page 14: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

The written response of each proposal to the above requirements shall be utilized as criteria in the review process. Consideration will be given to the type and quality of equipment being proposed as well as the overall cost of the proposal. A committee consisting of the Capital Projects Manager, Tradesman and other town staff members shall review the Proposals. A recommendation will be made to the Board of Selectmen. 3.3 SELECTION: Upon selection, the successful firm and the Town will execute contractual documents. 3.3 CODE COMPLIANCE: All work performed for this project shall be done by licensed technicians and in compliance with all Building Code requirements and regulations. All building and/or mechanical permits must be obtained by the contractor prior to beginning the project.

Page 15: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

The following information listed below is in regards to calculating the gas consumption and for sizing the steam boiler HB Smith Series 28 Steam Boiler: Sq. ft. Light oil gas capacity Sect, steam steam water gph mbh lbs/hr 8 5875 1,409,800 1,582,600 15.8 2212 1820 A.O. Smith Water Heater: Model # FSG 50 248 Gas NaturalBTU/HR Input 40000 Kitchen: 1 – Oven Wolf Range Co. Compton, Ca. Wolf Air Flow “Snorkler” #19421 this could be the stove # Nat. Gas Press. At Plug 4.8” W.C Maxitrol RV48L ½ “PSIG 3.0 – 6.0

Burnham: Low Pressure Boiler Model # PV83WC-TBWN Serial # 64414082 Burner Beckett Model # “AFG” Serial # 011212-61419 Gas Meter: Southern Connecticut Gas #721082 AC-250 RAL MAOP 5 PSI 250 C.F.M. @ ½ Diff ANSI- Class 250 Installed 1999 Upon past conversation with the Gas Company, gas out on the street is Low Pressure (6” water column). The contractor will double check this information with the gas company. Contractor is responsible to check all the information to insure that they are correct for their purpose of bidding this project.

Page 16: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Other ID: C10/C11/001/00006/

CURRENT OWNER TOPO. UTILITIES STRT./ROAD LOCATION CURRENT ASSESSMENT1 Level

4 Rolling

2 Public Water

3 Public Sewer

1

5

Paved

Curb & Gutter

2 Suburban Description Code Appraised Value Assessed Value

SUPPLEMENTAL DATA

EX COM LNEX COM BLEX CM OTB

212225

500,1001,547,800

15,000

350,1001,083,500

10,500

Total 2,062,900 1,444,100

BRANFORD, CT6014

BRANFORD TOWN OF SHORT BEACH

1019 MAIN ST

BRANFORD, CT 06405Additional Owners:

VISIONGIS ID: C10/C11/001/00006

BK-VOL/PAGE SALE DATE q/u v/i SALE PRICE V.C. PREVIOUS ASSESSMENTS (HISTORY)//

EXEMPTIONS OTHER ASSESSMENTS This signature acknowledges a visit by a Data Collector or AssessorYear Description Amount Code Description Number Amount Comm. Int.

APPRAISED VALUE SUMMARY

NOTES

Net Total Appraised Parcel Value 2,062,900

1,547,800

0

15,000

500,100

0

2,062,900

Appraised Bldg. Value (Card)

RECORD OF OWNERSHIP

ADULT DAY CARE CENTERTOWN OF BRANFORD

BRANFORD TOWN OF SHORT BEACH SCHOOLBRANFORD TOWN OF SHORT BEACH SCHOOL

(VARIOUS)(FIRE TRAINING

CTR)

LANDOLD CARD SHOWS

2.13 ACRES OF 6.13 ACRES

=WASTELAND

C

BUILDING PERMIT RECORDPermit ID Issue Date Type Description Amount Insp. Date % Comp. Date Comp. Comments Date ID Cd. Purpose/Result

1728916962

01/24/200211/23/2001 CM Commercial

240,0000

06/14/200210/01/2002

100100

10/01/2002 2000SF ADDN REARFOOTING+FNDT FOR A

10/14/20046/17/2002

SFTM

1100

Field ReviewMeasur+Listed

LAND LINE VALUATION SECTION

CONDO BLDGCONDO UNITCONDO FLOOR

CENSUS TR

HLDG TK

1843

Appraised XF (B) Value (Bldg)Appraised OB (L) Value (Bldg)Appraised Land Value (Bldg)Special Land Value

Total Appraised Parcel ValueValuation Method:

Total:ASSESSING NEIGHBORHOOD

Type ISVISIT/ CHANGE HISTORY

ASSOC PID#

Adjustment: 0

Type

Yr. Code Assessed Value Yr. Code Assessed Value Yr. Code Assessed Value212225

350,1001,083,500

10,500

2003 TTL 1,295,100 200220022002

212225

287,500998,100

14,000

Total: 1,444,100 Total: Total:

200420042004

NBHD/ SUB0650/A

NBHD NAME STREET INDEX NAME TRACING BATCH

1,295,100 1,299,600

B#11

Total Card Land Units:

903I9030

Use Code

UseDescription

MUNICIPAL MDL96MUNICIPAL MDL00

R-4Zone D Frontage Depth

1.005.13

UnitsACAC

AC6.13 Parcel Total Land Area:

115,400.0015,000.00

1.001.00

I. FactorUnit Price S.A.

50

6.13 AC

1.00001.0000

AcreAcre C. Factor

2.002.00

06500650

ST. Idx Adj.1.301.30

Total Land Value:

USENotes- Adj Special Pricing Adj. Unit Price Land Value

300,000200,100

500,100

DiscDisc

Property Location: 345 SHORE DR MAP ID: C10/C11 001/ 00006/ /Bldg #: 1 of 1 Card 1 of 1 Print Date: 09/04/2007 22:06Vision ID: 5575 Account # 011051

Bldg Name: State Use: 903ISec #: 1 ofof 1

Page 17: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

BASCRL

BASUBM

FOP

FOP

PTO

FOP60

19

36

56

36

4236

61

24

140

53

4

3

7

3

4723

37

3

23

58

3

33

18

4

15

Model

CONSTRUCTION DETAILElement Cd. Ch. Description

COST/MARKET VALUATION

BUILDING SUB-AREA SUMMARY SECTIONCode

Ttl. Gross Liv/Lease Area:

Style

GradeStoriesOccupancy

Exterior Wall 2Roof StructureRoof CoverInterior Wall 1

Exterior Wall 1

Interior Wall 2Interior Floor 1Interior Floor 2Heating FuelHeating TypeAC Type

Bldg Use

72 Public School96 Ind/Comm03 C1220 Brick

01 Flat04 T&G/Rubber01 Minim/Masonry

Total RoomsTotal BedrmsTotal Baths

Heat/ACFrame TypeBaths/PlumbingCeiling/WallRooms/PrtnsWall Height% Comn Wall

MIXED USE

Element Cd. Ch. DescriptionCONSTRUCTION DETAIL (CONTINUED)

05 Vinyl/Asphalt

02 Oil05 Hot Water01 None

903I MUNICIPAL MDL96

000

02 HEAT/AC SPLIT03 MASONRY02 AVERAGE06 CEIL & WALLS02 AVERAGE14

Code903I

DescriptionMUNICIPAL MDL96

Percentage100

BASCRLFOPPTOUBM

DescriptionFirst FloorCrawl SpacePorch, OpenPatioBasement, Unfinished

Living Area11,252

0

00

0

Gross Area11,252

11,252

8,220102594

3,032

23,200

Eff. Area11,252

02059

606

11,937

Unit Cost182.62

0.0035.8118.1436.50

Undeprec. Value2,054,840

03,652

10,775110,668

2,179,935

Apr Value15,000

Adj. Base Rate:Section. RCN:Net Other Adj:

182.622,179,9350.00

Replace CostAYB

Dep CodeRemodel RatingYear RemodeledDep %Functional ObslncExternal Obslnc

1Cost Trend Factor

2,179,9351952

G

2900

Status% CompleteOverall % CondApprais ValDep % OvrDep Ovr CommentMisc Imp OvrMisc Imp Ovr CommentCost to Cure OvrCost to Cure Ovr Comment

711,547,8000

0

0

OB-OUTBUILDING & YARD ITEMS(L) / XF-BUILDING EXTRA FEATURES(B)Code SubDescriptionPAV1 PAVING-ASPH

Sub Descript L/BL

Units20,000

Unit Price Yr Gde Dp Rt Cnd %Cnd1.50 2002 0 50

Property Location: 345 SHORE DR MAP ID: C10/C11 001/ 00006/ /Bldg #: 1 of 1 Card 1 of 1 Print Date: 09/04/2007 22:06Vision ID: 5575 Account # 011051

Bldg Name: State Use: 903ISec #: 1 ofof 1

Page 18: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

ENVIROMED SERVICES, INC.

Asbestos Inspection Report for 421 Shore Drive Boiler Components

Branford, Connecticut

prepared for: Town Of Branford

Department of General Government Buildings 1019 Main Street Branford, Ct 06405

August 10, 2009

EnviroMed Project # IH-09-202

470 Murdock Avenue, Meriden, CT 06450 (203) 238-4846 • facsimile (203) 238-4243

Page 19: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

EnviroMed Services, Inc. Project # IH-09-202 421 Shore Drive Branford, CT Asbestos Inspection Report

Table of Contents

I. Project Narrative Overview Summary of Results II. Bulk Sample Location Diagrams III. Sample Log and Results Table IV. Laboratory Analysis Sheets

Page 20: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

EnviroMed Services, Inc. Project # IH-09-202 421 Shore Drive Branford, CT Asbestos Inspection Report

I. PROJECT NARRATIVE Overview On August 10, 2009, a state-licensed asbestos inspector, Gene Berube (License # 000144), from Enviromed Services, Inc. (Enviromed) performed an asbestos inspection at 421 Shore Drive Branford, Connecticut. The purpose of this inspection was to identify the presence of asbestos in suspect boiler components, as directed by the client.

Samples were collected in accordance with 40 CFR Part 763.86 and 29 CFR Part 1926.1101, and analyzed using Polarized Light Microscopy (PLM). A total of thirty (30) bulk samples were collected. The interior materials sampled include: 12”, 8”, and 6” pipe insulation, mud / pipe joint insulation, black patching cement, rib rope / rope gasket, red compound sealer, and exhaust breeching cement insulation. Refer to Section II, Bulk Sample location Diagrams, for sample locations and identification. Summary of Results EnviroMed Services, Inc. accredited asbestos laboratory (NVLAP 200858-0) analyzed the bulk samples. Section III presents the complete list of analytical results for samples collected. The following presents the locations and estimated quantities of materials found to contain asbestos grater than 1.0 percent:

See Section III for results of all samples taken and Section IV for a copy of the laboratory analysis sheets for the samples collected.

Approximately 12’ of beige 12” pipe insulation was found to contain between 30% and 40% asbestos. Approximately 3 pieces of beige mud / 12” pipe joint insulation was found to contain 60% asbestos. Approximately 42’ of beige 8” pipe insulation was found to contain between 45% and 55% asbestos. Approximately 5 pieces of beige mud / 8” pipe joint insulation was found to contain 60% asbestos. Approximately 65’ of beige 6” pipe insulation was found to contain between 33% and 40% asbestos. Approximately 7 pieces of beige mud / 6” pipe joint insulation was found to contain between 45% and 60% asbestos. Additional Notes The possibility exists that suspect asbestos containing materials may be located behind fixed walls, under fixed flooring or above fixed ceilings. In the event of any renovation/demolition activities, upon the penetration or demolition of a fixed wall or ceiling, should any suspect materials be seen, a licensed asbestos inspector should be contacted to provide a follow-up inspection to determine the presence of asbestos.

Page 21: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

EnviroMed Services, Inc. Project # IH-09-202 421 Shore Drive Branford, CT Asbestos Inspection Report

II. BULK SAMPLE LOCATION DIAGRAMS

Page 22: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Project:

Prepared for:

Prepared by:

Drawing Title:

27 26 25

222324

21 20 19

18

1716

15

1413

12

11

10

9

8

7

65

4

3

21

12"

8"

12"

6"

8"

5'

Cleanout Cover

No Breeching

Rib Rope

LEGEND: BOILER SYSTEM #1Drawn By : DP

Town of Branford Dept. of General Government Buildings

421 Shore Drive Branford, CT

Asbestos Inspection Location Diagram

Drawing No.2

Scale : NTS

Date: 08/19/09

1EnviroMed Services # IH-09-202

EnviroMed Services, Inc.470 Murdock Ave., Meriden, CT

of

: SAMPLE LOCATIONS Approved By : TN

Page 23: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Project:

Drawing Title:

Prepared by:

Prepared for:

3029

28

2

: SAMPLE LOCATIONS

LEGEND: BOILER SYSTEM #2

Asbestos Inspection Location Diagram

421 Shore Drive Branford, CT

Town of Branford Dept. of General Government Buildings

Drawn By : DP

of

EnviroMed Services, Inc.470 Murdock Ave., Meriden, CT

EnviroMed Services # IH-09-202

Date: 08/19/09

Scale : NTS

2Drawing No.

Approved By : TN

Page 24: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

EnviroMed Services, Inc. Project # IH-09-202 421 Shore Drive Branford, CT Asbestos Inspection Report

III. RESULTS TABLE

*For more specific Locations look to Part II of the report * Sample ID listed by date and sample number BOILER SYSTEM LOCATION MATERIAL TYPE PERCENT

ASBESTOSMATERIAL QUANTITY SAMPLE ID

1

12” Pipe

Beige Pipe Insulation 30 12 Linear Ft 090810-01

1

12” Pipe

Beige Pipe Insulation 40 12 Linear Ft 090810-02

1 12” Pipe Beige Pipe Insulation 45 12 Linear Ft 090810-03

1 12” Pipe Elbows Beige Mud / Pipe Joint Insulation 60 3 Pieces 090810-04

1 12” Pipe Elbows Beige Mud / Pipe Joint Insulation 60 3 Pieces 090810-05

1 12” Pipe Elbows Beige Mud / Pipe Joint Insulation 60 3 Pieces 090810-06

1 8” Pipe Beige Pipe Insulation 45 42 Linear Ft 090810-07

1 8” Pipe Beige Pipe Insulation 47 42 Linear Ft 090810-08

1 8” Pipe Beige Pipe Insulation 55 42 Linear Ft 090810-09

1 8” Pipe Elbows Beige Mud / Pipe Joint Insulation 60 5 Pieces 090810-10

1 8” Pipe Elbows Beige Mud / Pipe Joint Insulation 60 5 Pieces 090810-11

1 8” Pipe Elbows Beige Mud / Pipe Joint Insulation 60 5 Pieces 090810-12

1 6” Pipe Beige Pipe Insulation 40 65 Linear Ft 090810-13

1 6” Pipe Beige Pipe Insulation 40 65 Linear Ft 090810-14

Page 25: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

EnviroMed Services, Inc. Project # IH-09-202 421 Shore Drive Branford, CT Asbestos Inspection Report

1 6” Pipe Beige Pipe Insulation 33 65 Linear Ft 090810-15

1 6” Pipe Elbows Beige Mud / Pipe Joint Insulation 60 7 Pieces 090810-16

1 6” Pipe Elbows Beige Mud / Pipe Joint Insulation 45 7 Pieces 090810-17

1 6” Pipe Elbows Beige Mud / Pipe Joint Insulation 56 7 Pieces 090810-18

1 Rib Rope/ Boiler Wall Black Packing Cement / Insulation NAD 3” wide 090810-19

1 Rib Rope/ Boiler Wall Black Packing Cement / Insulation NAD 3” wide 090810-20

1 Rib Rope/ Boiler Wall Black Packing Cement / Insulation NAD 3” wide 090810-21

1 Boiler Wall Beige Rope Gasket NAD 1” Round 090810-22

1 Boiler Wall Beige Rope Gasket NAD 1” Round 090810-23

1 Boiler Wall Beige Rope Gasket NAD 1” Round 090810-24

1 Cleanout Cover Red Compound Sealer NAD 4” X 18” 090810-25

1 Cleanout Cover Red Compound Sealer NAD 4” X 18” 090810-26

1 Cleanout Cover Red Compound Sealer NAD 4” X 18” 090810-27

2 Exhaust Pipe Brown Cementitious Exhaust Breeching Insulation NAD 12” round 090810-28

2 Exhaust Pipe Brown Cementitious Exhaust Breeching Insulation NAD 12” round 090810-29

2 Exhaust Pipe Brown Cementitious Exhaust Breeching Insulation NAD 12” round 090810-30

Page 26: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

EnviroMed Services, Inc. Project # IH-09-202 421 Shore Drive Branford, CT Asbestos Inspection Report

IV. LABORATORY ANALYSIS SHEETS

Page 27: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13,Meriden, CT 06450Phone (203)238~~6 : Facsimile (203)238-4243/.) c.=Sample ID #: .f (+ ()?-,,{(J~ .-. . ~Customer Name, Address: ot/O {3e.r....e.Sam Ie Location: Includin Room Buildin

Sample TVDe: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:

l.1Jene ..Breechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: ·r Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other:

Collected by: /fr;J Analyzed by: of, (d)AnAfY) ~p h/::!nlAdDate: 8'" /0 -? Date: ~/lg[C1--

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y.n) yGross Appearance y~CJ Fi~~(colo~ texture)Type of Asbestos

~~ IJPl(f)ff~.Qp .Present ')Percent Asbestos (/ ":lS7Morphology v Lf'JlIIRefractive Index ,-:(Uh / U l6{JjParallel/PerpendicularDispersion Colors

}/UfJrJ?JA:1 ~/!JIP1f/ParallellPerpendicularExtinction Characteristics 0 f

l

(parallel, oblique, wavy)Sign of Elongation (+1-) ''-f-Pleochroism (color) NParallel/PerpendicularBirefringence (o,l,m,h) V

Type(s) of Non-Asbestos 4rr1 CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionOptical PropertyType( s) & Percent of (non- 3St, Particulatefibrous) Materials Present

Total % Asbestos dSZh'lf2llfIlJa(sample)

Comments: 'I ({lG==tf1Accredited for Bulk Asbestos AnalYSISby NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev. 4-21-09-uc

Page 1 of 1

Page 28: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

EnviroMed Services, Inc.

err

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:...•.•••v ••"'.

Breechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: y Wall Plaster: Vinyl Floor Tile:Duct Insulation:

"- Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other:

Collected by: cf7::> Analyzed by: T (rJJJrLUAtfJ01P{J rJ7"

Date: 8.../0 -?Analytical Method: Polarized Light Microscopy with Dispersion Staining

Date: g[tR[M __

C

vA B

Homogeneous (Y,n)Gross Appearance(color, texture)

Type of AsbestosPresentPercent Asbestos '-' 't cr-:MorphologyRefractive IndexParallel/PerpendicularDispersion ColorsParallellPerpendicularExtinction Characteristics(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)ParallellPerpendicularBirefringence (o,l,m,h) vType(s) of Non-AsbestosFibers Present (and %)

Cellulose

Non-Asbestos FibersOptical Property

Incomplete Extinction

Type(s) & Percent of (non-fibrous) Materials Present

Particulate

Total % Asbestos(sample)

Comments:~~ ---i,~ __ =---=~~ __ ~COIlb-~C=)~::fft,[Aeeredlted for Bulk Asbestos AnalysIs by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 ofl

Page 29: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13,Meriden, CT 06450Phone (203)238~~6 : Facsimile (203)238-4243/:) C:::ttSample IDtt; ./. II d 1\<(j~ .-.. • V'--Customer Name, Address: Ot'6 Ben" eSam le Location: Includin Room Buildin

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERrAL: MISCELLANEOUS MATERrAL:..Breeching Insulation.f" Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Bodv Insulation: Roof Flashing

Transite:Wallboard:Other:

Collected by: 60 Analyzed by: T- (11/IAAA flJJ)oldDate: 8"10-7 Date: ~ jlg-rnt}

J' ~ I

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) yGross Appearance RPnrfl/ eflJMeJil J '-.'f(color, texture) 717Ul. "-Type of AsbestosPresent APercent Asbestos IIIMorphology ft?Refractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicularExtinction Characteristics(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)ParallellPerpendicularBirefringence (o,l,m,h) /'Type(s) of Non-Asbestos S.,~ x:?~~~Fibers Present (and %) J <) ua«. as,Non-Asbestos Fibers T~~rt~xtinction:Optical PropertyType(s) & Percent of (non- gAt (particulatefibrous) Materials PresentTotal % Asbestos

~

()i(sample)••... @c4/)JComments:

Accredited for Bulk Asbestos AnalYSISby NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1--- ---- -----------------------------------------------

Page 30: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846: Facsimile (203)238-4243

Sample ID #: 1(+6(l,.«()~...{Customer Name, Address: 01"16--~~~--~~~~~--------~------~--~------~----~--~-------Sam Ie Location: Includin Room Buildin :

Sample Type: (Indicated bv an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Y Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Bodv Insulation: Roof Flashing

Transite:Wallboard:Other: /J r::7 /

Collected by: 6;3 (~Analyzed by:

Date: 8~/o-? Date: /Analytical Method: Polarized Light Microscopy with Dispersion Staining

A B C

Flomogeneous(y,n) '-1 I J7

Gross Appearance (y.LAc

./ a:(color, texture) '11 .7 /1/..., ""If'

Type of Asbestosv~l /L.

Present ,. A -<..Percent Asbestos If ~ozMorphology v

~Refractive Index h.J'11~ u tr,ParallellPerpendicular ~Dispersion Colors .A/~ r ; ?L-ParallellPerpendicular +rrx~/uJ' _A.

Extinction Characteristics ;; ,I(parallel, oblique, wavy)Sign of Elongation (+1-) +-Pleochroism (color) Il/;ParallellPerpendicular /

Birefringence (o,l,m,h) e:Type(s) of Non-Asbestos lf uz CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionOptical PropertyType(s) & Percent of (non- JiPZ Particulatefibrous) Materials Present A

Total % Asbestos Jctz ~~/~(sample)

Comments: #Aeeredited for Bulk Asbestos AnalYSISby NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 31: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: 1(:f. (3 ?- --< (}~'-.z.,Customer Name, Address: Ot/6 /3en"eSam le Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireoroofinz: Susn.CeilinzBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: ~ Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinvl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: /1

Collected by: &15 Analyzed by: (JL/~Date: 8,,!O~? Date: ~ UrUv'7

1Analytical Method: Polarized Light Microsconv with Dispersion Staining

A B C

Homogeneous (y,n) '"1Gross Appearance

~~/I ,y~vV\(color, texture)Type of Asbestos {/ . V rh ,.,)!;h -,Present -vv ~"{r

Percent Asbestos 1/ /;/0 tMorphology

A..uu... __ --Refractive Index h- {If r/"III ,dtParallel/PerpendicularDispersion Colors ~(rt/ ~ParallellPerpendicular /1:,,/.Extinction Characteristics I; ,A

I(parallel, oblique, wavy)Sign of Elongation (+1-) '-1-Pleochroism (color) rt-:ParallellPerpendicularBirefringence (o,l,m,h) ez-Type(s) of Non-Asbestos '-1az CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionIOptical Property I

Type(s) & Percent of (non- Zuz Particulatefibrous) Materials PresentTotal % Asbestos Yd L l'LA~(sample)Comments: TAccredited for Bulk Asbestos AnalYSISby NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 32: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID#: 7(+ d 'l,<(jJZ~:3Customer Name, Addressj, _0,;;;· ...;'t....;/;.:;6~--:~_-rl~"'-- .....,..,.........:.. ~=- __ ~_"T"'"" _

Sam le Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp, CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: X' Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: .....,

Collected by: 60 Analyzed by: ~~L~Date: s-e-» Date: /' //,1/09

fAnalytical Method: Polarized Light Microscopy with Dispersion Staining

A B C

Homogeneous (y,n) '1Gross Appearance M~ /;t, tvlA/7(color, texture)Type of Asbestos .». p;~L --Present 7<Z

- z:;;c;;...Percent Asbestos // '1J -lMorphology (/ ~Refractive Index ·h~J--??7~/~ ~ParallellPerpendicularDispersion Colors J-h /'J?v

~ParallellPerpendicular F

Extinction Characteristics (I v

I(parallel, oblique, wavy)Sign of Elongation (+1-) 'rPleochroism (color) /VParallellPerpendicular ./

Birefringence (o.l.m.h) c--:Type(s) of Non-Asbestos Jo1 CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction•Optical PropertyType( s) & Percent of (non- '2.{"2 Particulatefibrous) Materials PresentTotal % Asbestos '1fC ~., LA(sample) A.:r -

Comments: tIAccredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-LJC

Page I of 1

Page 33: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: Trfd ?-..<o;z- ~I .Customer Name, Addressj, _O::::;..:t...,:/.::;6:::..........:..t3.;:· ~e..;;;.' -d-~----~---~----!.....;......;....,..;....;.~::=:---~-,....---Sam le Location: IncJudin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp. CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: X' Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other:

~Collected by:,_U'-"'_<J3_,· _

Date: 8"'10-?Analyzed by: _

Date: _

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) '-7Gross Appearance {j~~2 /~(color, texture) ./J./~~

Type of Asbestos v~ £./5 /..~~ A.'v/

Present .(."P''""/f v - -

Percent Asbestos // G (J---r

Morphology .//~ .s-:

Refractive Index h'r1 ?;7{/.)'/ 4ParallellPerpendicularDispersion Colors

~///A'.L'..k--.ParallellPerpendicular

Extinction Characteristics <I i'(parallel, oblique, wavy)Sign of Elongation (+1-) 'rPleochroism (color) /l/Parallel/PerpendicularBirefringence (o,l,m,h) L---Type(s) of Non-Asbestos (0""1 CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction.Optical PropertyType(s) & Percent of (non- Joz Particulatefibrous) Materials PresentTotal % Asbestos 007 ~-Pz-(sample) ~ ~ v-

Comments: ;7Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-OS71The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 34: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: 1(+dL...,.(d~'5 ,Customer Name, Addressj, --.;O;::;;..:.'t...:.,~O::..........:..f3.;;:· :;.,..;e...;.n-d-..;::;,a:: ~---~---l-.,;"..;....--.,;.___:::=:_--_:_-'r_---Sam le Location: Inc1udin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: X Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: A ~ /

Collected by: 6g Analyzed by: !I ~.f2_

Date: 8~/o-? Date: ;/ fffM.,v / {

Analvtical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) =r ,Gross Appearance fk:.~ /~ A /1/~(color, texture)Type of Asbestos a. f/f/-vL!PresentPercent Asbestos /J t,"r; cMorphology v L..---",Refractive Index -h,~~;pmr-rParallellPerpendicularDispersion Colors jlWo/a,M- ~~ParallellPerpendicularExtinction Characteristics r; 1/(parallel, oblique, wavy)Sign of Elongation (+/-) 'r-Pleochroism (color)

~ParallellPerpendicularBirefringence (o,l,m,h) L../'Type(s) of Non-Asbestos (U-t. CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

I Optical PropertyType(s) & Percent of (non- 3crz Particulatefibrous) Materials Present ,-Total % Asbestos (;0& C-/t ~1(sample) "'"- ./;. /DC:"

Comments: /IvAccredited for Bulk Asbestos AnalYSISby NVLAP Lab Code #200858"{) CT Lab #PH"{)571

The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 ofl

Page 35: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846: Facsimile (203)238-4243

Sample ID #: 1(16t·,.( 0 J.... -CCustomer Name, Address .•.•: _O-.....1"....;.,.::o,,--.....:..T...;3. '--e_n-d-...;;.c. ~--~ __ ---:.---~:=:_--~-r_---Sam le Location: Includin Room Buildin :

Sample Type: (Indicated bv an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERlAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp, CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: )C: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: /J /

Collected by: 6JJ Analyzed by: II"bL (l

Date: 8~!O-? Date: /M~c~r Y/ L

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) ~ /

Gross Appearance~ L~(color, texture) ••••A./A

Type of Asbestos a~Af//PresentPercent Asbestos /J "/ (i/-Morphology tY v

Refractive Indexhl..~~jJj/JtParallellPerpendicular

Dispersion Colors I\~/~ r-ParallellPerpendicularExtinction Characteristics \I v ( ,f 1/(parallel, oblique, wavy)Sign of Elongation (+1-) v,f-Pleochroism (color) 4/ParallellPerpendicular --Birefringence (o,l,m,h) c-«Type(s) of Non-Asbestos 11 CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionIOptical PropertyType(s) & Percent of (non- J" .J (, Particulatefibrous) Materials Present /'J

Total % Asbestos 602~:p(sample) <,

tYConunents. ~--~--~-- __ ------------~ __ ------------------------Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200SSS'{) CT Lab #PH'{)S71The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 36: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13,Meriden, CT 06450Phone (203)238-4846: Facsimile (203)238-4243

Sample ID#: T(+ d t·,..( ()~- '? .Customer Name, Addressj, _C;::;;...;t;...;,..:.6~.....:.f3..;;' :;....-e.._. +....;:;.& -:-~--~ __ "-----____:=_--_:_-,_---Sam le Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: X Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: "

Collected by: 60 h U-;l-J2Analyzed by:

Date: 8"10-2 Date: (J 11' 1#/0 Cj~/ /

Analytical Method: Polarized Light Microscopy with Dispersion Staining,

A B C

Homogeneous (y,n) 7Gross Appearance

~-.~/ LL/l.(color, texture) -v~ ...•Type of Asbestos r~~ A&:_ -

~Present :" A•• nrA-R.C7 ~Percent Asbestos P' "11./l 3'1Morphology d.. It A...

Refractive Index Jz l-'l1?:!'u /-1/7'1 ]./6 rr.h~qtParallellPerpendicularDispersion Colors W~k/~ -~ ~~~

. d2. -Parallel/Perpendicular ...•---- ~ _/- ~Extinction Characteristics !! Ii' /V( ./I(parallel, oblique, wavy)Sign of Elongation (+/-) . -1- rf-,Pleochroism (color) IV IVParallel/Perpendicular ,/

Birefringence (o.l.m.h) L-- Pl-!Type(s) of Non-Asbestos (.J2 CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

I Optical PropertyType(s) & Percent of (non- 1{fl Particulatefibrous) Materials Present i

Total % Asbestos '-121cL_~! 7! ~(sample)~Comments.~~ __ ~~ __ = ~_~~ ---::~~=~~ _

Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev. 4-21-09-uc

Page 1 of 1

Page 37: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: l(fdt,{o~-8Customer Name, Addressj, _0;::;- ;..:t....:/~6::::..-.--:...:;::;_-r:t:.....;;;.L- ---:::-:- __ ....,.~--:.. __ ......;."""":::=:- __ -:-_-r- _

Sam le Location: Includin Room Buildin :

Sample Type: (Indicated bv an "X" in the applicable column below)THERMAL SYSTEMS INSULAnON: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilinzBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: X. Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other:

Collected by: 60 Analyzed by: tI/~ ..0

Date: 8<-lo~? Date: / »/1;--- .: 9

f t'Analytical Method: Polarized Light Microscopy with Dispersion Staining

A B C

Homogeneous (y,n) 1-7

Gross Appearance ~/L(color, texture) n

Type of Asbestos -s y-, ---

~Present -"_'Z7~Percent Asbestos /I "'tr1- '7 ZMorphology A /1F. ~ /./-- -Refractive Index ch, ('Z1 ~/ ~F7 .; r 1J--'l1LL:ParallellPerpendicular ",.Dispersion Colors

~ I-~~~// L~Parallel/Perpendicular ~Extinction Characteristics I' f) ,y If ( ~/{parallel, oblique, wavy)Sign of Elongation (+/ -) V,..;--

I---

Pleochroism (color) -t, I

ParallellPerpendicular rVBirefringence (o,l,m,h) --- ,1,/1

Type(s) of Non-Asbestos /crz Cellulose, L--

Fibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

IOptical PropertyType(s) & Percent of (non- tr72 Particulatefibrous) Materials PresentTotal % Asbestos 'tJ~ln'7-od Z r«:»;(sample)Comments: 1/Accredited for Bulk Asbestos AnalYSISby NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 ofl

Page 38: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID#: 'Iff d ?-,{ 0A1Customer Name, Addressj, ........;C;::;....:.i....:./~_~;:;;.....;;~~;L... ........; ...,..~~..;,..;...-;.....;..;.~:--_--:"_--r _

Sample Type: (Indicated bv an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp, CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: J< Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linolewn:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: /} "

Collected by: 6<f3 Analyzed by:(~-t-fl--

Date: 8"IO~? Date:t7 cl71J-/09

/ (

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) ~Gross Appearance

~~~~(color, texture)Type of Asbestos ~~ /l;,. "A-/-XPresent v v ~

Percent Asbestos {/ ,Jo-z.- ) 2Morphology - A :z;;:._ ~ ,?

Refractive Index h~:r-Z/~i? ~~¥/rt r~// .~ParallellPerpendicular / v'Dispersion Colors \ .J1/L/t; i,~ J / (1/7. ' ~: ~ParallellPerpendicular a IJf'" tik•...~ vc...- 0,' . / //If '(

Extinction Characteristics II ,:7 t{parallel, oblique, wavy)Sign of Elongation (+1-) -r: tr:Pleochroism (color) /l; dParallellPerpendicularBirefringence (o.l.m.h) c---- ~Type(s) of Non-Asbestos IO·-Z CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

I Optical PropertyType(s) & Percent of (non- .J)-Z Particulatefibrous) Materials PresentTotal % Asbestos )07 c;L/;/l j- 2 ~I(sample) - /f"'-

7Comments.~~ ~~~~ _Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 ofl

Page 39: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846: Facsimile (203)238-4243

Sample ID #: If+d ?"<CJ<..-f() ,Customer Name, Addressj, --.,;0::::;..:1"....:,.:.1 ::::..........:.13.;:. :::;...;:e..;;;,rc....,l-..;::;,t: --.,;. .,...........!~..:......:..:...:.....",.....---- .•.....---

Sample Type: (Indicated by an "X" in the applicable column below)

Other: /1

THERMAL SYSTEMS INSULATION: SURFACING MATERIAL:Susp.CeilinzMISCELLANEOUS MATERIAL:

Boiler Insulation: Spray-on Fireproofing:Fixed Ceilinz Tile:Breeching Insulation: Acoustical Plaster:

Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: X Wall Plaster: Vinyl Floor Tile:

Flooring Mastic:Duct Insulation: Wallboard Compound:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Bodv Insulation: Roof Flashing

Transite:Wallboard:

Collected by:._Ur..,...:::_'7J)"-- _

Date: 8~/O -?Analyzed by: __ -fil~~-~~~:;;.'fZ___;;___:..----

Date: __ ?__¥-fft..!.../~17,£-7V'--L-~_/ [...

Analytical Method: Polarized Light Microscopy with Dispersion StainingCA B

Homogeneous (y,n)Gross Appearance

(colo~ texture)Type of AsbestosPresentPercent AsbestosMorphology

_ v

Refractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicularExtinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)ParallellPerpendicularBirefringence (o,l,m,h)Type(s) of Non-AsbestosFibers Present (and %)

Cellulose/dZNon-Asbestos FibersIOptical Property

Incomplete Extinction

Type(s) & Percent of (non-fibrous) Materials Present

Particulate

Total % Asbestos ~O' ? --d(sample) () ( c (-v-

Comments::-:-:--:-:-_-:---:--:-:~---:-:~"::,,,,:,,"~~=~ =-::--:-:~~-#~ _Accredited for Bulk Asbestos AnalYSISby NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 40: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID#: T(fc3 ?--<O~ -I( •Customer Name, Address: 0"/6 /3e..rc"eSam le Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp. CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: ~, Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: /l

Collected by: 6r;5 1/ M.>Z~Analyzed by:

Date: 8~!c>-? Date: ,/ Ul'r~~v / (

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) V_Gross Appearance C~ ~L(color, texture) ? r~ .~ 'I 1/1L.£,.,

Type of Asbestos 1/ (l &.J le/.PresentPercent Asbestos f...lrffMorphology A ~.

Refractive Index ch J'1~uj'j~~ParallellPerpendicularDispersion Colors I /J/~~ /-ParallellPerpendicular (J /~ -;., ~Extinction Characteristics ( {' pi'

(parallel, oblique, wavy) ()Sign of Elongation (+/-) :..f---Pleochroism (color)

~~.Parallel/PerpendicularBirefringence (o,l,m,h) '"

~Type(s) of Non-Asbestos It CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionOptical PropertyType(s) & Percent of (non- "32'2 Particulatefibrous) Materials Present A

Total % Asbestos G 'ot cL /?~_(sample) , -;r

Comments: ~Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-IJc

Page 1 of 1

Page 41: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13,Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID#:1t+d ?,.(d;"" "!,J. ,Customer Name, Address •..: _O.;;;;....;.t".....;.f.;:;:6~~f3....;, ~e_n-d-~ ~ ~~ ---::=:- __ -:--_r- _

Sam Ie Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp, CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: X Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: /1 /

Collected by: cfjj Analyzed by: ;r~Date: 8~/o-? Date:tfY' 47/1/0/'l c,

Analytical Method: Polarized Light Microscopy with Dispersion Staining (

A B C

Homogeneous (y,n) '7 d /Gross Appearance yp~----W- ~---/)./ ~(color, texture) v -./

Type of Asbestos /r~///-kPresentPercent Asbestos // ()i'aMorphology // -- -Refractive Index h "ParallellPerpendicular ,.Jl7 ?-7/1/~ J--;/6Dispersion Colors )1?£J t::=:---.-ParallellPerpendicular o /?,:Extinction Characteristics f

,;7

(parallel, oblique, wavy)Sign of Elongation (+1-) I-Pleochroism (color) /VParallellPerpendicular

"Birefringence (o,l,m,h) c->Type(s) of Non-Asbestos ri CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

IOptical PropertyType(s) & Percent of (non- 5(Z Particulatefibrous) Materials PresentTotal % Asbestos hCrz {d_.~(sample)

Comments: ijAccredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 42: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: T(..((j/\<(j~-f3 ,Customer Name, Addressj, _C;:;...:t...:/.:.6~-..:..f3..;;;:· ;;....e....;;,. -d-~----~---~~~";"""';"';~~--~-,.----Sam Ie Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: >< Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: .

Collected by: 6j3 Analyzed by:~_,L.Y __

Date: 8"10-2 Date:/' m~/;-t

/ ' ('

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) -r -IGross Appearance ~~\// ~

(color, texture) ~Type of Asbestos nb~ L/Present .-VA-(" -Percent Asbestos t.1(J~ /I ~Jt ,-.<.-Morphology 1/ " .i_ I-

Refractive Index hc,r'1 ~ t:~f?Parallel/PerpendicularDispersion Colors J4~/A ~Parallel/PerpendicularExtinction Characteristics

, (/l /'(parallel, oblique, wavy)Sign of Elongation (+1-) '-/-Pleochroism (color) /Z/"'Parallel/Perpendicular A

Birefringence (o,l,m,h) C-Type(s) of Non-Asbestos ..J~elluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

IOptical PropertyType(s) & Percent of (non- Juz Particulatefibrous) Materials Present .Total % Asbestos tro~ ~~~~ ~Z7?-(sample)Comments: t?'Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to clairnproduct endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 43: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: 7r!d ?,,<(j~<-/"1.Customer Name, Address ..:..:_O;:::;..:1;..:/~;::::...---!.13...;;;' ;;;...;;e.~~~ ~~ __ ......,.,.......-!...::;;;,.:..-.:...:....;,--...:,....... -.,... _

Sample Type: (Indicated bv an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: X Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Comnound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: -

Collected by: dJ3 Analyzed by: 7}/V~Date: 8../0-'1 Date:

/ fftr/O?/ (

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) '-J I"Gross Appearance ~!vIJ- • J. _

(color, texture) 'Y ~Type of Asbestos u t:7 /r': "Present r~h- 7pL ~Percent Asbestos //?rt. ~-/1

Morphology ,,- .- /""-:;y ." ./~

Refractive Index 1;.~W:I'v-/Z -,. -:7ParallellPerpendicular k 6.~/;.. £aL

Dispersion Colors hY( / --It tu--./ ~V<f7HC7 -v:~~~ParallellPerpendicular I-> 'F

Extinction Characteristics (JI I 7 -~

I(parallel, oblique, wavy)Sign of Elongation (+1-) 'L vJPleochroism (color) #- v

Parallel/PerpendiculartfV'

Birefringence (o,l,m,h) L- .~Type(s) of Non-Asbestos CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionOptical PropertyType(s) & Percent of (non- Particulatefibrous) Materials PresentTotal % Asbestos ~-uk-J06r/l ~I 22(sample)

IfConunents., _Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page I of 1

Page 44: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846: Facsimile (203)238-4243

Sample ID #: I (+ (3r..'<(\Jl....-I5' •Customer Name, Addressj, _C::::;..:t...:/~O:::...........:..f3.;;:- ~e...;;.' -d-...;;:::,.I(.----~---~~:...-....:.-----:~::=:_--_:_-_r_---

Sam le Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERlAL: MISCELLANEOUS MATERlAL:Boiler Insulation: Spray-on Fireproofing: Susp. CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: X Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: /l

Collected by: 6~ Analyzed by:/L/;;,/;£

.-if -v

Date: se-» Date:f' #lrft9

/ r

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y.n) c.-;/JGross Appearance /fu:~P',:t'/~(color, texture) .n..t.! /?

Type of Asbestos ~fZ~Present

Percent Asbestos // v,(,,7"ZMorphology v A. _._

Refractive Index .1-7,J11 ?h /.J::ZParallellPerpendicularDispersion Colors

,. ,ParallellPerpendicular 1f-fU " ://

,,~-Extinction Characteristics o (

~ 'i(parallel, oblique, wavy)Sign of Elongation (+1-) J. i--

Pleochroism (color) VParallellPerpendicularBirefringence (o,l,m,h) -:Type(s) of Non-Asbestos / Z 1CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionOptical PropertyType( s) & Percent of (non- J){ Particulatefibrous) Materials PresentTotal % Asbestos JJ? Gt..;? L~(sample)

Comments: t/Aeeredlted for Bulk Asbestos Analysis by NVLAP Lab Code #200SSS-O CT Lab #PH-OS71The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 ofl

Page 45: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: I (+ (}?"',{ ()P..... ~Ib .Customer Name, Address; _0..;:;· ;..;t.;..;/~o==-----l.13...;;· - ~e_--r:I-....;;::.E-----:--:----':""':"--~---___:=_--~-_r_---Sam Ie Location: IncJudin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susn.CeilinzBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: X Wall Plaster: Vinvl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofinz Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: /l /

Collected by: d~ Analyzed by: (j~~~(2

Date: 8"IO~? Date: / }/1)--/v'17 c (

Analytical Method: Polarized Light Microscopv with Dispersion Staining [

A B C

Homogeneous (y,n) - Y/J 1/Gross Appearance r~~ta _ A~.

(color, texture) 'f)" -/

Type of Asbestosv /rk /7/7 -

Present P' AFV'" --Percent Asbestos //(. 'o-tMorphologyRefractive Index k ~ ~ --:J(Parallel/Perpendicular . ,fL1~/II/.Dispersion Colors l.~~~ It?ParallellPerpendicularExtinction Characteristics 'v

~~

I(parallel, oblique, wavy)Sign of Elongation (+1-) lPleochroism (color) J0ParallellPerpendicularBirefringence (o,l,m,h) c.>Type(s) of Non-Asbestos r! CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionIOptical PropertyType(s) & Percent of (non- 'J 2;z Particulatefibrous) Materials PresentTotal % Asbestos 6UZ d ~A/'./7<,-t '(sample) Vl/ ~ -~ ~ --

Comments: ;/Accredited for Bulk Asbestos AnalYSISby NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page I of 1

Page 46: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ill #: lrfo 'l-,<O~"'(7,Customer Name, Addressj, _O=.,;'t....:f,.:.:6:::.-.....:.I3.;:' ::.-e.;;;.n+~ -:- ~---l--.,;....;.......;....;.~::=:-__ -:-_r- _

Sam Ie Location: Includin Room Buildin

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofmg: Susp.CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:PweJointInsulation: ~ Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other:

Collected by: &0 Analyzed by:IYZ/-/--

Date: 8~/o-? Date: ,~ m~/c7/ (

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y.n) JI/Gross Appearance ({/~~,ILL_ I.-A..(color, texture) y r , - ..".Type of Asbestos (/1'~~Present r---

Percent Asbestos -'" // 4 rr.Morphology M~Refractive Index

,-h~~/'J? 'CParallellPerpendicularDispersion Colors J-~~/ -

Parallel/Perpendicular 17Extinction Characteristics {I

,(parallel, oblique, wavy)Sign of Elongation (+1-) ViPleochroism (color) i:Parallel/PerpendicularBirefringence (o,l,m,h) L-Type(s) of Non-Asbestos /u t CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

IOptical PropertyType( s) & Percent of (non- 'f/~ ,)Particulatefibrous) Materials Present i"

Total % Asbestos O-;;$;r~~ -.-

(sample) l1J-?IConnnents.~~~ ~~~ ~~ __ ~ _

Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-OS71The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 47: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: Il..(.()L...,<(J~ "'18 ,Customer Name, Address ..:...:_0;;:;' ;..;t...:/.::6~.....:.f3..;;' ;;....;e..;;.n~...;;:;.t: -:-~ __ ::oo:----i:..;.;...;".....;...;;~=- __ ~_~ _

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Suso. CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: ~ Wall Plaster: Vinvl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: A -

Collected by: 6J3 Analyzed by: ne>:Date: 8~!O-? Date:

-7 /7//'/091/ / / r

Analytical Method: Polarized Light Microsconv with Dispersion Staining -,A B C

Homogeneous (y,n) 71J J

Gross Appearance IY;41 /h~ BJ~(color, texture) IV' vType of Asbestos 'l~ JVPresent .A..A ffZ'--z.Percent Asbestos // ((6 ZMorphology t> ~~ ...••...

Refractive Index h/rt7ZjJ~f',

ParallellPerpendicular /1Dispersion Colors

~CU-yj I/~Parallel/PerpendicularExtinction Characteristics I I

t7

I(parallel, oblique, wavy)Sign of Elongation (+1-) IJ.-Pleochroism (color) kParallel/PerpendicularBirefringence (o,l,m,h) L----Type(s) of Non-Asbestos J'2 CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete ExtinctionOptical PropertyType(s) & Percent of (non- :J(-2 Particulatefibrous) Materials PresentTotal % Asbestos J{( -~ "L/

(sample) .-. / ...I .•.~"';?1"V"'" ~

Comments: PAccredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 48: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

SarnpleID#: 1(+d'l,{o~-(?,Customer Name, Address: ottO {3en"e

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: X 73 h~k:QE'.mc!i I- Spray-on Fireproofing: Susp.CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: (/ /A'

Collected by: 6JJ Analyzed by://{J~

8'-10-2./ drr/o"lDate: Date:

/' {

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) yGross Appearance {fLv~ (riL ~

(color, texture) .21'1 ~.Type of Asbestos v

PresentPercent Asbestos 07MorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallel/PerpendicularExtinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)Parallel/PerpendicularBirefringence (o,l,m,h)Type(s) of Non-Asbestos J 2 Cel~L_ J'Fibers Present (and %) -:It,Non-Asbestos Fibers Incomp~=ction

I •••••.

Optical Property A-">

Type(s) & Percent of (non-7ZZ

Pitticulatefibrous) Materials PresentTotal % Asbestos O?(sample)Conunents:~~ ~~~~~ _Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200SSS'() CT Lab #PH'()S71The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the u.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 49: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk: Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: Tl+o(l:<(j~~-26,Customer Name, Address •..: _0.;;;;....;.1....;./..::0,,--.....:.13....;' """-e_n~....;;.&. ~ ~--l ~=-__ -:--_,...- _Sam le Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler InsulatioW<B bck' C~i1' Spray-on Fireproofing: Susp. CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other:

Collected by: t:ij3 Analyzed by: //~/--e-Date: 8~/C>-? Date: ,/ J7iff'er'1

{

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) '7Gross Appearance M~-£ ..#/

(color, texture) CJl9 V / ':-7r""./......,,-y -v V -/

Type of AsbestosPresentPercent Asbestos r/?-MorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicularExtinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)Parallel/PerpendicularBirefringence (o,l,m,h) "nType(s) of Non-Asbestos bdl, ~~se J'Fibers Present (and %) -~Non-Asbestos Fibers Incompre'Extinctio~Optical Property ~-~. - "Type(s) & Percent of (non- r(2 Particulatefibrous) Materials PresentTotal % Asbestos dl(sample)Comments: ---------------------------------------------------------------------------Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the u.S. Government. Rev.4-21-09-LJC

Page 1 of 1

Page 50: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: 7(+ ()?':< (J~ 1('. .___/)-r» Lab # Ier 7(; (Customer Name, Addressg, ......,;C:;;..;..t...:.,:/6=::....---:.f3..;;' ~e.._rc-r:r-;;;.a:.. I<-:O_C0~·Vl__ d..,."f~··_/!...-o·..;,.;a._-L_n....;..fc_o-:::rl~-:;;__ ~_r-- __

~6re.. err

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulations; 'i3hc..k- Cem€?h l' Spray-on Fireproofing: Susp. CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: "" /

Collected by: 673 Analyzed by: (~Date: 8"IO~? Date: / ff>Y'Cl C;

/Analytical Method: Polarized Light Microscopy with Dispersion Staining l

A B C

Homogeneous (y,n) yGross Appearance (fL_L 't» ~.L

~LA(color, texture) X •.•.........••.<-- •.....•..Type of AsbestosPresentPercent Asbestos UtMorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallel/PerpendicularExtinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)ParallellPerpendicularBirefringence (o,l,rn,h) ul)

Type(s) of Non-Asbestos l 0Cel~~s~_",. A r/.Fibers Present (and %) <22 .., -~--

Non-Asbestos Fibers Incomplet •• tion ./

Optical Property A.;:.d. ./ ~(~

Type(s) & Percent of (non- ? 't? Particulatefibrous) Materials PresentTotal % Asbestos U((sample)Corrunents:~~_~~ ~~~ ~~ __ ~~ _Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 51: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846: Facsimile (203)238-4243

Sample ID #: 7(+0?:<(j~-:J::<,Customer Name, Addressj, _0..;;;·· _r;;...I'""'::;;...._f:...f3...;;....e.._-_rcd-....;.z. ~---_:;:oor:--'----_=:__-___:-_..,.---

Sample Type: (Indicated bv an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashingr c, J.,.....~ 4Ck.t; lee.r Transite:

v Wallboard:Other:

Collected by: /'JJ5 Analyzed by: U£L 0

Date: 8<>10-7 Date: U ///t': /f (I/ { "

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) YGross Appearance flR/A:JL ;;Iv(color, texture) 4AA

Type of Asbestos "*'/ r:PresentPercent Asbestos U6MorphologyRefractive IndexParallel/PerpendicularDispersion ColorsParallellPerpendicularExtinction Characteristics(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)Parallel/PerpendicularBirefringence (o,l,m,h) J 'I.-zType(s) of Non-Asbestos f/C/ ~~

~Fibers Present (and %) -=rf}"Z .,Non-Asbestos Fibers Inco~~~ctiorr

IOptical Property A/-A

Type(s) & Percent of (non- 1-- (j~ Particulatefibrous) Materials PresentTotal % Asbestos 07-(sample)Corrnnents: _Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 ofl

Page 52: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ill #: 'l(fe) 1--,.(0)... -:13.Customer Name, Address ..:,.:_0;:;;..;1...;/.:::6::;,.· _..:.13..;;' ;;;.-.e_- +...;:;..::-----::--:----~---i•.....----.;__::==""--_::_-_r__-__:-Sam Ie Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susn. CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof FlashingX \t<(!)'i~ qCk-skpr Transite:

v Wallboard:Other: /\

Collected by: 613 Analyzed by: //~.0L 12

Date: 8~/o~? Date: t/ FJ/r/o9/

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) "Lf

•• A

Gross Appearance A~~;/LA .«:(color, texture) ....,'J A -/

Type of Asbestos v /' (. '# 1/Present ;,--.,...,Percent Asbestos

•...... '(

MorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallel/PerpendicularExtinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)Parallel/PerpendicularBirefringence (o,l,m,h)Type(s) of Non-Asbestos rl ~'-lose VFibers Present (and %) .nrt: A~A~ 0,~.-.Non-Asbestos Fibers ~ Incornp.fet~tinctidD.!OpticalProperty A.-. .7~.:,Type(s) & Percent of (non- ()"l Particl;t1'atefibrous) Materials PresentTotal % Asbestos 01(sample)

Comments:--:":'"__ -- __ ~--~~~-~ __~~~----~::_:_~=~~--------Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 ofl

Page 53: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

BulkAsbestosAnalysisReport EnviroMed Services,Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846: Facsimile (203)238-4243

Sample ill #: 7(+6 r,'<o:<:;«,Customer Name, Addressj, _0;:;;...;.1....:,/,::6::;,.· _..:.13..;;' ;;.....e.._- ....+-..;;;.&. •••••••---1 ---.,=- ,-- _

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilinzBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofmg Material:Valve Body Insulation: Roof FlashingX 7<.0 'Par2 ~ ker Transite:

Wallboard:Other: /J

Collected by: 6O Analyzed by: 0C#~~8"IO~? fa - )J:::o/ CT?'#Date: Date: /'

{ l

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) '1 /IGross Appearance IA~/J/?~h. LL(color, texture) /)~"'-'7..... ./ V -- /ffV >7-

Type of Asbestos r::? t' 1/PresentPercent Asbestos -:»MorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicularExtinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)ParallellPerpendicularBirefringence (o,l,m,h) /' /I -1Type(s) of Non-Asbestos 7)-1 LCe.Bt.0se L_Fibers Present (and %) ~ !I..e.." ;v. ~~/

Non-Asbestos Fibers/ InC~t~;iOl{'

Optical Property v rType(s) & Percent of (non-

Ir?Particulate

fibrous) Materials PresentTotal % Asbestos o:(sample)

Connnents:~~___.,---.,-~~--~~~~~~~~~--------~~~~~~----------------Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 54: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: T(+ () t,,{ d~- -25",Customer Name, Addressj, _O;:;....;t...:/.:::6~.....:.f3...;;, ~e_-.d-~ ~~ __ ~.....l__ .....;~::=::-__ ~_-r- _Sam le Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp. CeilingBreeching Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank: Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

»: (I-l.e.d CX!Jn1 o-, 111.,.,.1 Transite:Wallboard:Other: 1/ -

Collected by: 615 tI~Analyzed by:

Date: 8~!O-? Date: / J//r/07"/ c

Analytical Method: Polarized Light Microscopy with Dispersion Staining {

A B C

Homogeneous (y,n) '-1Gross Appearance A,;f ~. ;J/"(color, texture) ./ r/T./ V V ....,Type of Asbestos ~PresentPercent Asbestos //lMorphology v v

Refractive IndexParallellPerpendicularDispersion ColorsParallel/PerpendicularExtinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)Parallel/PerpendicularBirefringence (o.l.m.h) , .A

Type(s) of Non-Asbestos 't-uZu~ yFibers Present (and %) <:>d

Non-Asbestos Fibers Incomplete Ex~nOptical Property L~ / /7..,-

Type(s) & Percent of (non- !-2~ Particulatefibrous) Materials PresentTotal % Asbestos Cfl-

(sample)Connnents:~~ ~ ~~ ~~ __ ~~ _Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-OS71The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 55: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: T(..(.CJL":<O~~2.c..Customer Name, Address: Ot/6 {3e..n"eSam Ie Location: IncIudin Room Buildin :

Sample Type: (Indicated bv an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

)r 'Ke.",,) r: - )11"",) Transite:r Wallboard:

Other: /'\ -Collected by: dr;3 Analyzed by: () dL C'_

Date: 8"lo~? Date: V ffir; V''7-( {

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) C4Gross Appearance N ~?(color, texture)Type of Asbestos

//0 //PresentPercent Asbestos vv-MorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicularExtinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)ParallellPeroendicularBirefringence (o,l,m,h) }/<"1Type(s) of Non-Asbestos r. c~~

~Fibers Present (and %) '/ AI~

Non-Asbestos Fibers Incompl~ction.y

Optical Property .ff~••.- -v ~,d "Z.;Type(s) & Percent of (non- <fZ 2 Parficulatefibrous) Materials PresentTotal % Asbestos d?-

(sample)Connnents: ------------~~ __ ~ __ ------------------Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200SSS-O CT Lab #PH-OS71The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 56: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: Tff()L~,(O~ 77?Customer Name, Addressj, _O;;...;.1"...;.I..:.O~......:..f3...;;;' ;;;......e_. -r+-...;;;;.&:,-------- ••••...--:----..;.---,=---~-,.._---Sam le Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susn, CeilingBreechinz Insulation: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashingsr 12..RcJ r" r<1rAn O~ \V1 .0'1\ Transite:,

Wallboard:Other: /I

Collected by: d0 Analyzed by: {/ .c»AL .e:" ~V-v'

8--10-2 // /YI,/orDate: Date:( c

Analytical Method: Polarized Light Microscopy with Dispersion StainingA B C

Homogeneous (y,n) ~Gross Appearance

~~~ ~D(color, texture) ....,...,v v ""j.---

Type of Asbestos ?/Present ~-...-,Percent Asbestos (/'"MorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicular ~Extinction CharacteristicsI(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)Parallel/PerpendicularBirefringence (o,l,m,h) /_.»7Type(s) of Non-Asbestos "V-

5tll~~eFibers Present (and %) rs: ~~ -..,,-/ '--Non-Asbestos Fibers Incomplete ExtpctionOptical Property .....~J ~ .•.. '-Type( s) & Percent of (non- f i2Particulatefibrous) Materials PresentTotal % Asbestos 07

(sample)Comments: ~~~~~~----~~~~~~~~--------~~~~~~---------------Accredited for Bulk Asbestos Analysis by NVLAP Lab Code tlJ008S8-o CT Lab #PH-oS71The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev. 4-21-09-lJC

Page 1 of 1

Page 57: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846 : Facsimile (203)238-4243

Sample ID #: 1(+()?-,{O~-:<8,Customer Name, Addressj, ---.,;O:::;..:.t.~/~6::"'---l.f3.;;:'::;.....e~~;.L.. ---:~ __ """?"'r-...l.... __ ~-=~_--::'_-r- _

Sample TVJ)e: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp, CeilingBreechinz Insulation: ~ Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: r Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: /

Collected by: 60 Analyzed by: V~Date: 8~/o-? Date: ~ 01"/0 7

IAnalytical Method: Polarized Light Microscopy with Dispersion Staining

A B C

Homogeneous (y,n) ~Gross Appearance

~ "": ,Ara. ft:,~

(colo~ texture)Type of Asbestos

v

Present .-?

Percent Asbestos (/ (-MorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicularExtinction Characteristics(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)Parallel/PerpendicularBirefringence (o,l,m,h)Type(s) of Non-Asbestos ::JZ CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

I Optical PropertyType(s) & Percent of (non- 7'1- Z Particulatefibrous) Materials PresentTotal % Asbestos cJ6(sample)Comments: -----~~ __ = ---------Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 ofl

Page 58: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846: Facsimile (203)238-4243

SampleID#: 1(+()?,.(d~~J<7:Customer Name, Address: Or-tO 0en"'e

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreeching Insulation: x:: Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other: I

Collected by: 6~ Analyzed by: rM-RDate: 8~/o~? Date: fI f/lr/o~

/Analytical Method: Polarized Light Microscopy with Dispersion Staining

A B C

Homogeneous (y,n) 7Gross Appearance KJ/~. ( u..J .I /

(color, texture) ~ / ... ;:;~~Type of AsbestosPresentPercent Asbestos /j cMorphology ~

Refractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicularExtinction Characteristics(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)ParallellPerpendicularBirefringence (o,l,m,h)Type(s) of Non-Asbestos 2t! CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

IOptical PropertyType( s) & Percent of (non- '7r z Particulatefibrous) Materials PresentTotal % Asbestos O?(sample)Conunents:~~ ~ ~~ __ ~~ _Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-0 CT Lab #PH-0571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc

Page 1 of 1

Page 59: 2 proposals: 1) for the design/build of a steam boiler · 2009-09-11 · Legal Notice Request for Proposals Design/Build Steam Boiler Replacement Energy Management System Installation

Bulk Asbestos Analysis Report EnviroMed Services, Inc.470 Murdock Ave., Box 13, Meriden, CT 06450Phone (203)238-4846; Facsimile (203)238-4243

Sample ID #: I(f.o?-:<(J~....30Customer Name, Addressj, _O;:;;",,:,'t....:.'~6~......:..f3..;;:· :;,,-.e--rT-..;;;:.&,-- __ -:--:-- __ :>"'Ir---l __ .....;,--::~--_=_-r_---Sam Ie Location: Includin Room Buildin :

Sample Type: (Indicated by an "X" in the applicable column below)THERMAL SYSTEMS INSULATION: SURFACING MATERIAL: MISCELLANEOUS MATERIAL:Boiler Insulation: Spray-on Fireproofing: Susp.CeilingBreeching Insulation: )( / Acoustical Plaster: Fixed Ceiling Tile:Pipe Insulation: Ceiling Plaster: Glue Dots:Pipe Joint Insulation: Wall Plaster: Vinyl Floor Tile:Duct Insulation: Wallboard Compound: Flooring Mastic:Tank Insulation: Linoleum:Flexible Duct Connector: Roofing Material:Valve Body Insulation: Roof Flashing

Transite:Wallboard:Other:

Collected by: cf~ Analyzed by: /J idL d

~/C>- YDate. 8 ? Date. __ ~t7'---'6:..J£d?--r-y:_O-+r-Analytical Method: Polarized Light Microscopy with Dispersion Staining

A B C

Homogeneous (y,n) '-1Gross Appearance

~ Jl./~A_ \ lfl- o £77:-/(color, texture) ~

Type of AsbestosPresentPercent Asbestos //7MorphologyRefractive IndexParallellPerpendicularDispersion ColorsParallellPerpendicularExtinction Characteristics(parallel, oblique, wavy)Sign of Elongation (+1-)Pleochroism (color)ParallellPerpendicularBirefringence (o,l,m,h)Type(s) of Non-Asbestos f'? '1...CelluloseFibers Present (and %)Non-Asbestos Fibers Incomplete Extinction

! Optical PropertyType(s) & Percent of (non- 7rz Particulatefibrous) Materials PresentTotal % Asbestos 01(sample)

Comments:_~-:-~ ......•........_~~~ ~~~=~~ _Accredited for Bulk Asbestos Analysis by NVLAP Lab Code #200858-6 CT Lab #PH-6571The results of this analysis were obtained by a qualified individual using approved methodology, and relate only to the itemstested. This report cannot be used by the customer to claim product endorsement by the National Voluntary LaboratoryAccreditation Program (NVLAP) or any other agency of the U.S. Government. Rev.4-21-09-uc